Spraying equipment

By designing spray equipment that includes spray painting, drying and cleaning components, the problems of paint loss and cleaning difficulties in existing equipment are solved, efficient spraying and drying of workpieces are achieved, and production efficiency and quality are improved.

CN118925996APending Publication Date: 2024-11-12ZHEJIANG JINGSHENG FILM TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411043204.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the use of existing valve paint spraying equipment, the paint loss is large and difficult to clean, and the spraying and drying cannot be completed at the same time, resulting in low production efficiency and poor paint effect.

Method used

A spraying equipment including a processing frame, a conveyor belt, a painting assembly, a drying assembly and a cleaning assembly are designed. A nozzle is installed on the conveyor belt for spraying, and a dryer is used to dry the coating and clean the coating on the conveyor belt through a scraper.

Benefits of technology

The spraying and drying of workpieces is realized, production efficiency and operation quality are improved, and the loss of paint and the difficulty of cleaning are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118925996A_ABST
    Figure CN118925996A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of workpiece coating processing, and provides spraying equipment which is characterized in that a conveying belt is mounted on a processing frame, and the conveying belt transports along a first direction; the paint spraying assembly and the machining frame are relatively fixed in the first direction, and the paint spraying assembly comprises a nozzle facing the conveying belt. The drying assembly and the processing frame are relatively fixed in the first direction and located on the downstream of the paint spraying assembly, the drying assembly comprises a dryer, and an air outlet of the dryer faces the conveying belt. The cleaning assembly is installed on the processing frame and located on the downstream of the drying assembly, the cleaning assembly comprises a scraping plate, and the scraping plate can get close to or get away from the conveying belt in the second direction and is used for cleaning coating on the conveying belt; the second direction is perpendicular to the conveyor belt. Thus, the workpiece can be sprayed and dried, the coating on the conveying belt can be removed, and the production efficiency and the operation quality are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of workpiece coating processing, and in particular to a spraying device. Background Art

[0002] During use, valves are susceptible to chemical corrosion, seawater erosion, etc. Long-term use will cause rust on the valve surface, thus affecting its service life. Painting the valve can prevent corrosion, prevent oxidation and corrosion of the surface, slow down the rusting rate, and improve its anti-corrosion performance.

[0003] Chinese patent CN217017031U proposes a valve production paint spraying device, including a frame, a conveyor belt is provided on the surface of the frame, an induction generator is provided on the lower surface of the conveyor belt, a plurality of groups of insulating seats are equidistantly provided on the upper surface of the conveyor belt, a plug-in seat is provided on the upper surface of the insulating seat, a conductive ring is sleeved on the upper surface of the plug-in seat, the conductive ring is electrically connected to the induction generator, a spray box is provided in the middle of the upper surface of the frame, electrostatic spray guns are symmetrically provided on both sides of the inner wall of the spray box, and slide grooves are provided on the bottom of both sides of the spray box; the existing valve production paint spraying device solves the problem that the valve is directly sprayed by the spray gun during use, the paint loss is large, and when the spray gun sprays paint on both sides of the valve, the excess paint will be sprayed on the inner wall of the spray box and the surface of the spray gun, thereby forming a thicker paint layer on the inner wall of the spray box and the surface of the spray gun, which is very inconvenient to clean.

[0004] However, the above scheme cannot dry the paint on the surface of the gas equipment valve in time, and the staff needs to take it to another device for drying, resulting in low production efficiency of the gas equipment valve. It will also affect the effect of the paint spraying of the gas equipment valve and reduce the utilization efficiency of the paint spraying equipment for the gas equipment valve production.

[0005] Therefore, a spraying equipment is urgently needed to solve the above-mentioned technical problems. Summary of the invention

[0006] The purpose of the present invention is to provide a spraying device, which can complete spraying and drying of workpieces and can remove paint on a conveyor belt, thereby improving production efficiency and operation quality.

