LDACS ground station adaptive time synchronization method based on clock maintenance
By monitoring the clock difference between GNSS and LDACS ground station clock signals in real time, clock taming and maintaining operations are carried out based on the effectiveness of GNSS signals, the problem of satellite timing signal affecting the time synchronization of LDACS ground stations is solved, and the time synchronization accuracy of LDACS ground stations is improved. robustness.
Patent Information
- Application Number
- CN202410966408.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-18
AI Technical Summary
The impact of satellite timing signal availability on the LDACS ground clock system has led to the difficulty of improving land-based navigation performance and affecting the reliability of LDACS ground station time synchronization.
Adaptive time synchronization method of LDACS ground station based on clock retention is adopted, and the clock difference between the timing signal of the GNSS receiver and the clock signal of the LDACS ground station is monitored in real time, and the clock taming algorithm and clock retention algorithm are run according to the effectiveness of the GNSS signal, and the clock retention algorithm is used to perform the clock taming algorithm and the clock retention algorithm for LDACS. The ground station clock source performs corresponding control operations to achieve clock synchronization.
It improves the robustness and time synchronization accuracy of the LDACS ground station clock system, ensures high-precision synchronization when the GNSS timing signal is valid, and suppresses clock frequency drift when the signal fails, ensuring the short-term frequency stability of the system.
Smart Images

Figure CN118915419A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of aviation navigation, and in particular relates to an LDACS ground station adaptive time synchronization method based on clock retention. Background Art
[0002] The BeiDou global satellite navigation system was officially put into operation in 2020. It can be seen that with the development of science and technology, the positioning, navigation and timing (PNT) system has been continuously improved, especially the satellite-based space-based PNT has developed rapidly and has been widely used, bringing many conveniences and benefits to our lives and work. However, affected by the satellite denial environment and the natural vulnerability of satellite signals, PNT services have always faced severe challenges. Although the satellite navigation service capabilities in complex environments can be improved through optimization and improvement of signals, systems, receivers, etc., the problem cannot be fundamentally solved. Therefore, how to meet the needs of various users for spatiotemporal information as much as possible and provide spatiotemporal information services in an all-round way has always been the research focus in the field of navigation technology. Therefore, it is necessary to vigorously develop comprehensive PNT technology, that is, not to rely too much on GNSS, and use all applicable PNT information sources to implement full-airspace target positioning, navigation and timing services.
[0003] With the rapid growth of civil aviation transport volume, improving aviation PNT services is an urgent task as one of the important ways to strengthen air traffic management and optimize airspace utilization. Land-based navigation is one of the important means of aviation PNT, so it is of great value to carry out research on aviation land-based navigation technology. In addition, the concept of "integrated communication and navigation, one wide and narrow network" has been formally proposed, and the L-band Digital Aeronautical Communications System (LDACS) is a new type of air-to-ground digital broadband wireless link being standardized by the International Civil Aviation Organization. In addition to providing digital data links between ground stations and aircraft, this secure, scalable and spectrum-efficient data link also has embedded navigation capabilities. It is the first truly integrated communication, navigation and surveillance (CNS) system. It can be seen that LDACS conforms to the future development trend of communication systems and navigation systems and is the key to the development of future integrated communication and navigation (ICAN). Therefore, it is of great significance to carry out research on land-based navigation technology based on LDACS.
[0004] Time synchronization is the primary prerequisite for realizing PNT services. Therefore, how to reduce or even avoid the impact of satellite timing signal availability on the LDACS ground clock system is a key issue in improving the performance of LDACS land-based navigation. In summary, a clock-retention-based LDACS ground station adaptive time synchronization method is proposed. This method has important theoretical value and practical significance for the research of LDACS ground station time synchronization and land-based navigation technology. Summary of the invention
[0005] The purpose of the present invention is to provide an LDACS ground station adaptive time synchronization method based on clock retention, reduce the impact of satellite timing signal availability on the LDACS ground clock system, and help improve the reliability of LDACS land-based navigation.
[0006] To achieve the above object, the present invention provides an LDACS ground station adaptive time synchronization method based on clock retention, and the specific steps are as follows:
[0007] S1, monitor and record in real time the clock signal L(t) generated by the LDACS ground station clock source and the timing signal G(t) of the GNSS receiver at each moment;
[0008] S2, determine whether the timing signal G(t) of the GNSS receiver is valid, if so, proceed to S3 and S4; otherwise, proceed to S5;
[0009] S3, after receiving the clock signal of the LDACS ground station clock source and the timing signal of the GNSS receiver, the phase detector measures the clock difference information of the two signals to obtain the clock difference measurement value τ(t), and outputs the result to the controller;
[0010] S4, after receiving the clock error measurement result, the controller runs the LDACS ground station clock taming algorithm under the GNSS effective condition, calculates the clock error steering adjustment amount and performs corresponding steering operations on the LDACS ground station clock source, and then returns to S1;
[0011] S5. The controller runs the LDACS ground station clock short-time holding algorithm under GNSS loss according to all clock difference data in the last driving cycle under GNSS effective conditions, performs corresponding clock holding operations on the LDACS ground station clock source according to the obtained clock difference control adjustment amount, and then returns to S1.
