Operation and maintenance data management method and system based on big data analysis
By dividing the data center into operation and maintenance sub-regions, calculating the fault coefficient and task completion index, automated monitoring and risk warning of the operation and maintenance sub-regions are solved, and the warning in operation and maintenance data management is not timely and monitoring is not real-time in operation and maintenance data management in the existing technology. The problem has improved operation and maintenance efficiency and business continuity.
Patent Information
- Application Number
- CN202411414129.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-11
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-10-11
AI Technical Summary
The existing operation and maintenance data management methods lack an automated monitoring mechanism, which leads to untimely warning of emergencies, affecting the work efficiency of the operation and maintenance host, and the fault monitoring lacks real-time and global nature, and cannot respond quickly.
By dividing the target data center into multiple operation and maintenance sub-regions, calculating the equipment failure coefficient and task completion index, analyzing the regional operation and maintenance warning coefficient, dividing the operation and maintenance sub-region types, and performing operation risk warnings on the target data center based on the risk warning coefficient. , realize automated dynamic monitoring and real-time fault response.
It improves the timeliness of emergency warnings, shortens response time, and ensures the business continuity of the data center and the real-time and global nature of fault monitoring.
Smart Images

Figure CN118916248A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the computer field and relates to operation and maintenance technology, and specifically to an operation and maintenance data management method and system based on big data analysis. Background Art
[0002] The existing operation and maintenance data management methods have the following defects in the operation and maintenance process: 1. There is a lack of automatic monitoring mechanism for the operation and maintenance host that fails or has performance degradation, which easily leads to untimely warning of emergencies, thus affecting the work efficiency of the operation and maintenance host; 2. The process of fault monitoring of the operation and maintenance host lacks real-time and globality. After a fault occurs, the monitoring system cannot issue an alarm in time, resulting in the operation and maintenance team being unable to respond quickly. To this end, we propose an operation and maintenance data management method and system based on big data analysis. Summary of the invention
[0003] In view of the shortcomings of the prior art, the purpose of the present invention is to provide an operation and maintenance data management method and system based on big data analysis. In order to achieve the above purpose, the present invention adopts the following technical scheme: an operation and maintenance data management method based on big data analysis includes the following specific steps: Step S1: Divide the target data center into multiple operation and maintenance sub-areas, obtain the equipment failure coefficient corresponding to each operation and maintenance sub-area, obtain the task detection coefficient corresponding to each operation and maintenance sub-area, calculate the mean of the task detection coefficient to obtain the task completion index, and obtain the equipment operation and maintenance data; calculate the equipment failure coefficient corresponding to the first operation and maintenance sub-area, and the specific formula configuration is as follows:
[0004] ; Wherein, Sbg is the equipment failure coefficient corresponding to the first operation and maintenance sub-area, Tb1 to Tbn are the first reported failure value and the nth reported failure value respectively, and Gzj is the failure monitoring time length value; the first task monitoring coefficient is calculated, and the specific formula configuration is as follows:
[0005] ; Wherein, Rwj1 is the first task monitoring coefficient, Cpu is the average CPU usage, Ncl is the average memory utilization, and Rzx is the task execution time; Step S2: By analyzing the equipment operation and maintenance data, the regional operation and maintenance warning coefficient corresponding to each operation and maintenance sub-area is calculated, and the regional operation and maintenance warning coefficient threshold is obtained and compared with the regional operation and maintenance warning coefficient. According to the numerical comparison result, the operation and maintenance sub-area is divided into the first type of operation and maintenance sub-area and the second type of operation and maintenance sub-area, and the operation and maintenance area division data is obtained; the regional operation and maintenance warning coefficient is calculated, and the specific formula configuration is as follows:
[0006] ; Wherein, Qyy is the regional operation and maintenance warning coefficient, Sbg is the equipment failure coefficient, and Rwz is the task completion index; Step S3: According to the operation and maintenance area division data, operation risk warnings are issued to the operation and maintenance sub-areas and target data centers respectively.
[0007] Furthermore, the step S1 also includes the following specific steps: step S11: divide the target data center into m operation and maintenance equipment sub-areas with the same number of servers, and name them from the first operation and maintenance sub-area to the mth operation and maintenance sub-area respectively; step S12: monitor the operation and maintenance equipment failures of the first operation and maintenance sub-area to obtain the equipment failure coefficient corresponding to the first operation and maintenance sub-area; step S13: obtain the task completion index corresponding to the first operation and maintenance sub-area; step S14: define the equipment failure coefficient and task completion index corresponding to the first operation and maintenance sub-area as the first area operation and maintenance data; step S15: obtain the area operation and maintenance data corresponding to the second to the mth operation and maintenance sub-areas respectively, and obtain the second area operation and maintenance data to the mth area operation and maintenance data; step S16: define the first area operation and maintenance data to the mth area operation and maintenance data as equipment operation and maintenance data.
