Open caisson type elevator structure for bridge and tunnel combined part and construction method of open caisson type elevator structure

Through the docking of the caisson lift structure with the bridge and immersive pipe tunnel, the problems of extended structural length and large engineering volume in the transition area of ​​the deep-water area bridge and tunnel are solved, and the rapid passage of vehicles and efficient allocation of resources are achieved, reducing cost and safety risks.

CN118929505APending Publication Date: 2024-11-12CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411079500.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the bridge and tunnel transition areas in deep water areas, the existing technology is difficult to effectively solve the problems of extended structural length, large engineering volume, and high waterproof and anti-seepage requirements, resulting in increased construction period and cost.

Method used

Adopt a caisson lift structure, including a lifting platform that can move up and down and a segmented expansion bag, through the docking of the caisson structure with the bridge and immersive tube tunnel, the vehicle can be transported quickly, and through variable counterweight devices and electromechanical control The system optimizes vehicle traffic.

Benefits of technology

It reduces the project volume and cost, improves vehicle conversion efficiency, reduces safety hazards caused by human factors, and achieves efficient allocation of resources and alleviates traffic pressure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118929505A_ABST
    Figure CN118929505A_ABST
Patent Text Reader

Abstract

The open caisson type elevator structure comprises an open caisson structure, the open caisson structure is provided with a lifting table capable of moving up and down, the lifting table is provided with a first cavity and a second cavity, the upper end of the first side of the open caisson structure is connected with a bridge, and the lower end of the second side of the open caisson structure communicates with an immersed tunnel. The first chamber and the second chamber are respectively used for temporarily storing vehicles in two directions, the lifting platform is used for transferring the vehicles between a bridge and an immersed tunnel, and the problem of road connection in a bridge-tunnel transition area is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of marine engineering, and in particular to a caisson type elevator structure used for a bridge-tunnel junction and a construction method thereof. Background Art

[0002] The construction method of bridge-tunnel combination builds bridges in shallow water areas and tunnels in deep water areas according to the characteristics of the riverbed. It has obvious technical and economic benefits and has been widely used in various large-scale strait projects at home and abroad. The transition area between bridges and tunnels is usually realized by natural islands and artificial islands.

[0003] Artificial islands are land reclamation projects, which involve large amounts of ground treatment and land backfilling. Waste soil and fill not only occupy limited land area, but also consume a lot of time and resources for transportation. Especially in deep water areas, in order to ensure a smooth transition between bridges and tunnels, the length of the artificial island needs to be extended, further increasing the cost and construction difficulty.

[0004] Invention application publication number CN111485579A discloses a bridge-tunnel transition conversion structure between a suspended tunnel and a deep-water suspension bridge, but the transition elevation that can be adapted is limited, and a large-volume spiral approach bridge still needs to be built under deep-water conditions. Invention application publication number CN116024949A discloses an island-free cross-sea channel bridge-tunnel conversion structure and method, which uses a channel structure with a height difference as a bridge-tunnel conversion site. The structure still requires a long distance to meet driving requirements, and has high requirements for waterproofing and anti-seepage of the joints between the structures.

[0005] Although the above structures have a certain reduction in engineering workload compared to artificial islands, they are not suitable for bridge-tunnel transition areas in deep-water environments. At present, the maximum installation depth of offshore immersed tube tunnels is generally around 60m. As marine engineering develops into the deep sea, the water depth of some projects has reached nearly 100 meters. As the water depth deepens, the length of the structure needs to be extended in plane or space, there are many interferences in offshore construction, and high standards for waterproofing and anti-seepage are required, which further increases the project's construction period, cost, and construction difficulty. Summary of the invention

[0006] The invention provides a caisson type elevator structure for a bridge-tunnel junction and a construction method thereof, which solves the problem of road connection in a bridge-tunnel transition area.

[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is: a caisson type elevator structure for the junction of a bridge and a tunnel, including a caisson structure, the caisson structure is provided with a lifting platform which can move up and down, the lifting platform is provided with a first chamber and a second chamber, the upper end of the first side of the caisson structure is connected to the bridge, and the lower end of the second side of the caisson structure is connected to the immersed tube tunnel, the first chamber and the second chamber are respectively used for temporarily storing vehicles in two directions, and the lifting platform is used to transfer vehicles between the bridge and the immersed tube tunnel.

[0008] In the preferred scheme, the caisson structure is provided with a central sunken part, the lifting platform is arranged in the central sunken part, edge sinking cavities are provided on both sides of the central sunken part, and a liftable foundation counterweight block is provided in the edge sinking cavity. A driving wheel is provided at the upper end of the central sunken part, and a first lifting cable chain is wound around the driving wheel. One end of the first lifting cable chain is connected to the upper end of the lifting platform, and the other end of the first lifting cable chain is connected to the upper end of the foundation counterweight block.

[0009] In the preferred solution, there are multiple driving wheels, a connecting rod is provided, the connecting rod is sleeved with each driving wheel, a lifting motor is provided, the lifting motor is provided with a driving shaft, and the driving shaft and one end of the connecting rod are provided with a meshing bevel gear set.

