Method for improving operation reliability of oil field power distribution network

By calculating the evaluation value of the heavy load, overload and power outage time of 10kV or 6kV lines, priority is given to improving the lines with high evaluation value, solving the problem of improving the reliability of the distribution network in the existing technology, and achieving simple and efficient distribution The reliability of power supply in the power grid is improved.

CN118920437APending Publication Date: 2024-11-08PETROCHINA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310504771.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-06
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

When the existing technology improves the reliability of the distribution network, it is difficult to achieve simple, flexible and suitable methods for oil field sites. The precise modeling and analysis and data collection requirements are high, resulting in poor practicality and operability, and high investment costs and management difficulties. .

Method used

By counting the proportion of heavy load time, overload time and power outage time of 10kV or 6kV lines, calculate and sort the value of the distribution network operation reliability evaluation, formulate technical improvement measures, give priority to improving lines with high evaluation value, and improve the value of the distribution network. Power supply reliability of the distribution network.

Benefits of technology

It realizes a method to improve the power supply reliability of the distribution network under limited investment, which is simple and easy to operate, suitable for on-site operation of the oil field, and reduces investment costs and management difficulties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920437A_ABST
    Figure CN118920437A_ABST
Patent Text Reader

Abstract

The invention provides a method for improving operation reliability of an oil field power distribution network, and belongs to the technical field of power supply and distribution of power systems. On the basis of current operation data analysis of the 10kV or 6kV line of the oil field power distribution network, the current operation state and reliability of the oil field power distribution network are analyzed mainly on the basis of heavy load time proportion and overload time proportion statistics of the 10kV or 6kV line, the operation reliability of the 10kV or 6kV line is evaluated by adopting the analysis and judgment method, and the reliability of the oil field power distribution network is improved. And further obtaining a decision of oil field power distribution network line technology improvement measures, namely a priority order of power distribution line technology improvement, thereby realizing a purpose of improving the operation reliability of the power distribution network as much as possible under the condition of limited investment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of power supply and distribution of electric power systems, and in particular to a method for improving the operating reliability of an oilfield distribution network. Background Art

[0002] The distribution network is an important part of the power system, directly providing electricity to terminal production users. Once a power outage or maintenance occurs, it will directly affect the power supply to users. According to relevant statistics, the vast majority of user-side power outages are caused by distribution network failures, accounting for about 80% of power system failures. In oil field production, the power outage ratio of the distribution network and the power supply reliability of the distribution network directly affect the power supply to users. Therefore, in the planning and operation of the power system, it is particularly important to improve the power supply reliability of the distribution network.

[0003] At present, the reliability evaluation methods for distribution networks mainly include analytical methods (typically represented by failure mode and effect analysis, equivalent method, graph analysis method, minimum path method, etc.), simulation methods (typically represented by Monte Carlo method) and artificial intelligence methods (typically represented by neural network algorithm, fuzzy algorithm and genetic algorithm). On the basis of accurate modeling and analysis, the above methods can be used to evaluate the operational reliability of the distribution network, and technical and management improvement measures to improve the operational reliability of the distribution network can be given according to the evaluation indicators. However, the above methods are based on accurate modeling of the distribution network and simultaneous collection and analysis of a large amount of data. Due to the complexity of the oilfield distribution network, accurate modeling and analysis of the distribution network is difficult. The simultaneity and transmission of data collection have high requirements on the automatic device and its installation location. Its practicality and operability are not strong. Moreover, after applying the technical improvement measures, the original model needs to be modified and re-analyzed and calculated, which is time-consuming and laborious. Due to investment costs and management reasons, the above methods are mainly applied to the transmission network and are difficult to be applied to the distribution network.

[0004] The prior art has at least the following deficiencies:

[0005] 1. Accurate modeling and analysis of distribution networks is difficult. The simultaneity and transmission of data collection have high requirements on automatic devices and their installation locations, and their practicality and operability are not strong.

[0006] 2. Application of technological improvements requires modification of the original model and re-analysis and recalculation, which is time-consuming and labor-intensive, with high investment costs and difficulty in management. Summary of the invention

[0007] In view of the above-mentioned current state of the art, the problem to be solved by the present invention is how to improve the reliability of the distribution network in operation, especially for improving the operational reliability of the oilfield distribution network, and specific improvement measures and methods are given. Focusing on the real-time current data of the distribution network lines, on the basis of statistical analysis, a practical, feasible, simple and flexible method with strong operability is provided, which is suitable for oilfield on-site power operators to participate in improving the reliability of the distribution network, and an evaluation value for improving the operational reliability of the distribution network is obtained, and corresponding technical improvement measures and management measures are formed, which are simple and easy to implement, and suitable for oilfield distribution network operators to participate in the technical improvement work of improving the operational reliability of the distribution network. In order to solve the problems existing in the prior art, the present invention provides a method for improving the operational reliability of an oilfield distribution network. The method is based on the current operation data analysis of a 10kV or 6kV line of an oilfield distribution network, and is mainly based on the statistics of the heavy load time ratio and the overload time ratio of the 10kV or 6kV line. The method is used to analyze the current operating status and reliability of the oilfield distribution network. The analysis and judgment method is used to evaluate the operational reliability of the 10kV or 6kV line, and further obtain technical improvement measures for the oilfield distribution network line, so as to achieve the purpose of improving the operational reliability of the distribution network.

