Intelligent construction equipment group for high-speed rail roadbed and construction method of intelligent construction equipment group
By using intelligent construction equipment in the construction of high-speed railway subgrade, and utilizing sensors and processors to achieve unmanned driving and intelligent control, the problems of large surveying workload and quality being affected by human factors in traditional construction have been solved, thus improving construction efficiency and quality and enabling nighttime construction.
Patent Information
- Application Number
- CN202410990598.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-23
AI Technical Summary
Traditional high-speed railway subgrade filling construction suffers from problems such as a large workload of construction surveying, construction quality being greatly affected by the experience of operators, poor equipment coordination, and low efficiency of nighttime construction.
The high-speed railway subgrade intelligent construction equipment group includes loaders, concrete transport vehicles, bulldozers, graders, road rollers and concrete placing booms. The equipment is equipped with sensors such as lidar, locators and inertial measurement units. Through processors, it realizes unmanned driving and intelligent control. Combined with GPS navigation system, it automatically plans and executes construction tasks.
This method enables construction without measurement, improving construction efficiency, ensuring construction quality, reducing construction costs, and allowing roadbed filling to be carried out at night, thus avoiding quality problems caused by differences in the experience of machinery operators.
Smart Images

Figure CN118933008A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, and in particular to a high-speed railway subgrade intelligent construction equipment group and a construction method thereof. Background Art
[0002] my country's high-speed railways use a large number of ballastless tracks, so the long-term stable high smoothness of the ballastless track must be guaranteed to meet the requirements of high safety, high stability and high comfort of trains under high-speed operation. The deformation of the roadbed, as the foundation of the track, directly affects the high smoothness of the ballastless track, and its strength, stiffness and deformation must meet the requirements of the specifications.
[0003] At present, the traditional high-speed railway roadbed filling and compaction construction method has the following disadvantages:
[0004] 1) The workload of construction surveying and setting out is large, and the side lines and center lines need to be laid out for each layer of fill, which becomes a shortcoming that restricts construction efficiency;
[0005] 2) The elevation control of the top of the loose paving thickness requires bulldozers to flatten and trim multiple times, and the elevation is difficult to meet the design requirements;
[0006] 3) The initial setting time of chemically improved soil is short, and the mixing, transportation, paving and rolling take a long time, and each process needs to be quickly and compactly connected;
[0007] 4) On-site soil piling, loose paving, roadbed compaction and other operations are difficult and inefficient to carry out at night;
[0008] 5) The construction operation process of engineering machinery such as bulldozers, graders, and rollers requires high experience from the machine operators. The construction quality is greatly affected by the operators, which can easily lead to problems such as unstable construction quality.
[0009] 6) The equipment in roadbed construction has poor coordination, low scheduling efficiency, and problems such as idle work and waste of resources. Summary of the invention
[0010] In order to overcome the defects of the existing technology, a high-speed railway roadbed intelligent construction equipment group and a construction method are now provided to solve the problem that the construction quality of engineering machinery such as bulldozers, graders, and rollers in the traditional high-speed railway roadbed filling and compaction construction method is greatly affected by the operators, which easily leads to unstable construction quality.
[0011] In order to achieve the above-mentioned purpose, a high-speed railway subgrade intelligent construction equipment group is provided, comprising:
[0012] A loader, comprising a loader body and a first controller connected to the loader body, the loader body being equipped with a first camera, a first laser radar and a first locator, a bucket of the loader body being equipped with an angle sensor and a first inertial measurement unit, a hydraulic cylinder of the loader body being equipped with a pressure sensor, and the first controller being connected to the first camera, the first laser radar, the first locator, the angle sensor, the first inertial measurement unit and the pressure sensor;
[0013] A concrete transport vehicle, comprising a transport vehicle body and a second controller connected to the transport vehicle body, wherein a second camera, a second laser radar, a second locator and a second inertial measurement unit are installed on the transport vehicle body, and the second controller is connected to the second camera, the second laser radar, the second locator and the second inertial measurement unit;
[0014] A bulldozer, comprising a bulldozer body and a third controller connected to the bulldozer body, wherein a third laser radar and a third locator are installed on the bulldozer body, a first elevation locator is installed on a blade of the bulldozer body, and the third controller is connected to the third laser radar, the third locator and the first elevation locator;
[0015] A motor grader, comprising a motor grader body and a fourth controller connected to the motor grader body, wherein a fourth laser radar and a fourth locator are installed on the motor grader body, a second elevation locator is installed on a blade of the motor grader, and the fourth controller is connected to the fourth laser radar, the fourth locator and the second elevation locator;
[0016] A road roller, comprising a road roller body and a fifth controller connected to the road roller body, wherein a fifth laser radar and a fifth locator are installed on the road roller body, and the fifth controller is connected to the fifth laser radar and the fifth locator;
[0017] A concrete placing boom, comprising a concrete placing boom body and a sixth controller connected to the concrete placing boom body, wherein a liquid level detector for collecting the amount of concrete stored in the concrete placing boom body is installed on the concrete placing boom body, and the sixth controller is connected to the liquid level detector;
[0018] A processor is connected to the first controller, the second controller, the third controller, the fourth controller, the fifth controller and the sixth controller.
