Control system for automatically controlling coal unloading

By using laser scanners in the coal unloading system to monitor the distribution of coal seams in real time and dynamically adjust the path and speed of coal unloading trucks, the problems of low coal unloading efficiency and safety hazards in the existing technology are solved, and efficient and safe coal unloading operations are achieved.

CN118913276AActive Publication Date: 2024-11-08SHANDONG SHENLI HOISTING MASCH CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202410955356.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-08
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

The existing coal unloading technology lacks real-time monitoring of coal seam height based on laser scanning and dynamically adjusting the path and speed of coal unloading trucks, resulting in low coal unloading efficiency, posing safety hazards and environmental pollution problems.

Method used

Design an automatic control coal unloading system, including layout modules, planning modules, monitoring modules and path correction modules, use laser scanners to monitor coal seams distribution in real time, dynamically adjust the path and speed of coal unloading trucks, avoid collisions, and optimize the coal unloading path.

Benefits of technology

It improves coal unloading efficiency and safety, reduces energy waste and environmental pollution, ensures that the coal unloading trolley always works in the appropriate coal seam thickness position, matches the best coal unloading path, and ensures the system is efficient and stable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118913276A_ABST
    Figure CN118913276A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of coal unloading, in particular to a control system for automatically controlling coal unloading. The system comprises a layout module, a planning module, a monitoring module, a path correction module and a collision avoidance module. According to the method, the height change range of the whole coal seam can be covered by setting the mounting position of the laser scanner, the coal seam distribution diagram is generated according to the scanning result of the laser scanner, scanning data are processed, coal storage height data are reserved, the accuracy of the monitoring data of the laser scanner is ensured, and real-time data analysis is carried out, so that the coal seam distribution diagram is obtained. The optimal path planning of the coal unloading trolley is generated, the working path and speed of the coal unloading trolley are dynamically adjusted, the coal unloading trolley is prevented from running under the condition that no coal exists, energy waste is reduced, efficient coal unloading is ensured, and the trolley is ensured to unload coal at the position with the proper coal seam thickness all the time by calculating the storage and conveying capacity of each coal unloading pit. The optimal coal unloading path is matched, and efficient and stable operation of the system is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal unloading, and in particular to a control system for automatically controlling coal unloading. Background Art

[0002] In the traditional coal unloading process, manual operation or semi-automatic equipment is often used for coal unloading. This method has some obvious disadvantages: low efficiency. The manual operation coal unloading method requires a lot of human resources and has low efficiency. Although semi-automatic equipment has improved efficiency to a certain extent, it still requires manual intervention and cannot achieve fully automated operation. Safety hazards. During manual coal unloading, operators need to come into close contact with coal and coal unloading equipment, which poses great safety risks, such as collapse and mechanical injuries. The environment is harsh, and coal dust, noise, etc. have adverse effects on workers' health. Environmental pollution. Traditional coal unloading methods generate a lot of coal dust, causing air pollution and affecting the surrounding environment. Coal may scatter during the unloading process, causing ground pollution. High cost. Due to the need for a large number of manual participants, the labor cost is high. Equipment maintenance and energy consumption costs are also high. Therefore, there is an urgent need for a fully automatic control system for coal pits based on laser scanning and automatic control technology to improve coal unloading efficiency and safety and reduce environmental pollution and costs.

[0003] The patent document CN116281235A discloses an automatic control system for a coal pit unloading device, which includes an execution unit, a processing unit, a multi-party monitoring unit, and a server; the multi-party monitoring unit is used to obtain the operating status of the unloading device and related information of the transportation equipment; the server receives the starting position of the transportation equipment and the working position of the unloading device, processes and feeds back the driving and operating information of the transportation equipment to the processing unit. It can be seen that the existing coal unloading technology lacks a method based on laser scanning to monitor the coal seam height in real time and adjust the path and speed of the coal unloading trolley in time, making it difficult to achieve the optimal path planning and real-time operation adjustment of the coal unloading trolley. Summary of the invention

[0004] To this end, the present invention provides a control system for automatically controlling coal unloading, so as to overcome the problem in the prior art that the path and speed of the coal unloading trolley cannot be dynamically adjusted, resulting in low coal unloading efficiency.

