Visual display method and system for realizing municipal roads based on digitization

Through digital methods, the three-dimensional model is constructed and marked signals and auxiliary data are generated, which solves the problem of insufficient real simulation and detailed information in the visual display of municipal road engineering projects, and improves the effectiveness and efficiency of construction management.

CN118918284APending Publication Date: 2024-11-08广东筠诚建筑科技有限公司 +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410924568.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the visual display of municipal road engineering projects, the existing technology mainly relies on two-dimensional maps or floor plans, and cannot provide real road simulation and detailed information, resulting in poor construction management capabilities.

Method used

Using a digital-based method, a three-dimensional model is constructed by collecting current data of the construction project and inputting it into a preset construction analysis management module to generate different types of marking signals and auxiliary data for visual display of municipal road construction process.

Benefits of technology

It realizes an intuitive display of the current progress and estimated progress of municipal road construction projects, improves management effect, timely discovers abnormal situations, and avoids the shortcomings of traditional two-dimensional display methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118918284A_ABST
    Figure CN118918284A_ABST
Patent Text Reader

Abstract

The invention provides a method and a system for realizing visual display of municipal roads based on digitization. The method comprises the following steps: in response to a received acquisition instruction, acquiring current construction data of a construction project; based on the collected current construction data, constructing a current progress three-dimensional model of the construction project on a pre-constructed basic three-dimensional model of the construction project; substituting the current progress three-dimensional model of the construction project and the collected current construction data into a preset construction analysis management module to obtain different types of marking signals and auxiliary data groups matched with the marking signals; and covering a plurality of display layers on the constructed current progress three-dimensional model based on different types of the marking signals and the auxiliary data groups matched with the marking signals. According to the method, the current progress of the construction project of the municipal road can be visually displayed, the current progress of the construction project can be conveniently analyzed and marked, and related personnel can conveniently and visually know the current progress of the construction project and timely obtain abnormal conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of visualized display of the construction process of a municipal road, and specifically provides a method and system for realizing visualized display of a municipal road based on digitization. Background Art

[0002] With the rapid development of cities in my country, the scale and number of municipal road engineering projects are growing, and the supervision and management of their construction process has become particularly important. However, traditional management methods often rely on manual inspections, which have problems such as insufficient human resources and management omissions, and cannot meet the needs of rapid development. Current technology mainly relies on two-dimensional maps or simple floor plans to present the road conditions in the visualization of municipal road engineering projects. This display method is limited and cannot provide real road simulation and detailed information.

[0003] Accordingly, the art needs a new method for visualizing the construction process of municipal roads based on digitalization to solve the above problems. Summary of the invention

[0004] In order to overcome the above-mentioned defects, the present invention is proposed to provide a solution or at least partially solve the technical problems that the visualization display method of municipal road engineering projects in the prior art only stays on two-dimensional maps or plan views, cannot provide real road simulation and detailed information, and has poor construction management capabilities.

[0005] In a first aspect, the present invention provides a method for realizing a visual display of municipal roads based on digitization, the method comprising the following steps:

[0006] In response to the received collection instruction, collect current construction data of the construction project, wherein the current construction data at least includes current project data and current material data;

[0007] Based on the collected current construction data, construct a current progress three-dimensional model of the construction project on the pre-constructed basic three-dimensional model of the construction project;

[0008] Substituting the current progress three-dimensional model of the construction project and the collected current construction data into a preset construction analysis management module to obtain different types of marking signals and auxiliary data groups matching each marking signal, wherein the different types include different abnormal types and different grade types;

[0009] Based on the different types of each marking signal and the auxiliary data group matching each marking signal, the constructed current progress three-dimensional model is covered with at least one display layer to facilitate the visual display of the construction process of the municipal road.

[0010] In a technical solution of the above-mentioned method for realizing the visualization display of municipal roads based on digitization, before collecting the current construction data of the construction project in response to the received collection instruction, the method further includes:

[0011] Acquire construction data of municipal roads, wherein the construction data at least includes construction unit information, construction project data, and construction material data;

[0012] Based on the acquired construction data, a basic three-dimensional model of the construction project corresponding to the construction data is constructed.

[0013] In a technical solution of the above-mentioned method for realizing the visualization display of municipal roads based on digitalization, before substituting the current progress three-dimensional model of the construction project and the collected current construction data into a preset construction analysis management module, the method further includes:

[0014] Based on the construction data of the municipal road, determining a plurality of estimated nodes of the municipal road and an estimated data group corresponding to each estimated node;

[0015] Based on the multiple estimated nodes of the municipal road and the estimated data groups corresponding to each estimated node, respectively construct an estimated progress three-dimensional model corresponding to each estimated node on the pre-constructed basic three-dimensional model of the construction project;

[0016] The multiple estimated nodes of the municipal road, the estimated progress three-dimensional model corresponding to each estimated node, and the estimated data group corresponding to each estimated node are sent to and stored in a preset construction analysis management module.