[0019] Furthermore, the third laser radar is respectively installed at the front end and the rear end of the bulldozer body.
[0020] Furthermore, the fourth laser radar is installed at the front end and the rear end of the grader body respectively.
[0021] Furthermore, the fifth laser radar is respectively installed at the front end and the rear end of the roller body.
[0022] Furthermore, the liquid level detector is a liquid detector.
[0023] The present invention provides a construction method for a high-speed railway subgrade intelligent construction equipment group, comprising the following steps:
[0024] The processor obtains the electronic construction drawing of the high-speed railway foundation;
[0025] Based on the electronic construction drawing, the processor calculates and obtains the line type, position, elevation data and three-dimensional coordinates of the high-speed railway foundation;
[0026] The processor divides the high-speed railway foundation into a plurality of construction sections, calculates the amount of sand and gravel filler based on the construction sections and sends the amount to the outside;
[0027] The first controller obtains the amount of the sand and gravel filler and controls the loader body to transport the sand and gravel filler to the multiple construction sections;
[0028] After the sand and gravel are transported to the multiple construction sections, the processor sends the line type, position, elevation data and three-dimensional coordinates of the high-speed railway foundation to the outside;
[0029] The second controller, the third controller, the fourth controller, the fifth controller and the sixth controller respectively obtain the line type, position, elevation data and three-dimensional coordinates of the high-speed railway subgrade;
[0030] Based on the line type, position, elevation data and three-dimensional coordinates of the high-speed railway subgrade and the three-dimensional coordinates of the bulldozer body and the elevation of the blade, the third controller controls the bulldozer body and the fourth controller controls the grader body to pave the sand and gravel filler in the construction section to the design elevation of the filler layer of the high-speed railway subgrade in the construction section;
[0031] After the filler layer of the construction section reaches the designed elevation, the fifth controller controls the roller body to compact the filler layer of the construction section;
[0032] After the filling layer of the construction section is compacted, the processor calculates the amount of sand and gravel mixture based on the mix ratio of the raft concrete of the high-speed railway foundation and sends it to the outside;
[0033] The first controller obtains the amount of the sand and gravel mixture, and transports the sand and gravel mixture to a mixer based on the amount of the sand and gravel mixture to prepare raft concrete;
[0034] After the raft concrete is prepared, the processor sends a pouring signal to the outside;
[0035] The second controller and the sixth controller respectively obtain the pouring signal;
[0036] The second controller controls the transport vehicle body to transfer the raft concrete to the concrete placing machine body;
[0037] The sixth controller controls the concrete placing machine body to pour the raft concrete in the construction section;
[0038] When the stock of the raft concrete in the concrete placing boom body is lower than a preset threshold, the second controller controls the transport vehicle body to replenish the raft concrete in the concrete placing boom body until the raft concrete of the high-speed railway subgrade is poured.
[0039] The beneficial effect of the present invention is that the construction method of the high-speed railway subgrade intelligent construction equipment group of the present invention can realize measurement-free construction during the construction process, which can greatly improve construction efficiency, ensure construction quality, and reduce construction costs. The construction method of the high-speed railway subgrade intelligent construction equipment group of the present invention can realize subgrade filling work at night, which can effectively shorten the construction period. The construction method of the high-speed railway subgrade intelligent construction equipment group of the present invention can avoid the difference in filling quality caused by the difference in experience of mechanical operating personnel, and can ensure that the quality of subgrade filling meets the specifications to the greatest extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:
[0041] Figure 1 It is a structural schematic diagram of a high-speed railway subgrade intelligent construction equipment group according to an embodiment of the present invention.
