Transverse beam moving construction method for precast beam in abrupt slope mountainous area

By using embedded parts and slip temporary brackets in steep slopes and in a self-balanced bridge erecting machine, the bridge is able to build beams at the same time with the left and right spans of the bridge, solving the problem of low beam efficiency in steep slopes, improving construction efficiency and environmental protection, and reducing the cost.

CN118932883APending Publication Date: 2024-11-12CHINA FIRST HIGHWAY ENGINEERING CO LTD +1

Patent Information

Application Number
CN202411206271.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In steep slopes, it is difficult for the existing technology to achieve the construction of beam-mounted bridges at the same time, resulting in low beam efficiency and extended construction period, and lack of lifting conditions and beam-mounted channels.

Method used

The embedded parts and slip temporary brackets are used to combine with the self-balanced bridge stairs to achieve the bridge's left and right widths simultaneously through the slip rails, and the beam stairs are optimized to ensure that the beam slabs move and align at the same speed during the installation process.

Benefits of technology

It improves beam erection efficiency, shortens construction period, reduces construction costs, and reduces environmental damage, achieving green and environmentally friendly construction.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a transverse beam moving construction method for a precast beam in an abrupt slope mountainous area. The method comprises the following steps: (1) constructing an embedded part at the top of a capping beam; (2) a sliding temporary support is constructed; (3) mounting slipping supporting legs of the bridge girder erection machine; (4) normally erecting and mounting a right beam plate of the bridge by the bridge girder erection machine, wherein the bridge girder erection machine is positioned on the erected right beam plate after the right beam plate is erected and mounted; (5) lifting the left to-be-erected beam plate to a bridge girder erection machine; (6) the bridge girder erection machine carries the left to-be-erected beam plate to transversely slide; (7) mounting a first beam of the left part; (8) the bridge girder erection machine slides from left to right to return to the erected right beam; and (9) the steps (5)-(8) are circulated in sequence, and transverse beam moving erection of the whole bridge is completed. According to the invention, the girder erection mode of the bridge is optimized, and the technical problems that no hoisting condition exists in a mountain abrupt slope area and no girder erection channel exists in a steep mountainous road are solved; and the left and right beams of the bridge can be simultaneously erected, so that the beam erecting efficiency is improved, and the beam erecting period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge erection construction, and in particular to a construction method for transversely shifting prefabricated beams in steep mountainous areas. Background Art

[0002] At present, there are few construction methods for the span erection of highway bridge beams and slabs. The most common method is to use a bridge erection machine to achieve transverse displacement. The bridge erection machine connects the middle legs of the two bridges through a connecting beam to form a transverse beam, and then uses a transverse device to move the bridge erection machine to the middle leg of the other bridge, thereby completing the reinstallation of the other bridge by the bridge erection machine.

[0003] Although this measure can achieve the lateral movement of the bridge erection machine, the beams and slabs are not erected at the same time, so the beam erection efficiency is still not ideal, and the actual construction period is difficult to meet the construction requirements. Summary of the invention

[0004] In order to solve the defects in the prior art, the present invention provides a method for transversely shifting prefabricated beams in steep mountainous areas. The present invention optimizes the bridge beam erection method, overcomes the technical problems of no hoisting conditions in steep mountainous areas and no beam erection passages on steep mountainous roads; and can realize the simultaneous erection of beams on the left and right sides of the bridge, thereby improving the efficiency of beam erection and shortening the construction period of beam erection.

[0005] To achieve the above object, the present invention provides a method for transversely shifting prefabricated beams in steep mountainous areas, comprising the following steps:

[0006] (1) constructing the embedded parts on the top of the cap beam; a limited steel plate is provided on the top of the embedded parts;

[0007] (2) Construction of a temporary sliding support; the temporary sliding support mainly includes a column and a connection system unit, a distribution beam unit and a sliding track unit, and the bottom of the temporary sliding support is welded to the embedded parts;

[0008] (3) Installation of the sliding legs of the bridge erecting machine: Install the sliding legs of the bridge erecting machine on the sliding track unit of the sliding temporary support;

[0009] (4) The right beam of the bridge is normally erected and installed by the bridge erecting machine. After the erection and installation of the right beam is completed, the bridge erecting machine is located on the erected right beam;

[0010] (5) Lift the left beam plate to be erected to the bridge erection machine;

[0011] (6) The bridge erection machine carries the left beam plate to be erected and slides horizontally; during the horizontal sliding process, the two ends of the left beam plate to be erected are kept moving simultaneously and at the same speed;

[0012] (7) Install the first beam on the left side; control the alignment of the bridge during installation;

[0013] (8) The bridge erecting machine slides from left to right and returns to the erected right beam;

[0014] (9) The above steps (5) to (8) are repeated in sequence to complete the transverse beam installation of the entire bridge.