[0017] In a technical solution of the above-mentioned method for realizing the visualization display of municipal roads based on digitalization, before substituting the current progress three-dimensional model of the construction project and the collected current construction data into a preset construction analysis management module, the method further trains the construction analysis management module through the following steps:

[0018] Based on the historical construction database of different construction projects, multiple sets of training sample sets of different construction projects are obtained, wherein the training sample sets include a set of historical construction data of the construction project and / or a three-dimensional model of construction progress corresponding to the historical construction data;

[0019] Based on each group of training sample sets, determining a control data set corresponding to each group of training sample sets;

[0020] Based on each group of training sample sets and a control data set corresponding to each group of training sample sets, determining data differences of different categories of each group of training sample sets, wherein the different categories at least include material categories and engineering categories;

[0021] Based on the data differences of different categories of each training sample set, different types of label signals corresponding to each training sample set and auxiliary data sets matching each label signal are obtained, wherein the auxiliary data sets at least include one or more types of data matching the label signal;

[0022] Verification is performed based on different types of labeled signals corresponding to each set of training samples and auxiliary data sets matching each labeled signal to obtain the accuracy of each set of training samples;

[0023] Based on the accuracy of each group of training sample sets, it is determined whether the construction analysis management module has been trained.

[0024] In a technical solution of the above-mentioned method for realizing the visualization display of municipal roads based on digitization, before training the construction analysis management module, the method further includes:

[0025] Acquire multiple groups of historical construction data of different construction projects at different construction progress and / or three-dimensional models of construction progress corresponding to each historical construction data to form a historical construction database of different construction projects;

[0026] Acquire multiple groups of historical estimation data corresponding to different estimation nodes of different construction projects and / or three-dimensional models of historical estimation progress corresponding to each estimation node to form a historical estimation database of different construction projects;

[0027] The historical estimation database of different construction projects and the historical construction database of different construction projects are sent to the construction analysis management module.

[0028] In a technical solution of the above-mentioned method for realizing the visualization display of municipal roads based on digitization, the step of determining the reference data set corresponding to each set of training sample sets based on each set of training sample sets includes:

[0029] Based on each set of training sample sets and a historical estimation database of different construction projects, selectively obtain a historical estimation data set of the estimation node of the construction project corresponding to each training sample set and / or a historical estimation progress three-dimensional model corresponding to the estimation node;

[0030] The historical estimation data group of the estimation nodes of the construction project corresponding to each training sample set and / or the historical estimation progress three-dimensional model corresponding to the estimation nodes are obtained to form a control data set corresponding to each training sample set.

[0031] In a technical solution of the above-mentioned method for realizing the visualization display of municipal roads based on digitalization, the selective acquisition of the historical estimation data group of the estimation node of the construction project corresponding to each training sample set and / or the historical estimation progress three-dimensional model corresponding to the estimation node based on each training sample set and the historical estimation database of different construction projects includes:

[0032] Based on each set of training sample sets, determine the data type and construction progress of each set of training sample sets, wherein the data type is construction data and / or a three-dimensional model;

[0033] Based on the historical estimation database of different construction projects, the determined construction progress and data type of each training sample set, a historical estimation data set and / or a historical estimation progress three-dimensional model corresponding to the construction progress of each training sample set and matching the data type is obtained.

[0034] In a technical solution of the above-mentioned method for realizing the visualization display of municipal roads based on digitization, the different types of label signals corresponding to each set of training samples and the auxiliary data set matching each label signal are obtained based on the data differences of different categories of each set of training samples, including:

[0035] Based on the data differences of different categories of each training sample set, determine the abnormality type and grade type corresponding to each training sample set;

[0036] Based on the abnormality type and grade type corresponding to each group of training sample sets, different types of labeling signals corresponding to each group of training sample sets are obtained;

[0037] Based on different types of label signals corresponding to each set of training sample sets, selectively select one or more types of data matching each label signal;

[0038] One or more types of data matching the marking signal are used to form an auxiliary data group matching the marking signal.

[0039] In a technical solution of the above-mentioned method for realizing the visualization display of municipal roads based on digitization, the three-dimensional model of the current progress constructed is covered with at least one display layer based on different types of each marking signal and the auxiliary data group matching each marking signal, including:

[0040] Determine display data of each mark signal based on different types of each mark signal, wherein the display data at least includes a display position, a number of display layers, and a display mark structure;

[0041] Based on the display layer position of each marker signal and the auxiliary data group matched by each marker signal, determine the auxiliary display data of the data group corresponding to each marker signal, wherein the auxiliary display data at least includes the auxiliary display position, the number of auxiliary display layers and the auxiliary display state;

[0042] At least one display layer covering the current progress three-dimensional model is constructed based on the display data of each marking signal and the auxiliary display data of the data group corresponding to each marking signal.

[0043] In a second aspect, the present invention provides a system for visualizing municipal roads based on digitization, the system comprising an acquisition module, a three-dimensional model building module, a construction analysis management module and a control device, the acquisition module being used to acquire various data of construction projects, the three-dimensional model building module being used to build various three-dimensional models corresponding to construction projects, the construction analysis management module storing a historical estimation database of different construction projects and a historical construction database of different construction projects, the control device comprising a processor and a memory, the memory being suitable for storing multiple program codes, the program codes being suitable for being loaded and run by the processor to execute the method for visualizing municipal roads based on digitization as described in any one of the technical solutions of the above-mentioned method for visualizing municipal roads based on digitization.