[0042] Figure 2 The figure is a schematic structural diagram of a loader according to an embodiment of the present invention.
[0043] Figure 3 The figure is a schematic structural diagram of a concrete transport vehicle according to an embodiment of the present invention.
[0044] Figure 4 Schematic diagram of the structure of a bulldozer according to an embodiment of the present invention.
[0045] Figure 5 The figure is a schematic structural diagram of a motor grader according to an embodiment of the present invention.
[0046] Figure 6 Schematic diagram of the structure of a road roller according to an embodiment of the present invention.
[0047] Figure 7 Schematic diagram of the structure of a material placing machine according to an embodiment of the present invention. DETAILED DESCRIPTION
[0048] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant invention, rather than to limit the invention. It is also necessary to explain that, for ease of description, only the parts related to the invention are shown in the accompanying drawings.
[0049] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0050] Reference Figures 1 to 7 As shown, the present invention provides a high-speed railway subgrade intelligent construction equipment group, including: a loader, a concrete transport vehicle, a bulldozer, a grader, a roller, a placing machine and a processor 7.
[0051] See also Figure 2 As shown, the loader includes a loader body 1 and a first controller connected to the loader body 1. The loader body 1 is equipped with a first camera 11, a first laser radar 12 and a first locator 13. The bucket of the loader body 1 is equipped with an angle sensor 14 and a first inertial measurement unit 15. The hydraulic cylinder of the loader body 1 is equipped with a pressure sensor 16. The first controller is connected to the first camera 11, the first laser radar 12, the first locator 13, the angle sensor 14, the first inertial measurement unit 15 and the pressure sensor 16.
[0052] In this embodiment, the loader is an unmanned loader, which mainly realizes unmanned autonomous loading of various types of sand and gravel mixtures, as well as autonomous loading in the high-speed railway foundation raft concrete mixing bin. The unmanned loader uses the IMU (inertial measurement unit), angle sensor, pressure sensor and other hardware systems installed on it, as well as its positioning, navigation, control, communication and other software systems, through the controller, to achieve accurate navigation and real-time environmental perception of stopping, shifting, adding and subtracting throttle, braking, steering, shoveling, transporting and unloading, automatically realize task generation and path planning, and can automatically adjust the operation path and operation strategy according to the real-time data on site to ensure the continuity and stability of construction. The whole operation process does not require human intervention, and the operation efficiency is high, safe and reliable.
[0053] See also Figure 3 As shown, the concrete transport vehicle includes a transport vehicle body 2 and a second controller connected to the transport vehicle body 2. A second camera 21, a second laser radar 22, a second locator 23 and a second inertial measurement unit 25 are installed on the transport vehicle body 2. The second controller is connected to the second camera 21, the second laser radar 22, the second locator 23 and the second inertial measurement unit 25.
[0054] As a preferred embodiment, a third laser radar 32 is installed at the front end and the rear end of the bulldozer body 3 respectively.
[0055] In this embodiment, the concrete transport vehicle is an unmanned concrete transport vehicle, which is mainly used to transport the concrete mixed by the mixing station to the raft construction site. By installing high-precision GPS (locator), laser radar, IMU, etc., the motion information is scanned, the vehicle position is located with high precision, and the 3D information of the on-site environment is reconstructed with the help of visual sensors such as high-definition cameras, and obstacles, operation target points, etc. are detected and identified. Through the controller, according to the task requirements issued, the driving trajectory is automatically planned and generated, and the walking and operation tasks of the concrete transport vehicle are completed autonomously.
[0056] See also Figure 4 As shown, the bulldozer includes a bulldozer body 3 and a third controller connected to the bulldozer body 3. A third laser radar 32 and a third locator 32 are installed on the bulldozer body 3. A first elevation locator 36 is installed on the blade of the bulldozer body 3. The third controller is connected to the third laser radar 32, the third locator 32 and the first elevation locator 36.
[0057] In this embodiment, the bulldozer is an intelligent bulldozer, which mainly performs bulldozing operations on the earthwork at the construction site. The bulldozer is equipped with a roadbed design drawing import, a high-precision GPS positioning system, a bulldozer blade elevation locator, a laser radar, and a controller. Through the import of the roadbed design drawing, the line type, position, and corresponding elevation data of the high-speed railway roadbed design are extracted, that is, the three-dimensional data coordinates of the roadbed to be filled are obtained. Therefore, during the construction process, there is no need to conduct on-site construction measurements. The intelligent bulldozer can propose the design drawing coordinates based on the positioning position and determine the design elevation of the roadbed at that position.
