Tower top structure welding tool for tower crane
By designing the tower top structure welding tooling for tower cranes, using the combination of bottom tire frame, frame and positioning support, the problems of inconvenience and high cost of tower top welding are solved, and efficient and accurate tower top welding effect is achieved. On top of various tower models.
Patent Information
- Application Number
- CN202410800964.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2024-11-12
AI Technical Summary
The assembly and welding of tower crane top structure is inconvenient, the dimensional accuracy is difficult to guarantee, and the existing tooling is low in applicability, occupy more sites and high production costs.
A tower top structure welding tool for tower cranes was designed, including the bottom tire frame, a detachable frame and positioning support. The welding process of the tower top is simplified by assisting positioning and welding through pin shafts, reducing space occupation and Production cost.
It realizes efficient, accurate and economical tower top welding, and is suitable for tower tops of different models, reducing the types of tooling and site occupation, and improving operational convenience and positioning accuracy.
Smart Images

Figure CN118926801A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tower cranes, and in particular to a tower top structure welding tool for tower cranes. Background Art
[0002] The tower top is a very important component of the tower crane (referred to as tower crane). The tower top bears the upper load transmitted from the boom rope of the tower crane and the boom rope of the balance arm, so that the tower crane boom and the balance arm remain horizontal, and transmits it to the tower structure through structural components such as slewing bearings, upper and lower supports.
[0003] The top of a tower crane is mostly a conical structure, which is inconvenient to assemble and weld, and the dimensional accuracy is not easy to ensure. Generally, tooling is used for positioning assistance. Due to the different lengths of the top components of different tower cranes, each product needs a tooling for the top of the tower, which has low applicability, occupies a lot of space, and has high production costs. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a tower top structure welding tool for a tower crane, which is used to weld the tower top formed after riveting and welding.
[0005] The present invention adopts the following technical solutions:
[0006] A tower top structure welding tool for a tower crane comprises: a bottom frame, which is formed by welding a plurality of horizontal square steel pipes and a vertical square steel pipe, and a mounting plate is provided on the surface; a first frame, which is detachably arranged on the horizontal square steel pipe on one side of the upper surface of the bottom frame by bolts; a second frame, which is detachably arranged on the horizontal square steel pipe on the other side of the upper surface of the bottom frame by bolts; a first positioning support, which is arranged on the upper surface of the second frame and has first connecting holes on both sides for connecting a tower head part; two second positioning supports, which are symmetrically arranged on the upper surface of the first frame and have second connecting holes on both sides for connecting a tower top connecting ear plate; four third positioning supports, which are arranged on the mounting plate and have third connecting holes on both sides for fixing the bottom ear plate of the tower top; various components of the tower top after riveting and welding are connected to the connecting holes of each positioning support by pins and then welded, and the entire tower top is auxiliary positioned by one tool, and the structure is simple and the space occupied is small.
[0007] Preferably, the bottom tire frame is welded by 4 horizontal square steel tubes and 5 vertical square steel tubes, the upper end face of the bottom tire frame is provided with 12 first square plates, the lower end face of the bottom tire frame is provided with 10 second square plates, and the upper end face at the junction of the vertical square steel tubes and the horizontal square steel tubes is provided with 4 steel plates, and the surface of the steel plates is provided with mounting holes.
[0008] Preferably, the vertical square steel tubes include a first vertical square steel tube, a second vertical square steel tube, a third vertical square steel tube, a fourth vertical square steel tube and a fifth vertical square steel tube, grooves are provided on the surfaces of both sides of the second vertical square steel tube and the fourth vertical square steel tube, and steel plates are provided on the upper end faces of the junctions of the second vertical square steel tube and the fourth vertical square steel tube with the transverse square steel tubes.
[0009] Preferably, three reinforcing rib plates are provided between the steel plate and the transverse square steel tube.
[0010] Preferably, the first frame is welded by a first bottom beam, a second bottom beam and a plurality of first frame square steel pipes, six third-party plates are provided at both ends and in the middle of the lower surfaces of the first bottom beam and the second bottom beam, and a circular hole is provided at the center of the upper part of the second bottom beam; a panel is provided on one side of the top of the first frame, and symmetrical fourth connecting holes are provided on the panel.