[0008] Evaluation indicators are the description and embodiment of the reliability of the distribution system, and are also the theoretical basis for reference decision-making. There are two main types of distribution network reliability evaluation indicators that are widely used: the first type is to split the entire system into various components, and then analyze the reliability of each component separately; the second type starts from the entire power supply system and evaluates its overall operational reliability, but it is difficult to specifically locate and determine the equipment or line.

[0009] The evaluation index of the present invention belongs to the first category. The heavy load time proportion, overload time proportion and power outage time proportion of the line are analyzed and counted based on the model of the 10kV or 6kV line, the corresponding current carrying capacity and the actual value of the detected current of the line operation status and its duration value, so as to obtain the expected value of the power supply reliability of the line, and the weighted calculation value of the actual operation data is used as the basis for judgment to form a decision on technical improvement measures, so as to improve the power supply reliability of the distribution network where the line is located by replacing the line or transferring the load.

[0010] The present invention provides a method for improving the operational reliability of an oilfield distribution network, comprising the following steps:

[0011] Enter the model and current carrying capacity of the distribution network line into the distribution network line operation database; the distribution network is a 10kV or 6kV line;

[0012] Real-time detection of distribution network line current within a preset time period and entry into the distribution network line operation database;

[0013] Calculate the proportion of power outage time, line overload time and line heavy load time of the distribution network line within the preset time period; overload means that the current exceeds the rated value; heavy load means that the current reaches 80%-100% of the rated value; the preset time period is divided into operating time and power outage time;

[0014] Calculate and rank the reliability evaluation values ​​of distribution network lines according to the proportion of power outage time, line overload time and line heavy load time of distribution network lines;

[0015] According to the ranking results of the distribution network line reliability evaluation values, the distribution network lines with evaluation values ​​greater than the given evaluation value reference value are improved in line technology. The larger the evaluation value of the line, the higher the priority of the line technology improvement, thereby improving the operation reliability.

[0016] Preferably, the proportion of power outage time, the proportion of line overload time and the proportion of line heavy load time of the distribution network line are calculated based on the distribution network line model, the distribution network line current and the distribution network line current carrying capacity in the distribution network line operation database.

[0017] Preferably, the line outage time accounts for K T The calculation is done as follows:

[0018] Line outage time ratio K T = Line power outage time / (power outage time + operating time).

[0019] Preferably, the line overload time ratio K G The calculation is done as follows:

[0020] Line overload time ratio K G =Line overload time / operating time.

[0021] Preferably, the line overload time proportion includes a line overload time proportion of 90% to 100% and a line overload time proportion of 80% to 89%.

[0022] Preferably, the proportion of the line overload time of 90% to 100% and the proportion of the line overload time of 80% to 89% are calculated using the following method:

[0023] The proportion of line 90% to 100% overload time K G90~100 = Line 90%~100% overload time / operating time;

[0024] The proportion of line overload time between 80% and 89% is K G80~89 = Line 80%~89% overload time / operating time.

[0025] Preferably, the reliability evaluation value of the distribution network line is calculated based on the power outage time ratio, line overload time ratio and line heavy load time ratio of the distribution network line:

[0026] The line reliability evaluation value of the i-th line is set to K i , then:

[0027] K i =a1*K T +a2*K G +a3*K G(90-100) +a4*K G(80-89)

[0028] in,

[0029] a1+a2+a3+a4=1;

[0030] a1 is the weight value of the power outage time ratio to the line reliability evaluation value;

[0031] a2 is the weight value of the overload time ratio of the line reliability evaluation value;

[0032] a3 is the weight value of the line reliability evaluation value of 90%-100% overload time proportion;

[0033] a4 is the weight value of the line reliability evaluation value when the overload time accounts for 80%-89%.

[0034] Preferably, the reliability evaluation values ​​of the distribution network lines are ranked according to the proportion of power outage time, the proportion of line overload time and the proportion of line heavy load time of the distribution network lines, specifically, the lines with larger line reliability evaluation values ​​are ranked higher and have higher priority for improvement.

[0035] Preferably, the given evaluation value reference value is determined according to the acceptable proportion of line power outage time, the proportion of line overload time and the proportion of line heavy load time.

[0036] Preferably, the given evaluation value reference value is determined according to the acceptable line outage time proportion, line overload time proportion and line heavy load time proportion as follows:

[0037] Percentage of acceptable power outage time of the line K TY =Acceptable power outage time / (Acceptable power outage time + running time) = Acceptable power outage time / total time;

[0038] Percentage of acceptable overload time of line K GY =Acceptable overload time / operating time;

[0039] The line can accept 90% to 100% overload time proportion K GY90~100 =Acceptable 90% to 100% overload time / operating time;

[0040] The line can accept 80% to 89% overload time proportion K GY80~89=Acceptable 80% to 89% overload time / operating time;

[0041] Set the line evaluation benchmark value of the voltage level line to B XX , then:

[0042] B XX =b1*K TY +b2*K GY +b3*K GY90-100 +b4*K GY80-89

[0043] Among them, b1+b2+b3+b4=1;

[0044] XX is the line voltage level, 10 represents 10kV, 06 represents 6kV;

[0045] b1 is the weight value of the line's acceptable power outage time as a percentage of the line evaluation benchmark value;

[0046] b2 is the weight value of the line's acceptable overload time as a percentage of the line evaluation benchmark value;

[0047] b3 is the weight value of the line evaluation benchmark value of the line's acceptable 90%-100% overload time ratio;

[0048] b4 is the weight value of the line evaluation benchmark value of the line's acceptable 80%-89% overload time ratio.

