Lining slip form construction method for outgoing line vertical shaft of pumped storage power station
Through prefabricated sliding mold device and reasonable lifting sequence, the sliding mold construction problem in the narrow space of the vertical shaft of the pumped storage power station is solved, safe and efficient construction is achieved, the construction period is shortened and the integrity and stability of the sliding mold device is improved. .
Patent Information
- Application Number
- CN202411359981.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2024-11-12
AI Technical Summary
When the depth of the outgoing shaft of the pumped storage power station reaches 900m and the excavation diameter is less than 500m, the narrow construction space makes it difficult to construct the sliding form, and the construction period is extended, which affects construction safety and efficiency.
Prefabricated sliding mode device, including cable module, ventilation module, stair module and elevator module, is used to fix and lift the elevator truss beam and the connecting lifting frame to form a stable sliding mode structure, and is carried out by using a through-heart jack and an F-type lifting frame. Construction layer by layer, reasonable prefabricated assembly and lifting sequence, reduce the operation period in the well, and improve integrity and stability.
The construction cycle of sliding form assembly is shortened, construction safety is ensured, the integrity and stability of sliding form devices are improved, the problem of insufficient working space inside the outlet shaft is solved, and construction costs are reduced.
Smart Images

Figure CN118932953A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pumped storage power station construction, and in particular relates to a slipform construction method for lining a line outlet shaft of a pumped storage power station. Background Art
[0002] Pumped-storage power stations are key networking assets for regulating and balancing the power system, ensuring safety and stability, and improving the quality of electric energy. Compared with conventional water conservancy and hydropower projects, large-scale pumped-storage power station projects are unique in terms of reservoir construction, plant layout, and unit form. They are difficult to construct, technically complex, and have high safety risks, which are also key technologies in engineering construction. The construction of concrete in the outlet shaft of a pumped-storage power station is related to the operation of the entire pumped-storage power station. In order to ensure construction safety, slipforms are usually used for concrete pouring, and the slipforms are lifted by a hydraulic system. However, when the depth of the outlet shaft reaches 900m and the excavation diameter is less than 500m, the narrow construction space causes great construction difficulties for the slipform construction, resulting in serious delays in the entire construction period. Therefore, a slipform construction method for the lining of the outlet shaft of a pumped-storage power station should be provided. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a slipform construction method for the lining of the outlet shaft of a pumped-storage power station in view of the deficiencies in the above-mentioned prior art. The method has a simple structure, a reasonable design, and a reasonable prefabrication assembly and hoisting sequence, which reduces the working period in the shaft, solves the problem of insufficient working space inside the outlet shaft, ensures the safety of on-site construction, greatly shortens the construction period of the slipform assembly, and improves the integrity and stability of the slipform device under the connection action of the first elevated truss beam, the second elevated truss beam, the third elevated truss beam, the fourth elevated truss beam and multiple connecting lifting frames.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a slipform construction method for lining the outlet shaft of a pumped storage power station, characterized in that: the construction method comprises the following steps:
[0005] Step 1, prefabricate the slipform device;
[0006] The sliding form device includes a cable module sliding form assembly for forming a cable hole structure, a ventilation module sliding form assembly for forming a ventilation shaft, a stair module sliding form assembly for forming a stair shaft structure, and an elevator module sliding form assembly for forming an elevator shaft structure. The cable module sliding form assembly includes a first sliding form frame for forming a low-voltage cable hole and a second sliding form frame for forming a high-voltage cable hole, and the first sliding form frame and the second sliding form frame are fixedly connected by a first elevated truss beam. The ventilation module sliding form assembly includes a third sliding form frame and a fourth sliding form frame for forming a ventilation shaft, and the third sliding form frame and the fourth sliding form frame are fixedly connected by a second elevated truss beam. The stair module sliding form assembly includes a fifth sliding form frame for forming a stairwell and a sixth sliding form frame for forming a stair corridor, and the fourth elevated truss beam is installed on the fifth sliding form frame. The elevator module sliding form assembly includes a seventh sliding form frame for forming an elevator shaft and an eighth sliding form frame for forming an elevator hall, and the seventh sliding form frame and the eighth sliding form frame are fixedly connected by a third elevated truss beam.