[0005] To achieve the above object, the present invention provides a control system for automatically controlling coal unloading, comprising:

[0006] A deployment module is used to determine a number of monitoring areas according to the actual scope of the affected coal pit, and a laser scanner is set in each of the monitoring areas;

[0007] A planning module, used to determine the initial coal unloading position and generate the initial coal unloading path according to the coal unloading operation requirements and the initial coal seam distribution map, and determine the standard operation area according to the initial coal unloading position;

[0008] A monitoring module, used for real-time monitoring of the coal unloading process, generating a real-time scanning image corresponding to the starting coal unloading position and a current coal seam distribution map within the standard operation area according to the scanning result of the laser scanner;

[0009] A path correction module, used to determine the coal unloading position to be selected according to the current coal seam distribution map, and to correct the initial coal unloading path according to the coal unloading position to be selected to generate an intermediate coal unloading path;

[0010] The collision avoidance module is used to correct the intermediate coal unloading path according to the safety range of the coal unloading vehicle to obtain the target coal unloading path.

[0011] Furthermore, the planning module includes a path planning unit and an operation area determination unit, wherein:

[0012] The path planning unit is used to determine the initial coal unloading position and generate the initial coal unloading path according to the coal unloading operation requirements and the initial coal seam distribution map;

[0013] The operation area determination unit is used to determine the standard operation area according to the starting coal unloading position and the coal unloading operation requirements.

[0014] Furthermore, the path planning unit includes an acquisition subunit, a determination subunit and a path generation subunit, wherein:

[0015] The acquisition subunit is used to acquire the coal unloading position in the initial coal seam distribution map where the real-time coal seam height falls within the second standard coal seam height range;

[0016] The determination subunit is used to calculate the coal receiving height corresponding to each coal unloading position according to the initial coal seam distribution map, and select the coal unloading position with the largest coal receiving height as the starting coal unloading position;

[0017] The path generation subunit sorts the coal unloading positions in the order of real-time coal seam height from low to high, generates an initial coal unloading sequence number according to the sorting result, and generates an initial coal unloading path according to the starting coal unloading position and the initial coal unloading sequence number;

[0018] The path generation subunit uses the initial coal unloading position as the origin and uses the coal unloading positions corresponding to the initial coal unloading sequence numbers in ascending order as waypoints to generate the initial coal unloading path.

[0019] Furthermore, the monitoring module includes an acquisition unit, a thickness analysis unit, a coal unloading state analysis unit and a path correction unit, wherein:

[0020] The acquisition unit is used to acquire the real-time scanning image and the real-time coal seam height corresponding to the starting coal unloading position;

[0021] The thickness analysis unit is used to analyze the real-time scanning image and determine whether the thickness of the coal seam in the coal pit is uniform according to the analysis result;

[0022] The coal unloading state analysis unit is used to adjust the real-time unloading speed to the corrected unloading speed when it is determined that the coal seam thickness is uneven, and to monitor the unloading state in real time when it is determined that the coal seam thickness is uniform;

[0023] The path correction unit is used to correct the initial coal unloading path into an intermediate coal unloading path according to the current coal seam distribution map.

[0024] Furthermore, the acquisition unit includes a data acquisition subunit and a height calculation subunit, wherein

[0025] The data acquisition subunit is used to record the coal pit corresponding to the initial coal unloading position as the coal pit to be monitored, and collect the coal seam height image of the coal pit to be monitored;

[0026] The height calculation subunit is used to calculate the maximum height deviation value and the real-time coal seam height according to the coal seam height imaging.

[0027] Furthermore, the coal unloading state analysis unit includes a determination subunit, a comparison subunit and a control subunit, wherein:

[0028] The determination subunit is used to determine the real-time coal seam height according to the second standard coal seam height range;

[0029] The comparison subunit is used to compare the real-time coal seam height with the second standard coal seam height range when the real-time coal seam height is not within the second standard coal seam height range, so as to analyze the running state of the trolley;

[0030] The control subunit is used to output a stop coal unloading instruction when the real-time coal seam height is greater than the maximum value of the second standard coal seam height range.