[0049] Preferably, performing line technical improvement on the distribution network line having an evaluation value greater than a given evaluation value reference value includes: transferring line load or replacing a line model with a larger current carrying capacity on the distribution line having an evaluation value greater than a given evaluation value reference value.

[0050] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0051] (1) The present invention only needs to form the distribution 10(6)kV line model, line current carrying capacity and detect the actual operating current value and duration value statistics of the corresponding line, so as to form the evaluation decision value for technical improvement of the distribution network, without the need for precise modeling and analysis, without the need for a large number of online detection sensors, and without the need for simultaneity of detection data and state estimation to pre-process the data and coordinate the data.

[0052] (2) The present invention only requires the distribution network operators to conduct statistics and analysis on the line parameters and the line operation data within a certain period of time (such as year or month) to obtain technical improvement decisions, which can be specific to the evaluated lines and can give decisions on the priority of technical improvement of the lines, thereby achieving the purpose of improving the power supply reliability of the distribution network as much as possible with limited investment.

[0053] (3) The method of the present invention is highly operable and simple and easy to implement. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure 1 The present invention is a flowchart of a method for improving the operational reliability of an oilfield distribution network according to an embodiment of the present invention. DETAILED DESCRIPTION

[0055] The specific implementation modes of the present invention are described in detail below in conjunction with the accompanying drawings.

[0056] The present invention provides a method for improving the operational reliability of an oilfield distribution network, comprising the following steps:

[0057] Enter the model and current carrying capacity of the distribution network line into the distribution network line operation database; the distribution network is a 10kV or 6kV line;

[0058] Real-time detection of distribution network line current within a preset time period and entry into the distribution network line operation database;

[0059] Calculate the proportion of power outage time, line overload time and line heavy load time of the distribution network line within the preset time period; overload means that the current exceeds the rated value; heavy load means that the current reaches 80%-100% of the rated value; the preset time period is divided into operating time and power outage time;

[0060] Calculate and rank the reliability evaluation values ​​of distribution network lines according to the proportion of power outage time, line overload time and line heavy load time of distribution network lines;

[0061] According to the ranking results of the reliability evaluation values ​​of distribution network lines, technical improvements are made to the distribution network lines whose evaluation values ​​are greater than the given evaluation value benchmark values. The larger the evaluation value of the line, the higher the priority of the line technical improvement, which improves the operational reliability and provides a decision-making basis for the priority of technical improvements of distribution lines.

[0062] According to a specific implementation scheme of the present invention, the power outage time proportion, line overload time proportion and line heavy load time proportion of the distribution network line are calculated based on the distribution network line model, distribution network line current and distribution network line current carrying capacity in the distribution network line operation database.

[0063] According to a specific implementation scheme of the present invention, the line outage time accounts for K T The calculation is done as follows:

[0064] Line outage time ratio K T = Line power outage time / (power outage time + operating time).

[0065] According to a specific embodiment of the present invention, the line overload time proportion K GThe calculation is done as follows:

[0066] Line overload time ratio K G =Line overload time / operating time.

[0067] According to a specific embodiment of the present invention, the line overload time proportion includes the line overload time proportion of 90% to 100% and the line overload time proportion of 80% to 89%.

[0068] According to a specific embodiment of the present invention, the proportion of 90% to 100% overload time of the line and the proportion of 80% to 89% overload time of the line are calculated using the following method:

[0069] The proportion of line 90% to 100% overload time K G90~100 = Line 90%~100% overload time / operating time;

[0070] The proportion of line overload time between 80% and 89% is K G80~89 = Line 80%~89% overload time / operating time.

[0071] According to a specific implementation scheme of the present invention, the reliability evaluation value of the distribution network line is calculated based on the power outage time proportion, line overload time proportion and line heavy load time proportion of the distribution network line:

[0072] The line reliability evaluation value of the i-th line is set to K i , then:

[0073] K i =a1*K T +a2*K G +a3*K G(90-100) +a4*K G(80-89)

[0074] in,

[0075] a1+a2+a3+a4=1;

[0076] a1 is the weight value of the power outage time ratio to the line reliability evaluation value;

[0077] a2 is the weight value of the overload time ratio of the line reliability evaluation value;

[0078] a3 is the weight value of the line reliability evaluation value of 90%-100% overload time proportion;

[0079] a4 is the weight value of the line reliability evaluation value when the overload time accounts for 80%-89%.

[0080] According to a specific implementation scheme of the present invention, the reliability evaluation values ​​of the distribution network lines are ranked according to the proportion of power outage time, the proportion of line overload time and the proportion of line heavy load time of the distribution network lines. Specifically, the lines with larger line reliability evaluation values ​​are ranked higher and are given higher priority for improvement.