[0012] Preferably, the specific process of running the LDACS ground station clock taming algorithm under the GNSS effective condition in S4, calculating the clock error steering adjustment amount and performing corresponding steering operations on the LDACS ground station clock source is as follows:
[0013] S41, parameter initialization, setting the initial calibration identifier s, when s=0 is the initial calibration stage, when s=1 is the periodic frequency modulation stage; initial calibration is the premise of periodic frequency modulation, so the initialization parameter s=0; at the same time, in the initial calibration stage, that is, under the premise of s=0, the initial phase modulation state identifier i is set, when i=0 is the initial phase modulation stage, when i=1 is the initial frequency modulation stage; generally speaking, the initial phase deviation is large, so the initialization parameter i=0; in addition, t=0 is initialized;
[0014] S42, setting the initial clock difference measurement value threshold τ l0 , clock error measurement threshold τ l1 , clock taming relative frequency deviation threshold f l1 , driving period T, attenuation factor α;
[0015] S43, let t=t+1, and enter the clock taming process;
[0016] S44, monitor and record in real time the clock signal L(t) generated by the clock source of the LDACS ground station and the timing signal G(t) of the GNSS receiver at each moment, and obtain the clock difference measurement value τ(t);
[0017] S45, judging whether the initial calibration identifier s=0 is established, if yes, entering the initial calibration phase of S46, otherwise entering the periodic frequency modulation phase of S415;
[0018] S46, judging whether the phase adjustment state identifier i=0 is established, if yes, entering the initial phase adjustment step of S47, otherwise entering the initial frequency adjustment of S410;
[0019] S47, define the current time t as the initial time t0;
[0020] S48, compare the absolute value of the initial clock difference measurement value |τ(t0)| with the initial clock difference measurement value threshold τ l0 The size of |τ(t0)|≥τ l0 When it is established, the LDACS ground station clock source is directly phase-adjusted. After the phase adjustment is completed, return to S43 to recalculate and judge L(t) and G(t) at the next moment until |τ(t0)|<τ l0 When , proceed to the next step;
[0021] S49, defining the initial phase modulation state identifier i=1, indicating the end of the initial phase modulation, and proceeding to the next step of initial frequency modulation;
[0022] S410, compare the absolute value of the clock difference measurement value at the current time |τ(t)| with the clock difference measurement value threshold τ l1 The size of |τ(t)|≥τ l1When it holds, return to S43, recalculate and judge L(t) and G(t) at the next moment until |τ(t)| < τ l1 When it is satisfied, proceed to the next step;
[0023] S411. Based on the quadratic term clock error model y(t), fit all the clock error data from the start of the initial frequency modulation to the current moment in the above process, so as to obtain the clock error fitting model y1(t) in the initial calibration stage, and then obtain the initial frequency offset a corresponding to y1(t) 11 ;
[0024] S412. Obtain the initial clock control adjustment amount C0 from a 11 ;
[0025] S413. Perform reverse frequency modulation on the LDACS ground station clock source according to the initial clock control adjustment amount C0, and then proceed to the next step;
[0026] S414. Define the initial calibration identifier s = 1, indicating the end of the initial calibration, enter the periodic frequency modulation stage, define the new initial moment t0 = t + 1, and return to S43 to start new calculations and judgments on L(t) and G(t) at the next moment;
[0027] S415. Compare the size of t - t0 and the preset control period T. When t - t0 < T holds, return to S43 to recalculate and judge L(t) and G(t) at the next moment t = t + 1 until t - t0 ≥ T, then proceed to the next step;
[0028] S416. Based on the quadratic term clock error model y(t), fit all the clock error data within the above control period, so as to obtain the clock error fitting model y2(t) in the periodic frequency modulation stage, and then obtain the initial frequency offset a corresponding to y2(t) 21 ;
[0029] S417. Compare the size of the absolute value |τ(t)| of the clock error measurement value at the current moment with the clock error measurement value threshold τ l1 When |τ(t)| > τ l1 holds, perform S418, otherwise, perform S419;
[0030] S418. Judge whether the product τ(t)y'2(t) of the clock error measurement value τ(t) at the current moment and the first derivative value y'2(t) of the clock error fitting model in the periodic frequency modulation stage is less than 0. If so, the clock control amount is C1, otherwise the clock control amount is C2. The calculation formulas of C1 and C2 are as follows:
[0031]
[0032] S419. Judge whether the absolute value |a21 |Is it greater than the clock taming relative frequency deviation threshold f l1 , if yes, the clock error control amount is C3, otherwise, no control operation is performed in this cycle; the calculation formula of C3 is as follows:
[0033]
[0034] S420. Perform the corresponding reverse frequency modulation operation on the LDACS ground station clock source according to the clock error control amount obtained in the above process, then enter the next control cycle, define a new initial time t0=t+1, and return to S43 to recalculate and judge L(t) and G(t) at the next moment.
[0035] Preferably, the clock error measurement value τ(t) in S44 is determined by the pulse arrival time of the clock signal, specifically: at time t, the pulse arrival time of the timing signal G(t) of the GNSS receiver is t, and the pulse arrival time of the clock signal L(t) is t+τ(t), then relative to the timing signal G(t) of the GNSS receiver, the clock error measurement value of the clock signal L(t) at time t is τ(t); for the timing signal G(t) of the GNSS receiver, the clock error measurement value of the clock signal L(t) at the initial time t0 is τ(t0), and the initial clock error measurement value is τ(t0).