[0015] Preferably, in step (1), the embedded parts are The steel bars are threaded on the top and buried in the concrete through a limiter structure; the exposed length is 5 cm, the buried depth in the concrete is 40 cm, and a limit steel plate is set on the top with a thickness of 16 cm; during construction, the top limit steel plate and the lower steel bars are limited to keep the steel bars straight. After the construction of the limit steel plate is completed, the bolts are loosened and removed.

[0016] In any of the above schemes, it is preferred that in step (2), the columns and the columns of the connecting system unit are welded into a box-type structure using two [32a steels, and a 16mm thick top plate is set on the top, a stiffening plate is welded between the lower surface of the top plate and the box-type structure, and circumferential welding is performed according to an 8mm weld, and the bottom of the column is welded to the embedded part.

[0017] In any of the above schemes, it is preferred that in step (2), the columns are horizontally connected using a connecting system unit, and the connecting system unit is composed of a plurality of [10 steel scissors struts; the distribution beam unit is hoisted into place and welded to the top of the column and the connecting system unit; the distribution beam unit and the upper sliding track unit are connected using a 6mm weld.

[0018] In any of the above schemes, it is preferred that the bridge-erecting machine adopts a self-balancing bridge-erecting machine, which does not require a counterweight when shifting the beam laterally, and the balance and stability of the bridge-erecting machine is achieved by adjusting the positions of the front and rear cranes on the guide beam.

[0019] In any of the above schemes, it is preferred that in step (5), the left beam plate to be erected is transported from the right beam plate to the tail of the bridge-erecting machine for beam feeding, and then the left beam plate to be erected is longitudinally moved to the transverse beam-shifting span, and the bridge-erecting machine starts transversely moving the beam.

[0020] In any of the above schemes, it is preferred that in step (6), the bridge erection machine belt beam is slowly moved laterally, and the entire machine belt beam is moved laterally to the beam piece position to check the accuracy of the position.

[0021] In any of the above schemes, it is preferred that in step (7), after the beam is moved into place, the beam is dropped to a distance of 15 cm from the temporary support and then paused. The beam dropping process should be slow and the beam piece should be kept stable; after confirmation, the beam is dropped and the beam plate is temporarily fixed.

[0022] In any of the above schemes, it is preferred that in step (7), dedicated personnel are assigned at both ends of the beam to be responsible for bridge alignment, including controlling the verticality of the bridge, the distance between the beam body and the platform beam, and the centerline alignment.

[0023] In any of the above schemes, it is preferred that in step (9), after the left beam slab is erected by lateral beam shifting, 2 cm thick steel plates are fully laid on the left and right beam slabs to provide a channel for the beam transport vehicle to pass and feed the beams when the left beam slab is erected laterally.

[0024] Beneficial effects of the present invention:

[0025] 1. The present invention optimizes the bridge erection method, overcomes the technical problems of no hoisting conditions in steep mountain slopes and no beam erection channels on steep mountain roads; and can realize the simultaneous erection of beams on the left and right sides of the bridge, thereby improving the efficiency of beam erection and shortening the construction period.

[0026] 2. The present invention has high construction efficiency and is environmentally friendly. By erecting beams and slabs by span, the moving time of the bridge erection machine is reduced, and the efficiency of beam and slab erection is greatly improved. At the same time, this method has less damage to the ecological environment of the environment and is environmentally friendly.

[0027] 3. The present invention reduces construction costs; compared with traditional beam erection methods, the present invention overcomes the problem that the bridge erection machine cannot move horizontally to erect two beams on the left and right at the same time. Now, only the support and slide system need to be set up to meet the construction needs, the construction efficiency is greatly improved, and the erection cost of each beam is reduced. DETAILED DESCRIPTION

[0028] The technical solution of the present application will be described in detail below in conjunction with the specific implementation methods of the present application, but the following examples are only for understanding the present invention. The embodiments in the present application and the features in the embodiments can be combined with each other, and the present application can be implemented in a variety of different ways as defined and covered by the claims.