[0031] Furthermore, the path correction unit includes a data acquisition subunit, a data processing subunit, a standard value calculation subunit and a data analysis subunit, wherein:

[0032] The data acquisition subunit is used to obtain the current coal seam distribution map of the standard monitoring area when the real-time coal seam height is greater than the maximum value of the second standard coal seam height range;

[0033] The data processing subunit is used to obtain the real-time coal seam height at a position adjacent to the initial coal unloading position according to the current coal seam distribution map;

[0034] The standard value calculation subunit calculates the first standard coal seam height according to the real-time coal unloading demand intensity;

[0035] The data analysis subunit is used to correct the initial coal unloading path according to the comparison result between the real-time coal seam height and the first standard coal seam height.

[0036] Furthermore, the height calculation subunit divides the coal seam height imaging into several simulated coal seam units with vertical lines, calculates the average coal seam height of each simulated coal seam unit and records it as the simulated coal seam height, adds up the simulated coal seam heights and divides it by the number of simulated coal seam units to obtain the real-time coal seam height of the monitored coal pit, subtracts the real-time coal seam height from each simulated coal seam height to obtain several coal seam height differences, takes the absolute value of each coal seam height difference, and obtains the largest value among the absolute values ​​as the maximum height deviation value.

[0037] Furthermore, the collision avoidance module includes a range calculation unit and a route control unit, wherein:

[0038] The range calculation unit is used to calculate the safety range according to the actual distance between the coal unloading trolley and other coal unloading trolleys;

[0039] The route control unit is used to control the coal unloading vehicle to travel outside the safety range.

[0040] Furthermore, the path correction unit obtains the number of coal unloading positions to be selected and records it as the real-time correction number, and corrects the remaining actual coal unloading positions in the initial coal unloading path to the coal unloading positions to be selected by the real-time correction number to obtain the intermediate coal unloading positions.

[0041] Compared with the prior art, the beneficial effects of the present invention lie in that, by setting the installation position of the laser scanner according to the actual size of the affected coal pit area, it is ensured that the height variation range of the entire coal seam can be covered; by generating a coal seam distribution map based on the scanning results of the laser scanner, the scanned data is processed, the coal storage height data is retained, and other data is deleted, so as to improve the accuracy of the dynamic scanning coal storage height data and ensure the accuracy of the laser scanner monitoring data; by analyzing real-time data, the optimal path planning of the coal unloading trolley is generated, the working path and speed of the coal unloading trolley are dynamically adjusted to avoid the coal unloading trolley running without coal, reduce energy waste, ensure efficient coal unloading, and by calculating the storage and transportation capacity of each coal unloading pit, ensure that the trolley always unloads coal at a position with appropriate coal seam thickness, match the best coal unloading path, and ensure efficient and stable operation of the system.

[0042] Furthermore, by dividing the coal seam height imaging into several simulated coal seam units, that is, simulating the coal seam height into segments, the average height of each area is calculated as the simulated coal seam height of each simulated coal seam unit, and the average value of each simulated coal seam height is calculated as the real-time coal seam height. By comparing the real-time coal seam height with the simulated coal seam height, the height difference is calculated, and the largest height difference is selected as the maximum height deviation value to ensure accurate calculation.

[0043] Furthermore, by setting up a collision avoidance module, it is ensured that the coal unloading trolley avoids unstable or dangerous areas during path planning, thereby maintaining operation stability and improving operation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 This is a connection diagram of a control system for automatically controlling coal unloading according to an embodiment of the present invention;

[0045] Figure 2 A top view of a laser scanner deployed in a coal pit according to an embodiment of the present invention;

[0046] Figure 3 This is a connection diagram of a monitoring module according to an embodiment of the present invention;

[0047] Figure 4 Schematic diagram of the connection of the path correction unit according to an embodiment of the present invention. DETAILED DESCRIPTION

[0048] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0049] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0050] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0051] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0052] See also Figure 1 , Figure 2 and Figure 4 As shown, Figure 1This is a connection diagram of a control system for automatically controlling coal unloading according to an embodiment of the present invention. Figure 2 This is a top view of a laser scanner deployed in a coal pit according to an embodiment of the present invention. Figure 4 The figure is a connection diagram of a path correction unit according to an embodiment of the present invention. The present invention provides a control system for automatically controlling coal unloading, comprising:

[0053] A deployment module is used to determine a number of monitoring areas according to the actual scope of the affected coal pit, and a laser scanner is set in each of the monitoring areas;

