Arched beam type hoisting equipment as well as mounting method and using method thereof

Through the design of arch beam lifting equipment, the combined structure of arch frame and walking frame and the concrete conveying system are used to solve the problem of low concrete pouring and lifting efficiency of hydropower station dams, and realize efficient concrete conveying and lifting, which is suitable for Large complex construction area.

CN118929432APending Publication Date: 2024-11-12CHINA THREE GORGES PROJECTS DEV CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411088222.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The concrete pouring and lifting of hydropower dams is inefficient, and the existing cable and tower machines are restricted due to the lifting weight limit, resulting in limited project progress.

Method used

Design an arch beam lifting equipment, including the first track, arch frame, lifting trolley and concrete conveying system, and realize the lifting and combined lifting operations of multiple lifting trolleys through the combined structure of the arch frame and the walking frame. Combined with the telescopic belt machine and the adjustment mechanism, the continuous conveying and position adjustment of concrete is achieved.

Benefits of technology

It significantly improves the efficiency of concrete pouring and project progress, meets the lifting needs of large and complex construction areas, enhances lifting capacity and load bearing capacity, and solves the problem of inefficiency of existing equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118929432A_ABST
    Figure CN118929432A_ABST
Patent Text Reader

Abstract

The invention discloses arched girder type hoisting equipment and a mounting method and a using method thereof.The arched girder type hoisting equipment comprises a first track, arch frames, a hoisting trolley and a concrete conveying system, the first track is used for being mounted on foundation platforms on the two sides of a canyon, and walking frames are mounted on the lower sides of the two ends of the two arch frames correspondingly; the walking vehicle frames on the two sides are used for being installed on the first rails on the two sides respectively, a plurality of crane carriages are installed on the two arch frames, and a concrete conveying system is installed in the gallery below the foundation platform. The multiple hoisting trolleys on each arched beam type hoisting device can conduct hoisting operation independently and can also conduct combined operation, the hoisting requirements for multiple pouring bin positions and large hoisting capacity in construction of dams, concrete water conservancy facilities, large-size buildings and the like are met, the concrete conveying system is hung through the multiple hoisting trolleys, and the hoisting efficiency is improved. The concrete produced by the mixing plant can be directly conveyed to the pouring bin position of the construction area through the concrete conveying system, the pouring efficiency of the construction area is improved, and the project progress is accelerated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of hydropower station construction equipment, and in particular to an arch beam type lifting equipment and an installation method and a use method thereof. Background Art

[0002] Hydropower stations are mostly located in deep mountain valleys, and the amount of concrete poured for hydropower station dams is often very large. The pouring speed of concrete directly determines the commissioning time of the hydropower station. Every day earlier the commissioning will bring millions of direct benefits. The pouring method of this type of large-volume concrete is generally a cable crane or a tower crane arranged on the warehouse. Due to the limitation of lifting weight and the non-continuous pouring of pouring a tank of concrete in one working cycle, the lifting and pouring efficiency is low, which directly affects the progress of the project. Summary of the invention

[0003] The technical problem to be solved by the present invention is to solve the problems existing in the above-mentioned background technology and provide an arch beam type lifting equipment for solving the problem of low efficiency of concrete pouring and hoisting of hydropower station dams.

[0004] Another technical problem to be solved by the present invention is to provide an installation method for an arch-beam type lifting equipment, so as to solve the problem of installing the arch-beam type lifting equipment.

[0005] Another technical problem to be solved by the present invention is to provide a method for using an arch beam type lifting equipment, so as to solve the problem of using the arch beam type lifting equipment.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: an arch-beam type lifting equipment, including a first track, an arch frame, a lifting trolley and a concrete conveying system, wherein the first track is used to be installed on the basic platforms on both sides of the canyon, and walking frames are respectively installed on the lower sides of the two ends of the two arch frames, and the walking frames on both sides are respectively used to be installed on the first tracks on both sides, and multiple lifting trolleys are installed on the two arch frames. One end of the concrete conveying system is connected to the basic platform, and the other end is suspended by the winch system of the lifting trolley and extends to the canyon.

[0007] A truss structure is arranged at the lower side of the arch frame.

[0008] The traveling frame comprises a machine base, a roller wheel and a first motor. The roller wheel is installed on the lower side of the machine base and rotates through a central axis. The first motor is installed on the machine base. The output shaft of the first motor is connected to the central axis of one of the roller wheels for transmission. Two arch frames are installed on the machine base.

[0009] A traveling frame is installed at both ends of each arch frame, and the two traveling frames located on the same side are connected into a whole.

[0010] The lifting trolley includes a traveling seat, a box body and a winch system, wherein traveling seats are respectively installed on both sides of the box body, and the traveling seats on both sides are respectively on the upper sides of two arch frames, the winch system is installed in the box body, and the hook of the winch system extends downward from between the two arch frames; at least two traveling wheels are installed on the lower side of the traveling seat, and the traveling wheels roll on the upper sides of the arch frames, a rack is installed on the arch frame, a bracket is installed on the outer side of the traveling seat, a second motor is installed on the bracket, a first gear is installed on the output shaft of the second motor, and the first gear is meshed with the rack for transmission.

[0011] A second track is installed on the arch frame, and the running wheels roll on the second track.

[0012] A busbar is also installed on the arch frame, and a hub is installed on the walking seat or the bracket. The hub elastically contacts the busbar for electrical conduction, and the hub is used to supply power to the winch system and the second motor.

[0013] An electric control cabinet is also installed in the box, the electric control cabinet is electrically connected to the hub, the hoisting system and the second motor are electrically connected to the electric control cabinet, and a remote control unit is provided in the electric control cabinet, and the hoisting system and the second motor are started and stopped by remote control.