[0058] The specific functions of the bulldozer are as follows:
[0059] ① The position of the bulldozer is measured in real time through the GPS positioning system. Through the controller, in coordination with the GPS base station, the position of the bulldozer is compared and linked with the position on the drawing, and the design elevation of the roadbed at the position of the bulldozer blade is automatically determined.
[0060] ② The elevation of the bottom of the blade is obtained through the bulldozer blade elevation locator, and the data is fed back to the controller. The controller controls the blade to move up and down according to the difference between the design elevation of the roadbed at the position of the bulldozer blade and the actual elevation of the bottom of the blade, so as to adjust the blade elevation so that the fill height meets the design requirements.
[0061] ③ Through the multiple laser radars installed on the fuselage, it senses the obstacles around the fuselage. When an obstacle is detected 5m in front of the fuselage, a warning signal is issued. When an obstacle is detected 1.5m in front of the fuselage, the vehicle automatically stops to ensure the safety of operations when the vision is unclear at night.
[0062] ④ Multiple high-speed railway bed filling intelligent bulldozers can work together at the same time and cooperate with each other. The controller can ensure that the longitudinal distance between them is not less than 20m and the overlap width of the bulldozer area is not less than 2m to meet the construction specifications.
[0063] See also Figure 5 As shown, the motor grader includes a motor grader body 4 and a fourth controller connected to the motor grader body 4. A fourth laser radar 42 and a fourth locator 43 are installed on the motor grader body 4. A second elevation locator 46 is installed on the blade of the motor grader. The fourth controller is connected to the fourth laser radar 42, the fourth locator 43 and the second elevation locator 46.
[0064] As a preferred embodiment, fourth laser radars 42 are respectively installed at the front and rear ends of the grader body 4 .
[0065] In this embodiment, the intelligent grader mainly performs scraping operations on the construction site. First, the real-time location information provided by GPS positioning and laser ranging is used to ensure that the grader is always in an accurate geographic coordinate position during the construction process; then, the line type, position and corresponding elevation data of the high-speed railway subgrade design are extracted through the roadbed design drawing, that is, the three-dimensional data coordinates of the roadbed to be filled are obtained, and the target flatness is set based on the pre-imported three-dimensional design data, and the height difference of the grader relative to the laser reference surface is determined. Finally, the grader converts these design data into the operating instructions of the grader, adjusts the scraper height of the grader, and automatically leveling according to the design requirements.
[0066] The specific functions of the grader are as follows:
[0067] ① Through the GPS positioning system, the position of the bulldozer is measured in real time in combination with the laser rangefinder. Through the controller, in coordination with the GPS base station, the position of the grader is compared and linked with the position on the drawing, and the design elevation of the roadbed at the position of the grader blade is automatically determined.
[0068] ② The elevation of the bottom of the blade is obtained through the elevation locator of the grader blade, and the data is fed back to the controller. The controller controls the blade to move up and down according to the difference between the design elevation of the roadbed at the position of the grader blade and the actual elevation of the bottom of the blade, so as to adjust the blade elevation so that the fill height meets the design requirements.
[0069] ③ Through the multiple laser radars installed on the fuselage, it senses the obstacles around the fuselage. When an obstacle is detected 5m in front of the fuselage, a warning signal is issued. When an obstacle is detected 1.5m in front of the fuselage, the vehicle automatically stops to ensure the safety of operations when the vision is unclear at night.
[0070] ④ Multiple high-speed railway bed filling intelligent graders can work together at the same time and cooperate with each other. The controller can ensure that the longitudinal distance between them is not less than 20m and the overlap width of the scraping area is not less than 2m to meet the construction specifications.
[0071] See also Figure 6 As shown, the road roller comprises a road roller body 5 and a fifth controller connected to the road roller body 5. A fifth laser radar 52 and a fifth positioner 53 are installed on the road roller body 5.
[0072] The fifth controller is connected to the fifth laser radar 52 and the fifth locator 53 .
[0073] As a preferred embodiment, a fifth laser radar 52 is installed at the front end and the rear end of the roller body 5 respectively.
