Geological sampling and surveying equipment for constructional engineering

By using sealing plates and vibration mechanisms in geological survey equipment to achieve customized sampling depth, the problem that traditional equipment cannot meet depth sampling and data errors is solved, and the accuracy of geological survey and the durability of the equipment are improved.

CN118913770APending Publication Date: 2024-11-08FUJIAN TIMES YUANCHUANG ENG DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411312149.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Traditional geological surveying equipment cannot meet the need to sample geology at a certain depth, and soil depth data may be misaligned during sampling, resulting in survey data errors.

Method used

A geological sampling and surveying equipment for construction engineering was designed, using a sealing structure and a vibration mechanism to seal the non-demand depth of soil at one end of the sampling cylinder through the sealing plate, and custom sampling depth is achieved using a shaker and meshing gear, and through impact blocks and spring structures Drive the sampling strips to vibrate, separate the sample from the sampling barrel, and avoid repeated operations and structural sealing problems.

Benefits of technology

It realizes customized sampling depth, improves the accuracy of geological surveys, avoids serious damage to geology, extends the service life of the equipment, and improves the accuracy of sampling data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118913770A_ABST
    Figure CN118913770A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of geological survey, and discloses constructional engineering geological sampling survey equipment which comprises a sampling barrel, a connecting plate is connected to the upper end of the sampling barrel, a vibration seat is connected to the upper end of the connecting plate, an outer hole is formed in the outer side of the sampling barrel, an abutting column is slidably connected to the outer hole, and a first spring is connected to the abutting column; the other end of the first spring is connected to the inner wall of the sampling barrel, a sampling strip block is fixedly connected into the sampling barrel, a sampling groove is formed in the sampling strip block, a bottom sliding rail is connected to the lower end of the sampling strip block, and a sealing plate is slidably connected to the bottom sliding rail. One end of the sampling barrel is sealed by the sealing plate, so that soil with non-required sampling depth is filtered out when the sampling barrel is tamped underground, when the sampling depth is reached, the crank structure is rotated to open the sealing plate structure, the equipment is continuously tamped underground at the moment, and the soil in the sampling groove is the soil required to be sampled at the moment; and the requirement of customizing the sampling depth is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geological survey, and in particular to a geological sampling and surveying device for construction engineering. Background Art

[0002] Geological survey is an investigation and research activity that uses various means and methods to explore and detect geology, determine the appropriate bearing layer, determine the foundation type based on the bearing capacity of the bearing layer, and calculate the foundation parameters.

[0003] Before the implementation of a construction project, it is necessary to survey the geology of the location where the building is located to understand the strength of the natural foundation of the area. Due to the different sizes of buildings, the strength requirements of the foundation are different. When the natural foundation of the area does not meet the construction requirements, it is necessary to artificially change the foundation or add an artificial foundation to meet the construction requirements. Traditionally, when conducting geological surveys, it is necessary to remove the soil in the area for sampling through sampling equipment. Since the sampling extends from the ground to the underground, the sampling range can only be from the ground to the required depth of the survey, which cannot meet the needs of geological survey and sampling at a certain depth. In addition, when sampling, the corresponding depth data of the soil in the sampling tube may be misaligned, that is, when the soil of the required depth needs to be taken out, its depth data in the sampling tube will be offset, causing errors in the survey data.

[0004] Based on this, a construction engineering geological sampling and surveying equipment is proposed. Summary of the invention

