Point-column method presplitting blasting design method and system
By optimizing the pre-crack blasting parameters and design models, the unevenness and stability of the ore column walls during traditional point column mining was solved, and a more efficient and safe blasting effect was achieved, reducing costs and rock damage.
Patent Information
- Application Number
- CN202411388681.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In underground metal mines, when the traditional dot column method returns to the mining column, the gloss blasting leads to uneven walls of the dot column and a lot of pumice stones remaining, which affects production safety. The blasting causes damage and vibration to the ore column, reducing stability.
By systematically collecting and analyzing existing blasting scheme information, setting and optimizing pre-cracking parameters, such as pre-cracking hole spacing, charge dosage, charge structure and pre-cracking hole extension time, establishing corresponding analysis models, and optimizing blasting design schemes Reduce rock mass and unevenness, and improve blast control accuracy and efficiency.
It significantly improves the blasting effect and safety, reduces the amount and cost of explosives, enhances the stability of the mining site and engineering quality, and ensures the continuous uniformity and safety of the blasting process.
Smart Images

Figure CN118917107A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of blasting engineering, in particular to a point-column method pre-splitting blasting design method and system. Background Art
[0002] When underground metal mines use the point-pillar method to recover mining pillars, the traditional method uses smooth blasting technology to expand the outermost layer, which results in uneven wall surfaces of the point pillars after blasting and a large amount of residual pumice, which seriously affects the safety of mine production and leads to frequent accidents. Converting smooth blasting to pre-crack blasting and creating pre-cracks at the point-pillar boundary can not only reduce the damage of the explosion shock wave to the retained pillars, but also reduce the blasting vibration of the retained pillars, and also increase the stability of the pillars. Therefore, in practical applications, it is necessary to comprehensively consider the design of the point-pillar method for mining blasting, in which the design content includes but is not limited to rock structure, explosive type, drilling arrangement, etc. In order to better meet the blasting needs under complex rock structure and geological conditions, and improve the blasting effect and safety, it is necessary to optimize the point-pillar method for mining blasting design based on existing blasting information and blasting technology. Summary of the invention
[0003] In view of the defects of the existing methods and the shortcomings of practical applications, the present invention systematically collects and analyzes the existing blasting scheme information, and sets and optimizes the various parameters of pre-splitting blasting based on the information, including the first parameter, the second parameter, the third parameter and the fourth parameter, and obtains the point column method pre-splitting blasting design scheme according to the key parameters, thereby reducing the large blockiness and unevenness of the rock, and improving the engineering quality and operation efficiency. At the same time, by optimizing the blasting parameters, the negative impact of blasting on the mechanical properties of the rock can also be reduced, and the overall stability of the rock mass can be maintained. Through scientific and reasonable pre-splitting blasting design, unnecessary explosives can be reduced, the blasting cost can be reduced, and the blasting accuracy and efficiency can be improved.
[0004] Optionally, the collecting of existing blasting scheme information and setting of pre-splitting blasting scheme parameters based on the existing blasting scheme information include: setting a first parameter of the pre-splitting blasting scheme, the first parameter of the pre-splitting blasting scheme including the pre-splitting hole spacing; setting a second parameter of the pre-splitting blasting scheme, the second parameter of the pre-splitting blasting scheme including the charge amount; setting a third parameter of the pre-splitting blasting scheme, the third parameter of the pre-splitting blasting scheme including the charge structure; setting a fourth parameter of the pre-splitting blasting scheme, the fourth parameter of the pre-splitting blasting scheme including the pre-splitting hole delay time. The present invention sets four key parameters of the pre-splitting blasting scheme based on the existing blasting scheme information, which can significantly improve the accuracy and effect of blasting control, enhance the stability of the stope, improve economic benefits and improve engineering safety.
[0005] Optionally, the establishing of the pre-splitting blasting first parameter analysis model and analyzing the pre-splitting blasting first parameter based on the pre-splitting blasting first parameter analysis model comprises: establishing the pre-splitting blasting first parameter analysis model based on the existing blasting scheme information; and obtaining the pre-splitting hole spacing through the pre-splitting blasting first parameter analysis model. The present invention can improve the scientificity and accuracy of the design scheme, optimize the blasting effect and reduce the environmental impact by establishing the pre-splitting blasting analysis model and analyzing the pre-splitting blasting parameters.
[0006] Optionally, the pre-splitting blasting first parameter analysis model satisfies the following relationship:
[0007] in, is the pre-crack hole spacing, is the ultimate tensile strength of rock, is the ultimate compressive strength of rock, μ is the Poisson's ratio of rock, and d is the diameter of blasthole. The present invention calculates the pre-splitting hole spacing through a related model, which helps to reduce the error of experience or intuitive judgment and improves the accuracy and objectivity of the analysis result.
[0008] Optionally, the establishing of the pre-splitting blasting second parameter analysis model and the analyzing of the pre-splitting blasting second parameter based on the pre-splitting blasting second parameter analysis model include: establishing the pre-splitting blasting second parameter analysis model based on the existing blasting scheme information; and obtaining the blasting single hole charge through the pre-splitting blasting second parameter analysis model. The pre-splitting blasting analysis model of the present invention can adapt to the changes in blasting engineering conditions such as different rock properties, hole spacing, and hole diameters, and the model parameters can be optimized according to specific blasting engineering conditions, thereby improving the pertinence and practicality of the method of the present invention.
[0009] Optionally, the pre-splitting blasting second parameter analysis model satisfies the following relationship:
[0010] in, is the charge amount for a single hole, is the blast hole diameter, is the charge density, is the density of explosives, and L is the depth of blasthole. The model of the present invention utilizes relevant theories such as blasting mechanics and rock mechanics, provides a solid theoretical basis for the blasting model, and helps to ensure the scientificity and reliability of the parameter analysis model.