[0007] Step 2: Hoisting the slipform device:
[0008] Step 201, after completing the measurement, positioning and laying out of the bottom of the outgoing shaft, hoisting the cable module sliding formwork assembly;
[0009] Step 202, hoisting the ventilation module sliding formwork assembly, and connecting and fixing one end of the second elevated truss beam to the first sliding formwork frame;
[0010] Step 203, hoisting the elevator module sliding formwork assembly, and connecting and fixing one end of the third elevated truss beam to the second sliding formwork frame;
[0011] Step 204, hoisting the fifth sliding formwork frame, and connecting and fixing the two ends of the fourth elevated truss beam to the fourth sliding formwork frame and the seventh sliding formwork frame respectively;
[0012] Step 205, hoisting the sixth sliding formwork frame;
[0013] Step 3: Installation of multiple connecting lifting frames and multiple F-type lifting frames:
[0014] The first sliding form frame, the second sliding form frame, the third sliding form frame, the fourth sliding form frame, the fifth sliding form frame, the sixth sliding form frame, the seventh sliding form frame and the eighth sliding form frame are connected as a whole by using a plurality of connecting lifting frames, and one or more F-shaped lifting frames are installed on the first sliding form frame, the second sliding form frame, the third sliding form frame, the fourth sliding form frame, the fifth sliding form frame, the sixth sliding form frame, the seventh sliding form frame and the eighth sliding form frame;
[0015] Step 4: Installation of multiple through-type jacks:
[0016] Through-type jacks are installed on the first elevated truss beam, the second elevated truss beam, the third elevated truss beam, the fourth elevated truss beam, the connecting lifting frame and the F-type lifting frame;
[0017] Step 5, debugging of synchronous lifting of multiple through-type jacks;
[0018] Step 6: Install the plastering platform, lift the slipform device layer by layer, and construct the lining of the outlet shaft layer by layer.
[0019] The above-mentioned slipform construction method for the lining of the outlet shaft of a pumped-storage power station is characterized in that: in step five, before debugging the synchronous jacking of multiple through-type jacks, it is necessary to first install a steel platform on the slipform device, and arrange a laser level and a hydraulic station on the steel platform, and connect the multiple through-type jacks to the hydraulic station.
[0020] The above-mentioned slipform construction method for the lining of the outlet shaft of a pumped-storage power station is characterized in that: in step five, after completing the debugging of the synchronous jacking of multiple through-type jacks, the steel bar platform is used to construct the bottom layer of steel bars, and the bottom concrete layer is cast and formed.
[0021] The above-mentioned slipform construction method for the lining of the outlet shaft of a pumped-storage power station is characterized in that: in step six, when the lining of the outlet shaft is constructed layer by layer to the outlet hole entrance, a plurality of parallel support beams are arranged under the slipform device, and then the slipform device is dropped onto the support beams, and the slipform device is dismantled and transported out of the outlet hole.
[0022] The above-mentioned slipform construction method for the lining of the outlet shaft of a pumped-storage power station is characterized in that the first slipform frame, the second slipform frame, the third slipform frame, the fourth slipform frame, the fifth slipform frame, the sixth slipform frame, the seventh slipform frame and the eighth slipform frame all include an outer ring formwork and a radial truss beam arranged inside the outer ring formwork.
[0023] Compared with the prior art, the present invention has the following advantages:
[0024] 1. The present invention forms a cable module slipform assembly by first fixing the first slipform frame and the second slipform frame through a first elevated truss beam; fixing the third slipform frame and the fourth slipform frame through a second elevated truss beam to form a ventilation module slipform assembly; fixing the seventh slipform frame and the eighth slipform frame through a third elevated truss beam to form an elevator module slipform assembly; a fourth elevated truss beam is installed on the fifth slipform frame; then, the cable module slipform assembly, the ventilation module slipform assembly, the elevator module slipform assembly, the fifth slipform frame, and the sixth slipform frame are hoisted in sequence. The reasonable prefabrication assembly and hoisting sequence reduces the working period in the shaft, solves the problem of insufficient working space inside the outlet shaft, ensures the safety of on-site construction, and greatly shortens the construction period of slipform assembly.
