Power distribution method, device, storage medium and program product

By storing excess electricity into the energy storage system in the microgrid and controlling the energy storage system and the air-conditioning unit to jointly supply energy when the air-conditioning system is started, the problem of waste of excess electricity in the microgrid is solved, and the effective utilization and cost of energy is achieved save.

CN118920521APending Publication Date: 2024-11-08TBEA NANJING INTELLIGENT ELECTRIC CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410960544.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In a microgrid, when the power generation power of a renewable energy power supply unit is greater than the load power, energy waste cannot be effectively avoided.

Method used

By storing excess electricity into the energy storage system and controlling the operation of the energy storage system and/or the air conditioning unit when the air conditioning system starts up command is received to jointly supply energy and avoid energy waste.

Benefits of technology

It effectively avoids waste of energy, and saves operating costs and reduces costs through collaborative energy supply when the air conditioning system is running.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920521A_ABST
    Figure CN118920521A_ABST
Patent Text Reader

Abstract

The invention discloses a power distribution method and device, a storage medium and a program product, and relates to the technical field of power distribution, and the disclosed power distribution method comprises the steps: storing redundant electric energy of a microgrid to an energy storage system under the condition that the current generated power of a renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the energy storage system converts the surplus electric energy into heat energy or cold energy for energy storage; and under the condition that an air conditioning system starting instruction is received, the energy storage system and / or the air conditioning unit are / is controlled to operate. According to the invention, when the current generated power output by the renewable energy power supply in the micro-grid is greater than the current load power in the park, the waste of energy can be avoided for redundant electric energy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power distribution technology, and in particular to a power distribution method, device, storage medium and program product. Background Art

[0002] At present, microgrids, as an effective access and management method for distributed power sources, have become an important part of modern power grids. The campus photovoltaic storage microgrid consists of renewable energy power supply, load, energy storage system and power distribution monitoring system. It is an autonomous system that can realize protection control and energy management.

[0003] However, when the current power generation output by the renewable energy power supply unit within the microgrid is greater than the current load power within the park, energy waste cannot be avoided for the excess electricity. Summary of the invention

[0004] The main purpose of this application is to provide a power distribution method, device, storage medium and program product, aiming to solve the technical problem of excess electrical energy and unavoidable energy waste.

[0005] To achieve the above objectives, the present application proposes a power distribution method, comprising:

[0006] When the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess electric energy of the microgrid is stored in the energy storage system, so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage;

[0007] When receiving an air-conditioning system start-up instruction, the energy storage system and / or the air-conditioning unit are controlled to operate.

[0008] In one embodiment, when an air conditioning system start-up instruction is received, the step of controlling the operation of the energy storage system and / or the air conditioning unit includes:

[0009] When receiving the air conditioning system start-up command, if the current power generation power of the renewable power supply unit of the microgrid is less than the current load power of the microgrid, and the current power generation power is greater than the difference between the current load power and the power of the air conditioning unit, the air conditioning unit is controlled to operate;

[0010] When receiving the air conditioning system start-up command, if the current power generation power of the renewable power supply unit of the microgrid is less than the current load power of the microgrid, and less than the difference between the current load power and the power of the air conditioning unit, it is determined whether the energy storage system has surplus energy;

[0011] If the energy storage system has surplus energy, the energy storage system is controlled to operate;

[0012] If the energy storage system has no remaining energy, the air conditioning unit is controlled to operate.

[0013] In one embodiment, when an air conditioning system start-up instruction is received, the step of controlling the operation of the energy storage system and / or the air conditioning unit includes:

[0014] In case of receiving the air conditioning system start-up instruction, if the current power generation power of the renewable power supply unit of the microgrid is zero, determining whether the air conditioning unit is in an operating state;

[0015] If the air conditioning unit is not in operation, the air conditioning unit is controlled to operate;

[0016] If the air conditioning unit is in operation, determine whether the energy storage system has residual energy;

[0017] If the energy storage system has surplus energy, the energy storage system is controlled to operate.