[0054] A planning module, used to determine the initial coal unloading position and generate the initial coal unloading path according to the coal unloading operation requirements and the initial coal seam distribution map, and determine the standard operation area according to the initial coal unloading position;

[0055] A monitoring module, which is connected to the layout module and is used to monitor the coal unloading process in real time, and to generate a real-time scanning image corresponding to the starting coal unloading position and a current coal seam distribution map in the standard operation area according to the scanning result of the laser scanner;

[0056] a path correction module, which is connected to the monitoring module and is used to determine the coal unloading position to be selected according to the current coal seam distribution map, and to correct the initial coal unloading path according to the coal unloading position to be selected to generate an intermediate coal unloading path;

[0057] A collision avoidance module, which is connected to the path correction module and is used to correct the intermediate coal unloading path according to the safety range of the coal unloading vehicle to obtain a target coal unloading path;

[0058] The coal unloading operation module is used to adjust the driving path and speed according to the received instructions.

[0059] By setting the installation position of the laser scanner according to the actual size of the affected coal pit area, it is ensured that the entire coal seam height variation range can be covered. By generating a coal seam distribution map based on the scanning results of the laser scanner, the scanned data is processed, the coal storage height data is retained, and other data is deleted to improve the accuracy of the dynamic scanning coal storage height data and ensure the accuracy of the laser scanner monitoring data. By analyzing real-time data, the optimal path planning of the coal unloading trolley is generated, and the working path and speed of the coal unloading trolley are dynamically adjusted to avoid the coal unloading trolley running without coal, reduce energy waste, and ensure efficient coal unloading. By calculating the storage and transportation capacity of each coal unloading pit, it is ensured that the trolley always unloads coal at a position with appropriate coal seam thickness, matching the best coal unloading path, and ensuring efficient and stable operation of the system.

[0060] The coal unloading trolley in this embodiment is equipped with a high-precision positioning and navigation system to ensure that it travels along the path generated by the planning module. The control system of the coal unloading trolley maintains communication with each module and receives adjustment instructions in real time.

[0061] Specifically, the planning module includes a path planning unit and an operation area determination unit, wherein:

[0062] The path planning unit is used to determine the initial coal unloading position and generate the initial coal unloading path according to the coal unloading operation requirements and the initial coal seam distribution map;

[0063] The operation area determination unit is used to determine the standard operation area according to the starting coal unloading position and the coal unloading operation requirements;

[0064] The standard operation area represents a set of points whose distance from all coal unloading positions to the starting coal unloading position is less than or equal to a first preset radius;

[0065] Bi={x:d(x,Qi)≤R}, Bi represents the standard operating area, Qi represents the starting coal unloading position, d represents the actual distance from any other coal unloading position to the starting coal unloading position, and R represents the first preset radius.

[0066] In this embodiment, the first preset radius is the smaller distance that the coal unloading trolley moves when operating. It is affected by the coal unloading amount of the coal unloading trolley and the arrangement of each coal pit, and can be set to 10m. The standard operating area represents a smaller operating area. Within this area, the moving distance of the coal unloading trolley is not large, so that the coal unloading trolley can quickly perform coal unloading operations.

[0067] The initial coal seam distribution map in this embodiment represents the coal seam data collected before the coal unloading operation begins, and the coal unloading position represents the designated position for unloading coal from the coal unloading trolley, and the coal is unloaded safely and accurately according to the operation requirements.

[0068] First, plan the operation route of the coal unloading trolley according to the actual capacity of each coal receiving pit, and give priority to unloading locations with large capacity to ensure efficient coal unloading.

[0069] Specifically, the path planning unit includes an acquisition subunit, a determination subunit and a path generation subunit, wherein:

[0070] The acquisition subunit is used to acquire the coal unloading position in the initial coal seam distribution map where the real-time coal seam height falls within the second standard coal seam height range;

[0071] The determination subunit is used to calculate the coal receiving height corresponding to each coal unloading position according to the initial coal seam distribution map, and select the coal unloading position with the largest coal receiving height as the starting coal unloading position;

[0072] The path generation subunit sorts the coal unloading positions in the order of real-time coal seam height from low to high, generates an initial coal unloading sequence number according to the sorting result, and generates an initial coal unloading path according to the starting coal unloading position and the initial coal unloading sequence number;

[0073] The path generation subunit uses the initial coal unloading position as the origin and uses the coal unloading positions corresponding to the initial coal unloading sequence numbers in ascending order as waypoints to generate the initial coal unloading path.

