Vertical transportation method of existing hoistway hoisting transportation device in building renewal and transformation construction

By installing wall poles and guide rail frames on the walls of the building structure and combining the sliding mechanism, the problem of large land occupation of transportation equipment in the narrow shaft is solved, and efficient and flexible vertical transportation is achieved, which is suitable for construction scenarios of urban renewal projects.

CN118929478APending Publication Date: 2024-11-12BEIJING CONSTRUCTION ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411071412.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In urban renewal projects, under existing building renovation construction scenarios, conventional shaft lifting and transportation equipment is not suitable for installation in narrow shafts due to its large footprint, resulting in inflexible and efficient construction.

Method used

The combination of wall rods, guide rail frames and sliding mechanisms is adopted. By installing wall rods and guide rail frames on the structural walls, the area occupied is reduced and vertical transportation is achieved through the sliding mechanism, which is suitable for shafts in narrow spaces.

Benefits of technology

It realizes efficient vertical transportation in existing building shafts, reduces the area occupied by construction sites, improves the flexibility and stability of transportation equipment, and adapts to the needs of different building heights.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118929478A_ABST
    Figure CN118929478A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction, in particular to a vertical transportation method of an existing shaft lifting transportation device for building renewal and transformation construction, which comprises the following steps: S1, mounting wall-attached rods: mounting a plurality of wall-attached rods at intervals along the height direction of a structural wall body, and forming a mounting cavity on one side of each wall-attached rod along the height direction of the structural wall body; s2, a guide rail frame is installed, specifically, the guide rail frame is formed by splicing a plurality of standard knots in the height direction of the structural wall, and the standard knots are installed in the installation cavities of the wall attaching fasteners at intervals; and S3, the suspension cage is installed, specifically, a sliding mechanism is installed on the standard knot, and the suspension cage slides on the sliding mechanism in the height direction of the structural wall. The method has the effect of being adaptive to the existing building hoistway and not occupying the construction site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building construction, and in particular to a vertical transportation method for a hoisting and transportation device of an existing shaft in building renovation and reconstruction construction. Background Art

[0002] Existing building renovation refers to the process of rebuilding, renovating and renovating various types of buildings that have been built and put into use. This process aims to improve the quality and connotation of the buildings, solve the problem of unsuitable environment for residents, and at the same time improve the city's image and the quality of life of residents.

[0003] In the relevant technologies, the renovation construction of existing buildings in the context of urban renewal projects is often not flexible and efficient enough in the renovation construction scenarios of existing buildings in urban renewal projects because the construction site is located in the core area of ​​the city, there are a large number of buildings around it and the surrounding roads are mostly urban trunk roads with heavy traffic.

[0004] Regarding the above-mentioned related technologies, due to the small area of ​​the existing shaft, conventional shaft lifting and transportation equipment occupies a large area and is not suitable for installation in the existing shaft. Therefore, developing a lifting and transportation device and a construction method that can adapt to the existing building shaft and does not occupy the construction site has become an urgent problem to be solved in the implementation of current urban renewal projects. Summary of the invention

[0005] In order not to occupy the construction site, the present application provides a vertical transportation method of the existing hoisting and transportation device in the building renovation construction.

[0006] This application provides a vertical transportation method for an existing hoisting and transportation device in a building renovation and reconstruction construction, which adopts the following technical solution: A vertical transportation method for a hoisting and transporting device in an existing well in a building renovation and reconstruction construction adopts the following technical scheme, including the following steps: S1: Install the wall rod: A plurality of wall attachment rods are installed at intervals along the height direction of the structural wall, and an installation cavity is formed on one side of the wall attachment rod along the height direction of the structural wall; S2: Install the guide rail: The guide rail frame is assembled from a plurality of standard sections along the height direction of the structural wall, and the standard sections are installed in the installation cavity of the wall fastener in an interval manner; S3: Install the cage: A sliding mechanism is installed on the standard section, and the cage slides on the sliding mechanism along the height direction of the structural wall.