[0036] Preferably, the specific method for directly phase-modulating the LDACS ground station clock source in S48 is: controlling the time when the LDACS ground station clock source generates the clock signal L(t) so that the rising edges of the pulse signals L(t) and G(t) are aligned as much as possible.
[0037] Preferably, the expression of the quadratic clock error model y(t) in S411 is as follows:
[0038]
[0039] Where y(t) represents the clock error of the clock source signal L(t) of the LDACS ground station at time t under clock taming relative to the timing signal G(t) of the GNSS receiver, t represents the current time, t0 represents the starting time, a0 represents the initial clock error, a1 represents the initial frequency deviation, a2 represents the frequency drift rate caused by temperature change factors, and ε y (t) represents the random error corresponding to y(t).
[0040] Preferably, the expression of the clock error fitting model y1(t) in the initial calibration stage in S411 is as follows:
[0041]
[0042] In the formula, a 10Denote the initial clock error corresponding to y1(t), a 11 Denote the initial frequency offset corresponding to y1(t), a 12 Denote the frequency drift rate corresponding to y1(t), and ε1(t) denote the random error corresponding to y1(t).
[0043] Preferably, all the clock error data within the above-mentioned driving period are fitted based on the quadratic term clock error model, so as to obtain the calculation expression of the clock error fitting model y2(t) in the period frequency modulation stage as follows:
[0044]
[0045] In the formula, a 20 Denote the initial clock error corresponding to y2(t), a 21 Denote the initial frequency offset corresponding to y2(t), a 22 Denote the frequency drift rate corresponding to y2(t), and ε2(t) denote the random error corresponding to y2(t).
[0046] Preferably, the short-term clock holding algorithm of the LDACS ground station clock under GNSS outage is run in S5, and the specific process of performing corresponding clock holding operations on the LDACS ground station clock source according to the obtained clock error driving adjustment amount is as follows:
[0047] S51. Set the clock error prediction value threshold τ l2 , the clock holding relative frequency deviation threshold f l2 , the ten-thousand-second frequency stability σ of the LDACS ground station clock source, and the driving period T;
[0048] S52. Construct the historical clock error data set {τ(t)} from all the clock error data within the last driving period under GNSS valid conditions;
[0049] S53. Fit the historical clock error data set {τ(t)} based on the linear term clock error model, so as to obtain the clock error fitting model x(t) of the LDACS ground station clock source under GNSS timing signal failure;
[0050] S54. Use x(t) to predict the clock error at the next moment t = t + 1, and obtain the clock error prediction value
[0051] S55. Compare the size of t - t0 and the preset driving period T. When t - t0 < T holds, return to S54 to predict the clock error at the next moment again until t - t0 ≥ T, and then proceed to the next step;
[0052] S56. Judge the absolute value of the clock error prediction value at the current moment Whether it is less than the clock error prediction value threshold τ l2, if yes, proceed to the next step, otherwise jump to S510;
[0053] S57, determine whether the initial frequency deviation absolute value |b1| corresponding to x(t) is less than the clock relative frequency deviation threshold f l2 , if yes, proceed to the next step, otherwise jump to S510;
[0054] S58, determine the current time clock error forecast value The product of the first-order derivative value x'(t) of the clock error fitting model Is it less than 0? If so, proceed to the next step; otherwise, jump to S510;
[0055] S59: No adjustment operation is performed, a new initial time t0=t+1 is defined, and the process returns to S54, and the clock holding process of the next cycle is entered based on the current clock difference model;
[0056] S510, setting the clock to maintain the adjustment amount C = ±σ, and performing reverse frequency modulation on the LDACS ground station clock source;
[0057] S511, the clock error forecast value of the driving time As the initial clock error b0 of x(t), the clock holding adjustment amount C is used as the increment of the relative frequency deviation to obtain a new relative frequency deviation, and then return to S53 to update the original clock error model, and at the same time define a new initial time t0=t+1 to enter the clock holding process of the next cycle.
[0058] Preferably, in S54, x(t) is used to predict the clock error at the next time t=t+1 to obtain a clock error prediction value The expression is as follows:
[0059] x(t)=b0+b1(t-t0)+ε x (t)
[0060] Where x(t) represents the clock error of the clock source clock signal L(t) of the LDACS ground station relative to the timing signal G(t) of the GNSS receiver at time t under clock retention, t represents the current time, t0 represents the starting time, b0 represents the initial clock error corresponding to x(t); b1 represents the initial frequency deviation corresponding to x(t); ε x (t) represents the random error corresponding to x(t).
[0061] Therefore, the present invention adopts the above-mentioned LDACS ground station adaptive time synchronization method based on clock retention, which has the following beneficial effects:
[0062] (1) The method provided by the present invention comprehensively considers the impact of the availability of GNSS timing signals on the LDACS ground station clock system, and performs different clock control operations on the LDACS ground station clock according to whether the GNSS timing signals are valid, which greatly improves the robustness of the system;
[0063] (2) Based on the principle of GNSS tameable clock, the present invention designs a clock taming algorithm for LDACS ground station under GNSS valid conditions, which is used for clock taming operation when GNSS timing signal is valid. The algorithm can significantly improve the effectiveness and reliability of clock taming operation and ensure high-precision time synchronization of LDACS ground station when GNSS timing signal is valid.