[0014] The concrete conveying system includes a telescopic belt conveyor and several transfer belt conveyors. The feeding end of the telescopic belt conveyor is connected to the basic platform. The feeding end of the telescopic belt conveyor and the feeding end of the transfer belt conveyor, as well as the feeding end of the upper transfer belt conveyor and the feeding end of the lower transfer belt conveyor are connected for horizontal rotation and up and down swinging through an adjusting mechanism; the transfer belt conveyor is suspended by the winch system of the lifting trolley and extends toward the canyon.

[0015] The adjustment mechanism includes a connecting part, a first hinged part and a second hinged part. The connecting part is arranged at the unloading end of the telescopic belt conveyor and the transfer belt conveyor. The upper end of the first hinged part is rotatably installed on the lower side of the connecting part through a bearing. The second hinged part is installed on the upper side of the feeding end of the transfer belt conveyor. The first hinged part is hinged to the second hinged part.

[0016] The adjustment mechanism also includes a third motor, which is installed at the unloading end of the telescopic belt conveyor and the transfer belt conveyor. A second gear is installed on the output shaft of the third motor. A gear ring is fixedly installed on the first hinged part. The gear ring is rotatably connected to the connecting part, and the second gear is meshed with the gear ring for transmission.

[0017] The first hinged portion is provided with a gear ring, and the second gear meshes with the gear ring for transmission.

[0018] The telescopic belt conveyor is first mounted on a luffing cylinder, and the luffing cylinder is mounted on a basic platform.

[0019] A corridor is arranged in the basic platform, and the concrete conveying system passes through the corridor.

[0020] It also includes an installation system, which includes a flip cylinder and a traction device. A first pier is provided on the basic platform, and the first track is installed on the first pier. The arch frame is hinged to the hinge seat on the side of the first pier through a third hinge part near the end, and the end of the arch frame is hinged to one end of the flip cylinder through a fourth hinge part. The other end of the flip cylinder passes through the first pier and is hinged to the basic platform. One end of the traction device is hingedly installed on the basic platform away from the side of the arch frame, and the other end is hinged to the upper side of the arch frame.

[0021] A first connecting rod and a second connecting rod are fixedly connected between the two arch frames at positions located at the ends. The first connecting rod is hinged to the turning cylinder, and the second connecting rod is hinged to the traction device.

[0022] The arch frame is composed of two halves, and mounting systems are respectively installed on the basic platforms on both sides. The mounting systems on both sides respectively drive one half of the arch frame, and the arch frame is connected by welding or bolts after being closed.

[0023] The base platform is also provided with a second buttress and a third buttress for supporting the arch frame.

[0024] The traction device is a hydraulic cylinder or a wire traction machine.

[0025] A method for installing an arch beam type lifting equipment is used for installing an arch beam type lifting equipment, and the installation method comprises the following steps: S1. Preparation before installation: set up an installation area on the base platform, set up the first pier on the base platform, and install the first track on the first pier; S2. Arch assembly: In the installation area of ​​the base platform, the two arches are assembled into an arch assembly through the first connecting rod and the second connecting rod, the third hinge portion is hinged to the hinge seat by inserting a latch, the fourth hinge portion is hinged to the flip cylinder by inserting a latch, and the traction device is hinged to the arch assembly by a latch; S3. Arch lifting: The hydraulic system drives the turning cylinder to extend, and the turning cylinder pushes the arch assembly to turn clockwise. When the turning cylinder rotates to the limit position, the arch assembly also turns over the vertical state; S4. Pulling and releasing the arch frame: first start the traction device to tighten the arch frame assembly, then remove the pin at the connection between the fourth hinge and the flip cylinder, and then lower the arch frame assembly by the traction device until the other end of the arch frame assembly falls on the first track on the other side of the base platform, and then release the connection between the traction device and the arch frame assembly, and release the connection between the third hinge and the hinge seat; S5. Installation of the hoisting trolley: Use a crane to hoist the hoisting trolley onto the arch frame for installation. After debugging and moving it to a position on the arch frame that does not interfere with the installation of other hoisting trolleys, proceed with the installation of the next hoisting trolley. This process will continue until multiple hoisting trolleys are installed. Then, debug the arch frame movement, hoisting trolley movement, and overall control before the trolley can be put into use.

[0026] A method for using an arch beam type lifting equipment, using the arch beam type lifting equipment, the method for using comprises the following steps: S1. Extend the feeding end of the telescopic belt conveyor to the mixing plant, or connect the mixing plant to the feeding end of the telescopic belt conveyor through a belt conveyor, so that the concrete produced by the mixing plant is directly transported to the telescopic belt conveyor; S2. According to the construction requirements of the dam, several transfer belt conveyors are installed at the unloading end of the telescopic belt conveyor through the adjustment mechanism, and the unloading end of the transfer belt conveyor is hooked on the hoisting system of the lifting trolley; S3. The concrete transported from the mixing plant passes through the telescopic belt conveyor and then transported to the transfer belt conveyor, and then transported to the working area of ​​the dam. When the position of the working area changes in the canyon width direction, the telescopic belt conveyor is extended or retracted or the number of transfer belt conveyors is increased or decreased to meet the change in the position of the working area; when the position of the working area changes in the upstream and downstream directions of the canyon, the arch frame is moved on the first track through the traveling frame, and the angle of the transfer belt conveyor is adjusted through the adjusting mechanism to meet the change in the position of the working area; when the position of the working area changes in the canyon height direction, the height of the transfer belt conveyor is adjusted through the winch system to meet the change in the position of the working area.

