Cooperative seismic isolation structure for bridge

By using elastic parts and cables on the bridge to coordinate the displacement control, the collision problem of double-span bridges in earthquake conditions in high-intensity areas is solved, and a low-cost and low-difficulty earthquake resistance is achieved.

CN118932851APending Publication Date: 2024-11-12CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411339187.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In municipal projects in high-intensity areas, the lateral structure of the double-span bridge has a small clearance, which leads to the need for a large number of large-sized dampers to avoid collisions in earthquake conditions, resulting in high cost and difficult construction.

Method used

The elastic members and cables coordinate to control the relative displacement of the two bridges. The elastic members are designed and connected to the cables one by one on the box girder to avoid violent collisions during asynchronous displacement, and through the anchoring device and shear type Cross cables enable fixing and cushioning of cables.

Benefits of technology

It effectively avoids violent collisions after two bridges deviate too much from each other, reduces construction difficulty and cost, and improves the earthquake resistance of the bridge.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932851A_ABST
    Figure CN118932851A_ABST
Patent Text Reader

Abstract

The invention discloses a synergetic seismic isolation structure for a bridge, and relates to the technical field of bridge seismic resistance, the synergetic seismic isolation structure comprises an elastic supporting member arranged between two adjacent box girders; the two box girders are arranged on the two sides of a bridge respectively. The elastic supporting component comprises an inhaul cable and a plurality of elastic pieces, the elastic pieces are evenly distributed on the opposite faces of the two box girders, and the elastic pieces on the two box girders are in one-to-one correspondence; the inhaul cable is connected between the two box girders. By the adoption of the scheme, when asynchronous displacement occurs, relative displacement of the two bridges is controlled through coordination of the elastic pieces and the inhaul cables, violent collision caused by excessive deviation of the two bridges can be avoided, and therefore violent collision is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge earthquake resistance, and in particular to a cooperative earthquake isolation structure for bridges. Background Art

[0002] my country is a country prone to strong earthquakes. Bridges are an important part of the lifeline system, and damaged bridges are difficult to repair. Therefore, the seismic design of bridges has received increasing attention, and the development of bridge seismic isolation devices has been actively promoted.

[0003] The working principle of the seismic isolation device is mainly based on extending the natural vibration period of the structure and reducing the displacement of the structure, so that the structural system can achieve a certain isolation or shock absorption effect, thereby ensuring the seismic performance of the structure. By designing a flexible support structure, the natural vibration period of the structure is extended, the acceleration response of the structure is reduced, and the seismic response under the action of the earthquake is weakened. This is achieved by increasing the flexibility and damping of the structure, thereby reducing the impact of the earthquake on the structure. While extending the natural vibration period of the structure, the displacement of the structure will increase. In order to reduce this part of the increased structural displacement, some damper-type energy dissipation elements can be applied in the structural design. When an earthquake occurs, these elements quickly enter the plastic state from the original elastic state as the structural force deformation increases, and generate damping to consume the energy of the earthquake, thereby increasing the energy dissipation capacity and damping value of the structure.

[0004] When the bridge deck is wider, a double-span bridge is often used because of its beautiful shape, wide view of the bridge deck, and strong traffic capacity. It can solve the distortion and shear lag problems caused by the excessive width of a single-span bridge deck, and avoid lateral uneven settlement and other problems.

[0005] In municipal engineering projects in high-intensity areas, when it is necessary to widen and rebuild an existing bridge on the original site using a double-span bridge, the net gap between the two spans of the bridge is very small due to the limited width of the middle strip of the bridge approach. At this time, the conventional seismic isolation bridge design scheme is adopted, which has high requirements for the lateral displacement control of the bridge. A large number of dampers with larger specifications must be used to avoid collision of the double-span bridge under earthquake conditions.

[0006] In this case, since the functional area does not have adjustment space, the gap between the double-span bridges cannot meet the deformation gap required by the seismic isolation bridge. In addition, in order to avoid collision between the two spans under earthquake conditions, large-tonnage dampers are usually used to control bridge deformation, which is costly and difficult to construct. Summary of the invention

[0007] The present invention aims to solve the deficiencies of the prior art and to provide a cooperative seismic isolation structure for bridges. By adopting this scheme, when asynchronous displacement occurs, the relative displacement of the two bridge sections is coordinated and controlled by elastic members and cables, so that the two bridge sections can be prevented from colliding violently after deviating too much from each other, thereby avoiding violent collisions.