[0044] The above one or more technical solutions of the present invention have at least one or more of the following beneficial effects:

[0045] By responding to the collection instruction, the current construction data of the construction project is collected, and the current progress three-dimensional model is constructed on the pre-constructed basic three-dimensional model according to the data, so that the management personnel can intuitively see the structure of the current progress three-dimensional model on the basic three-dimensional model, and realize the visualization display of the current progress of the municipal road construction project. Then, by substituting the current progress three-dimensional model and the current construction data into the construction analysis management module, different types of marking signals and auxiliary data groups corresponding to each marking signal are obtained, and the analysis and marking of the current progress of the construction project are realized. Then, according to different types of marking signals and auxiliary data groups corresponding to each marking signal, multiple display layers are covered on the constructed current progress three-dimensional model to realize the visualization display of the construction process of the municipal road, and different types of marking signals are intuitively displayed on the current progress three-dimensional model, which is convenient for the management personnel to intuitively know the current progress of the construction project and obtain abnormal situations in time, thereby improving the management effect, avoiding the technical problem that the visualization display method of the municipal road engineering project in the prior art only stays on the two-dimensional map or plane map, cannot provide real road simulation and detailed information, and the management personnel cannot intuitively obtain various information of the road construction project.

[0046] In the technical solution for implementing the present invention, by determining each estimated node of the municipal road construction project and its corresponding estimated data group based on the construction data of the municipal road, and constructing corresponding estimated progress three-dimensional models according to the estimated data groups of the estimated nodes, the estimation of the municipal road construction project is realized, and then by storing each estimated node, its corresponding estimated progress three-dimensional model and its corresponding estimated data group in a preset construction analysis management module, the analysis effect of the construction analysis management module on the collected construction data is improved, thereby improving the analysis and processing capabilities of the construction analysis management module on the collected construction data.

[0047] In the technical solution of the present invention, in the model training, multiple groups of training sample sets corresponding to different construction projects are obtained through the historical construction database of different construction projects, which realizes the random acquisition of training sample sets and improves the comprehensiveness of the training construction analysis and management model. Then, the control data set corresponding to each group of training sample sets is determined, and then, based on the training sample sets and their corresponding control data sets, the data differences of different categories of each group of training sample sets are determined, and then the different types of marking signals and their auxiliary data sets corresponding to each group of training sample sets are obtained, which realizes the accurate acquisition of marking signals and their auxiliary data sets. Then, by verifying the different types of marking signals and their auxiliary data sets corresponding to each group of training sample sets, the training results of the construction analysis and management model are verified, and the automatic training of the construction analysis and management model is realized, thereby realizing the intelligent training capability of the construction analysis and management model.

[0048] In the technical solution of the present invention, by determining the display data of each marker signal according to different types of marker signals, and then determining the auxiliary display data corresponding to each marker signal according to the display layer position of the marker signal and its corresponding auxiliary data group, it is achieved that the marker signal and its auxiliary data group are selectively directly or indirectly displayed in a targeted manner according to the specific situation of the marker signal, thereby improving the intelligent display effect of the construction process. The present invention provides a method and system for realizing the visualization display of municipal roads based on digitization. The method includes collecting current construction data of a construction project in response to a received collection instruction; based on the collected current construction data, constructing a current progress three-dimensional model of the construction project on a pre-constructed basic three-dimensional model of the construction project; substituting the current progress three-dimensional model of the construction project and the collected current construction data into a preset construction analysis management module to obtain different types of marker signals and auxiliary data groups matching each marker signal; based on the different types of each marker signal and the auxiliary data groups matching each marker signal, the constructed current progress three-dimensional model is covered with multiple display layers. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The disclosure of the present invention will become more easily understood with reference to the accompanying drawings. It is easy for those skilled in the art to understand that these drawings are only for illustrative purposes and are not intended to limit the scope of protection of the present invention. In addition, similar numbers in the figures are used to represent similar components, among which:

[0050] Figure 1 It is a schematic flow chart of main steps of a method for realizing a visualized display of municipal roads based on digitization according to an embodiment of the present invention;

[0051] Figure 2 It is a flowchart of the main steps of the training construction analysis management module of the method for realizing the visualization display of municipal roads based on digitalization according to an embodiment of the present invention;

[0052] Figure 3 It is a schematic diagram of the main structural block diagram of a system for realizing a visualization display of municipal roads based on digitization according to an embodiment of the present invention.

[0053] Reference numerals list :

[0054] 300: a visual display system for municipal roads based on digitalization; 301: a control device; 3011: a processor; 3012: a memory; 3013: a program code; 302: a construction analysis management module; 3021: a historical estimation database; 3022: a historical construction database; 303: an acquisition module; 304: a three-dimensional model building module. DETAILED DESCRIPTION

[0055] Some embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0056] In the description of the present invention, "module" and "processor" may include hardware, software or a combination of the two. A module may include hardware circuits, various suitable sensors, communication ports, and memories, and may also include software parts, such as program codes, or a combination of software and hardware. The processor may be a central processing unit, a microprocessor, an image processor, a digital signal processor, or any other suitable processor. The processor has data and / or signal processing functions. The processor may be implemented in software, hardware, or a combination of the two. Non-temporary computer-readable storage media include any suitable medium that can store program codes, such as a magnetic disk, a hard disk, an optical disk, a flash memory, a read-only memory, a random access memory, and the like. The term "A and / or B" means all possible combinations of A and B, such as only A, only B, or A and B. The term "at least one A or B" or "at least one of A and B" has a similar meaning to "A and / or B", and may include only A, only B, or A and B. The singular terms "one" and "the" may also include plural forms.

[0057] See attached Figure 1 , Figure 1 FIG. 1 is a flow chart showing the main steps of a method for realizing a visual display of municipal roads based on digitization according to an embodiment of the present invention. Figure 1 As shown, the method for realizing the visualization display of municipal roads based on digitization in the embodiment of the present invention mainly includes the following steps S101 to S104.