[0027] The present invention has the following beneficial effects: 1. Compared with the commonly used cable cranes and gantry cranes, this patent adopts the arch beam form, and the load-bearing capacity and lifting capacity of the crane are greatly increased. The multiple lifting trolleys on each arch beam type lifting equipment can be used for lifting operations separately, and the trolleys on the same or different arch beam type lifting equipment can also be combined to perform corresponding double trolley or multi-trolley lifting operations, which meets the lifting requirements of multiple pouring positions and large lifting weights in dam construction, can well meet the operation requirements of the construction area, and is particularly suitable for large and complex construction areas. In addition, by hanging the concrete conveying system with multiple lifting trolleys, the concrete produced by the mixing plant can be directly transported to the pouring position of the dam through the concrete conveying system, which improves the pouring efficiency of the dam body and the progress of the project. By hanging the feeding belt conveyor with a hook system, the continuous and uninterrupted pouring of concrete from the mixing plant to the pouring area can be achieved, and the hook can also perform various conventional lifting operations.

[0028] 2. This patent solves the problem of low efficiency of existing casting equipment. Compared with existing cable cranes, gantry cranes and other equipment, the lighter structural weight achieves a larger lifting capacity and more functions. It can use multiple machines on the same track, thereby effectively improving the casting efficiency and generating considerable economic and social benefits.

[0029] 3. To solve the problem of installing arch beams across large-span casting areas, this patent realizes the installation of arch frames through an installation system, which is very innovative. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0031] Figure 1 It is a schematic diagram of the main structure of the present invention.

[0032] Figure 2 It is a schematic diagram of the three-dimensional structure of the present invention.

[0033] Figure 3 It is a schematic diagram of the top structure of the present invention.

[0034] Figure 4 This is a schematic structural diagram of the traveling frame of the present invention installed on the first track.

[0035] Figure 5 It is a structural schematic diagram of the connection between the arch frame and the traveling frame of the present invention.

[0036] Figure 6 It is a structural schematic diagram of the installation of the lifting trolley and the arch frame of the present invention.

[0037] Figure 7 It is a schematic diagram of the three-dimensional structure of the lifting trolley of the present invention.

[0038] Figure 8 It is a schematic diagram of the structure of the lifting trolley from above of the present invention.

[0039] Fig. 9 It is a schematic diagram of the structure of the regulating mechanism of the present invention.

[0040] Fig.10 This is a schematic diagram of the state of the arch frame of the present invention when it is installed and the arch frame is located in the installation area.

[0041] Fig.11 This is a schematic diagram of the arch frame of the present invention when it is installed and the arch frame is in a vertical state.

[0042] Fig.12 This is a schematic diagram of the state of the arch frame when it is installed and located above the canyon.

[0043] Fig.13 This is a schematic diagram of the installation system structure of the present invention.

[0044] Fig.14 This is a schematic diagram of the first pier structure of the present invention.

[0045] Fig.15 It is a schematic diagram of the structure of the second buttress and the third buttress of the present invention.

[0046] In the figure: Basic platform 100, first pier 101, first track 102, hinged seat 103, corridor 110; Arch frame 200, truss structure 201, third hinge part 202, fourth hinge part 203, second track 204, busbar 205, first connecting rod 206, rack 207, second connecting rod 208, traveling frame 210, machine base 211, roller wheel 212, first motor 213; Lifting trolley 300, traveling seat 310, traveling wheel 311, bracket 312, second motor 313, first gear 314, hub 315, box 320, hoisting system 330, hook 331, electric control cabinet 340; Concrete conveying system 400, telescopic belt conveyor 410, transfer belt conveyor 420, luffing cylinder 430; Installation system 500, tilting cylinder 501, traction device 502, second buttress 503, third buttress 504; Adjustment mechanism 600, third motor 601, second gear 602, connecting part 603, gear ring 604, first hinge part 605, second hinge part 606; Canyon 700, Dam 701. DETAILED DESCRIPTION

[0047] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0049] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0050] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0051] Embodiment 1: See also Figure 1-9 An arch beam type lifting equipment includes a first track 102, an arch frame 200, a lifting trolley 300 and a concrete conveying system 400, wherein the first track 102 is used to be installed on the basic platform 100 on both sides of the canyon 700, and the lower sides of the two ends of the two arch frames 200 are respectively installed with a walking frame 210, and the walking frames 210 on both sides are respectively used to be installed on the first track 102 on both sides, and multiple lifting trolleys 300 are installed on the two arch frames 200. One end of the concrete conveying system 400 is connected to the basic platform 100, and the other end is suspended by the hoisting system 330 of the lifting trolley 300 and extends toward the canyon 700.

[0052] Compared with the currently commonly used cable cranes and gantry cranes, this patent adopts an arch beam form, and the load-bearing capacity and the lifting capacity of the crane are greatly increased. The multiple hoisting trolleys 300 on each arch beam type hoisting equipment can be used for hoisting operations separately, and the trolleys on the same or different arch beam type hoisting equipment can also be combined to perform corresponding double trolley or multi-trolley lifting operations, which meets the hoisting requirements of multiple casting positions and large lifting weights in the construction of dams, concrete water conservancy facilities, large-volume buildings, etc., can well meet the operation requirements of the construction area, and is particularly suitable for large and complex construction areas. In addition, by hanging the concrete conveying system 400 with multiple hoisting trolleys 300, the concrete produced by the mixing plant can be directly transported to the casting position of the dam through the concrete conveying system 400, which improves the casting efficiency of the dam body and improves the progress of the project.

[0053] See also Figure 1 A truss structure 201 is provided at the lower side of the arch 200, and the structural strength of the arch 200 is improved by providing the truss structure. The truss structure 201 includes a transverse rod and a longitudinal rod, the transverse rod connects the two ends of the lower side of the arch 200, and a plurality of longitudinal rods connect the arch 200 and the transverse rod. Of course, a diagonal brace can be further provided between the arch 200 and the transverse rod. The transverse brace and the vertical brace are both provided under the arch, and in order not to interfere with the position of the rack, they are staggered to further supplement the strength of the arch. The arch, the transverse brace, and the vertical brace are all assembled into a whole by multiple sections, and are connected by welding or partial flange bolts to avoid interference with components such as the track and the rack.