[0011] Preferably, the second frame is welded by a third bottom beam, a fourth bottom beam, a plurality of second frame square steel tubes, diagonal webs and H-shaped steels; fourth square plates are provided at both ends and in the middle of the lower surfaces of the third bottom beam and the fourth bottom beam; an H-plate is provided at the bottom of the H-shaped steel, the H-plate is located on the upper end surface of the square steel tube of the second frame, a fifth square plate is provided on the upper part of the H-shaped steel, and the fifth square plate is provided with symmetrical fifth connecting holes.
[0012] Preferably, the second frame square steel tube includes a second frame square steel tube A, a second frame square steel tube B, a second frame square steel tube C and a second frame square steel tube D, the second frame square steel tube A is connected between the third bottom beam and the fourth bottom beam, two second frame square steel tubes B are longitudinally arranged on the third bottom beam, the second frame square steel tube C is arranged between the two second frame square steel tubes B, the second frame square steel tube D and the diagonal web are arranged between the H-shaped steel and the second frame square steel tube C for limiting; one end of the three second frame square steel tubes D abuts against the two ends and the middle of the H-shaped steel, and the other ends respectively abut against the two second frame square steel tubes C and one side of the third bottom beam for limiting.
[0013] Preferably, the first positioning support includes a first support body and a first connecting hole located on the first support body, a first reinforcing rib plate is provided inside the first support body, and a first steel sleeve for fixing and supporting the first pin shaft is provided on the first connecting hole.
[0014] Preferably, the second positioning support includes a second support body and a second connecting hole located on the second support body, a second reinforcing rib plate is provided inside the second support body, and a second steel sleeve for fixing and supporting the second pin shaft is provided on the second connecting hole.
[0015] Preferably, the third positioning support includes a third support body and a third connecting hole located on the third support body, a third reinforcing rib plate is provided inside the third support body, and a third steel sleeve for fixing and supporting the third pin shaft is provided on the third connecting hole.
[0016] Compared with the prior art, the present invention has the following advantages:
[0017] 1. The present invention provides a tower top structure welding tool for a tower crane, which is used to weld the tower top formed after riveting and welding, and assists in positioning the entire tower top through one tool. The structure is simple and the space occupied is small.
[0018] 2. In the present invention, various structural designs are modular, and the two frames and three positioning supports are all detachable. Different positioning supports can be selected according to different types of tower tops. There is no need to make different types of tower top tooling, which reduces the space occupied by tooling and reduces production costs.
[0019] 3. In the present invention, when performing tower top welding operations, it is only necessary to put the workpiece into the tooling, fix the upper part of the workpiece on the first positioning support and the second positioning support on both sides, and the first positioning support and the second positioning support are close to the frame; the bottom of the tower top is fixed on the four third positioning supports on the bottom tire frame, and the pins are inserted into each connecting hole. The operation is convenient, the efficiency is improved, the structure is reliable and stable, the positioning accuracy is high, and it is economical and practical and suitable for wide promotion. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a front schematic diagram of the overall structure of the present invention;
[0021] Figure 2 It is a side schematic diagram of the overall structure of the present invention;
[0022] Figure 3 It is a schematic top view of the overall structure of the present invention;
[0023] Figure 4 A three-dimensional schematic diagram of the bottom tire frame of the present invention;
[0024] Figure 5 It is a three-dimensional schematic diagram of the first frame of the present invention;
[0025] Figure 6 It is a three-dimensional schematic diagram of the second frame of the present invention;
[0026] Figure 7 It is a three-dimensional schematic diagram of the first positioning support of the present invention;
[0027] Figure 8 It is a three-dimensional schematic diagram of the second positioning support of the present invention;
[0028] Fig. 9 It is a three-dimensional schematic diagram of the third positioning support of the present invention.