[0007] To achieve this object, the present invention adopts the following technical solutions:

[0008] Spraying equipment, including:

[0009] Processing framework;

[0010] A conveyor belt, the conveyor belt is installed on the processing frame, and the conveyor belt is transported along a first direction;

[0011] A paint spraying assembly, the paint spraying assembly and the processing frame are relatively fixed in the first direction, the paint spraying assembly comprises a nozzle, and the nozzle faces the conveyor belt;

[0012] A drying component, the drying component and the processing frame are relatively fixed in the first direction and are located downstream of the painting component, the drying component includes a dryer, and the air outlet of the dryer faces the conveyor belt;

[0013] A cleaning assembly, the cleaning assembly is mounted on the processing frame, the cleaning assembly is located downstream of the drying assembly, the cleaning assembly comprises a scraper, the scraper can approach or move away from the conveyor belt along a second direction, and is used to clean the paint on the conveyor belt;

[0014] The second direction is perpendicular to the conveyor belt.

[0015] As a preferred technical solution for the above-mentioned spraying equipment, the above-mentioned processing frame includes a base, a first support frame and a second support frame. The above-mentioned first support frame and the above-mentioned second support frame are respectively fixed to the above-mentioned base, the above-mentioned conveyor belt is installed on the above-mentioned base, the above-mentioned paint spraying assembly is installed on the above-mentioned first support frame, and the above-mentioned drying assembly is installed on the above-mentioned second support frame.

[0016] As a preferred technical solution of the above-mentioned spraying equipment, the above-mentioned paint spraying component and the above-mentioned drying component are both located above the above-mentioned conveyor belt, and the above-mentioned cleaning component is located below the above-mentioned conveyor belt.

[0017] As a preferred technical solution of the above-mentioned spraying equipment, the above-mentioned cleaning component also includes a recovery box, which is installed on the above-mentioned base and is located below the above-mentioned scraper.

[0018] As a preferred technical solution of the above-mentioned spraying equipment, the above-mentioned paint spraying assembly includes a turntable, which is rotatably connected to the above-mentioned first support frame, the rotation axis of the above-mentioned turntable is parallel to the above-mentioned second direction, and the above-mentioned nozzle is installed at an eccentric position of the above-mentioned turntable.

[0019] As a preferred technical solution of the above-mentioned spraying equipment, a plurality of the above-mentioned nozzles are provided, and the plurality of the above-mentioned nozzles are evenly arranged around the axis of the above-mentioned turntable.

[0020] As a preferred technical solution for the above-mentioned spraying equipment, the above-mentioned paint spraying assembly also includes a driver, a first transmission wheel, a second transmission wheel and a belt. The output end of the above-mentioned driver is coaxially transmitted with the above-mentioned first transmission wheel. The above-mentioned first transmission wheel is rotatably connected with the above-mentioned second support frame. The above-mentioned first transmission wheel and the above-mentioned second transmission wheel are driven by the above-mentioned belt, and the above-mentioned second transmission wheel is coaxially fixed with the above-mentioned turntable through a transmission shaft.

[0021] As a preferred technical solution of the above-mentioned spraying equipment, a fixing frame is fixed to the side of the above-mentioned first support frame in the above-mentioned second direction facing away from the above-mentioned conveyor belt, and the above-mentioned fixing frame includes a first fixing plate, and the above-mentioned driver is fixed to the above-mentioned first fixing plate.

[0022] As a preferred technical solution of the above-mentioned spraying equipment, the above-mentioned drying component also includes a filter screen, and the above-mentioned filter screen is installed at the output end of the above-mentioned dryer.

[0023] As a preferred technical solution of the above-mentioned spraying equipment, the above-mentioned cleaning assembly further includes a guide rail and a slider, the above-mentioned guide rail is fixed to the above-mentioned base, the above-mentioned slider can slide on the above-mentioned guide rail along the above-mentioned second direction, and the above-mentioned scraper is fixed to one side of the above-mentioned slider in the third direction;

[0024] The first direction, the second direction and the third direction are perpendicular to each other.

[0025] Beneficial effects of the present invention:

[0026] The present application provides a spraying device, including a processing frame, a conveyor belt, a paint spraying assembly, a drying assembly and a cleaning assembly. The conveyor belt is installed on the processing frame, and the conveyor belt is transported along a first direction; the paint spraying assembly and the processing frame are relatively fixed in the first direction, and the paint spraying assembly includes a nozzle, and the nozzle faces the conveyor belt; the drying assembly and the processing frame are relatively fixed in the first direction and are located downstream of the paint spraying assembly, and the drying assembly includes a dryer, and the air outlet of the dryer faces the conveyor belt; the cleaning assembly is installed on the processing frame, and the cleaning assembly is located downstream of the drying assembly. The cleaning assembly includes a scraper, and the scraper can approach or move away from the conveyor belt along a second direction, and is used to clean the paint on the conveyor belt; the second direction is perpendicular to the conveyor belt.