[0007] By adopting the above technical solution, since the space in the existing shaft is relatively narrow, an installation cavity is provided on the wall-attached rod, and the standard section is located in the installation cavity. The standard section is directly installed on the structural wall through the wall-attached rod, thereby further reducing the overall occupied area. By setting the wall-attached rod, the number of wall-attached rods can be set according to the height of the existing building. The wall-attached rod and guide rail frame provided in the present application occupy a smaller area and are suitable for the construction and transportation site of the existing building.

[0008] Optionally, each of the wall-mounting rods is detachably connected to a wall-mounting fastener, and the wall-mounting fastener is provided with the installation cavity.

[0009] By adopting the above technical solution and providing a detachable wall fastener, when the installation cavity for accommodating the standard section is worn and affects the use, it is convenient for personnel to replace and install the wall fastener.

[0010] Optionally, the wall attaching rods are arranged along a length direction parallel to the structural wall, and each of the wall attaching rods is provided with at least two wall attaching fasteners.

[0011] By adopting the above technical solution, in order to improve the stability of the fixation of the standard section, the wall attaching rod is arranged parallel to the length direction of the structural wall, and at least two wall attaching fasteners are arranged on the wall attaching rod, so that the two sides of the standard section can be fixed simultaneously by the wall attaching fasteners, ensuring that the guide rail frame formed by splicing the standard sections can be in a stable state.

[0012] Optionally, the wall attaching rod is provided with a groove in a direction perpendicular to both the height direction of the structural wall and the length direction of the wall attaching rod, and the groove is arranged close to one side of the structural wall.

[0013] By adopting the above technical solution, due to the unevenness of the structural wall, in this case, in order to enable the wall attaching rod to still be stably fixed to the structural wall, a groove is provided on one side of the wall attaching rod, and a gasket can be provided in the groove to reduce or eliminate the height difference between the structural wall and the wall attaching fastener, so that the wall attaching rod can be firmly connected to the structural wall. In addition, by providing the groove, the wall attaching rod can better disperse the stress when bearing force, thereby improving the bearing capacity and stability.

[0014] Optionally, the wall fastener has at least two clamping parts, a plurality of the clamping parts are detachably connected, a clamping groove is provided on the clamping part, and when the plurality of the clamping parts are connected, the clamping grooves on each of the clamping parts are connected to form the installation cavity.

[0015] By adopting the above technical solution, in order to more stably install and clamp the standard section, an installation cavity is formed by at least two clamping parts, and multiple clamping parts can increase the clamping range of standard sections of different sizes.

[0016] Optionally, an anti-capping joint is also installed on the top of the guide rail frame.

[0017] By adopting the above technical solution, when the cage slides through the sliding mechanism, in order to avoid the cage from sliding too much and causing the roof to fall, an anti-falling joint is provided on the top of the guide rail frame to protect the guide rail frame.

[0018] Optionally, the wall-attaching rod is provided with a plurality of positioning holes evenly spaced apart along its length direction, and the positioning holes are aligned with the installation positions of the wall-attaching fasteners.

[0019] By adopting the above technical solution, since the sizes of standard sections are different, by setting multiple positioning holes on the wall-mounted rod, the wall-mounted fasteners can be moved and the wall-mounted fasteners correspond to the corresponding installation holes, so that standard sections of different sizes can be fixed by the wall-mounted fasteners.

[0020] Optionally, two parallel limit rods are detachably connected to the structural wall, the two limit rods are spaced apart along the length direction of the structural wall, the wall attachment rod is located between the two limit rods, and a plurality of scale grooves are provided on the limit rod along the height direction of the structural wall.

[0021] By adopting the above technical solution, since the guide rail frame needs to be in a stable state during the transportation operation, the guide rail frame needs to be kept as parallel to the structural wall as possible. For this reason, two mutually parallel limit rods are set, and the limit rods are used to position multiple wall-mounted rods to reduce the offset of two adjacent wall-mounted rods along the length direction of the structural wall. The limit rods are provided with scale grooves to facilitate personnel to evenly set multiple wall-mounted frames.

[0022] Optionally, the limiting rod is provided with a sliding groove along the height direction of the structural wall, a positioning plate is provided in the sliding groove, one end of the positioning plate slides along the wall of the sliding groove, the positioning plate is fixed to the limiting rod by screws, and the wall-attaching rod is overlapped on the positioning plate.