[0008] Furthermore, the step S12 also includes the following specific steps: step S121: in the process of fault detection for the first operation and maintenance sub-area, the time value corresponding to the current moment is obtained as the first reference time point, the time point corresponding to the previous characteristic monitoring time length of the first reference time is used as the second reference time point, and the period between the first reference time point and the second reference time point is defined as the fault monitoring period; step S122: the time length value corresponding to the fault monitoring period is obtained to obtain the fault monitoring time length value; step S123: in the first operation and maintenance sub-area, n operation and maintenance hosts are selected as test hosts respectively, and they are named as the first test host to the nth test host respectively; step S124: the number of fault times reported by the first test host to the nth test host in the fault monitoring period is obtained respectively, and the first reported fault value and the nth reported fault value are obtained; step S125: the first reported fault value and the nth reported fault value are calculated with the fault monitoring time length value to obtain the equipment failure coefficient corresponding to the first operation and maintenance sub-area.
[0009] Furthermore, the step S13 also includes the following specific steps: step S131: obtain a work task list corresponding to the first operation and maintenance sub-area, select i work tasks from the work task list as sample work tasks, and name them as the first sample work task to the i-th sample work task, respectively; step S132: perform work detection on the first sample work task to obtain a first task monitoring coefficient; step S133: perform work monitoring on the second sample work task to the i-th sample work task, respectively, to obtain the second task monitoring coefficient to the i-th task monitoring coefficient; step S134: calculate the average of the first task monitoring coefficient to the i-th task monitoring coefficient to obtain the task completion index corresponding to the first operation and maintenance sub-area.
[0010] Furthermore, the step S132 also includes the following specific steps: step S1321: obtaining the average CPU usage rate corresponding to the operation and maintenance host that executes the first sample work task during the completion of the first sample work task; step S1322: obtaining the average memory utilization rate corresponding to the operation and maintenance host that executes the first sample work task during the completion of the first sample work task; step S1323: taking the time point when the first operation and maintenance sub-area starts to execute the first sample work task as the first execution monitoring time point; step S1324: taking the time point when the first operation and maintenance sub-area ends executing the first sample work task as the second execution monitoring time point; step S1325: calculating the numerical difference between the first execution monitoring time point and the second execution monitoring time point to obtain the task execution duration; step S1326: obtaining the first task monitoring coefficient by calculating the average CPU usage rate, the average memory utilization rate and the task execution duration.
[0011] Furthermore, the step S2 also includes the following specific steps: step S21: acquiring equipment operation and maintenance data, and acquiring first area operation and maintenance data to mth area operation and maintenance data respectively according to the equipment operation and maintenance data; step S22: performing early warning analysis on the first area operation and maintenance sub-area according to the first area operation and maintenance data, and obtaining the regional operation and maintenance early warning coefficient corresponding to the first operation and maintenance sub-area; step S23: acquiring the regional operation and maintenance early warning coefficients corresponding to the second area operation and maintenance data to the mth area operation and maintenance data respectively; step S24: acquiring the regional operation and maintenance early warning coefficient threshold and performing numerical comparison with the regional operation and maintenance early warning coefficient, dividing the operation and maintenance sub-area into a first type of operation and maintenance sub-area and a second type of operation and maintenance sub-area according to the numerical comparison result, and obtaining operation and maintenance area division data.
[0012] Furthermore, the step S22 also includes the following specific steps: step S221: respectively obtaining the equipment failure coefficient and the task completion index according to the first regional operation and maintenance data; step S222: calculating the equipment failure coefficient and the task completion index to obtain the regional operation and maintenance warning coefficient.
[0013] Furthermore, the step S24 further includes the following specific steps: Step S241: respectively obtaining the equipment failure coefficient threshold and the task completion index threshold, and calculating the equipment failure coefficient threshold and the task completion index threshold to obtain the regional operation and maintenance warning coefficient threshold; calculating the regional operation and maintenance warning coefficient threshold, the specific formula configuration is as follows:
[0014] ; Wherein, Qyy1 is the regional operation and maintenance warning coefficient threshold, Sbg1 is the equipment failure coefficient threshold, and Rwz1 is the task completion index threshold; Step S242: When the regional operation and maintenance warning coefficient is greater than or equal to the regional operation and maintenance warning coefficient threshold, the corresponding operation and maintenance sub-area is judged to be the first type of operation and maintenance sub-area; Step S243: When the regional operation and maintenance warning coefficient is less than the regional operation and maintenance warning coefficient threshold, the corresponding operation and maintenance sub-area is judged to be the second type of operation and maintenance sub-area.