[0018] In one embodiment, when the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, before storing the excess electric energy of the microgrid into the energy storage system so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage, the method further includes:

[0019] Determine whether the current period is in the off-peak electricity price period;

[0020] If the current period is not a valley electricity price period, then when the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess electric energy of the microgrid is stored in the energy storage system, so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage.

[0021] In one embodiment, determining whether the current period is after the valley electricity price period further includes:

[0022] If the current period is in the off-peak electricity price period, the electric energy sent by the grid power supply unit is stored in the energy storage system, so that the energy storage system converts the electric energy sent by the grid power supply unit into heat energy or cold energy for energy storage.

[0023] In one embodiment, the step of storing the excess electric energy of the microgrid into an energy storage system so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage includes:

[0024] If the current state of the energy storage system is a preset state, the excess electric energy is stored in the energy storage system so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage; the preset state is a state in which the energy storage system is not fully stored;

[0025] If the current state of the energy storage system is not the preset state, the excess electric energy is stored in the grid power supply unit.

[0026] In one embodiment, the energy storage system is a cold and heat storage system.

[0027] In addition, to achieve the above objectives, the present application also proposes a power distribution device, which includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program is configured to implement the steps of the power distribution method as described above.

[0028] In addition, to achieve the above-mentioned purpose, the present application also proposes a storage medium, which is a computer-readable storage medium. A computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the power distribution method as described above are implemented.

[0029] In addition, to achieve the above-mentioned purpose, the present application also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, the steps of the power distribution method as described above are implemented.

[0030] One or more technical solutions proposed in this application have at least the following technical effects:

[0031] In this application, when the current power generation of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess power of the microgrid is stored in the energy storage system, that is, this application stores the excess power of the microgrid through the energy storage system, which can avoid energy waste. At the same time, when the air-conditioning system is running, the air-conditioning system is adjusted from a single air-conditioning unit to a coordinated energy supply of the air-conditioning unit and the energy storage system, which can save the overall operating cost of the air-conditioning, thereby achieving the purpose of solving the cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0033] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the drawings required for use in the embodiments or the related technical descriptions are briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0034] Figure 1 A schematic diagram of a flow chart provided for Embodiment 1 of the power distribution method of the present application;

[0035] Figure 2 This is a flow chart of the summer electricity strategy for this application;

[0036] Figure 3 This is a schematic diagram of the equipment structure of the hardware operating environment involved in the power distribution method in the embodiment of the present application.

[0037] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0038] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.

[0039] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.

[0040] The main solution of the embodiment of the present application is: when the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess electric energy of the microgrid is stored in the energy storage system, so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage; when a start-up command of the air-conditioning system is received, the operation of the energy storage system and / or the air-conditioning unit is controlled.

[0041] In recent years, with the vigorous development of large-scale distributed renewable energy, microgrids, as an effective access and management method for distributed power sources, have become an important part of modern power grids. The campus photovoltaic storage microgrid consists of photovoltaic power generation, loads, energy storage systems and power distribution monitoring systems. It is an autonomous system that can achieve protection control and energy management.

[0042] When the current power output of the renewable energy power supply unit in the microgrid is greater than the current load power in the park, the following three methods are mainly used to solve the excess power:

[0043] Method 1: The output power of the renewable energy inverter is adjusted through the microgrid distribution system AGC (Automatic Generation Control) or the primary frequency modulation module, so that the current power generation power output by the renewable energy power supply unit is equal to the current load power inside the park, that is, power is abandoned.

[0044] Method 2: Send excess electricity to the large power grid through the microgrid's mains connection point, and collect corresponding revenue from the local power company;

[0045] Method three: Build electrochemical energy storage facilities represented by lithium batteries, and use PCS (Power Conversation System) devices to match the electrochemical energy storage equipment. When the current power generation output by the renewable energy power supply unit inside the microgrid is greater than the current load power inside the park, the excess electric energy will be charged into the electrochemical energy storage equipment. When the current power generation output by the renewable energy power supply unit inside the microgrid is less than the current load power inside the park, the electric energy stored in the electrochemical energy storage equipment will be released.

[0046] However, when using method 1 to solve the problem of excess electricity, there is no construction cost except for adding an AGC or a primary frequency modulation module. However, this method greatly reduces the energy conversion efficiency of the renewable energy power supply unit, causing energy waste, and cannot play a role in shifting the peak load of the microgrid.