[0010] In the preferred scheme, the caisson structure is provided with a central sunken part, and the lifting platform is arranged in the central sunken part. The lifting platform includes a first lifting platform and a second lifting platform arranged side by side and separately. The first lifting platform and the second lifting platform include a central lifting frame, and a vehicle loading platform is provided on the central lifting frame. The first chamber is arranged in the vehicle loading platform of the first lifting platform, and the second chamber is arranged in the vehicle loading platform of the second lifting platform. A driving wheel is provided at the upper end of the central sunken part, and a first lifting cable chain is wound around the driving wheel. One end of the first lifting cable chain is connected to the upper end of the vehicle loading platform of the first lifting platform, and the other end of the first lifting cable chain is connected to the upper end of the vehicle loading platform of the second lifting platform.

[0011] In the preferred solution, an outer frame lifting frame is provided on the outer side of each vehicle loading platform, and a second fixed pulley and a second lifting cable chain connected to the second fixed pulley are also provided on the upper port of the central sunken part, one end of the second lifting cable chain is connected to the central lifting frame, and the other end of the second lifting cable chain is connected to the outer frame lifting frame, and a variable counterweight device is provided on the outer frame lifting frame.

[0012] In a preferred solution, a platform is provided on the outer frame lifting frame, a powered roller is provided at the bottom of the central sinking part, a basic counterweight is provided on the powered roller, and the powered roller drives the basic counterweight to be placed on the platform.

[0013] In the preferred solution, an expandable bag is provided on the outer frame lifting frame, the expandable bag can be filled with liquid, a liquid storage tank is provided at the bottom of the central sinking part, and a liquid pump is also provided, and the liquid storage tank is connected to the expandable bag through the liquid pump.

[0014] In a preferred embodiment, the expandable bags are distributed in a ring shape on the outer frame lifting frame. The expandable bags include multiple independent segments and a rotary valve. The rotary valve includes a fixed cylinder. A rotatable rotating shaft is provided in the fixed cylinder. The rotating shaft is a hollow structure. A plurality of blade structures are provided on the inner wall of the fixed cylinder along the circumferential direction. The blade structure divides the rotating shaft and the fixed cylinder into multiple separation chambers, and a connecting hole is provided between one of the separation chambers and the inside of the rotating shaft.

[0015] In the preferred scheme, a vertical frame is also provided, an upper connecting frame and a lower connecting frame are provided on the inner wall of the central sunken part, the upper connecting frame and the lower connecting frame are connected to the vertical frame so that the inner side forms an up-and-down traveling space, the outer frame lifting frame is provided with a transverse connecting frame, the transverse connecting frame passes through the up-and-down traveling space, a linear track is provided on the inner wall of the central sunken part and the vertical frame, and the outer ends of the central lifting frame and the outer frame lifting frame are provided with first and second traveling wheels arranged orthogonally, and the first and second traveling wheels roll against the linear track.

[0016] Including construction methods, For foundation treatment, a dredger is used to remove the mud surface in the construction area and dig downward to form a groove. When the slope ratio and digging depth meet the design requirements, the foundation trench is leveled; Caisson conversion structure prefabrication: the main caisson, lifting platform and other structures of the conversion structure are made in the prefabrication yard. The part below the main caisson top plate is prefabricated in layers in the factory and then assembled. The rack mechanism and counterweight block slide of the wall are installed in advance and anti-corrosion measures are taken. The steel sealing door structure similar to the caisson is prefabricated at the butt end of the caisson. The caisson surface is tested for anti-seepage before installation. If it is qualified, the next step is carried out. The wire rope holes are preset on the top plate of the caisson. Caisson transportation and positioning sinking: After the caisson steel shell is prefabricated, it is transported to the site by barge or semi-submersible barge, and initially positioned with cables. Water is poured into the caisson bulkhead to sink to a certain elevation. After the caisson is planted, underwater concrete is poured symmetrically and evenly into the bulkhead. The concrete should have high fluidity and not segregate underwater, and further absorb mud and sink to the designed elevation; Casting of bottom concrete and caisson wall construction. After cleaning the bottom of the caisson, the bottom concrete construction is carried out. After pumping out the water, a layer of buffer filler is filled on the bottom concrete. The concrete is poured in the caisson compartment, and the walls on both sides of the lifting platform and the round end structure wall of the caisson are constructed. The ends of the immersed tubes are butted together. After the concrete of the main structure of the caisson reaches the designed strength, a water stop joint is installed at the joint between the immersed tube and the transition structure of the caisson. After the butt joint is completed, the end sealing door at the transition end of the caisson is removed, and scour protection is carried out around the caisson. Install the lifting platform, lower the lifting platform and install the wire rope, hoist and debug the gear rack transmission performance to ensure that the lifting platform can move up and down along the wall smoothly and maintain the lifting system strength; For the construction of the top plate and the structures above, the top plate structure of the caisson is constructed first. After the top plate concrete reaches the designed strength, the hoist and electromechanical control equipment are installed on the upper part of the top plate. After the wire rope and the counterweight are connected, the lifting system is released and the construction of the upper electromechanical equipment room continues; The caisson and the bridge transition end structure are constructed and connected.