[0058] Step S101: In response to a received collection instruction, current construction data of a construction project is collected, wherein the current construction data at least includes current project data and current material data;

[0059] Specifically, in some embodiments, the collection instruction can be a collection instruction issued periodically, or a collection instruction issued by a manager through the system. The selection of the collection instruction here is only an exemplary description. In actual testing, technical personnel in this field can make a selection according to actual needs, which will not be repeated here.

[0060] Furthermore, in some embodiments, before collecting the current construction data of the construction project in response to the received collection instruction, the method further includes:

[0061] Acquire construction data of municipal roads, wherein the construction data at least includes construction unit information, construction project data, and construction material data;

[0062] Based on the acquired construction data, a basic three-dimensional model of the construction project corresponding to the construction data is constructed.

[0063] Specifically, in some embodiments, the construction technology of constructing a basic three-dimensional model of the construction project corresponding to the construction data and constructing a current progress three-dimensional model of the construction project based on the pre-constructed basic three-dimensional model of the construction project can be a technology for constructing three-dimensional models in the prior art. The choice of construction technology here is only an exemplary explanation. In actual testing, technical personnel in this field can make a choice according to actual needs. As long as it is possible to construct a basic three-dimensional model of the construction project corresponding to the construction data acquired, and to construct a current progress three-dimensional model of the construction project based on the pre-constructed basic three-dimensional model of the construction project according to the collected current construction data, it will not be repeated here.

[0064] Specifically, in some embodiments, after obtaining the construction data of the municipal road, the method further includes:

[0065] Based on the construction data of municipal roads, multiple collection times corresponding to the construction projects are determined.

[0066] Specifically, in some embodiments, the method further includes:

[0067] If any collection time of the construction project is reached, a collection instruction is sent to the collection module.

[0068] Step S102: constructing a current progress three-dimensional model of the construction project based on the pre-constructed basic three-dimensional model of the construction project based on the collected current construction data;

[0069] Step S103: Substituting the current progress three-dimensional model of the construction project and the collected current construction data into a preset construction analysis management module to obtain different types of marking signals and auxiliary data groups matching each marking signal, wherein the different types include different abnormal types and different grade types;

[0070] Furthermore, in some embodiments, before substituting the current progress three-dimensional model of the construction project and the collected current construction data into a preset construction analysis management module, the method further includes:

[0071] Based on the construction data of the municipal road, determining a plurality of estimated nodes of the municipal road and an estimated data group corresponding to each estimated node;

[0072] Based on the multiple estimated nodes of the municipal road and the estimated data groups corresponding to each estimated node, respectively construct an estimated progress three-dimensional model corresponding to each estimated node on the pre-constructed basic three-dimensional model of the construction project;

[0073] The multiple estimated nodes of the municipal road, the estimated progress three-dimensional model corresponding to each estimated node, and the estimated data group corresponding to each estimated node are sent to and stored in a preset construction analysis management module.

[0074] like Figure 2 As shown, further, in some embodiments, before substituting the current progress three-dimensional model of the construction project and the collected current construction data into the preset construction analysis management module, the method further trains the construction analysis management module through the following steps:

[0075] Based on the historical construction database of different construction projects, multiple sets of training sample sets of different construction projects are obtained, wherein the training sample sets include a set of historical construction data of the construction project and / or a three-dimensional model of construction progress corresponding to the historical construction data;

[0076] Based on each group of training sample sets, determining a control data set corresponding to each group of training sample sets;

[0077] Based on each group of training sample sets and a control data set corresponding to each group of training sample sets, determining data differences of different categories of each group of training sample sets, wherein the different categories at least include material categories and engineering categories;

[0078] Based on the data differences of different categories of each training sample set, different types of label signals corresponding to each training sample set and auxiliary data sets matching each label signal are obtained, wherein the auxiliary data sets at least include one or more types of data matching the label signal;

[0079] Verification is performed based on different types of labeled signals corresponding to each set of training samples and auxiliary data sets matching each labeled signal to obtain the accuracy of each set of training samples;

[0080] Based on the accuracy of each group of training sample sets, it is determined whether the construction analysis management module has been trained.

[0081] Specifically, in some embodiments, judging whether the construction analysis management module has been trained based on the accuracy of each training sample set includes:

[0082] If the accuracy of the training sample set exceeds the preset single-body accuracy threshold, the correct sample of this training is increased by 1; otherwise, the next training sample set is determined;

[0083] After the accuracy of all training sample sets is counted, the number of correct samples in this training and the number of all training sample sets in this training are obtained;

[0084] Based on the number of correct samples in this training and the number of all training sample sets in this training, the overall accuracy of this training is obtained;

[0085] If the overall accuracy of the training exceeds the preset overall accuracy threshold, the training of the construction analysis management module is judged to be completed; otherwise, the training of the construction analysis management module is judged to have failed, and the construction analysis management module is retrained.

[0086] Specifically, in some embodiments, the preset single-cell accuracy threshold and the preset overall accuracy threshold may both be 95%, the preset single-cell accuracy threshold may also be 98%, and the preset overall accuracy threshold may also be 96%. The settings of the preset single-cell accuracy threshold and the preset overall accuracy threshold here are only exemplary. In actual tests, those skilled in the art may set them according to actual needs, which will not be elaborated here.

[0087] Furthermore, in some embodiments, before training the construction analysis management module, the method further includes:

[0088] Acquire multiple groups of historical construction data of different construction projects at different construction progress and / or three-dimensional models of construction progress corresponding to each historical construction data to form a historical construction database of different construction projects;

[0089] Acquire multiple groups of historical estimation data corresponding to different estimation nodes of different construction projects and / or three-dimensional models of historical estimation progress corresponding to each estimation node to form a historical estimation database of different construction projects;

[0090] The historical estimation database of different construction projects and the historical construction database of different construction projects are sent to the construction analysis management module.