[0011] Optionally, the optimizing the third parameter of pre-splitting blasting and the fourth parameter of pre-splitting blasting based on the existing blasting scheme information comprises: designing a blasting charging method according to the existing blasting scheme information, the blasting charging method comprising enhanced charging at the bottom of the hole, normal charging in the middle of the hole, and weakened charging at the hole mouth; optimizing the third parameter of pre-splitting blasting by the blasting charging method. The present invention optimizes the pre-splitting blasting parameters based on the existing blasting scheme information, which can improve the blasting effect, ensure the rock crushing quality, and enhance the engineering safety.
[0012] Optionally, the optimization of the third parameter of pre-splitting blasting and the fourth parameter of pre-splitting blasting based on the existing blasting scheme information includes: designing a pre-splitting hole delay time according to the existing blasting scheme information, wherein the pre-splitting hole delay time includes setting the delay time difference of adjacent blasthole sections to 300ms; and optimizing the fourth parameter of pre-splitting blasting by the pre-splitting hole delay time. The present invention sets a reasonable delay time, which can reduce the damage of the blasting project to the surrounding rock mass and maintain the stability of the mining area. In addition, optimizing the delay time can ensure that the blasting effects between the sections are connected to each other, avoiding excessive impact and damage to the mining area structure.
[0013] Optionally, the combining of the first pre-splitting blasting parameter, the second pre-splitting blasting parameter, the third pre-splitting blasting parameter and the fourth pre-splitting blasting parameter to obtain the point-column method pre-splitting blasting design scheme includes: optimizing the initial blasting design scheme based on the pre-splitting hole spacing, the single hole charge, the blasting charge method and the pre-splitting hole delay time to obtain the point-column method pre-splitting blasting design scheme. The present invention comprehensively considers the relevant blasting scheme parameters, can ensure that the pre-splitting blasting forms continuous and uniform pre-cracks in the rock mass, improves the blasting effect, makes the blasting scheme more in line with the actual blasting conditions, and broadens the scope of use of the blasting scheme.
[0014] In the second aspect, the present invention also provides a point-column method pre-splitting blasting design system, which can efficiently execute a point-column method pre-splitting blasting design method provided by the present invention, the system includes an input device, a processor, an output device and a memory, wherein the input device, the processor, the output device and the memory are interconnected, the memory includes a computer-readable storage medium as described in the first aspect of the present invention, the memory is used to store a computer program, the computer program includes program instructions, and the processor is configured to call the program instructions. The system provided by the present invention has a compact structure, strong applicability, and greatly improves the operating efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a flow chart of the point-column method pre-splitting blasting design method of the present invention; Figure 2 It is a schematic diagram of the existing blasthole arrangement of the point-column method pre-splitting blasting design method of the present invention; Figure 3It is a schematic diagram of the blasthole charging method and structure of the point-column method pre-splitting blasting design method of the present invention; Figure 4 It is a schematic diagram of blasthole arrangement after optimization of the point-column method pre-splitting blasting design method of the present invention; Figure 5 It is a schematic diagram of the charge structure of the point-column method pre-splitting blasting design method of the present invention; Figure 6 It is a schematic diagram of the detonation sequence network of the point-column method pre-splitting blasting design method of the present invention; Figure 7 This is a schematic diagram of the structure of the point-column method pre-splitting blasting design system of the present invention. DETAILED DESCRIPTION
[0016] The specific embodiments of the present invention will be described in detail below. It should be noted that the embodiments described herein are only for illustration and are not intended to limit the present invention. In the following description, a large number of specific details are set forth in order to provide a thorough understanding of the present invention. However, it is obvious to those of ordinary skill in the art that these specific details do not need to be adopted to implement the present invention. In other examples, in order to avoid confusing the present invention, known circuits, software or methods are not specifically described.
[0017] Throughout the specification, references to "one embodiment," "an embodiment," "an example," or "an example" mean that a particular feature, structure, or characteristic described in conjunction with the embodiment or example is included in at least one embodiment of the present invention. Therefore, the phrases "in one embodiment," "in an embodiment," "an example," or "an example" appearing in various places throughout the specification do not necessarily all refer to the same embodiment or example. In addition, particular features, structures, or characteristics may be combined in one or more embodiments or examples in any suitable combination and / or subcombination. In addition, it should be understood by those of ordinary skill in the art that the figures provided herein are for illustrative purposes and that the figures are not necessarily drawn to scale.
[0018] See also Figure 1 In order to cope with the complex and changeable rock structure and geological conditions, the existing blasting information and engineering technology are used to comprehensively optimize and improve the blasting plan to ensure that the blasting plan can significantly improve the blasting effect while maintaining efficient operation, so as to minimize safety risks, meet the blasting needs in different complex environments, and provide strong guarantees for blasting engineering projects. The present invention provides a point-column method pre-splitting blasting design method, which includes the following steps: S1. Collect the existing blasting scheme information, and set the pre-splitting blasting scheme parameters based on the existing blasting scheme information. The specific implementation steps and related contents are as follows: First, collect the information of existing blasting plans, the specific contents of which are as follows: In an optional embodiment, inclined layered ore rocks with a dip angle between 15° and 30° are selected for processing in the mining area. The above-mentioned rock strata not only have significant lithological differences, but also during the blasting process, the degree of development of joints plays a decisive role in the blasting formation effect. When the degree of joint development is high, the rock mass will show weaker resistance to blasting, thereby affecting the blasting efficiency and effect.