[0023] By adopting the above technical solution, by setting a positioning plate that slides along the limit rod, the positioning plates located on both sides of the structural wall slide along the sliding groove to the scale groove of the installation position and are fixed to the limit rod. The wall-attached rod can be further overlapped on the positioning plate, and the positioning plate further ensures that the wall-attached rod is in a horizontal state. When the preliminary position is determined, the positioning plate can position and support the wall-attached part.

[0024] Optionally, an infrared laser locator is rotatably connected to the positioning plate or the limit rod. When the light emitted by the infrared laser locator is parallel to the height direction of the structural wall, the infrared laser locator detects the horizontality of the limit rod. When the light emitted by the infrared laser locator is parallel to the length direction of the structural wall, the infrared laser locator detects the horizontality of the wall-attached rod.

[0025] By adopting the above technical solution, in order to further ensure the horizontality of the limit rod and the wall-attaching rod, a rotatable infrared laser locator is set up to detect the horizontality of the limit rod and the wall-attaching rod respectively, thereby further ensuring that the guide rail frame is in a vertical state.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. The present application further reduces the occupied area of ​​the existing well by providing a wall-mounted frame and a guide rail frame installed on the wall-mounted frame, wherein the wall-mounted frame is installed on the structural wall, and the guide rail frame can be provided according to the height of the existing building; 2. In the present application, the wall fastener is detachably connected to the wall rod, and when the installation cavity is worn, the wall fastener can be replaced in time; 3. The present application sets limit rods and positioning plates, and the positions of multiple wall-mounted frames are positioned by two limit rods to reduce the deviation of the wall-mounted frames. By setting a positioning plate that slides along the limit rods, the horizontality of the wall-mounted frames can be further adjusted by the positioning plates, and the positioning plates can support the wall-mounted frames, further improving the stability of the wall-mounted frames. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a schematic diagram of the overall structure of a hoisting and transporting device for an existing shaft in a building renovation and reconstruction construction; Figure 2 It is a structural schematic diagram of the guide rail frame and the sliding mechanism of the present application; Figure 3 It is a structural schematic diagram of the connection between the wall-attached rod and the structural wall of the present application; Figure 4 It is a structural diagram of the wall fastener of the present application; Figure 5 It is a structural diagram of the wall-attached rod of the present application; Figure 6 It is a structural schematic diagram of the limit rod and structural wall of this application.

[0028] Explanation of the reference numerals in the accompanying drawings: 1. Structural wall; 2. Wall-attached rod; 21. Bolt; 22. Threaded hole; 23. Wall-attached fastener; 231. Installation cavity; 232. Clamping portion; 233. Clamping groove; 234. Lug; 235. Locking member; 236. Connecting seat; 24. Groove; 25. Positioning hole; 3. Guide rail frame; 31. Standard section; 311. Fixed rod; 3111. Contact surface; 3112. Rod to be installed; 32. Anti-overflow section; 4. Cage; 41. Sliding block; 42. Working platform; 5. Sliding mechanism; 51. Slide rail; 52. Transmission assembly; 521. Rack; 522. Gear; 53. Driving member; 531. Installation seat; 6. Limit rod; 61. Positioning plate; 62. Slide groove; 63. Scale groove; 7. Infrared laser locator. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-6 This application is described in further detail.

[0030] The embodiment of the present application discloses a vertical transportation method of a hoisting and transportation device of an existing shaft in building renovation and reconstruction construction.

[0031] Reference Figure 1 and Figure 2 A vertical transportation method of a hoisting and transporting device for an existing well in a building renovation and reconstruction construction comprises the following steps: S1: Install the wall rod 2: Reference Figure 1 , a plurality of wall-attaching rods 2 are installed at intervals along the height direction of the structural wall 1, and the wall-attaching rods 2 are fixed to the structural wall 1 by bolts 21. Specifically, a threaded hole 22 is formed through the wall-attaching rod 2, and the bolt 21 is connected to the structural wall 1 after passing through the threaded hole 22. The bolt 21 is threadedly connected to the threaded hole 22, and an installation cavity 231 is formed on one side of each wall-attaching rod 2 along the height direction of the structural wall 1; Reference Figure 1 Furthermore, each wall-mounting rod 2 is detachably connected with a wall-mounting fastener 23, and the wall-mounting fastener 23 is provided with the installation cavity 231. If the installation cavity 231 is worn and affects the use, the wall-mounting fastener 23 can be replaced.