[0005] The purpose of the present invention is to provide a construction engineering geological sampling and surveying device in order to solve the above-mentioned problem.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions: A construction engineering geological sampling and surveying equipment comprises a sampling barrel, the upper end of the sampling barrel is connected to a connecting plate, the upper end of the connecting plate is connected to a vibration seat, an outer hole is provided on the outer side of the sampling barrel, an abutment column is slidably connected to the outer hole, a spring 1 is connected to the abutment column, the other end of the spring 1 is connected to the inner wall of the sampling barrel, a sampling bar is fixedly connected in the sampling barrel, a sampling groove is provided on the sampling bar, a bottom slide rail is connected to the lower end of the sampling bar, a sealing plate is slidably connected to the bottom slide rail, a meshing gear is rotatably connected to the sampling bar, and a transmission member for driving the meshing gear to rotate is connected to the sampling barrel; The sampling bar block is connected to a fixing bar, a clamping frame and a connecting frame, one end of the fixing bar is connected to a button, a lifting block is slidably connected between the clamping frames, one side of the lifting block is connected to a toothed plate, and the lifting block is connected to a vibration mechanism for driving the sampling bar block to vibrate, thereby facilitating the separation of the sample in the sampling slot and the sampling tube.

[0007] Preferably, an armrest is arranged above the vibration seat, both ends of the armrest are fixedly connected to the connecting plate, and the armrest is in a "U" shape.

[0008] Preferably, stoppers are fixedly connected to both ends of the bottom slide rail.

[0009] Preferably, the transmission member includes a crank, one end of which is connected to a transmission gear, the transmission gear is rotatably connected to the sampling bar through an axle, the transmission gear is connected to a transmission wheel one through a transmission belt one, the transmission wheel one is connected to a transmission wheel two, the transmission wheel two is connected to a transmission wheel three through a transmission belt two, and the transmission wheel three is fixedly connected to one side of the meshing gear.

[0010] Preferably, two transmission gears are provided, and the two transmission gears are rotatably connected to corresponding wheel axles respectively, and the two transmission gears are meshed with each other.

[0011] Preferably, the vibration mechanism includes an impact block, one end of the impact block is connected to a lifting rod and spring 2, the impact block is connected to an inclined block 1, the upper end of the lifting block is connected to a folding plate, the connecting frame is rotatably connected to a deflection plate, the deflection plate is connected to an inclined block 2, and the connecting frame is connected to an impact seat.

[0012] Preferably, the lifting block is connected to a sleeve block, the lifting rod is slidably connected to the sleeve block, and one end of the spring is fixedly connected to the sleeve block.

[0013] Preferably, the sampling bar block is connected to a wheel frame, the wheel frame is rotatably connected to a pulley, the sealing plate is connected to a traction rope, and the other end of the traction rope is connected to the lifting block via a pulley.

[0014] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are: 1. The present application adopts a sealing plate structure to seal one end of the sampling tube, so that soil at a depth other than the required sampling depth can be filtered out when the tube is rammed into the ground. When the sampling depth is reached, the sealing plate structure is opened by turning the crank structure. When the device is continued to be rammed into the ground, the soil in the sampling trough is the soil required for sampling, thereby meeting the requirements for customized sampling depth, while also avoiding serious damage to the geology and improving the accuracy of geological surveys.

[0015] 2. The present application adopts an impact block structure, and utilizes the impact block and the spring structure to complete the force storage, thereby realizing the impact effect on the impact seat, driving the sampling bar to vibrate, facilitating the separation of the soil sample in the sampling trough and the sampling tube, and adopting a non-disassembly sampling structure to avoid repeated operations that may cause sealing problems between the structures, thereby improving the durability of the survey equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A schematic diagram showing the overall structure of a surveying device provided in an embodiment of the present invention is shown; Figure 2 It shows a schematic structural diagram of the separation between the sampling strip and the sampling tube provided in an embodiment of the present invention; Figure 3 It shows a schematic structural diagram of the connection of the lifting block provided according to an embodiment of the present invention; Figure 4 A schematic diagram of the explosion structure of the lifting block connection provided according to an embodiment of the present invention is shown; Figure 5 It shows a schematic diagram of the side view structure of the second connection of the inclined block provided in an embodiment of the present invention; Figure 6 A schematic diagram of the explosion structure of the sleeve block connection provided according to an embodiment of the present invention is shown.