[0029] Example 1

[0030] A method for transversely shifting prefabricated beams in steep mountainous areas comprises the following steps:

[0031] (1) constructing the embedded parts on the top of the cap beam; a limited steel plate is provided on the top of the embedded parts;

[0032] (2) Construction of a temporary sliding support; the temporary sliding support mainly includes a column and a connection system unit, a distribution beam unit and a sliding track unit, and the bottom of the temporary sliding support is welded to the embedded parts;

[0033] (3) Installation of the sliding legs of the bridge erecting machine: Install the sliding legs of the bridge erecting machine on the sliding track unit of the sliding temporary support;

[0034] (4) The right beam of the bridge is normally erected and installed by the bridge erecting machine. After the erection and installation of the right beam is completed, the bridge erecting machine is located on the erected right beam;

[0035] (5) Lift the left beam plate to be erected to the bridge erection machine;

[0036] (6) The bridge erection machine carries the left beam plate to be erected and slides horizontally; during the horizontal sliding process, the two ends of the left beam plate to be erected are kept moving simultaneously and at the same speed;

[0037] (7) Install the first beam on the left side; control the alignment of the bridge during installation;

[0038] (8) The bridge erecting machine slides from left to right and returns to the erected right beam;

[0039] (9) The above steps (5) to (8) are repeated in sequence to complete the transverse beam installation of the entire bridge.

[0040] In step (1), the embedded parts are The steel bars are threaded on the top and buried in the concrete through a limiter structure; the exposed length is 5 cm, the buried depth in the concrete is 40 cm, and a limit steel plate is set on the top with a thickness of 16 cm; during construction, the top limit steel plate and the lower steel bars are limited to keep the steel bars straight. After the construction of the limit steel plate is completed, the bolts are loosened and removed.

[0041] In the step (2), the columns and the connecting system units are welded into a box-type structure using two [32a steels, and a 16mm thick top plate is set on the top. A stiffening plate is welded between the lower surface of the top plate and the box-type structure, and circumferential welding is performed according to an 8mm weld. The bottom of the column is welded to the embedded part.

[0042] In the step (2), the columns are connected horizontally using a connecting system unit, which is composed of a plurality of [10 steel scissors braces; the distribution beam unit is hoisted into place and welded to the top of the column and the connecting system unit; the distribution beam unit is connected to the upper sliding track unit using a 6mm weld.

[0043] The bridge erecting machine adopts a self-balancing bridge erecting machine, which does not need a counterweight when the beam is moved horizontally, and the balance and stability of the bridge erecting machine are achieved by adjusting the positions of the front and rear cranes on the guide beam.

[0044] In the step (5), the left beam plate to be erected is transported from the right beam plate to the rear of the bridge erection machine for beam feeding, and then the left beam plate to be erected is longitudinally moved to the transverse beam shifting span, and the bridge erection machine starts the transverse movement of the beam.

[0045] In the step (6), the bridge erection machine belt beam is slowly moved horizontally, and the entire machine belt beam is moved horizontally to the beam piece position to check the accuracy of the position.

[0046] In the step (7), after the beam is moved into place, the beam is lowered to a position of 15 cm from the temporary support and then paused. The beam lowering process should be slow and the beam piece should be kept stable. After confirmation, the beam is lowered and the beam plate is temporarily fixed.

[0047] In step (7), dedicated personnel are assigned at both ends of the beam to be responsible for the alignment of the bridge, including controlling the verticality of the bridge, the gap between the beam body and the platform beam, and the alignment of the center line.

[0048] In the step (9), after the left beam slab is erected by lateral beam shifting, 2 cm thick steel plates are fully laid on the left and right beam slabs to provide a channel for the beam transport vehicle to pass and feed the beams when the left beam slab is erected later.