[0017] The beneficial effects of the present invention are as follows: the structure occupies a small area and has a small engineering volume, which greatly reduces the construction cost. Compared with artificial islands, it has significant economic advantages; it effectively improves the conversion efficiency of vehicles between tunnels and bridges, and the vehicles do not need to rotate to go uphill and downhill, which improves the comfort of vehicle drivers; the movement speed of the lifting platform can be automatically controlled according to the traffic flow and traffic conditions, and resources are reasonably allocated and traffic pressure is alleviated; the travel time of vehicles in the bridge-tunnel combination area is controlled by the system, reducing the safety hazards and risks caused by human factors; a double lifting platform type counterweight structure is adopted, and the counterweight adjustment is completed at a low position through the outer frame lifting frame, and the weight difference of two-way traffic is balanced with less energy consumption, which reduces the load of the lifting drive mechanism and reduces the driving energy consumption; the expandable bag separation cavity is arranged in sections, and the horizontality of the lifting platform is accurately adjusted, the overload wear of the lifting cable chain is reduced, and the safety of lifting is ensured. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0019] Figure 1 This is a schematic diagram of the bridge-tunnel junction.

[0020] Figure 2 It is a top view of the integral caisson structure of the lifting platform.

[0021] Figure 3 It is a cross-sectional view of the integral caisson structure of the lifting platform.

[0022] Figure 4 It is the caisson wall structure.

[0023] Figure 5 It is a schematic diagram of the transition section between the caisson and the immersed tube.

[0024] Figure 6 It is a schematic diagram of the transition section between the caisson and the bridge.

[0025] Figure 7 It is a schematic diagram of a split lift platform.

[0026] Figure 8 It is a side view of the interference structure of the outer frame lifting frame.

[0027] Fig. 9 This is a schematic diagram of the walking component.

[0028] Fig.10This is a schematic diagram of basic counterweight adjustment.

[0029] Fig.11 It is the connection diagram of the pulley system of the central lifting frame and the outer frame lifting frame.

[0030] Fig.12 It is a schematic diagram of the arrangement of the expandable bag partition chamber.

[0031] Fig.13 This is the structural diagram of the rotary valve.

[0032] In the figure: caisson structure 1; first chamber 101; second chamber 102; central sinking part 103; edge sinking cavity 104; wall steel plate 105; vertical ribs 106; transverse diaphragm 107; truss 108; bridge 2; caisson and bridge docking transition section 201; immersed tube tunnel 3; caisson and immersed tube docking transition section 301; foundation counterweight block 4; first lifting cable chain 5; connecting rod 501; drive shaft 502; lifting motor 503; drive wheel 504; first fixed pulley 505; bevel gear set 506; central lifting frame 6; outer frame lifting frame 7; transverse connecting frame 701; platform Plate 702; powered roller 703; vehicle carrier 8; vertical frame 9; upper connecting frame 901; lower connecting frame 902; up and down travel space 903; travel assembly 10; linear track 1001; first travel wheel 1002; second travel wheel 1003; first lifting platform 11; second lifting platform 12; second lifting cable chain 13; second fixed pulley 1301; expandable bag 14; liquid storage tank 1401; liquid pump 1402; segment 1403; rotary valve 1404; rotating shaft 1405; partition chamber 1406; connecting hole 1407; fixed cylinder 1408. DETAILED DESCRIPTION

[0033] like Figure 1-13 In the invention, a caisson type elevator structure for a bridge-tunnel junction is disclosed, comprising a caisson structure 1, wherein the caisson structure 1 is provided with a lifting platform which can be moved up and down, wherein the lifting platform is provided with a first chamber 101 and a second chamber 102, wherein the upper end of a first side of the caisson structure 1 is connected to a bridge 2, and the lower end of a second side of the caisson structure 1 is connected to an immersed tube tunnel 3, wherein the first chamber 101 and the second chamber 102 are respectively used for temporarily storing vehicles in two directions, and the lifting platform is used for transferring vehicles between the bridge 2 and the immersed tube tunnel 3.

[0034] The lifting platform can be a whole or two parts. For the integral structure, such as Figure 2The lifting platform is raised to the same height as the bridge 2, and the forward traffic on the bridge 2 enters the first chamber 101 through the transition section 201 where the caisson and the bridge are connected. The integral lifting platform is lowered to the same height as the immersed tube tunnel 3, and the forward traffic in the first chamber 101 enters the immersed tube tunnel 3; while the reverse traffic enters the second chamber 102 from the immersed tube tunnel 3 at this time, the integral lifting platform rises back to the same height as the bridge 2, and the reverse traffic enters another lane on the bridge 2 from the second chamber 102.

[0035] In the preferred scheme, the caisson structure 1 is provided with a central sunken part 103, the lifting platform is arranged in the central sunken part 103, edge sinking cavities 104 are provided on both sides of the central sunken part 103, a liftable foundation counterweight block 4 is provided in the edge sinking cavity 104, a driving wheel 504 is provided at the upper end of the central sunken part 103, a first lifting cable chain 5 is wound around the driving wheel 504, one end of the first lifting cable chain 5 is connected to the upper end of the lifting platform, and the other end of the first lifting cable chain 5 is connected to the upper end of the foundation counterweight block 4.

[0036] The first lifting cable chain 5 can be a chain or a steel cable, the corresponding driving wheel 504 can be a sprocket or a pulley, a load-bearing partition wall can be set between the central sinking part 103 and the edge sinking cavity 104, and a driving wheel 504 and a first lifting cable chain 5 are arranged at intervals on the load-bearing partition wall.

[0037] The load-bearing partition wall mainly consists of a wall steel plate 105 , vertical ribs 106 , a transverse partition 107 and a truss 108 .