[0047] Although the second method can effectively avoid energy waste, the large amount of excess electricity in the park connected to the grid will inevitably have an impact on the stability of the local large power grid and affect the operation of the regional power grid. In addition, the second method cannot play the role of peak shifting and valley filling for the microgrid load.

[0048] Although the third method can avoid energy waste and play a role in shifting the peak load of the microgrid, the electrochemical energy storage equipment is expensive and has extremely high safety requirements for fire protection. Therefore, storing excess electricity through the third method will increase costs.

[0049] Therefore, in the related art, when the current power generation output by the renewable energy power supply unit within the microgrid is greater than the current load power within the park, energy waste cannot be avoided for the excess electric energy.

[0050] This application provides a solution. When the current power generation of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess power of the microgrid is stored in the energy storage system. That is, this application stores the excess power of the microgrid through the energy storage system, which can avoid energy waste. At the same time, when the air-conditioning system is running, the air-conditioning system is adjusted from a single air-conditioning unit to a coordinated energy supply of the air-conditioning unit and the energy storage system, which can save the overall operating cost of the air-conditioning, thereby achieving the purpose of solving the cost.

[0051] It should be noted that the execution subject of this embodiment can be a computing service device with data processing, network communication and program running functions, such as a tablet computer, a personal computer, a mobile phone, etc., or an electronic device capable of realizing the above functions, a power distribution device, etc. The following takes the power distribution device as an example to illustrate this embodiment and the following embodiments.

[0052] Based on this, the present application embodiment provides a power distribution method, referring to Figure 1 , Figure 1 This is a flow chart of the first embodiment of the power distribution method of the present application.

[0053] In this embodiment, the power distribution method includes steps S10 to S20:

[0054] Step S10, when the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess electric energy of the microgrid is stored in the energy storage system, so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage.

[0055] In this embodiment, the microgrid, also known as microgrid, refers to a small power generation and distribution system composed of distributed power sources, energy storage devices, energy conversion devices, load devices, monitoring devices and protection devices. The introduction of microgrids can realize the flexible and efficient application of distributed power sources and solve the problem of grid connection of a large number of distributed power sources with various styles. The development and extension of microgrids can fully promote the large-scale access of distributed power sources and renewable energy, realize the highly reliable supply of multiple energy types to loads, realize active distribution networks, and make the transition from traditional power grids to smart grids.

[0056] The energy storage system is a cold and heat storage system, that is, a dual energy storage system. The cold and heat storage system can use refrigeration / heat equipment to remove / charge the heat in the cold storage medium when the cold is not needed, store cold / heat, and then use this cold / heat during the peak period of air conditioning. Among them, the energy storage and heat storage system uses water with very stable chemical properties as the energy storage medium, which can store both sensible heat and heat, and can also be made into ice for latent heat storage.

[0057] The renewable power supply unit may be a solar power generation unit, or a wind power generation unit, or a solar power generation unit and a wind power generation unit, which is not limited in this embodiment.

[0058] Specifically, a monitoring system can be installed in the renewable power supply unit of the microgrid, and the monitoring system can measure the power generated by the device in real time, that is, the current power generation power of the renewable power supply unit of the microgrid. In addition, an electric meter or smart electric meter can be installed in the microgrid to record the load power of the microgrid in real time, that is, the current load power of the microgrid.

[0059] After collecting the current power generation of the renewable power supply unit of the microgrid and the current load power of the microgrid, the monitoring system and smart meter in the microgrid can send the current power generation and load power to the distribution equipment. After receiving the current power generation and load power, the distribution equipment determines whether the current power generation is greater than the current load power. When the current power generation is greater than the current load power of the microgrid, the excess power of the microgrid is stored in the energy storage system, so that the energy storage system converts the excess power into heat or cold energy for energy storage.