[0025] 2. After the cable module slipform assembly, the ventilation module slipform assembly, the stair module slipform assembly and the elevator module slipform assembly are hoisted, the present invention installs multiple connecting lifting frames and multiple F-type lifting frames, and uses multiple connecting lifting frames to connect the first slipform frame, the second slipform frame, the third slipform frame, the fourth slipform frame, the fifth slipform frame, the sixth slipform frame, the seventh slipform frame and the eighth slipform frame into one, so as to form a complete slipform structure. The first elevated truss beam, the second elevated truss beam, the third elevated truss beam, the fourth elevated truss beam, the connecting lifting frame and the F-type lifting frame can all provide stable support for the through-type jack, and can withstand the lifting load of the entire slipform device, and transfer the lateral pressure of the concrete pouring on the outer ring formwork to the radial truss beam.
[0026] 3. The slipform device of the present invention includes a cable module slipform assembly, a ventilation module slipform assembly, a stair module slipform assembly and an elevator module slipform assembly. Under the connection action of the first elevated truss beam, the second elevated truss beam, the third elevated truss beam, the fourth elevated truss beam and a plurality of connecting lifting frames, the integrity and stability of the slipform device are improved.
[0027] 4. The construction process of the present invention is reasonably designed, which helps to shorten the construction period and reduce the construction cost, and is easy to promote and apply.
[0028] To sum up, the construction process of the present invention is reasonably designed, and the reasonable prefabrication assembly and hoisting sequence reduces the working period in the well, solves the problem of insufficient working space inside the outlet shaft, ensures the safety of on-site construction, and greatly shortens the construction period of the slipform assembly. Under the connection action of the first elevated truss beam, the second elevated truss beam, the third elevated truss beam, the fourth elevated truss beam and multiple connecting lifting frames, the integrity and stability of the slipform device are improved.
[0029] The present invention is further described in detail below through the accompanying drawings and examples. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a flow chart of the present invention.
[0031] Figure 2 It is a structural schematic diagram of the outlet shaft of the present invention.
[0032] Figure 3 It is a schematic structural diagram of the sliding mode device of the present invention.
[0033] Figure 4 It is a schematic diagram of the connection relationship between the slipform device, multiple connecting lifting frames, multiple F-type lifting frames and multiple through-type jacks of the present invention.
[0034] Figure 5 It is a schematic diagram of the connection relationship between the second elevated truss beam, the F-type lifting frame and the through-type jack of the present invention.
[0035] Figure 6 The figure is a schematic diagram of the arrangement of multiple support beams on the outgoing shaft of the present invention.
[0036] Description of reference numerals:
[0037] 1—first sliding form frame; 2—second sliding form frame; 3—third sliding form frame;
[0038] 4—the fourth sliding form frame; 5—the fifth sliding form frame; 6—the sixth sliding form frame;
[0039] 7—the seventh sliding formwork frame; 8—the eighth sliding formwork frame; 9—the outgoing shaft;
[0040] 10—Line-out shaft lining; 11—Low-voltage cable hole; 12—High-voltage cable hole;
[0041] 13—ventilation shaft; 14—doorway; 15—staircase;
[0042] 16—staircase corridor; 17—elevator shaft; 18—elevator hall;
[0043] 19—first elevated truss beam; 20—second elevated truss beam; 21—third elevated truss beam;
[0044] 22—fourth elevated truss beam; 23—connecting lifting frame; 24—F-type lifting frame;
[0045] 25—through-type jack; 26—plastering platform; 27—wire outlet hole;
[0046] 28—Support beam. DETAILED DESCRIPTION
[0047] like Figures 1 to 6 A slipform construction method for lining a vertical shaft of a pumped storage power station outlet is shown, and the construction method comprises the following steps:
[0048] Step 1, prefabricate the slipform device;