[0032] S2: Install the guide rail 3: Reference Figure 1 The guide rail frame 3 is assembled by a plurality of standard sections 31 along the height direction of the structural wall 1. The standard section 31 is installed in the installation cavity 231 of the wall fastener 23. The standard section 31 includes a plurality of fixing rods 311. Specifically, the standard section 31 is a frame structure formed by overlapping a plurality of fixing rods 311. Preferably, in this embodiment, 12 fixing rods 311 are provided, and the 12 fixing rods 311 are spliced ​​together to form a cube in the shape of a frame structure. Reference Figure 1When installing the guide rail frame 3, in order to ensure stability, it is necessary to make one side of the rectangular frame formed by the four fixing rods 311 parallel to the structural wall 1. The fixing rods 311 on this side need to be as parallel to the structural wall 1 as possible. For the convenience of description, this surface is named contact surface 3111, and the fixing rods 311 on the contact surface 3111 are named rods to be installed 3112. The rods to be installed 3112 are inserted into the installation cavity 231 and connected to the wall fasteners 23 to ensure that the standard section 31 is stably installed on the structural wall 1 through the wall fasteners 2.

[0033] S3: Install the cage 4: Reference Figure 2 , a sliding mechanism 5 is installed on the guide rail frame 3, and the cage 4 slides along the height direction of the structural wall 1 on the sliding mechanism 5. Specifically, the sliding mechanism 5 includes a slide rail 51, a transmission assembly 52 and a driving member 53. The slide rail 51 is fixedly connected to the side wall of the guide rail frame 3, and a slider 41 is fixedly connected to the cage 4. The slider 41 slides on the slide rail 51 along the height direction of the structural wall 1. The transmission assembly 52 includes a rack 521 and a gear 522. The rack 521 is fixedly connected to the side wall of the guide rail frame 3, and the gear 522 is meshed with the rack 521. In this embodiment, the driving member 53 is a motor, and the output shaft of the motor is coaxially fixedly connected to the gear 522. The motor casing is fixedly connected to the cage 4 through a mounting seat 531. A working platform 42 is provided on the cage 4. When in use, a person stands on the working platform 42, and the driving member 53 drives the cage 4 to slide along the height direction of the structural wall 1 through the gear 522 and the rack 521 to bring the person to the working position.

[0034] Reference Figure 2 In order to prevent the cage 4 from roof bulging when sliding along the height direction of the guide rail frame 3, an anti-bulging joint 32 is also installed on the top of the guide rail frame 3. In this embodiment, the structure of the anti-bulging joint 32 is exactly the same as that of the standard joint 31. The sliding mechanism 5 is not set on the anti-bulging joint 32, and the anti-bulging joint 32 serves as a structure to limit the cage 4 from roof bulging.

[0035] Reference Figure 3 In order to further improve the installation stability of the guide rail frame 3, the wall-mounting rod 2 is horizontally arranged, and each wall-mounting rod 2 is provided with at least two wall-mounting fasteners 23. In some embodiments, the wall-mounting fasteners 23 can be two, four, or six. In this embodiment, two wall-mounting fasteners 23 are provided.

[0036] Reference Figure 3The wall attaching rod 2 is provided with a groove 24 which is perpendicular to both the height direction and the length direction of the structural wall 1. The groove 24 is arranged close to one side of the structural wall 1. That is to say, there is a gap between the wall attaching rod 2 and the structural wall 1. The groove 24 of the wall attaching rod 2 can better disperse the stress when the wall attaching rod 2 is subjected to force, thereby improving the bearing capacity and stability. In addition, if the structural wall 1 has a flatness deviation, a steel plate gasket can be added in the groove 24 to reduce or eliminate the height difference between the structural wall 1 and the wall attaching fastener 23.