[0081] According to a specific implementation of the present invention, a given evaluation value reference value is determined based on an acceptable proportion of line power outage time, a proportion of line overload time, and a proportion of line heavy load time.

[0082] According to a specific implementation scheme of the present invention, the given evaluation value reference value is determined based on the acceptable line power outage time ratio, line overload time ratio and line heavy load time ratio as follows:

[0083] Percentage of acceptable power outage time of the line K TY =Acceptable power outage time / (Acceptable power outage time + running time) = Acceptable power outage time / total time;

[0084] Percentage of acceptable overload time of line K GY =Acceptable overload time / operating time;

[0085] The line can accept 90% to 100% overload time proportion K GY90~100 =Acceptable 90% to 100% overload time / operating time;

[0086] The line can accept 80% to 89% overload time proportion K GY80~89 =Acceptable 80% to 89% overload time / operating time;

[0087] Set the line evaluation benchmark value of the voltage level line to B XX , then:

[0088] B XX =b1*K TY +b2*K GY +b3*K GY90-100 +b4*K GY80-89

[0089] in,

[0090] b1+b2+b3+b4=1;

[0091] XX is the line voltage level, 10 represents 10kV, 06 represents 6kV;

[0092] b1 is the weight value of the line's acceptable power outage time as a percentage of the line evaluation benchmark value;

[0093] b2 is the weight value of the line's acceptable overload time as a percentage of the line evaluation benchmark value;

[0094] b3 is the weight value of the line evaluation benchmark value of the line's acceptable 90%-100% overload time ratio;

[0095] b4 is the weight value of the line evaluation benchmark value of the line's acceptable 80%-89% overload time ratio.

[0096] According to a specific embodiment of the present invention, performing line technical improvements on distribution network lines having evaluation values ​​greater than a given evaluation value reference value includes: transferring line loads or replacing line models with larger current carrying capacity on distribution lines having evaluation values ​​greater than a given evaluation value reference value.

[0097] Example 1

[0098] According to a specific implementation scheme of the present invention, the method for improving the operational reliability of the oilfield distribution network of the present invention is described in detail below.

[0099] The present invention provides a method for improving the operational reliability of an oilfield distribution network, comprising the following steps:

[0100] Enter the model and current carrying capacity of the distribution network line into the distribution network line operation database; the distribution network is a 10kV or 6kV line;

[0101] Real-time detection of distribution network line current within a preset time period and entry into the distribution network line operation database;

[0102] Calculate the proportion of power outage time, line overload time and line heavy load time of the distribution network line within the preset time period; overload means that the current exceeds the rated value; heavy load means that the current reaches 80%-100% of the rated value; the preset time period is divided into operating time and power outage time;

[0103] Calculate and rank the reliability evaluation values ​​of distribution network lines according to the proportion of power outage time, line overload time and line heavy load time of distribution network lines;

[0104] According to the ranking results of the distribution network line reliability evaluation values, the distribution network lines with evaluation values ​​greater than a given evaluation value reference value are technically improved, and the larger the evaluation value of the line, the higher the priority of the line technical improvement.

[0105] Example 2

[0106] According to a specific implementation scheme of the present invention, the method for improving the operational reliability of the oilfield distribution network of the present invention is described in detail below.

[0107] The present invention provides a method for improving the operational reliability of an oilfield distribution network, comprising the following steps:

[0108] Enter the model and current carrying capacity of the distribution network line into the distribution network line operation database; the distribution network is a 10kV or 6kV line;

[0109] Real-time detection of distribution network line current within a preset time period and entry into the distribution network line operation database;

[0110] Calculate the proportion of power outage time, line overload time and line heavy load time of the distribution network line within the preset time period; overload means that the current exceeds the rated value; heavy load means that the current reaches 80%-100% of the rated value; the preset time period is divided into operating time and power outage time;

[0111] Calculate and rank the reliability evaluation values ​​of distribution network lines according to the proportion of power outage time, line overload time and line heavy load time of distribution network lines;

[0112] According to the ranking results of the distribution network line reliability evaluation values, the distribution network lines with evaluation values ​​greater than a given evaluation value reference value are technically improved, and the larger the evaluation value of the line, the higher the priority of the line technical improvement.

[0113] Among them, according to the distribution network line model, distribution network line current and distribution network line current carrying capacity in the distribution network line operation database, the proportion of distribution network line power outage time, the proportion of line overload time and the proportion of line heavy load time are calculated.

[0114] Example 3

[0115] According to a specific implementation scheme of the present invention, the method for improving the operational reliability of the oilfield distribution network of the present invention is described in detail below.