[0091] In the above embodiment, by determining each estimated node of the municipal road construction project and its corresponding estimated data group based on the construction data of the municipal road, and constructing corresponding estimated progress three-dimensional models according to the estimated data groups of the estimated nodes, the estimation of the municipal road construction project is achieved, and then by storing each estimated node, its corresponding estimated progress three-dimensional model and its corresponding estimated data group in a preset construction analysis management module, the analysis effect of the construction analysis management module on the collected construction data is improved, thereby improving the analysis and processing capabilities of the construction analysis management module on the collected construction data.

[0092] Specifically, in some embodiments, obtaining multiple sets of training sample sets for different construction projects based on historical construction databases of different construction projects includes:

[0093] Based on the historical construction database of different construction projects, multiple different construction projects are randomly selected;

[0094] Based on a historical construction database corresponding to a plurality of randomly selected different construction projects, randomly selecting at least one construction progress of each construction project;

[0095] Based on historical construction databases corresponding to a plurality of randomly selected different construction projects, selecting historical construction data and / or a three-dimensional model of construction progress corresponding to the construction progress of at least one of the construction projects;

[0096] The historical construction data and / or the three-dimensional model of the construction progress corresponding to a construction progress of each construction project are used as a set of training sample sets of the construction project to obtain multiple sets of training sample sets of different construction projects.

[0097] Specifically, in some embodiments, determining the control data set corresponding to each group of training sample sets based on each group of training sample sets includes:

[0098] Based on each set of training sample sets and a historical estimation database of different construction projects, selectively obtain a historical estimation data set of the estimation node of the construction project corresponding to each training sample set and / or a historical estimation progress three-dimensional model corresponding to the estimation node;

[0099] The historical estimation data group of the estimation nodes of the construction project corresponding to each training sample set and / or the historical estimation progress three-dimensional model corresponding to the estimation nodes are obtained to form a control data set corresponding to each training sample set.

[0100] Specifically, in some embodiments, selectively acquiring the historical estimation data group of the estimation node of the construction project corresponding to each training sample set and / or the historical estimation progress three-dimensional model corresponding to the estimation node based on each training sample set and the historical estimation database of different construction projects includes:

[0101] Based on each set of training sample sets, determine the data type and construction progress of each set of training sample sets, wherein the data type is construction data and / or a three-dimensional model;

[0102] Based on the historical estimation database of different construction projects, the determined construction progress and data type of each training sample set, a historical estimation data set and / or a historical estimation progress three-dimensional model corresponding to the construction progress of each training sample set and matching the data type is obtained.

[0103] Specifically, in some embodiments, the data type of the control data set is consistent with the data type of the training sample set.

[0104] Specifically, in some embodiments, determining the data difference values ​​of different categories of each training sample set based on each training sample set and the reference data set corresponding to each training sample set includes:

[0105] The data of different categories in each training sample set are compared with the data of corresponding categories in the control data set corresponding to each training sample set to obtain the data difference of different categories in each training sample set.

[0106] Specifically, in some embodiments, obtaining different types of label signals corresponding to each set of training sample sets and auxiliary data sets matching each label signal based on data differences of different categories of each set of training sample sets includes:

[0107] Based on the data differences of different categories of each training sample set, determine the abnormality type and grade type corresponding to each training sample set;

[0108] Based on the abnormality type and grade type corresponding to each group of training sample sets, different types of labeling signals corresponding to each group of training sample sets are obtained;

[0109] Based on different types of label signals corresponding to each set of training sample sets, selectively select one or more types of data matching each label signal;

[0110] One or more types of data matching the marking signal are used to form an auxiliary data group matching the marking signal.

[0111] Specifically, in some embodiments, based on different types of label signals corresponding to each set of training samples, selectively selecting one or more types of data matching each label signal includes:

[0112] Based on the abnormality type and grade type of the marked signal corresponding to the training sample set, one or more types of data corresponding to the abnormality type and grade type in the training sample set are selected.

[0113] Specifically, in some embodiments, the abnormality type can be abnormal material usage, abnormal material storage quantity, abnormal project progress, and abnormal project equipment. The level type can be level A, level B, level C, or level one, level two, or level three. The settings of the abnormality type and level type here are only exemplary. In actual testing, those skilled in the art can set them according to actual needs, which will not be repeated here.

[0114] In the above embodiment, during model training, multiple groups of training sample sets corresponding to different construction projects are obtained through historical construction databases of different construction projects, thereby realizing random acquisition of training sample sets and improving the comprehensiveness of training construction analysis and management models. Then, a control data set corresponding to each group of training sample sets is determined, and then, based on the training sample sets and their corresponding control data sets, data differences of different categories of each group of training sample sets are determined, thereby obtaining different types of marking signals and their auxiliary data sets corresponding to each group of training sample sets, thereby realizing accurate acquisition of marking signals and their auxiliary data sets. Then, by verifying the different types of marking signals and their auxiliary data sets corresponding to each group of training sample sets, the training results of the construction analysis and management model are verified, thereby realizing automated training of the construction analysis and management model and thereby realizing intelligent training capabilities of the construction analysis and management model.

