Optimization method for ledger management of power system
By using multi-dimensional ledger management and agent data collection, the problems of high labor costs and insufficient automation in power system ledger management have been solved, realizing automated ledger management and the continuity of business processes, and improving operation and maintenance efficiency and accuracy.
Patent Information
- Application Number
- CN202410970495.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-08
AI Technical Summary
The existing power system ledger management has problems such as high labor costs, lack of system automation, lack of integration between ledger management and production processes, insufficient system topology drawing function, and discontinuous operation and maintenance business flow.
By adopting a multi-dimensional and multi-group ledger management approach, combined with Agent data collection, automatic data entry, auditing, and information alerts are achieved, optimizing the ledger management model, enabling automatic updates and auditing, and combining with an intelligent integrated operation and maintenance support platform for resource discovery and topology mapping, establishing a business flow model, and improving operation and maintenance efficiency.
It reduced the data entry burden on maintenance personnel, ensured the accuracy and uniqueness of the ledgers, achieved automated ledger management and seamless business flow, and improved maintenance efficiency.
Smart Images

Figure CN118917795A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power systems, and relates to a ledger management method, in particular to an optimization method for power system ledger management. Background Art
[0002] The intelligent integrated operation and maintenance support platform (SG-I60002.0) is mainly aimed at operation and maintenance personnel, system administrators, dispatchers, etc. It relies on 15 core components to centrally provide basic operation and maintenance service capabilities such as collection, configuration, operation, analysis, and integration. It effectively supports the company's information operation and maintenance model from traditional steady-state operation and maintenance to a "dual-state" operation and maintenance model, and supports the transformation of the operation and maintenance system to an "Internet dispatching and inspection system."
[0003] However, as the application scope and depth of SG-I60002.0 gradually expand, the following problems exist:
[0004] The "freshness" of the ledger and the whole process management need to be improved. At present, the maintenance of the ledger relies on pure manual maintenance and closed-loop management, which has high labor costs; the information profession lacks the implementation of the overall ledger model and management standards, and there is a lack of effective connection between different ledgers in system automation. The ledger management is not connected with the production process, and timely automated maintenance cannot be achieved, resulting in a broken window effect in ledger management; the offline process has not been fully realized online, and it is impossible to timely and effectively remind changes to the ledger or even automatically change it, resulting in a lack of ledger management.
[0005] The display capability of the system topology drawing function needs to be enhanced. The current system architecture drawing board lacks the topology display form and information integration function of the network, security equipment, etc. required by users, and the support for judging the cause of the system fault alarm level is insufficient.
[0006] The business flow of dispatching, operation and inspection lacks continuity. The information operation and maintenance profession provides basic information resource support services to other professions such as marketing and equipment. In the process of docking with the information operation and maintenance profession, other professions do not understand the specific business flow. It is necessary to establish a business flow to connect the dispatching, operation and inspection business, help other professions quickly understand the business process of this profession, and realize the efficient flow of business.
[0007] Therefore, the present invention proposes an optimization method for power system ledger management to solve the above problems.
[0008] After searching, no public documents of the prior art identical or similar to the present invention were found. Summary of the invention
[0009] The purpose of the present invention is to overcome the shortcomings of the prior art, propose an optimization method for power system ledger management, realize multi-dimensional and multi-group management mode, deeply combine Agent collection, optimize the management mode of the ledger, and provide comprehensive support for users to carry out various information operation and maintenance management tasks in a flexible and autonomous closed loop, thereby improving the operation and maintenance results and reducing the input burden of operation and maintenance personnel; automatic auditing of the ledger is realized to ensure the accuracy and uniqueness of the ledger.
[0010] The present invention solves the practical problem by adopting the following technical solutions:
[0011] A method for optimizing system ledger management includes the following steps:
[0012] S1. Develop a ledger management model as needed;
[0013] S2. Based on the ledger management model developed in step S1, the collection tool automatically enters data to build a ledger;
[0014] S3. Automatically audit the ledger constructed in step S2 and export the audit report;
[0015] S4. Set up intelligent reminders for ledger information to display system health history, device health history, and software health history.