[0019] When the upward horizontal layered filling method is used for actual mining, a certain number of pillars must be designed and retained in order to ensure the stability and safety of the stope structure. The size of the pillars needs to be analyzed and stability evaluated based on rock mechanics to ensure that the pillars can withstand the pressure and deformation strength of the surrounding rock mass.
[0020] However, under specific rock conditions, if the blasting control plan is not accurate enough, it will lead to the formation of a hyperbolic wall. The irregular wall will not only cause problems such as over-excavation and under-excavation, but also increase mining costs and have a serious impact on the safety and stability of the mining site. Over-excavation will lead to unnecessary waste of resources, while under-excavation will affect the smooth progress of subsequent mining work.
[0021] Based on the collected blasting plan information, it can be known that in an optional embodiment, the fault layers actually applied in the blasting site mainly include but are not limited to FV-11, FV-11-1 and FV-15.
[0022] Among them, the FV-11 fault has an obvious NW trend and tilts toward the NE direction, with an inclination angle between 65° and 75°. The width of the broken zone of the FV-11 fault is between 0.2 meters and 0.5 meters. The above-mentioned fractured part is mainly filled with carbonates, fault mud and surrounding rock breccias. The relevant fillings not only affect the stability of the fault, but also bring challenges to the safety and feasibility of mining operations.
[0023] The FV-11-1 fault is similar to the FV-11 fault in many aspects. The FV-11-1 fault also has a NW trend and NE dip, an inclination angle between 65° and 75°, a broken zone width between 0.2 m and 0.5 m, and its filling is similar to the FV-11 fault, mainly composed of carbonates, fault mud and surrounding rock breccia.
[0024] The strike of the FV-15 fault is mainly between N40° and 70°W, tending towards the NE, with an inclination angle ranging from 65° to 73°. The width of the broken zone of the FV-15 fault is between 0.2m and 0.8m, which is slightly wider than the first two faults mentioned above. The fillings of the FV-15 fault mainly include carbonates, iron mud and surrounding rock breccias. The above fillings further affect the stability of the fault and the safety of mining operations.
[0025] Based on the collected blasting scheme information, in another optional embodiment, the blasting scheme information is analyzed, and the distribution of aquifers and aquicludes in the geological structure of the mining section is relatively clear. Among them, the Quaternary porous aquifer mainly appears in local areas of the river valley, but the water filling effect on the ore deposit is not significant. In contrast, the sandstone fissure aquifer group in the lower section of the Shezi Formation is widely distributed. Although the lower section of the Shezi Formation is the secondary aquifer of the mining section, due to the influence of weathering, the cracks in the above sandstone gradually close and decrease from shallow to deep, but the overall connectivity is good. Within the entire mining section, the mudstone and sandstone aquiclude group of the Ganhaizi Formation occupies an important position. The above-mentioned aquiclude group has stable stratigraphic positions and reliable water-isolating properties, and is also the key water-isolating boundary of the mining section.
[0026] The development pattern of cracks in rock strata is mainly determined by lithology and geological structure. Lava rocks mainly develop vertical joints and cracks, which have good water content; tuff rocks mainly develop transverse joints and cracks, and their water content is relatively poor; dolomite marble rocks mainly develop structural joints and cracks, and their water content varies with different lithology. In addition, the degree of crack development and water content of the gabbro-diabase intrusion and its contact zone surrounding rocks are also affected by lithology.
[0027] Therefore, when designing the pre-splitting blasting plan, it is necessary to comprehensively consider the characteristics of the rock strata, the degree of joint development, and the influence of factors such as the aquifer and impermeable layer of the geological structure of the mining section, and control and adjust the blasting plan to ensure the quality of blasting formation and mining efficiency, while ensuring the safety and stability of the mining site.
[0028] Then, reasonable pre-splitting blasting plan parameters are set based on the collected blasting plan information and information analysis results.
[0029] In an optional embodiment, the conventional point-column method mining blasting scheme is analyzed. In the early stage of small-section access excavation, the tunneling blasting technology is mainly used, in which the tunnel is designed with a bottom width of 4 meters and a top height of 3.6 meters, thereby forming a section with a circumference of 30.52 meters and an area of 28.03 square meters. The rock mass here is mainly layered metamorphic tuff. 48 blast holes are set during the tunneling blasting construction process, and the above blast holes mainly include 9 slot holes, 18 auxiliary holes, 15 peripheral holes and 6 bottom plate holes. Please refer to Table 1 for the above blasting parameters.
[0030] Table 1 Parameters of conventional point column mining blasting scheme
[0031] After the excavation of the small section is completed, it needs to be further expanded to the boundary of the point column. On the basis of the small section, the tunnel is further widened to form a large section, with a bottom width of 10 meters, a top height of 5 meters, a circumference of 40.84 meters, and an area of 50.66 square meters. During the above expansion operation, the blasthole setting content is as follows. A total of 58 blastholes are set, mainly including 28 peripheral holes, 16 auxiliary holes, 8 inner circle holes and 6 bottom plate holes. For the blasthole arrangement, please refer to Figure 2 Based on this, the point-column mining in the embodiment can be ensured to proceed smoothly, and the safety and efficiency of the mining process can be guaranteed.
[0032] In the process of conventional point-column mining blasting, rock emulsion explosives of specific specifications are selected for blasting construction. Specifically, No. 2 rock emulsion explosives with a diameter of 32mm and a length of 300mm are selected. While ensuring the blasting effect, the above explosives also take into account the safety and efficiency of the construction operation. The explosive charge quantity is shown in Table 2. Making explosives based on the table data is conducive to ensuring the standardization and accuracy of the blasting process.