[0054] See also Figure 4 , 5 The traveling frame 210 includes a base 211, a roller wheel 212 and a first motor 213. The roller wheel 212 is rotatably mounted on the lower side of the base 211 through a central axis. The first motor 213 is mounted on the base 211. The output shaft of the first motor 213 is connected to the central axis of one of the roller wheels 212 for transmission. The arch frame 200 is mounted on the base 211. Through the above structure, the arch frame 200 moves on the first track 102 through the traveling frame 210.

[0055] In one embodiment, the traveling frame 210 can be one, and two arch frames 200 are installed on the same traveling frame 210. In another embodiment, see Figure 5 , a traveling frame 210 is installed at both ends of each arch frame 200, and the two traveling frames 210 on the same side are connected as a whole. Specifically, a flange plate can be set on the opposite side of the two traveling frames 210, and the two traveling frames 210 are connected by bolts of the flange plate. Of course, it can also be used Figure 5 The structure shown in FIG. 1 is welded into one piece by connecting rods. Through the above structure, the two arches 200 are positioned and supported.

[0056] In a specific implementation, the traveling frame 210 can be welded to the lower side of the arch frame 200, or it can be Figure 5 As shown, it is mounted on the underside of the arch 200 by bolts.

[0057] See also Figure 6 , 7 The lifting trolley 300 includes a traveling seat 310, a box body 320 and a hoisting system 330. The traveling seats 310 are respectively installed on both sides of the box body 320, and the traveling seats 310 on both sides are respectively on the upper sides of the two arch frames 200. The hoisting system 330 is installed in the box body 320, and the hook 331 of the hoisting system 330 extends downward from between the two arch frames 200; at least two traveling wheels 311 are installed on the lower side of the traveling seat 310, and the traveling wheels 311 roll on the upper side of the arch frame 200. A rack 207 is installed on the lower side of the arch frame 200, and a bracket 312 is installed on the outer side of the traveling seat 310. A second motor 313 is installed on the bracket 312, and a first gear 314 is installed on the output shaft of the second motor 313. The first gear 314 is meshed with the rack 207 for transmission. The first gear 314 is meshed with the rack 207 at the lower side of the arch 200 , so that the travel seat 310 is limited to move on the arch 200 .

[0058] Furthermore, a second track 204 is installed on the arch frame 200, and the running wheel 311 rolls on the second track 204. The second track 204 can not only improve the structural strength of the arch frame 200, but also prevent the running wheel 311 from causing wear of the arch frame 200, and can also ensure that the running wheel 311 runs along the longitudinal axis of the arch frame 200 to avoid deviation failure. In this solution, the running wheel 311 adopts a track wheel.

[0059] It should be noted that when the second track 204 is not provided on the arch frame 200 , the traveling wheel 311 is a cambered wheel matched with the arch frame 200 .

[0060] See also Figure 5 , 6 , a busbar 205 is also installed on the arch frame 200, and an insulating plate is placed between the busbar 205 and the arch frame 200 to ensure that the arch frame 200 is not electrified. A hub 315 is installed on the walking seat 310 or the bracket 312, and a spring is arranged in the bracket of the hub 315 to ensure that the hub 315 always elastically maintains contact with the busbar 205 and conducts electricity under various influences such as vibration, shaking, and bouncing during the operation of the patent device. The hub 315 is used to supply power to the hoisting system 330 and the second motor 313. Through the above structure, the power supply of the hoisting system 330 and the second motor 313 is realized. When in use, the busbar 205 is laid on the arch frame 200 and connected to the power supply, and the hub 315 slides along the busbar 205 and can conduct electricity.

[0061] Furthermore, an electric control cabinet 340 is installed in the box body 320, the electric control cabinet 340 is electrically connected to the hub 315, the hoisting system 330 and the second motor 313 are electrically connected to the electric control cabinet 340, and a remote control unit is provided in the electric control cabinet 340, and the hoisting system 330 and the second motor 313 are started and stopped by remote control. Through the above structure, remote control of the hoisting trolley 300 and the hoisting system 330 is realized. The remote control unit is an existing technology, for example, a QA600 industrial crane wireless controller is used, and the controller includes a controller host and a remote controller.

[0062] See also Figure 1 The concrete conveying system 400 includes a telescopic belt conveyor 410 and several transfer belt conveyors 420. The feeding end of the telescopic belt conveyor 410 is connected to the basic platform 100. The lower feeding end of the telescopic belt conveyor 410 and the feeding end of the transfer belt conveyor 420, as well as the lower feeding end of the transfer belt conveyor 420 above and the feeding end of the transfer belt conveyor 420 below are connected to each other through the adjustment mechanism 600 for horizontal rotation and vertical swinging. The transfer belt conveyor 420 is suspended by the hoisting system 330 of the lifting trolley 300 and extends toward the canyon 700. Through the above structure, the transfer belt conveyors 420 and the transfer belt conveyors 420, as well as the telescopic belt conveyors 410 and the transfer belt conveyors 420, can be horizontally rotated and longitudinally swung through the adjustment mechanism 600 to realize the transportation of concrete to different casting positions on the dam 701.

[0063] For details, see Fig. 9 The adjusting mechanism 600 includes a connecting part 603, a first hinged part 605 and a second hinged part 606. The connecting part 603 is arranged at the unloading end of the telescopic belt conveyor 410 and the transfer belt conveyor 420. The upper end of the first hinged part 605 is rotatably installed on the lower side of the connecting part 603 through a bearing. The second hinged part 606 is installed on the upper side of the loading end of the transfer belt conveyor 420. The first hinged part 605 is hinged to the second hinged part 606.