[0074] In this embodiment, the roller is an intelligent roller, which is mainly used to compact the earthwork at the construction site. It uses high-precision GPS, laser radar and other sensors to sense the dynamic changes of terrain height, obstacles and construction sites, obtain detailed terrain information, and use the controller to assist in optimizing path planning so that the roller can cover every grid unit and take the shortest path; in addition, based on the principle of real-time feedback control, the data collected by the vibration sensor during the compaction process is used to reversely infer the modulus of the compacted roadbed soil to complete the judgment of the compaction effect.
[0075] The specific functions of the roller are as follows:
[0076] ① The GPS positioning system is used to measure the position of the roller in real time. Through the controller, in coordination with the GPS base station, the position of the grader is compared and linked with the position on the drawing to automatically determine the area to be compacted.
[0077] ②The controller controls the roller to construct the area to be compacted, and collects and records the compaction conditions of each area through the vibration sensor.
[0078] ③ After all the areas to be compacted are compacted, the areas where the compaction degree has not reached 100% will be automatically supplemented with compaction.
[0079] ④ Multiple high-speed railway subgrade filling intelligent rollers can work together at the same time and cooperate with each other. The controller can ensure that the longitudinal distance between each roller is not less than 20m and the overlap width of the compaction area is not less than 2m to meet the construction specifications.
[0080] See also Figure 7 As shown, the concrete placing boom comprises a concrete placing boom body 6 and a sixth controller connected to the concrete placing boom body 6. A liquid level detector 61 for collecting the amount of concrete stored in the concrete placing boom body 6 is installed on the concrete placing boom body 6. The sixth controller is connected to the liquid level detector 61.
[0081] As a preferred embodiment, the liquid level detector 61 is a liquid detector.
[0082] In this embodiment, the concrete placing machine is an intelligent concrete placing machine, which mainly realizes the concrete placing operation at the construction site. The concrete placing machine controller is equipped to realize automatic placing and automatic feedback of the remaining material in the hopper, and automatically sends a material transport signal to the processor when the material in the hopper is less than 20%.
[0083] The processor 7 is connected to the first controller, the second controller, the third controller, the fourth controller, the fifth controller and the sixth controller.
[0084] The processor can achieve unified management and scheduling of all construction equipment. With the help of Beidou's high-precision positioning data, the processor can grasp the real-time position and working status of each equipment, automatically generate task planning, and schedule each equipment through status information feedback from loaders, concrete trucks, bulldozers, graders, rollers, and concrete placing machines.
[0085] The present invention provides a construction method for a high-speed railway subgrade intelligent construction equipment group, comprising the following steps:
[0086] S1. Processor 7 obtains the electronic construction drawing of the high-speed railway foundation.
[0087] S2. Based on the electronic construction drawing, the processor 7 calculates and obtains the line type, position, elevation data and three-dimensional coordinates of the high-speed railway foundation.
[0088] S3. See Figure 1 As shown, the processor 7 divides the high-speed railway foundation into a plurality of construction sections, calculates the amount of sand and gravel filler based on the construction sections and sends it to the outside.
[0089] S4. The first controller obtains the amount of sand and gravel filler and controls the loader body 1 to transport the sand and gravel filler to multiple construction sections.
[0090] S5. After the sand and gravel are transported to multiple construction sections, the processor 7 sends the line type, position, elevation data and three-dimensional coordinates of the high-speed railway foundation to the outside.
[0091] S6, the second controller, the third controller, the fourth controller, the fifth controller and the sixth controller respectively obtain the line type, position, elevation data and three-dimensional coordinates of the high-speed railway foundation.
[0092] S7. Based on the line type, position, elevation data and three-dimensional coordinates of the high-speed railway subgrade and the three-dimensional coordinates of the bulldozer body 3 and the elevation of the blade, the third controller controls the bulldozer body 3 and the fourth controller controls the grader body 4 to pave the sand and gravel filling in the construction section to the designed elevation of the filling layer of the high-speed railway subgrade in the construction section.
[0093] S8. After the filling layer in the construction section reaches the designed elevation, the fifth controller controls the roller body 5 to compact the filling layer in the construction section.
[0094] S9. After the filling layer in the construction section is compacted, the processor 7 calculates the amount of sand and gravel mixture based on the mix ratio of the raft concrete of the high-speed railway subgrade and sends it to the outside.
[0095] S10. The first controller obtains the amount of sand and gravel mixture, and transfers the sand and gravel mixture to a mixer based on the amount of sand and gravel mixture to prepare raft concrete.