[0033] Table 2 Charge quantity of conventional point column mining blasting scheme
[0034] In the conventional point-column method of mining blasting, except for the roof hole, other blast holes adopt continuous uncoupled charging technology and no additional filling treatment is performed. In order to ensure the accuracy and safety of the detonation operation, digital electronic detonators are selected for bottom hole detonation. The above charging structure and detonation method can effectively improve the blasting effect and reduce safety risks. In order to more clearly show the charging method and structural layout of each blast hole, please refer to Figure 3 , where 5 represents the auxiliary hole, 6 represents the top hole, and 4 represents the inner circle hole, auxiliary hole and bottom plate hole.
[0035] Based on the above embodiment, the parameters of the pre-splitting blasting scheme of the present invention are set, the pre-splitting hole spacing is set as the first parameter of the pre-splitting blasting scheme, the charge amount is set as the second parameter of the pre-splitting blasting scheme, the charge structure is set as the third parameter, and the pre-splitting hole delay time is set as the fourth parameter.
[0036] The pre-splitting hole spacing is the distance between the centers of adjacent pre-splitting holes. In the embodiment, the pre-splitting hole spacing is determined based on the hardness of the rock, the development of the cracks, the performance of the explosives, and the expected blasting effect. If the pre-splitting hole spacing is too large, the cracks will be discontinuous, and if the spacing is too small, the cost will be increased and the blasting effect will not be obvious.
[0037] The charge amount is one of the key factors affecting the effect of pre-splitting blasting. Too small a charge amount cannot generate enough stress to cause cracks in the rock, while too large a charge amount will cause the cracks to be too wide, and even produce unnecessary vibrations and flying rocks. The charge amount needs to be determined by considering factors such as rock density, explosive type, hole depth, and expected crack width.
[0038] The charge structure refers to the arrangement of explosives in the blasthole, which mainly includes continuous charge, interval charge and segmented charge. Different charge structures have different effects on the pre-splitting blasting effect. Interval charge can reduce the impact of explosives on the hole wall, which is conducive to the formation of cracks; segmented charge can adjust the charge amount of different sections according to needs to achieve more precise crack control. When selecting the charge structure, it is necessary to comprehensively consider factors such as rock properties, hole depth, explosive type and expected blasting effect.
[0039] The pre-crack delay time refers to the interval between the detonation times of adjacent pre-crack holes. The pre-crack delay time needs to be set considering factors such as the rock stress wave propagation speed, crack expansion speed, and safety requirements. A reasonable delay time can make the cracks generated by adjacent pre-crack holes interconnected to form a continuous crack surface; too short a delay time will cause the cracks to interfere with each other and affect the blasting effect; too long a delay time will increase the construction difficulty and cost.
[0040] Furthermore, the method of setting blasting parameters in the present embodiment is only an optional condition of the present invention. In one or some other embodiments, the method of setting blasting parameters can be adjusted according to the actual blasting situation and the requirements of the blasting plan, which can not only improve the blasting effect, reduce the blasting cost and improve the safety, but also enhance the adaptability of blasting technology and promote technological innovation.
[0041] S2. Establish a pre-splitting blasting first parameter analysis model, and analyze the pre-splitting blasting first parameter based on the pre-splitting blasting first parameter analysis model. The specific implementation steps and related contents are as follows: Based on the existing blasting scheme information, a pre-splitting blasting first parameter analysis model is established, and the pre-splitting hole spacing is obtained through the above pre-splitting blasting first parameter analysis model. The specific implementation content is as follows: To set the pre-splitting hole spacing, it is necessary to comprehensively consider the physical and mechanical properties of the rock, the characteristics of the explosives, and the purpose of blasting. In the embodiment, an air-spaced charging method is selected to improve the blasting effect and ensure the safety of the blasting operation.
[0042] Combining theoretical analysis and engineering experience, the above-mentioned first parameter analysis model of pre-splitting blasting satisfies the following relationship:
[0043] in, is the pre-crack hole spacing, is the ultimate tensile strength of rock, is the ultimate compressive strength of rock, μ is the Poisson’s ratio of rock, and d is the blasthole diameter.
[0044] In the embodiment, the diameter of the blast hole is 40 mm.
[0045] The pre-crack hole spacing also satisfies the following relationship:
[0046] Based on the practical data of mine construction, the pre-splitting hole spacing can be obtained based on the above empirical formula, where It is the distance-to-diameter ratio, and its value range can be between 8 and 12 according to practical data.
[0047] However, it is not enough to rely solely on empirical formulas. In order to determine the hole spacing more accurately, the embodiment further combines the results of numerical simulation research and historical blasting information to analyze the stress distribution and crack expansion of the layered rocks at the simulated test site during the blasting process. The rocks in the above-mentioned area mainly present a single-layer joint structure between the blastholes, and the angle of the joints is about 30°. Its geological characteristics have an important influence on the blasting effect.
[0048] In the embodiments, by combining the stress distribution and crack expansion of the layered rocks in the blasting process at the simulated test site, the geological characteristics of the rocks in the test area can be deeply understood, which is conducive to designing a point-column pre-splitting blasting design scheme that is more in line with the actual situation.
[0049] Furthermore, the parameter design method of the point-column boundary pre-splitting blasting scheme in the present embodiment is only an optional condition of the present invention. In one or some other embodiments, the parameter design method can be adjusted according to the blasting purpose and actual application conditions, which can better match the specific geological conditions and blasting requirements, thereby optimizing the blasting effect, reducing excessive rock crushing and flying rock phenomena, and improving blasting efficiency.