[0049] The sliding form device includes a cable module sliding form assembly for forming a cable hole structure, a ventilation module sliding form assembly for forming a ventilation shaft 13, a stair module sliding form assembly for forming a stairwell structure, and an elevator module sliding form assembly for forming an elevator shaft structure. The cable module sliding form assembly includes a first sliding form frame 1 for forming a low-voltage cable hole 11 and a second sliding form frame 2 for forming a high-voltage cable hole 12. The first sliding form frame 1 and the second sliding form frame 2 are fixedly connected by a first overhead truss beam 19. The ventilation module sliding form assembly includes a first sliding form frame 1 for forming a ventilation shaft 13. The third slipform frame 3 and the fourth slipform frame 4 are fixedly connected by the second elevated truss beam 20, the stair module slipform assembly includes a fifth slipform frame 5 for forming the stairwell 15 and a sixth slipform frame 6 for forming the stair corridor 16, the fifth slipform frame 5 is installed with a fourth elevated truss beam 22, the elevator module slipform assembly includes a seventh slipform frame 7 for forming the elevator shaft 17 and an eighth slipform frame 8 for forming the elevator hall 18, the seventh slipform frame 7 and the eighth slipform frame 8 are fixedly connected by the third elevated truss beam 21;
[0050] Step 2: Hoisting the slipform device:
[0051] Step 201, after completing the measurement, positioning and laying out of the bottom of the outgoing cable shaft 9, hoisting the cable module sliding formwork assembly;
[0052] Step 202, hoisting the ventilation module sliding formwork assembly, and connecting and fixing one end of the second elevated truss beam 20 to the first sliding formwork frame 1;
[0053] Step 203, hoisting the elevator module sliding formwork assembly, and connecting and fixing one end of the third elevated truss beam 21 to the second sliding formwork frame 2;
[0054] Step 204, hoisting the fifth sliding formwork frame 5, and connecting and fixing the two ends of the fourth elevated truss beam 22 to the fourth sliding formwork frame 4 and the seventh sliding formwork frame 7 respectively;
[0055] Step 205, hoisting the sixth sliding formwork frame 6;
[0056] Step 3: Installation of multiple connection lifting frames 23 and multiple F-type lifting frames 24:
[0057] The first sliding form frame 1, the second sliding form frame 2, the third sliding form frame 3, the fourth sliding form frame 4, the fifth sliding form frame 5, the sixth sliding form frame 6, the seventh sliding form frame 7 and the eighth sliding form frame 8 are connected as a whole by using a plurality of connecting lifting frames 23, and the first sliding form frame 1, the second sliding form frame 2, the third sliding form frame 3, the fourth sliding form frame 4, the fifth sliding form frame 5, the sixth sliding form frame 6, the seventh sliding form frame 7 and the eighth sliding form frame 8 are each installed with one or more of the F-type lifting frames 24;
[0058] Step 4: Installation of multiple through-type jacks 25:
[0059] A through-type jack 25 is installed on the first elevated truss beam 19, the second elevated truss beam 20, the third elevated truss beam 21, the fourth elevated truss beam 22, the connecting lifting frame 23 and the F-type lifting frame 24;
[0060] Step 5: Debugging of synchronous lifting of multiple through-type jacks 25;
[0061] Step 6: Install the plastering platform 26, lift the slipform device layer by layer, and construct the lining 10 of the outlet shaft layer by layer.
[0062] In this embodiment, in step one, the first slipform frame 1 and the second slipform frame 2 are first fixedly connected by the first elevated truss beam 19 to form a cable module slipform assembly; the third slipform frame 3 and the fourth slipform frame 4 are fixedly connected by the second elevated truss beam 20 to form a ventilation module slipform assembly; the seventh slipform frame 7 and the eighth slipform frame 8 are fixedly connected by the third elevated truss beam 21 to form an elevator module slipform assembly; the fourth elevated truss beam 22 is installed on the fifth slipform frame 5; thereafter, according to the hoisting sequence in step two, the cable module slipform assembly, the ventilation module slipform assembly, the elevator module slipform assembly, the fifth slipform frame 5, and the sixth slipform frame 6 are hoisted in turn. Reasonable prefabrication assembly and hoisting sequence reduce the working period in the well, solve the problem of insufficient working space inside the outlet shaft 9, ensure the safety of on-site construction, and greatly shorten the construction period of slipform assembly.