[0015] Furthermore, the step S3 also includes the following specific steps: step S31: obtaining operation and maintenance area division data; step S32: when the operation and maintenance sub-area is a first type of operation and maintenance sub-area, performing normal risk monitoring on the operation and maintenance sub-area; step S33: when the operation and maintenance sub-area is a second type of operation and maintenance sub-area, issuing an operation and maintenance risk warning for the operation and maintenance sub-area; step S34: obtaining the number value corresponding to the second type of operation and maintenance sub-area in the target data center, obtaining the number value of abnormal operation and maintenance areas, calculating the ratio of the number value of abnormal operation and maintenance areas to m, and obtaining the abnormal area number ratio; step S35: obtaining the abnormal area number ratio threshold, and numerically comparing the abnormal area number ratio with the abnormal area number ratio threshold; specifically as follows: step S351: when the abnormal area number ratio is greater than or equal to the abnormal area number ratio threshold, issuing an operation risk warning for the target data center; step S352: when the abnormal area number ratio is less than the abnormal area number ratio threshold, performing normal operation risk monitoring on the target data center.
[0016] An operation and maintenance data management system based on big data analysis, the specific working process of each module is as follows: data acquisition module: used to divide the target data center into multiple operation and maintenance sub-areas, respectively, obtain the equipment failure coefficient and task completion index corresponding to each operation and maintenance sub-area, and obtain equipment operation and maintenance data; data analysis module: used to divide the operation and maintenance sub-areas into first-type operation and maintenance sub-areas and second-type operation and maintenance sub-areas by analyzing the equipment operation and maintenance data, and obtain operation and maintenance area division data; risk warning module: used to issue operation risk warnings to the operation and maintenance sub-areas and the target data center respectively according to the operation and maintenance area division data.
[0017] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are as follows: 1. The present invention divides the target data center into multiple operation and maintenance sub-areas, obtains the equipment failure coefficient and task completion index corresponding to each operation and maintenance sub-area, and realizes automatic dynamic monitoring of the target data center, thereby improving the timeliness of emergency warning, shortening the response time, and ensuring business continuity. 2. The present invention performs operation risk warnings for the operation and maintenance sub-areas and the target data center according to the operation and maintenance area division data, which can effectively ensure the real-time and global nature of the data center fault monitoring process. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0019] Figure 1 It is a diagram of the implementation steps of the present invention.
[0020] Figure 2 It is the overall system block diagram of the present invention.
[0021] Figure 3 The data interaction flow chart of the present invention. DETAILED DESCRIPTION
[0022] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] Embodiment 1
[0024] See also Figure 1 The present invention provides a technical solution: an operation and maintenance data management method based on big data analysis, comprising the following specific steps:
[0025] Step S1: Acquire equipment operation and maintenance data; Step S11: Divide the target data center into m operation and maintenance equipment sub-areas with the same number of servers, and name them from the first operation and maintenance sub-area to the mth operation and maintenance sub-area respectively; Step S12: Perform operation and maintenance equipment fault monitoring on the first operation and maintenance sub-area to obtain the equipment fault coefficient corresponding to the first operation and maintenance sub-area; Step S12 also includes the following specific steps: Step S121: In the process of fault detection on the first operation and maintenance sub-area, obtain the time value corresponding to the current moment as the first reference time point, take the time point corresponding to the previous characteristic monitoring time length of the first reference time as the second reference time point, and define the period between the first reference time point and the second reference time point as the fault monitoring time point Segment; Step S122: Obtain the time length value corresponding to the fault monitoring period to obtain the fault monitoring time length value; Step S123: Select n operation and maintenance hosts in the first operation and maintenance sub-area as test hosts, and name them as the first test host to the nth test host respectively; Step S124: Obtain the fault time values reported by the first test host to the nth test host in the fault monitoring period respectively, and obtain the first reported fault value and the nth reported fault value; Step S125: Calculate the first reported fault value and the nth reported fault value with the fault monitoring time length value to obtain the equipment failure coefficient corresponding to the first operation and maintenance sub-area; Calculate the equipment failure coefficient corresponding to the first operation and maintenance sub-area, and the specific formula configuration is as follows:
[0026] ; Wherein, Sbg is the equipment failure coefficient corresponding to the first operation and maintenance sub-area, Tb1 to Tbn are respectively the first reported failure value and the nth reported failure value, and Gzj is the failure monitoring time length value; Step S13: Obtain the task completion index corresponding to the first operation and maintenance sub-area; The step S13 also includes the following specific steps: Step S131: Obtain the work task list corresponding to the first operation and maintenance sub-area, select i work tasks from the work task list as sample work tasks, and name them as the first sample work task to the i-th sample work task respectively; Step S132: Perform a work detection on the first sample work task to obtain the first task monitoring coefficient; The step S132 also includes the following specific steps: Step S1321: Obtain the first sample work task completion process, obtain the execution of the first The average CPU usage rate corresponding to the operation and maintenance host of the sample work task; step S1322: during the completion of the first sample work task, obtain the average memory utilization rate corresponding to the operation and maintenance host that executes the first sample work task; step S1323: the time point when the first operation and maintenance sub-area starts to execute the first sample work task is taken as the first execution monitoring time point; step S1324: the time point when the first operation and maintenance sub-area ends to execute the first sample work task is taken as the second execution monitoring time point; step S1325: calculate the numerical difference between the first execution monitoring time point and the second execution monitoring time point to obtain the task execution duration; step S1326: calculate the average CPU usage rate, the average memory utilization rate and the task execution duration to obtain the first task monitoring coefficient; the first task monitoring coefficient is calculated, and the specific formula configuration is as follows:
[0027] ; Wherein, Rwj1 is the first task monitoring coefficient, Cpu is the average CPU usage, Ncl is the average memory utilization, and Rzx is the task execution time; Step S133: Perform work monitoring on the second sample work task to the i-th sample work task respectively, and obtain the second task monitoring coefficient to the i-th task monitoring coefficient; Step S134: Calculate the average of the first task monitoring coefficient to the i-th task monitoring coefficient to obtain the task completion index corresponding to the first operation and maintenance sub-area; Step S14: Define the equipment failure coefficient and task completion index corresponding to the first operation and maintenance sub-area as the first area operation and maintenance data; Step S15: Acquire the regional operation and maintenance data corresponding to the second to the m-th operation and maintenance sub-areas respectively, and obtain the second area operation and maintenance data to the m-th area operation and maintenance data; Step S16: Define the first area operation and maintenance data to the m-th area operation and maintenance data as equipment operation and maintenance data.
