Bench test method of eight-in-one controller program OTA upgrade precondition

By simulating the different states of the eight-in-one controller, using the bench test method to judge the pre-conditions for OTA upgrades, the safety risks and difficulty problems of actual vehicle testing during the OTA upgrade of new energy vehicles are solved, and a more efficient test process is achieved. Security.

CN118915682APending Publication Date: 2024-11-08EWEA-TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410880196.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the field of new energy vehicles, there are safety risks brought by actual vehicle testing during the OTA upgrade process of the eight-in-one controller, and the prerequisites for OTA upgrade cannot be fully simulated, resulting in high testing difficulty and risk.

Method used

Using the bench test method, by connecting the eight-in-one controller, battery simulator, motor, dynamometer, power supply, diagnostic tools and PC, simulate the preconditions of different states, and determine whether OTA program upgrade is allowed, including low voltage. In the power outage, standby, drive status, etc., the corresponding commands are sent through the CAN bus and detected, downloaded and installed.

Benefits of technology

The test conditions and working conditions are clarified, the test difficulty is reduced, the testing efficiency is improved, and the risks brought by vehicle testing are avoided, providing an optimization reference for vehicle OTA.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118915682A_ABST
    Figure CN118915682A_ABST
Patent Text Reader

Abstract

The invention discloses a bench test method of an eight-in-one controller program OTA upgrade precondition, and the method can clearly evaluate the test condition and working condition through the judgment of the precondition, and provides a reference for the optimization of the whole vehicle OTA. By simulating the mode that the VCU sends the precondition signals to the CAN bus, verification of various precondition coupling conditions is achieved, the testing difficulty is greatly reduced, meanwhile, the testing efficiency is greatly improved, the problem that testing cannot be normally carried out due to shortage of whole vehicle resources is solved, and meanwhile the risk brought by whole vehicle testing is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of new energy vehicles, and specifically relates to a bench test method for pre-conditions for OTA upgrade of an eight-in-one controller program, which is suitable for matching pure electric motor-driven passenger cars or commercial vehicles. Background Art

[0002] During the OTA upgrade of the eight-in-one controller in the vehicle environment, the vehicle OTA management platform (PC side) is used to command Icard to detect the status of the eight-in-one controller (verify the target version and the previous version status) - download (download the target program to Icard through the cloud) - install (install the target program to the eight-in-one controller). After downloading the upgrade package and before installation, the installation preparation environment needs to be verified, that is, the verification of the program installation prerequisites. The upgrade prerequisites include, for example, the vehicle power-on status, the vehicle charging status, the vehicle auxiliary drive working status, the vehicle speed, etc.

[0003] As the heart of pure electric new energy vehicles, the eight-in-one controller not only controls the power output of the motor, but also takes into account the high-voltage power distribution of other auxiliary parts of the vehicle. Therefore, actual vehicle testing has risks and cannot fully simulate the prerequisites for OTA upgrades of the eight-in-one controller. The bench test completely avoids the safety risks brought by actual vehicle testing and fully covers the prerequisites for OTA upgrades of the eight-in-one controller through signal simulation, further improving the test progress and project development progress. Summary of the invention

[0004] The purpose of the present invention is to provide a bench test method for the pre-conditions of OTA upgrade of an eight-in-one controller program, so as to solve the safety risks brought by actual vehicle testing.