[0116] The present invention provides a method for improving the operational reliability of an oilfield distribution network, comprising the following steps:

[0117] Enter the model and current carrying capacity of the distribution network line into the distribution network line operation database; the distribution network is a 10kV or 6kV line;

[0118] Real-time detection of distribution network line current within a preset time period and entry into the distribution network line operation database;

[0119] Calculate the proportion of power outage time, line overload time and line heavy load time of the distribution network line within the preset time period; overload means that the current exceeds the rated value; heavy load means that the current reaches 80%-100% of the rated value; the preset time period is divided into operating time and power outage time;

[0120] Calculate and rank the reliability evaluation values ​​of distribution network lines according to the proportion of power outage time, line overload time and line heavy load time of distribution network lines;

[0121] According to the ranking results of the distribution network line reliability evaluation values, the distribution network lines with evaluation values ​​greater than a given evaluation value reference value are technically improved, and the larger the evaluation value of the line, the higher the priority of the line technical improvement.

[0122] Among them, according to the distribution network line model, distribution network line current and distribution network line current carrying capacity in the distribution network line operation database, the proportion of distribution network line power outage time, the proportion of line overload time and the proportion of line heavy load time are calculated.

[0123] Among them, the line outage time accounts for K T The calculation is done as follows:

[0124] Line outage time ratio K T = Line power outage time / (power outage time + operating time).

[0125] Among them, the line overload time accounts for K G The calculation is done as follows:

[0126] Line overload time ratio K G =Line overload time / operating time.

[0127] Example 4

[0128] According to a specific implementation scheme of the present invention, the method for improving the operational reliability of the oilfield distribution network of the present invention is described in detail below.

[0129] The present invention provides a method for improving the operational reliability of an oilfield distribution network, comprising the following steps:

[0130] Enter the model and current carrying capacity of the distribution network line into the distribution network line operation database; the distribution network is a 10kV or 6kV line;

[0131] Real-time detection of distribution network line current within a preset time period and entry into the distribution network line operation database;

[0132] Calculate the proportion of power outage time, line overload time and line heavy load time of the distribution network line within the preset time period; overload means that the current exceeds the rated value; heavy load means that the current reaches 80%-100% of the rated value; the preset time period is divided into operating time and power outage time;

[0133] Calculate and rank the reliability evaluation values ​​of distribution network lines according to the proportion of power outage time, line overload time and line heavy load time of distribution network lines;

[0134] According to the ranking results of the distribution network line reliability evaluation values, the distribution network lines with evaluation values ​​greater than a given evaluation value reference value are technically improved, and the larger the evaluation value of the line, the higher the priority of the line technical improvement.

[0135] Among them, according to the distribution network line model, distribution network line current and distribution network line current carrying capacity in the distribution network line operation database, the proportion of distribution network line power outage time, the proportion of line overload time and the proportion of line heavy load time are calculated.

[0136] Among them, the line outage time accounts for K T The calculation is done as follows:

[0137] Line outage time ratio K T = Line power outage time / (power outage time + operating time).

[0138] Among them, the line overload time accounts for K G The calculation is done as follows:

[0139] Line overload time ratio K G =Line overload time / operating time.

[0140] Among them, the proportion of line overload time includes the proportion of line overload time of 90% to 100% and the proportion of line overload time of 80% to 89%.

[0141] Among them, the proportion of line overload time of 90% to 100% and the proportion of line overload time of 80% to 89% are calculated by the following method:

[0142] The proportion of line 90% to 100% overload time K G90~100 = Line 90%~100% overload time / operating time;

[0143] The proportion of line overload time between 80% and 89% is K G80~89 = Line 80%~89% overload time / operating time.

[0144] Example 5

[0145] According to a specific implementation scheme of the present invention, the method for improving the operational reliability of the oilfield distribution network of the present invention is described in detail below.

[0146] The present invention provides a method for improving the operational reliability of an oilfield distribution network, comprising the following steps:

[0147] Enter the model and current carrying capacity of the distribution network line into the distribution network line operation database; the distribution network is a 10kV or 6kV line;

[0148] Real-time detection of distribution network line current within a preset time period and entry into the distribution network line operation database;

[0149] Calculate the proportion of power outage time, line overload time and line heavy load time of the distribution network line within the preset time period; overload means that the current exceeds the rated value; heavy load means that the current reaches 80%-100% of the rated value; the preset time period is divided into operating time and power outage time;

[0150] Calculate and rank the reliability evaluation values ​​of distribution network lines according to the proportion of power outage time, line overload time and line heavy load time of distribution network lines;

[0151] According to the ranking results of the distribution network line reliability evaluation values, the distribution network lines with evaluation values ​​greater than a given evaluation value reference value are technically improved, and the larger the evaluation value of the line, the higher the priority of the line technical improvement.

[0152] Among them, according to the distribution network line model, distribution network line current and distribution network line current carrying capacity in the distribution network line operation database, the proportion of distribution network line power outage time, the proportion of line overload time and the proportion of line heavy load time are calculated.

[0153] Among them, the line outage time accounts for K T The calculation is done as follows:

[0154] Line outage time ratio K T = Line power outage time / (power outage time + operating time).

[0155] Among them, the line overload time accounts for K G The calculation is done as follows:

[0156] Line overload time ratio K G =Line overload time / operating time.

[0157] Among them, the proportion of line overload time includes the proportion of line overload time of 90% to 100% and the proportion of line overload time of 80% to 89%.