[0064] (3) The present invention adopts a dynamic adjustment strategy to design a short-term clock maintenance algorithm for the LDACS ground station under GNSS loss of lock, which is used for clock steering operations when the GNSS timing signal is invalid. The algorithm can effectively suppress the clock error accumulation caused by the frequency drift of the LDACS ground station clock source itself, and achieve short-term maintenance of the frequency stability of the LDACS ground station clock source, which can guarantee the system time synchronization accuracy to a certain extent.
[0065] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0066] Figure 1 It is a schematic diagram of the application of the present invention in the LDACS land-based navigation system;
[0067] Figure 2 The present invention is a schematic diagram of an adaptive time synchronization method for LDACS ground stations based on clock retention;
[0068] Figure 3 It is a flow chart of the time synchronization algorithm of the LDACS ground station in the present invention;
[0069] Figure 4 This is a flow chart of the LDACS ground station clock maintenance algorithm in the present invention. DETAILED DESCRIPTION
[0070] The following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0071] See also Figure 1-4, an adaptive time synchronization method for LDACS ground station based on clock retention, performs different clock control operations on the LDACS ground station clock source based on the validity of the GNSS timing signal. When the GNSS timing signal is valid, the clock control operation of the LDACS ground station clock source is performed using the real-time clock difference data to achieve clock taming; when the GNSS timing signal is invalid, the clock control operation of the LDACS ground station clock source is performed using the historical clock difference data to achieve clock retention. The specific steps are as follows:
[0072] S1, monitor and record in real time the clock signal L(t) generated by the LDACS ground station clock source and the timing signal G(t) of the GNSS receiver at each moment;
[0073] S2, determine whether the timing signal G(t) of the GNSS receiver is valid, if so, proceed to S3 and S4; otherwise, proceed to S5;
[0074] S3, after receiving the clock signal of the LDACS ground station clock source and the timing signal of the GNSS receiver, the phase detector measures the clock difference information of the two signals to obtain the clock difference measurement value τ(t), and outputs the result to the controller;
[0075] S4. After receiving the clock error measurement result, the controller runs the LDACS ground station clock taming algorithm under the effective GNSS condition, calculates the clock error steering adjustment amount and performs corresponding steering operations on the LDACS ground station clock source, and then returns to S1; wherein, the LDACS ground station clock taming algorithm under the effective GNSS condition is run, the clock error steering adjustment amount is calculated and the LDACS ground station clock source is subjected to corresponding steering operations; it includes two stages: initial calibration and periodic frequency modulation. The initial calibration stage is mainly to calibrate the initial phase deviation and initial frequency deviation existing in the initial stage of the LDACS ground station clock source. The basic principle is that the clock error is usually large in the initial stage, and the initial phase deviation can be quickly eliminated by phase adjustment. On this basis, the initial frequency deviation can be eliminated by reverse frequency modulation, thereby accelerating the convergence speed of the LDACS ground station clock source and making the clock error change smoothly within a specific range. The basic principle of the periodic frequency modulation stage is that the clock error will become smaller after the initial calibration. When the clock error is small, the use of periodic frequency modulation to control the LDACS ground station clock source can reduce the occurrence of phase jumps, thereby ensuring the frequency stability of the LDACS ground station clock source. The specific formula is as follows:
[0076]
[0077] in, is the relative frequency deviation, Δy is the clock error variation of the LDACS ground station clock source within the time interval T, is the phase change of the LDACS ground station clock source output signal within the time interval T. It can be seen that the final result of frequency modulation is to adjust the phase of the LDACS ground station clock source output signal without destroying the continuity of the signal, so it is necessary to perform periodic frequency modulation on the LDACS ground station clock source;
[0078] Combination Figure 3 , the specific process is as follows:
[0079] S41, parameter initialization, set the initial calibration identifier s, when s=0 is the initial calibration stage, when s=1 is the periodic frequency modulation stage; initial calibration is the premise of periodic frequency modulation, so the initialization parameter s=0; at the same time, in the initial calibration stage, that is, under the premise of s=0, set the initial phase modulation state identifier i, when i=0 is the initial phase modulation stage, when i=1 is the initial frequency modulation stage; generally speaking, the initial phase deviation is large, so the initialization parameter i=0; in addition, initialize h=0;
[0080] S42, setting the initial clock difference measurement value threshold τ l0 , clock error measurement threshold τ l1 , clock taming relative frequency deviation threshold f l1 , driving period T, attenuation factor α;
[0081] S43, let t=t+1, and enter the clock taming process;
[0082] S44. Monitor and record in real time the clock signal L(t) generated by the LDACS ground station clock source and the timing signal G(t) of the GNSS receiver at each moment, and obtain the clock error measurement value τ(t); wherein the clock error measurement value τ(t) is determined by the pulse arrival time of the clock signal, specifically: at moment t, the pulse arrival time of the timing signal G(t) of the GNSS receiver is t, and the pulse arrival time of the clock signal L(t) is t+τ(t), then relative to the timing signal G(t) of the GNSS receiver, the clock error measurement value of the clock signal L(t) at moment t is τ(t); for the timing signal G(t) of the GNSS receiver, the clock error measurement value of the clock signal L(t) at the initial moment t0 is τ(t0), and the initial clock error measurement value is τ(t0).