[0074] In this embodiment, the real-time coal seam height represents the vertical distance from the bottom of the coal unloading pit to the top of the coal seam, and the coal receiving height represents the vertical distance from the top of the coal seam to the top of the coal unloading pit. The starting coal unloading position is numbered 0, and the initial coal unloading sequence number increases sequentially from 1, for example 1, 2, 3...

[0075] See also Figure 3 As shown, it is a connection diagram of the monitoring module according to an embodiment of the present invention;

[0076] Specifically, the monitoring module includes an acquisition unit, a thickness analysis unit, a coal unloading state analysis unit and a path correction unit, wherein:

[0077] The acquisition unit is used to acquire a real-time scanning image corresponding to the starting coal unloading position;

[0078] The thickness analysis unit is used to analyze the real-time scanning image and determine whether the thickness of the coal seam in the coal pit is uniform according to the analysis result;

[0079] The coal unloading state analysis unit is used to adjust the real-time unloading speed to a corrected unloading speed when it is determined that the coal seam thickness is uneven;

[0080] The path correction unit is used to correct the initial coal unloading path into an intermediate coal unloading path according to the current coal seam distribution map.

[0081] Specifically, the acquisition unit includes a data acquisition subunit and a height calculation subunit, wherein

[0082] The data acquisition subunit is used to record the coal pit corresponding to the initial coal unloading position as the coal pit to be monitored, and collect the coal seam height image of the coal pit to be monitored;

[0083] The height calculation subunit is used to calculate the maximum height deviation value according to the coal seam height imaging;

[0084] Among them, the height calculation subunit uses vertical lines to divide the coal seam height imaging into several simulated coal seam units, and calculates the average coal seam height of each simulated coal seam unit as the simulated coal seam height, adds up the simulated coal seam heights and divides them by the number of simulated coal seam units to obtain the real-time coal seam height of the coal pit to be monitored, subtracts the real-time coal seam height from each simulated coal seam height to obtain several coal seam height differences, takes the absolute value of each coal seam height difference, and obtains the largest value among the absolute values ​​as the maximum height deviation value.

[0085] The coal seam height imaging is divided into several simulated coal seam units, that is, the coal seam height is simulated and segmented, and the average height of each area is calculated as the simulated coal seam height of each simulated coal seam unit, and the average value of each simulated coal seam height is calculated as the real-time coal seam height. By comparing the real-time coal seam height with the simulated coal seam height, the height difference is calculated, and the largest height difference is selected as the maximum height deviation value to ensure accurate calculation.

[0086] Specifically, the thickness analysis unit obtains the maximum height deviation value according to the real-time scanning image, and determines the maximum height deviation value according to the standard height deviation value.

[0087] If the maximum height deviation value is less than or equal to the standard height deviation value, the coal seam thickness is determined to be uniform, and the real-time coal seam height is obtained;

[0088] If the maximum height deviation value is greater than the standard height deviation value, the thickness is uneven, and the coal unloading state analysis unit and the control unit adjust the real-time unloading speed of the coal unloading trolley in a small range to adjust it to the corrected unloading speed;

[0089] Among them, Vs'=Vs×[1+(ΔHm-ΔHs) / ΔHm], Vs' is the corrected unloading speed, Vs is the real-time unloading speed, ΔHm is the maximum height deviation value, and ΔHs is the standard height deviation value.

[0090] The standard height deviation value in this embodiment represents the allowable fluctuation difference of the coal seam thickness in the real-time scanning image. The coal seam thickness is the vertical distance from the bottom of the coal unloading pit to the top of the coal seam, that is, the actual vertical thickness of the coal at a specific point. The maximum height deviation value is within the standard height deviation value range, indicating that the coal seam thickness is uniform. Generally, the standard height deviation value range is set between 0.3 meters and 0.8 meters, and is adjusted according to the specifications of the actual coal unloading pit. If it is determined that the maximum height deviation value is greater than the standard height deviation value, it means that the coal seam thickness is uneven. This is because the coal unloading speed is slow, causing coal to accumulate in some areas, while insufficient coal unloading in other areas results in uneven thickness. In this case, the coal unloading speed needs to be adaptively increased.