[0063] In this embodiment, after completing the lifting of the cable module slipform assembly, the ventilation module slipform assembly, the stair module slipform assembly and the elevator module slipform assembly, in step three, multiple connecting lifting frames 23 and multiple F-type lifting frames 24 are installed, and the first slipform frame 1, the second slipform frame 2, the third slipform frame 3, the fourth slipform frame 4, the fifth slipform frame 5, the sixth slipform frame 6, the seventh slipform frame 7 and the eighth slipform frame 8 are connected as a whole using multiple connecting lifting frames 23 to form a completed slipform structure, and the first elevated truss beam 19, the second elevated truss beam 20, the third elevated truss beam 21, the fourth elevated truss beam 22, the connecting lifting frame 23 and the F-type lifting frame 24 can all provide stable support for the through-type jack 25.
[0064] In this embodiment, in step six, after the slipform device climbs to a height of 3 meters, the plastering platform 26 is installed, and two anti-falling nets are set at the bottom of the plastering platform 26 to ensure construction safety.
[0065] In this embodiment, in step five, before debugging the synchronous lifting of multiple through-type jacks 25, it is necessary to first install a steel platform on the slipform device, arrange a laser level and a hydraulic station on the steel platform, and connect the multiple through-type jacks 25 to the hydraulic station.
[0066] In this embodiment, in step five, after the debugging of synchronous lifting of the plurality of through-type jacks 25 is completed, the bottom layer of steel bars is constructed using a steel bar platform, and the bottom concrete layer is cast and formed.
[0067] like Figure 6 As shown, in this embodiment, in step six, when the lining 10 of the cable outlet shaft is constructed layer by layer to the opening of the cable outlet hole 27, a plurality of parallel support beams 28 are arranged below the slipform device, and then the slipform device is lowered onto the support beams 28, and the slipform device is dismantled and transported out of the cable outlet hole 27.
[0068] In this embodiment, after the construction of the outlet shaft lining 10 is completed, a plurality of parallel support beams 28 are arranged below the slipform device, and the slipform device is temporarily supported by the plurality of support beams 28, so that the slipform device can be easily dismantled at the opening of the outlet hole 27. There is no need to lower the slipform device to the bottom of the outlet shaft 9 again, which greatly improves the construction efficiency and shortens the construction period.
[0069] like Figure 3 and Figure 4 As shown, in this embodiment, the first slipform frame 1, the second slipform frame 2, the third slipform frame 3, the fourth slipform frame 4, the fifth slipform frame 5, the sixth slipform frame 6, the seventh slipform frame 7 and the eighth slipform frame 8 all include an outer ring formwork and a radial truss beam arranged inside the outer ring formwork.
[0070] In this embodiment, the radial truss beam is mainly composed of a Bailey truss and a connecting pin. The Bailey truss is a structural member welded with channel steel, steel pipe and steel plate. The upper end of the Bailey truss bears pressure and the lower end bears tension. It has great rigidity, ensuring the rigidity and strength of the entire slipform device.