[0083] S45, judging whether the initial calibration identifier s=0 is established, if yes, entering the initial calibration phase of S46, otherwise entering the periodic frequency modulation phase of S415;
[0084] S46, judging whether the phase adjustment state identifier i=0 is established, if yes, entering the initial phase adjustment step of S47, otherwise entering the initial frequency adjustment of S410;
[0085] S47, define the current time t as the initial time t0;
[0086] S48, compare the absolute value of the initial clock difference measurement value |τ(t0)| with the initial clock difference measurement value threshold τ l0 The size of |τ(t)0)|≥τ l0 When it is established, the LDACS ground station clock source is directly phase-adjusted. The specific method is: control the time when the LDACS ground station clock source generates the clock signal L(t) so that the rising edges of the pulse signals of L(t) and G(t) are aligned as much as possible; after the phase adjustment is completed, return to S43 to recalculate and judge L(t) and G(t) at the next moment until |τ(t0)|<τ l0 When , proceed to the next step;
[0087] S49, defining the initial phase modulation state identifier i=1, indicating the end of the initial phase modulation, and proceeding to the next step of initial frequency modulation;
[0088] S410, compare the absolute value of the clock difference measurement value at the current time |τ(t)| with the clock difference measurement value threshold τ l1 The size of |τ(t)|≥τ l1 When it is established, return to S43 and recalculate and judge L(t) and G(t) at the next moment until |τ(t)|<τ l1 When , proceed to the next step;
[0089] S411, based on the quadratic clock error model y(t), all clock error data from the initial frequency modulation to the current moment in the above process are fitted, so as to obtain the clock error fitting model y1(t) in the initial calibration stage, and then obtain the initial frequency deviation a corresponding to y1(t) 11 ; Among them, the expression of the quadratic clock error model y(t) is as follows:
[0090]
[0091] Where y(t) represents the clock error of the clock source signal L(t) of the LDACS ground station at time t under clock taming relative to the timing signal G(t) of the GNSS receiver, t represents the current time, t0 represents the starting time, a0 represents the initial clock error, a1 represents the initial frequency deviation, a2 represents the frequency drift rate caused by temperature change factors, and ε y (t) represents the random error corresponding to y(t);
[0092] The expression of the clock error fitting model y1(t) in the initial calibration phase is as follows:
[0093]
[0094] In the formula, a 10 represents the initial clock error corresponding to y1(t), a 11represents the initial frequency offset corresponding to y1(t), a 12 represents the frequency drift rate corresponding to y1(t), and ε1(t) represents the random error corresponding to y1(t).
[0095] S412. From a 11 obtain the initial clock error driving adjustment amount C0;
[0096] S413. Perform reverse frequency modulation on the LDACS ground station clock source according to the initial clock error driving adjustment amount C0, and then proceed to the next step;
[0097] S414. Define the initial calibration identifier s = 1, indicating the end of the initial calibration, enter the periodic frequency modulation stage, define the new initial time t0 = t + 1, and return to S43 to start new calculations and judgments for L(t) and G(t) at the next moment;
[0098] S415. Compare the size of t - t0 and the preset driving period T. When t - t0 < T holds, return to S43 to recalculate and judge L(t) and G(t) at the next moment t = t + 1 until t - t0 ≥ T, and then proceed to the next step;
[0099] S416. Fit all the clock error data within the above driving period based on the quadratic term clock error model y(t) to obtain the clock error fitting model y2(t) in the periodic frequency modulation stage, and further obtain the initial frequency offset a 21 corresponding to y2(t); where the calculation expression of the clock error fitting model y2(t) in the periodic frequency modulation stage is as follows:
[0100]
[0101] In the formula, a 20 represents the initial clock error corresponding to y2(t), a 21 represents the initial frequency offset corresponding to y2(t), a 22 represents the frequency drift rate corresponding to y2(t), and ε2(t) represents the random error corresponding to y2(t).
[0102] S417. Compare the absolute value of the clock error measurement value |τ(t)| at the current moment with the clock error measurement value threshold τ l1 , and when |τ(t)| > τ l1 holds, perform S418, otherwise, perform S419;
[0103] S418. Judge whether the product τ(t)y'2(t) of the clock error measurement value τ(t) at the current moment and the first derivative value y'2(t) of the clock error fitting model in the periodic frequency modulation stage is less than 0. If so, the clock error driving amount is C1, otherwise the clock error driving amount is C2. The calculation formulas of C1 and C2 are as follows:
[0104]
[0105] S419, determine the absolute value of the initial frequency deviation corresponding to y2(t) |a 21 |Is it greater than the clock taming relative frequency deviation threshold f l1 , if yes, the clock error control amount is C3, otherwise, no control operation is performed in this cycle; the calculation formula of C3 is as follows:
[0106]
[0107] S420. Perform the corresponding reverse frequency modulation operation on the LDACS ground station clock source according to the clock error control amount obtained in the above process, then enter the next control cycle, define a new initial time t0=t+1, and return to S43 to recalculate and judge L(t) and G(t) at the next moment.