[0005] The technical solution adopted by the present invention is: A bench test method for preconditions of OTA upgrade of an eight-in-one controller program comprises an eight-in-one controller, a battery simulator, a motor, a dynamometer, a power supply, a diagnostic tool, an Icard and a PC; the eight-in-one controller is connected to the battery simulator and the motor respectively through high-voltage wires; the motor is connected to the dynamometer shaft; the power supply is connected to the Icard and the eight-in-one controller respectively through power wires; the diagnostic tool is connected to the eight-in-one controller through a vehicle CAN line and is connected to the PC through a USB connection line; the Icard is connected to the eight-in-one controller through an upgrade CAN line, and the Icard and the PC transmit data through the cloud; the cooling water is used to cool the eight-in-one controller and the motor; The test method using the above equipment includes the following steps: Step 1, precondition judgment: detect the status of the eight-in-one controller, motor, EPS and ACM, and determine whether to perform OTA program upgrade; Step 2: When the eight-in-one controller is powered on at low voltage and enters the shutdown state, OTA program upgrade is allowed, and the conditions for the controller to be powered on at low voltage and enter the shutdown state are verified; When the eight-in-one controller enters the standby state after high voltage power-on, OTA program upgrade is allowed, and the conditions for the controller to enter the standby state after high voltage power-on are verified; When the eight-in-one controller is powered on with high voltage and enters the driving state, OTA program upgrade is not allowed, and the conditions for the controller to be powered on with high voltage and enter the driving state are verified; When the 8-in-1 controller is in low voltage power-on shutdown state and the motor speed is >50rpm, OTA program upgrade is not allowed. Verify the condition that the controller is in low voltage power-on shutdown state and the motor speed is >50rpm; When the 8-in-1 controller is in high voltage power-on standby state and the motor speed is >50rpm, OTA program upgrade is not allowed. Verify the condition that the controller is in high voltage power-on standby state and the motor speed is >50rpm; When the 8-in-1 controller is in low voltage, powered-on, and stopped state while charging, OTA program upgrade is not allowed. Verify the conditions when the controller is in low voltage, powered-on, and stopped state while charging; When the 8-in-1 controller is in high voltage power-on standby state and charging state at the same time, OTA program upgrade is not allowed. Verify the conditions when the controller is in low voltage or high voltage power-on standby state and charging state at the same time; When the 8-in-1 controller is in high voltage power-on standby state and EPS is enabled at the same time, OTA program upgrade is not allowed. Verify the conditions when the controller is in high voltage power-on standby state and EPS is enabled at the same time. When the eight-in-one controller is in high-voltage power-on standby state and ACM is enabled, OTA program upgrade is not allowed. The conditions when the controller is in high-voltage power-on standby state and ACM is enabled are verified.

[0006] Further, in step 2, when the eight-in-one controller is powered on at low voltage and enters the shutdown state, the precondition test implementation steps for allowing OTA upgrade are: Step 11, connect the vehicle CANH and CANL to the diagnostic tool and the host computer through the 48-pin low-voltage line of the 8-in-1 controller; Step 12, connect the upgraded CANH and CANL of the 8-in-1 controller 48pin low-voltage line to Icard and supply 24V power to Icard through an external power supply; Step 13, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the 8-in-1 controller to supply 24V; Step 14, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller. The high voltage power supply of the eight-in-one controller is 600V; Step 15, send a shutdown command by simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 16, use the PC command Icard to detect the status of the eight-in-one controller, download it, and install it.

[0007] Further, in step 2, when the eight-in-one controller is powered on at high voltage and enters the standby state, the precondition test implementation steps for allowing OTA upgrade are: Step 21, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 22, connect the upgraded CANH and CANL of the 8-in-1 controller 48pin low-voltage line to the Icard and supply 24V power to the Icard through an external power supply; Step 23, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the 8-in-1 controller to supply 24V; Step 24, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 25, simulating VCU to send a standby command on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 26, use the PC to command Icard to detect the status of the eight-in-one controller, download it, and install it.

[0008] Further, in step 2, when the eight-in-one controller is powered on at high voltage and enters the driving state, the precondition test implementation steps for not allowing OTA upgrade are as follows: Step 31, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 32, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 33, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the eight-in-one controller to supply 24V; Step 34, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 35, sending a drive instruction by simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 36, command Icard to detect the status of the eight-in-one controller, download it, and install it through the PC.

[0009] Further, in step 2, when the eight-in-one controller is in low voltage power-on shutdown state and the motor speed is > 50 rpm, the precondition test implementation steps for not allowing OTA upgrade are as follows: Step 41, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 42, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 43, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the eight-in-one controller to supply 24V; Step 44, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 45, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a shutdown command and reverse the motor speed to be greater than 50rpm; Step 46, command Icard to detect the status of the eight-in-one controller, download it, and install it through the PC.