[0008] The present invention is achieved through the following technical solutions:

[0009] A cooperative seismic isolation structure for a bridge, comprising:

[0010] An elastic supporting member, wherein the elastic supporting member is arranged between two adjacent box girders; the two box girders are arranged on both sides of the bridge;

[0011] The elastic supporting member comprises a cable and a plurality of elastic members, the plurality of elastic members are evenly distributed on the opposite surfaces of the two box beams, and the elastic members on the two box beams correspond to each other one by one;

[0012] The cable is connected between the two box girders.

[0013] Compared with the prior art, the conventional seismic isolation bridge design scheme has very high requirements for the lateral displacement control of the bridge, and a large number of dampers with larger specifications must be used to avoid collisions between double-span bridges under earthquake conditions. In this case, since the functional area does not have adjustment space, the gap between the double-span bridges cannot meet the deformation gap required for seismic isolation bridges. At the same time, to avoid collisions between the two bridges under earthquake conditions, large-tonnage dampers are usually used to control bridge deformation, which is expensive and difficult to construct. The present invention provides a collaborative seismic isolation structure for bridges. With this scheme, when asynchronous displacement occurs, the relative displacement of the two bridges is coordinated and controlled by elastic parts and cables, which can avoid violent collisions between the two bridges after they deviate too much from each other, thereby avoiding violent collisions. In addition, it has low cost and low construction difficulty. The specific scheme includes an elastic supporting member arranged between two adjacent box girders, the two box girders are located on both sides of the bridge, and the elastic supporting member includes an elastic member and a cable, wherein the elastic member adopts a rubber block, which can be directly attached to the side of the box girder by gluing, and the elastic members correspond one to one on the two box girders, and the spacing between two relative elastic members is smaller than the spacing between two adjacent box girders, that is, the spacing between two adjacent cross beams, so that when the distance between the two box girders is close, the two elastic members first contact and squeeze each other, thereby resisting the impact and avoiding the hard collision of the two bridges under earthquake conditions; in addition, a cable is also connected between the two box girders. When the two box girders move away from each other, the tension of the cable can prevent the two bridges from deviating too much from each other, thereby reducing the swing amplitude of the box girder. Therefore, the relative displacement of the two bridges can be coordinated and controlled by the elastic member and the cable, which can avoid the two bridges from colliding violently after deviating too much from each other, thereby avoiding violent collision.

[0014] In order to improve the seismic performance of the bridge, a number of transversely arranged beams are sequentially arranged in the box girder along the length direction of the box girder, a pier is arranged at the bottom of each beam, a seismic isolation bearing is arranged between the beam and the pier, and the plane of the seismic isolation bearing is located on the center line of the beam, the beams on the two box girders correspond to each other, and an elastic member is arranged at each beam, and the elastic member and the seismic isolation bearing plane are located on the same axis. In this scheme, a number of beams are arranged in the length direction of the box girder, that is, the road direction, a pier is arranged at each beam position, and two seismic isolation bearings are arranged on the transverse center line of the pier, wherein the piers on the two box girders are symmetrically arranged along the center line of the road; when the two bridges are displaced in the same direction and frequency, the elastic members and cables do not work, and at this time the seismic isolation bearings realize the seismic isolation function.

[0015] As an implementation method of a cable, and to ensure that the rotation of the beam at the support is not hindered under normal working conditions, a cable is provided at each of the two corresponding elastic members, and the cable is provided along the length direction of the beam, and the two ends of the cable pass through the two elastic members respectively, and respectively penetrate the box beams on both sides, and are connected to the anchoring device on the box beam; the cable is provided just above the center line of the seismic isolation support. In this solution, the elastic members and the cables are both provided at the center line positions of the corresponding seismic isolation supports, which can realize the rapid positioning of each component during the installation process, and ensure that the rotation of the beam at the support is not hindered under normal working conditions; in addition, the two ends of the cable pass through the box beams on both sides respectively, and realize the pulling through the anchoring device.