[0016] Moreover, the specific method of step S1 is:
[0017] Users can independently develop the ledger management model of SG-I60002.0 and specify objects, attributes and relationships to implement associated queries.
[0018] Moreover, the specific steps of step S2 include:
[0019] (1) Use the collection tool agent and collection protocol to compile rules and automatically collect, and automatically fill in the specified characters according to the displacement mark;
[0020] (2) Automatic acquisition of physical resource changes: Automatically acquire unmanaged IT resources, collect all indicators of resources installed with the agent, directly fill in the ledger information, and generate reminders for user confirmation. Provide users with a customized agent configuration window to configure manual collection strategies. Automatically match the collected information to the dimensions covered by the ledger based on the agent's IP address.
[0021] Furthermore, the step S2 (2) further comprises:
[0022] ① Discovery of resource configuration changes
[0023] The resource automatic discovery function based on the intelligent integrated operation and maintenance support platform (SG-I60002.0) provides basic data processing capabilities for upper-level software and hardware management according to actual management needs. When new software is automatically discovered, a reminder is sent to the relevant responsible person through the intermediate service, and the responsible person confirms it. If the confirmation is correct, the relevant process is called, and the software ledger is automatically updated after confirmation;
[0024] ②Automatic update of ledger fields
[0025] Collect all indicators of the resources where AGENT is installed, match the collected results with the ledger field information, generate reminders, and fill in the information after the user confirms to ensure the freshness of the ledger;
[0026] Complete the information inheritance between the IT resource management module and the operation monitoring management module, display the equipment status corresponding to the equipment ledger in the equipment ledger, expand the monitoring status to prompt information of health, alarm, fault, maintenance preparation, maintenance, and change confirmation, and drill down the operation monitoring to the ledger management, so that the ledger is always associated with the physical object, and build a "live ledger";
[0027] ③ Manage all the hardware and software involved in the IT resource ledger by status, and automatically record the current status, operation time calculation, maintenance expiration alarm, overdue service alarm, alarm record, maintenance record, defect record and other multi-dimensional records of the IT resources in operation;
[0028] Moreover, the specific steps of step S3 include:
[0029] (1) Audit rule setting: Audit rules are set according to the model and attributes, including single-attribute filling style check setting and multi-attribute linkage rule check setting to implement inventory inspection of the ledger.
[0030] (2) Pre-audit: When saving, pre-audit is carried out according to the audit rules. Those that do not comply with the audit rules cannot be saved and stored.
[0031] (3) Create new audit tasks: Create different audit tasks as needed to audit the ledger data within its jurisdiction, including automatic audits and manual audits.
[0032] (4) Prepare audit reports: Customize audit reports based on the current situation to reflect the actual audit situation, and staff can export them by themselves.
[0033] Advantages and beneficial effects of the present invention:
[0034] The present invention realizes a multi-dimensional and multi-grouping management method, deeply combines Agent collection, optimizes the management mode of the ledger, provides comprehensive support for users to flexibly and autonomously carry out various information operation and maintenance management tasks in a closed loop, improves the operation and maintenance results, and reduces the input burden of operation and maintenance personnel; it realizes automatic auditing of the ledger to ensure the accuracy and uniqueness of the ledger. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 A schematic diagram of the technical architecture provided by an embodiment of the present invention;
[0036] Figure 2 An overall framework diagram provided for an embodiment of the present invention;
[0037] Figure 3 A data architecture diagram provided for an embodiment of the present invention. DETAILED DESCRIPTION
[0038] The embodiments of the present invention are further described in detail below with reference to the accompanying drawings:
[0039] A method for optimizing system ledger management includes the following steps:
[0040] S1. Develop a ledger management model as needed;
[0041] The specific method of step S1 is:
[0042] Users can independently develop the ledger management model of SG-I60002.0 and specify objects, attributes and relationships to implement associated queries.