[0029] In the figure, the bottom tire frame 1, the horizontal square steel tube 1-1, the vertical square steel tube 1-2, the first vertical square steel tube 1-2-1, the second vertical square steel tube 1-2-2, the third vertical square steel tube 1-2-3, the fourth vertical square steel tube 1-2-4, the fifth vertical square steel tube 1-2-5, the mounting plate 1-3, the first square plate 1-4, the second square plate 1-5, the reinforcing rib plate 1-6, the first frame 2, the first bottom beam 2-1, the second bottom beam 2-2, the first frame square steel tube 2-3, the first frame square steel tube A2-3-1, the first frame square steel tube B2-3-2, the first frame square steel tube C2-3-3, the first frame square steel tube D2-3-4, the first frame square steel tube E2-3-5, the third plate 2-4, the panel 2-5, the fourth connecting hole 2-6, the second frame 3, the third bottom beam 3-1, the fourth bottom beam 3-2, The second frame square steel pipe 3-3, the second frame square steel pipe A3-3-1, the second frame square steel pipe B3-3-2, the second frame square steel pipe C3-3-3, the second frame square steel pipe D3-3-4, the diagonal web 3-4, the H-shaped steel 3-5, the fourth square plate 3-6, the H-plate 3-7, the fifth square plate 3-8, the fifth connecting hole 3-9, the first positioning support 4, the first connecting hole 4-1, the first support body 4-2, the first reinforcing rib plate 4-3, the first pin shaft 4-4, the first steel sleeve 4-5, the second positioning support 5, the second connecting hole 5-1, the second support body 5-2, the second reinforcing rib plate 5-3, the second pin shaft 5-4, the second steel sleeve 5-5, the third positioning support 6, the third connecting hole 6-1, the third support body 6-2, the third reinforcing rib plate 6-3, the third pin shaft 6-4, the third steel sleeve 6-5. DETAILED DESCRIPTION
[0030] In order to facilitate the understanding of the technical solution of the present invention, a detailed description is given below in conjunction with the accompanying drawings and specific embodiments.
[0031] Example 1
[0032] like Figure 1-3 As shown, a tower crane tower top structure welding tool comprises a bottom frame 1, a first frame 2, a second frame 3, a first positioning support 4, a second positioning support 5 and a third positioning support 6:
[0033] The bottom tire frame 1 is formed by welding a plurality of horizontal square steel tubes 1-1 and vertical square steel tubes 1-2, and a mounting plate 1-3 is provided on the surface;
[0034] Specifically, Figure 4As shown, the bottom tire frame 1 is welded by 4 horizontal square steel tubes 1-1 and 5 vertical square steel tubes 1-2, the 4 horizontal square steel tubes 1-1 are respectively arranged at the front and the rear, the front and the rear are horizontal square steel tubes 1-1 stacked in groups of two, and the 5 vertical square steel tubes 1-2 are located between the two groups of horizontal square steel tubes 1-1, and the vertical square steel tubes 1-2 are respectively the first vertical square steel tube 1-2-1, the second vertical square steel tube 1-2-2, the third vertical square steel tube 1-2-3, the fourth vertical square steel tube 1-2-4 and the fifth vertical square steel tube 1-2-5, the first vertical square steel tube 1-2-1, the second vertical square steel tube 1-2-2, the fourth vertical square steel tube 1-2-4 and the fifth vertical square steel tube 1-2-5 are all stacked in groups of two for bearing the frame, and the third vertical square steel tube 1-2-3 is a single one;
[0035] The upper end surface of the bottom tire frame 1 is provided with 12 first square plates 1-4, which are respectively arranged on the end of the horizontal square steel tube 1-1, the middle of the first vertical square steel tube 1-2-1, the middle of the fifth vertical square steel tube 1-2-5, the second vertical square steel tube 1-2-2 and the fourth vertical square steel tube 1-2-4;
[0036] The lower end surface of the bottom tire frame 1 is provided with 10 second square plates 1-5, which are arranged at the bottom of the transverse square steel tube 1-1;
[0037] The first square plate 1-4 and the second square plate 1-5 have the same size and specification and are welded to the bottom tire frame 1. The first square plate 1-4 and the second square plate 1-5 are provided with mounting holes on their surfaces to reduce the processing amount of the square steel tube and increase the centering degree of the tooling. If there are no first square plates 1-4 and second square plates 1-5, the upper and lower surfaces of the horizontal square steel tube 1-1 and the vertical square steel tube 1-2 need to be processed, which is a large workload.
[0038] Four steel plates 1-3 are provided on the upper end faces of the junctions of the second vertical square steel tube 1-2-2 and the fourth vertical square steel tube 1-2-4 with the transverse square steel tube 1-1, and mounting holes are provided on the surfaces of the steel plates 1-3. The first square plates 1-4 on the second vertical square steel tube 1-2-2 and the fourth vertical square steel tube 1-2-4 are located between the steel plates 1-3, and three reinforcing rib plates 1-6 are provided between the steel plates 1-3 and the transverse square steel tube 1-1; grooves are provided on the surfaces of both sides of the second vertical square steel tube 1-2-2 and the fourth vertical square steel tube 1-2-4 to facilitate the installation of bolts to fix the tire frame on the bottom tire frame.