[0010] Further, in step 2, when the eight-in-one controller is in high voltage power-on standby state and the motor speed is > 50 rpm, the precondition test implementation steps for not allowing OTA upgrade are as follows: Step 51, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 52, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 53, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 54, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 55, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a standby command and reverse the motor speed to be greater than 50rpm; Step 56, command Icard to detect the status of the eight-in-one controller, download it, and install it through the PC.

[0011] Further, in step 2, when the eight-in-one controller is in low voltage power-on shutdown state and charging state at the same time, the precondition test implementation steps for not allowing OTA upgrade are: Step 61, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 62, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 63, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 64, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 65, simulating VCU to send a shutdown command and simulating BMS to send a charging command on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 66, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.

[0012] Further, in step 2, when the eight-in-one controller is in high voltage power-on standby state and charging state at the same time, the precondition test implementation steps for not allowing OTA upgrade are: Step 71, connect the vehicle CANH and CANL to the diagnostic tool and the host computer through the 48-pin low-voltage line of the eight-in-one controller; Step 72, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 73, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 74, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 75, simulating VCU to send a standby command and simulating BMS to send a charging command on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 76, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.

[0013] Further, in step 2, when the eight-in-one controller is in high voltage power-on standby state and EPS is enabled, the precondition test implementation steps for not allowing OTA upgrade are: Step 81, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 82, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the 8-in-1 controller to the Icard and supply 24V power to the Icard through an external power supply; Step 83, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the eight-in-one controller to supply 24V; Step 84, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 85, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a standby command and enable EPS; Step 86, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.

[0014] Further, in step 2, when the eight-in-one controller is in high voltage power-on standby state and ACM is enabled, the precondition test implementation steps for not allowing OTA upgrade are: Step 91, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 92, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 93, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 94, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 95, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a standby command and enable ACM; Step 96, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.

[0015] The beneficial effects of the present invention are as follows: the present invention clearly evaluates the test conditions and working conditions, and provides a reference for the optimization of the whole vehicle OTA; by simulating the VCU (vehicle control unit) to send a precondition signal to the CAN bus, the verification of multiple precondition coupling situations is realized, which greatly reduces the difficulty of testing and greatly improves the test efficiency. This invention solves the problem of the shortage of whole vehicle resources and the inability to carry out normal testing, and also avoids the risks brought by whole vehicle testing. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of a bench test environment applied in the present invention; Figure 2 The result corresponding to the preconditions for OTA upgrade of the eight-in-one controller program of the present invention; Figure 3 It is a schematic diagram of the test process of the present invention. DETAILED DESCRIPTION

[0017] The present invention will be further described below in conjunction with the accompanying drawings.

[0018] like Figure 1 As shown, the present invention is a bench test method for the prerequisite of OTA upgrade of the eight-in-one controller program. A bench test environment is pre-built, including an eight-in-one controller, a battery simulator, a motor, a dynamometer, a 24V power supply, a diagnostic tool, an Icard and a PC; the eight-in-one controller is connected to the battery simulator and the motor respectively through high-voltage lines; the motor is connected to the dynamometer shaft; the 24V power supply is connected to the Icard and the eight-in-one controller respectively through power lines; the diagnostic tool is connected to the eight-in-one controller through the vehicle CAN line, and is connected to the PC through a USB connection line; the Icard is connected to the eight-in-one controller through the upgrade CAN line, and the Icard and the PC transmit data through the cloud; the cooling water forms a loop to cool the eight-in-one controller and the motor.

[0019] like Figure 2 and Figure 3 As shown, the test method using the above equipment includes the following steps: Step 1, precondition judgment: detect the status of the eight-in-one controller, motor, EPS (steering motor) and ACM (air compressor), and determine whether to perform OTA program upgrade; Step 2: When the eight-in-one controller enters the shutdown state after low voltage power-on, OTA program upgrade is allowed, and the conditions for the controller to enter the shutdown state after low voltage power-on are verified; the specific steps are: Step 11, connect the vehicle CANH and CANL to the diagnostic tool and the host computer through the 48-pin low-voltage line of the 8-in-1 controller; Step 12, connect the upgraded CANH and CANL of the 8-in-1 controller 48pin low-voltage line to Icard and supply 24V power to Icard through an external power supply; Step 13, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the 8-in-1 controller to supply 24V; Step 14, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller. The high voltage power supply of the eight-in-one controller is 600V; Step 15, send a shutdown command by simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 16, use the PC command Icard to detect the status of the eight-in-one controller, download it, and install it.