[0043] In this embodiment, for ordinary users, independent ledgers suitable for different IT resource management objects can be established, and different IT resource management dimensions can be classified into core, important, and general levels; the core level is the unique constraint attribute field of the ledger itself; the important level is the field that different management departments attach importance to and can be associated with the ledger, and the general management dimension is the management attribute dimension added by different roles themselves.
[0044] In addition, users can add or delete general management attributes for a maintenance object and set filling rules for attribute content according to their own management needs.
[0045] S2. Based on the ledger management model established in step S1, the collection tool automatically enters data to construct the ledger.
[0046] The specific steps of step S2 include:
[0047] (1) Use the collection tool agent and collection protocol to compile rules and automatically collect, and automatically fill in the specified characters according to the displacement mark;
[0048] (2) Automatic acquisition of physical resource changes: Automatically acquire unmanaged IT resources, collect all indicators of resources installed with the agent, directly fill in the ledger information, and generate reminders for user confirmation. Provide users with a customized agent configuration window to configure manual collection strategies. Automatically match the collected information to the dimensions covered by the ledger based on the agent's IP address.
[0049] In this embodiment, the step S2 (2) further includes:
[0050] ① Discovery of resource configuration changes
[0051] The resource automatic discovery function based on the intelligent integrated operation and maintenance support platform (SG-I60002.0) provides basic data processing capabilities for upper-level software and hardware management in accordance with actual management needs. When new software is automatically discovered, a reminder is sent to the relevant responsible person through the intermediate service, and the responsible person confirms it. If the confirmation is correct, the relevant process is called, and the software ledger is automatically updated after confirmation.
[0052] ②Automatic update of ledger fields
[0053] Collect all indicators of the resources where AGENT is installed, match the collected results with the ledger field information, generate reminders, and fill in the information after user confirmation to ensure the freshness of the ledger.
[0054] Complete the information inheritance between the IT resource management module and the operation monitoring management module, display the equipment status corresponding to the ledger in the equipment ledger, expand the monitoring status to health, alarm, fault, maintenance preparation, maintenance, change confirmation and other prompt information, drill down the operation monitoring to the ledger management, so that the ledger is always associated with the physical object, and build a "live ledger".
[0055] ③ Manage all the hardware and software involved in the IT resource ledger by status, and automatically record the current status, operation time calculation, maintenance expiration alarm, overdue service alarm, alarm record, maintenance record, defect record and other multi-dimensional records of the IT resources in operation;
[0056] In this embodiment, a one-stop search method can be added, such as searching by keyword, searching by category, searching by custom tags, searching by attribute values or relationships, etc., to facilitate the search and viewing process of the staff.
[0057] S3, automatically audit the ledger constructed in step S2;
[0058] The specific steps of step S3 include:
[0059] (1) Audit rule setting: Audit rules are set according to the model and attributes, including single-attribute filling style check setting and multi-attribute linkage rule check setting to implement inventory inspection of the ledger.
[0060] (2) Pre-audit: When saving, pre-audit is carried out according to the audit rules. Those that do not comply with the audit rules cannot be saved and stored.
[0061] (3) Create new audit tasks: Create different audit tasks as needed to audit the ledger data within its jurisdiction, including automatic audits and manual audits.
[0062] (4) Prepare audit reports: Customize audit reports based on the current situation to reflect the actual audit situation, and staff can export them by themselves.
[0063] In this embodiment, accordingly, unqualified resources will be automatically distributed to the corresponding administrator, who will decide whether to issue a work order for specific confirmation or directly delete or merge them.
[0064] The present invention can provide a dedicated interface to manage resource information deleted by users, help users query mistakenly deleted data resources, and then quickly restore them to the database through resource recovery commands, making it convenient for users to trace data.
[0065] In addition, the audit resource type, time, non-compliant content, disposal results, etc. are recorded to facilitate later tracing. The record content includes the first audit time, the most recent audit time, the number of data audits, the data auditor, the audit results, etc.