[0091] Specifically, when it is determined that the maximum height deviation value is less than or equal to the standard height deviation value, the coal unloading state analysis unit compares the real-time coal seam height with the second standard coal seam height range.

[0092] If the real-time coal seam height is not within the second standard coal seam height range, the real-time coal seam height is compared with the second standard coal seam height range to analyze the trolley operation status;

[0093] If the real-time coal seam height is within the second standard coal seam height range, the trolley operation status is determined to be normal and no adjustment is required.

[0094] Specifically, the real-time coal seam height is compared with the second standard coal seam height range.

[0095] If the real-time coal seam height is less than the minimum value of the second standard coal seam height range, an on-site inspection is carried out;

[0096] If the real-time coal seam height is greater than the maximum value of the second standard coal seam height range, stop unloading coal, calculate the real-time coal unloading demand intensity, analyze the current coal seam distribution map, and determine whether to correct the initial unloading path based on the analysis results to obtain the intermediate unloading path.

[0097] The second standard coal seam height set in this embodiment represents the coal seam height corresponding to the maximum capacity of the coal pit, which is theoretically close to the vertical distance from the bottom to the top of the coal pit. The second standard coal seam height and the error height constitute the second standard coal seam height range. The error height represents the error value of the detection data caused by the unevenness of the actual material inside the coal pit. Generally, it is set between 1 cm and 5 cm, and is selected according to the actual specifications of the coal pit and the quality of coal.

[0098] Specifically, the analysis of the current coal seam distribution map includes:

[0099] Obtain current coal seam distribution map of standard monitoring area;

[0100] Acquire the real-time coal seam height at a position adjacent to the initial coal unloading position according to the current coal seam distribution map;

[0101] Calculate the first standard coal seam height according to the real-time coal unloading demand intensity;

[0102] Compare the first standard coal seam height with the real-time coal seam height;

[0103] If the real-time coal seam height is less than or equal to the first standard coal seam height, the corresponding coal pit position is recorded as the coal unloading position to be selected, so as to correct the initial coal unloading path;

[0104] If the real-time coal seam height is greater than the first standard coal seam height, the real-time coal seam height corresponding to the next adjacent coal pit position is compared until the determination of all coal pit positions in the standard monitoring area is completed. If there is a real-time coal seam height less than or equal to the first standard coal seam height, the corresponding coal pit position is recorded as the coal unloading position to be selected. If the real-time coal seam height is still determined to be greater than the first standard coal seam height, the next coal unloading position is determined according to the initial coal unloading path.

[0105] The real-time coal unloading demand intensity in this embodiment represents the actual coal loading capacity in the coal unloading trolley, in volume. The first standard coal seam height represents the actual vertical distance of coal from the bottom to the top in the coal pit when the coal pit accommodates the actual coal loading capacity. The real-time coal unloading demand intensity is obtained by subtracting the real-time coal unloading demand intensity from the actual height of the coal unloading pit and dividing it by the cross-sectional area of ​​the coal pit.

[0106] By analyzing the coal unloading pits near the current transport position of the coal unloading car, it is determined whether to optimize the coal unloading route according to the actual capacity of the coal unloading pits, that is, to give priority to transporting the coal to the coal unloading pits that are closer for unloading, thereby improving the coal unloading efficiency.

[0107] Specifically, the corrections to the initial coal unloading path include:

[0108] The number of coal unloading positions to be selected is obtained and recorded as the real-time correction number, and the remaining actual coal unloading positions in the initial coal unloading path are corrected to the coal unloading positions to be selected by the real-time correction number.

[0109] Specifically, the collision avoidance module corrects the intermediate coal unloading path according to the safety range of the coal unloading trolley to avoid collision;

[0110] Wherein, Di={x:d(x,Oi)≤R'}, Di represents the safety range, Oi represents the coal unloading car, d represents the actual distance between the coal unloading car and other coal unloading cars, and R' represents the second preset radius;

[0111] Among them, the second preset radius represents the minimum safe distance between the coal unloading trolley and other trolleys or obstacles during operation, so that the coal unloading trolley always operates within a safe range. The second preset radius is set between 0.2 meters and 0.5 meters, and is adjusted according to the size, characteristics and number of the actual coal unloading trolley or obstacles.