[0096] S11, after the raft slab concrete is prepared, the processor 7 sends a pouring signal to the outside.
[0097] S12, the second controller and the sixth controller obtain pouring signals respectively.
[0098] S13, the second controller controls the transport vehicle body 2 to transfer the raft concrete to the concrete placing machine body 6.
[0099] S14, the sixth controller controls the concrete placing machine body 6 to pour the raft slab concrete in the construction section.
[0100] S15. When the stock of raft concrete in the concrete placing machine body 6 is lower than a preset threshold, the second controller controls the transport vehicle body 2 to replenish the raft concrete in the concrete placing machine body 6 until the raft concrete of the high-speed railway foundation is poured.
[0101] The construction method of the high-speed railway subgrade intelligent construction equipment group of the present invention transforms the existing loaders and concrete transport vehicles into wire-controlled ones, installs various sensors so that they can be unmanned and controlled by the processor, and various sensors and their installation positions.
[0102] Install various sensors on bulldozers, graders and rollers to enable them to have functions such as intelligent blade control and intelligent positioning, and are controlled by the processor. Various sensors and their installation locations.
[0103] Install the GPS navigation system base station within the on-site construction scope and determine the base station coordinates.
[0104] Through the roadbed design drawing import system carried by the intelligent bulldozer, intelligent grader and intelligent roller, the completed base station will be marked in the electronic construction drawing in CAD format. The roadbed design drawing import processor will automatically use the location coordinates of the base station installed on site as a reference to reversely calculate the coordinates of each construction position in the design drawing.
[0105] The processor uses the base station coordinates as a reference to extract the line type, position and corresponding elevation data of the high-speed railway subgrade design, and obtains the three-dimensional data coordinates of the subgrade to be filled.
[0106] During the roadbed filling construction phase, the management personnel set the construction section that needs to be filled that day, and the processor automatically calculates the required amount of sand and gravel filling, automatically plans the production tasks, and performs scheduling operations.
[0107] First, the processor controls the operating position of the dump trucks in the site and the amount of filling required in the current period, and issues instructions to the corresponding number of dump trucks and unmanned loaders. The dump trucks drive to the silo, and the unmanned loaders load sand and gravel of the corresponding particle size type into the dump trucks according to the instructions issued by the processor. The dump trucks unload the sand and gravel to the corresponding positions as required.
[0108] After the sand and gravel are transported to the required amount, the processor issues instructions to the intelligent bulldozer, intelligent grader, and intelligent roller, and the intelligent bulldozer, grader, and roller perform intelligent pushing, leveling, and compacting operations.
[0109] The smart bulldozer and smart grader use the GPS positioning system to measure the position of the bulldozer in real time, and compare and link the position of the bulldozer and grader with the position on the drawing through their respective controllers to determine the design elevation of the roadbed at the position of the bulldozer and grader blade.
[0110] The elevation of the bottom of the blade is obtained through the bulldozer and grader blade elevation locator, and the data is fed back to the respective controllers. The respective controllers control the blade to move up and down according to the difference between the design elevation of the roadbed at the blade position and the actual elevation of the bottom of the blade, so as to adjust the blade elevation so that the fill height meets the design requirements. When the blade elevation within the construction roadbed filling range is always consistent with the design elevation (the control error is ±2cm), the filling construction of this section is completed.
[0111] After the grader completes the work, the intelligent press will perform intelligent compaction operations until the construction of all sections is completed.
[0112] During the raft construction phase, the management personnel set the raft sections that need to be constructed that day, and the processor automatically calculates the required concrete, automatically plans the production tasks, and performs scheduling operations.
[0113] The loader in the mixing station shovels the corresponding sand and gravel to the mixer according to the concrete mix ratio requirements. After the mixer finishes mixing the concrete, the processor dispatches an unmanned concrete transport vehicle to transport the concrete from the mixing station to the corresponding concrete placing machine position.
[0114] The intelligent concrete placing machine places concrete according to the control of the processor, and feeds back a material shortage signal to the processor when the concrete in the silo is less than 20%. The processor then dispatches the corresponding unmanned concrete transport vehicle to transport concrete to the placing machine until the construction of all sections is completed.