[0064] Furthermore, the adjustment mechanism 600 also includes a third motor 601, which is installed at the unloading end of the telescopic belt conveyor 410 and the transfer belt conveyor 420. A second gear 602 is installed on the output shaft of the third motor 601. A gear ring 604 is provided on the first hinged part 605, and a bearing is provided in the gear ring 604. The gear ring 604 is rotatably connected to the connecting part 603 through the bearing. The first hinged part 605 is fixedly installed on the lower side of the gear ring 604, and the second gear 602 is meshed with the gear ring 604 for transmission. By providing the third motor 601, the horizontal angle of each transfer belt conveyor 420 can be actively adjusted, and the transfer belt conveyor 420 after the angle is adjusted can be kept in a fixed position under the action of the third motor 601. Specifically, the third motor 601 is a structure in which a motor and a reducer are integrated.

[0065] See also Figure 1 The telescopic belt conveyor 410 is installed on a first luffing cylinder 430, and the luffing cylinder 430 is installed on a basic platform 100. The height of the telescopic belt conveyor 410 can be adjusted as needed.

[0066] See also Figure 1 , 2 A corridor 110 is provided in the base platform 100 , and the telescopic belt conveyor 410 is installed in the corridor 110 , so that the concrete conveying system 400 does not interfere with the movement of the arch frame 200 .

[0067] See also Figure 1 The arch beam type lifting equipment also includes a mounting system 500, through which the arch frame 200 is installed. Specifically, the installation system 500 includes a tilting cylinder 501 and a traction device 502. A first pier 101 is provided on the base platform 100. The pier 101 is a concrete or steel structure connected to the ground through a foundation. The lower part of each arch frame is reliably connected to the upper part of the walking frame 210 through a flange or welding. The first track 102 is installed on the first pier 101. The arch frame 200 is hinged to the hinge seat 103 on the side of the first pier 101 through a third hinge part 202 near the end. The end of the arch frame 200 is hinged to one end of the tilting cylinder 501 through a fourth hinge part 203. The other end of the tilting cylinder 501 passes through the first pier 101 and is hinged to the base platform 100. One end of the traction device 502 is hingedly installed on the base platform 100 away from the side of the arch frame 200, and the other end is hingedly installed on the upper side of the arch frame 200. See Fig.12 The two arch frames 200 of the arch beam type lifting equipment can be respectively provided with the installation system 500, so as to realize the separate installation of the two arch frames 200. When separately installed, two traveling frames 210 need to be respectively installed at both ends of the two arch frames 200. After the arch frames 200 are installed in place, the two traveling frames 210 on each side are connected into an integrated structure.

[0068] The steel strands, strand cylinders and wire drums are connected at the upper part of the arch through a hinge. An end anchor is set at the end of the steel strand and is rotatably connected to the hinge through a pin. The steel strands are driven by the strand cylinder, and the arch is flipped in steps by the flip cylinder, from the installation position to the working position. The wire drum is used to store the steel strands, and the strand cylinder drives the steel strands to extend and retract to further drive the arch to flip.

[0069] In one of the schemes, see Figure 2 , 11A first connecting rod 206 and a second connecting rod 208 are fixedly connected at the ends of the two arches 200, the first connecting rod 206 is hinged to the turning cylinder 501, and the second connecting rod 208 extends upward with a hinge plate, which is hinged to the traction device 502. Through the above structure, a set of installation system 500 can be set to turn the two arches 200 into place.

[0070] Embodiment 2: The difference between this embodiment and the first embodiment is that if the width of the canyon is large, the width of the casting area of ​​the dam 701 is large, resulting in a large length and weight of the arch frame 200. Figure 1 Two half-width arch frames 200 can be respectively arranged on the foundation platform 100 on the left and right banks of the canyon 700 according to the above structure. After the two half-width arch frames 200 are installed in place through the installation systems 500 on both sides, personnel can then perform bolt or welding connections at the joints.

[0071] Specifically, the arch frame 200 is composed of two halves, and the basic platforms 100 on both sides are respectively installed with installation systems 500. The installation systems 500 on both sides respectively drive one half of the arch frame 200. The arch frame 200 is connected by welding or bolts after being closed.

[0072] For further information, see Figure 1 , 10 15, the second buttress 503 and the third buttress 504 for supporting the arch frame 200 are also installed on the basic platform 100. The second buttress 503 and the third buttress 504 are used to support the arch frame 200, so as to facilitate the turning of the arch frame 200.

[0073] Specifically, the traction device 502 is a hydraulic cylinder or a wire traction machine.

[0074] Embodiment three: See also Figure 10-13 , an installation method of an arch beam type lifting equipment, used for installing an arch beam type lifting equipment, the installation method comprises the following steps; S1. Preparation before installation: An installation area is set on the base platform 100, a first buttress 101 is set on the base platform 100, and a first track 102 is installed on the first buttress 101; S2. Arch assembly: In the installation area of ​​the base platform 100, the two arches 200 are assembled into an arch assembly through the first connecting rod 206, the third hinge portion 202 and the hinge seat 103 are hinged by inserting a latch, the fourth hinge portion 203 and the flip cylinder 501 are hinged by inserting a latch, and the traction device 502 and the arch assembly are hinged by a latch; S3 arch jacking: through the hydraulic system to drive the flip cylinder 501 extension, flip cylinder 501 push the arch assembly clockwise flip, when the rotation to the limit of the flip cylinder 501, the arch assembly also flipped over the vertical state; S4. Pulling and lowering the arch frame: first start the traction device 502 to tighten the arch frame assembly, so that the traction device 502 is stressed, then remove the pin at the connection between the fourth hinge 203 and the flip cylinder 501, and then lower the arch frame assembly by the traction device 502 until the other end of the arch frame assembly falls on the first track 102 on the other side of the base platform 100 or the two arch frame assemblies are reliably connected after being aligned in the air, and finally release the connection between the traction device 502 and the arch frame assembly, and release the connection between the third hinge 202 and the hinge seat 103; S5. Installation of the hoisting trolley 300: Use a crane to hoist the hoisting trolley 300 onto the arch frame for installation. After debugging and moving it to a position on the arch frame that does not interfere with the installation of other hoisting trolleys 300, proceed with the installation of the next hoisting trolley 300. This process continues until multiple hoisting trolleys 300 are installed. Then proceed with the running of the arch frame 200, the running of the hoisting trolley 300, and overall control debugging before the hoisting trolley 300 can be put into use.