[0020] When the eight-in-one controller is powered on with high voltage and enters the standby state, OTA program upgrade is allowed to verify the conditions for the controller to be powered on with high voltage and enter the standby state; the specific steps are: Step 21, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 22, connect the upgraded CANH and CANL of the 8-in-1 controller 48pin low-voltage line to the Icard and supply 24V power to the Icard through an external power supply; Step 23, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the 8-in-1 controller to supply 24V; Step 24, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 25, simulating VCU to send a standby command on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 26, use the PC to command Icard to detect the status of the eight-in-one controller, download it, and install it.

[0021] When the eight-in-one controller is powered on with high voltage and enters the driving state, OTA program upgrade is not allowed. The conditions for the controller to be powered on with high voltage and enter the driving state are verified; the specific steps are: Step 31, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 32, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 33, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the eight-in-one controller to supply 24V; Step 34, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 35, sending a drive instruction by simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 36, command Icard to detect the status of the eight-in-one controller, download it, and install it through the PC.

[0022] When the 8-in-1 controller is in low voltage power-on shutdown state and the motor speed is >50rpm, OTA program upgrade is not allowed. Verify the condition that the controller is in low voltage power-on shutdown state and the motor speed is >50rpm. The specific steps are as follows: Step 41, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 42, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 43, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the eight-in-one controller to supply 24V; Step 44, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 45, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a shutdown command and reverse the motor speed to be greater than 50rpm; Step 46, command Icard to detect the status of the eight-in-one controller, download it, and install it through the PC.

[0023] When the 8-in-1 controller is in high voltage power-on standby state and the motor speed is >50rpm, OTA program upgrade is not allowed. Verify the condition that the controller is in high voltage power-on standby state and the motor speed is >50rpm. The specific steps are as follows: Step 51, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 52, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 53, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 54, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 55, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a standby command and reverse the motor speed to be greater than 50rpm; Step 56, command Icard to detect the status of the eight-in-one controller, download it, and install it through the PC.

[0024] When the 8-in-1 controller is in low voltage power-on shutdown state and charging state at the same time, OTA program upgrade is not allowed. Verify the conditions of the controller in low voltage power-on shutdown state and charging state at the same time; the specific steps are: Step 61, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 62, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 63, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 64, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 65, simulating VCU to send a shutdown command and simulating BMS to send a charging command on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 66, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.

[0025] When the 8-in-1 controller is in high voltage power-on standby state and charging state at the same time, OTA program upgrade is not allowed. Verify the conditions of the controller in low voltage or high voltage power-on standby state and charging state at the same time; the specific steps are: Step 71, connect the vehicle CANH and CANL to the diagnostic tool and the host computer through the 48-pin low-voltage line of the eight-in-one controller; Step 72, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 73, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 74, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 75, simulating VCU to send a standby command and simulating BMS to send a charging command on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 76, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.

[0026] When the 8-in-1 controller is in high voltage power-on standby state and EPS is enabled at the same time, OTA program upgrade is not allowed. Verify the conditions when the controller is in high voltage power-on standby state and EPS is enabled at the same time. The specific steps are: Step 81, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 82, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the 8-in-1 controller to the Icard and supply 24V power to the Icard through an external power supply; Step 83, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the eight-in-one controller to supply 24V; Step 84, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 85, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a standby command and enable EPS; Step 86, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.

[0027] When the 8-in-1 controller is in high voltage power-on standby state and ACM is enabled, OTA program upgrade is not allowed. Verify the conditions when the controller is in high voltage power-on standby state and ACM is enabled. The specific steps are: Step 91, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 92, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 93, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 94, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 95, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a standby command and enable ACM; Step 96, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.