[0049] Example 2

[0050] A method for transversely shifting prefabricated beams in steep mountainous areas comprises the following steps:

[0051] (1) constructing the embedded parts on the top of the cap beam; a limited steel plate is provided on the top of the embedded parts;

[0052] (2) Construction of a temporary sliding support; the temporary sliding support mainly includes a column and a connection system unit, a distribution beam unit and a sliding track unit, and the bottom of the temporary sliding support is welded to the embedded parts;

[0053] (3) Installation of the sliding legs of the bridge erecting machine: Install the sliding legs of the bridge erecting machine on the sliding track unit of the sliding temporary support;

[0054] (4) The right beam of the bridge is normally erected and installed by the bridge erecting machine. After the erection and installation of the right beam is completed, the bridge erecting machine is located on the erected right beam;

[0055] (5) Lift the left beam plate to be erected to the bridge erection machine;

[0056] (6) The bridge erection machine carries the left beam plate to be erected and slides horizontally; during the horizontal sliding process, the two ends of the left beam plate to be erected are kept moving simultaneously and at the same speed;

[0057] (7) Install the first beam on the left side; control the alignment of the bridge during installation;

[0058] (8) The bridge erecting machine slides from left to right and returns to the erected right beam;

[0059] (9) The above steps (5) to (8) are repeated in sequence to complete the transverse beam installation of the entire bridge.

[0060] In step (1), the embedded parts are The steel bars are threaded on the top and buried in the concrete through a limiter structure; the exposed length is 5 cm, the buried depth in the concrete is 40 cm, and a limit steel plate is set on the top with a thickness of 16 cm; during construction, the top limit steel plate and the lower steel bars are limited to keep the steel bars straight. After the construction of the limit steel plate is completed, the bolts are loosened and removed.

[0061] In the step (2), the columns and the connecting system units are welded into a box-type structure using two [32a steels, and a 16mm thick top plate is set on the top. A stiffening plate is welded between the lower surface of the top plate and the box-type structure, and circumferential welding is performed according to an 8mm weld. The bottom of the column is welded to the embedded part.

[0062] In the step (2), the columns are connected horizontally using a connecting system unit, which is composed of a plurality of [10 steel scissors braces; the distribution beam unit is hoisted into place and welded to the top of the column and the connecting system unit; the distribution beam unit is connected to the upper sliding track unit using a 6mm weld.

[0063] The bridge erecting machine adopts a self-balancing bridge erecting machine, which does not need a counterweight when the beam is moved horizontally, and the balance and stability of the bridge erecting machine are achieved by adjusting the positions of the front and rear cranes on the guide beam.

[0064] In the step (5), the left beam plate to be erected is transported from the right beam plate to the rear of the bridge erection machine for beam feeding, and then the left beam plate to be erected is longitudinally moved to the transverse beam shifting span, and the bridge erection machine starts the transverse movement of the beam.

[0065] In the step (6), the bridge erection machine belt beam is slowly moved horizontally, and the entire machine belt beam is moved horizontally to the beam piece position to check the accuracy of the position.

[0066] In the step (7), after the beam is moved into place, the beam is lowered to a position of 15 cm from the temporary support and then paused. The beam lowering process should be slow and the beam piece should be kept stable. After confirmation, the beam is lowered and the beam plate is temporarily fixed.

[0067] In step (7), dedicated personnel are assigned at both ends of the beam to be responsible for the alignment of the bridge, including controlling the verticality of the bridge, the gap between the beam body and the platform beam, and the alignment of the center line.

[0068] In the step (9), after the left beam slab is erected by lateral beam shifting, 2 cm thick steel plates are fully laid on the left and right beam slabs to provide a channel for the beam transport vehicle to pass and feed the beams when the left beam slab is erected later.

[0069] In addition, in order to further improve the technical effect of the present invention, in this embodiment, the columns and connecting system units are made of channel steel butt-welded into a box-type structure, which can be stably placed between or on the pad stones, and the sliding track unit is made of I-beam.

[0070] When moving the beam, add a fastening chain and support, and it is forbidden to move the beam down the ramp. Paint marks every 10cm on the sliding track unit to observe whether the outrigger displacement is synchronized. When the beam piece moves horizontally, a special person is arranged at the outrigger to observe the operation. If there is any abnormality, stop the machine in time to check and correct it. The horizontal movement speed is controlled at 2.5m / min, and fast horizontal movement is strictly prohibited.