[0066] In summary, the pain points of irregular ledger entry and difficult management of existing ledgers have been solved. When entering data, different resource managers can set compliance resource pools for the attributes of this resource. Any attribute value of the ledger that is intended to be changed cannot be entered if it is not approved, effective, or does not meet the rules, thereby preventing illegal changes to the ledger information. After entry, different managers can define inspection tasks according to the set rules, filter out non-compliant ledgers, and proceed to the next step of distributing forms, merging, deleting, and other actions.
[0067] S4. Ledger information reminder.
[0068] The step S4 comprises:
[0069] (1) Intelligent reminder:
[0070] Based on the service life and failure frequency of the equipment, according to the artificial strategy baseline, intelligently push replacement suggestions for equipment with matching parameters among the hardware equipment that has not been put into operation; intelligently make purchase reminders based on the number of expired equipment; for equipment that has expired or is about to expire, push the maintenance renewal reminder system equipment health history;
[0071] (2) Display system health history:
[0072] Automatically record the healthy operation status of each application system, and fully display the healthy operation time, maintenance records, fault records, alarm records, disposal methods and other information of the database, middleware, and host it depends on, and the information can be exported.
[0073] (3) Display device health history:
[0074] Automatically record the healthy operation status of each device, and comprehensively display the maintenance records, expansion records, alarm records, and fault records of each device, which can be exported. It also focuses on recording the main operation and maintenance objects such as servers and virtual machines, and displays the health status of related databases, middleware, and application systems.
[0075] (4) Display software health history:
[0076] Taking software instances as points, it reflects important management events such as failures, alarms, maintenance, and changes of various databases and middleware, helping software administrators analyze software operation status and classify the difficulty of various software operation and maintenance.
[0077] In this embodiment, the present invention improves the record of ledger changes, records the change time and change type, and clearly records the change event, the change person, and the change content before and after, so that managers can see at a glance when tracing the change. For manual non-collected field changes, a rigorous change confirmation process is constructed, and a change event is formed, and different roles are reminded along the way.
[0078] In this embodiment, the present invention can provide dedicated services to realize the sharing and opening of ledger-related data to external systems, focusing on supporting the local data middle station. According to the actual requirements of the data center, a customized service interface or a dedicated database intermediate table is provided to help the data middle station obtain ledger data.
[0079] In summary, we design and develop a full ledger model that meets the full life cycle management of IT resources. We design ledger models that meet the operation and management characteristics of different operation and maintenance objects, and make underlying associations to achieve multi-dimensional association query capabilities for ledger data.
[0080] Additionally, the following are included:
[0081] (I) Building self-customized online IT business process micro-applications
[0082] Based on the I60002.0 system, we sorted out, designed and improved the full-process model that meets the company's information management needs, and carried out online customized development and associated it with the IT resource management module. Users can build online process work orders in real time, freely associate operation and maintenance object resource ledgers, set filling rules, manually set approval roles and approval processes, and greatly improve the online approval efficiency for resource changes.
[0083] (1) Sorting out the information models involved in all core processes
[0084] Sort out all the company's professional information processes, optimize and improve the process models, and extract the roles, links and related data involved in closed-loop management.
[0085] (2) Association between process modules and ledger information
[0086] Build a management model based on the concept of process change drive, realize the comprehensive integration of process data and ledger data, and realize the process-driven and closed-loop ledger change.
[0087] (3) Public field model management
[0088] For common fields with high reuse rates in various forms, a field model library is established to unify input constraints and value source settings. When using, drag and drop through the model editing interface to reduce repetitive "reinventing the wheel" work in form creation.
[0089] (4) Build online process micro-applications
[0090] According to the company's characteristics, the core information management process is customized and improved to achieve online circulation.
[0091] (5) Build a “Process Creation” micro-application
[0092] Build a set of process creation micro-applications that can be designed by users, associated with roles, set links, and associated with ledgers to meet users' temporary needs for online business process approval.
[0093] (6) Work order reminder management
[0094] According to the actual operation of the work order, you can independently set the work order notification method at each stage of the work order, including system message notification, SMS notification, etc. It can also be linked with the urging function to send urgent reminders.