[0016] As a specific structure of the anchoring device, the anchoring device includes a pressure plate, the end of the cable is fixed to the middle of the pressure plate, the circumferential end of the pressure plate is connected to the box beam by a plurality of bolts, and a second rubber block is arranged between the pressure plate and the side wall of the box beam. In this solution, the pressure plate is fixed to the side wall of the box beam by a plurality of bolts, and a gap is left between the pressure plate and the box beam. The second rubber block is arranged in the gap, and while realizing the anchoring tension, the second rubber block plays a certain buffering role.

[0017] In order to facilitate the rapid replacement and maintenance of the cable, the anchoring device also includes a pipeline, which is pre-buried in the box beam and is used for the cable to pass through.

[0018] As another embodiment of the cable, a scissor-type cross cable is provided between the two box beams, and the scissor-type cross cable is formed by two sections of the cable being arranged in a scissor-like cross from one end to the other end of the box beam, and each protruding vertex in the middle of the scissor-type cross cable is located at the position of the elastic member. In this scheme, the scissor-type cross cable is a cross of two sections of the cable in sequence to form a multi-section cross shape connected to each other, and each protruding vertex is connected to the cross beam and is located at the position of the elastic member, preferably at the center line on the same plane of the seismic isolation bearing, so that the pulling at the box beam can be achieved to avoid the two bridges from colliding violently after deviating too much from each other, thereby avoiding violent collisions. In addition, anchoring devices can also be provided at the two end positions of the two sections of the cable, so that the anchoring devices and the longer cables can play a buffering role under the action of earthquakes; a ring can also be provided at the end of the cross beam, so that the protruding vertices of the scissor-type cross cable are all movably connected to the ring, realizing a movable connection, so that the entire cable can be tightened synchronously.

[0019] In order to realize the collection of earthquake response data, the elastic member adopts a first rubber block, and the interior of the first rubber block is provided with a liquid storage bag, a drainage pipe and a collection pipe, the liquid storage bag is filled with liquid, the bottom of the drainage pipe is connected to the interior of the liquid storage bag, the top of the drainage pipe extends out of the first rubber block and is U-shaped, and the downwardly bent part of the top of the drainage pipe faces and is directly opposite to the opening position of the collection pipe. In this scheme, the elastic member is a rubber block, and a liquid storage bag is provided in the rubber block, and the liquid is stored in the liquid storage bag. The liquid is an incompressible liquid, and the volume can be basically kept unchanged under normal environmental conditions; the upper end of the liquid storage bag is connected with a drainage pipe, and the upper end of the drainage pipe is U-shaped. In this way, under the temperature working condition, the two bridges are slightly squeezed against each other, and the liquid in the rubber squeezes into the drainage pipe but does not pass over the top of the U-shaped pipe. When under the earthquake working condition, the squeezing force causes the liquid to pass over the U-shaped pipe and enter the collection pipe. When the earthquake is over, the working status of the device during the earthquake can be judged based on the amount of liquid in the collection tube. At the same time, the earthquake response data of the bridge can be collected and applied to earthquake research.

[0020] In order to provide enough liquid to realize the collection of seismic response data, the cable includes a cable body, a drainage hose is arranged on the axis of the cable body, and a plurality of rope strands are evenly distributed in the circumferential direction of the drainage hose; the drainage hose is filled with liquid, and the end of the drainage hose is provided with a liquid collection device. In this scheme, the cable is specially prepared, and a drainage hose is arranged on the axis of the cable body, and a plurality of rope strands are woven and wrapped around the drainage hose in the circumferential direction, so that the initial pulling is realized by the rope strands, and when the cable is subjected to a large tensile force under earthquake conditions, it deforms itself, and the circumferential rope strands are squeezed toward the drainage hose in the center, so that the liquid in the drainage hose is discharged into the liquid collection device, so the amount of liquid collected can be used to judge the magnitude of the tensile force, thereby realizing the collection of seismic response data; in addition, it can also be set as a tension sensor for detection, that is, a tension sensor is set on the cable.

[0021] Because double-span bridges are generally wide, and the gap between adjacent box girders is small, the maintenance vehicle cannot perform maintenance on the middle position of the double-span bridge. Therefore, in order to achieve daily maintenance and repair, a maintenance platform is set between the two box girders by manual crawling. The maintenance platform adopts a wire rope net, which is connected and arranged in sequence from one end of the box girder to the other end and is parallel to the box girder; the cable is used to support the maintenance platform. That is, the cable is located below the maintenance platform for support.