[0050] S3. Establish a pre-splitting blasting second parameter analysis model, and analyze the pre-splitting blasting second parameter based on the above pre-splitting blasting second parameter analysis model. The specific implementation steps and related contents are as follows: Based on the existing blasting scheme information, a pre-splitting blasting second parameter analysis model is established. The blasting single-hole charge is obtained through the above pre-splitting blasting second parameter analysis model. The specific implementation content is as follows: From the blasting information, we can know that it is necessary to determine the appropriate line charge density and charge amount based on parameters such as rock properties, blasthole diameter, explosive type, and blasting target.
[0051] In this embodiment, the charge density of a single hole satisfies the following relationship:
[0052] in, is the charge density, is the blast hole spacing, is the compressive strength of rock.
[0053] The coefficient of pressure increase when the gas collides with the wall of the blast hole can measure the degree of pressure amplification when the gas collides with the wall in the blast hole. Based on the existing blasting information, it is known that the above coefficient value is usually between 8 and 11.
[0054] Based on this, the second parameter analysis model of pre-splitting blasting is obtained, and the second parameter analysis model of pre-splitting blasting satisfies the following relationship:
[0055] in, is the charge amount for a single hole, is the blast hole diameter, is the charge density, is the density of explosive and L is the depth of blasthole.
[0056] By performing joint calculation and optimization on multiple formulas, the single-hole charge was finally determined to be 0.9 kg in the embodiment.
[0057] The line charge density formula is further modified and optimized, and the optimized line charge density satisfies the following relationship:
[0058] in, is the optimized charge density, d is the borehole diameter, is the blast hole spacing, is the compressive strength of rock.
[0059] In the embodiment, the linear charge density formula is modified and optimized, which can improve the blasting effect, reduce safety risks, improve economic benefits and enhance construction flexibility, help to achieve more accurate, efficient, safe and environmentally friendly blasting operations, and improve the efficiency and quality of the entire blasting project.
[0060] Furthermore, in the present embodiment, the charge design method for different hole types is only an optional condition of the present invention. In one or some other embodiments, the charge of the blasting scheme can be adjusted according to the blasting requirements and the blasting prediction results, which can better adapt to different geological conditions and blasting requirements, achieve more accurate rock crushing effects, avoid excessive or insufficient crushing, and thus improve blasting efficiency.
[0061] S4. Based on the above existing blasting scheme information, the third pre-splitting blasting parameter and the fourth pre-splitting blasting parameter are optimized. The specific implementation steps and related contents are as follows: The blasting charging method is optimized according to the existing blasting scheme information. In the embodiment, the blasting charging method mainly includes enhanced charging at the bottom of the hole, normal charging in the middle of the hole, and weakened charging at the hole mouth. The third parameter of the pre-splitting blasting is optimized through the above blasting charging method.
[0062] It is necessary to increase the amount of explosives at the bottom of the blasthole to enhance the blasting power of the bottom area, which helps to overcome the clamping effect of the bottom rock, ensure sufficient crushing of the bottom of the blasthole, and create favorable conditions for subsequent blasting; in the middle of the blasthole, charge according to normal charging density and method. The middle area is the main action area of blasting. Through reasonable charging amount, uniform crushing of rocks can be ensured; near the mouth of the blasthole, appropriately reduce the amount of explosives, that is, weaken the charging, which can reduce the blasting energy at the mouth of the blasthole, avoid or reduce the impact of flying rocks and gravel on the surrounding environment, and also protect the safety of blasting equipment and workers around the mouth of the blasthole.
[0063] Based on this, the third parameter of pre-splitting blasting, namely the blasting charging method, is optimized, including but not limited to the optimization of structural factors such as breaking line spacing, hole spacing, and row spacing. The above charging method can more accurately control the distribution and transfer of blasting energy, achieve more uniform and efficient rock crushing, thereby improving the blasting effect, reducing blasting costs, and enhancing the safety of operations.
[0064] The blasting charging method of this embodiment is mainly to adjust the charging method, strengthen the bottom of the hole, keep it normal in the middle of the hole, and weaken the hole mouth, which provides an effective means to optimize the third parameter of the pre-splitting blasting and ensures the efficiency, safety and environmental protection of the blasting plan.
[0065] Then, the pre-splitting hole delay time needs to be designed according to the existing blasting scheme information. In the embodiment, the pre-splitting hole delay time mainly includes setting the delay time difference of adjacent blasthole sections to 300ms. The fourth parameter of pre-splitting blasting is optimized by the pre-splitting hole delay time.
[0066] When designing the delay time of the pre-splitting hole, a specific strategy is adopted to optimize the fourth parameter of the pre-splitting blasting. In the embodiment, the delay time difference between adjacent blasthole sections is set to 300 milliseconds, thereby ensuring that the pre-splitting blasting process can be carried out in a predetermined order and time interval, thereby optimizing the final blasting effect.
[0067] Based on this, it can be ensured that each blasthole is detonated in a predetermined order, avoiding energy superposition and resource waste caused by simultaneous detonation, and ensuring the effective transmission of blasting energy; through reasonable time intervals, the stress concentration phenomenon in the rock caused by continuous detonation is reduced, the degree of damage to the surrounding rocks is reduced, and the safety of the surrounding environment and structures is protected; reasonable delay time helps cracks in the rock to expand along a predetermined path and speed, improving the effect and efficiency of pre-splitting blasting; by precisely controlling the delay time, more uniform and detailed rock crushing can be achieved, reducing the generation of large rocks and improving the blasting quality.
[0068] Furthermore, the specific design content of the blasting plan in the present embodiment is only an optional condition of the present invention. In one or some other embodiments, the blasting plan can be adjusted according to the actual blasting requirements and the blasting plan design parameters. The blasting plan can be flexibly adjusted according to the geological conditions, rock characteristics, environmental restrictions and other factors of the specific project to ensure that the blasting operation can better adapt to the actual situation and improve the blasting effect.