[0095] (II) Improve system topology drawing function
[0096] Improve the system topology diagram function, support users to associate with IT resource ledgers according to their own wishes, and support automatic connection into a diagram; based on the unified agent to collect information to display service nodes and network link alarm information, you can drill down to the specific equipment to carry software, monitoring indicators, alarm information pop-up and other functions.
[0097] (1) Developing topology templates
[0098] Refine unified methods, establish topology templates, and design and develop system architecture topology diagram templates that conform to the usage habits of the company's operation and maintenance personnel.
[0099] (2) Design and development of topological elements
[0100] Supporting the design of view elements for new templates, such as all-round element atlases for servers, network switches, network links, etc. Supporting customized upload of related icon elements to help users enrich topology styles.
[0101] (3) Topology version management
[0102] A new topology management function is added to help users manage historical versions of topology maps, making it easier for users to trace topology changes.
[0103] (4) Topology underlying data association
[0104] Design and develop the system topology's functions in terms of element object association ledger data and collection tools, so that the topology map can reflect the ledger association relationship and resource monitoring information in real time, and automatically perform multi-dimensional association on newly added element objects based on ledger information.
[0105] (5) Topological relationship mining
[0106] When operating a topology map, when you select a specific resource, you can perform relationship mining to display all resources associated with the resource, helping users establish a good operating experience.
[0107] (6) Topology Permission Management
[0108] Assign management permissions to the topology based on the application system. Different users can log in to view the topology of different application systems.
[0109] (III) Optimization of the value chain of dispatching, transportation and inspection business:
[0110] According to the "Design of Core Business Processes for Information Dispatch and Operation Inspection System Optimization", the three business domains of operation, dispatch, and operation inspection are divided, with a total of 13 categories and 16 core business processes. In combination with the "Regulations on the Management of Online and Offline Information Systems of Limited Liability Companies" (Regulations No.: (Information / 4) 261-2020), the corresponding process forms are added. At the same time, business flows are established, and the various processes of various business domains are horizontally connected, and the various stages of each business flow are defined. The type of work order initiated at each stage is limited, and each stage is automatically or manually determined to end and enter the next stage.
[0111] (1) Business flow model construction
[0112] Users can establish business flow models by themselves, including the definition of each stage of the business flow, the flow method of the stage, the dispatching and inspection work orders that can be operated at each stage, and the participating roles and initiating roles at each stage.
[0113] (2) Automatic determination of business flows
[0114] When the business flow is in progress, the user can manually confirm whether to enter the next stage, or define the judgment rules to automatically determine whether to enter the next stage.
[0115] (3) Generate business flow report
[0116] After the business flow is completed, an overall report can be generated to show the entire process of the specific work, including resource application, resource change, testing, etc., to help users understand the task completion status.
[0117] (4) Automatic triggering link integrated with collected data
[0118] The status, indicators, etc. of the "ledger-physical" delivery results of resources in each link are collected, standard strategies are formulated, and the results after the execution of actions in each link are judged to be up to standard. If the results meet the standards, they are automatically input into the input instructions for triggering the next link in the business flow or serve as one of the preparatory actions.
[0119] The system technical architecture of the present invention is as follows: Figure 1 and Figure 2 As shown, the present invention adopts B / S architecture as a whole. Users access it through the enterprise portal. The presentation layer is mainly based on Angular 4. The service layer adopts Spring Cloud Netflix microservice framework. The data layer uses Oracle, MySQL, MongoDB and other database technologies. The collection layer obtains the collected data through unified Agent and protocol collection. The service monitoring and governance components penetrate multiple layers to monitor the service link. The overall service runs on the infrastructure of the network layer and the platform layer.
[0120] The system follows the technical architecture of the intelligent integrated operation and maintenance support platform, and expands on micro-applications, following the SG-UAP architecture and the technical requirements of "one system, one platform, multiple scenarios, and micro-applications". It adopts a B / S architecture, the backend uses the SpringCloud Netflix microservice framework, and the frontend is mainly based on Angular 4, building the overall microservice framework of the SG-I60002.0 platform.