[0039] The first frame 2 is detachably mounted on a transverse square steel pipe 1-1 on one side of the upper surface of the bottom tire frame 1 by means of bolts;
[0040] Specifically, Figure 5As shown, the first frame 2 is welded by a first bottom beam 2-1, a second bottom beam 2-2 and a plurality of first frame square steel pipes 2-3, the length of the first bottom beam 2-1 is greater than that of the second bottom beam 2-2, and third-party plates 2-4 are provided at both ends and in the middle of the lower surfaces of the first bottom beam 2-1 and the second bottom beam 2-2, and are connected to the bottom tire frame 1 through the third-party plates 2-4; inclined cutouts are provided at both ends of the first bottom beam 2-1 to facilitate installation and removal of bolts, and a round hole is provided at the center of the upper part of the second bottom beam 2-2; a panel 2-5 is provided on one side of the top of the first frame 2, and symmetrical fourth connecting holes 2-6 are provided on the panel 2-5;
[0041] The first frame square steel tubes 2-3 include 4 first frame square steel tubes A2-3-1, 2 first frame square steel tubes B2-3-2, 2 first frame square steel tubes C2-3-3, 2 first frame square steel tubes D2-3-4 and 2 first frame square steel tubes E2-3-5 arranged longitudinally, the 4 first frame square steel tubes A are arranged on the first bottom beam 2-1 and the second bottom beam 2-2, and the 2 first frame square steel tubes B are arranged on the first bottom beam 2-1 and the second bottom beam 2-2, two first frame square steel pipes C are arranged in the middle between the first frame square steel pipes A, two first frame square steel pipes D are arranged in the upper part between the first frame square steel pipes A, and two first frame square steel pipes E are respectively arranged between the two first frame square steel pipes C and the two first frame square steel pipes D. The first frame square steel pipe 2-3 cooperates with the first bottom beam 2-1 and the second bottom beam 2-2 to form the frame of the first frame 2;
[0042] The second frame 3 is detachably arranged on the transverse square steel pipe 1-1 on the other side of the upper surface of the bottom tire frame 1 by bolts;
[0043] Specifically, Figure 6 As shown, it is welded by a third bottom beam 3-1, a fourth bottom beam 3-2, a plurality of second frame square steel tubes 3-3, a diagonal web member 3-4 and an H-shaped steel 3-5; a fourth square plate 3-6 is provided at both ends and in the middle of the lower surface of the third bottom beam 3-1 and the fourth bottom beam 3-2, and a through hole is provided between the third bottom beam 3-1, the fourth bottom beam 3-2 and the fourth square plate 3-6, and the third bottom beam 3-1 and the fourth bottom beam 3-2 are connected to the bottom tire frame 1 through the fourth square plate 3-6; an H-plate 3-7 is provided at the bottom of the H-shaped steel 3-5, and the H-plate 3-7 is located on the upper end surface of the second frame square steel tube 3-3, and a fifth square plate 3-8 is provided on the upper part of the H-shaped steel 3-5, and the fifth square plate 3-8 is provided with a symmetrical fifth connecting hole 3-9.
[0044] The second frame square steel pipe 3-3 includes a second frame square steel pipe A3-3-1, a second frame square steel pipe B3-3-2, a second frame square steel pipe C3-3-3 and a second frame square steel pipe D3-3-4, the second frame square steel pipe A3-3-1 is connected between the third bottom beam 3-1 and the fourth bottom beam 3-2, two second frame square steel pipes B3-3-2 are longitudinally arranged on the third bottom beam 3-1, and the second frame square steel pipes C3-3-3 and D3-3-4 are longitudinally arranged on the third bottom beam 3-1. 3-3 is arranged between two second frame square steel pipes B3-3-2, and the second frame square steel pipe D3-3-4 and the diagonal web bar 3-4 are arranged between the H-shaped steel 3-5 and the second frame square steel pipe C3-3-3 for limiting. One end of the three second frame square steel pipes D3-3-4 abuts against the two ends and the middle of the H-shaped steel 3-5, and the other end respectively abuts against the two second frame square steel pipes C3-3-3 and one side of the third bottom beam 3-1 for limiting.