[0071] The PLC controls the overall lateral sliding of the left beam plate to be erected by the bridge erection machine, and lubrication can be performed according to the smoothness between the sliding leg of the bridge erection machine and the sliding track unit. When the friction detection device set on the sliding leg detects that the friction between the sliding leg of the bridge erection machine and the sliding track unit increases to more than 20% of the set friction, it will significantly affect the sliding between the sliding leg and the sliding track unit. At this time, the feedback signal is given to the PLC controller, which issues an instruction to control the refueling device set on the sliding track unit, and the oil filling solenoid valve opens to start refueling and lubricating the sliding track unit. When the lubrication detection unit detects that the state of the sliding track unit meets the lubrication requirements, it feeds back information to the main control cabinet and stops oiling. The refueling device is set with a liquid level alarm. When the liquid level is lower than 10 liters, the staff refuels according to the alarm prompt. When the ambient temperature is lower than 5°C, the fluidity of the lubricating oil deteriorates. At this time, the heating device in the refueling device works. When the oil temperature rises to 15°C, the temperature sensor transmits a signal to the PLC controller to stop heating.

[0072] The sliding track unit can be controlled by PLC, which greatly improves the degree of automation. It monitors the smoothness between the sliding legs of the bridge erection machine and the sliding track unit in real time, avoiding accidents during the lateral movement, greatly saving labor costs, improving work efficiency and ensuring construction safety.

[0073] The construction method of this embodiment reduces the time of moving the beam erecting machine, effectively improves the efficiency of beam and slab erection, and reduces the cost of beam erection. At the same time, the method has less damage to the ecological environment of the environment and is green and environmentally friendly.

[0074] Example 3

[0075] A method for transversely shifting prefabricated beams in steep mountainous areas comprises the following steps:

[0076] (1) constructing the embedded parts on the top of the cap beam; a limited steel plate is provided on the top of the embedded parts;

[0077] (2) Construction of a temporary sliding support; the temporary sliding support mainly includes a column and a connection system unit, a distribution beam unit and a sliding track unit, and the bottom of the temporary sliding support is welded to the embedded parts;

[0078] (3) Installation of the sliding legs of the bridge erecting machine: Install the sliding legs of the bridge erecting machine on the sliding track unit of the sliding temporary support;

[0079] (4) The right beam of the bridge is normally erected and installed by the bridge erecting machine. After the erection and installation of the right beam is completed, the bridge erecting machine is located on the erected right beam;

[0080] (5) Lift the left beam plate to be erected to the bridge erection machine;

[0081] (6) The bridge erection machine carries the left beam plate to be erected and slides horizontally; during the horizontal sliding process, the two ends of the left beam plate to be erected are kept moving simultaneously and at the same speed;

[0082] (7) Install the first beam on the left side; control the alignment of the bridge during installation;

[0083] (8) The bridge erecting machine slides from left to right and returns to the erected right beam;

[0084] (9) The above steps (5) to (8) are repeated in sequence to complete the transverse beam installation of the entire bridge.

[0085] In step (1), the embedded parts are The steel bars are threaded on the top and buried in the concrete through a limiter structure; the exposed length is 5 cm, the buried depth in the concrete is 40 cm, and a limit steel plate is set on the top with a thickness of 16 cm; during construction, the top limit steel plate and the lower steel bars are limited to keep the steel bars straight. After the construction of the limit steel plate is completed, the bolts are loosened and removed.

[0086] In the step (2), the columns and the connecting system units are welded into a box-type structure using two [32a steels, and a 16mm thick top plate is set on the top. A stiffening plate is welded between the lower surface of the top plate and the box-type structure, and circumferential welding is performed according to an 8mm weld. The bottom of the column is welded to the embedded part.

[0087] In the step (2), the columns are connected horizontally using a connecting system unit, which is composed of a plurality of [10 steel scissors braces; the distribution beam unit is hoisted into place and welded to the top of the column and the connecting system unit; the distribution beam unit is connected to the upper sliding track unit using a 6mm weld.

[0088] The bridge erecting machine adopts a self-balancing bridge erecting machine, which does not need a counterweight when the beam is moved horizontally, and the balance and stability of the bridge erecting machine are achieved by adjusting the positions of the front and rear cranes on the guide beam.

[0089] In the step (5), the left beam plate to be erected is transported from the right beam plate to the rear of the bridge erection machine for beam feeding, and then the left beam plate to be erected is longitudinally moved to the transverse beam shifting span, and the bridge erection machine starts the transverse movement of the beam.