[0022] In order to facilitate the maintenance personnel to enter, maintenance manholes connected to the upper space of the wire rope net are reserved at both ends of the box beam. A movable ladder can be set at the abutment position, and the maintenance personnel can enter the reserved maintenance manhole through the movable ladder to enter the maintenance platform for maintenance.

[0023] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0024] 1. The present invention provides a cooperative seismic isolation structure for a bridge. When this solution is adopted, when asynchronous displacement occurs, the relative displacement of the two bridge sections is coordinated and controlled by elastic members and cables, so that the two bridge sections can be prevented from colliding violently after deviating too much from each other, thereby avoiding violent collisions.

[0025] 2. The present invention provides a cooperative seismic isolation structure for bridges. With this solution, under temperature conditions, the two bridges are slightly squeezed against each other, and the liquid in the rubber is squeezed into the drainage pipe but does not pass over the top U-shaped tube. Under earthquake conditions, the squeezing force causes the liquid to pass over the U-shaped tube and enter the collection tube. When the earthquake is over, the working state of the device during the earthquake can be judged based on the amount of liquid in the collection tube, and the bridge earthquake response data can be collected for earthquake research. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:

[0027] Figure 1 A schematic diagram of a bridge structure provided by the present invention;

[0028] Figure 2 A front view of a bridge of a cooperative seismic isolation structure according to an embodiment of the present invention;

[0029] Figure 3 A cross-sectional view of a bridge of a cooperative seismic isolation structure according to an embodiment of the present invention;

[0030] Figure 4 A schematic diagram of the structure of an anchoring device according to an embodiment of the present invention;

[0031] Figure 5 A front view of a bridge of a cooperative seismic isolation structure according to another embodiment of the present invention;

[0032] Figure 6 A cross-sectional view of a bridge of a cooperative seismic isolation structure according to another embodiment of the present invention;

[0033] Figure 7 A front view of a bridge with a cooperative seismic isolation structure according to another embodiment of the present invention after a maintenance platform is installed;

[0034] Figure 8 A cross-sectional view of a bridge of a cooperative seismic isolation structure according to another embodiment of the present invention after a maintenance platform is provided;

[0035] Fig. 9 A schematic diagram of the interior of an elastic member of another embodiment provided by the present invention;

[0036] Fig.10 A simplified diagram of the interior of a cable according to another embodiment of the present invention;

[0037] Fig.11 A cross-sectional view of a cable according to another embodiment of the present invention.

[0038] Marks and corresponding parts names in the attached drawings:

[0039] 1-cable, 101-cable body, 102-drainage hose, 103-strand, 2-elastic member, 201-liquid storage bag, 202-drainage pipe, 203-collecting pipe, 3-box beam, 301-cross beam, 4-seismic isolation bearing, 5-anchoring device, 501-pressure plate, 502-bolt, 503-second rubber block, 504-pipeline, 6-maintenance platform, 7-maintenance manhole, 8-pier. DETAILED DESCRIPTION

[0040] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0041] Embodiment 1:

[0042] This embodiment 1 provides a cooperative seismic isolation structure for a bridge, such as Figure 1-Figure 11 As shown, including:

[0043] An elastic supporting member, wherein the elastic supporting member is arranged between two adjacent box beams 3; the two box beams 3 are arranged on both sides of the bridge;

[0044] The elastic supporting member comprises a cable 1 and a plurality of elastic members 2, the plurality of elastic members 2 are evenly distributed on the opposite surfaces of the two box beams 3, and the elastic members 2 on the two box beams 3 correspond one to one;

[0045] The cable 1 is connected between the two box beams 3 .

