Complex stratum carrier pile synchronous filling device and construction method
By designing a window synchronous tamping filler device in the construction of carrier piles in complex formations and tamping extrusion technology using clay sintered bricks, the problems of low construction efficiency and insufficient bearing capacity of carrier piles in complex formations are solved, and high efficiency and safety are achieved construction process.
Patent Information
- Application Number
- CN202411317254.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-12
AI Technical Summary
In complex formation soils, due to uneven formation distribution during carrier pile construction, the ramming hammer frequently pulls out the guardrail, which is inefficient, and small-particle fillers are not easy to meet the bearing capacity, which poses construction safety hazards.
A complex formation carrier pile synchronous packing device is designed, including opening a window on the outer wall of the casing, and using the window to tamp the bottom of the carrier pile and tamp the filling in synchronously, combining the chute and hopper structure to avoid frequent pulling of hammers in the casing. And use clay sintered bricks from building recycling materials for tamping and extrusion to ensure bearing capacity.
It improves construction efficiency, shortens construction cycle, ensures construction safety, saves people, materials and machine costs, and solves the problem of insufficient bearing capacity of small-particle fillers.
Smart Images

Figure CN118932990A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an integrated device for tamping and filling a carrier pile, and in particular to a synchronous filling device for a carrier pile in a complex stratum and a construction method, belonging to the technical field of pile foundation construction. Background Art
[0002] With the development of urban construction, more and more houses, industrial plants, bridges and other buildings are being built, and the geological conditions faced are also diverse. For soil layers with more complex geology, such as gravel, silty clay and construction waste landfill areas, workers cannot adopt excavation and replacement. Therefore, in order to avoid excavation and replacement while reducing the length of the pile foundation, carrier pile construction is generally adopted. Affected by the uneven distribution of the strata, during construction, workers need to frequently pull out the tamping hammer and replace the casing back and forth according to the different lengths of the carrier piles, which is time-consuming, labor-intensive and inefficient. At the same time, when carrying out the tamping and extrusion construction at the bottom of the carrier pile, there is a hidden danger that small-size fillers are not easy to meet the bearing capacity. Summary of the invention
[0003] The technical problem to be solved by the present invention is: to overcome the shortcomings of the prior art, to provide a synchronous filling device and construction method for carrier piles in complex strata, to use a window to implement simultaneous tamping of the bottom of the carrier pile and filling, to avoid frequent pulling out of the casing by the tamping hammer in the casing during the filling process, to shorten the construction period and to ensure construction safety.
[0004] The technical solution adopted by the present invention to solve the technical problem is: A synchronous filling device for carrier piles in complex formations comprises a casing, an outer wall of which is provided with a window, a chute is provided on the right side of the casing, the right end of the chute is hinged to a bracket, a hopper is provided below the chute, a base frame is provided at the bottom of the hopper, an arc-shaped groove is provided on the left side of the hopper, and the arc-shaped groove is tightly attached to the outer wall of the casing.
[0005] There are at least two windows.
[0006] The chute is distributed in a shape of being lower on the left and higher on the right. The right side of the chute is rotatably connected to a displacement sleeve. The displacement sleeve is sleeved on the right end of the bracket and fixedly connected to the bracket by bolts.
[0007] The left end of the bracket is sleeved with an arc-shaped support plate, which is fixedly connected to the bracket by bolts, and the arc-shaped support plate is located below the chute.