[0027] Specifically, the conveyor belt includes a loading position and a unloading position spaced apart in a first direction. The workpiece is placed on the conveyor belt from the loading position. The conveyor belt carries the workpiece along the first direction through a paint spraying assembly, a drying assembly, an unloading position and a cleaning assembly in sequence. When the workpiece passes through the paint spraying assembly, the paint spraying assembly sprays paint from its nozzle to the workpiece, and the coverage area of ​​the paint is larger than the area of ​​the workpiece. In this way, part of the paint covers the surface of the workpiece, and the other part of the paint falls on the conveyor belt. The conveyor belt carries the painted workpiece to the bottom of the drying assembly, the dryer is started, and a hot air flow is blown out from its air outlet, so that the paint covering the surface of the workpiece is quickly dried, and the conveyor belt carries the dried workpiece to the unloading position. The workpiece moves out of the conveyor belt. When the conveyor belt with paint moves to the cleaning assembly, the scraper of the cleaning assembly is close to the conveyor belt, and the conveyor belt continues to move. The relative movement of the transmission belt and the scraper enables the scraper to peel off the paint on the surface of the conveyor belt. Furthermore, in order to reduce the resistance of the conveyor belt when transporting workpieces, the scraper can move along the second direction. Generally, the scraper is located on the side away from the conveyor belt. When the conveyor belt with paint is close to the cleaning component, the scraper is close to the conveyor belt and is in close contact with the conveyor belt.

[0028] The spraying equipment completes spraying and drying of the workpiece and can remove the paint on the conveyor belt, thus improving production efficiency and work quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments of the present invention. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the contents of the embodiments of the present invention and these drawings without paying any creative work.

[0030] Figure 1 is a schematic structural diagram of a spraying device provided by an embodiment of the present invention;

[0031] Figure 2 is a schematic structural diagram of a paint spraying assembly provided in an embodiment of the present invention;

[0032] Figure 3 is a schematic structural diagram of a drying component provided by an embodiment of the present invention;

[0033] Figure 4 It is a schematic diagram of the structure of a cleaning component provided in an embodiment of the present invention.

[0034] In the figure:

[0035] X, first direction; Y, second direction; Z, third direction;

[0036] 10. Processing frame; 11. Base; 12. First support frame; 121. First support rod; 122. Second support rod; 123. First connecting rod; 13. Second support frame; 131. Third support rod; 132. Fourth support rod; 133. Second connecting rod; 14. Fixing frame; 141. First fixing plate; 142. Second fixing plate;

[0037] 20. Conveyor belt;

[0038] 30. Paint spraying assembly; 31. Nozzle; 32. Turntable; 33. Driver; 34. First transmission wheel; 35. Second transmission wheel; 36. Belt; 37. Adjustment hose; 38. Bearing; 39. Transmission shaft;

[0039] 40. Drying component; 41. Dryer; 42. Filter;

[0040] 50. Cleaning assembly; 51. Scraper; 52. Guide rail; 53. Slider; 54. Recovery box. DETAILED DESCRIPTION

[0041] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0042] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0043] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0044] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0045] like Figures 1 to 4 As shown, the present application provides a spraying device, including a processing frame 10, a conveyor belt 20, a paint spraying assembly 30, a drying assembly 40 and a cleaning assembly 50. Among them, the conveyor belt 20 is installed on the processing frame 10, and the conveyor belt 20 is transported along the first direction X; the paint spraying assembly 30 is relatively fixed with the processing frame 10 in the first direction X, and the paint spraying assembly 30 includes a nozzle 31, and the nozzle 31 faces the conveyor belt 20; the drying assembly 40 is relatively fixed with the processing frame 10 in the first direction X and is located downstream of the paint spraying assembly 30, and the drying assembly 40 includes a dryer 41, and the air outlet of the dryer 41 faces the conveyor belt 20; the cleaning assembly 50 is installed on the processing frame 10, and the cleaning assembly 50 is located downstream of the drying assembly 40. The cleaning assembly 50 includes a scraper 51, and the scraper 51 can approach or move away from the conveyor belt 20 along the second direction Y, and is used to clean the paint on the conveyor belt 20; the second direction Y is perpendicular to the conveyor belt 20.