[0037] Reference Figure 3 and Figure 4 In order to facilitate the installation of the standard section 31, the wall fastener 23 is provided with at least two clamping parts 232, and the plurality of clamping parts 232 are detachably connected. In this embodiment, two clamping parts 232 are provided, and each clamping part 232 is provided with a clamping groove 233, so that the wall fastener 23 forms a semi-circular shape. When two adjacent clamping parts 232 are connected, the clamping grooves 233 on the two clamping parts 232 are connected to form the installation cavity 231; further, in order to facilitate the connection and fixation of the two clamping parts 232, the clamping parts 23 A lug 234 is integrally fixed to the outer peripheral wall at the end of the clamping groove 233. The two lugs 234 on the same side of the two clamping parts 232 are hinged, and the two lugs 234 on the other side are fixed by a locking member 235 to achieve the fixation of the two clamping parts 232. The rod 3112 to be installed on the contact surface 3111 of the standard section 31 is located in the installation cavity 231, and the outer peripheral wall of the rod 3112 to be installed is in contact with the inner peripheral wall of the installation cavity 231, so that the wall fastener 23 can fix the rod 3112 to be installed.

[0038] Reference Figure 4 In some embodiments, the wall fastener 23 and the wall attaching rod 2 can be welded or detachably connected. In order to facilitate the replacement of the wall fastener 23, in this embodiment, the wall fastener 23 and the wall attaching rod 2 are detachably connected. Specifically, the wall fastener 23 is fixedly connected to a connecting seat 236 on one side close to the wall attaching rod 2, and the connecting seat 236 is fixedly connected to the wall fastener 23 by screws.

[0039] Reference Figure 4 and Figure 5 In this embodiment, the wall fastener 23 is connected and fixed to the wall attaching rod 2 through the mounting seat 531. Since the standard sections 31 have different sizes, if the width of the standard section 31 is small, in order to enable the wall fastener 23 to fix the standard sections 31 with different widths, the wall attaching rod 2 is evenly spaced along its length direction to provide a plurality of positioning holes 25. The installation position of the wall fastener 23 on the wall attaching rod 2 is determined by the width of the standard section 31, so that personnel can install the wall fastener 23 in the positioning holes 25 at different positions through the locking member 234, thereby adapting to the size of the standard section 31.

[0040] Reference Figure 6 , since the wall-attaching rods 2 need to be arranged at intervals along the height direction of the structural wall 1, in order to ensure that the guide rail frame 3 is in a vertical state, it is necessary to ensure that the two ends of multiple wall-attaching rods 2 are on the same horizontal line. Before installing the wall-attaching rods 2, a limit rod 6 is connected to the structural wall 1, and the position of the wall-attaching rod 2 is limited by the limit rod 6. The limit rod 6 is parallel to the height direction of the structural wall 1. In this embodiment, two limit rods 6 are provided, and the two limit rods 6 are arranged at intervals along the length direction of the wall-attaching rods 2. The wall-attaching rod 2 is located between the two limit rods 6. A plurality of positioning plates 61 are slidably connected to the limit rod 6 along its own length direction. The positioning plate 61 is fixed to the limit rod 6 by screws. Specifically, the limit rod 6 is provided with a slide groove 62 along its own length direction. One end of the positioning plate 61 is located in the slide groove 62 and slides along the groove wall of the slide groove 62. The wall-attaching rod 2 is overlapped on the positioning plate 61, and the positioning plate 61 supports the wall-attaching rod 2.

[0041] Reference Figure 6 In order to ensure that the spacing between multiple wall-mounted rods 2 is the same, a scale groove 63 is provided on the limit rod 6. When in use, the personnel can position the positioning plate 61 according to the scale on the scale groove 63 to ensure that the spacing between each wall-mounted rod 2 is the same, and further ensure that each wall-mounted rod 2 is in a parallel state.

[0042] Reference Figure 6 In order to further measure the horizontality of the limit rod 6 and the wall-attached rod 2, an infrared laser locator 7 is rotatably connected to the positioning plate 61 or the limit rod 6. In this embodiment, the infrared laser locator 7 is rotatably connected to the positioning plate 61. When the light emitted by the infrared laser locator 7 is parallel to the height direction of the structural wall 1, the infrared laser locator is used to test the horizontality of the wall-attached rod 2. When the light emitted by the infrared laser locator 7 is parallel to the length direction of the structural wall 1, the infrared laser locator is used to test the horizontality of the limit rod 6.