[0115] Step S104: Based on the different types of each marking signal and the auxiliary data group matching each marking signal, the constructed current progress three-dimensional model is covered with at least one display layer to facilitate the visual display of the municipal road construction process.

[0116] Specifically, in some embodiments, covering at least one display layer of the constructed current progress three-dimensional model based on different types of each marker signal and the auxiliary data group matching each marker signal includes:

[0117] Determine display data of each mark signal based on different types of each mark signal, wherein the display data at least includes a display position, a number of display layers, and a display mark structure;

[0118] Based on the display layer position of each marker signal and the auxiliary data group matched by each marker signal, determine the auxiliary display data of the data group corresponding to each marker signal, wherein the auxiliary display data at least includes the auxiliary display position, the number of auxiliary display layers and the auxiliary display state;

[0119] At least one display layer covering the current progress three-dimensional model is constructed based on the display data of each marking signal and the auxiliary display data of the data group corresponding to each marking signal.

[0120] Specifically, in some embodiments, the display mark structure can be a chart structure that displays an auxiliary data group that matches the mark signal, or it can be a text structure that displays the auxiliary data group of the mark signal. The auxiliary display state can be a hidden state or a window display state associated with the click position. The settings of the display mark structure and the auxiliary display state here are only exemplary. In actual tests, those skilled in the art can make settings according to actual needs, which will not be repeated here.

[0121] Specifically, in some embodiments, the display mark structure is a text structure of the auxiliary data group of the display mark signal, that is, a text column, and the display position is the construction position corresponding to the mark signal, the display layer number is 1, the auxiliary display position is above the display position, the auxiliary display layer number is 2, the auxiliary display state is the window display state associated with the click position, and the click position is consistent with the display position.

[0122] Then, according to the display data, a marking point is constructed at a position in the current progress three-dimensional model that is consistent with the location of the construction position, and the marking point is covered at a position above the location of the construction position in the current progress three-dimensional model, so that when the management personnel selects the marking point, a text bar for displaying the auxiliary data group is displayed;

[0123] Furthermore, based on the auxiliary display data, a window display layer associated with the mark point position is constructed above the position of the text bar, and the window display layer displays text information of the auxiliary display data, so that when the administrator selects the mark point in the form of a click, the window display layer is displayed above the text bar used to display the auxiliary data group.

[0124] Specifically, in some embodiments, when the abnormality type corresponding to the marking signal is abnormal material storage quantity or abnormal material usage, the chart structure matching the auxiliary data group of the marking signal can be a material usage data curve or a material storage quantity curve, so as to facilitate a visual display of the material situation, thereby facilitating management personnel to more intuitively understand the material situation.

[0125] In the above embodiment, by determining the display data of each marking signal according to the different types of marking signals, and then determining the auxiliary display data corresponding to each marking signal according to the display layer position of the marking signal and its corresponding auxiliary data group, it is achieved that according to the specific situation of the marking signal, the marking signal and its auxiliary data group are selectively displayed directly or indirectly, thereby improving the intelligent display effect of the construction process.

[0126] Based on the above steps S101 to S104, by responding to the collection instruction, the current construction data of the construction project is collected, and according to the data, a current progress three-dimensional model is constructed on the pre-constructed basic three-dimensional model, so that the management personnel can intuitively see the structure of the current progress three-dimensional model on the basic three-dimensional model, and realize the visualization display of the current progress of the municipal road construction project. Then, by substituting the current progress three-dimensional model and the current construction data into the construction analysis management module, different types of marking signals and auxiliary data groups corresponding to each marking signal are obtained, and the analysis and marking of the current progress of the construction project are realized. Then, according to different types of marking signals and auxiliary data groups corresponding to each marking signal, multiple display layers are covered on the constructed current progress three-dimensional model to realize the visualization display of the construction process of the municipal road, and different types of marking signals are intuitively displayed on the current progress three-dimensional model, which is convenient for the management personnel to intuitively know the current progress of the construction project and obtain abnormal situations in time, thereby improving the management effect, avoiding the technical problem that the visualization display method of municipal road engineering projects in the prior art only stays on two-dimensional maps or plane maps, cannot provide real road simulation and detailed information, and the management personnel cannot intuitively obtain various types of information of road construction projects.

[0127] It should be pointed out that although the various steps in the above embodiments are described in a specific order, those skilled in the art can understand that in order to achieve the effects of the present invention, different steps do not have to be performed in such an order. They can be performed simultaneously (in parallel) or in other orders. These changes are within the scope of protection of the present invention.

[0128] Furthermore, the present invention also provides a digital-based visualization display system for municipal roads.

[0129] See attached Figure 3 , Figure 3 FIG. 1 is a main structural block diagram of a digitally-based visualization display system for municipal roads according to an embodiment of the present invention. Figure 3As shown, the visualization display system 300 for realizing municipal roads based on digitization in the embodiment of the present invention mainly includes a collection module 303, a three-dimensional model construction module 304, a construction analysis management module 302 and a control device 301. The collection module 303 is used to collect various data of construction projects, the three-dimensional model construction module 304 is used to build various three-dimensional models corresponding to the construction projects, the construction analysis management module 302 stores a historical estimation database 3021 of different construction projects and a historical construction database 3022 of different construction projects, and the control device 301 includes a processor 3011 and a memory 3012. The memory 3012 can be configured to store a program code 3013 for executing the visualization display method for realizing municipal roads based on digitization in the above method embodiment, and the processor 3011 can be configured to execute the program code 3013 in the memory 3012, which includes but is not limited to executing the program code 3013 for realizing the visualization display method for municipal roads based on digitization in the above method embodiment. For the convenience of explanation, only the part related to the embodiment of the present invention is shown. For the specific technical details not disclosed, please refer to the method part of the embodiment of the present invention. The control device 301 may be a control device 301 device including various electronic devices.