[0008] The construction method of the complex stratum carrier pile synchronous filling device comprises the following steps: S1. Measurement and setting out: Use GPS to set out the axis and carrier pile positions, and review and accept them. The axis measurement allows the total length L≤±15mm, and the total width B deviation ≤±5mm; S2. Pile driver in place ①. Determine the location of the pile according to the drawing, align the center of the pre-welded φ400mm steel bar circle with the center point of the pile position, leave an imprint, and move the pile driver into place; ②. Align the casing with the imprint and place it on the ground, and use a tripod pendant to adjust the casing vertically in two directions of 90° or use a level ruler to adjust it vertically in two directions; S3, hammering into holes ①, first use a slender hammer to gently tamp the ground to accurately locate the casing at the pile position, then raise the slender hammer to tamp, use the back pressure rope to back pressure the casing and the slender hammer to sink synchronously to form a hole; ② The tamping hammer continuously tamps inside the casing, and the carrier pile casing sinks synchronously with the tamping hole depth; when the casing sinks to the designed elevation, the casing is fixed and the carrier pile hole depth is checked; the final sinking depth of the casing should be consistent with the mark left on the casing for measuring the pile length and the designed elevation; S4, packing tamping ① After the casing sinks to the designed elevation, lift the weight above the outer filling port of the casing and start filling; ② After filling, use a 4T heavy hammer to let it fall freely in the casing, repeatedly tamping the filling at the bottom of the carrier; ③ During the tamping process, the observer should always observe and follow the marks on the wire rope, and ensure that the staff cannot work inside the casing during the tamping process; S5, hammering amount difference detection ① After the carrier forms a dense state, measure the hammering difference when the hammer rebounds. The weight is 4kN and the free fall motion is performed at a drop distance of 5m. ② When measuring the hammering difference, it is strictly forbidden to use the brake and clutch; the hammering difference of each level should be smaller or equal to the previous hammering, and the cumulative value of the three hammering differences should meet the design requirements; S6, ramming dry hard concrete ① After the hammering difference meets the design requirements, tamp the dry hard concrete; the tamping volume is 0.3m3. After meeting the design requirements, lift the hammer 3 meters and tap 4 times to make the dry hard concrete surface completely dense; ② Sink the steel cage into the casing and measure the top elevation of the steel cage to ensure it meets the design and specification requirements; S7, carrier transfer concrete pouring ①. After the steel cage is sunk into the casing according to the designed elevation, the window on the outside of the casing is used as the concrete pouring port, and a hopper is placed on the ground outside the casing; ②. Adjust the position of the displacement sleeves on both sides of the chute according to the position of the window. At the same time, adjust the height of the arc support plate so that the left end of the chute is located in the window and the chute is distributed in a shape of low on the left and high on the right; ③. Let the concrete flow from the crane hopper into the chute, and then flow into the window of the casing along the chute, pouring all the way to the pile top elevation, and appropriately over-pouring by not less than 50cm; ④. Select a vibrating rod of appropriate length according to the depth of the carrier pile, vibrate it step by step during the concrete pouring process, and vibrate it from the bottom to the top step by step as required. Insert it quickly and pull it out slowly during the vibration.
[0009] The casing is first filled with bricks in a tamping amount of 0.5-0.8 m³, and then filled with more than 0.3 m³ of dry hard concrete, and the dry hard concrete is hammered out of the casing by 2 cm.
[0010] Before sinking the casing, make a casing elevation control point 15 cm away from the casing; use a slender hammer to pull the casing out, place the steel cage, and then pour concrete to the cage top elevation, then pull out the casing at one time, vibrate it with a vibrating rod, and move the machine to the next pile position.
[0011] The positive beneficial effects of the present invention are: 1. The present invention continuously opens windows of 0.2*0.35 specifications on the outside of the carrier pile casing, and uses the windows to implement the tamping of the bottom of the carrier pile and the filling simultaneously, which can avoid the tamping hammer in the casing frequently pulling out the casing during the filling process. At the same time, it can avoid the casing being replaced back and forth during the construction of carrier piles of different lengths, thereby greatly improving the construction efficiency of the carrier piles.
[0012] 2. The present invention utilizes clay sintered bricks made of construction recycling materials to ram and extrude the bottom of the carrier pile, thereby solving the hidden danger that small-size fillers are difficult to meet the bearing capacity. This not only shortens the construction period and ensures construction safety, but also saves investment in manpower, materials, and machinery costs.