[0158] Among them, the proportion of line overload time of 90% to 100% and the proportion of line overload time of 80% to 89% are calculated by the following method:

[0159] The proportion of line 90% to 100% overload time K G90~100 = Line 90%~100% overload time / operating time;

[0160] The line is overloaded for 80% to 89% of the time. G80~89 = Line 80%~89% overload time / operating time.

[0161] Among them, according to the proportion of power outage time, line overload time and line heavy load time of the distribution network line, the reliability evaluation value of the distribution network line is calculated as follows:

[0162] The line reliability evaluation value of the i-th line is set to K i , then:

[0163] K i =a1*K T +a2*K G +a3*K G(90-100) +a4*K G(80-89)

[0164] in,

[0165] a1+a2+a3+a4=1;

[0166] a1 is the weight value of the power outage time ratio to the line reliability evaluation value;

[0167] a2 is the weight value of the overload time ratio of the line reliability evaluation value;

[0168] a3 is the weight value of the line reliability evaluation value of 90%-100% overload time proportion;

[0169] a4 is the weight value of the line reliability evaluation value when the overload time accounts for 80%-89%.

[0170] Among them, the reliability evaluation values ​​of the distribution network lines are ranked according to the proportion of power outage time, the proportion of line overload time and the proportion of line heavy load time. Specifically, the lines with larger line reliability evaluation values ​​are ranked higher and have higher priority for improvement.

[0171] Among them, the given evaluation value benchmark is determined according to the acceptable proportion of line power outage time, line overload time and line heavy load time.

[0172] Example 6

[0173] According to a specific implementation scheme of the present invention, the method for improving the operational reliability of the oilfield distribution network of the present invention is described in detail below.

[0174] The present invention provides a method for improving the operational reliability of an oilfield distribution network, comprising the following steps:

[0175] Enter the model and current carrying capacity of the distribution network line into the distribution network line operation database; the distribution network is a 10kV or 6kV line;

[0176] Real-time detection of distribution network line current within a preset time period and entry into the distribution network line operation database;

[0177] Calculate the proportion of power outage time, line overload time and line heavy load time of the distribution network line within the preset time period; overload means that the current exceeds the rated value; heavy load means that the current reaches 80%-100% of the rated value; the preset time period is divided into operating time and power outage time;

[0178] Calculate and rank the reliability evaluation values ​​of distribution network lines according to the proportion of power outage time, line overload time and line heavy load time of distribution network lines;

[0179] According to the ranking results of the distribution network line reliability evaluation values, the distribution network lines with evaluation values ​​greater than a given evaluation value reference value are technically improved, and the larger the evaluation value of the line, the higher the priority of the line technical improvement.

[0180] Among them, according to the distribution network line model, distribution network line current and distribution network line current carrying capacity in the distribution network line operation database, the proportion of distribution network line power outage time, the proportion of line overload time and the proportion of line heavy load time are calculated.

[0181] Among them, the line outage time accounts for K T The calculation is done as follows:

[0182] Line outage time ratio K T = Line power outage time / (power outage time + operating time).

[0183] Among them, the line overload time accounts for K G The calculation is done as follows:

[0184] Line overload time ratio K G =Line overload time / operating time.

[0185] Among them, the proportion of line overload time includes the proportion of line overload time of 90% to 100% and the proportion of line overload time of 80% to 89%.

[0186] Among them, the proportion of line overload time of 90% to 100% and the proportion of line overload time of 80% to 89% are calculated by the following method:

[0187] The proportion of line 90% to 100% overload time K G90~100 = Line 90%~100% overload time / operating time;

[0188] The line is overloaded for 80% to 89% of the time. G80~89 = Line 80%~89% overload time / operating time.

[0189] Among them, according to the proportion of power outage time, line overload time and line heavy load time of the distribution network line, the reliability evaluation value of the distribution network line is calculated as follows:

[0190] The line reliability evaluation value of the i-th line is set to K i , then:

[0191] K i =a1*K T +a2*K G +a3*K G(90-100) +a4*K G(80-89)

[0192] in,

[0193] a1+a2+a3+a4=1;

[0194] a1 is the weight value of the power outage time ratio to the line reliability evaluation value;

[0195] a2 is the weight value of the overload time ratio of the line reliability evaluation value;

[0196] a3 is the weight value of the line reliability evaluation value of 90%-100% overload time proportion;

[0197] a4 is the weight value of the line reliability evaluation value when the overload time accounts for 80%-89%.

[0198] Among them, the reliability evaluation values ​​of the distribution network lines are ranked according to the proportion of power outage time, the proportion of line overload time and the proportion of line heavy load time. Specifically, the lines with larger line reliability evaluation values ​​are ranked higher and have higher priority for improvement.