[0060] It should be noted that when storing the excess electric energy of the microgrid in the energy storage system, the excess electric energy can be stored only when the energy storage system has spare capacity. When the energy storage system has no spare capacity, the excess electric energy cannot be stored. In order to avoid wasting excess electric energy when the energy storage system has no spare capacity, further, as an optional implementation, step S10 specifically includes:

[0061] Step S101, if the current state of the energy storage system is a preset state, the excess electric energy is stored in the energy storage system, so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage.

[0062] The preset state is a state where the energy storage system is not fully charged.

[0063] Step S102: if the current state of the energy storage system is not the preset state, the excess electric energy is stored in the grid power supply unit.

[0064] Specifically, the energy storage system is equipped with a capacity monitoring device for monitoring the capacity information of the energy storage system, and after monitoring the capacity information of the energy storage system, the monitored capacity information is sent to the power distribution device. After receiving the capacity information, the power distribution device can determine whether the current state of the energy storage is a preset state according to the capacity information, that is, when the capacity information indicates that there is spare capacity, the current state of the energy storage system is determined to be the preset state. When the capacity information indicates that there is no spare capacity, it is determined that the current state of the energy storage system is not the preset state.

[0065] When the current state of the energy storage system is the preset state, the excess electric energy is stored in the energy storage system so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage. When the current state of the energy storage system is not the preset state, it is determined that the energy storage system has no spare capacity to store excess electric energy. At the same time, in order to avoid the waste of excess electric energy, the excess electric energy can be transmitted to the grid power supply unit through the grid connection point and stored in the grid power supply unit.

[0066] In this embodiment, whether to store excess electric energy in the energy storage system is determined according to the current state of the energy storage system, so as to avoid the situation where the energy storage system stores excess electric energy in the energy storage system when there is no spare capacity, thereby causing waste of excess electric energy.

[0067] It is understandable that the electricity consumption of the microgrid can be divided into valley electricity price period and peak electricity price period. During the valley electricity price period, a large amount of electricity is mainly provided by the power supply unit of the power grid, and a small amount of electricity is provided by the renewable power supply unit of the microgrid. Therefore, in order to balance the energy production and consumption within the microgrid, ensure that the excess electricity is not wasted, and avoid relying on more expensive electricity sources during high load periods, further, as an optional implementation, before step S10, it also includes:

[0068] Step S1, determining whether the current period is in a valley electricity price period.

[0069] Step S2, if the current time period is not in the valley electricity price period, then when the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess electric energy of the microgrid is stored in the energy storage system, so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage.

[0070] Step S3, if the current time period is in the off-peak electricity price period, the electric energy sent by the grid power supply unit is stored in the energy storage system, so that the energy storage system converts the electric energy sent by the grid power supply unit into heat energy or cold energy for energy storage.

[0071] In this embodiment, the valley electricity price period may be a valley period in electricity prices, that is, a period of time during the day when electricity consumption is relatively low and the load on the microgrid is relatively light.

[0072] Specifically, the power distribution equipment can receive the current electricity price information sent by the smart meter or the electric energy monitoring system. After receiving the current electricity price information, the power distribution equipment determines whether the current time period is in the valley electricity price period according to the current electricity price information. If the current time period is not in the valley electricity price period, it is determined whether the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid. When the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess electric energy of the microgrid is stored in the energy storage system, so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage. If the current time period is in the valley electricity price period, the electric energy sent by the grid power supply unit is stored in the energy storage system, so that the energy storage system converts the electric energy sent by the grid power supply unit into heat energy or cold energy for energy storage.

[0073] In this embodiment, during the off-peak electricity price period, the electric energy sent by the grid power supply unit is stored in the energy storage system, so that the energy storage system converts the electric energy sent by the grid power supply unit into heat energy or cold energy for energy storage. When it is not in the off-peak electricity price period, the excess electric energy of the microgrid is stored in the energy storage system, so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage. This can balance the energy production and consumption within the microgrid, ensure that the excess electric energy is not wasted, and avoid relying on more expensive electricity sources during high-load periods.

[0074] Step S20, when receiving the air conditioning system start-up instruction, controlling the energy storage system and / or the air conditioning unit to operate.