[0069] S5. Combining the first pre-splitting blasting parameter, the second pre-splitting blasting parameter, the third pre-splitting blasting parameter and the fourth pre-splitting blasting parameter to obtain the point column method pre-splitting blasting design scheme, the specific steps and implementation contents are as follows: The initial blasting design is optimized based on the pre-splitting hole spacing, single hole charge, blasting charge method and pre-splitting hole delay time to obtain the point column method pre-splitting blasting design of the embodiment. The specific implementation content is as follows: In this embodiment, the blasting plan is optimized based on the above-mentioned pre-splitting hole spacing parameter information.
[0070] After comprehensive consideration of the above blasting parameters and various factors, it was finally decided to adopt a hole spacing of 400 mm in this embodiment. The mine construction blasting information, numerical simulation results and rock geological characteristics were comprehensively analyzed and weighed to ensure the efficiency and safety of the blasting plan. Through reasonable hole spacing design, the rock crushing effect can be maximized and the impact of blasting operations on the surrounding environment can be reduced.
[0071] Furthermore, in the point-column boundary pre-splitting blasting scheme of this embodiment, a total of 71 blast holes are planned to ensure the uniformity and safety of the blasting effect, among which a hole spacing of 600 mm is selected in the roof area, and the smooth blasting method with better implementation effect is adopted.
[0072] Since the left and right empty areas are the boundary areas of the point column, the pre-splitting blasting technology is used in the embodiment. Mainly based on the physical properties of the rock, geological conditions and blasting purposes, the pre-splitting hole spacing in the boundary area is set to 400mm, based on which the expansion direction and range of the cracks can be more accurately controlled, thereby ensuring the integrity and stability of the point column boundary. Except for the above-mentioned special areas, the parameter settings of the remaining blastholes all use standard blasting parameters, which ensures the safety and efficiency of the blasting project while ensuring the blasting effect.
[0073] See Table 3 for the blasthole parameters of the point column boundary pre-splitting blasting scheme in the embodiment.
[0074] Table 3 Sectional blasthole parameters of point column method pre-splitting blasting design
[0075] In order to clearly understand the location, spacing and layout of each blasthole and provide intuitive guidance for blasting operations, a blasthole layout distribution diagram for the point-column method pre-splitting blasting design is also drawn. For details, please refer to Figure 4 In order to clearly understand the location, spacing and layout of each blast hole and provide intuitive guidance for blasting operations, Figure 4 A blasthole arrangement distribution diagram of the point-column method pre-splitting blasting design was drawn up, with a total of 71 blastholes set up, mainly including 34 peripheral holes, 23 auxiliary holes, 6 inner circle holes and 8 bottom plate holes.
[0076] The point-column boundary pre-splitting blasting scheme fully considers factors such as geological conditions, blasting purposes and construction requirements. Through reasonable blasthole arrangement and parameter setting, it helps to achieve efficient and safe blasting operations.
[0077] In this embodiment, the blasting plan is optimized according to the output result of the above-mentioned charge quantity model.
[0078] The relevant calculation results are obtained according to the second parameter analysis model of pre-splitting blasting, density calculation function and relevant theoretical formulas, and the linear charge density of 400g / m is selected as the initial setting according to the relevant calculation results. However, in the actual blasting process, the clamping effect at the bottom of the pre-splitting hole is more obvious. In order to overcome the above difficulties, the amount of explosives at the bottom is increased. Based on the blasting information and the actual situation on site, 5 rolls of explosives are configured for each pre-splitting hole in the embodiment to ensure that sufficient blasting energy can be formed at the bottom.
[0079] At the same time, in order to ensure the implementation effect and safety of the blasting plan, 8 rolls of explosives were configured in the inner circle hole, auxiliary hole and bottom plate hole respectively to ensure that different holes can exert maximum efficiency during blasting. For the buffer hole, 7 rolls of explosives were configured to ensure the blasting effect while minimizing the impact on the surrounding environment.
[0080] The charge configuration of the blasting scheme in the embodiment is shown in Table 4, which lists the number of explosive rolls and the total charge of various hole types, which can ensure the point column method pre-splitting blasting. Figure 5 Effective implementation of the design method, where 1 represents the pre-splitting hole, 2 represents the buffer hole, 3 represents the top plate hole, and 4 represents the inner circle hole, auxiliary hole, and bottom plate hole.
[0081] Table 4 Statistical table of cross-section charge quantity of point column method pre-splitting blasting design scheme
[0082] In this embodiment, the charge structure of the blasting scheme is optimized according to the above-mentioned charge method.
[0083] First, 5 rolls of emulsion explosives are loaded into a single hole, and the total charge length is 1500mm to meet the initial energy requirement of pre-splitting blasting. The charging method in the embodiment adopts a segmented charging strategy, that is, the bottom adopts a reinforced charging method, and the blasting power is increased by increasing the amount of explosives, thereby overcoming the clamping effect of the bottom rock and ensuring sufficient crushing of the bottom of the blasthole; then, the middle section of the blasthole is normally charged, that is, the charge is loaded according to the predetermined charge density and method, ensuring that the rock is evenly crushed in the middle area; then, the amount of charge is reduced at the orifice part, and the blasting energy at the orifice is reduced by reducing the amount of explosives, preventing the surrounding environment and construction personnel from being damaged by flying rocks and gravel, and protecting the equipment and structures around the orifice.
[0084] Furthermore, in order to more effectively control the transfer and distribution of blasting energy, an air spacing method is used in the charging process, and detonating cords are used to connect the sections of explosives, thereby ensuring that each section of explosives can be detonated in a predetermined order and time, and the remaining blast holes will continue to use the existing charging structure to maintain the consistency and stability of the blasting plan; finally, after the charging is completed, the blast holes are filled with gun mud in the embodiment to ensure that the explosives can fully function during blasting and prevent the leakage of explosion gas and energy.