[0038] In the preferred embodiment, there are multiple driving wheels 504, and a connecting rod 501 is also provided. The connecting rod 501 is sleeved with each driving wheel 504, and a lifting motor 503 is also provided. The lifting motor 503 is provided with a driving shaft 502, and the driving shaft 502 and one end of the connecting rod 501 are provided with a meshing bevel gear set 506.

[0039] The lifting motor 503 can adopt a worm gear reduction drive motor with a dual drive shaft, which can synchronously drive all the driving wheels 504 on both sides to rotate synchronously through the connecting rod 501. In order to adapt to the width of the partition wall, a first fixed pulley 505 or a freely rotating sprocket can be installed on the edge of the partition wall.

[0040] In the preferred scheme, the caisson structure 1 is provided with a central sunken part 103, and the lifting platform is arranged in the central sunken part 103. The lifting platform includes a first lifting platform 11 and a second lifting platform 12 arranged side by side and separately. The first lifting platform 11 and the second lifting platform 12 include a central lifting frame 6, and a vehicle loading platform 8 is provided on the central lifting frame 6. The first chamber 101 is arranged in the vehicle loading platform 8 of the first lifting platform 11, and the second chamber 102 is arranged in the vehicle loading platform 8 of the second lifting platform 12. A driving wheel 504 is provided at the upper end of the central sunken part 103, and a first lifting cable chain 5 is wound around the driving wheel 504. One end of the first lifting cable chain 5 is connected to the upper end of the vehicle loading platform 8 of the first lifting platform 11, and the other end of the first lifting cable chain 5 is connected to the upper end of the vehicle loading platform 8 of the second lifting platform 12.

[0041] like Figure 7 This is a split lift structure. The first lift 11 and the second lift 12 have the same structure and weight, and can balance each other. The lifting motor 503 only needs to load the difference in vehicle weight between the first chamber 101 and the second chamber 102.

[0042] In the preferred solution, an outer frame lifting frame 7 is provided on the outer side of each vehicle loading platform 8, and a second fixed pulley 1301 and a second lifting cable chain 13 wound around the second fixed pulley 1301 are also provided on the upper port of the central sunken portion 103, one end of the second lifting cable chain 13 is connected to the central lifting frame 6, and the other end of the second lifting cable chain 13 is connected to the outer frame lifting frame 7, and a variable counterweight device is provided on the outer frame lifting frame 7.

[0043] On the basis that the first lifting platform 11 and the second lifting platform 12 serve as counterweights for each other, each outer frame lifting frame 7 also serves as its own counterweight.

[0044] In order to ensure the closed loop, a cable chain and a fixed pulley are also required to be arranged at the lower ends of the central lifting frame 6 and the outer frame lifting frame 7. The second lifting cable chain 13 does not need to be provided with a driving device, but adopts a follow-up mode. Since it is connected to the central lifting frame 6, when the vehicle platform 8 rises, the outer frame lifting frame 7 falls. A variable counterweight device can be arranged on the outer frame lifting frame 7, and the counterweight can be increased or decreased according to the specific vehicle flow in both directions.

[0045] In the preferred solution, a platform 702 is provided on the outer frame lifting frame 7, a powered roller 703 is provided at the bottom of the central sinking part 103, a basic counterweight block 4 is provided on the powered roller 703, and the powered roller 703 drives the basic counterweight block 4 to be placed on the platform 702.

[0046] The variable counterweight device includes a powered roller 703 and a basic counterweight block 4.

[0047] The powered roller 703 is outside the outer frame lifting frame 7 and does not interfere with its up and down movement. The length of the powered roller 703 is greater than the width of the basic counterweight 4, so when the outer frame lifting frame 7 descends, the basic counterweight 4 does not interfere with the outer frame lifting frame 7 on the powered roller 703.

[0048] According to historical data, the approximate difference between the forward traffic flow and the reverse traffic flow can be known in advance, and the basic counterweight block 4 can be placed in advance on the outer frame lifting frame 7 of the first lifting platform 11 or the second lifting platform 12 on the side with larger traffic flow.

[0049] When the outer frame lifting frame 7 descends to the same height as the platform 702 and the powered roller 703, the powered roller 703 drives the basic counterweight block 4 to move horizontally to the platform 702. At this time, the outer frame lifting frame 7 rises and can take away the platform 702, which is equivalent to an increase in the total weight of the outer frame lifting frame 7. Therefore, the pulling force on the central lifting frame 6 increases, and the counterweight effect increases.

[0050] In the preferred embodiment, an expandable bag 14 is provided on the outer frame lifting frame 7, and the expandable bag 14 can be filled with liquid. A liquid storage tank 1401 is provided at the bottom of the central sinking part 103, and a liquid pump 1402 is also provided. The liquid storage tank 1401 is connected to the expandable bag 14 through the liquid pump 1402.

[0051] The liquid storage tank 1401 can be made of local materials and filled with seawater. The liquid pump 1402 can be used to fill the expandable bag 14 with seawater or pump seawater from the expandable bag 14 into the liquid storage tank 1401 in reverse order to adjust the total weight of the outer frame lifting frame 7.

[0052] Weighing sensors are installed at the transition section 201 between the caisson and the bridge and the transition section 301 between the caisson and the immersed tube to record the total weight of the vehicles entering the first chamber 101 and the second chamber 102 .