[0075] The arch frame 200 is installed by the above method.

[0076] Specific: Step 1: Preparation before installation. Set up the installation area at the appropriate position of the basic platform 100, design and install the corresponding first pier 101, second pier 503, and third pier 504 according to the force requirements, install the first track 102 on the first pier 101, and then install the walking frame 210 according to the position of the arch frame, and then ensure that it is in a vertical state through support; install the saddle on the second pier 503 and the third pier 504.

[0077] Step 2: Assemble the arch frame. Assemble the arch frame 200 section by section and in pairs on the second pier 503 and the third pier 504. The direction of installation section by section is from the first pier 101 to the third pier 504. It is installed in an upside-down manner, that is, it is 180 degrees upside-down from the direction in which the arch frame is installed. The hinge points at the ends of the first section of the arch frame are respectively connected to the hinge seats 103 provided on the first pier 101 through pins. Then, the subsequent arch frame sections are installed by flange bolt connection. Before installing each arch frame section, the first track 102, truss structure 201, rack 207, busbar 205 and other accessories attached to it must be removed to avoid cumbersome subsequent installation. After the arch frame is installed, it is adjusted as a whole.

[0078] Step 3: lifting the arch frame. The rotating cylinder 501 has been connected by a rotating shaft in the above steps. Then, the steel strands and end anchors extended from the traction device 502 are connected to the hinge point on the upper part of the arch frame by a pin. In principle, the paired left and right arch frames need to be connected with steel strands. The method of synchronous lifting and pulling and releasing the paired left and right arch frames is preferred to ensure the stability of the process. During the arch frame lifting stage, the flipping cylinder 501 is first extended. As the piston rod of the flipping cylinder 501 is continuously extended and the flipping cylinder 501 rotates around the hinge point on the platform as a whole, the arch frame is pushed and rotated around the rotating shaft at the same time. When it rotates to the limit position of the flipping cylinder, the arch frame is also flipped over the vertical state, rotating from being above the platform as a whole to being above the casting area as a whole. Subsequently, the arch frame lifting stage is converted to the pulling and releasing stage.

[0079] Step 4: Pull and release the arch frame. First, start the traction device 502 to slightly pull the steel strands with the arch frame. After the steel strands are tightened, slightly loosen the force of the flip cylinder 501 to facilitate the release of the connection between the flip cylinder 501 and the hinge point at the rear end of the arch frame. The traction device 502 then releases the steel strands to continue rotating the arch frame around the axis and lowering it until the other end of the arch frame falls on the walking frame 210 on the first pier 101 at the other end of the casting area. At this time, the walking frame 210 pre-installed on the first track 102 on both sides of the left and right banks of the casting area is under the arch frame. Fine-tune the walking frame 210 to connect it to the arch frame by bolts or welding. Release the pin connection between the traction device 502 and the hinge point on the arch frame, and start the traction device 502 to retract the steel strands. If the width of the casting area is large, resulting in a large length and weight of the steel arch frame, the method of assembling, lifting, and pulling down half of the steel arch frame on the left and right bank platforms of the casting area can also be adopted. The two half-width steel arch frames are closed in the air, and then personnel bolt or weld the joints.

[0080] Step 5: Installation of accessories and trolleys. Use a small crane to lift the lifting trolley 300 onto the arch frame and lock it. After debugging, move it to a position on the arch frame that does not interfere with the installation. Then install the second lifting trolley 300. After multiple trolley frames are installed and debugged, debug the arch frame travel and overall control, and then put it into use. Move the installed arch beam crane away from the installation position by moving the trolley, and then follow the above steps to install the next arch beam crane.

[0081] Embodiment 4: A method for using an arch beam type lifting equipment, using the arch beam type lifting equipment, the method for using comprises the following steps: S1. The feeding end of the telescopic belt conveyor 410 is extended to the mixing plant, or the mixing plant is connected to the feeding end of the telescopic belt conveyor 410 through a belt conveyor, so that the concrete produced by the mixing plant is directly transported to the telescopic belt conveyor 410; S2 according to the construction requirements of the dam 701, the unloading end of the telescopic belt conveyor 410 is installed by adjusting the mechanism 600 to transfer a number of belt conveyors 420, the unloading end of the transfer belt conveyor 420 is hooked on the hoisting system 330 of the lifting trolley 300; S3. The concrete transported from the mixing plant passes through the telescopic belt conveyor 410 and then transported to the transfer belt conveyor 420, and then transported to the working area of ​​the dam 701. When the position of the working area changes in the width direction of the canyon 700, the telescopic belt conveyor 410 is extended or the number of transfer belt conveyors 420 is increased or decreased to meet the change of the position of the working area; when the position of the working area changes in the upstream and downstream directions of the canyon 700, the arch frame 200 is moved on the first track 102 by the traveling frame 210, and the angle of the transfer belt conveyor 420 is adjusted by the adjusting mechanism 600 to meet the change of the position of the working area; when the position of the working area changes in the height direction of the canyon 700, the height of the transfer belt conveyor 420 is adjusted by the winch system 330 to meet the change of the position of the working area.

[0082] Through the above method, it is achieved that the concrete produced by the mixing plant is directly transported to the pouring position of the dam 701 through the concrete transport system 400.