[0075] It should be noted that, as an important component of the load side of the microgrid, the air conditioning system has a relatively large proportion of energy consumption in the entire microgrid load, especially in summer and winter. In order to reduce the operating energy consumption of the air conditioning unit as much as possible, the energy supply mode of the air conditioning system can be adjusted to energy storage system energy supply, or air conditioning unit energy supply, or energy storage system and air conditioning unit energy supply at the same time. Therefore, in order to determine the specific energy supply mode of the air conditioning system, further, as an optional implementation method, step S20 specifically includes:

[0076] Step S201A, when receiving the air conditioning system start-up instruction, if the current power generation power of the renewable power supply unit of the microgrid is less than the current load power of the microgrid, and the current power generation power is greater than the difference between the current load power and the air conditioning unit power, the air conditioning unit is controlled to operate.

[0077] Step S202A, when receiving the air conditioning system start-up instruction, if the current power generation power of the renewable power supply unit of the microgrid is less than the current load power of the microgrid, and less than the difference between the current load power and the air conditioning unit power, it is determined whether the energy storage system has surplus energy.

[0078] Step S203A: If the energy storage system has surplus energy, the energy storage system is controlled.

[0079] Step S204A: If there is no remaining energy in the energy storage system, the air conditioning unit is controlled to operate.

[0080] In this embodiment, when the power distribution equipment receives the air-conditioning system start-up command, it can determine the energy supply mode of the air-conditioning system based on the current power generation power, the current load power and the load power of the air-conditioning unit, that is, the energy storage system supplies energy, or the air-conditioning unit supplies energy, or the energy storage system and the air-conditioning unit supply energy at the same time.

[0081] Specifically, the power distribution equipment can collect the current power generation, current load power and air conditioning unit power of the microgrid in the aforementioned manner. After collecting the current power generation, current load power and air conditioning unit power, the power distribution equipment determines whether the current power generation is less than the current load power, and whether the current power generation is greater than the difference between the current load power and the air conditioning unit power. When the current power generation is less than the current load power, and the current power generation is greater than the difference between the current load power and the air conditioning unit power, the current power generation of the microgrid is insufficient to meet the current load power of the microgrid, but it is sufficient to provide the air conditioning unit with the power required for operation. In order to maximize the use of the electric energy of the renewable power supply unit and reduce the need to purchase electricity from the traditional power grid, the air conditioning unit is controlled to operate to provide energy for the operation of the air conditioning system. When the current power generation is less than the current load power, and the current power generation is less than the difference between the current load power and the power of the air-conditioning unit, the current output power of the renewable power supply unit of the microgrid is not zero, but its current power generation is not enough to provide the power required for the operation of the air-conditioning unit. In order to maximize the use of the electric energy of the renewable power supply unit and reduce the need to purchase electricity from the traditional power grid, it is determined whether there is surplus energy in the energy storage system. When there is surplus energy in the energy storage system, the energy storage system is controlled to operate to provide energy for the operation of the air-conditioning system to reduce the energy consumption of the air-conditioning unit. When there is no surplus energy in the energy storage system, the air-conditioning unit is controlled to operate to provide energy for the operation of the air-conditioning system, wherein the electric energy for the operation of the air-conditioning unit is provided by the renewable power supply unit and the power grid power supply unit of the microgrid at the same time, so as to maximize the use of the electric energy of the renewable power supply unit and reduce the purchase of electricity from the traditional power grid.

[0082] In this embodiment, the energy supply mode of the air-conditioning system is determined according to the current power generation, the current load power and the load power of the air-conditioning unit, that is, when the current power generation is sufficient to provide the power required for the operation of the air-conditioning unit, the air-conditioning unit is controlled to operate, which can maximize the use of the electric energy of the renewable power supply unit and reduce the need to purchase electricity from the traditional power grid. When the current power generation is insufficient to provide the power required for the operation of the air-conditioning unit, and there is surplus energy in the energy storage system, the energy storage system is controlled to operate to reduce the energy consumption of the air-conditioning unit. When the current power generation is insufficient to provide the power required for the operation of the air-conditioning unit, and there is no surplus energy in the energy storage system, the air-conditioning unit is controlled to operate, and the electric energy for the operation of the air-conditioning unit is provided by the renewable power supply unit and the power supply unit of the grid of the microgrid at the same time, which not only maximizes the consumption of new energy power generation, but also realizes the peak shifting and valley filling of the load power of the microgrid.

