Quality supervision method and system for cast-in-place pile hidden project
Through sensors and big data analysis technology, key parameters of the cast-infused pile concealed project are monitored in real time, quality risks are identified and early warnings are issued, solving the problems of inconsistency between construction and design and cutting corners, and achieving high-precision, timeliness and safety quality supervision.
Patent Information
- Application Number
- CN202410968849.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-08
AI Technical Summary
In the hidden project of cast-injected piles, there is a lack of effective quality supervision methods, which leads to quality problems such as inconsistency between construction and design, use of steel bars before inspection, and cutting corners.
Use sensors to obtain detection data, and conduct real-time analysis through big data analysis technology to determine whether there are abnormalities in the data, issue early warning reminders, including building a big data analysis platform based on cloud computing, integrating machine learning algorithms, identifying quality risks, and combining multiple sensors (pressure, temperature, humidity, vibration, camera) conducts comprehensive monitoring and automatically process data to ensure data quality and safety.
Real-time monitoring and rapid acquisition of key data are achieved to ensure the accuracy and safety of the data, notify relevant personnel through multi-channel early warning, shorten reaction time, avoid unnecessary shutdowns and cost waste, provide emergency response suggestions, and improve construction quality.
Smart Images

Figure CN118917727A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of detection, and in particular to a quality supervision method and system for cast-in-place pile concealed engineering. Background Art
[0002] In the cast-in-place pile concealed project (rebar cage), steel bar raw material is one of the important building materials that affects the quality of engineering construction. According to the requirements of the cast-in-place pile construction quality supervision specifications, the model and specifications of the steel bar raw materials actually used on site must meet the requirements of the construction design drawings, and the amount of steel bars of the corresponding model and specifications must also meet the design requirements. At present, there is a lack of effective supervision measures, resulting in quality problems such as inconsistency between construction and design, use of steel bars without inspection, and cutting corners at the construction site. Summary of the invention
[0003] The technical problem to be solved by the present invention is to overcome the above technical problems and provide a quality supervision method and system for cast-in-place pile concealed engineering.
[0004] To solve the above technical problems, the technical solution provided by the present invention is: a quality supervision method for cast-in-place pile concealed projects includes: obtaining detection data from sensors; performing real-time analysis on the received detection data through big data analysis technology; judging whether there are any abnormalities in the detection data, and issuing an early warning reminder when there are any abnormalities.
[0005] In some embodiments, the received test data is analyzed in real time through big data analysis technology to determine whether there are any abnormalities in the test data, including: building a big data analysis platform based on cloud computing, integrating machine learning algorithms, and performing in-depth analysis of the test data to identify quality risks of the test.
[0006] In some embodiments, it is determined whether there is an abnormality in the detection data. When an abnormality exists, an early warning reminder is issued, including: when the result of the data analysis exceeds a preset threshold, an early warning is issued and pushed to the relevant person in charge via SMS, email or APP.
[0007] In some embodiments, the sensor includes a pressure sensor, a temperature sensor, a humidity sensor, a vibration sensor, and a camera.
[0008] In some embodiments, it also includes uploading all detection data to the cloud and local storage to enable multiple users to access.
[0009] In some embodiments, it also includes establishing a historical database, uploading historical detection data to the historical database, and performing trend analysis on the data uploaded to the historical database.
[0010] In some embodiments, determining whether there is an anomaly in the detection data and issuing an early warning reminder when an anomaly exists includes: setting an early warning threshold of the detection data based on the designed return and historical data.
[0011] In some embodiments, when a parameter approaches a warning threshold, a yellow warning signal is issued to draw the attention of on-site staff; when a parameter exceeds the warning threshold, a red warning signal is issued to alert staff.
[0012] In some embodiments, acquiring detection data from the sensor includes: collecting sequential data every five minutes.
[0013] In some embodiments, a quality supervision system for cast-in-place pile concealed engineering,
[0014] An acquisition unit, used for acquiring detection data from a sensor;
[0015] An analysis unit, used to perform real-time analysis on the received detection data by using big data analysis technology;
[0016] The reminder unit is used to determine whether there is any abnormality in the detection data, and issue an early warning reminder when an abnormality exists.
[0017] The advantages of the present invention compared with the prior art are:
[0018] (1) Real-time monitoring is achieved through sensors and data collectors, which can quickly obtain key data during the construction process.
[0019] (2) The integrated use of multiple sensors ensures comprehensive monitoring of key parameters of the pile, including strain, inclination, mud pressure and temperature.
[0020] (3) High-precision sensors ensure the accuracy of data collection. The combination of cloud storage and local storage ensures the security and reliability of data, and can ensure data integrity even if there are network problems.
[0021] (4) Automatically process outliers and missing values in data to improve data quality.
[0022] (5) Display early warning information in real time to facilitate timely response by on-site personnel.
[0023] (6) The early warning system can issue an early warning the moment a parameter exceeds the threshold, shortening the response time and notifying relevant personnel through multiple channels such as text messages, emails, and mobile phone application push notifications to ensure the timeliness and comprehensiveness of information transmission.
[0024] (7) Classify and handle according to the warning level (mild warning and severe warning) to avoid unnecessary shutdown and cost waste. Provide corresponding treatment suggestions based on the warning level to guide on-site personnel to take emergency measures quickly. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic flow chart of the method of the present invention.