[0053] Since the counterweights of the first lifting platform 11 and the second lifting platform 12 have been roughly adapted to the vehicle flow by adjusting the basic counterweight block 4 in advance, the balance on both sides can be adjusted more accurately by the expandable bag 14 at this time.

[0054] The expandable bag 14 and the liquid storage tank 1401 usually store a medium amount of seawater. There are four types of weight adjustment: The first one is that the first lifting platform 11 is at the lower position, the outer frame lifting frame 7 of the first lifting platform 11 is at the upper position, the second lifting platform 12 is at the upper position, the outer frame lifting frame 7 of the second lifting platform 12 is at the lower position, and the total weight of the vehicle in the first chamber 101 is greater than the total weight of the vehicle in the second chamber 102. At this time, part of the seawater is pumped out from the expandable bag 14 of the second lifting platform 12 at the lower position into the liquid storage tank 1401. Since the weight of one of the counterweight outer frame lifting frames 7 of the second lifting platform 12 is reduced, the equivalent weight of its own system is equivalent to an increase, and the weight is equivalent to an increase when it is used as a counterweight for the first lifting platform 11. Therefore, the first lifting platform 11 and the second lifting platform 12 are restored to balance.

[0055] The second type is that the first lifting platform 11 is in the lower position, the outer frame lifting frame 7 of the first lifting platform 11 is in the upper position, the second lifting platform 12 is in the upper position, the outer frame lifting frame 7 of the second lifting platform 12 is in the lower position, and the total weight of the vehicle in the first chamber 101 is less than the total weight of the vehicle in the second chamber 102. At this time, seawater needs to be filled into the expandable bag 14 of the second lifting platform 12 from the liquid storage tank 1401.

[0056] The third type is that the first lifting platform 11 is in the upper position, the outer frame lifting frame 7 of the first lifting platform 11 is in the lower position, the second lifting platform 12 is in the lower position, and the outer frame lifting frame 7 of the second lifting platform 12 is in the upper position, and the total weight of the vehicle in the first chamber 101 is greater than the total weight of the vehicle in the second chamber 102. At this time, seawater is filled into the expandable bag 14 of the first lifting platform 11 from the liquid storage tank 1401, and the weight of the outer frame lifting frame 7 in one of the counterweights of the first lifting platform 11 increases, and the overall weight of the first lifting platform 11 is equivalently reduced, and the balance with the second lifting platform 12 is restored.

[0057] The fourth type is that the first lifting platform 11 is in the upper position, the outer frame lifting frame 7 of the first lifting platform 11 is in the lower position, the second lifting platform 12 is in the lower position, the outer frame lifting frame 7 of the second lifting platform 12 is in the upper position, and the total weight of the vehicle in the first chamber 101 is less than the total weight of the vehicle in the second chamber 102. At this time, seawater is filled into the liquid storage tank 1401 from the expandable bag 14 of the first lifting platform 11.

[0058] Since the pumping in and pumping back of seawater always occurs when the expandable bag 14 is in the lower position, at this time, the height of the liquid storage tank 1401 is equivalent to that of the expandable bag 14, and there is almost no need to overcome gravity to do work, so the energy consumption of adjusting the variable counterweight is very low. However, since the counterweight is adjusted to be balanced, the energy consumed by the lifting motor 503 is reduced, and the reduction is greater than the energy consumption of the liquid pump 1402, so overall, the energy consumption is reduced.

[0059] Although the peak periods of forward and reverse traffic flow are different, from a large time scale, the total amount of forward and reverse traffic flow generally remains equal as a whole. Therefore, the proportion of seawater capacity in the expandable bag 14 and the liquid storage tank 1401 will not be extreme. In addition, the capacity of the expandable bag 14 is relatively large. During the peak period, when the water is discharged in one direction, it can be ensured that the expandable bag 14 will not be emptied or filled. During the reverse peak period, the balance will be restored without manual intervention.

[0060] In the preferred embodiment, the expandable bag 14 is distributed in a ring shape on the outer frame lifting frame 7. The expandable bag 14 includes multiple independent segments 1403 and a rotary valve 1404. The rotary valve 1404 includes a fixed cylinder 1408. A rotatable rotating shaft 1405 is provided in the fixed cylinder 1408. The rotating shaft 1405 is a hollow structure. The inner wall of the fixed cylinder 1408 is provided with multiple blade structures along the circumferential direction. The blade structure divides the rotating shaft 1405 and the fixed cylinder 1408 into multiple separation chambers 1406, and a connecting hole 1407 is provided between one of the separation chambers 1406 and the rotating shaft 1405.

[0061] Inclination sensors are installed at four corners of the first chamber 101 and the second chamber 102 to monitor the overall tilt angle.

[0062] The rotating shaft 1405 is connected to the external on-off valve through a rotating joint, and its main shaft is driven by a motor synchronous belt mechanism. When the connecting hole 1407 rotates to connect with a certain partition chamber 1406, the on-off valve opens, and water can be filled or pumped into the segment 1403. Adjust the overall levelness of the vehicle platform 8 to avoid excessive weight on one side causing serious wear of the mechanism on that side.