[0028] Step S2: By analyzing the equipment operation and maintenance data, the operation and maintenance sub-area is divided into a first type of operation and maintenance sub-area and a second type of operation and maintenance sub-area, and the operation and maintenance area division data is obtained; Step S21: Acquire the equipment operation and maintenance data, and respectively acquire the first area operation and maintenance data to the mth area operation and maintenance data according to the equipment operation and maintenance data; Step S22: Perform early warning analysis on the first operation and maintenance sub-area according to the first area operation and maintenance data, and obtain the regional operation and maintenance early warning coefficient corresponding to the first operation and maintenance sub-area; The step S22 also includes the following specific steps: Step S221: Acquire the equipment failure coefficient and the task completion index according to the first area operation and maintenance data; Step S222: Calculate the equipment failure coefficient and the task completion index to obtain the regional operation and maintenance early warning coefficient; Calculate the regional operation and maintenance early warning coefficient, and the specific formula configuration is as follows:
[0029] ; Wherein, Qyy is the regional operation and maintenance warning coefficient, Sbg is the equipment failure coefficient, and Rwz is the task completion index; Step S23: respectively obtain the regional operation and maintenance warning coefficients corresponding to the second regional operation and maintenance data to the mth regional operation and maintenance data; Step S24: obtain the regional operation and maintenance warning coefficient threshold and compare the regional operation and maintenance warning coefficient numerically, and divide the operation and maintenance sub-area into the first type of operation and maintenance sub-area and the second type of operation and maintenance sub-area according to the numerical comparison result, and obtain the operation and maintenance area division data; Step S24 also includes the following specific steps: Step S241: respectively obtain the equipment failure coefficient threshold and the task completion index threshold, and calculate the regional operation and maintenance warning coefficient threshold by calculating the equipment failure coefficient threshold and the task completion index threshold; calculate the regional operation and maintenance warning coefficient threshold, and the specific formula configuration is as follows:
[0030] ; Wherein, Qyy1 is the regional operation and maintenance warning coefficient threshold, Sbg1 is the equipment failure coefficient threshold, and Rwz1 is the task completion index threshold; Step S242: When the regional operation and maintenance warning coefficient is greater than or equal to the regional operation and maintenance warning coefficient threshold, the corresponding operation and maintenance sub-area is judged to be the first type of operation and maintenance sub-area; Step S243: When the regional operation and maintenance warning coefficient is less than the regional operation and maintenance warning coefficient threshold, the corresponding operation and maintenance sub-area is judged to be the second type of operation and maintenance sub-area.
[0031] Step S3: Please refer to Figure 3, and perform an operation risk warning on the target data center according to the operation and maintenance area division data; step S31: obtain the operation and maintenance area division data; step S32: when the operation and maintenance sub-area is the first type of operation and maintenance sub-area, the risk monitoring of the operation and maintenance sub-area is performed normally; step S33: when the operation and maintenance sub-area is the second type of operation and maintenance sub-area, an operation and maintenance risk warning is issued for the operation and maintenance sub-area; step S34: obtain the number value corresponding to the second type of operation and maintenance sub-area in the target data center, obtain the number value of abnormal operation and maintenance areas, calculate the ratio of the number value of abnormal operation and maintenance areas to m, and obtain the number ratio of abnormal areas; step S35: obtain the abnormal area number ratio threshold, and perform a numerical comparison between the abnormal area number ratio and the abnormal area number ratio threshold; specifically as follows: step S351: when the abnormal area number ratio is greater than or equal to the abnormal area number ratio threshold, an operation risk warning is issued for the target data center; step S352: when the abnormal area number ratio is less than the abnormal area number ratio threshold, the operation risk monitoring of the target data center is performed normally.