[0130] Specifically, in some embodiments, the three-dimensional model construction module 304 can be a construction module for constructing a three-dimensional model in the prior art. The selection of the three-dimensional model construction module 304 here is only an exemplary description. In actual testing, those skilled in the art can make a selection according to actual needs, which will not be repeated here.

[0131] Specifically, in some embodiments, the acquisition module 303 can be a variety of camera devices, radar devices, or weighing devices. The selection of the acquisition module 303 here is only an exemplary description. In actual testing, technical personnel in this field can make a selection according to actual needs. As long as the current construction data of the construction project can be collected through the acquisition module 303, it will not be repeated here.

[0132] In one implementation, the description of the specific implementation functions may refer to steps S101 to S104.

[0133] The above-mentioned digital-based visualization display system 300 for municipal roads is used to perform Figure 1The embodiment of the method for visual display of municipal roads based on digitalization shown in the figure is similar in technical principles, technical problems solved and technical effects produced. Those skilled in the art can clearly understand that for the convenience and conciseness of description, the specific working process and relevant instructions of the system 300 for visual display of municipal roads based on digitalization can refer to the contents described in the embodiment of the method for visual display of municipal roads based on digitalization, which will not be repeated here.

[0134] It is understood by those skilled in the art that the present invention implements all or part of the processes in the method of the above embodiment, and can also be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and when the computer program is executed by the processor 3011, the steps of each of the above method embodiments can be implemented. Among them, the computer program includes a computer program code 3013, and the computer program code 3013 can be in the form of source code, object code, executable file or some intermediate form. The computer-readable storage medium may include: any entity or device, medium, U disk, mobile hard disk, disk, optical disk, computer memory 3012, read-only memory 3012, random access memory 3012, electric carrier signal, telecommunication signal and software distribution medium that can carry the computer program code 3013. It should be noted that the content contained in the computer-readable storage medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, the computer-readable storage medium does not include electric carrier signal and telecommunication signal.

[0135] Furthermore, the visualization display system 300 for realizing municipal roads based on digitalization of the present invention also includes a computer-readable storage medium. In a computer-readable storage medium embodiment according to the present invention, the computer-readable storage medium can be configured to store a program code 3013 for executing the visualization display method for realizing municipal roads based on digitalization of the above-mentioned method embodiment, and the program code 3013 can be loaded and run by the processor 3011 to realize the visualization display method for realizing municipal roads based on digitalization. For ease of explanation, only the parts related to the embodiment of the present invention are shown. For specific technical details not disclosed, please refer to the method part of the embodiment of the present invention. The computer-readable storage medium can be a memory 3012 device formed by various electronic devices. Optionally, the computer-readable storage medium in the embodiment of the present invention is a non-temporary computer-readable storage medium.

[0136] Further, it should be understood that since the setting of each module is only for illustrating the functional units of the device of the present invention, the physical devices corresponding to these modules may be the processor 3011 itself, or a part of the software, a part of the hardware, or a part of the combination of software and hardware in the processor 3011. Therefore, the number of each module in the figure is only schematic.

[0137] Those skilled in the art will appreciate that the modules in the device can be adaptively split or merged. Such splitting or merging of specific modules will not cause the technical solution to deviate from the principle of the present invention, and therefore, the technical solutions after splitting or merging will fall within the protection scope of the present invention.

[0138] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

Claims

1. A method for realizing the visualization display of municipal roads based on digitization, characterized in that: The method comprises the following steps: In response to the received collection instruction, collect current construction data of the construction project, wherein the current construction data at least includes current project data and current material data; Based on the collected current construction data, construct a current progress three-dimensional model of the construction project on the pre-constructed basic three-dimensional model of the construction project; Substituting the current progress three-dimensional model of the construction project and the collected current construction data into a preset construction analysis management module to obtain different types of marking signals and auxiliary data groups matching each marking signal, wherein the different types include different abnormal types and different grade types; Based on the different types of each marking signal and the auxiliary data group matching each marking signal, the constructed current progress three-dimensional model is covered with at least one display layer to facilitate the visual display of the construction process of the municipal road.

2. The method for realizing the visualization display of municipal roads based on digitization according to claim 1 is characterized in that: Before collecting the current construction data of the construction project in response to the received collection instruction, the method further includes: Acquire construction data of municipal roads, wherein the construction data at least includes construction unit information, construction project data, and construction material data; Based on the acquired construction data, a basic three-dimensional model of the construction project corresponding to the construction data is constructed.

3. The method for realizing the visualization display of municipal roads based on digitization according to claim 2 is characterized in that: Before substituting the current progress three-dimensional model of the construction project and the collected current construction data into a preset construction analysis management module, the method further includes: Based on the construction data of the municipal road, determining a plurality of estimated nodes of the municipal road and an estimated data group corresponding to each estimated node; Based on the multiple estimated nodes of the municipal road and the estimated data groups corresponding to each estimated node, respectively construct an estimated progress three-dimensional model corresponding to each estimated node on the pre-constructed basic three-dimensional model of the construction project; The multiple estimated nodes of the municipal road, the estimated progress three-dimensional model corresponding to each estimated node, and the estimated data group corresponding to each estimated node are sent to and stored in a preset construction analysis management module.