[0112] When a possible collision risk is identified, the collision avoidance module will correct the middle coal unloading path according to the safety range of the coal unloading trolley. By adjusting the path, the coal unloading trolley can avoid potential collision obstacles or other vehicles to ensure safe passage. By effectively keeping the route of the coal unloading trolley outside the safety range and ensuring the safety and smooth progress of the coal unloading process, the collision risk can be reduced and the overall safety and efficiency of the coal unloading system can be improved.

[0113] In this embodiment, a certain number (standard) of 3D scanning radars are installed above the receiving coal pit, and 3D scanning is performed at a certain period. The scanning results are transmitted to the computer center in real time, and the coal seam height distribution in the receiving coal pit is analyzed by software to determine the X / Y / Z values ​​of the high and low points. The computer software sorts the data of the high and low points, and controls the coal unloading trolley to work automatically according to the control strategy through the PLC system; in the initial stage, the coal unloading trolley performs full-range work, and records the position information and operating current information in real time to estimate the coal seam status at each position point. After working several times, it can perform small-scale coal unloading work according to the real-time coal seam height to ensure the working efficiency of the coal unloading trolley, avoid empty running as much as possible, and improve the efficiency of coal unloading.

[0114] Specifically, according to the situation of the coal yard, several fixed suspended laser scanners are installed at designated positions on the top of the coal pit. The two coal pits are both 250 meters long and 7 meters wide. The coal pits are divided into 30 7m×7m direction bins. A total of 12 fixed laser 3D radars are installed, and the laser 3D radar is installed directly above the coal pile. The laser 3D radar uses an outdoor enhanced laser scanner, which has a scanning radius of more than 50 meters for the coal pile. 12 scanners can achieve full coverage of the coal pile in the yard.

[0115] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

[0116] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A control system for automatic coal unloading, characterized in that: include, A deployment module is used to determine a number of monitoring areas according to the actual scope of the affected coal pit, and a laser scanner is set in each of the monitoring areas; A planning module, used to determine the initial coal unloading position and generate the initial coal unloading path according to the coal unloading operation requirements and the initial coal seam distribution map, and determine the standard operation area according to the initial coal unloading position; A monitoring module, used for real-time monitoring of the coal unloading process, generating a real-time scanning image corresponding to the starting coal unloading position and a current coal seam distribution map within the standard operation area according to the scanning result of the laser scanner; A path correction module, used to determine the coal unloading position to be selected according to the current coal seam distribution map, and to correct the initial coal unloading path according to the coal unloading position to be selected to generate an intermediate coal unloading path; The collision avoidance module is used to correct the intermediate coal unloading path according to the safety range of the coal unloading vehicle to obtain the target coal unloading path.

2. The control system for automatic coal unloading according to claim 1, characterized in that: The planning module includes a path planning unit and an operation area determination unit, wherein: The path planning unit is used to determine the initial coal unloading position and generate the initial coal unloading path according to the coal unloading operation requirements and the initial coal seam distribution map; The operation area determination unit is used to determine the standard operation area according to the starting coal unloading position and the coal unloading operation requirements.

3. The automatic control system for coal unloading according to claim 2 is characterized in that: The path planning unit includes an acquisition subunit, a determination subunit and a path generation subunit, wherein: The acquisition subunit is used to acquire the coal unloading position in the initial coal seam distribution map where the real-time coal seam height falls within the second standard coal seam height range; The determination subunit is used to calculate the coal receiving height corresponding to each coal unloading position according to the initial coal seam distribution map, and select the coal unloading position with the largest coal receiving height as the starting coal unloading position; The path generation subunit sorts the coal unloading positions in the order of real-time coal seam height from low to high, generates an initial coal unloading sequence number according to the sorting result, and generates an initial coal unloading path according to the starting coal unloading position and the initial coal unloading sequence number; The path generation subunit uses the initial coal unloading position as the origin and uses the coal unloading positions corresponding to the initial coal unloading sequence numbers in ascending order as waypoints to generate the initial coal unloading path.