[0063] For example, the expandable bag 14 is rectangular, and the first side of the expandable bag 14 can be arranged with A1 and A2, the second side with B1 and B2, the third side with C1 and C2, and the fourth side with D1 and D2. In this way, the weight of seawater in each direction can be accurately adjusted. The corresponding second lifting cable chains 13 are also eight in number, which are suspended at the corresponding positions through the pulley block. When a corner or side of the first lifting platform 11 tilts downward, the corresponding counterweight can be added.

[0064] In the preferred embodiment, a vertical frame 9 is further provided, and an upper connecting frame 901 and a lower connecting frame 902 are provided on the inner wall of the central sunken part 103. The upper connecting frame 901 and the lower connecting frame 902 are connected to the vertical frame 9 so that the inner side forms an up-and-down traveling space 903. The outer frame lifting frame 7 is provided with a transverse connecting frame 701, and the transverse connecting frame 701 passes through the up-and-down traveling space 903. A linear track 1001 is provided on the inner wall of the central sunken part 103 and the vertical frame 9, and the outer ends of the central lifting frame 6 and the outer frame lifting frame 7 are provided with first walking wheels 1002 and second walking wheels 1003 arranged orthogonally, and the first walking wheels 1002 and the second walking wheels 1003 roll against the linear track 1001.

[0065] The travel assembly 10 is arranged at two opposite end surfaces, and the linear track 1001 can be made of I-beam.

[0066] Embodiment 2: A caisson type elevator structure used for the junction of a bridge and a tunnel, comprising a bottom foundation, a caisson type main body, a docking transition section, a lifting platform, a braking mechanism, a driving structure, a control system, etc.

[0067] The caisson-type main body is characterized by a round-end design in appearance, which effectively reduces the force of waves and water flow.

[0068] Preferably, the caisson body adopts a double-layer steel shell concrete structure, vertical ribs are welded on the double-layer steel plates of the wall, and transverse diaphragms and trusses are welded between the inner and outer steel plates. After the caisson steel shell is floated and sunk, the bottom sealing concrete is poured to ensure the water tightness of the structure, and the reinforcement concrete is poured inside the double-layer steel plate to ensure that the structure has good strength.

[0069] It is preferred that a layer of buffer filler is filled on the bottom concrete to prevent the lifting platform from falling suddenly after a safety accident occurs, thereby ensuring the safety of vehicles and drivers.

[0070] The bottom foundation may be provided with anti-pullout piles according to factors such as the thickness of the bottom sealing concrete and buoyancy.

[0071] The driving structure is arranged in multiple groups along the bridge and tunnel direction, each group includes a steel wire rope, a winch, a counterweight, etc. The winch of the driving mechanism is installed on the top of the caisson top plate after it is cast and formed, and the movement channel of the counterweight connected to the steel wire rope is opened inside the double-layer concrete structure of the caisson body.

[0072] A plurality of racks are symmetrically installed on the double-layer concrete wall, and transmission gears are installed in the boxes at the four corners of the lifting platform. The lifting platform can be automatically controlled to move up and down along the racks of the wall through a winch.

[0073] The lifting platform serves as a transportation channel for vehicles. Its up and down movement is controlled by the steel wire rope of the driving structure. Two cavities are set in the lifting platform to divert the upper and lower vehicles, effectively improving the conversion efficiency of vehicles between the lifting platform and the immersed tube or bridge pavement.

[0074] The control system can determine the optimal number of transitions per minute based on the traffic volume on the bridge deck and in the immersed tube, issue instructions to the drive structure, and control the movement speed of the lifting platform. Preferably, the single passage time is controlled within 10 minutes.

[0075] Preferably, in a water depth of 30m, the lifting height is designed to be 50m. Preferably, the one-way two-lane has a traffic volume of 600 vehicles per hour, a single travel time of 10 minutes, and 100 vehicles need to pass through at a time. The plane size of the round-end caisson is about 60m×90m, and the plane size of the elevator is about 50m×80m.

[0076] The braking mechanism is arranged at the four corners of the bottom plate of the lifting platform and at the connection of the wire rope. It opens after detecting the abnormal movement speed of the lifting platform, and stops the lifting platform urgently through the friction between the gear bar and the wire rope on the well wall.

[0077] The docking transition section serves as a pause area for vehicles about to enter the lifting platform, and electromechanical equipment such as traffic indicator lights are installed.

[0078] Preferably, a water stop joint is provided at the butt end of the immersed tube to ensure water tightness.