[0090] In the step (6), the bridge erection machine belt beam is slowly moved horizontally, and the entire machine belt beam is moved horizontally to the beam piece position to check the accuracy of the position.

[0091] In the step (7), after the beam is moved into place, the beam is lowered to a position of 15 cm from the temporary support and then paused. The beam lowering process should be slow and the beam piece should be kept stable. After confirmation, the beam is lowered and the beam plate is temporarily fixed.

[0092] In step (7), dedicated personnel are assigned at both ends of the beam to be responsible for the alignment of the bridge, including controlling the verticality of the bridge, the gap between the beam body and the platform beam, and the alignment of the center line.

[0093] In the step (9), after the left beam slab is erected by lateral beam shifting, 2 cm thick steel plates are fully laid on the left and right beam slabs to provide a channel for the beam transport vehicle to pass and feed the beams when the left beam slab is erected later.

[0094] In addition, in order to further improve the technical effect of the present invention, in this embodiment, the cap beam top embedded parts and the sliding temporary bracket are both arranged on two adjacent cap beams in front and behind, so that when the bridge erection machine moves horizontally, the bridge erection machine is horizontally moved to erect beams through two sliding track units. In step (6), the sliding legs of the bridge erection machine installed in step (3) are first connected and fixed to the bridge erection machine itself, and then the sliding legs of the bridge erection machine are horizontally moved left and right on the two sliding track units, thereby driving the bridge erection machine with beams to realize horizontal movement of beams.

[0095] During the lateral movement, the hydraulic pump station is used to control the hydraulic cylinder to meet the requirements of uniform and stable sliding speed. In order to eliminate the unequal friction caused by component processing errors and the non-absolute levelness of the sliding track unit on site, which causes the hydraulic cylinder to move asynchronously or even get stuck, the hydraulic pump station drive adopts the industrial control device control method of pressure and position closed-loop comprehensive control.

[0096] The present invention utilizes the sliding principle to realize the synchronous dragging of the hydraulic cylinder under the control of the industrial control device, so that the sliding legs of the bridge erection machine can slide synchronously into place, shortening the construction time and reducing the construction cost. The method can perform the overall span transverse beam shifting construction between the same spans of bridges, is not restricted by the conditions of high pier beam erection, and can quickly and conveniently complete the transverse beam shifting construction of one span and then continue the through-hole construction, providing a construction reference for subsequent similar engineering construction, and has great economic and social value.

[0097] It can be seen from the above embodiments that the present invention optimizes the bridge erection method, overcomes the technical problems of no hoisting conditions in steep mountain slopes and no beam erection channels on steep mountain roads; and can realize the simultaneous erection of beams on the left and right sides of the bridge, thereby improving the efficiency of beam erection and shortening the construction period.

[0098] The invention has high construction efficiency and is environmentally friendly; by erecting beams and slabs by span, the moving time of the bridge erection machine is reduced, and the efficiency of beam and slab erection is greatly improved. At the same time, this method has less damage to the ecological environment of the environment and is environmentally friendly.

[0099] The invention reduces construction costs; compared with the traditional beam erection method, the invention overcomes the problem that the bridge erection machine cannot move horizontally to erect two left and right beams at the same time. Now only the support and slide system are set up to meet the construction needs, the construction efficiency is greatly improved, and the erection cost of each beam is reduced.

[0100] The above is only a preferred embodiment of the present invention, and does not limit the present invention in other forms. Any technician familiar with the profession may use the above disclosed technical content to change or modify it into an equivalent embodiment with equivalent changes. However, any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention without departing from the technical solution of the present invention still belongs to the protection scope of the technical solution of the present invention.

Claims

1. A method for transversely shifting prefabricated beams in steep mountainous areas, characterized in that: The following steps are involved: (1) constructing the embedded parts on the top of the cap beam; a limited steel plate is provided on the top of the embedded parts; (2) Construction of a temporary sliding support; the temporary sliding support mainly includes a column and a connection system unit, a distribution beam unit and a sliding track unit, and the bottom of the temporary sliding support is welded to the embedded parts; (3) Installation of the sliding legs of the bridge erecting machine: Install the sliding legs of the bridge erecting machine on the sliding track unit of the sliding temporary support; (4) The right beam of the bridge is normally erected and installed by the bridge erecting machine. After the erection and installation of the right beam is completed, the bridge erecting machine is located on the erected right beam; (5) Lift the left beam plate to be erected to the bridge erection machine; (6) The bridge erection machine carries the left beam plate to be erected and slides horizontally; During the lateral sliding process, keep the two ends of the left beam plate moving simultaneously and at the same speed; (7) Install the first beam on the left side; control the alignment of the bridge during installation; (8) The bridge erecting machine slides from left to right and returns to the erected right beam; (9) The above steps (5) to (8) are repeated in sequence to complete the transverse beam installation of the entire bridge.