[0017] Legend: 1. Sampling tube; 2. Connecting plate; 3. Vibrating seat; 4. Handrail; 5. Outer hole; 6. Sampling strip block; 7. Sampling slot; 8. Wheel frame; 9. Clamping frame; 10. Connecting frame; 11. Crank; 12. Transmission wheel 1; 13. Transmission gear; 14. Transmission belt 1; 15. Fixing bar; 16. Transmission belt 2; 17. Pulley; 18. Traction rope; 19. Lifting block; 20. Folding plate; 21. Deflection plate; 22. Abutment column; 23. Spring 1; 24. Impact block; 25. Lifting rod; 26. Spring 2; 27. Wheel axle; 28. Transmission wheel 2; 29. ​​Transmission wheel 3; 30. Meshing gear; 31. Tooth plate; 32. Closing plate; 33. Impact seat; 34. Inclined block 1; 35. Inclined block 2; 36. Button; 37. Stopper; 38. Bottom slide rail; 39. Bushing block. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] See also Figure 1-6 , the present invention provides a technical solution: A construction engineering geological sampling and surveying equipment comprises a sampling barrel 1, the upper end of the sampling barrel 1 is connected to a connecting plate 2, the upper end of the connecting plate 2 is connected to a vibration seat 3, the vibration seat 3 can generate vibration, so that the sampling tube 1 connected below is rammed into the ground, an outer hole 5 is provided on the outer side of the sampling barrel 1, the outer hole 5 structure has two, an abutment column 22 is slidably connected to the outer hole 5, a spring 23 is connected to the abutment column 22, the other end of the spring 23 is connected to the inner wall of the sampling barrel 1, and the other end of the spring 23 is fixedly connected to the abutment column 22, the abutment column 22 plays the role of abutting a deflection plate 21 to ensure that the deflection plate 21 deflects to the side of the impact block 24, a sampling bar 6 is fixedly connected to the sampling barrel 1, and a sampling groove 7 is provided on the sampling bar 6, When the sampling tube 1 enters the underground, the soil can enter the sampling groove 7, thereby completing the sampling operation. The lower end of the sampling bar 6 is connected to a bottom slide rail 38, and a sealing plate 32 is slidably connected to the bottom slide rail 38. The sealing plate 32 structure is provided with two, and the sealing plates 32 are fitted with each other at the docking point, wherein the sealing plates 32 are provided with a magnet structure at the docking point, which is convenient for the sealing plates 32 to be reset after the sampling is completed, that is, to restore the state of the two sealing plates 32 docking and blocking one end of the sampling groove 7, and the resetting of the sealing plates 32 can be assisted by manual resetting, and the sampling bar 6 is rotatably connected to a meshing gear 30, and the sampling bar 6 is fixedly connected to a rod, and the meshing gear 30 is rotatably connected to the rod, and the sampling tube 1 is connected to a transmission member for driving the meshing gear 30 to rotate; The sampling bar 6 is connected to a fixing bar 15, a clamping frame 9 and a connecting frame 10, one end of the fixing bar 15 is connected to a button 36, and the fixing bar 15 is connected to an alarm structure. When the button 36 structure is pressed, the alarm structure is activated and an alarm is sounded to warn the operator to stop rotating the crank 11 structure, wherein the button 36 is connected to the alarm structure via a cable, a lifting block 19 is slidably connected between the clamping frames 9, the lifting block 19 is arranged between the clamping frames 9, a tooth plate 31 is connected to one side of the lifting block 19, the tooth plate 31 structure is meshed with the meshing gear 30, when the meshing gear 30 rotates, the tooth plate 31 structure is displaced in the vertical direction, and a vibration mechanism is connected to the lifting block 19 to drive the sampling bar 6 to vibrate, so as to facilitate the separation of the sample in the sampling slot 7 and the sampling tube 1.

[0020] Specifically, Figure 1 As shown, an armrest 4 is arranged above the vibration seat 3, and both ends of the armrest 4 are fixedly connected to the connecting plate 2. The armrest 4 is in a "U" shape. By setting the armrest 4 structure, it is convenient for the operator to hold the equipment, thereby ensuring the stability of the equipment during the survey process.