[0032] In this application, if corresponding calculation formulas appear, the above calculation formulas are all dimensionless and take their numerical calculations. The weight coefficients, proportional coefficients and other coefficients in the formulas are set to a result value obtained by quantifying each parameter. The size of the weight coefficient and the proportional coefficient can be determined as long as it does not affect the proportional relationship between the parameter and the result value.
[0033] Embodiment 2
[0034] See also Figure 2 Based on another concept of the same invention, an operation and maintenance data management system based on big data analysis is proposed, including a data acquisition module, a data analysis module, a risk warning module and a server, the data acquisition module, the data analysis module and the risk warning module are respectively connected to the server, and the server controls the data acquisition module, the data analysis module and the risk warning module respectively; the data acquisition module acquires equipment operation and maintenance data; the target data center is divided into m operation and maintenance equipment sub-areas with the same number of servers, and they are named the first operation and maintenance sub-area to the mth operation and maintenance sub-area respectively.
[0035] It should be noted here that: in the present application, m is the quantity value corresponding to the operation and maintenance equipment sub-area corresponding to the target data center, and m is an integer greater than 0; the first operation and maintenance sub-area is monitored for operation and maintenance equipment faults to obtain the equipment failure coefficient corresponding to the first operation and maintenance sub-area; specifically as follows: in the process of fault detection in the first operation and maintenance sub-area, the time value corresponding to the current moment is obtained as the first reference time point, and the time point corresponding to the previous characteristic monitoring time length of the first reference time is taken as the second reference time point, and the period between the first reference time point and the second reference time point is defined as the fault monitoring period; the time length value corresponding to the fault monitoring period is obtained to obtain the fault monitoring time length value.
[0036] It should be noted here that: in the present application, the feature monitoring duration is specifically limited to 30 minutes; the fault monitoring period involved here is dynamically updated in real time as the time value corresponding to the current moment changes; n operation and maintenance hosts are selected as test hosts in the first operation and maintenance sub-area, and they are named the first test host to the nth test host respectively.
[0037] It should be noted here that: in the present application, n is the number value corresponding to the test host, and n is an integer greater than 0; the number of fault times reported by the first test host to the nth test host during the fault monitoring period is obtained respectively, and the first reported fault value and the nth reported fault value are obtained; the first reported fault value and the nth reported fault value are calculated with the fault monitoring time length value to obtain the equipment failure coefficient corresponding to the first operation and maintenance sub-area; the equipment failure coefficient corresponding to the first operation and maintenance sub-area is calculated, and the specific formula configuration is as follows:
[0038] ; Wherein, Sbg is the equipment failure coefficient corresponding to the first operation and maintenance sub-area, Tb1 to Tbn are the first reported fault value and the nth reported fault value respectively, and Gzj is the fault monitoring time length value; the task completion index corresponding to the first operation and maintenance sub-area is obtained; specifically as follows: obtain the work task list corresponding to the first operation and maintenance sub-area, select i work tasks in the work task list as sample work tasks, and name them as the first sample work task to the i-th sample work task respectively.
[0039] It should be noted here that: in this application, i is the quantity value corresponding to the sample work task, and i is an integer greater than 0; perform work detection on the first sample work task to obtain the first task monitoring coefficient; specifically as follows: obtain the average CPU usage corresponding to the operation and maintenance host that executes the first sample work task during the completion of the first sample work task; obtain the average memory utilization corresponding to the operation and maintenance host that executes the first sample work task during the completion of the first sample work task; take the time point when the first operation and maintenance sub-area starts to execute the first sample work task as the first execution monitoring time point; take the time point when the first operation and maintenance sub-area ends the execution of the first sample work task as the second execution monitoring time point; calculate the numerical difference between the first execution monitoring time point and the second execution monitoring time point to obtain the task execution time; calculate the average CPU usage, average memory utilization and task execution time to obtain the first task monitoring coefficient; calculate the first task monitoring coefficient, and the specific formula configuration is as follows:
[0040] ; Wherein, Rwj1 is the first task monitoring coefficient, Cpu is the average CPU usage, Ncl is the average memory utilization, and Rzx is the task execution time; perform work monitoring on the second sample work task to the i-th sample work task respectively, and obtain the second task monitoring coefficient to the i-th task monitoring coefficient; calculate the average of the first task monitoring coefficient to the i-th task monitoring coefficient to obtain the task completion index corresponding to the first operation and maintenance sub-area; define the equipment failure coefficient and task completion index corresponding to the first operation and maintenance sub-area as the first area operation and maintenance data; obtain the regional operation and maintenance data corresponding to the second to the m-th operation and maintenance sub-areas respectively, and obtain the second area operation and maintenance data to the m-th area operation and maintenance data; define the first area operation and maintenance data to the m-th area operation and maintenance data as equipment operation and maintenance data; the data acquisition module acquires the equipment operation and maintenance data and transmits it to the data analysis Module; the data analysis module calculates the regional operation and maintenance warning coefficient corresponding to each operation and maintenance sub-area by analyzing the equipment operation and maintenance data, obtains the regional operation and maintenance warning coefficient threshold and compares it with the regional operation and maintenance warning coefficient, and divides the operation and maintenance sub-area into the first type of operation and maintenance sub-area and the second type of operation and maintenance sub-area according to the numerical comparison result, and obtains the operation and maintenance area division data; obtains the equipment operation and maintenance data, and obtains the first area operation and maintenance data to the mth area operation and maintenance data according to the equipment operation and maintenance data; performs warning analysis on the first operation and maintenance sub-area according to the first area operation and maintenance data, and obtains the regional operation and maintenance warning coefficient corresponding to the first operation and maintenance sub-area; specifically as follows: obtains the equipment failure coefficient and the task completion index according to the first area operation and maintenance data; calculates the equipment failure coefficient and the task completion index to obtain the regional operation and maintenance warning coefficient; calculates the regional operation and maintenance warning coefficient, and the specific formula configuration is as follows:
[0041] ; Wherein, Qyy is the regional operation and maintenance warning coefficient, Sbg is the equipment failure coefficient, and Rwz is the task completion index; respectively obtain the regional operation and maintenance warning coefficients corresponding to the second regional operation and maintenance data to the mth regional operation and maintenance data; obtain the regional operation and maintenance warning coefficient threshold and perform numerical comparison with the regional operation and maintenance warning coefficient, and divide the operation and maintenance sub-area into the first type of operation and maintenance sub-area and the second type of operation and maintenance sub-area according to the numerical comparison result, and obtain the operation and maintenance area division data; specifically as follows: respectively obtain the equipment failure coefficient threshold and the task completion index threshold, and calculate the regional operation and maintenance warning coefficient threshold by combining the equipment failure coefficient threshold and the task completion index threshold.
[0042] It should be noted here that: in this application, the equipment failure coefficient threshold is the maximum equipment failure coefficient corresponding to the operation and maintenance sub-area in normal operation, and the task completion index threshold is the minimum task completion index corresponding to the operation and maintenance sub-area in normal operation; the regional operation and maintenance warning coefficient threshold is calculated, and the specific formula configuration is as follows:
[0043] ; Among them, Qyy1 is the regional operation and maintenance warning coefficient threshold, Sbg1 is the equipment failure coefficient threshold, and Rwz1 is the task completion index threshold; when the regional operation and maintenance warning coefficient is greater than or equal to the regional operation and maintenance warning coefficient threshold, the corresponding operation and maintenance sub-area is judged to be the first type of operation and maintenance sub-area; when the regional operation and maintenance warning coefficient is less than the regional operation and maintenance warning coefficient threshold, the corresponding operation and maintenance sub-area is judged to be the second type of operation and maintenance sub-area.
[0044] It should be noted here that: in the present application, the first type of operation and maintenance sub-area is in a normal operating state, and the second type of operation and maintenance sub-area is in an abnormal operating state; the data analysis module obtains the operation and maintenance area division data and transmits it to the risk warning module; the risk warning module issues an operation risk warning for the target data center based on the operation and maintenance area division data; obtains the operation and maintenance area division data; when the operation and maintenance sub-area is the first type of operation and maintenance sub-area, the operation and maintenance sub-area is normally monitored for risk; when the operation and maintenance sub-area is the second type of operation and maintenance sub-area, an operation and maintenance risk warning is issued for the operation and maintenance sub-area; obtains the number value corresponding to the second type of operation and maintenance sub-area in the target data center, obtains the number value of abnormal operation and maintenance areas, calculates the ratio of the number value of abnormal operation and maintenance areas to m, and obtains the number ratio of abnormal areas; obtains the abnormal area number ratio threshold, and compares the abnormal area number ratio with the abnormal area number ratio threshold; specifically as follows: when the abnormal area number ratio is greater than or equal to the abnormal area number ratio threshold, an operation risk warning is issued for the target data center; when the abnormal area number ratio is less than the abnormal area number ratio threshold, the target data center is normally monitored for operation risk.
[0045] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well.