[0085] In this embodiment, the pre-splitting holes are subjected to segmented charging, air spacing and taphole mud filling, etc., which optimizes the charging method and charging structure, helps to improve blasting efficiency, reduce safety risks, and protect the surrounding environment. Figure 5 , where 1 represents the top crack hole, 2 represents the buffer hole, 3 represents the top plate hole, and 4 represents the inner circle hole, auxiliary hole and top plate hole.
[0086] In this embodiment, the blasting plan is optimized according to the above-mentioned pre-splitting hole delay time.
[0087] In this embodiment, the delay time difference between adjacent blasthole sections is set to 300 milliseconds, which realizes the optimization of the fourth parameter of pre-splitting blasting, ensures the orderly progress of the blasting process, reduces stress concentration, optimizes crack expansion and improves blasting quality, which is of great significance for improving blasting effects and reducing safety risks.
[0088] According to the design result of the above pre-splitting delay time, the time setting of the delayed detonation in an optional embodiment is shown in Table 5.
[0089] Table 5 Statistical table of delayed detonation time of point column method pre-splitting blasting design scheme
[0090] Furthermore, in order to demonstrate the design of the pre-splitting hole delay time in the point-column method pre-splitting blasting design, a detonation sequence diagram of the point-column method pre-splitting blasting design was drawn. Figure 6 , where t1 to t6 represent the detonation time of each section respectively, the delay time of section t1 is 0ms, indicating that the detonation time is 0, the delay time of section t2 is 300ms, indicating that the detonation time of section t2 is 300ms, and so on.
[0091] Traditional smooth blasting usually follows the detonation sequence from inside to outside (t2-t3-t4-t5-t6-t1), while the present invention adopts the opposite sequence (t1-t2-t3-t4-t5-t6), where the t1 section is detonated first. The present invention first detonates the t1 section to form a pre-crack at the boundary of the point column as the first barrier to protect the ore pillar, thereby significantly reducing the direct impact of subsequent blasting loads on the point column.
[0092] Different from conventional smooth blasting, the present invention utilizes the first detonated t1 segment to generate pre-cracks at the boundary of the point column, which serves as a buffer layer to resist the impact force caused by subsequent blasting, protects the pillar from direct impact, and improves the stability and safety of the pillar.
[0093] The detonation sequence (t1-t2-t3-t4-t5-t6) of the present invention realizes a unique protection mechanism during the blasting process. The pre-cracks formed by the first detonated t1 section effectively weaken the shock waves and stress waves generated by the subsequent blasting, providing better protection for the pillars. It not only improves the durability of the pillars, but also optimizes the safety and efficiency of the entire blasting process.
[0094] A point-column method pre-splitting blasting design method further includes conducting field test construction on the pre-splitting blasting scheme designed by the present invention, and its specific implementation contents are as follows: In order to avoid errors caused by changes in test site conditions, this field test was conducted on the same fixed section. In the selected same section, the left part was tested using the point column method pre-splitting blasting design scheme of the present invention, and the right side used the conventional mine expansion scheme. However, due to the height limitation of the site, the blasthole layout on the section cannot be carried out completely according to the preset design scheme. The blasthole layout is carried out on the premise of ensuring that the hole spacing and row spacing meet the requirements. The depth of the blasthole is 3.2 meters and the aperture is 4.2 mm. During the blasting process, rock emulsion explosives were selected. Please refer to Table 6 for explosive parameters.
[0095] Table 6 Performance parameters of rock emulsion explosives
[0096] The blasting effect analysis was carried out on the point-column method pre-splitting blasting design scheme of the present invention.
[0097] During the pillar blasting process, the point-pillar pre-splitting blasting design significantly improved the quality of the blasting results. Observing the half-hole marks on the left and right sides, the point-pillar pre-splitting blasting design can ensure that the test pillar wall reaches a high degree of flatness, with the average over-excavation and under-excavation controlled within 10 cm, and the half-hole marks remain intact, which further proves the precise control and blasting of the rock by the point-pillar pre-splitting blasting design.
[0098] In contrast, due to the large spacing between blast holes and the large amount of explosives in a single hole in the conventional blasting scheme, serious over-excavation occurred on the right side. From the relevant experimental data, it can be seen that the conventional blasting scheme has weak and intermittent half-hole marks, indicating that the rock has been subjected to uneven and relatively violent blasting impact in the conventional blasting scheme.
[0099] A comparative analysis of the contours after blasting showed that the left side contour using the point-pillar pre-splitting blasting design was smoother and more linear, while the right side pillar wall using the conventional blasting scheme presented a concave curve shape, further verifying the degree of difference in blasting effects between the two blasting schemes.
[0100] In addition, the analysis of the blast pile morphology shows that the blast pile is obviously biased towards the left side, mainly because the pre-splitting holes on the left and right sides are detonated in different orders. The pre-splitting holes on the left side are detonated first, forming a relatively stable blasting boundary, while the subsequent detonation on the right side pushes the broken rocks to move to the left, and finally forms a distribution biased towards the left side. In addition, there are no obvious large rocks in the test blast pile, which meets the loading requirements of the shovel truck and improves the subsequent transportation efficiency.
[0101] Based on the blasting effect analysis results, it can be seen that the point-pillar pre-splitting blasting design proposed in the present invention shows good advantages in pillar blasting, which not only ensures the blasting quality, but also improves the work efficiency of blasting engineering, and can be widely used in the field of mining technology.