[0013] 3. The present invention prevents concrete materials from overflowing by arranging a base frame at the bottom of the chute. At the same time, the height of the chute can be adjusted according to the window position, which is beneficial for workers to carry out filling construction. It is easy to use and simple to operate. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 It is a structural schematic diagram of the hopper of the present invention; Among them: 1-casing, 2-window, 3-bracket, 4-displacement sleeve, 5-arc support plate, 6-chute, 7-hopper, 701-arc groove, 8-base, A-pile hole. DETAILED DESCRIPTION
[0015] The present invention will be further explained and illustrated below in conjunction with the accompanying drawings: Example 1, see Figure 1-Figure 2 A synchronous filling device for carrier piles in complex strata comprises a casing 1, a window 2 is dug on the outer wall of the casing 1, a chute 6 is arranged on the right side of the casing 1, the right end of the chute 6 is hinged to a bracket 3, a hopper 7 is arranged below the chute 6, a base frame 8 is arranged at the bottom of the hopper 7, an arc-shaped groove 701 is arranged on the left side of the hopper 7, and the arc-shaped groove 701 is tightly attached to the outer wall of the casing 1.
[0016] The number of windows 2 is at least two.
[0017] The chute 6 is distributed in a shape of being lower on the left and higher on the right. The right side of the chute 6 is rotatably connected to the displacement sleeve 4. The displacement sleeve 4 is sleeved on the right end of the bracket 3 and fixedly connected to the bracket 3 by bolts.
[0018] The left end of the bracket 3 is sleeved with an arc-shaped support plate 5 , which is fixedly connected to the bracket 3 by bolts, and the arc-shaped support plate 5 is located below the chute 6 .
[0019] In the above description, both sides of the right end of the chute are rotatably connected to the displacement sleeve, and the rotation axis is located at the right position of the middle part of the chute.
[0020] In the above description, the height of the left end of the chute can be adjusted by adjusting the height of the arc-shaped support plate.
[0021] In the above description, when in use, the arc-shaped groove at the left end of the hopper can be in close contact with the outer wall of the casing.
[0022] Example 2, a construction method of the above-mentioned complex stratum carrier pile synchronous filling device, comprises the following steps: S1. Measurement and setting out: Use GPS to set out the axis and carrier pile positions, and review and accept them. The axis measurement allows the total length L≤±15mm, and the total width B deviation ≤±5mm; S2. Pile driver in place ①. Determine the location of the pile according to the drawing, align the center of the pre-welded φ400mm steel bar circle with the center point of the pile position, leave an imprint, and move the pile driver into place; ②. Align the casing 1 with the imprint and place it on the ground surface, and use a tripod pendant to adjust the casing vertically in two directions of 90° or use a level ruler to adjust it vertically in two directions; S3, hammering into holes ①, first use a slender hammer to gently tamp the ground to accurately locate the casing 1 at the pile position, then raise the slender hammer to tamp, and use the back pressure rope to counter-press the casing 1 and the slender hammer to sink synchronously to form a hole; ② The tamping hammer continuously tamps in the casing 1, and the carrier pile casing sinks synchronously with the tamping hole depth; when the casing 1 sinks to the design elevation, the casing is fixed and the carrier pile hole depth is checked; the final sinking depth of the casing 1 should be consistent with the mark left on the casing for measuring the pile length and the design elevation; S4, packing tamping ① After the casing sinks to the designed elevation, lift the weight above the outer filling port of the casing and start filling; ② After filling, use a 4T heavy hammer to let it fall freely in the casing, repeatedly tamping the filling at the bottom of the carrier; ③ During the tamping process, the observer should always observe and follow the marks on the wire rope, and ensure that the staff cannot work inside the casing during the tamping process; S5, hammering amount difference detection ① After the carrier forms a dense state, measure the hammering difference when the hammer rebounds. The weight is 4kN and the free fall motion is performed at a drop distance of 5m. ② When measuring the hammering difference, it is strictly forbidden to use the brake and clutch; the hammering difference of