[0021] Specifically, Figure 6 As shown, the two ends of the bottom slide rail 38 are fixedly connected with stoppers 37 . By arranging the stoppers 37 structures at the two ends of the bottom slide rail 38 , the sealing plate 32 is limited to avoid separation between the sealing plate 32 structure and the bottom slide rail 38 .

[0022] Specifically, Figure 4 , Figure 5 and Figure 6 As shown, the transmission member includes a crank 11, which is rotatably connected to the sampling tube 1, and one end of the crank 11 is connected to a transmission gear 13, which is rotatably connected to the sampling strip 6 through a wheel axle 27. Two wheel axles 27 are provided, and the wheel axles 27 are fixedly connected to the sampling strip 6. The transmission gear 13 is connected to a transmission wheel 12 through a transmission belt 14, wherein one side of the transmission gear 13 is connected to a wheel-shaped structure, and the transmission wheel 12 is connected to the wheel-shaped structure through a transmission belt 14, so When the transmission gear 13 rotates, it can drive the transmission wheel 12 to rotate. The transmission wheel 12 is connected to the transmission wheel 2 28. A rod-shaped structure is connected between the transmission wheel 12 and the transmission wheel 2 28. The rod-shaped structure is rotatably connected to the sampling block 6. The transmission wheel 2 28 is connected to the transmission wheel 3 29 through the transmission belt 2 16. The transmission wheel 3 29 is fixedly connected to one side of the meshing gear 30. The transmission wheel 3 29 is provided with one. The transmission wheel 3 29 is rotatably connected to the rod fixedly connected to the sampling block 6.

[0023] Specifically, Figure 4 and Figure 5 As shown, two transmission gears 13 are provided, and the two transmission gears 13 are rotatably connected to the corresponding wheel axles 27 respectively, and the two transmission gears 13 are meshed with each other. By setting the transmission gears 13, the operation of the two transmission gears 13 is kept synchronous, ensuring that when the equipment is vibrated, the impact block 24 structure can fall at the same time.

[0024] Specifically, Figure 4 and Figure 5 As shown, the vibration mechanism includes an impact block 24, one end of which is connected to a lifting rod 25 and a spring 26, an inclined block 1 34 is connected to the impact block 24, one end of which is provided with an inclined surface, a folding plate 20 is connected to the upper end of the lifting block 19, one end of the folding plate 20 is an inclined surface for abutting against the deflection plate 21, thereby driving the deflection plate 21 to deflect, the deflection plate 21 is rotatably connected to the connecting frame 10, the deflection plate 21 is connected to an inclined block 2 35, one end of which is provided with an inclined surface, an impact seat 33 is connected to the connecting frame 10, the impact seat 33 and the impact block 24 are arranged opposite to each other, the impact seat 33, the connecting frame 10 and the sampling strip block 6 are an integrated structure, and when the impact block 24 hits the impact seat 33, the sampling strip block 6 can be driven to vibrate.

[0025] Specifically, Figure 3 As shown, a sleeve block 39 is connected to the lifting block 19, the lifting rod 25 is slidably connected to the sleeve block 39, one end of the spring 26 is fixedly connected to the sleeve block 39, and the sleeve block 39 structure serves to limit the lifting rod 25, thereby improving the stability of the lifting rod 25 in the vertical direction.

[0026] Specifically, Figure 4 As shown, the sampling bar 6 is connected to a wheel frame 8, and the wheel frame 8 is rotatably connected to a pulley 17. A traction rope 18 is connected to the sealing plate 32, and the other end of the traction rope 18 is connected to the lifting block 19 via the pulley 17. By setting the pulley 17 structure, the wear of the traction rope 18 structure when it is pulled is reduced. By pulling the traction rope 18, the two sealing plates 32 can be separated from each other. When sampling, it is necessary to ensure that the sealing plates 32 are separated and the crank 11 structure stops rotating to avoid the sealing plates 32 from re-docking under the attraction of the magnet.