2. The method for transversely shifting prefabricated beams in steep mountainous areas according to claim 1 is characterized in that: In step (1), the embedded parts are The steel bars are threaded on the top and buried in the concrete through a limiter structure; the exposed length is 5 cm, the buried depth in the concrete is 40 cm, and a limit steel plate is set on the top with a thickness of 16 cm; during construction, the top limit steel plate and the lower steel bars are limited to keep the steel bars straight. After the construction of the limit steel plate is completed, the bolts are loosened and removed.

3. The method for transversely shifting prefabricated beams in steep mountainous areas according to claim 1 or 2, characterized in that: In the step (2), the columns and the connecting system units are welded into a box-type structure using two [32a steels, and a 16mm thick top plate is set on the top. A stiffening plate is welded between the lower surface of the top plate and the box-type structure, and circumferential welding is performed according to an 8mm weld. The bottom of the column is welded to the embedded part.

4. The method for transversely shifting prefabricated beams in steep mountainous areas according to claim 3 is characterized in that: In the step (2), the columns are connected horizontally using a connecting system unit, which is composed of a plurality of [10 steel scissors braces; the distribution beam unit is hoisted into place and welded to the top of the column and the connecting system unit; the distribution beam unit is connected to the upper sliding track unit using a 6mm weld.

5. The method for transversely shifting prefabricated beams in steep mountainous areas according to claim 4 is characterized in that: The bridge erecting machine adopts a self-balancing bridge erecting machine, which does not need a counterweight when the beam is moved horizontally, and the balance and stability of the bridge erecting machine are achieved by adjusting the positions of the front and rear cranes on the guide beam.

6. The method for transversely shifting prefabricated beams in steep mountainous areas according to claim 4 or 5, characterized in that: In the step (5), the left beam plate to be erected is transported from the right beam plate to the rear of the bridge erection machine for beam feeding, and then the left beam plate to be erected is longitudinally moved to the transverse beam shifting span, and the bridge erection machine starts the transverse movement of the beam.

7. The method for transversely shifting prefabricated beams in steep mountainous areas according to claim 6 is characterized in that: In the step (6), the bridge erection machine belt beam is slowly moved horizontally, and the entire machine belt beam is moved horizontally to the beam piece position to check the accuracy of the position.

8. The method for transversely shifting prefabricated beams in steep mountainous areas according to claim 7 is characterized in that: In the step (7), after the beam is moved into place, the beam is lowered to a position of 15 cm from the temporary support and then paused. The beam lowering process should be slow and the beam piece should be kept stable. After confirmation, the beam is lowered and the beam plate is temporarily fixed.

9. The method for transversely shifting prefabricated beams in steep mountainous areas according to claim 7 or 8, characterized in that: In step (7), dedicated personnel are assigned at both ends of the beam to be responsible for the alignment of the bridge, including controlling the verticality of the bridge, the gap between the beam body and the platform beam, and the alignment of the center line.

10. The method for transversely shifting prefabricated beams in steep mountainous areas according to claim 9 is characterized in that: In the step (9), after the left beam slab is erected by lateral beam shifting, 2 cm thick steel plates are fully laid on the left and right beam slabs to provide a channel for the beam transport vehicle to pass and feed the beams when the left beam slab is erected later.

Citation Information

Patent Citations

  • Method for erecting precast beam of super-wide bridge deck at narrow space by using high-low leg gantry crane

    CN106567342A

  • Traversing luffing method of large-sized bridge erecting machine

    CN108532463A

  • Construction method for changing single-width into double-width beam erection of integral bridge span

    CN110552292A

  • Construction method for changing single-width girder into double-width girder on bent cap

    CN111893895A

  • Double-bridge girder erection method

    CN113832863A

Cited By

  • Precast beam plate sliding erection method and device

    CN120350618A