each level should be smaller or equal to the previous hammering, and the cumulative value of the three hammering differences should meet the design requirements; S6, ramming dry hard concrete ① After the hammering difference meets the design requirements, tamp the dry hard concrete; the tamping volume is 0.3m3. After meeting the design requirements, lift the hammer 3 meters and tap 4 times to make the dry hard concrete surface completely dense; ②, sink the steel cage into the casing 1, and measure the top elevation of the steel cage to ensure it meets the design and specification requirements; S7, carrier transfer concrete pouring ①, when the steel cage is sunk into the casing 1 according to the designed elevation, the window 2 on the outside of the casing 1 is used as the concrete pouring port, and a hopper 7 is placed on the ground outside the casing 1; ②, adjust the position of the displacement sleeves 4 on both sides of the chute 6 according to the position of the window 2, and at the same time, adjust the height of the arc support plate 5 so that the left end of the chute 6 is located in the window 2, and the chute 6 is distributed in a shape of low on the left and high on the right; ③. Let the concrete flow from the crane hopper into the chute 6, and then flow into the window 2 of the casing 1 along the chute 6, and pour it all the way to the pile top elevation, and appropriately over-pour by not less than 50cm; ④. Select a vibrating rod of appropriate length according to the depth of the carrier pile, vibrate it step by step during the concrete pouring process, and vibrate it from the bottom to the top step by step as required. Insert it quickly and pull it out slowly during the vibration.
[0023] First, fill the casing 1 with bricks in a tamping amount of 0.5-0.8 m³, then fill with more than 0.3 m³ of dry hard concrete, and hammer the dry hard concrete out of the casing by 2 cm.
[0024] Before sinking the casing, make a casing elevation control point 15 cm away from the casing; use a slender hammer to pull the casing out, place the steel cage, and then pour concrete to the cage top elevation, then pull out the casing at one time, vibrate it with a vibrating rod, and move the machine to the next pile position.
[0025] The present invention ensures the construction quality of the carrier pile and realizes fast and efficient construction while reducing the need to replace matching casings and avoiding the disadvantage that the hammer head must be pulled out of the casing mouth back and forth during the bottom tamping in order to carry out filling. By continuously opening windows on the outside of the carrier pile casing, the bottom tamping of the carrier pile and the filling are carried out simultaneously by using the opened windows, and the bearing capacity of the silty clay layer at the bottom of the carrier pile is improved while avoiding the need to replace the casing back and forth during the construction of carrier piles of different lengths. Clay sintered bricks made of construction recycled materials are used to tamp and extrude the bottom of the carrier pile, which can better meet the needs, ensure the project quality and shorten the construction period.
Claims
1. A synchronous packing device for carrier piles in complex formations, comprising a casing (1), characterized in that: A window (2) is provided on the outer wall of the casing (1), a chute (6) is provided on the right side of the casing (1), the right end of the chute (6) is hinged to the bracket (3), a hopper (7) is provided below the chute (6), a base frame (8) is provided at the bottom of the hopper (7), an arc-shaped groove (701) is provided on the left side of the hopper (7), and the arc-shaped groove (701) is in close contact with the outer wall of the casing (1).
2. A synchronous filling device for carrier piles in complex strata according to claim 1, characterized in that: There are at least two windows (2).
3. The complex stratum carrier pile synchronous filling device according to claim 1 is characterized by: The chute (6) is distributed in a shape of being lower on the left and higher on the right. The right side of the chute (6) is rotatably connected to a displacement sleeve (4). The displacement sleeve (4) is sleeved on the right end of the bracket (3) and is fixedly connected to the bracket (3) by bolts.
4. The complex stratum carrier pile synchronous filling device according to claim 1 is characterized by: The left end of the bracket (3) is sleeved with an arc-shaped support plate (5), the arc-shaped support plate (5) is fixedly connected to the bracket (3) by bolts, and the arc-shaped support plate (5) is located below the chute (6).