[0046] Compared with the prior art, the conventional seismic isolation bridge design scheme has very high requirements for the lateral displacement control of the bridge, and a large number of dampers with larger specifications must be used to avoid collisions between double-span bridges under earthquake conditions. In this case, since the functional area does not have adjustment space, the gap between the double-span bridges cannot meet the deformation gap required for seismic isolation bridges. At the same time, to avoid collisions between the two bridges under earthquake conditions, large-tonnage dampers are usually used to control bridge deformation, which is expensive and difficult to construct. The present invention provides a collaborative seismic isolation structure for bridges. With this scheme, when asynchronous displacement occurs, the relative displacement of the two bridges is coordinated and controlled by the elastic member 2 and the cable 1, which can avoid violent collisions between the two bridges after they deviate too much from each other, thereby avoiding violent collisions. In addition, it has low cost and low construction difficulty. In the specific scheme, it includes an elastic supporting member arranged between two adjacent box girders 3, the two box girders 3 are located on both sides of the bridge, and the elastic supporting member includes an elastic member 2 and a cable 1, wherein the elastic member 2 adopts a rubber block, which can be directly attached to the side of the box girder 3 by gluing, and the elastic member 2 corresponds to the two box girders 3 one by one, and the spacing between two relative elastic members 2 is smaller than the spacing between the two adjacent box girders 3, that is, the spacing between the two adjacent cross beams 301, so that when the distance between the two box girders 3 is close, the two elastic members 2 first contact and squeeze, thereby resisting the impact and avoiding the hard collision of the two bridges under earthquake conditions; in addition, a cable 1 is also connected between the two box girders 3, when the two box girders 3 are away from each other, the tension of the cable 1 can avoid the two bridges from deviating too much from each other, thereby reducing the swing amplitude of the box girder 3, so the relative displacement of the two bridges is coordinated by the elastic member 2 and the cable 1 to avoid the two bridges from colliding violently after deviating too much from each other, thereby avoiding violent collision.

[0047] In order to improve the seismic performance of the bridge, along the length direction of the box beam 3, a number of transversely arranged crossbeams 301 are sequentially arranged in the box beam 3, each crossbeam 301 is provided with a pier 8 at the bottom, a seismic isolation support 4 is arranged between the crossbeam 301 and the pier 8, and the seismic isolation support 4 is located on the center line of the crossbeam 301. The crossbeams 301 on the two box beams 3 correspond to each other, and an elastic member 2 is correspondingly arranged at each crossbeam 301, and the elastic member 2 and the seismic isolation support 4 are located on the same axis. In this scheme, a number of crossbeams 301 are arranged in the length direction of the box beam 3, that is, the road direction, and a pier 8 is arranged at the position of each crossbeam 301, and two seismic isolation supports 4 are arranged on the transverse center line of the pier 8, wherein the piers 8 on the two box beams 3 are symmetrically arranged along the center line of the road; when the two bridges are displaced in the same direction and frequency, the elastic member 2 and the cable 1 do not work, and the seismic isolation support 4 realizes the seismic isolation function.

[0048] Embodiment 2:

[0049] This embodiment 2 is further limited on the basis of embodiment 1, such as Figure 2-Figure 4 As shown, an implementation method of a cable 111 is provided; as an implementation method of a cable 1, and to ensure that the rotation of the beam body at the support is not hindered under normal working conditions, a cable 1 is provided at each two corresponding elastic members 2, and the cable 1 is provided along the length direction of the beam 301, and the two ends of the cable 1 pass through the two elastic members 2 respectively, and respectively pass through the box beams 3 on both sides, and are connected to the anchoring device 5 on the box beam 3; the cable 1 is provided just above the center line of the seismic isolation support 4. In this solution, the elastic member 2 and the cable 1 are both provided at the center line position of the corresponding seismic isolation support 4, which can realize the rapid positioning of each component during the installation process, and ensure that the rotation of the beam body at the support is not hindered under normal working conditions; in addition, the two ends of the cable 1 pass through the box beams 3 on both sides respectively, and realize the pulling through the anchoring device 5.

[0050] As a specific structure of the anchoring device 5, the anchoring device 5 includes a pressing plate 501, the end of the cable 1 is fixed to the middle of the pressing plate 501, the circumferential end of the pressing plate 501 is connected to the box beam 3 by a plurality of bolts 502, and a second rubber block 503 is arranged between the pressing plate 501 and the side wall of the box beam 3. In this solution, the pressing plate 501 is fixed to the side wall of the box beam 3 by a plurality of bolts 502, and at this time, a gap is left between the pressing plate 501 and the box beam 3, and a second rubber block 503 is arranged in the gap, and while realizing anchor tension, the second rubber block 503 plays a certain buffering role.

[0051] In order to facilitate the rapid replacement and maintenance of the cable 1 , the anchoring device 5 further includes a pipe 504 , which is pre-buried in the box beam 3 and is used for the cable 1 to pass through.

[0052] Embodiment 3:

[0053] This embodiment 3 is further defined on the basis of embodiment 1, such as Figure 5-Figure 11 As shown, another embodiment of the cable 111 is provided.