[0045] The first positioning support 4 is arranged on the upper surface of the second frame 3, and has first connecting holes 4-1 on both sides for connecting the tower head part;
[0046] Specifically, Figure 7 As shown, the first support body 4-2 and the first connecting hole 4-1 located on the first support body 4-2, the first support body 4-2 is provided with a first reinforcing rib plate 4-3 inside, and the first connecting hole 4-1 is provided with a first steel sleeve 4-5 for fixing and supporting the first pin shaft 4-4;
[0047] Two second positioning supports 5 are symmetrically arranged on the upper surface of the first frame 2, and have second connecting holes 5-1 on both sides for connecting the tower top connecting ear plates;
[0048] Specifically, Figure 8 As shown, the second positioning support 5 includes a second support body 5-2 and a second connecting hole 5-1 located on the second support body 5-2, a second reinforcing rib plate 5-3 is provided inside the second support body 5-2, and a second steel sleeve 5-5 is provided on the second connecting hole 5-1 to fix and support the second pin shaft 5-4.
[0049] Four third positioning supports 6 are arranged on the mounting plate 1-3, and third connecting holes 6-1 are arranged on both sides for fixing the ear plates at the bottom of the tower top;
[0050] Specifically, Fig. 9 As shown, the third positioning support 6 includes a third support body 6-2 and a third connecting hole 6-1 located on the third support body 6-2, a third reinforcing rib plate 6-3 is provided inside the third support body 6-2, and a third steel sleeve 6-5 for fixing and supporting the third pin shaft 6-4 is provided on the third connecting hole 6-1.
[0051] The components of the tower top after riveting and welding are connected to the connection holes of each positioning support through pins and then welded.
[0052] When assembling and welding the tower top structure, the ear plates at the bottom of the tower top are respectively connected to the four groups of third positioning supports 6, the connecting ear plates at the tower top are connected to the two groups of second positioning supports 5, and the tower head part is connected to the first positioning support 4. The corresponding pins are installed in the connecting holes of the above three positioning supports to fix them before assembling and welding. The connecting holes of each positioning support are finely processed and have high positioning accuracy. After welding is completed, each pin is removed and the tower top is lifted out by a crane. This tooling is convenient for disassembly, simple to operate, reliable in structure, and has high accuracy, thereby ensuring the welding size of the tower top.
[0053] In this embodiment, in addition to being connected and fixed to the tower top, the third positioning support 6 also abuts against both sides of the first frame 2 and the second frame 3 to limit them, thereby preventing the tower top from being laterally shifted due to vibration during welding and ensuring operation accuracy.
[0054] The above are only preferred embodiments of the present invention. The protection scope of the present invention shall be based on the scope defined by the claims. Several improvements and modifications made by those skilled in the art without departing from the spirit and scope of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A tower crane tower top structure welding tool, It is characterized in that include: The bottom tire frame (1) is formed by welding a plurality of horizontal square steel pipes (1-1) and vertical square steel pipes (1-2), and a mounting plate (1-3) is provided on the surface; A first frame (2) is detachably arranged on a transverse square steel pipe (1-1) on one side of the upper surface of the bottom tire frame (1) by means of bolts; The second frame (3) is detachably arranged on the transverse square steel pipe (1-1) on the other side of the upper surface of the bottom tire frame (1) by means of bolts; A first positioning support (4) is arranged on the upper surface of the second frame (3) and has first connecting holes (4-1) on both sides for connecting to the tower head part; Two second positioning supports (5) are symmetrically arranged on the upper surface of the first frame (2), and have second connection holes (5-1) on both sides for connecting to the tower top connection ear plates; Four third positioning supports (6) are arranged on the mounting plate (1-3) and are provided with third connecting holes (6-1) on both sides for fixing the ear plates at the bottom of the tower top; The components of the tower top after riveting and welding are connected to the connection holes of each positioning support through pins and then welded.
2. A tower crane tower top structure welding tool according to claim 1, It is characterized in that The bottom tire frame (1) is welded from four horizontal square steel tubes (1-1) and five vertical square steel tubes (1-2); the upper end surface of the bottom tire frame (1) is provided with 12 first square plates (1-4); the lower end surface of the bottom tire frame (1) is provided with 10 second square plates (1-5); the upper end surface at the junction of the vertical square steel tube (1-2) and the horizontal square steel tube (1-1) is provided with four steel plates (1-3); and the surface of the steel plates (1-3) is provided with mounting holes.