[0083] It should be noted that, in some special cases, the current output power of the renewable power supply unit in the microgrid may be zero. For example, when the renewable power supply unit is a solar power generation unit, the current output power of the renewable power supply unit is zero at night. Therefore, when the current output power of the renewable power supply unit is zero, in order to reduce the operating energy consumption of the air-conditioning unit, further, as an optional implementation, step S20 specifically includes:

[0084] Step S201B, when receiving the air conditioning system start-up instruction, if the current power generation power of the renewable power supply unit of the microgrid is zero, determine whether the air conditioning unit is in operation.

[0085] Step S202B: if the air conditioning unit is not in operation, control the air conditioning unit to operate.

[0086] Step S203B: if the air conditioning unit is in operation, determine whether the energy storage system has surplus energy.

[0087] Step S204B: if the energy storage system has surplus energy, control the energy storage system to operate.

[0088] Specifically, when receiving the air-conditioning system start-up instruction, if the current power generation power of the renewable power supply unit of the microgrid is zero, the renewable power supply unit cannot provide electric energy for the operation of the air-conditioning system, and the electric energy sent by the grid power supply unit can be used as the electric energy for the operation of the air-conditioning system. In order to reduce the operating energy consumption of the air-conditioning unit, while controlling the operation of the air-conditioning unit, it is determined whether there is surplus energy in the energy storage system. When there is surplus energy in the energy storage system, the operation of the energy storage system is controlled, and the air-conditioning system is adjusted from the energy supply of a single air-conditioning unit to the coordinated energy supply of the air-conditioning unit and the dual storage system. While reducing the energy consumption of the air-conditioning unit, the use of electric energy from the grid power supply unit can also be reduced, thereby reducing the operating cost of the air-conditioning system. When there is no surplus energy in the energy storage system, the electric energy provided by the grid power supply unit is used to control the operation of the air-conditioning unit to supply energy to the air-conditioning system.

[0089] In this embodiment, when the current power generation of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess power of the microgrid is stored in the energy storage system, that is, this embodiment stores the excess power of the microgrid through the energy storage system, which can avoid energy waste. At the same time, when the air-conditioning system is running, the air-conditioning system is adjusted from a single air-conditioning unit to a coordinated energy supply of the air-conditioning unit and the energy storage system, which can save the overall operating cost of the air-conditioning, thereby achieving the purpose of solving the cost.

[0090] To facilitate a better understanding of this embodiment, a specific example is provided below.

[0091] Specifically, refer to Figure 2 As shown, Figure 2 This is a flow chart of the summer electricity consumption strategy of this application, wherein in summer, the energy storage system is a cold storage system, the renewable power supply unit is a photovoltaic power generation unit, Ps is the current power generation, Pt is the current load power, and Pa is the power of the air conditioning unit. Determine whether the current period is a valley electricity price period. When the current period is a valley electricity price period, determine whether the cold storage system has spare capacity. When the cold storage system has spare capacity, the electric energy sent by the grid power supply unit is stored in the energy storage system, so that the cold storage system converts the electric energy sent by the grid power supply unit into heat energy or cold energy for energy storage. When the cold storage system has no spare capacity, the electric energy provided by the grid power supply unit is used as the electric energy for the operation of the microgrid. When the current period is not in a valley electricity price period, determine whether the current power generation is zero. When the current power generation is zero, it is determined whether the air-conditioning unit is in operation. When the air-conditioning unit is in operation, that is, Pa>0, it is determined whether there is residual energy in the cold storage system. When there is residual energy in the cold storage system, the cold storage system is controlled to operate and perform cooling operations. When there is no residual energy in the cold storage system, the air-conditioning unit is controlled to operate using the electric energy provided by the grid power supply unit, that is, the load is powered by the mains. When the air-conditioning unit is not in operation, that is, Pa<0, the microgrid load consumes the electric energy provided by the grid power supply unit, that is, the load consumes the mains. When the current power generation is not zero, it is determined whether the current power generation is greater than the current load power, that is, Ps>Pt. When the current power generation is greater than the current load power, it is determined whether the cold storage system has spare capacity. When there is spare capacity in the cold storage system, the excess electric energy of the microgrid is stored in the energy storage system, so that the energy storage system converts the excess electric energy into cold energy for energy storage, that is, surplus power cold storage. When the cold storage system has no spare capacity, the excess electric energy is transmitted to the power supply unit of the power grid through the grid connection point, that is, the surplus power is connected to the grid. When the current power generation power is equal to the current load power, that is, Ps=Pt, the current power generation power is used for the load of the microgrid, that is, the load completely absorbs photovoltaics. When the current power generation power is less than the current load power, that is, Ps<Pt, it is determined whether the current power generation power is less than the difference between the current load power and the power of the air-conditioning unit. When the current power generation power is less than the current load power, and the current power generation power is less than the difference between the current load power and the power of the air-conditioning unit, it is determined whether there is residual energy in the cold storage system. If there is residual energy in the cold storage system, the cold storage system is controlled to operate, that is, the cold energy of the cold storage system is called for cooling. If there is no residual energy in the cold storage system, the air-conditioning unit is controlled to operate, that is, cooling is performed by the air-conditioning unit. When the current power generation power is less than the current load power, and the current power generation power is greater than the difference between the current load power and the power of the air-conditioning unit, the air-conditioning unit is controlled to operate, that is, cooling is performed by the air-conditioning unit. Correspondingly, in winter, the energy storage system is a heat storage system, and its specific electricity consumption strategy can refer to the summer electricity consumption strategy, which will not be repeated here.