[0102] See also Figure 7 In an optional embodiment, in order to efficiently execute a point-column pre-splitting blasting design method provided by the present invention, the present invention further provides a point-column pre-splitting blasting design system, the point-column pre-splitting blasting design system comprising a processor, an input device, an output device and a memory, the processor, the input device, the output device and the memory are interconnected, wherein the memory is used to store a computer program, the computer program comprises program instructions, the processor is configured to call the program instructions, and execute the specific steps of the point-column pre-splitting blasting design method and related embodiments provided by the present invention. The basic point-column pre-splitting blasting design system of the present invention has a complete structure and is objectively stable.
[0103] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. A point-column pre-splitting blasting design method, characterized in that: The steps include: Collecting existing blasting scheme information, and setting pre-splitting blasting scheme parameters based on the existing blasting scheme information; Establishing a pre-splitting blasting first parameter analysis model, and analyzing the pre-splitting blasting first parameter based on the pre-splitting blasting first parameter analysis model; Establishing a pre-splitting blasting second parameter analysis model, and analyzing the pre-splitting blasting second parameter based on the pre-splitting blasting second parameter analysis model; Optimizing the third pre-splitting blasting parameter and the fourth pre-splitting blasting parameter based on the existing blasting scheme information; The point-column method presplitting blasting design scheme is obtained by combining the first presplitting blasting parameter, the second presplitting blasting parameter, the third presplitting blasting parameter and the fourth presplitting blasting parameter.
2. The point-column pre-splitting blasting design method according to claim 1, characterized in that: The collecting of existing blasting scheme information and setting of pre-splitting blasting scheme parameters based on the existing blasting scheme information includes: Setting a first parameter of a pre-splitting blasting scheme, wherein the first parameter of the pre-splitting blasting scheme includes a pre-splitting hole spacing; Setting a second parameter of the pre-splitting blasting scheme, wherein the second parameter of the pre-splitting blasting scheme includes a charge amount; Setting a third parameter of the pre-splitting blasting scheme, wherein the third parameter of the pre-splitting blasting scheme includes a charge structure; A fourth parameter of the pre-splitting blasting scheme is set, wherein the fourth parameter of the pre-splitting blasting scheme includes a pre-splitting hole delay time.
3. The point-column pre-splitting blasting design method according to claim 1, characterized in that: The establishing of the first parameter analysis model of pre-splitting blasting and the analyzing of the first parameter of pre-splitting blasting based on the first parameter analysis model of pre-splitting blasting include: Establishing a first parameter analysis model of pre-splitting blasting based on the existing blasting scheme information; The pre-splitting hole spacing is obtained through the pre-splitting blasting first parameter analysis model.
4. The point-column pre-splitting blasting design method according to claim 3 is characterized in that: The first parameter analysis model of pre-splitting blasting satisfies the following relationship: , in, is the pre-crack hole spacing, is the ultimate tensile strength of rock, is the ultimate compressive strength of rock, μ is the Poisson’s ratio of rock, and d is the blasthole diameter.
5. The point-column pre-splitting blasting design method according to claim 3, characterized in that: The establishing of the pre-splitting blasting second parameter analysis model and the analyzing of the pre-splitting blasting second parameter based on the pre-splitting blasting second parameter analysis model include: Establishing a second parameter analysis model for pre-splitting blasting based on the existing blasting scheme information; The single-hole blasting charge is obtained through the pre-splitting blasting second parameter analysis model.
6. The point-column pre-splitting blasting design method according to claim 5, characterized in that: The second parameter analysis model of pre-splitting blasting satisfies the following relationship: , in, is the charge amount for a single hole, is the blast hole diameter, is the charge density, is the density of explosive and L is the depth of blasthole.
7. The point-column pre-splitting blasting design method according to claim 5, characterized in that: The optimizing the third pre-splitting blasting parameter and the fourth pre-splitting blasting parameter based on the existing blasting scheme information includes: Designing a blasting charging method based on the existing blasting plan information, the blasting charging method includes enhanced charging at the bottom of the hole, normal charging in the middle of the hole, and weakened charging at the hole mouth; The third parameter of pre-splitting blasting is optimized by the blasting charging method.
8. The point-column pre-splitting blasting design method according to claim 7, characterized in that: The optimizing the third pre-splitting blasting parameter and the fourth pre-splitting blasting parameter based on the existing blasting scheme information includes: Design a pre-splitting hole delay time according to the existing blasting plan information, wherein the pre-splitting hole delay time includes a delay time difference of adjacent blasthole sections set to 300ms; The fourth parameter of pre-splitting blasting is optimized by the pre-splitting hole delay time.
9. The point-column pre-splitting blasting design method according to claim 8, characterized in that: The point-column method presplitting blasting design scheme obtained by combining the first presplitting blasting parameter, the second presplitting blasting parameter, the third presplitting blasting parameter and the fourth presplitting blasting parameter comprises: The initial blasting design scheme is optimized based on the pre-splitting hole spacing, single hole charge, blasting charge method and pre-splitting hole delay time to obtain the point-column method pre-splitting blasting design scheme.
10. Point-column method pre-splitting blasting design system, characterized in that: The system includes a processor, an input device, an output device and a memory, wherein the processor, the input device, the output device and the memory are interconnected, wherein the memory is used to store a computer program, the computer program includes program instructions, and the processor is configured to call the program instructions to execute the point-column pre-splitting blasting design method according to any one of claims 1 to 9.
Citation Information
Patent Citations
Presplit blasting method
CN101441055A
Cited By
Stability analysis method based on low-vibration blasting of cultural relic conservation area
CN120369503A
A stability analysis method based on low-vibration blasting in cultural relic protection zone
CN120369503B
Pet feeder control method and system, terminal equipment and storage medium
CN121336725A