4. The control system for automatic coal unloading according to claim 1, characterized in that: The monitoring module includes an acquisition unit, a thickness analysis unit, a coal unloading state analysis unit and a path correction unit, wherein: The acquisition unit is used to acquire the real-time scanning image and the real-time coal seam height corresponding to the starting coal unloading position; The thickness analysis unit is used to analyze the real-time scanning image and determine whether the thickness of the coal seam in the coal pit is uniform according to the analysis result; The coal unloading state analysis unit is used to adjust the real-time unloading speed to the corrected unloading speed when it is determined that the coal seam thickness is uneven, and to monitor the unloading state in real time when it is determined that the coal seam thickness is uniform; The path correction unit is used to correct the initial coal unloading path into an intermediate coal unloading path according to the current coal seam distribution map.

5. The control system for automatic coal unloading according to claim 4, characterized in that: The acquisition unit includes a data acquisition subunit and a height calculation subunit, wherein The data acquisition subunit is used to record the coal pit corresponding to the initial coal unloading position as the coal pit to be monitored, and collect the coal seam height image of the coal pit to be monitored; The height calculation subunit is used to calculate the maximum height deviation value and the real-time coal seam height according to the coal seam height imaging.

6. The control system for automatic coal unloading according to claim 5, characterized in that: The coal unloading state analysis unit includes a determination subunit, a comparison subunit and a control subunit, wherein: The determination subunit is used to determine the real-time coal seam height according to the second standard coal seam height range; The comparison subunit is used to compare the real-time coal seam height with the second standard coal seam height range when the real-time coal seam height is not within the second standard coal seam height range, so as to analyze the running state of the trolley; The control subunit is used to output a stop coal unloading instruction when the real-time coal seam height is greater than the maximum value of the second standard coal seam height range.

7. The control system for automatic coal unloading according to claim 6, characterized in that: The path correction unit includes a data acquisition subunit, a data processing subunit, a standard value calculation subunit and a data analysis subunit, wherein: The data acquisition subunit is used to obtain the current coal seam distribution map of the standard monitoring area when the real-time coal seam height is greater than the maximum value of the second standard coal seam height range; The data processing subunit is used to obtain the real-time coal seam height at a position adjacent to the initial coal unloading position according to the current coal seam distribution map; The standard value calculation subunit calculates the first standard coal seam height according to the real-time coal unloading demand intensity; The data analysis subunit is used to correct the initial coal unloading path according to the comparison result between the real-time coal seam height and the first standard coal seam height.

8. The control system for automatic coal unloading according to claim 5, characterized in that: The height calculation subunit divides the coal seam height imaging into several simulated coal seam units with vertical lines, calculates the average coal seam height of each simulated coal seam unit and records it as the simulated coal seam height, adds up the simulated coal seam heights and divides it by the number of simulated coal seam units to obtain the real-time coal seam height of the monitored coal pit, subtracts the real-time coal seam height from each simulated coal seam height to obtain several coal seam height differences, takes the absolute value of each coal seam height difference, and obtains the largest value among the absolute values ​​as the maximum height deviation value.

9. The control system for automatic coal unloading according to claim 1, characterized in that: The collision avoidance module includes a range calculation unit and a route control unit, wherein: The range calculation unit is used to calculate the safety range according to the actual distance between the coal unloading trolley and other coal unloading trolleys; The route control unit is used to control the coal unloading vehicle to travel outside the safety range.

10. The control system for automatic coal unloading according to claim 4, characterized in that: The path correction unit obtains the number of coal unloading positions to be selected and records it as the real-time correction number, and corrects the remaining actual coal unloading positions in the initial coal unloading path to the coal unloading positions to be selected by the real-time correction number to obtain the intermediate coal unloading positions.

Citation Information

Patent Citations

  • Automatic control system for discharging device of coal receiving pit

    CN116281235A

  • Generating system and method for high-precision three-dimensional navigation map of fully mechanized mining face

    CN110118550A

  • Material taking path planning method and system for bucket wheel machine

    CN115716603A

  • Coal mine unmanned mining automatic positioning system based on 5G network

    CN116437437A

  • Coal unloading ditch coal storage measuring method and system based on dynamic laser scanning

    CN117629066A