[0043] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A vertical transportation method for an existing hoisting and transportation device in a building renovation and reconstruction construction, characterized in that: The steps include: S1: Install the wall mounting rod (2): A plurality of wall attachment rods (2) are installed at intervals along the height direction of the structural wall (1), and an installation cavity (231) is formed on one side of the wall attachment rod (2) along the height direction of the structural wall (1); S2: Install the guide rail (3): The guide rail frame (3) is assembled from a plurality of standard sections (31) along the height direction of the structural wall (1), and the standard sections (31) are installed in the installation cavity (231) of the wall fastener (23) in an interval manner; S3: Install the cage (4): A sliding mechanism (5) is installed on the standard section (31), and the cage (4) slides on the sliding mechanism (5) along the height direction of the structural wall (1).

2. The vertical transportation method of the existing hoisting and transportation device for building renovation and reconstruction according to claim 1 is characterized by: Each of the wall-mounting rods (2) is detachably connected to a wall-mounting fastener (23), and the wall-mounting fastener (23) is provided with the installation cavity (231).

3. The vertical transportation method of the existing hoisting and transportation device for building renovation and reconstruction according to claim 2 is characterized by: The wall-attaching rods (2) are arranged along a length direction parallel to the structural wall (1), and each of the wall-attaching rods (2) is provided with at least two wall-attaching fasteners (23).

4. The vertical transportation method of the existing hoisting and transportation device for building renovation and reconstruction according to claim 1 is characterized by: The wall attachment rod (2) is provided with a groove (24) in a direction perpendicular to both the height direction of the structural wall (1) and the length direction of the structural wall (1), and the groove (24) is arranged close to one side of the structural wall (1).

5. The vertical transportation method of the existing hoisting and transportation device for building renovation and reconstruction according to claim 2 is characterized by: The wall fastener (23) has at least two clamping parts (232), and a plurality of the clamping parts (232) are detachably connected. A clamping groove (233) is provided on the clamping part (232). When the plurality of the clamping parts (232) are connected, the clamping groove (233) on each of the clamping parts (232) is connected to form the installation cavity (231).

6. The vertical transportation method of the existing hoisting and transportation device for building renovation and reconstruction according to claim 1 is characterized by: An anti-falling joint (32) is also installed on the top of the guide rail frame (3).

7. The vertical transportation method of the existing hoisting and transportation device for building renovation and reconstruction according to claim 2 is characterized by: The wall-attaching rod (2) is provided with a plurality of positioning holes (25) evenly spaced along its length direction, and the positioning holes (25) are aligned with the installation positions of the wall-attaching fasteners (23).

8. The vertical transportation method of the existing hoisting and transportation device for building renovation and reconstruction according to any one of claims 1 to 7 is characterized by: The structural wall (1) is detachably connected to two mutually parallel limiting rods (6), the two limiting rods (6) are spaced apart along the width direction of the structural wall (1), the wall attachment rod (2) is located between the two limiting rods (6), and the limiting rod (6) is provided with a plurality of scale grooves (63) along the height direction of the structural wall (1).

9. The vertical transportation method of the existing hoisting and transportation device for building renovation and reconstruction according to claim 8 is characterized by: The limiting rod (6) is provided with a sliding groove (62) along the height direction of the structural wall (1), and a positioning plate (61) is provided in the sliding groove (62). One end of the positioning plate (61) slides along the groove wall of the sliding groove (62), and the positioning plate (61) is fixed to the limiting rod (6) by screws, and the wall-attaching rod (2) is overlapped on the positioning plate (61).

10. The vertical transportation method of the existing hoisting and transportation device in the building renovation and reconstruction construction according to claim 9 is characterized by: An infrared laser locator (7) is rotatably connected to the positioning plate (61) or the limiting rod (6). When the light emitted by the infrared laser locator (7) is parallel to the height direction of the structural wall (1), the infrared laser locator (7) detects the horizontality of the limiting rod (6). When the light emitted by the infrared laser locator (7) is parallel to the length direction of the structural wall (1), the infrared laser locator (7) detects the horizontality of the wall-attaching rod (2).