Claims
1. An operation and maintenance data management method based on big data analysis, characterized in that: include: Step S1: Divide the target data center into multiple operation and maintenance sub-areas, obtain the equipment failure coefficient corresponding to each operation and maintenance sub-area, obtain the task detection coefficient corresponding to each operation and maintenance sub-area, calculate the mean of the task detection coefficients to obtain the task completion index, and obtain the equipment operation and maintenance data; Calculate the equipment failure coefficient corresponding to the first operation and maintenance sub-area. The specific formula configuration is as follows: ; Among them, Sbg is the equipment failure coefficient corresponding to the first operation and maintenance sub-area, Tb1 to Tbn are the first reported fault value and the nth reported fault value respectively, and Gzj is the fault monitoring time length value; Calculate the first task monitoring coefficient, the specific formula configuration is as follows: ; Among them, Rwj1 is the first task monitoring coefficient, Cpu is the average CPU usage, Ncl is the average memory utilization, and Rzx is the task execution time; Step S2: Analyze the equipment operation and maintenance data, calculate the regional operation and maintenance warning coefficient corresponding to each operation and maintenance sub-area, obtain the regional operation and maintenance warning coefficient threshold and compare the values with the regional operation and maintenance warning coefficient, and divide the operation and maintenance sub-area into a first type of operation and maintenance sub-area and a second type of operation and maintenance sub-area according to the numerical comparison result, and obtain the operation and maintenance area division data; Calculate the regional operation and maintenance warning coefficient. The specific formula configuration is as follows: ; Among them, Qyy is the regional operation and maintenance warning coefficient, Sbg is the equipment failure coefficient, and Rwz is the task completion index; Step S3: Provide operation risk warnings for the operation and maintenance sub-areas and the target data center respectively according to the operation and maintenance area division data.
2. The operation and maintenance data management method based on big data analysis according to claim 1 is characterized in that: The step S1 further includes the following specific steps: Step S11: Divide the target data center into m operation and maintenance equipment sub-areas with the same number of servers, and name them the first operation and maintenance sub-area to the mth operation and maintenance sub-area respectively; Step S12: monitoring the operation and maintenance equipment failures in the first operation and maintenance sub-area to obtain the equipment failure coefficient corresponding to the first operation and maintenance sub-area; Step S13: Acquire the task completion index corresponding to the first operation and maintenance sub-area; Step S14: defining the equipment failure coefficient and task completion index corresponding to the first operation and maintenance sub-area as the first area operation and maintenance data; Step S15: acquiring the regional operation and maintenance data corresponding to the second to m-th operation and maintenance sub-regions respectively, to obtain the second regional operation and maintenance data to the m-th regional operation and maintenance data; Step S16: define the first region operation and maintenance data to the mth region operation and maintenance data as equipment operation and maintenance data.
3. The operation and maintenance data management method based on big data analysis according to claim 2 is characterized in that: The step S12 further includes the following specific steps: Step S121: in the process of fault detection for the first operation and maintenance sub-area, a time value corresponding to the current time is obtained as a first reference time point, a time point corresponding to a characteristic monitoring duration before the first reference time is taken as a second reference time point, and a period between the first reference time point and the second reference time point is defined as a fault monitoring period; Step S122: acquiring the time length value corresponding to the fault monitoring period to obtain the fault monitoring time length value; Step S123: Select n operation and maintenance hosts in the first operation and maintenance sub-area as test hosts, and name them as the first test host to the nth test host respectively; Step S124: respectively obtaining the number of fault times reported by the first test host to the nth test host during the fault monitoring period, and obtaining a first reported fault value and an nth reported fault value; Step S125: The first reported fault value, the nth reported fault value and the fault monitoring time length value are calculated to obtain the equipment fault coefficient corresponding to the first operation and maintenance sub-area.
4. The operation and maintenance data management method based on big data analysis according to claim 2 is characterized in that: The step S13 further includes the following specific steps: Step S131: obtaining a work task list corresponding to the first operation and maintenance sub-area, selecting i work tasks from the work task list as sample work tasks, and naming them as the first sample work task to the i-th sample work task respectively; Step S132: Perform work detection on the first sample work task to obtain a first task monitoring coefficient; Step S133: performing work monitoring on the second sample work task to the i-th sample work task respectively, and obtaining the second task monitoring coefficient to the i-th task monitoring coefficient; Step S134: Calculate the average of the first task monitoring coefficient to the i-th task monitoring coefficient to obtain the task completion index corresponding to the first operation and maintenance sub-area.
5. The operation and maintenance data management method based on big data analysis according to claim 4 is characterized in that: The step S132 further includes the following specific steps: Step S1321: during the process of obtaining the first sample work task, obtaining the average CPU usage rate corresponding to the operation and maintenance host executing the first sample work task; Step S1322: during the process of obtaining the first sample work task, obtaining the average memory utilization rate corresponding to the operation and maintenance host executing the first sample work task; Step S1323: taking the time point when the first operation and maintenance sub-area starts to execute the first sample work task as the first execution monitoring time point; Step S1324: taking the time point when the first operation and maintenance sub-area finishes executing the first sample work task as the second execution monitoring time point; Step S1325: Calculate the numerical difference between the first execution monitoring time point and the second execution monitoring time point to obtain the task execution duration; Step S1326: Calculate the average CPU usage, average memory utilization, and task execution time to obtain a first task monitoring coefficient.