[0027] In summary, the construction engineering geological sampling and surveying equipment provided by the present embodiment needs to be installed on the top of the sampling tube 1 when sampling and surveying of geology is required before the construction project. When the sampling tube 1 is aligned with the location where sampling is required, it is ensured that the sealing plates 32 are connected. At this time, one end of the sampling tube 1 is in a closed state. The operator holds the handrail 4 structure and starts the vibration seat 3 structure to send the sampling tube 1 into the ground by vibration. By measuring the height of the sampling tube 1 leaking out of the ground, the depth of the sampling tube 1 into the ground is understood. When the sampling depth is reached, the operator rotates the crank 11 structure, and the crank 11 drives the meshing gear 30 to rotate, and the meshing gear 30 drives the tooth plate 31 to rise and fall, thereby driving the lifting block 19 to rise in height, so as to cooperate with the traction rope 18 to pull the sealing plate 32 apart, and then continue to tamp the sampling tube 1 into the ground. At this time, the soil entering the sampling groove 7 is the soil sample of the required depth. After the sampling is completed, the device is pulled out from the ground by the power tool, and the sampling operation is completed; Then it is necessary to separate the sample from the equipment. At this time, the connecting plate 2 and the sampling tube 1 are separated, and the sampling tube is inverted. Then, the crank 11 is rotated to make the lifting block 19 structure and the fixed bar 15 approach each other. Since there is an inclined surface structure between the inclined block 1 34 and the inclined block 2 35, when the height of the lifting block 19 rises, the inclined block 1 34 can push the inclined block 2 35 to move, thereby causing the deflection plate 21 to deflect. As the height of the lifting block 19 continues to rise, the lifting rod 25 structure will contact the button 36 structure. When the button 36 structure is pressed, an alarm will sound, that is, this is the maximum position of the lifting rod 25. At this time, the operator needs to rotate the crank 11 in the opposite direction. At this time, the lifting block 19 structure and the impact seat 33 are close to each other, and when the impact block 24 and the impact seat 33 are close to each other, the plane structures of the inclined block 1 34 and the inclined block 2 35 are limited to each other. At this time, the inclined block 2 35 can prevent the inclined block 1 34 from moving. At this time, the spring 2 26 structure begins to accumulate force. As the height of the lifting block 19 continues to rise, the lifting rod 25 structure will contact the button 36 structure. When the button 36 structure is pressed, an alarm will sound. That is, this is the maximum position of the lifting rod 25. At this time, the operator needs to rotate the crank 11 in the opposite direction. At this time, the lifting block 19 structure and the impact seat 33 are close to each other. When the impact block 24 and the impact seat 33 are close to each other, the plane structures of the inclined block 1 34 and the inclined block 2 35 are limited to each other. At this time, the inclined block 1 34 can prevent the inclined block 1 34 from When the folding plate 20 contacts the deflection plate 21, the deflection plate 21 is pushed to deflect by the inclined surface of the folding plate 20. When the deflection plate 21 deflects, the spring 1 23 structure is compressed. When the deflection plate 21 deflects, the inclined block 1 34 and the inclined block 2 35 are separated from each other. At this time, the inclined block 25 cannot limit the inclined block 1 34. At this time, the elastic potential energy of the spring 1 23 is released, and the spring 1 23 pushes the impact block 24 toward the impact seat. 33 are close to each other, and since the impact seat 33 and the sampling strip block 6 are fixed, that is, when the impact seat 33 is impacted and vibrates, the sampling strip block 6 will be driven to vibrate, thereby forcing the soil sample in the sampling slot 7 to separate from the sampling tube 1, and finally achieving the effect of separating the sample from the sampling tube 1. Through this equipment, the effect of accurate sampling at the required depth can be achieved, and the accuracy of subsequent soil detection data is improved. In addition, the surveying equipment is an integrated structure and does not need to be disassembled, which improves the sealing of the connection between the structures.