[0054] A scissor-type cross cable is provided between the two box beams 3. The scissor-type cross cable is formed by two sections of the cable 1 arranged in a scissor-like cross from one end to the other end of the box beam 3. Each protruding vertex in the middle of the scissor-type cross cable is located at the position of the elastic member 2. In this solution, the scissor-type cross cable is composed of two sections of cables 1 that cross in sequence to form a multi-section cross shape that is connected. Each protruding vertex is connected to the crossbeam 301 and is located at the position of the elastic member 2, preferably at the center line on the same plane of the seismic isolation bearing 4. In this way, the pulling at the box beam 3 can be achieved to avoid a violent collision after the two bridges deviate too much from each other, thereby avoiding a violent collision. In addition, anchoring devices 5 may be provided at both ends of the two sections of the cable 1, so that the anchoring devices 5 and the longer cable 1 can play a buffering role under the action of earthquakes; a ring may also be provided at the end of the crossbeam 301, so that the apex of the scissor-type cross cable members extending out can be flexibly connected to the ring, realizing a movable connection, so that the entire cable 1 can be tightened synchronously.

[0055] In order to collect seismic response data, the elastic member 2 adopts a first rubber block, and a liquid storage bag 201, a drainage pipe 202 and a collection pipe 203 are arranged inside the first rubber block. The liquid storage bag 201 is filled with liquid, and the bottom of the drainage pipe 202 is connected to the inside of the liquid storage bag 201. The top of the drainage pipe 202 extends out of the first rubber block and is U-shaped. The downwardly bent part of the top of the drainage pipe 202 faces and is opposite to the opening position of the collection pipe 203. In this solution, the elastic member 2 is a rubber block, and a liquid storage capsule 201 is arranged inside the rubber block. Liquid is stored in the liquid storage capsule 201. The liquid is an incompressible liquid, and its volume can remain basically unchanged under normal environmental conditions. A drainage pipe 202 is connected to the upper end of the liquid storage capsule 201, and the upper end of the drainage pipe 202 is U-shaped. In this way, under the temperature working condition, the two bridges are slightly squeezed against each other, and the liquid in the rubber is squeezed into the drainage pipe 202 but will not pass over the top of the U-shaped pipe. Under the earthquake working condition, the squeezing force causes the liquid to pass over the U-shaped pipe and enter the collection pipe. When the earthquake is over, the working state of the device during the earthquake can be judged according to the amount of liquid in the collection pipe, and the bridge earthquake response data can be collected for earthquake research.

[0056] In order to provide enough liquid to collect seismic response data, the cable 1 includes a cable body 101, a drainage hose 102 is arranged on the axis of the cable body 101, and a plurality of rope strands 103 are evenly distributed in the circumferential direction of the drainage hose 102; the drainage hose 102 is filled with liquid, and the end of the drainage hose 102 is provided with a liquid collection device. In the present scheme, the cable 1 is specially prepared, and a drainage hose 102 is located on the axis of the cable body 101. A plurality of rope strands 103 are woven and wrapped around the drainage hose 102 in a circumferential direction. In this way, initial pulling is achieved through the rope strands 103. Under earthquake conditions, the cable 1 is subjected to a large tensile force, causing itself to deform. The circumferential rope strands 103 are squeezed toward the drainage hose 102 in the center, thereby discharging the liquid in the drainage hose 102 into the liquid collection device. Therefore, the magnitude of the tensile force can be determined by the amount of liquid collected, thereby realizing the collection of seismic response data. In addition, it can also be configured to perform detection in the form of a tension sensor, that is, a tension sensor is provided on the cable 1.

[0057] Since double span bridges are generally wide, and the gap between adjacent box beams 3 is small, the maintenance vehicle cannot perform maintenance on the middle position of the double span bridge. Therefore, in order to realize daily maintenance and repair, a maintenance platform 6 is set between the two box beams 3 by manual crawling. The maintenance platform 6 adopts a wire rope net, which is sequentially connected from one end of the box beam 3 to the other end and parallel to the box beam 3; the cable 1 is used to support the maintenance platform 6. That is, the cable 1 is located below the maintenance platform 6 for support.

[0058] In order to facilitate the entry of maintenance personnel, maintenance manholes 7 connected to the upper space of the wire rope net are reserved at both ends of the box beam 3. A movable ladder can be set at the abutment position, and the reserved maintenance manhole 7 can be entered through the movable ladder to enter the maintenance platform 6 for maintenance.