4. The method for realizing the visualization display of municipal roads based on digitization according to claim 3 is characterized in that: Before substituting the current progress three-dimensional model of the construction project and the collected current construction data into a preset construction analysis management module, the method further trains the construction analysis management module through the following steps: Based on the historical construction database of different construction projects, multiple sets of training sample sets of different construction projects are obtained, wherein the training sample sets include a set of historical construction data of the construction project and / or a three-dimensional model of construction progress corresponding to the historical construction data; Based on each group of training sample sets, determining a control data set corresponding to each group of training sample sets; Based on each group of training sample sets and a control data set corresponding to each group of training sample sets, determining data differences of different categories of each group of training sample sets, wherein the different categories include at least material categories and engineering categories; Based on the data differences of different categories of each training sample set, different types of label signals corresponding to each training sample set and auxiliary data sets matching each label signal are obtained, wherein the auxiliary data sets at least include one or more types of data matching the label signal; Verification is performed based on different types of labeled signals corresponding to each set of training samples and auxiliary data sets matching each labeled signal to obtain the accuracy of each set of training samples; Based on the accuracy of each group of training sample sets, it is determined whether the construction analysis management module has been trained.

5. The method for realizing the visualization display of municipal roads based on digitization according to claim 4 is characterized in that: Before training the construction analysis management module, the method further includes: Acquire multiple groups of historical construction data of different construction projects at different construction progress and / or three-dimensional models of construction progress corresponding to each historical construction data to form a historical construction database of different construction projects; Acquire multiple groups of historical estimation data corresponding to different estimation nodes of different construction projects and / or three-dimensional models of historical estimation progress corresponding to each estimation node to form a historical estimation database of different construction projects; The historical estimation database of different construction projects and the historical construction database of different construction projects are sent to the construction analysis management module.

6. The method for realizing the visualization display of municipal roads based on digitization according to claim 5 is characterized in that: The step of determining the control data set corresponding to each training sample set based on each training sample set includes: Based on each set of training sample sets and a historical estimation database of different construction projects, selectively obtain a historical estimation data set of the estimation node of the construction project corresponding to each training sample set and / or a historical estimation progress three-dimensional model corresponding to the estimation node; The historical estimation data group of the estimation nodes of the construction project corresponding to each training sample set and / or the historical estimation progress three-dimensional model corresponding to the estimation nodes are obtained to form a control data set corresponding to each training sample set.

7. The method for realizing the visualization display of municipal roads based on digitization according to claim 6 is characterized in that: The selective acquisition of the historical estimation data group of the estimation node of the construction project corresponding to each training sample set and / or the historical estimation progress three-dimensional model corresponding to the estimation node based on each training sample set and the historical estimation database of different construction projects includes: Based on each set of training sample sets, determine the data type and construction progress of each set of training sample sets, wherein the data type is construction data and / or a three-dimensional model; Based on the historical estimation database of different construction projects, the determined construction progress and data type of each training sample set, a historical estimation data set and / or a historical estimation progress three-dimensional model corresponding to the construction progress of each training sample set and matching the data type is obtained.

8. The method for realizing the visualization display of municipal roads based on digitization according to claim 6 is characterized in that: The method of obtaining different types of label signals corresponding to each training sample set and an auxiliary data set matching each label signal based on data differences of different categories of each training sample set includes: Based on the data differences of different categories of each training sample set, determine the abnormality type and grade type corresponding to each training sample set; Based on the abnormality type and grade type corresponding to each group of training sample sets, different types of labeling signals corresponding to each group of training sample sets are obtained; Based on different types of label signals corresponding to each set of training sample sets, selectively select one or more types of data matching each label signal; One or more types of data matching the marking signal are used to form an auxiliary data group matching the marking signal.

9. The method for realizing the visualization display of municipal roads based on digitization according to claim 8 is characterized in that: The method of covering at least one display layer of the constructed current progress three-dimensional model based on different types of each marker signal and the auxiliary data group matching each marker signal includes: Determine display data of each mark signal based on different types of each mark signal, wherein the display data at least includes a display position, a number of display layers, and a display mark structure; Based on the display layer position of each marker signal and the auxiliary data group matched by each marker signal, determine the auxiliary display data of the data group corresponding to each marker signal, wherein the auxiliary display data at least includes the auxiliary display position, the number of auxiliary display layers and the auxiliary display state; At least one display layer covering the current progress three-dimensional model is constructed based on the display data of each marking signal and the auxiliary display data of the data group corresponding to each marking signal.

10. A digital-based visualization display system for municipal roads, characterized in that: The system includes an acquisition module, a three-dimensional model building module, a construction analysis management module and a control device, the acquisition module is used to collect various data of construction projects, the three-dimensional model building module is used to build various three-dimensional models corresponding to the construction projects, the construction analysis management module stores a historical estimation database of different construction projects and a historical construction database of different construction projects, and the control device includes a processor and a memory, the memory is suitable for storing multiple program codes, and the program codes are suitable for being loaded and run by the processor to execute the method for visual display of municipal roads based on digitalization as described in any one of claims 1 to 9.

Citation Information

Patent Citations

  • Engineering data processing method and system for visual progress display

    CN116777387A

  • Engineering construction project construction period management method and system based on BIM and GIS

    CN117391640A

  • Engineering project site cost management assessment method and system, and storage medium

    CN117474496A

  • Highway construction progress intelligent prediction method and system

    CN117829382A

  • Three-dimensional visual construction management system

    CN118194409A