[0108] S5. The controller runs the LDACS ground station clock short-time holding algorithm under GNSS loss according to all clock error data in the last driving cycle under GNSS effective conditions, performs corresponding clock holding operations on the LDACS ground station clock source according to the obtained clock error driving adjustment, and then returns to S1. The main principle of this algorithm is that when the GNSS timing signal fails, the LDACS ground station clock source cannot use the clock error value with the GNSS timing signal to achieve frequency modulation, but the frequency drift of the LDACS ground station clock source is objectively present, so it is necessary to suppress the frequency deviation caused by the clock source frequency drift, so the algorithm generates a clock error model according to the historical clock error data, and then uses the model to predict the clock error and make corresponding compensation, so as to maintain the clock synchronization accuracy to a certain extent; Among them, the specific process of running the LDACS ground station clock short-time holding algorithm under GNSS loss and performing corresponding clock holding operations on the LDACS ground station clock source according to the obtained clock error driving adjustment is as follows:
[0109] S51. Setting the clock error prediction value threshold τ l2 , the clock maintains the relative frequency deviation threshold f l2 , LDACS ground station clock source frequency stability σ in ten thousand seconds, driving period T;
[0110] S52, forming a historical clock error data set {τ(t)} with all clock error data in the last driving cycle under the GNSS effective condition;
[0111] S53, fitting the historical clock error data set {τ(t)} based on the linear clock error model, thereby obtaining the LDACS ground station clock source clock error fitting model x(t) when the GNSS timing signal fails;
[0112] S54. Forecast the clock error at the next moment \(t = t + 1\) using \(x(t)\) to obtain the clock error forecast value. The specific expression is as follows:
[0113] \(x(t)=b_0 + b_1(t - t_0)+\varepsilon\) x (t)
[0114] Among them, \(x(t)\) represents the clock error between the clock signal \(L(t)\) of the LDACS ground station clock source and the timing signal \(G(t)\) of the GNSS receiver at time \(t\) under clock hold. \(t\) represents the current time, \(t_0\) is the starting time, \(b_0\) represents the initial clock error corresponding to \(x(t)\); \(b_1\) represents the initial frequency offset corresponding to \(x(t)\); \(\varepsilon\) x (t) represents the random error corresponding to \(x(t)\).
[0115] S55. Compare the magnitudes of \(t - t_0\) and the preset driving period \(T\). When \(t - t_0\lt T\) holds, return to S54 to forecast the clock error at the next moment again until \(t - t_0\geq T\), and then proceed to the next step.
[0116] S56. Judge the absolute value of the clock error forecast value at the current moment Whether it is less than the clock error forecast value threshold \(\tau\) l2 . If so, proceed to the next step; otherwise, jump to S510.
[0117] S57. Judge whether the absolute value of the initial frequency offset \(|b_1|\) corresponding to \(x(t)\) is less than the clock hold relative frequency deviation threshold \(f\) l2 . If so, proceed to the next step; otherwise, jump to S510.
[0118] S58. Judge the product of the clock error forecast value at the current moment and the first derivative value \(x^\prime(t)\) of the clock error fitting model Whether it is less than 0. If so, proceed to the next step; otherwise, jump to S510.
[0119] S59. Do not perform adjustment operations. Define a new initial time \(t_0=t + 1\), return to S54, and enter the clock hold process for the next cycle based on the current clock error model.
[0120] S510. Let the clock hold adjustment amount \(C=\pm\sigma\), and perform reverse frequency modulation on the LDACS ground station clock source.
[0121] S511. Use the clock error forecast value at the driving moment as the initial clock error \(b_0\) of \(x(t)\), use the clock hold adjustment amount \(C\) as the increment of the relative frequency deviation to obtain a new relative frequency deviation, return to S53 to update the original clock error model, and at the same time define a new initial time \(t_0=t + 1\) to enter the clock hold process for the next cycle.
[0122] Therefore, the present invention adopts the above-mentioned LDACS ground station adaptive time synchronization method based on clock retention, and performs corresponding clock driving operations on the LDACS ground station clock source by judging the validity of the timing signal of the GNSS receiver, thereby improving the time synchronization accuracy of the LDACS ground station clock system, effectively enhancing the reliability of the LDACS ground station time synchronization system, and greatly improving the robustness of the system.
[0123] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. A method for adaptive time synchronization of LDACS ground stations based on clock retention, characterized in that: The specific steps are as follows: S1, monitor and record in real time the clock signal L(t) generated by the LDACS ground station clock source and the timing signal G(t) of the GNSS receiver at each moment; S2, determine whether the timing signal G(t) of the GNSS receiver is valid, if so, proceed to S3 and S4; Otherwise, proceed to S5; S3, after receiving the clock signal of the LDACS ground station clock source and the timing signal of the GNSS receiver, the phase detector measures the clock difference information of the two signals to obtain the clock difference measurement value τ(t), and outputs the result to the controller; S4, after receiving the clock error measurement result, the controller runs the LDACS ground station clock taming algorithm under the GNSS effective condition, calculates the clock error steering adjustment amount and performs corresponding steering operations on the LDACS ground station clock source, and then returns to S1; S5. The controller runs the LDACS ground station clock short-time holding algorithm under GNSS loss according to all clock difference data in the last driving cycle under GNSS effective conditions, performs corresponding clock holding operations on the LDACS ground station clock source according to the obtained clock difference control adjustment amount, and then returns to S1.