[0046] Specifically, the conveyor belt 20 includes a loading position and a unloading position spaced apart in the first direction X. The workpiece is placed on the conveyor belt 20 from the loading position. The conveyor belt 20 carries the workpiece along the first direction X and passes through the paint spraying assembly 30, the drying assembly 40, the unloading position and the cleaning assembly 50 in sequence. When the workpiece passes through the paint spraying assembly 30, the paint spraying assembly 30 sprays paint from its nozzle 31 to the workpiece, and the coverage area of ​​the paint is larger than the area of ​​the workpiece. In this way, part of the paint covers the surface of the workpiece, and the other part of the paint falls on the conveyor belt 20. The conveyor belt 20 The workpiece that has been sprayed arrives under the drying component 40, the dryer 41 is started, and a hot air flow is blown out from its air outlet to quickly dry the paint covering the surface of the workpiece, and the conveyor belt 20 carries the dried workpiece to the unloading position. The workpiece moves out of the conveyor belt 20, and when the conveyor belt 20 with paint moves to the cleaning component 50, the scraper 51 of the cleaning component 50 is close to the conveyor belt 20, and the conveyor belt 20 continues to move. The relative movement between the transmission belt and the scraper 51 enables the scraper 51 to peel off the paint on the surface of the conveyor belt 20.

[0047] Furthermore, in order to reduce the resistance of the conveyor belt 20 when transporting workpieces, the scraper 51 can move along the second direction Y. Generally, the scraper 51 is located on the side away from the conveyor belt 20. When the conveyor belt 20 with paint is close to the cleaning component 50, the scraper 51 is close to the conveyor belt 20 and is in close contact with the conveyor belt 20.

[0048] Optionally, the processing frame 10 includes a base 11, a first support frame 12 and a second support frame 13, the first support frame 12 and the second support frame 13 are respectively fixed to the base 11, the conveyor belt 20 is installed on the base 11, the paint spraying assembly 30 is installed on the first support frame 12, and the drying assembly 40 is installed on the second support frame 13.

[0049] Specifically, the first support frame 12 and the second support frame 13 are both gantry structures. The first support frame 12 includes a first support rod 121, a second support rod 122 and a first connecting rod 123. The first connecting rod 123 and the conveyor belt 20 are spaced apart in the second direction Y. The first connecting rod 123 is fixed to the base 11 through the first support rod 121 and the second support rod 122. The conveyor belt 20 passes between the first support rod 121 and the second support rod 122, and the paint spraying assembly 30 is installed on the first connecting rod 123; the second support frame 13 includes a third support rod 131, a fourth support rod 132 and a second connecting rod 133. The second connecting rod 133 and the conveyor belt 20 are spaced apart in the second direction Y. The second connecting rod 133 is fixed to the base 11 through the third support rod 131 and the fourth support rod 132. The conveyor belt 20 passes between the third support rod 131 and the fourth support plate, and the drying assembly 40 is installed on the second connecting rod 133. In this way, the paint spraying assembly 30 and the drying assembly 40 are installed on the processing frame 10, so that the relative positions between them and the conveyor belt 20 in the second direction Y and the first direction X can be kept fixed.

[0050] Optionally, the paint spraying assembly 30 and the drying assembly 40 are both located above the conveyor belt 20, and the cleaning assembly 50 is located below the conveyor belt 20. Specifically, the base 11 is provided with a U-shaped groove, the depth direction of the U-shaped groove is parallel to the second direction Y, the length direction of the U-shaped groove is parallel to the first direction X, and the paint is transmitted to the opening installed in the U-shaped groove, and the cleaning assembly 50 is installed in the U-shaped groove. In this way, since the paint always has a tendency to flow downward under the action of gravity, the paint spraying assembly 30 is arranged above the conveyor belt 20, which makes it easy for the paint to adhere to the workpiece. Similarly, the cleaning assembly 50 is installed below the conveyor belt 20. When the scraper 51 scrapes the paint off the conveyor belt 20, the paint automatically falls off from the conveyor belt 20 under the action of gravity.