[0121] The working principle of the present invention is:
[0122] The present invention proposes an optimization method for the management of the ledger of the power system, which performs the query, entry, modification, deletion and entry of the resource ledger data through the middle platform service layer, and synchronously pushes the processed data in real time. Using the data subscription method, through the newly created intermediate service, the data content of the self-built micro-application is automatically synchronized to the unified push SG-I60002.0, the data push service is started, the relevant data mapping table is managed, and the SG-I60002.0 unified push module develops a data receiving service to receive the real-time pushed change data. Through the construction of the content of the present invention, a CMDB resource configuration management library that meets the requirements of information-based dispatching and inspection is constructed. CMDB configuration management database, CMDB storage and management of various configuration information and service delivery processes of equipment in the enterprise IT architecture are closely connected, support the operation of these processes, give play to the value of configuration information, and rely on related processes to ensure the accuracy and uniqueness of data. Using the CMDB model to manage the company's overall IT resources, realize the online dispatching and inspection business process, can customize and accurately associate ledger information, realize multi-dimensional lean management of resources, and customize the ability of topology templates to achieve the goal of multi-faceted management of application systems. Achieve unified statistical display of resources, optimize display effects, and perform step-by-step clicks and layer-by-layer drill-down effects, so that operation and maintenance personnel can quickly grasp the overall situation of resources. And from the application system dimension, display the alarm history of the application system, as well as key information such as user activity. Define the adaptive full-process cycle management status, perform special management of key status, link related processes with resource configuration, achieve the goal of one-time entry and multiple uses, and create a new intelligent reminder function to remind operation and maintenance personnel to perform subsequent operations or status management.
[0123] Ultimately, by establishing business flows, horizontally connecting the various processes in the three major business domains of operation, scheduling, and inspection, defining each stage of the business flow, limiting the type of work order initiated at each stage, automatically or manually determining the end of each stage and entering the next stage, and finally forming a business flow report to help users understand the business flow situation.
[0124] The optimization method, system, storage medium and terminal of the system ledger management of the present invention are formulated according to the business construction requirements, integration requirements and information security requirements, and the specific requirements are as follows:
[0125] 1. Business development requirements
[0126] Improve and perfect the micro-application construction of the I60002.0 system, enhance the automated operation and maintenance capabilities, optimize the automation and resource management modules, build the overall core framework of automation and CMDB, improve the functions of account management, two-ticket management, architecture graphics, process customization, monitoring graphics, etc., and fully support users to flexibly and autonomously carry out various information operation and maintenance management tasks in a closed loop, and improve the operation and maintenance results. Figure 2 and Figure 3The overall framework diagram and data architecture diagram shown (complying with SG-CIM design requirements)
[0127] like Figure 2 As shown in the figure, the platform is generally divided into the application layer, the middle platform service layer, and the operation and maintenance perception layer. The application layer provides micro-application components for users to use flexibly. The middle platform service layer provides data analysis, process services, resource allocation and other capabilities to support micro-application components. The operation and maintenance perception layer obtains the data collected by the operation and maintenance equipment through agents, protocols, interfaces and other methods to support the data analysis of the middle platform service layer.
[0128] like Figure 3 As shown in the figure, the underlying data consists of the permission control system, the collection control function, and the third-party system. The data support system of the permission control system controls users' access to micro-applications and access to ledger data. The data obtained by the collection control function supports various functions of the CMDB ledger. The data integrated by the third-party system is provided for process service use. The process service and the CMDB service interact with each other to change data and pull and display data, which jointly supports the inspection tools, process tools, and management tools in the application tools.
[0129] Its main requirements are as follows:
[0130] (1) Improve the ledger management function
[0131] In combination with the company's actual business needs, the ledger management function is improved based on I60002.0, a multi-dimensional and multi-group management method is implemented, Agent collection is deeply integrated, the ledger management mode is optimized, and dedicated shared open services are provided to help third-party interfaces quickly call data.