5. The construction method of a complex stratum carrier pile synchronous filling device according to claim 1 is characterized in that: The steps include: S1. Measurement and setting out: Use GPS to set out the axis and carrier pile positions, and review and accept them. The axis measurement allows the total length L≤±15mm, and the total width B deviation ≤±5mm; S2. Pile driver in place ①. Determine the location of the pile according to the drawing, align the center of the pre-welded φ400mm steel bar circle with the center point of the pile position, leave an imprint, and move the pile driver into place; ②. Place the casing (1) on the ground surface in line with the imprint, and use a tripod plumb bob to adjust the casing vertically in two directions at 90° or use a level ruler to adjust it vertically in two directions; S3, hammering into holes ①, first use a slender hammer to gently tamp the ground so that the casing (1) is accurately located at the pile position, and then the slender hammer is raised to tamp, and the casing (1) is pressed back by a back pressure rope so that it sinks synchronously with the slender hammer to form a hole; ② The tamping hammer continuously tamps the casing (1), and the carrier pile casing sinks synchronously with the tamping hole depth; when the casing (1) sinks to the design elevation, the casing is fixed and the carrier pile hole depth is checked; the final sinking depth of the casing (1) should be consistent with the mark left on the casing for measuring the pile length and the design elevation; S4, packing tamping ① After the casing sinks to the designed elevation, lift the weight above the outer filling port of the casing and start filling; ② After filling, use a 4T heavy hammer to let it fall freely in the casing, repeatedly tamping the filling at the bottom of the carrier; ③ During the tamping process, the observer should always observe and follow the marks on the wire rope, and ensure that the staff cannot work inside the casing during the tamping process; S5, hammering amount difference detection ① After the carrier forms a dense state, measure the hammering difference when the hammer rebounds. The weight is 4kN and the free fall motion is performed at a drop distance of 5m. ② When measuring the hammering difference, it is strictly forbidden to use the brake and clutch; the hammering difference of each level should be smaller or equal to the previous hammering, and the cumulative value of the three hammering differences should meet the design requirements; S6, ramming dry hard concrete ① After the hammering difference meets the design requirements, tamp the dry hard concrete; the tamping volume is 0.3m3. After meeting the design requirements, lift the hammer 3 meters and tap 4 times to make the dry hard concrete surface dense; ② Sink the steel cage into the casing (1) and measure the top elevation of the steel cage to ensure it meets the design and specification requirements; S7, carrier transfer concrete pouring ①, after the steel cage is sunk into the casing (1) according to the designed elevation, the window (2) outside the casing (1) is used as a concrete pouring port, and a hopper (7) is placed on the ground outside the casing (1); ②, adjusting the positions of the displacement sleeves (4) on both sides of the chute (6) according to the position of the window (2), and at the same time, adjusting the height of the arc-shaped support plate (5) so that the left end of the chute (6) is located in the window (2), and the chute (6) is distributed in a shape of being lower on the left and higher on the right; ③. Concrete is poured from the crane hopper into the chute (6), and then into the window (2) of the casing (1) along the chute (6), until it reaches the pile top elevation, and over-pouring is appropriately performed by not less than 50 cm; ④. Select a vibrating rod of appropriate length according to the depth of the carrier pile, vibrate it step by step during the concrete pouring process, and vibrate it from the bottom to the top step by step as required. Insert it quickly and pull it out slowly during the vibration.
6. The construction method of a synchronous filling device for carrier piles in complex strata according to claim 5 is characterized by: The casing (1) is first filled with bricks in a tamping amount of 0.5 to 0.8 m³, and then filled with more than 0.3 m³ of dry hard concrete, and the dry hard concrete is hammered out of the casing by 2 cm.
7. The construction method of a complex stratum carrier pile synchronous filling device according to claim 5 is characterized by: Before sinking the casing, make a casing elevation control point 15 cm away from the casing; use a slender hammer to pull the casing out, place the steel cage, and then pour concrete to the cage top elevation, then pull out the casing at one time, vibrate it with a vibrating rod, and move the machine to the next pile position.