[0051] Optionally, the cleaning assembly 50 further includes a recovery box, which is mounted on the base 11 and is located below the scraper 51. The recovery box is used to receive the paint dropped from the conveyor belt 20.

[0052] Optionally, the paint spraying assembly 30 includes a turntable 32, which is rotatably connected to the first support frame 12, the rotation axis of the turntable 32 is parallel to the second direction Y, and the nozzle 31 is installed at an eccentric position of the turntable 32. Specifically, the turntable 32 is rotatably connected to the first connecting rod 123 of the first support frame 12 through a transmission shaft 39, and the turntable 32 is concentrically arranged with the transmission shaft 39, that is, the rotation axis of the turntable 32 is the axis of the turntable 32 itself, and the nozzle 31 is installed at an eccentric position. When the turntable 32 rotates relative to the first support frame 12, the nozzle 31 rotates around the axis of the turntable 32, so that the spraying area of ​​the nozzle 31 can be expanded.

[0053] Optionally, multiple nozzles 31 are provided, and the multiple nozzles 31 are evenly arranged around the axis of the rotating disk 32. In this way, by providing multiple nozzles 31, the multiple nozzles 31 can work at the same time, improving the work efficiency and quality; or one nozzle 31 can be selected for work, and the other nozzles 31 are designed as redundancy. When a blockage occurs to an individual nozzle 31, the other nozzles 31 can immediately replace it for spraying.

[0054] Furthermore, the nozzle 31 is connected to a barrel containing paint via an adjustable hose 37 .

[0055] Optionally, the paint spraying assembly 30 further includes a driver 33, a first transmission wheel 34, a second transmission wheel 35 and a belt 36, wherein the output end of the driver 33 is coaxially driven with the first transmission wheel 34, the first transmission wheel 34 is rotatably connected with the second support frame 13, the first transmission wheel 34 and the second transmission wheel 35 are driven by the belt 36, and the second transmission wheel 35 is coaxially fixed with the turntable 32 by the transmission shaft 39. Specifically, the driver 33 is a motor, and its model is ZR SHJDJ.

[0056] Optionally, a fixing frame 14 is fixed to the first support frame 12 on the side facing away from the conveyor belt 20 in the second direction Y, and the fixing frame 14 includes a first fixing plate 141, and the driver 33 is fixed to the first fixing plate 141. Specifically, a fixing frame 14 is installed on the side of the first connecting rod 123 of the first support frame 12 facing away from the conveyor belt 20, and the fixing frame 14 includes a first fixing plate 141 and a second fixing plate 142, and the first fixing plate 141 and the second fixing plate 142 are arranged in an L shape, the first fixing plate 141 is arranged at intervals from the first connecting rod 123 in the second direction Y and is connected to the first connecting rod 123 through the second fixing plate 142, the first transmission wheel 34 and the second transmission wheel 35 are rotatably connected to the first connecting rod 123, the axis of the first transmission wheel 34 and the axis of the second transmission wheel 35 are both parallel to the second direction Y, the bottom of the driver 33 is fixed to the first fixing plate 141, and the output end of the driver 33 is coaxially arranged with the first transmission wheel 34.

[0057] Furthermore, the transmission shaft 39 passes through the first connecting rod 123 and is connected to the first connecting rod 123 through a bearing 38. The outer ring of the bearing 38 is fixed to the first connecting rod 123, and the inner ring of the bearing 38 is fixed to the transmission shaft 39. The second transmission wheel 35 and the turntable 32 are respectively located on both sides of the first connecting rod 123.

[0058] Generally, the drying component 40 draws air from the outside and heats the air through the heating mechanism inside the drying component 40 to form a hot air flow. In this process, in order to prevent impurities in the air from being adsorbed on the workpiece along with the air flow and mixed with the paint on the surface of the workpiece, in this embodiment, the drying component 40 also includes a filter 42, which is installed at the output end of the dryer 41. The air flow output by the dryer is filtered by the filter 42.

[0059] Optionally, the cleaning assembly 50 also includes a guide rail 52 and a slider 53, the guide rail 52 is fixed to the base 11, the slider 53 can slide on the guide rail 52 along the second direction Y, and a scraper 51 is fixed on one side of the slider 53 in the third direction Z; the first direction X, the second direction Y and the third direction Z are perpendicular to each other.