[0199] Among them, the given evaluation value benchmark value is determined according to the acceptable line power outage time ratio, line overload time ratio and line heavy load time ratio, specifically:

[0200] Percentage of acceptable power outage time of the line K TY =Acceptable power outage time / (Acceptable power outage time + running time) = Acceptable power outage time / total time;

[0201] Percentage of acceptable overload time of line K GY =Acceptable overload time / operating time;

[0202] The line can accept 90% to 100% overload time proportion K GY90~100 =Acceptable 90% to 100% overload time / operating time;

[0203] The line can accept 80% to 89% overload time proportion K GY80~89 =Acceptable 80% to 89% overload time / operating time;

[0204] Set the line evaluation benchmark value of the voltage level line to B XX , then:

[0205] B XX =b1*K TY +b2*K GY +b3*K GY90-100 +b4*K GY80-89

[0206] in,

[0207] b1+b2+b3+b4=1;

[0208] XX is the line voltage level, 10 represents 10kV, 06 represents 6kV;

[0209] b1 is the weight value of the line's acceptable power outage time as a percentage of the line evaluation benchmark value;

[0210] b2 is the weight value of the line's acceptable overload time as a percentage of the line evaluation benchmark value;

[0211] b3 is the weight value of the line evaluation benchmark value of the line's acceptable 90%-100% overload time ratio;

[0212] b4 is the weight value of the line evaluation benchmark value of the line's acceptable 80%-89% overload time ratio.

[0213] Among them, the line technical improvement of the distribution network line with an evaluation value greater than a given evaluation value reference value includes: transferring the line load of the distribution line with an evaluation value greater than the given evaluation value reference value or replacing the line model with a larger current carrying capacity.

[0214] Example 7

[0215] According to a specific implementation scheme of the present invention, the method for improving the operational reliability of the oilfield distribution network of the present invention is described in detail below.

[0216] The reliability of the distribution network is based on the operational reliability of the line. The statistical analysis is based on a period of time (such as one year or one month) for continuous detection of line current duration, where the time base of the power outage time ratio is the total time of the statistical period, and the time base of the overload time ratio and the heavy load time ratio is the line operation time. According to the operating current value range, duration value, and power outage time value detected in real time by the distribution line, statistical analysis is finally performed separately.

[0217] In this embodiment: the power supply reliability of a 10kV line of a distribution network requires that the proportion of power outage time shall not be greater than 5%, the proportion of overload time shall not be greater than 10%, the proportion of 90% to 100% heavy load time shall not be greater than 20%, and the proportion of 80% to 89% heavy load time shall not be greater than 40%; the weight of the proportion of power outage time is a1=0.4, the weight of the proportion of overload time is a2=0.3, the weight of the proportion of 90% to 100% heavy load time is a3=0.2, and the weight of the proportion of 80% to 89% heavy load time is a4=0.1, thereby calculating the evaluation benchmark value B of this 10kV distribution line 10 :Evaluation benchmark value B 10 =0.4*5%+0.3*10%+0.2*20%+0.1*40%=0.13; so the evaluation benchmark value of this 10kV is B 10 To meet the above power supply reliability requirements, the actual evaluation value of this 10kV line within a period of time (such as one year or one month) should not be greater than 0.13. That is, after the actual operation situation within a period of time (such as one year or one month) is counted, the above evaluation value calculation formula is used: K i =a1*K T +a2*K G +a3*K G(90-100) +a4*K G(80-89) The calculated evaluation value K i If it is greater than 0.13, it is necessary to transfer the load to the i-th line or replace the model of the i-th line to increase the current carrying capacity of the i-th line. The line evaluation benchmark value formula for the corresponding voltage level line is: B 10 =b1*K TY +b2*K GY +b3*K GY90-100 +b4*K GY80-89 is the evaluation benchmark value B of the 10 kV power distribution line in this embodiment under certain power supply reliability requirements 10 Calculation formula.

[0218] When the i-th line is replaced, the line model and current carrying capacity of the database are modified accordingly; or after the load of the i-th line is transferred, the actual operating current operating range and its duration value for a certain period of time (such as year or month) are statistically analyzed and calculated, and the power supply reliability evaluation value K of this distribution network line can be obtained again. i , and B 10 =0.13 evaluation benchmark value for comparison. If it is less than or equal to 0.13, the i-th line reaches the expected value of power supply reliability. When this method is used to evaluate multiple lines of the distribution network, under the premise that the expected value of power supply reliability of the distribution network lines is the same and the weight coefficient remains unchanged, the evaluation benchmark values ​​B of these lines are first calculated. 10Then, all the lines in the evaluation area are evaluated within a period of time (such as one year or one month). i Calculation of the evaluation value K i Greater than the evaluation benchmark value B 10 The lines with the evaluation value K need to be improved or load transferred. i Greater than the evaluation benchmark value B 10 The line is based on the evaluation value K of the line. i The line evaluation value K i The size of K can determine which line urgently needs technical improvement measures, that is, in the line that needs technical improvement, the evaluation value K i The larger the line, the more urgent it is to take technical improvement measures. This embodiment takes a line of 10kV voltage level as an example to illustrate the specific application of this method. For a line of 6kV voltage level, the application method is the same.

[0219] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.

Claims

1. A method for improving the operational reliability of an oilfield distribution network, characterized in that: The steps include: Enter the model and current carrying capacity of the distribution network line into the distribution network line operation database; the distribution network is a 10kV or 6kV line; Real-time detection of distribution network line current within a preset time period and entry into the distribution network line operation database; Calculate the proportion of power outage time, line overload time and line heavy load time of the distribution network line within the preset time period; Overload means the current exceeds the rated value; Heavy load means that the current reaches 80%-100% of the rated value; The preset time period is divided into operation time and power outage time; Calculate and rank the reliability evaluation values ​​of distribution network lines according to the proportion of power outage time, line overload time and line heavy load time of distribution network lines; According to the ranking results of the distribution network line reliability evaluation values, the distribution network lines with evaluation values ​​greater than a given evaluation value reference value are technically improved, and the larger the evaluation value of the line, the higher the priority of the line technical improvement.