Claims

1. A bench test method for the preconditions of OTA upgrade of an eight-in-one controller program, characterized in that: It includes an eight-in-one controller, a battery simulator, a motor, a dynamometer, a power supply, a diagnostic tool, an Icard and a PC; the eight-in-one controller is connected to the battery simulator and the motor respectively through high-voltage wires; the motor is connected to the dynamometer shaft; the power supply is connected to the Icard and the eight-in-one controller respectively through power lines; the diagnostic tool is connected to the eight-in-one controller through the vehicle CAN line and is connected to the PC through a USB connection line; the Icard is connected to the eight-in-one controller through an upgraded CAN line, and the Icard and the PC transmit data through the cloud; the cooling water is used to cool the eight-in-one controller and the motor; The test method using the above equipment includes the following steps: Step 1, precondition judgment: detect the status of the eight-in-one controller, motor, EPS and ACM, and determine whether to perform OTA program upgrade; Step 2: When the eight-in-one controller is powered on at low voltage and enters the shutdown state, OTA program upgrade is allowed, and the conditions for the controller to be powered on at low voltage and enter the shutdown state are verified; When the eight-in-one controller enters the standby state after high voltage power-on, OTA program upgrade is allowed, and the conditions for the controller to enter the standby state after high voltage power-on are verified; When the eight-in-one controller is powered on with high voltage and enters the driving state, OTA program upgrade is not allowed, and the conditions for the controller to be powered on with high voltage and enter the driving state are verified; When the 8-in-1 controller is in low voltage power-on shutdown state and the motor speed is >50rpm, OTA program upgrade is not allowed. Verify the condition that the controller is in low voltage power-on shutdown state and the motor speed is >50rpm; When the 8-in-1 controller is in high voltage power-on standby state and the motor speed is >50rpm, OTA program upgrade is not allowed. Verify the condition that the controller is in high voltage power-on standby state and the motor speed is >50rpm; When the 8-in-1 controller is in low voltage, powered-on, and stopped state while charging, OTA program upgrade is not allowed. Verify the conditions when the controller is in low voltage, powered-on, and stopped state while charging; When the 8-in-1 controller is in high voltage power-on standby state and charging state at the same time, OTA program upgrade is not allowed. Verify the conditions when the controller is in low voltage or high voltage power-on standby state and charging state at the same time; When the 8-in-1 controller is in high voltage power-on standby state and EPS is enabled at the same time, OTA program upgrade is not allowed. Verify the conditions when the controller is in high voltage power-on standby state and EPS is enabled at the same time. When the eight-in-one controller is in high-voltage power-on standby state and ACM is enabled, OTA program upgrade is not allowed. The conditions when the controller is in high-voltage power-on standby state and ACM is enabled are verified.

2. The bench test method for the preconditions of OTA upgrade of the eight-in-one controller program according to claim 1, characterized in that: In step 2, when the 8-in-1 controller is powered on at low voltage and enters shutdown state, the precondition test implementation steps for allowing OTA upgrade are as follows: Step 11, connect the vehicle CANH and CANL to the diagnostic tool and the host computer through the 48-pin low-voltage line of the 8-in-1 controller; Step 12, connect the upgraded CANH and CANL of the 8-in-1 controller 48pin low-voltage line to Icard and supply 24V power to Icard through an external power supply; Step 13, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the 8-in-1 controller to supply 24V; Step 14, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller. The high voltage power supply of the eight-in-one controller is 600V; Step 15, send a shutdown command by simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 16: Use the PC command Icard to detect the status of the eight-in-one controller, download it, and install it.

3. The bench test method for the preconditions of OTA upgrade of the eight-in-one controller program according to claim 1, characterized in that: In step 2, when the 8-in-1 controller is powered on with high voltage and enters the standby state, the precondition test implementation steps for allowing OTA upgrade are as follows: Step 21, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 22, connect the upgraded CANH and CANL of the 8-in-1 controller 48pin low-voltage line to the Icard and supply 24V power to the Icard through an external power supply; Step 23, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the 8-in-1 controller to supply 24V; Step 24, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 25, simulating VCU to send a standby command on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 26, use the PC to command Icard to detect the status of the eight-in-one controller, download it, and install it.