[0132] (2) Automatic audit of ledgers
[0133] Based on the headquarters' data governance requirements and combined with actual data conditions, automatic auditing of ledgers is realized, non-compliant ledgers are automatically screened out, and guided for disposal to ensure the accuracy and uniqueness of the ledgers.
[0134] (3) Realize the improvement of account value
[0135] Based on I60002.0, all software and hardware resources are managed, with the ledger as the management source. The physical operation status of software and hardware is combined with the ledger information to realize the timely feedback of the operation status and changes of the physical software and hardware resources to the ledger, and to display the operation status information in multiple dimensions. As time goes by, the change records, operation time, maintenance period, fault history, and maintenance history are automatically recorded to provide real-time decision support for the company's infrastructure investment.
[0136] (4) Enable users to customize online processes based on IT resource records at any time
[0137] Build process self-control micro-applications to enable users to customize online processes based on IT resource ledgers at any time. A work order management module that supports users to independently associate IT resource objects, set approval roles, and set approval processes, fully realizing users' online office and online approval.
[0138] (5) Improve the functionality of the system topology
[0139] Respond to the application of various virtualization technologies under the new situation, adapt to the actual business operations, optimize the system topology drawing method, reflect the actual operation mode of the system in detail and in depth, and guide operation and maintenance personnel to carry out their business.
[0140] (6) Automatically fill in the attribute fields of physical resources
[0141] It realizes the full connection between the ledger and the two-ticket process, and automatically updates the ledger based on the information collected by the agent and the non-collected manually entered information, so as to realize the "freshness" of the ledger by timely reflecting the impact of the operation results; it realizes the flexibility of users to add and delete the management dimensions of IT resources, and fully realizes the self-control of the ledger manager.
[0142] (7) Optimize and improve the dispatching, transportation and inspection value chain
[0143] Establish business flows, horizontally connect the various processes in the three major business domains of operation, scheduling, and inspection, define the various stages of the business flow, limit the type of work orders initiated at each stage, automatically or manually determine the end of each stage, enter the next stage, and finally form a business flow report to help users understand the business flow situation.
[0144] 2. Integration requirements
[0145] The present invention needs to realize the integration of the mail system and the dynamic environment system, realize the relevant reminder function and obtain the relevant indicators.
[0146] 3. Information security requirements
[0147] The information security protection level of the system ledger management in the present invention must meet the basic level 2 requirements of the information system security protection level, as follows:
[0148] (1) Identity Authentication
[0149] 1) A dedicated login control module should be provided to identify and authenticate the login user;
[0150] 2) The user identity authentication information of the application system should not be easily misused, the password complexity should meet the requirements, and the password should be changed regularly.
[0151] 3) A login failure processing function should be provided, which can take measures such as ending the session, limiting the number of illegal logins and automatic logout;
[0152] 4) Identity authentication, user identity uniqueness check, user identity authentication information complexity check, and login failure processing functions should be enabled, and relevant parameters should be configured according to the security policy.
[0153] (2) Access Control
[0154] 1) Access control functions should be provided to control user access to objects such as files and database tables based on security policies;
[0155] 2) The coverage of access control should include subjects, objects and operations between them related to resource access;
[0156] 3) The access control policy should be configured by the authorized subject, and the access rights of the default account should be strictly limited;
[0157] 4) Different accounts should be granted the minimum permissions required to complete their respective tasks, and a mutually restrictive relationship should be formed between them;
[0158] (3) Security Audit
[0159] 1) It should provide security audit functions covering each user and audit important security events such as user login, user logout, adding users, and modifying user permissions of the application system;
[0160] 2) The integrity of audit activities should be ensured to ensure that audit records cannot be deleted, modified or overwritten.
[0161] The content of the audit record should at least include the date, time, initiator information, type, description and results of the event.