2. The method for improving the operational reliability of an oilfield distribution network according to claim 1, characterized in that: According to the distribution network line model, distribution network line current and distribution network line current carrying capacity in the distribution network line operation database, the proportion of distribution network line power outage time, the proportion of line overload time and the proportion of line heavy load time are calculated.

3. The method for improving the operational reliability of an oilfield distribution network according to claim 2, characterized in that: Line outage time ratio K T The calculation is done as follows: Line outage time ratio K T = Line power outage time / (power outage time + operating time).

4. The method for improving the operational reliability of an oilfield distribution network according to claim 3, characterized in that: Line overload time ratio K G The calculation is done as follows: Line overload time ratio K G =Line overload time / operating time.

5. The method for improving the operational reliability of an oilfield distribution network according to claim 4, characterized in that: The proportion of line overload time includes the proportion of line overload time of 90% to 100% and the proportion of line overload time of 80% to 89%.

6. The method for improving the operational reliability of an oilfield distribution network according to claim 5, characterized in that: The proportion of line overload time between 90% and 100% and the proportion of line overload time between 80% and 89% are calculated using the following method: The proportion of line 90% to 100% overload time K G90~100 = Line 90%~100% overload time / operating time; The proportion of line overload time between 80% and 89% is K G80~89 = Line 80%~89% overload time / operating time.

7. The method for improving the operational reliability of an oilfield distribution network according to claim 6, characterized in that: According to the proportion of power outage time, line overload time and line heavy load time of the distribution network line, the reliability evaluation value of the distribution network line is calculated, specifically: The line reliability evaluation value of the i-th line is set to K i , then: <h2 style=";text-align:left;direction:ltr">K<h2 style=";text-align:left;direction:ltr"> i <h2 style=";text-align:left;direction:ltr"> =a1*K<h2 style=";text-align:left;direction:ltr"> T <h2 style=";text-align:left;direction:ltr"> +a2*K<h2 style=";text-align:left;direction:ltr"> G <h2 style=";text-align:left;direction:ltr"> +a3*K<h2 style=";text-align:left;direction:ltr"> G(90-100) <h2 style=";text-align:left;direction:ltr"> +a4*K<h2 style=";text-align:left;direction:ltr"> G(80-89) in, a1+a2+a3+a4=1; a1 is the weight value of the power outage time ratio to the line reliability evaluation value; a2 is the weight value of the overload time ratio of the line reliability evaluation value; a3 is the weight value of the line reliability evaluation value of 90%-100% overload time proportion; a4 is the weight value of the line reliability evaluation value when the overload time accounts for 80%-89%.

8. The method for improving the operational reliability of an oilfield distribution network according to claim 7, characterized in that: The reliability evaluation values ​​of the distribution network lines are ranked according to the proportion of power outage time, the proportion of line overload time and the proportion of line heavy load time. Specifically, the lines with larger reliability evaluation values ​​are ranked higher and have higher priority for technical improvement.

9. The method for improving the operational reliability of an oilfield distribution network according to any one of claims 7 or 8, characterized in that: The given evaluation value benchmark is determined based on the acceptable proportion of line power outage time, line overload time and line heavy load time.

10. The method for improving the operational reliability of an oilfield distribution network according to claim 9, characterized in that: The given evaluation value benchmark is determined based on the acceptable line outage time ratio, line overload time ratio and line heavy load time ratio as follows: Percentage of acceptable power outage time of the line K TY =Acceptable power outage time / (Acceptable power outage time + running time) = Acceptable power outage time / total time; Percentage of acceptable overload time of line K GY =Acceptable overload time / operating time; The line can accept 90% to 100% overload time proportion K GY90~100 =Acceptable 90% to 100% overload time / operating time; The line can accept 80% to 89% overload time proportion K GY80~89 =Acceptable 80% to 89% overload time / operating time; Set the line evaluation benchmark value of the voltage level line to B XX , then: B XX =b1*K TY +b2*K GY +b3*K GY90-100 +b4*K GY80-89 in, b1+b2+b3+b4=1; XX is the line voltage level, 10 represents 10kV, 06 represents 6kV; b1 is the weight value of the line's acceptable power outage time as a percentage of the line evaluation benchmark value; b2 is the weight value of the line's acceptable overload time as a percentage of the line evaluation benchmark value; b3 is the weight value of the line evaluation benchmark value of the line's acceptable 90%-100% overload time ratio; b4 is the weight value of the line evaluation benchmark value of the line's acceptable 80%-89% overload time ratio.

11. The method for improving the operational reliability of an oilfield distribution network according to claim 10, characterized in that: Carrying out technical improvements to distribution network lines having evaluation values ​​greater than given evaluation value reference values ​​includes: transferring line loads or replacing line models with larger current carrying capacity for distribution lines having evaluation values ​​greater than given evaluation value reference values.