4. The bench test method for the preconditions of OTA upgrade of the eight-in-one controller program according to claim 1, characterized in that: In step 2, when the 8-in-1 controller enters the driving state after high voltage power-on, the precondition test implementation steps for not allowing OTA upgrade are as follows: Step 31, connect the vehicle CANH and CANL to the diagnostic tool and the host computer through the 48-pin low-voltage line of the eight-in-one controller; Step 32, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 33, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the eight-in-one controller to supply 24V; Step 34, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 35, sending a drive instruction by simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 36, command Icard to detect the status of the eight-in-one controller, download it, and install it through the PC.

5. The bench test method for the preconditions of OTA upgrade of the eight-in-one controller program according to claim 1, characterized in that: In step 2, when the 8-in-1 controller is in low voltage power-on shutdown state and the motor speed is > 50rpm, the precondition test implementation steps for not allowing OTA upgrade are as follows: Step 41, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 42, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 43, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the eight-in-one controller to supply 24V; Step 44, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 45, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a shutdown command and reverse the motor speed to be greater than 50rpm; Step 46, command Icard to detect the status of the eight-in-one controller, download it, and install it through the PC.

6. The bench test method for the preconditions of OTA upgrade of the eight-in-one controller program according to claim 1, characterized in that: In step 2, when the 8-in-1 controller is in high voltage power-on standby state and the motor speed is > 50 rpm, the precondition test implementation steps for not allowing OTA upgrade are as follows: Step 51, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 52, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 53, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 54, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 55, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a standby command and reverse the motor speed to be greater than 50rpm; Step 56, command Icard to detect the status of the eight-in-one controller, download it, and install it through the PC.

7. The bench test method for the preconditions of OTA upgrade of the eight-in-one controller program according to claim 1, characterized in that: In step 2, when the 8-in-1 controller is in low voltage power-on shutdown state and charging state at the same time, the precondition test implementation steps for not allowing OTA upgrade are as follows: Step 61, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 62, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 63, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 64, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 65, simulating VCU to send a shutdown command and simulating BMS to send a charging command on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 66, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.

8. The bench test method for the preconditions of OTA upgrade of the eight-in-one controller program according to claim 1, characterized in that: In step 2, when the 8-in-1 controller is in high voltage power-on standby state and charging state at the same time, the precondition test implementation steps for not allowing OTA upgrade are as follows: Step 71, connect the vehicle CANH and CANL to the diagnostic tool and the host computer through the 48-pin low-voltage line of the eight-in-one controller; Step 72, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 73, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 74, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 75, simulating VCU to send a standby command and simulating BMS to send a charging command on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller; Step 76, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.

9. The bench test method for the preconditions of OTA upgrade of the eight-in-one controller program according to claim 1, characterized in that: In step 2, when the 8-in-1 controller is in high voltage power-on standby state and EPS is enabled, the precondition test implementation steps for not allowing OTA upgrade are as follows: Step 81, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 82, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the 8-in-1 controller to the Icard and supply 24V power to the Icard through an external power supply; Step 83, connect an external low-voltage power supply through the 24V+ and 24V- of the 48-pin low-voltage line of the eight-in-one controller to supply 24V; Step 84, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 85, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a standby command and enable EPS; Step 86, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.

10. The bench test method for the preconditions of OTA upgrade of the eight-in-one controller program according to claim 1, characterized in that: In step 2, when the 8-in-1 controller is in high voltage power-on standby state and ACM is enabled, the precondition test implementation steps for not allowing OTA upgrade are as follows: Step 91, connect the vehicle CANH and CANL through the 48-pin low-voltage line of the eight-in-one controller to the diagnostic tool and connect to the host computer; Step 92, connect the upgraded CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to the Icard and supply 24V power to the Icard through an external power supply; Step 93, supply 24V through the 24V+ and 24V- external low-voltage power supply of the 48-pin low-voltage line of the 8-in-1 controller; Step 94, connect the high voltage through the high voltage input terminal of the eight-in-one controller, and connect the corresponding motor through the three-phase output of the eight-in-one controller, and the high voltage power supply of the eight-in-one controller is 600V; Step 95, simulating VCU on the host computer corresponding to the diagnostic tool connected to the vehicle CANH and CANL of the 48-pin low-voltage line of the eight-in-one controller to send a standby command and enable ACM; Step 96, command Icard to detect the status of the eight-in-one controller, download and install it through the PC.