[0026] Figure 2 It is a system structure block diagram of the present invention. DETAILED DESCRIPTION
[0027] Please see attached Figure 1-2 The technical solution provided by the present invention is: a quality supervision method for cast-in-place pile concealed engineering comprises:
[0028] S101, acquiring detection data from a sensor;
[0029] S102, performing real-time analysis on the received detection data through big data analysis technology;
[0030] S103, determining whether there is any abnormality in the detection data, and issuing an early warning reminder when there is any abnormality.
[0031] In some embodiments, the received test data is analyzed in real time through big data analysis technology to determine whether there are any abnormalities in the test data, including: building a big data analysis platform based on cloud computing, integrating machine learning algorithms, and performing in-depth analysis of the test data to identify quality risks of the test.
[0032] In some embodiments, it is determined whether there is an abnormality in the detection data. When an abnormality exists, an early warning reminder is issued, including: when the result of the data analysis exceeds a preset threshold, an early warning is issued and pushed to the relevant person in charge via SMS, email or APP.
[0033] In some embodiments, the sensor includes a pressure sensor, a temperature sensor, a humidity sensor, a vibration sensor, and a camera.
[0034] In some embodiments, it also includes uploading all detection data to the cloud and local storage to enable multiple users to access.
[0035] In some embodiments, it also includes establishing a historical database, uploading historical detection data to the historical database, and performing trend analysis on the data uploaded to the historical database.
[0036] In some embodiments, determining whether there is an anomaly in the detection data and issuing an early warning reminder when an anomaly exists includes: setting an early warning threshold of the detection data based on the designed return and historical data.
[0037] In some embodiments, when a parameter approaches a warning threshold, a yellow warning signal is issued to draw the attention of on-site staff; when a parameter exceeds the warning threshold, a red warning signal is issued to alert staff.
[0038] In some embodiments, acquiring detection data from the sensor includes: collecting sequential data every five minutes.
[0039] In some embodiments, a quality supervision system for cast-in-place pile concealed engineering,
[0040] An acquisition unit 201 is used to acquire detection data from a sensor;
[0041] An analysis unit 202, used to perform real-time analysis on the received detection data using big data analysis technology;
[0042] The reminder unit 203 is used to determine whether there is any abnormality in the detection data, and issue an early warning reminder when an abnormality exists.
[0043] The advantages of the present invention compared with the prior art are:
[0044] (1) Real-time monitoring is achieved through sensors and data collectors, which can quickly obtain key data during the construction process.
[0045] (2) The integrated use of multiple sensors ensures comprehensive monitoring of key parameters of the pile, including strain, inclination, mud pressure and temperature.
[0046] (3) High-precision sensors ensure the accuracy of data collection. The combination of cloud storage and local storage ensures the security and reliability of data, and can ensure data integrity even if there are network problems.
[0047] (4) Automatically process outliers and missing values in data to improve data quality.
[0048] (5) Display early warning information in real time to facilitate timely response by on-site personnel.
[0049] (6) The early warning system can issue an early warning the moment a parameter exceeds the threshold, shortening the response time and notifying relevant personnel through multiple channels such as text messages, emails, and mobile phone application push notifications to ensure the timeliness and comprehensiveness of information transmission.
[0050] (7) Classify and handle according to the warning level (mild warning and severe warning) to avoid unnecessary shutdown and cost waste. Provide corresponding treatment suggestions based on the warning level to guide on-site personnel to take emergency measures quickly.
[0051] The present invention and its embodiments are described above, and such description is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. In short, if ordinary technicians in the field are inspired by it, without departing from the purpose of the invention, they can design a structure and embodiment similar to the technical solution without creativity, which should belong to the protection scope of the present invention.
Claims
1. A quality supervision method for cast-in-place pile concealed engineering, characterized in that: include: Acquire detection data from sensors; Real-time analysis of received test data through big data analysis technology; Determine whether there are any abnormalities in the detection data, and issue an early warning reminder when there are any abnormalities.
2. The method according to claim 1, characterized in that The received test data is analyzed in real time through big data analysis technology to determine whether there are any abnormalities in the test data, including: Build a cloud computing-based big data analysis platform, integrate machine learning algorithms, and conduct in-depth analysis of inspection data to identify quality risks of inspections.
3. The method according to claim 1, characterized in that Determine whether the detection data is abnormal. If there is an abnormality, the warning reminders include: When the results of data analysis exceed the preset threshold, an early warning will be issued and pushed to the relevant person in charge via SMS, email or APP.
4. The method according to claim 1, characterized in that: The sensors include a pressure sensor, a temperature sensor, a humidity sensor, a vibration sensor and a camera.
5. The method according to claim 1, characterized in that This also includes uploading all inspection data to the cloud and local storage for access by multiple users.
6. The method according to claim 1, characterized in that It also includes establishing a historical database, uploading historical detection data to the historical database, and performing trend analysis on the data uploaded to the historical database.
7. The method according to claim 1, characterized in that Determine whether the detection data is abnormal. If there is an abnormality, the warning reminders include: Set warning thresholds for detection data based on design returns and historical data.
8. The method according to claim 7, characterized in that When the parameter approaches the warning threshold, a yellow warning signal is issued to draw the attention of on-site staff; When the parameter exceeds the warning threshold, a red warning signal is issued to remind the staff immediately.
9. The method according to claim 8, characterized in that Acquiring detection data from the sensor includes: collecting sequential data every five minutes.
10. A quality supervision system for cast-in-place pile concealed engineering, characterized in that: An acquisition unit, used for acquiring detection data from a sensor; An analysis unit, used to perform real-time analysis on the received detection data by using big data analysis technology; The reminder unit is used to determine whether there is any abnormality in the detection data, and issue an early warning reminder when an abnormality exists.