3. A tower crane tower top structure welding tool according to claim 2, It is characterized in that The vertical square steel tube (1-2) comprises a first vertical square steel tube (1-2-1), a second vertical square steel tube (1-2-2), a third vertical square steel tube (1-2-3), a fourth vertical square steel tube (1-2-4) and a fifth vertical square steel tube (1-2-5); grooves are provided on the surfaces of both sides of the second vertical square steel tube (1-2-2) and the fourth vertical square steel tube (1-2-4); and a steel plate (1-3) is provided on the upper end surface of the junction between the second vertical square steel tube (1-2-2) and the fourth vertical square steel tube (1-2-4) and the transverse square steel tube (1-1).
4. The tower crane tower top structure welding tool according to claim 1, It is characterized in that Three reinforcing rib plates (1-6) are arranged between the steel plate (1-3) and the transverse square steel tube (1-1).
5. The tower crane tower top structure welding tool according to claim 1, It is characterized in that The first frame (2) is welded from a first bottom beam (2-1), a second bottom beam (2-2) and a plurality of first frame square steel pipes (2-3); six third-party plates (2-4) are provided at both ends and in the middle of the lower surfaces of the first bottom beam (2-1) and the second bottom beam (2-2); a circular hole is provided at the center of the upper part of the second bottom beam (2-2); a panel (2-5) is provided on one side of the top of the first frame (2); and symmetrical fourth connection holes (2-6) are provided on the panel (2-5).
6. The tower crane tower top structure welding tool according to claim 1, It is characterized in that The second frame (3) is welded by a third bottom beam (3-1), a fourth bottom beam (3-2), a plurality of second frame square steel tubes (3-3), diagonal web bars (3-4) and H-shaped steel (3-5); fourth square plates (3-6) are provided at both ends and in the middle of the lower surfaces of the third bottom beam (3-1) and the fourth bottom beam (3-2); an H plate (3-7) is provided at the bottom of the H-shaped steel (3-5), the H plate (3-7) is located on the upper end surface of the second frame square steel tube (3-3), and a fifth square plate (3-8) is provided on the upper part of the H-shaped steel (3-5), and the fifth square plate (3-8) is provided with symmetrical fifth connecting holes (3-9).
7. A tower crane tower top structure welding tool according to claim 6, It is characterized in that The second frame square steel pipe (3-3) comprises a second frame square steel pipe A (3-3-1), a second frame square steel pipe B (3-3-2), a second frame square steel pipe C (3-3-3) and a second frame square steel pipe D (3-3-4), wherein the second frame square steel pipe A (3-3-1) is connected between the third bottom beam (3-1) and the fourth bottom beam (3-2), two second frame square steel pipes B (3-3-2) are longitudinally arranged on the third bottom beam (3-1), and the second frame square steel pipe C (3-3-3) is connected to the fourth bottom beam (3-2). -3-3) is arranged between two second frame square steel pipes B (3-3-2), and the second frame square steel pipe D (3-3-4) and the diagonal web bar (3-4) are arranged between the H-shaped steel (3-5) and the second frame square steel pipe C (3-3-3) for limiting; one end of the three second frame square steel pipes D (3-3-4) is against the two ends and the middle of the H-shaped steel (3-5), and the other end is respectively against the two second frame square steel pipes C (3-3-3) and one side of the third bottom beam (3-1) for limiting.
8. The tower crane tower top structure welding tool according to claim 1, It is characterized in that The first positioning support (4) comprises a first support body (4-2) and a first connecting hole (4-1) located on the first support body (4-2); a first reinforcing rib plate (4-3) is provided inside the first support body (4-2); and a first steel sleeve (4-5) for fixing and supporting a first pin shaft (4-4) is provided on the first connecting hole (4-1).
9. The tower crane tower top structure welding tool according to claim 1, It is characterized in that The second positioning support (5) comprises a second support body (5-2) and a second connecting hole (5-1) located on the second support body (5-2); a second reinforcing rib plate (5-3) is provided inside the second support body (5-2); and a second steel sleeve (5-5) for fixing and supporting a second pin shaft (5-4) is provided on the second connecting hole (5-1).
10. The tower top structure welding tool for a tower crane according to claim 1, It is characterized in that The third positioning support (6) comprises a third support body (6-2) and a third connecting hole (6-1) located on the third support body (6-2); a third reinforcing rib plate (6-3) is provided inside the third support body (6-2); and a third steel sleeve (6-5) for fixing and supporting a third pin shaft (6-4) is provided on the third connecting hole (6-1).