[0083] According to the calculated data of the span and force bearing capacity of the arch frame, multiple lifting trolleys 300 can be arranged to carry out lifting and pouring operations at different positions in the pouring area on the arch frame 200 at the same time, or to carry out joint lifting operations through multi-hook lifting to obtain a larger lifting weight and realize more lifting functions.

[0084] Advantages of this patent (I) Large lifting capacity. Compared with the currently commonly used cable cranes and gantry cranes, this patent adopts the arch beam form, which greatly increases the bearing capacity and lifting capacity of the crane, effectively improving the construction efficiency.

[0085] (II) Various hoisting forms. The multiple hoists on each arch-beam crane of the present patent can perform hoisting operations separately, and the trolleys on the same or different cranes can also be combined to perform corresponding double trolley or multi-trolley lifting operations, which meets the various hoisting requirements such as multiple warehouse locations and large lifting weights, and can well meet the operation requirements of the construction area, and is particularly suitable for large and complex construction areas.

[0086] (III) Simple design and strong innovation. The patented arch beam crane is simple and cleverly designed, but highly innovative and practical. Because it is equipped with a movable trolley, the working range of a single device is large and has strong promotion value.

[0087] (IV) Novel installation method. This patent solves the problem of arch beam installation across a large span casting area through an innovative method, using only a simple flip cylinder and a twisting cylinder, which is very innovative.

[0088] The above-mentioned embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made on the basis of the above description. It is not necessary and impossible to list all the implementation methods here, that is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. An arch beam type lifting equipment, Features: The invention comprises a first track (102), an arch frame (200), a lifting trolley (300) and a concrete conveying system (400), wherein the first track (102) is used to be installed on a basic platform (100) on both sides of a canyon (700), a traveling frame (210) is respectively installed on the lower sides of both ends of the two arch frames (200), and the traveling frames (210) on both sides are respectively used to be installed on the first track (102) on both sides, and a plurality of lifting trolleys (300) are installed on the two arch frames (200); one end of the concrete conveying system (400) is connected to the basic platform (100), and the other end is suspended by a hoisting system (330) of the lifting trolley (300) and extends toward the canyon (700).

2. An arch beam type lifting equipment according to claim 1, Features: A truss structure (201) is provided on the lower side of the arch frame (200).

3. The arch beam type lifting equipment according to claim 1, Features: The traveling frame (210) comprises a machine base (211), a roller wheel (212) and a first motor (213); the roller wheel (212) is rotatably mounted on the lower side of the machine base (211) via a central axis; the first motor (213) is mounted on the machine base (211); an output shaft of the first motor (213) is connected to the central axis of one of the roller wheels (212) for transmission; and two arch frames (200) are mounted on the machine base (211).

4. An arch beam type lifting equipment according to claim 3, Features: A traveling frame (210) is installed at both ends of each arch frame (200), and two traveling frames (210) located on the same side are connected to form a whole.

5. The arch beam type lifting equipment according to claim 1, Features: The lifting trolley (300) comprises a traveling seat (310), a box (320) and a hoisting system (330); the traveling seats (310) are respectively installed on both sides of the box (320); the traveling seats (310) on both sides are respectively located on the upper sides of two arch frames (200); the hoisting system (330) is installed in the box (320); a hook (331) of the hoisting system (330) extends downward from between the two arch frames (200); the traveling seat (310) is installed on both sides of the box (320); At least two running wheels (311) are installed on the lower side of the arch frame (200), and the running wheels (311) roll and travel on the upper side of the arch frame (200). A rack (207) is installed on the arch frame (200). A bracket (312) is installed on the outer side of the running seat (310), and a second motor (313) is installed on the bracket (312). A first gear (314) is installed on the output shaft of the second motor (313), and the first gear (314) is meshed with the rack (207) for transmission.

6. An arch beam type lifting equipment according to claim 5, Features: A second track (204) is installed on the arch frame (200), and the running wheels (311) roll on the second track (204).

7. The arch beam type lifting equipment according to claim 5, Features: A busbar (205) is also installed on the arch frame (200), and a hub (315) is installed on the traveling seat (310) or the bracket (312). The hub (315) elastically contacts the busbar (205) for electrical conduction, and the hub (315) is used to supply power to the hoisting system (330) and the second motor (313).

8. An arch beam type lifting equipment according to claim 7, Features: An electric control cabinet (340) is also installed in the box body (320); the electric control cabinet (340) is electrically connected to the hub (315); the hoisting system (330) and the second motor (313) are electrically connected to the electric control cabinet (340); a remote control unit is provided in the electric control cabinet (340); and the hoisting system (330) and the second motor (313) are started and stopped by remote control.

9. The arch beam type lifting equipment according to claim 1, Features: The concrete conveying system (400) comprises a telescopic belt conveyor (410) and a plurality of transfer belt conveyors (420); the feeding end of the telescopic belt conveyor (410) is connected to the base platform (100); the feeding end of the telescopic belt conveyor (410) and the feeding end of the transfer belt conveyor (420), as well as the feeding end of the upper transfer belt conveyor (420) and the feeding end of the lower transfer belt conveyor (420) are connected to each other for horizontal rotation and vertical swinging via an adjusting mechanism (600); the transfer belt conveyor (420) is suspended by a hoisting system (330) of a lifting trolley (300) and extends toward the canyon (700).

10. An arch beam type lifting equipment according to claim 9, Features: The adjustment mechanism (600) comprises a connecting portion (603), a first hinged portion (605) and a second hinged portion (606); the connecting portion (603) is arranged at the unloading ends of the telescopic belt conveyor (410) and the transfer belt conveyor (420); the upper end of the first hinged portion (605) is rotatably mounted on the lower side of the connecting portion (603) via a bearing; the second hinged portion (606) is mounted on the upper side of the loading end of the transfer belt conveyor (420); and the first hinged portion (605) is hingedly connected to the second hinged portion (606).