[0060] Specifically, the guide rail 52 includes a rack, and the slider 53 is rotatably connected to a gear, and the gear is meshed with the rack.

[0061] In other embodiments, the guide rail 52 includes a screw, and the slider 53 is threadedly connected to the screw and does not rotate around the axis of the screw. In this way, when the screw rotates, the slider 53 can move along the axis of the screw, and the axis of the screw is parallel to the second direction Y.

[0062] In addition, the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims

1. Spraying equipment, characterized in that, include: Processing frame (10); a conveyor belt (20), the conveyor belt (20) being mounted on the processing frame (10), the conveyor belt (20) transporting along a first direction (X); a paint spraying assembly (30), the paint spraying assembly (30) and the processing frame (10) being relatively fixed in the first direction (X), the paint spraying assembly (30) comprising a nozzle (31), and the nozzle (31) facing the conveyor belt (20); a drying component (40), the drying component (40) and the processing frame (10) being relatively fixed in the first direction (X) and being located downstream of the painting component (30), the drying component (40) comprising a drying machine (41), and an air outlet of the drying machine (41) facing the conveyor belt (20); a cleaning assembly (50), the cleaning assembly (50) being mounted on the processing frame (10), the cleaning assembly (50) being located downstream of the drying assembly (40), the cleaning assembly (50) comprising a scraper (51), the scraper (51) being able to approach or move away from the conveyor belt (20) along a second direction (Y), and being used for cleaning the paint on the conveyor belt (20); The second direction (Y) is perpendicular to the conveyor belt (20).

2. The spraying equipment according to claim 1, characterized in that: The processing frame (10) comprises a base (11), a first support frame (12) and a second support frame (13); the first support frame (12) and the second support frame (13) are respectively fixed to the base (11); the conveyor belt (20) is installed on the base (11); the paint spraying assembly (30) is installed on the first support frame (12); and the drying assembly (40) is installed on the second support frame (13).

3. The spraying equipment according to claim 2, characterized in that: The paint spraying assembly (30) and the drying assembly (40) are both located above the conveyor belt (20), and the cleaning assembly (50) is located below the conveyor belt (20).

4. The spraying equipment according to claim 3, characterized in that: The cleaning assembly (50) further comprises a recovery box, which is mounted on the base (11) and is located below the scraper (51).

5. The spraying equipment according to claim 2, characterized in that: The paint spraying assembly (30) comprises a turntable (32), the turntable (32) is rotatably connected to the first support frame (12), the rotation axis of the turntable (32) is parallel to the second direction (Y), and the nozzle (31) is installed at an eccentric position of the turntable (32).

6. The spraying equipment according to claim 5, characterized in that: A plurality of the nozzles (31) are provided, and the plurality of the nozzles (31) are evenly arranged around the axis of the rotating disk (32).

7. The spraying equipment according to claim 5, characterized in that: The paint spraying assembly (30) further comprises a driver (33), a first transmission wheel (34), a second transmission wheel (35) and a belt (36); the output end of the driver (33) is coaxially driven with the first transmission wheel (34); the first transmission wheel (34) is rotationally connected with the second support frame (13); the first transmission wheel (34) and the second transmission wheel (35) are driven via the belt (36); and the second transmission wheel (35) is coaxially fixed with the turntable (32) via a transmission shaft (39).

8. The spraying equipment according to claim 7, characterized in that: A fixing frame (14) is fixed to the first supporting frame (12) on the side facing away from the conveyor belt (20) in the second direction (Y), and the fixing frame (14) includes a first fixing plate (141), and the driver (33) is fixed to the first fixing plate (141).

9. The spraying equipment according to claim 2, characterized in that: The drying component (40) further comprises a filter screen (42), and the filter screen (42) is installed at the output end of the drying machine (41).

10. The spraying equipment according to claim 2, characterized in that: The cleaning assembly (50) further comprises a guide rail (52) and a slider (53), wherein the guide rail (52) is fixed to the base (11), the slider (53) is capable of sliding on the guide rail (52) along the second direction (Y), and the scraper (51) is fixed to one side of the slider (53) in the third direction (Z); The first direction (X), the second direction (Y) and the third direction (Z) are perpendicular to each other.