[0162] It should be noted that the functional modules of this project are all deployed using self-built micro-applications, running side by side with the SG-I60002.0 unified promotion service module without any dependencies. The resource ledger data is queried, entered, modified, deleted and entered through the middle-office service layer, and the processed data is pushed to the intermediate service in real time. Using the data subscription method, the data content of the self-built micro-application is automatically synchronized to the unified promotion SG-I60002.0 through the newly created intermediate service, the data push service is enabled, and the relevant data mapping tables are managed. The SG-I60002.0 unified promotion module develops a data receiving service to receive real-time pushed change data to ensure that the SG-I60002.0 version upgrade promoted by the headquarters will not affect the use of the self-built micro-application functions.
[0163] It should be emphasized that the embodiments of the present invention are illustrative rather than restrictive. Therefore, the present invention includes but is not limited to the embodiments described in the specific implementation modes. Any other implementation modes derived by those skilled in the art based on the technical solutions of the present invention also fall within the scope of protection of the present invention.
Claims
1. A method for optimizing system ledger management, characterized in that: The following steps are involved: S1. Develop a ledger management model as needed; S2. Based on the ledger management model developed in step S1, the collection tool automatically enters data to build a ledger; S3. Automatically audit the ledger constructed in step S2 and export the audit report; S4. Set up intelligent reminders for ledger information to display system health history, device health history, and software health history.
2. The optimization method for system ledger management according to claim 1, characterized in that: The specific method of step S1 is: Users can independently develop the ledger management model of SG-I60002.0 and specify objects, attributes and relationships to implement associated queries.
3. The optimization method for system ledger management according to claim 1, characterized in that: The specific steps of step S2 include: (1) Use the collection tool agent and collection protocol to compile rules and automatically collect, and automatically fill in the specified characters according to the displacement mark; (2) Automatic acquisition of physical resource changes: Automatically acquire unmanaged IT resources, collect all indicators of resources installed with the agent, directly fill in the ledger information, and generate reminders for user confirmation. Provide users with a customized agent configuration window to configure manual collection strategies. Automatically match the collected information to the dimensions covered by the ledger based on the agent's IP address.
4. The optimization method for system ledger management according to claim 3 is characterized by: The step S2 (2) further includes: ① Discovery of resource configuration changes The resource automatic discovery function based on the intelligent integrated operation and maintenance support platform (SG-I60002.0) provides basic data processing capabilities for upper-level software and hardware management according to actual management needs. When new software is automatically discovered, a reminder is sent to the relevant responsible person through the intermediate service, and the responsible person confirms it. If the confirmation is correct, the relevant process is called, and the software ledger is automatically updated after confirmation; ②Automatic update of ledger fields Collect all indicators of the resources where AGENT is installed, match the collected results with the ledger field information, generate reminders, and fill in the information after the user confirms to ensure the freshness of the ledger; Complete the information inheritance between the IT resource management module and the operation monitoring management module, display the equipment status corresponding to the equipment ledger in the equipment ledger, expand the monitoring status to prompt information of health, alarm, fault, maintenance preparation, maintenance, and change confirmation, and drill down the operation monitoring to the ledger management, so that the ledger is always associated with the physical object, and build a "live ledger"; ③ Manage all the hardware and software involved in the IT resource ledger according to their status, and automatically record the current status, operation time calculation, maintenance expiration alarm, overdue service alarm, alarm record, maintenance record, defect record and other multi-dimensional records of the IT resources in operation.
5. The optimization method for system ledger management according to claim 1, characterized in that: The specific steps of step S3 include: (1) Audit rule setting: Audit rules are set according to models and attributes, including single-attribute filling style check setting and multi-attribute linkage rule check setting to implement inventory check of ledgers; (2) Pre-audit: When saving, pre-audit is carried out according to the audit rules. Those that do not comply with the audit rules cannot be saved and stored; (3) Create new audit tasks: Create different audit tasks as needed to audit the ledger data within its jurisdiction, including automatic audit and manual audit; (4) Prepare audit reports: Customize audit reports based on the current situation to reflect the actual audit situation, and staff can export them by themselves.