[0092] It should be noted that the above examples are only used to understand the present application and do not constitute a limitation on the present application and the power distribution method. More simple transformations based on this technical concept are all within the protection scope of the present application.

[0093] The present application provides a power distribution device, which includes: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the power distribution method in the above-mentioned embodiment one.

[0094] Reference below Figure 3 , which shows a schematic diagram of the structure of a power distribution device suitable for implementing the embodiment of the present application. The power distribution device in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Displays), PMPs (Portable Multimedia Players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 3 The power distribution equipment shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0095] like Figure 3As shown, the power distribution equipment may include a processing device 1001 (e.g., a central processing unit, a graphics processing unit, etc.), which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM: Read On ly Memory) 1002 or a program loaded from a storage device 1003 to a random access memory (RAM: Random Access Memory) 1004. Various programs and data required for the operation of the power distribution equipment are also stored in the RAM 1004. The processing device 1001, the ROM 1002, and the RAM 1004 are connected to each other via a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems may be connected to the I / O interface 1006: input devices 1007 including, for example, a touch screen, a touchpad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; output devices 1008 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 1003 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 1009. The communication device 1009 may allow the power distribution device to communicate with other devices wirelessly or by wire to exchange data. Although the power distribution device with various systems is shown in the figure, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems may be implemented or have alternatively.

[0096] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.

[0097] The power distribution equipment provided by the present application adopts the power distribution method in the above embodiment, which can solve the technical problem of the inability to avoid energy waste for excess electric energy. Compared with the related art, the beneficial effects of the power distribution equipment provided by the present application are the same as the beneficial effects of the power distribution method provided by the above embodiment, and the other technical features in the power distribution equipment are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.

[0098] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0099] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0100] The present application provides a computer-readable storage medium having computer-readable program instructions (ie, computer programs) stored thereon, wherein the computer-readable program instructions are used to execute the power distribution method in the above-mentioned embodiment.

[0101] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM: Erasable Programmab le Read On ly Memory or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM: CD-Read On ly Memory), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency: Radio Frequency), etc., or any suitable combination of the above.

[0102] The computer-readable storage medium may be included in the power distribution device; or may exist independently without being installed in the power distribution device.

[0103] The above-mentioned computer-readable storage medium carries one or more programs. When the above-mentioned one or more programs are executed by the power distribution equipment, the power distribution equipment: when the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, stores the excess electric energy of the microgrid into the energy storage system, so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage; when receiving the air-conditioning system start-up command, controls the operation of the energy storage system and / or the air-conditioning unit.