11. An arch beam type lifting equipment according to claim 10, Features: The adjustment mechanism (600) further comprises a third motor (601), the third motor (601) being mounted at the unloading ends of the telescopic belt conveyor (410) and the transfer belt conveyor (420), a second gear (602) being mounted on the output shaft of the third motor (601), a gear ring (604) being fixedly mounted on the first hinged portion (605), the gear ring (604) being rotatably connected to the connecting portion (603), and the second gear (602) being meshed with the gear ring (604) for transmission.

12. The arch beam type lifting equipment according to claim 9, Features: The telescopic belt conveyor (410) is first mounted on a luffing oil cylinder (430), and the luffing oil cylinder (430) is mounted on a base platform (100).

13. An arch beam type lifting equipment according to any one of claims 1, 9 to 12, Features: A corridor (110) is provided in the basic platform (100), and the concrete conveying system (400) passes through the corridor (110).

14. The arch beam type lifting equipment according to claim 1, Features: The invention also comprises a mounting system (500), wherein the mounting system (500) comprises a tilting cylinder (501) and a traction device (502); a first buttress (101) is arranged on the base platform (100); a first track (102) is mounted on the first buttress (101); the arch frame (200) is hinged to a hinge seat (103) on the side of the first buttress (101) at a position close to the end thereof through a third hinge portion (202); the end of the arch frame (200) is hinged to one end of the tilting cylinder (501) through a fourth hinge portion (203); the other end of the tilting cylinder (501) passes through the first buttress (101) and is hinged to the base platform (100); one end of the traction device (502) is hingedly mounted on the base platform (100) on a side away from the arch frame (200); and the other end is hinged to the upper side of the arch frame (200).

15. An arch beam type lifting equipment according to claim 14, Features: A first connecting rod (206) and a second connecting rod (208) are fixedly connected between the two arch frames at the ends; the first connecting rod (206) is hinged to the tilting cylinder (501), and the second connecting rod (208) is hinged to the traction device (502).

16. An arch beam type lifting equipment according to claim 14 or 15, Features: The arch frame (200) is composed of two halves, and mounting systems (500) are respectively installed on the base platforms (100) on both sides. The mounting systems (500) on both sides respectively drive one half of the arch frame (200), and the arch frame (200) is connected by welding or bolts after being closed.

17. An arch beam type lifting equipment according to claim 14 or 15, Features: A second buttress (503) and a third buttress (504) for supporting the arch frame (200) are also installed on the basic platform (100).

18. The arch beam type lifting equipment according to claim 14, Features: The traction device (502) is a hydraulic cylinder or a wire traction machine.

19. A method for installing an arch beam type lifting equipment, Features: For installation of an arch beam type lifting equipment according to claim 15, the installation method comprises the following steps; S1. Preparation before installation: setting an installation area on the base platform (100), setting a first pier (101) on the base platform (100), and installing a first track (102) on the first pier (101); S2. Arch frame assembly: In the installation area of ​​the base platform (100), two arch frames (200) are assembled into an arch frame assembly through a first connecting rod (206) and a second connecting rod (208), the third hinge portion (202) and the hinge seat (103) are hinged by inserting a latch, the fourth hinge portion (203) and the tilting cylinder (501) are hinged by inserting a latch, and the traction device (502) and the arch frame assembly are hinged by a latch; S3. Arch lifting: The hydraulic system drives the flip cylinder (501) to extend, and the flip cylinder (501) pushes the arch assembly to flip clockwise. When the rotation reaches the limit position of the flip cylinder (501), the arch assembly also flips over the vertical state; S4. Pulling and lowering the arch frame: first start the traction device (502) to tighten the arch frame assembly, then remove the pin at the connection between the fourth hinge part (203) and the tilting cylinder (501), and then lower the arch frame assembly by the traction device (502) until the other end of the arch frame assembly falls on the first track (102) on the other side of the base platform (100), then release the connection between the traction device (502) and the arch frame assembly, and release the connection between the third hinge part (202) and the hinge seat (103); S5. Installation of the hoisting trolley (300): Use a crane to hoist the hoisting trolley (300) onto the arch frame for installation. After debugging and moving it to a position on the arch frame that does not interfere with the installation of other hoisting trolleys (300), the next hoisting trolley (300) is installed. After multiple hoisting trolleys (300) are installed, the arch frame (200) and the hoisting trolley (300) are moved and the overall control is debugged, and then it can be put into use.

20. A method for using an arch beam type lifting device, Features: The arch beam type lifting equipment according to claim 13 is adopted, and the method of using the same comprises the following steps; S1. Extending the feeding end of the telescopic belt conveyor (410) to the mixing plant, or connecting the mixing plant with the feeding end of the telescopic belt conveyor (410) through a belt conveyor, so that the concrete produced by the mixing plant is directly transported to the telescopic belt conveyor (410); S2. According to the construction requirements of the dam (701), a plurality of transfer belt conveyors (420) are installed at the unloading end of the telescopic belt conveyor (410) through an adjustment mechanism (600), and the unloading end of the transfer belt conveyor (420) is hooked on the winch system (330) of the lifting trolley (300); S3. The concrete transported from the mixing plant passes through the telescopic belt conveyor (410) and is then transported to the transfer belt conveyor (420), and is then transported to the working area of ​​the dam (701). When the position of the working area changes in the width direction of the canyon (700), the telescopic belt conveyor (410) is extended or the number of transfer belt conveyors (420) is increased or decreased to meet the change in the position of the working area; when the position of the working area changes in the upstream and downstream directions of the canyon (700), the arch frame (200) is moved on the first track (102) by the traveling frame (210), and the angle of the transfer belt conveyor (420) is adjusted by the adjustment mechanism (600) to meet the change in the position of the working area; when the position of the working area changes in the height direction of the canyon (700), the height of the transfer belt conveyor (420) is adjusted by the hoisting system (330) to meet the change in the position of the working area.