[0079] A construction method for a caisson type elevator structure used at a bridge-tunnel junction. For foundation treatment, a dredger is used to remove the mud surface in the construction area and dig downward to form a groove. When the slope ratio and digging depth meet the design requirements, the foundation trench is leveled; Caisson conversion structure prefabrication: the main caisson, lifting platform and other structures of the conversion structure are made in the prefabrication yard. The part below the main caisson top plate is prefabricated in layers in the factory and then assembled. The rack mechanism and counterweight block slide of the wall are installed in advance and anti-corrosion measures are taken. The steel sealing door structure similar to the caisson is prefabricated at the butt end of the caisson. The caisson surface is tested for anti-seepage before installation. If it is qualified, the next step is carried out. The wire rope holes are preset on the top plate of the caisson. Caisson transportation and positioning sinking: After the caisson steel shell is prefabricated, it is transported to the site by barge or semi-submersible barge, and initially positioned with cables. Water is poured into the caisson bulkhead to sink to a certain elevation. After the caisson is planted, underwater concrete is poured symmetrically and evenly into the bulkhead. The concrete should have high fluidity and not segregate underwater, and further absorb mud and sink to the designed elevation; Casting of bottom concrete and caisson wall construction. After cleaning the bottom of the caisson, the bottom concrete construction is carried out. After pumping out the water, a layer of buffer filler is filled on the bottom concrete. The concrete is poured in the caisson compartment, and the walls on both sides of the lifting platform and the round end structure wall of the caisson are constructed. The ends of the immersed tubes are butted together. After the concrete of the main structure of the caisson reaches the designed strength, a water stop joint is installed at the joint between the immersed tube and the transition structure of the caisson. After the butt joint is completed, the end sealing door at the transition end of the caisson is removed, and scour protection is carried out around the caisson. Install the lifting platform, lower the lifting platform and install the wire rope, hoist and debug the gear rack transmission performance to ensure that the lifting platform can move up and down along the wall smoothly and maintain the lifting system strength; For the construction of the top plate and the structures above, the top plate structure of the caisson is constructed first. After the top plate concrete reaches the designed strength, the hoist and electromechanical control equipment are installed on the upper part of the top plate. After the wire rope and the counterweight are connected, the lifting system is released and the construction of the upper electromechanical equipment room continues; The caisson and the bridge transition end structure are constructed and connected.

[0080] 1. The structure of the present invention has strong adaptability to foundation and water depth. The bottom of the structure can be equipped with anti-pullout piles according to the thickness of the bottom concrete, buoyancy and other factors, which effectively reduces the workload of foundation treatment, excavation depth and dredging work; the well wall adopts double-layer concrete to ensure good strength and water tightness.

[0081] 2. The structure of the present invention occupies a small area and has a small engineering volume. The design length of the structure in a water depth of 30 meters does not exceed 100 meters, which greatly reduces the construction cost and has high economic benefits. Compared with artificial islands (length direction of km), it has significant economic advantages.

[0082] 3. The lifting structure provided in the structure of the present invention can realize the rapid passage of vehicles. The one-way two-lane passage time of 100 vehicles is less than 10 minutes, which effectively improves the conversion efficiency of vehicles between tunnels and bridges. Moreover, the vehicles do not need to rotate to go uphill or downhill, which improves the comfort of the vehicle drivers.

[0083] The present invention can automatically control the movement speed of the lifting platform according to the vehicle flow and traffic conditions, rationally allocate resources and alleviate traffic pressure; the vehicle's travel time in the bridge-tunnel area is controlled by the system, reducing safety hazards and risks caused by human factors.

[0084] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A caisson type elevator structure for a bridge-tunnel junction, characterized in that: The caisson structure (1) comprises a caisson structure (1), wherein the caisson structure (1) is provided with a lifting platform that can move up and down, wherein the lifting platform is provided with a first chamber (101) and a second chamber (102), wherein the upper end of the first side of the caisson structure (1) is connected to the bridge (2), and the lower end of the second side of the caisson structure (1) is connected to the immersed tube tunnel (3), wherein the first chamber (101) and the second chamber (102) are respectively used for temporarily storing vehicles in two directions, and the lifting platform is used for transferring vehicles between the bridge (2) and the immersed tube tunnel (3).

2. The caisson type elevator structure for the bridge-tunnel junction according to claim 1 is characterized in that: The caisson structure (1) is provided with a central sinking part (103), a lifting platform is arranged in the central sinking part (103), edge sinking cavities (104) are arranged on both sides of the central sinking part (103), a liftable basic counterweight block (4) is arranged in the edge sinking cavity (104), a driving wheel (504) is arranged at the upper end of the central sinking part (103), a first lifting cable chain (5) is wound around the driving wheel (504), one end of the first lifting cable chain (5) is connected to the upper end of the lifting platform, and the other end of the first lifting cable chain (5) is connected to the upper end of the basic counterweight block (4).

3. The caisson type elevator structure for the bridge-tunnel junction according to claim 2 is characterized in that: A plurality of driving wheels (504) are provided, and a connecting rod (501) is also provided. The connecting rod (501) is sleeved with each driving wheel (504). A lifting motor (503) is also provided. The lifting motor (503) is provided with a driving shaft (502). The driving shaft (502) and one end of the connecting rod (501) are provided with a meshing bevel gear set (506).

4. The caisson type elevator structure for the bridge-tunnel junction according to claim 1 is characterized in that: The caisson structure (1) is provided with a central sinking part (103), and a lifting platform is arranged in the central sinking part (103). The lifting platform comprises a first lifting platform (11) and a second lifting platform (12) which are arranged side by side and separately. The first lifting platform (11) and the second lifting platform (12) comprise a central lifting frame (6), and a vehicle loading platform (8) is arranged on the central lifting frame (6). The first chamber (101) is arranged in the vehicle loading platform (8) of the first lifting platform (11), and the second chamber (102) is arranged in the vehicle loading platform (8) of the second lifting platform (12). A driving wheel (504) is provided at the upper end of the central sinking part (103), and a first lifting cable chain (5) is wound around the driving wheel (504). One end of the first lifting cable chain (5) is connected to the upper end of the vehicle loading platform (8) of the first lifting platform (11), and the other end of the first lifting cable chain (5) is connected to the upper end of the vehicle loading platform (8) of the second lifting platform (12).