[0104] The computer program code for performing the operation of the present application can be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages, such as Java Small tale C++, and conventional procedural programming languages, such as "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).

[0105] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0106] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0107] The readable storage medium provided in the present application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned power distribution method, and can solve the technical problem of the unavoidable waste of energy for excess electric energy. Compared with the related art, the beneficial effects of the computer-readable storage medium provided in the present application are the same as the beneficial effects of the power distribution method provided in the above-mentioned embodiment, and will not be repeated here.

[0108] The present application also provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the steps of the power distribution method as described above are implemented.

[0109] The computer program product provided by the present application can solve the technical problem of the unavoidable waste of energy for excess electric energy. Compared with the related art, the beneficial effects of the computer program product provided by the present application are the same as the beneficial effects of the power distribution method provided by the above embodiment, which will not be repeated here.

[0110] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.

Claims

1. A power distribution method, characterized in that: The method comprises: When the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess electric energy of the microgrid is stored in the energy storage system, so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage; When an air-conditioning system start-up instruction is received, the energy storage system and / or the air-conditioning unit are controlled to operate.

2. The method according to claim 1, characterized in that When receiving the air conditioning system start-up instruction, the step of controlling the operation of the energy storage system and / or the air conditioning unit comprises: When receiving an air conditioning system start-up instruction, if the current power generation power of the renewable power supply unit of the microgrid is less than the current load power of the microgrid, and the current power generation power is greater than the difference between the current load power and the power of the air conditioning unit, the air conditioning unit is controlled to operate; In the case of receiving an air conditioning system start-up instruction, if the current power generation power of the renewable power supply unit of the microgrid is less than the current load power of the microgrid, and less than the difference between the current load power and the power of the air conditioning unit, then determining whether the energy storage system has surplus energy; If the energy storage system has surplus energy, controlling the energy storage system; If the energy storage system has no residual energy, the air conditioning unit is controlled to operate.

3. The method according to claim 1, characterized in that When receiving the air conditioning system start-up instruction, the step of controlling the operation of the energy storage system and / or the air conditioning unit comprises: In case of receiving an air conditioning system start-up instruction, if the current power generation power of the renewable power supply unit of the microgrid is zero, determining whether the air conditioning unit is in an operating state; If the air conditioning unit is not in operation, controlling the air conditioning unit to operate; If the air conditioning unit is in operation, determining whether the energy storage system has residual energy; If the energy storage system has surplus energy, the energy storage system is controlled to operate.

4. The method according to claim 1, characterized in that When the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess electric energy of the microgrid is stored in the energy storage system so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage, the method further includes: Determine whether the current period is in the off-peak electricity price period; If the current time period is not a valley electricity price period, then when the current power generation power of the renewable power supply unit of the microgrid is greater than the current load power of the microgrid, the excess electric energy of the microgrid is stored in the energy storage system, so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage.

5. The method according to claim 4, characterized in that The determining whether the current period is after the valley electricity price period, the method further comprises: If the current period is in the off-peak electricity price period, the electric energy sent by the grid power supply unit is stored in the energy storage system, so that the energy storage system converts the electric energy sent by the grid power supply unit into heat energy or cold energy for energy storage.

6. The method according to claim 1, characterized in that The step of storing the excess electric energy of the microgrid into an energy storage system so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage includes: If the current state of the energy storage system is a preset state, the excess electric energy is stored in the energy storage system so that the energy storage system converts the excess electric energy into heat energy or cold energy for energy storage; the preset state is a state in which the energy storage system is not fully charged; If the current state of the energy storage system is not a preset state, the excess electric energy is stored in a grid power supply unit.

7. The method according to any one of claims 1 to 6, characterized in that: The energy storage system is a cold and heat storage system.

8. A power distribution device, characterized in that: The device comprises: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program is configured to implement the steps of the power distribution method according to any one of claims 1 to 7.

9. A storage medium, characterized in that: The storage medium is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the power distribution method according to any one of claims 1 to 7 are implemented.

10. A computer program product, characterized in that The computer program product comprises a computer program, and when the computer program is executed by a processor, the steps of the power distribution method according to any one of claims 1 to 7 are implemented.