2. The method for adaptive time synchronization of LDACS ground stations based on clock retention according to claim 1, characterized in that: The specific process of running the LDACS ground station clock discipline algorithm under the GNSS effective condition in S4, calculating the clock error steering adjustment amount and performing corresponding steering operations on the LDACS ground station clock source is as follows: S41, parameter initialization, setting the initial calibration identifier s, when s=0 is the initial calibration stage, when s=1 is the periodic frequency modulation stage; setting the initial phase modulation state identifier i, when i=0 is the initial phase modulation stage, when i=1 is the initial frequency modulation stage; initializing t=0; S42, setting the initial clock difference measurement value threshold τ l0 , clock error measurement threshold τ l1 , clock taming relative frequency deviation threshold f l1 , driving period T, attenuation factor α; S43, let t=t+1, and enter the clock taming process; S44, monitor and record in real time the clock signal L(t) generated by the clock source of the LDACS ground station and the timing signal G(t) of the GNSS receiver at each moment, and obtain the clock difference measurement value τ(t); S45, judging whether the initial calibration identifier s=0 is established, if yes, entering the initial calibration phase of S46, otherwise entering the periodic frequency modulation phase of S415; S46, judging whether the phase adjustment state identifier i=0 is established, if yes, entering the initial phase adjustment step of S47, otherwise entering the initial frequency adjustment of S410; S47, define the current time t as the initial time t0; S48, compare the absolute value of the initial clock difference measurement value |τ(t0)| with the initial clock difference measurement value threshold τ l0 The size of |τ(t0)|≥τ l0 When it is established, the LDACS ground station clock source is directly phase-adjusted. After the phase adjustment is completed, return to S43 to recalculate and judge L(t) and G(t) at the next moment until |τ(t0)|<τ l0 When , proceed to the next step; S49, defining the initial phase modulation state identifier i=1, indicating the end of the initial phase modulation, and proceeding to the next step of initial frequency modulation; S410, compare the absolute value of the clock difference measurement value at the current time |τ(t)| with the clock difference measurement value threshold τ l1 The size of |τ(t)|≥τ l1 When it is established, return to S43 and recalculate and judge L(t) and G(t) at the next moment until |τ(t)|<τ l1 When , proceed to the next step; S411, based on the quadratic clock error model y(t), all clock error data from the initial frequency modulation to the current moment in the above process are fitted, so as to obtain the clock error fitting model y1(t) in the initial calibration stage, and then obtain the initial frequency deviation a corresponding to y1(t) 11 ; S412, by a 11 Get the initial clock error control adjustment amount C0; S413, reverse frequency modulation is performed on the LDACS ground station clock source according to the initial clock error control adjustment amount C0, and then the next step is performed; S414, define the initial calibration identifier s=1, marking the end of the initial calibration, enter the periodic frequency modulation phase, define a new initial time t0=t+1, and return to S43 to start a new calculation and judgment of L(t) and G(t) at the next moment; S415, compare t-t0 with the preset driving cycle 0. When t-t0<0, return to S43, recalculate and judge L(t) and G(t) at the next moment t=t+1, until t-t0≥T, proceed to the next step; S416, fitting all clock error data in the above driving cycle based on the quadratic clock error model y(t), thereby obtaining the clock error fitting model y2(t) in the periodic frequency modulation stage, and then obtaining the initial frequency deviation a corresponding to y2(t) 21 ; S417, compare the absolute value of the clock difference measurement value at the current time |τ(t)| with the clock difference measurement value threshold τ l1 The size of |τ(t)|>τ l1 If established, proceed to S418, otherwise, proceed to S419; S418, determine whether the product τ(t)y'2(t) of the current clock error measurement value τ(t) and the first-order derivative value y'2(t) of the clock error fitting model in the periodic frequency modulation stage is less than 0. If so, the clock error control amount is C1, otherwise the clock error control amount is C2. The calculation formulas of C1 and C2 are as follows: S419, determine the absolute value of the initial frequency deviation corresponding to y2(t) |a 21 |Is it greater than the clock taming relative frequency deviation threshold f l1 , if yes, the clock error control amount is C3, otherwise, no control operation is performed in this cycle; the calculation formula of C3 is as follows: S420. Perform the corresponding reverse frequency modulation operation on the LDACS ground station clock source according to the clock error control amount obtained in the above process, then enter the next control cycle, define a new initial time t0=t+1, and return to S43 to recalculate and judge L(t) and G(t) at the next moment.
3. The method for adaptive time synchronization of LDACS ground stations based on clock retention according to claim 2, characterized in that: The clock error measurement value τ(t) in S44 is determined by the pulse arrival time of the clock signal, specifically: at time t, the pulse arrival time of the timing signal G(t) of the GNSS receiver is t, and the pulse arrival time of the clock signal L(t) is t+τ(t), then relative to the timing signal G(t) of the GNSS receiver, the clock error measurement value of the clock signal L(t) at time t is τ(t); For the timing signal G(t) of the GNSS receiver, the clock error measurement value of the clock signal L(t) at the initial time t0 is τ(t0), and the initial clock error measurement value is τ(t0).