[0071] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent structural change made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A slipform construction method for lining a vertical shaft of a pumped storage power station, characterized in that: The construction method comprises the following steps: Step 1, prefabricate the slipform device; The sliding form device comprises a cable module sliding form assembly for forming a cable hole structure, a ventilation module sliding form assembly for forming a ventilation shaft (13), a stair module sliding form assembly for forming a stair shaft structure, and an elevator module sliding form assembly for forming an elevator shaft structure. The cable module sliding form assembly comprises a first sliding form frame (1) for forming a low-voltage cable hole (11) and a second sliding form frame (2) for forming a high-voltage cable hole (12). The first sliding form frame (1) and the second sliding form frame (2) are fixedly connected via a first overhead truss beam (19). The ventilation module sliding form assembly comprises a third sliding form frame (3) for forming a ventilation shaft (13). and a fourth sliding formwork frame (4), the third sliding formwork frame (3) and the fourth sliding formwork frame (4) being fixedly connected via a second elevated truss beam (20), the stair module sliding formwork assembly comprising a fifth sliding formwork frame (5) for forming a stairwell (15) and a sixth sliding formwork frame (6) for forming a stair corridor (16), the fifth sliding formwork frame (5) being mounted with a fourth elevated truss beam (22), the elevator module sliding formwork assembly comprising a seventh sliding formwork frame (7) for forming an elevator shaft (17) and an eighth sliding formwork frame (8) for forming an elevator hall (18), the seventh sliding formwork frame (7) and the eighth sliding formwork frame (8) being fixedly connected via a third elevated truss beam (21); Step 2: Hoisting the slipform device: Step 201, after completing the measurement, positioning and laying out of the bottom of the outlet shaft (9), hoisting the cable module sliding formwork assembly; Step 202: hoist the ventilation module sliding formwork assembly, and connect and fix one end of the second elevated truss beam (20) to the first sliding formwork frame (1); Step 203, hoisting the elevator module sliding formwork assembly, and connecting and fixing one end of the third elevated truss beam (21) to the second sliding formwork frame (2); Step 204, hoisting the fifth sliding formwork frame (5), and connecting and fixing the two ends of the fourth elevated truss beam (22) to the fourth sliding formwork frame (4) and the seventh sliding formwork frame (7) respectively; Step 205, hoisting the sixth sliding formwork frame (6); Step 3: Installation of multiple connecting lifting frames (23) and multiple F-type lifting frames (24): The first sliding form frame (1), the second sliding form frame (2), the third sliding form frame (3), the fourth sliding form frame (4), the fifth sliding form frame (5), the sixth sliding form frame (6), the seventh sliding form frame (7) and the eighth sliding form frame (8) are connected as a whole by using a plurality of connecting lifting frames (23); and one or more F-shaped lifting frames (24) are installed on each of the first sliding form frame (1), the second sliding form frame (2), the third sliding form frame (3), the fourth sliding form frame (4), the fifth sliding form frame (5), the sixth sliding form frame (6), the seventh sliding form frame (7) and the eighth sliding form frame (8); Step 4: Installation of multiple through-type jacks (25): A through-type jack (25) is installed on the first elevated truss beam (19), the second elevated truss beam (20), the third elevated truss beam (21), the fourth elevated truss beam (22), the connecting lifting frame (23) and the F-type lifting frame (24); Step 5, debugging of synchronous lifting of multiple through-type jacks (25); Step 6: Install the plastering platform (26), lift the slipform device layer by layer, and construct the lining (10) of the outlet shaft layer by layer.
2. A slipform construction method for lining a vertical shaft of a pumped storage power station according to claim 1, characterized in that: In step five, before debugging the synchronous lifting of multiple through-type jacks (25), it is necessary to first install a steel platform on the slipform device, arrange a laser level and a hydraulic station on the steel platform, and connect the multiple through-type jacks (25) to the hydraulic station.
3. A slipform construction method for lining a vertical shaft of a pumped storage power station according to claim 1, characterized in that: In step five, after the synchronous lifting and debugging of the plurality of through-type jacks (25) is completed, the bottom layer of steel bars is constructed using a steel bar platform, and a bottom concrete layer is cast and formed.
4. A slipform construction method for lining a vertical shaft of a pumped storage power station according to claim 1, characterized in that: In step six, when the lining (10) of the cable outlet shaft is constructed layer by layer to the opening of the cable outlet hole (27), a plurality of parallel support beams (28) are arranged below the slipform device, and then the slipform device is lowered onto the support beams (28), and the slipform device is dismantled and transported out of the cable outlet hole (27).
5. A slipform construction method for lining a vertical shaft of a pumped storage power station according to claim 1, characterized in that: The first sliding formwork frame (1), the second sliding formwork frame (2), the third sliding formwork frame (3), the fourth sliding formwork frame (4), the fifth sliding formwork frame (5), the sixth sliding formwork frame (6), the seventh sliding formwork frame (7) and the eighth sliding formwork frame (8) all comprise an outer ring formwork and a radiating truss beam arranged inside the outer ring formwork.