[0028] The above description of the embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A construction engineering geological sampling and surveying device, comprising a sampling tube (1), characterized in that: The upper end of the sampling barrel (1) is connected to a connecting plate (2), the upper end of the connecting plate (2) is connected to a vibration seat (3), an outer hole (5) is provided on the outer side of the sampling barrel (1), an abutment column (22) is slidably connected to the outer hole (5), a spring (23) is connected to the abutment column (22), the other end of the spring (23) is connected to the inner wall of the sampling barrel (1), a sampling bar (6) is fixedly connected to the sampling barrel (1), a sampling groove (7) is provided on the sampling bar (6), a bottom slide rail (38) is connected to the lower end of the sampling bar (6), a sealing plate (32) is slidably connected to the bottom slide rail (38), a meshing gear (30) is rotatably connected to the sampling bar (6), and a transmission member for driving the meshing gear (30) to rotate is connected to the sampling barrel (1); The sampling bar block (6) is connected to a fixing bar (15), a clamping frame (9) and a connecting frame (10); one end of the fixing bar (15) is connected to a button (36); a lifting block (19) is slidably connected between the clamping frames (9); one side of the lifting block (19) is connected to a tooth plate (31); and the lifting block (19) is connected to a vibration mechanism for driving the sampling bar block (6) to vibrate, thereby facilitating the separation of the sample in the sampling slot (7) and the sampling tube (1).

2. A construction engineering geological sampling and surveying equipment according to claim 1, characterized in that: An armrest (4) is arranged above the vibration seat (3), and both ends of the armrest (4) are fixedly connected to the connecting plate (2), and the armrest (4) is in a "U" shape.

3. A construction engineering geological sampling and surveying equipment according to claim 1, characterized in that: Stoppers (37) are fixedly connected to both ends of the bottom slide rail (38).

4. A construction engineering geological sampling and surveying equipment according to claim 1, characterized in that: The transmission member comprises a crank (11), one end of the crank (11) is connected to a transmission gear (13), the transmission gear (13) is rotatably connected to the sampling bar (6) via a wheel shaft (27), the transmission gear (13) is connected to a transmission wheel 1 (12) via a transmission belt 1 (14), the transmission wheel 1 (12) is connected to a transmission wheel 2 (28), the transmission wheel 2 (28) is connected to a transmission wheel 3 (29) via a transmission belt 2 (16), and the transmission wheel 3 (29) is fixedly connected to one side of the meshing gear (30).

5. A construction engineering geological sampling and surveying equipment according to claim 4, characterized in that: Two transmission gears (13) are provided, and the two transmission gears (13) are rotatably connected to corresponding wheel shafts (27) respectively, and the two transmission gears (13) are meshed with each other.

6. A construction engineering geological sampling and surveying equipment according to claim 1, characterized in that: The vibration mechanism comprises an impact block (24), one end of the impact block (24) is connected to a lifting rod (25) and a second spring (26), the impact block (24) is connected to a first inclined block (34), the upper end of the lifting block (19) is connected to a folding plate (20), the connecting frame (10) is rotatably connected to a deflection plate (21), the deflection plate (21) is connected to a second inclined block (35), and the connecting frame (10) is connected to an impact seat (33).

7. A construction engineering geological sampling and surveying equipment according to claim 6, characterized in that: The lifting block (19) is connected to a sleeve block (39), the lifting rod (25) is slidably connected to the sleeve block (39), and one end of the spring (26) is fixedly connected to the sleeve block (39).

8. The construction engineering geological sampling and surveying equipment according to claim 6, characterized in that: The sampling bar block (6) is connected to a wheel frame (8), the wheel frame (8) is rotatably connected to a pulley (17), the sealing plate (32) is connected to a traction rope (18), and the other end of the traction rope (18) is connected to a lifting block (19) via the pulley (17).