5. The caisson type elevator structure for the bridge-tunnel junction according to claim 4 is characterized in that: An outer frame lifting frame (7) is provided on the outside of each vehicle loading platform (8); a second fixed pulley (1301) and a second lifting cable chain (13) wound around the second fixed pulley (1301) are also provided at the upper end of the central sinking portion (103); one end of the second lifting cable chain (13) is connected to the central lifting frame (6); the other end of the second lifting cable chain (13) is connected to the outer frame lifting frame (7); and a variable counterweight device is provided on the outer frame lifting frame (7).

6. The caisson type elevator structure for the bridge-tunnel junction according to claim 5 is characterized in that: A platform (702) is provided on the outer frame lifting frame (7), a powered roller (703) is provided at the bottom of the central sinking portion (103), a basic counterweight (4) is provided on the powered roller (703), and the powered roller (703) drives the basic counterweight (4) to be placed on the platform (702).

7. The caisson type elevator structure for the bridge-tunnel junction according to claim 5 or 6 is characterized in that: An expandable bag (14) is provided on the outer frame lifting frame (7), and the expandable bag (14) can be filled with liquid. A liquid storage tank (1401) and a liquid pump (1402) are provided at the bottom end of the central sinking part (103). The liquid storage tank (1401) is connected to the expandable bag (14) through the liquid pump (1402).

8. The caisson type elevator structure for the bridge-tunnel junction according to claim 7 is characterized in that: The expandable bag (14) is distributed in a ring shape on the outer frame lifting frame (7). The expandable bag (14) includes a plurality of independent segments (1403) and is also provided with a rotary valve (1404). The rotary valve (1404) includes a fixed cylinder (1408). A rotatable rotating shaft (1405) is provided in the fixed cylinder (1408). The rotating shaft (1405) is a hollow structure. The inner wall of the fixed cylinder (1408) is provided with a plurality of blade structures along the circumferential direction. The blade structures divide the rotating shaft (1405) and the fixed cylinder (1408) into a plurality of separation chambers (1406). A connecting hole (1407) is provided between one of the separation chambers (1406) and the rotating shaft (1405).

9. The caisson type elevator structure for the bridge-tunnel junction according to claim 4 is characterized in that: A vertical frame (9) is also provided. An upper connecting frame (901) and a lower connecting frame (902) are provided on the inner wall of the central sinking part (103). The upper connecting frame (901) and the lower connecting frame (902) are connected to the vertical frame (9) so that the inner side forms an up-and-down travel space (903). The outer frame lifting frame (7) is provided with a transverse connecting frame (701). The transverse connecting frame (701) passes through the up-and-down travel space (903). A linear track (1001) is provided on the inner wall of the central sinking part (103) and the vertical frame (9). The outer ends of the central lifting frame (6) and the outer frame lifting frame (7) are provided with a first running wheel (1002) and a second running wheel (1003) arranged orthogonally. The first running wheel (1002) and the second running wheel (1003) roll against the linear track (1001).

10. The construction method of the caisson type elevator structure for the bridge-tunnel junction according to claim 1 is characterized by: For foundation treatment, a dredger is used to remove the mud surface in the construction area and dig downward to form a groove. When the slope ratio and digging depth meet the design requirements, the foundation trench is leveled; Caisson conversion structure prefabrication: the main caisson, lifting platform and other structures of the conversion structure are made in the prefabrication yard. The part below the main caisson top plate is prefabricated in layers in the factory and then assembled. The rack mechanism and counterweight block slide of the wall are installed in advance and anti-corrosion measures are taken. The steel sealing door structure similar to the caisson is prefabricated at the butt end of the caisson. The caisson surface is tested for anti-seepage before installation. If it is qualified, the next step is carried out. The wire rope holes are preset on the top plate of the caisson. Caisson transportation and positioning sinking: After the caisson steel shell is prefabricated, it is transported to the site by barge or semi-submersible barge, and initially positioned with cables. Water is poured into the caisson bulkhead to sink to a certain elevation. After the caisson is planted, underwater concrete is poured symmetrically and evenly into the bulkhead. The concrete should have high fluidity and not segregate underwater, and further absorb mud and sink to the designed elevation; Casting of bottom concrete and caisson wall construction. After cleaning the bottom of the caisson, the bottom concrete construction is carried out. After pumping out the water, a layer of buffer filler is filled on the bottom concrete. The concrete is poured in the caisson compartment, and the walls on both sides of the lifting platform and the round end structure wall of the caisson are constructed. The ends of the immersed tubes are butted together. After the concrete of the main structure of the caisson reaches the designed strength, a water stop joint is installed at the joint between the immersed tube and the transition structure of the caisson. After the butt joint is completed, the end sealing door at the transition end of the caisson is removed, and scour protection is carried out around the caisson. Install the lifting platform, lower the lifting platform and install the wire rope, hoist and debug the gear rack transmission performance to ensure that the lifting platform can move up and down along the wall smoothly and maintain the lifting system strength; For the construction of the top plate and the structures above, the top plate structure of the caisson is constructed first. After the top plate concrete reaches the designed strength, the hoist and electromechanical control equipment are installed on the upper part of the top plate. After the wire rope and the counterweight are connected, the lifting system is released and the construction of the upper electromechanical equipment room continues; The caisson and the bridge transition end structure are constructed and connected.