[0059] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A cooperative seismic isolation structure for a bridge, It is characterized in that include: An elastic supporting member, wherein the elastic supporting member is arranged between two adjacent box girders (3); the two box girders (3) are arranged on both sides of the bridge; The elastic supporting member comprises a cable (1) and a plurality of elastic members (2), wherein the plurality of elastic members (2) are evenly distributed on opposite surfaces of the two box beams (3), and the elastic members (2) on the two box beams (3) correspond to each other one by one; The cable (1) is connected between the two box beams (3).

2. A cooperative seismic isolation structure for a bridge according to claim 1, It is characterized in that Along the length direction of the box beam (3), a plurality of transversely arranged cross beams (301) are sequentially arranged in the box beam (3), a pier (8) is arranged at the bottom of each cross beam (301), a seismic isolation support (4) is arranged between the cross beam (301) and the pier (8), the plane of the seismic isolation support (4) is located on the center line of the cross beam (301), the cross beams (301) on the two box beams (3) correspond to each other one by one, and an elastic member (2) is correspondingly arranged at each cross beam (301), and the plane of the elastic member (2) and the seismic isolation support (4) are located on the same axis.

3. A cooperative seismic isolation structure for a bridge according to claim 2, It is characterized in that A cable (1) is provided at each of the two corresponding elastic members (2), and the cable (1) is provided along the length direction of the cross beam (301). The two ends of the cable (1) pass through the two elastic members (2) respectively, and respectively penetrate the box beams (3) on both sides, and are connected to the anchoring device (5) on the box beam (3); the cable (1) is provided directly above the center line of the seismic isolation bearing (4).

4. A cooperative seismic isolation structure for a bridge according to claim 3, It is characterized in that The anchoring device (5) comprises a pressure plate (501), the end of the cable (1) is fixed to the middle of the pressure plate (501), the circumferential end of the pressure plate (501) is connected to the box beam (3) via a plurality of bolts (502), and a second rubber block (503) is arranged between the pressure plate (501) and the side wall of the box beam (3).

5. A cooperative seismic isolation structure for a bridge according to claim 4, It is characterized in that The anchoring device (5) further comprises a pipe (504), wherein the pipe (504) is pre-buried inside the box beam (3) and is used for the cable (1) to pass through.

6. The cooperative seismic isolation structure for a bridge according to claim 1, It is characterized in that A scissor-type cross cable member is arranged between the two box beams (3), and the scissor-type cross cable member is formed by two sections of the cable (1) arranged in a scissor-type cross direction from one end to the other end of the box beam (3), and each protruding vertex in the middle of the scissor-type cross cable member is located at the position of the elastic member (2).

7. A cooperative seismic isolation structure for a bridge according to claim 6, It is characterized in that The elastic member (2) is a first rubber block, wherein a liquid storage bag (201), a liquid discharge pipe (202) and a collecting pipe (203) are arranged inside the first rubber block, the liquid storage bag (201) is filled with liquid, the bottom of the liquid discharge pipe (202) is connected to the inside of the liquid storage bag (201), the top of the liquid discharge pipe (202) extends out of the first rubber block and is U-shaped, and the downwardly bent portion of the top of the liquid discharge pipe (202) faces and is directly opposite to the opening position of the collecting pipe (203).

8. A cooperative seismic isolation structure for a bridge according to claim 7, It is characterized in that The cable (1) comprises a cable body (101), a drainage hose (102) is arranged on the axis of the cable body (101), and a plurality of rope strands (103) are evenly distributed in the circumferential direction of the drainage hose (102); the drainage hose (102) is filled with liquid, and the end of the drainage hose (102) is provided with a liquid collecting device.

9. The cooperative seismic isolation structure for a bridge according to claim 1, It is characterized in that An inspection platform (6) is arranged between the two box girders (3). The inspection platform (6) is made of a wire rope net, which is connected and arranged in sequence from one end to the other end of the box girder (3) and is parallel to the box girder (3). The cable (1) is used to support the inspection platform (6).

10. A cooperative seismic isolation structure for a bridge according to claim 9, It is characterized in that Maintenance manholes (7) communicating with the upper space of the wire rope net are reserved at both ends of the box beam (3).