4. The method for adaptive time synchronization of LDACS ground stations based on clock retention according to claim 3, characterized in that: The specific method of directly phase-modulating the LDACS ground station clock source in S48 is: controlling the time when the LDACS ground station clock source generates the clock signal L(t) so that the rising edges of the pulse signals L(t) and G(t) are aligned as much as possible.
5. The method for adaptive time synchronization of LDACS ground stations based on clock retention according to claim 4, characterized in that: The expression of the quadratic clock error model y(t) in S411 is as follows: Where y(t) represents the clock error of the clock source signal L(t) of the LDACS ground station at time t under clock taming relative to the timing signal G(t) of the GNSS receiver, t represents the current time, t0 represents the starting time, a0 represents the initial clock error, a1 represents the initial frequency deviation, a2 represents the frequency drift rate caused by temperature change factors, and ε y (t) represents the random error corresponding to y(t).
6. The method for adaptive time synchronization of LDACS ground stations based on clock retention according to claim 5, characterized in that: The expression of the clock error fitting model y1(t) in the initial calibration stage in S411 is as follows: In the formula, a 10 represents the initial clock error corresponding to y1(t), a 11 represents the initial frequency deviation corresponding to y1(t), a 12 It represents the frequency drift rate corresponding to y1(t), and ε1(t) represents the random error corresponding to y1(t).
7. The method for adaptive time synchronization of LDACS ground stations based on clock retention according to claim 6, characterized in that: The calculation expression of the clock error fitting model y2(t) in the periodic frequency modulation stage in S416 is as follows: In the formula, a 20 represents the initial clock error corresponding to y2(t), a 21 represents the initial frequency deviation corresponding to y2(t), a 22 It represents the frequency drift rate corresponding to y2(t), and ε2(t) represents the random error corresponding to y2(t).
8. The method for adaptive time synchronization of LDACS ground stations based on clock retention according to claim 7, characterized in that: In S5, the LDACS ground station clock short-time hold algorithm is run under GNSS lockout. The specific process of performing the corresponding clock hold operation on the LDACS ground station clock source according to the obtained clock error steering adjustment is as follows: S51. Setting the clock error prediction value threshold τ l2 , the clock maintains the relative frequency deviation threshold f l2 , LDACS ground station clock source frequency stability σ in ten thousand seconds, driving period 0; S52, forming a historical clock error data set {τ(t)} with all clock error data in the last driving cycle under the GNSS effective condition; S53, fitting the historical clock error data set {τ(t)} based on the linear clock error model, thereby obtaining the LDACS ground station clock source clock error fitting model x(t) when the GNSS timing signal fails; S54, using x(t) to predict the clock error at the next time t=t+1, and obtain the clock error prediction value S55, compare t-t0 with the preset driving cycle 0. When t-t0<0, return to S54 and make a clock error forecast for the next time, until t-t0≥0, and then proceed to the next step; S56. Determine the absolute value of the current time clock error forecast value Is it less than the clock error prediction value threshold τ l2 , if yes, proceed to the next step, otherwise jump to S510; S57, determine whether the initial frequency deviation absolute value |b1| corresponding to x(t) is less than the clock relative frequency deviation threshold f l2 , if yes, proceed to the next step, otherwise jump to S510; S58, determine the current time clock error forecast value The product of the first-order derivative value x′(t) of the clock error fitting model Is it less than 0? If so, proceed to the next step; otherwise, jump to S510; S59: No adjustment operation is performed, a new initial time t0=t+1 is defined, and the process returns to S54, and the clock holding process of the next cycle is entered based on the current clock difference model; S510, setting the clock to maintain the adjustment amount C = ±σ, and performing reverse frequency modulation on the LDACS ground station clock source; S511, the clock error forecast value of the driving time As the initial clock error b0 of x(t), the clock holding adjustment amount C is used as the increment of the relative frequency deviation to obtain a new relative frequency deviation, and then return to S53 to update the original clock error model, and at the same time define a new initial time t0=t+1 to enter the clock holding process of the next cycle.
9. The method for adaptive time synchronization of LDACS ground stations based on clock retention according to claim 8, characterized in that: In S54, x(t) is used to predict the clock error at the next time t=t+1 to obtain the clock error prediction value The expression is as follows: x(t)=b0+b1(t-t0)+ε x (t) Where x(t) represents the clock error of the clock source clock signal L(t) of the LDACS ground station relative to the timing signal G(t) of the GNSS receiver at time t under clock retention, t represents the current time, t0 represents the starting time, b0 represents the initial clock error corresponding to x(t); b1 represents the initial frequency deviation corresponding to x(t); ε x (t) represents the random error corresponding to x(t).
Citation Information
Patent Citations
High-precision time-frequency signal dynamic control method based on residual correction
CN112636857A
High-precision phase adjusting system and method based on delay line
CN116760406A
Atomic clock control parameter determination method and device, terminal equipment and storage medium
CN116819932A
Phase-locked loop hundred-picosecond-level clock regulation and control method, device and system and storage medium
CN117826570A
Reference frequency / Timing generating device
JP2000040958A
Cited By
Miniature PNT system high-reliability clock synchronization method based on CSAC
CN119536457A