6. The operation and maintenance data management method based on big data analysis according to claim 1 is characterized in that: The step S2 further comprises the following specific steps: Step S21: Acquire equipment operation and maintenance data, and acquire first area operation and maintenance data to mth area operation and maintenance data respectively according to the equipment operation and maintenance data; Step S22: performing early warning analysis on the first operation and maintenance sub-region according to the first regional operation and maintenance data, and obtaining a regional operation and maintenance early warning coefficient corresponding to the first operation and maintenance sub-region; Step S23: respectively obtaining the regional operation and maintenance warning coefficients corresponding to the second regional operation and maintenance data to the mth regional operation and maintenance data; Step S24: obtaining a regional operation and maintenance warning coefficient threshold and performing numerical comparison with the regional operation and maintenance warning coefficient, dividing the operation and maintenance sub-region into a first type of operation and maintenance sub-region and a second type of operation and maintenance sub-region according to the numerical comparison result, and obtaining operation and maintenance region division data.
7. The operation and maintenance data management method based on big data analysis according to claim 6 is characterized in that: The step S22 further includes the following specific steps: Step S221: acquiring the equipment failure coefficient and the task completion index respectively according to the first area operation and maintenance data; Step S222: Calculate the equipment failure coefficient and the task completion index to obtain the regional operation and maintenance warning coefficient.
8. The operation and maintenance data management method based on big data analysis according to claim 6 is characterized in that: The step S24 further includes the following specific steps: Step S241: respectively obtaining a device failure coefficient threshold and a task completion index threshold, and calculating the device failure coefficient threshold and the task completion index threshold to obtain a regional operation and maintenance warning coefficient threshold; Calculate the regional operation and maintenance warning coefficient threshold. The specific formula configuration is as follows: ; Among them, Qyy1 is the regional operation and maintenance warning coefficient threshold, Sbg1 is the equipment failure coefficient threshold, and Rwz1 is the task completion index threshold; Step S242: when the regional operation and maintenance warning coefficient is greater than or equal to the regional operation and maintenance warning coefficient threshold, the corresponding operation and maintenance sub-region is determined to be a first type of operation and maintenance sub-region; Step S243: When the regional operation and maintenance warning coefficient is less than the regional operation and maintenance warning coefficient threshold, it is determined that the corresponding operation and maintenance sub-region is a second type of operation and maintenance sub-region.
9. The operation and maintenance data management method based on big data analysis according to claim 1 is characterized in that: The step S3 further includes the following specific steps: Step S31: Acquire operation and maintenance area division data; Step S32: When the operation and maintenance sub-area is a first type of operation and maintenance sub-area, risk monitoring is normally performed on the operation and maintenance sub-area; Step S33: When the operation and maintenance sub-area is a second type of operation and maintenance sub-area, an operation and maintenance risk warning is issued for the operation and maintenance sub-area; Step S34: obtaining the number value corresponding to the second type of operation and maintenance sub-area in the target data center, obtaining the number value of abnormal operation and maintenance areas, calculating the ratio of the number value of abnormal operation and maintenance areas to m, and obtaining the number ratio of abnormal areas; Step S35: obtaining an abnormal region quantity ratio threshold, and comparing the abnormal region quantity ratio with the abnormal region quantity ratio threshold; The details are as follows: Step S351: when the abnormal area quantity ratio is greater than or equal to the abnormal area quantity ratio threshold, an operation risk warning is issued to the target data center; Step S352: When the abnormal area quantity ratio is less than the abnormal area quantity ratio threshold, the target data center is normally monitored for operation risks.
10. An operation and maintenance data management system based on big data analysis, applicable to an operation and maintenance data management method based on big data analysis as claimed in any one of claims 1 to 9, characterized in that: The specific working process of each module of the management system is as follows: Data acquisition module: used to divide the target data center into multiple operation and maintenance sub-areas, obtain the equipment failure coefficient and task completion index corresponding to each operation and maintenance sub-area, and obtain equipment operation and maintenance data; Data analysis module: used to divide the operation and maintenance sub-areas into first-type operation and maintenance sub-areas and second-type operation and maintenance sub-areas by analyzing the equipment operation and maintenance data, and obtain operation and maintenance area division data; Risk warning module: used to issue operational risk warnings to the operation and maintenance sub-areas and target data centers based on the operation and maintenance area division data.
Citation Information
Patent Citations
Visual operation and maintenance management method and system for data center
CN114676862A
Operation and maintenance management system and method for mechanical equipment
CN116307346A
Aircraft operation and maintenance management system based on data analysis
CN116664103A
Public energy consumption equipment operation and maintenance management system suitable for smart park
CN118096132A
Cited By
Equipment inventory management method based on IDC equipment data acquisition
CN119311527A
Communication system operation and maintenance management method and system applying data analysis
CN121309378A