[0115] The construction method of the high-speed railway subgrade intelligent construction equipment group of the present invention can realize measurement-free construction during the construction process, which can greatly improve construction efficiency, ensure construction quality, and reduce construction costs. The construction method of the high-speed railway subgrade intelligent construction equipment group of the present invention can realize subgrade filling work at night, which can effectively shorten the construction period. The construction method of the high-speed railway subgrade intelligent construction equipment group of the present invention can avoid the difference in filling quality caused by the difference in experience of mechanical operating personnel, and can ensure that the quality of subgrade filling meets the specifications to the greatest extent.
[0116] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the present application.
Claims
1. A high-speed railway subgrade intelligent construction equipment group, characterized in that: include: A loader, comprising a loader body and a first controller connected to the loader body, the loader body being equipped with a first camera, a first laser radar and a first locator, a bucket of the loader body being equipped with an angle sensor and a first inertial measurement unit, a hydraulic cylinder of the loader body being equipped with a pressure sensor, and the first controller being connected to the first camera, the first laser radar, the first locator, the angle sensor, the first inertial measurement unit and the pressure sensor; A concrete transport vehicle, comprising a transport vehicle body and a second controller connected to the transport vehicle body, wherein a second camera, a second laser radar, a second locator and a second inertial measurement unit are installed on the transport vehicle body, and the second controller is connected to the second camera, the second laser radar, the second locator and the second inertial measurement unit; A bulldozer, comprising a bulldozer body and a third controller connected to the bulldozer body, wherein a third laser radar and a third locator are installed on the bulldozer body, a first elevation locator is installed on a blade of the bulldozer body, and the third controller is connected to the third laser radar, the third locator and the first elevation locator; A motor grader, comprising a motor grader body and a fourth controller connected to the motor grader body, wherein a fourth laser radar and a fourth locator are installed on the motor grader body, a second elevation locator is installed on a blade of the motor grader, and the fourth controller is connected to the fourth laser radar, the fourth locator and the second elevation locator; A road roller, comprising a road roller body and a fifth controller connected to the road roller body, wherein a fifth laser radar and a fifth locator are installed on the road roller body, and the fifth controller is connected to the fifth laser radar and the fifth locator; A concrete placing boom, comprising a concrete placing boom body and a sixth controller connected to the concrete placing boom body, wherein a liquid level detector for collecting the amount of concrete stored in the concrete placing boom body is installed on the concrete placing boom body, and the sixth controller is connected to the liquid level detector; A processor is connected to the first controller, the second controller, the third controller, the fourth controller, the fifth controller and the sixth controller.
2. The high-speed railway subgrade intelligent construction equipment group according to claim 1 is characterized in that: The third laser radar is installed at the front end and the rear end of the bulldozer body respectively.
3. The high-speed railway subgrade intelligent construction equipment group according to claim 1 is characterized in that: The fourth laser radar is installed at the front end and the rear end of the grader body respectively.
4. The high-speed railway subgrade intelligent construction equipment group according to claim 1 is characterized in that: The fifth laser radar is installed at the front end and the rear end of the roller body respectively.
5. The high-speed railway subgrade intelligent construction equipment group according to claim 1 is characterized in that: The liquid level detector is a liquid detector.
6. A construction method for a high-speed railway subgrade intelligent construction equipment group as claimed in any one of claims 1 to 5, characterized in that: The following steps are involved: The processor obtains the electronic construction drawing of the high-speed railway foundation; Based on the electronic construction drawing, the processor calculates and obtains the line type, position, elevation data and three-dimensional coordinates of the high-speed railway foundation; The processor divides the high-speed railway foundation into a plurality of construction sections, calculates the amount of sand and gravel filler based on the construction sections and sends the amount to the outside; The first controller obtains the amount of the sand and gravel filler and controls the loader body to transport the sand and gravel filler to the multiple construction sections; After the sand and gravel are transported to the multiple construction sections, the processor sends the line type, position, elevation data and three-dimensional coordinates of the high-speed railway foundation to the outside; The second controller, the third controller, the fourth controller, the fifth controller and the sixth controller respectively obtain the line type, position, elevation data and three-dimensional coordinates of the high-speed railway subgrade; Based on the line type, position, elevation data and three-dimensional coordinates of the high-speed railway subgrade and the three-dimensional coordinates of the bulldozer body and the elevation of the blade, the third controller controls the bulldozer body and the fourth controller controls the grader body to pave the sand and gravel filler in the construction section to the design elevation of the filler layer of the high-speed railway subgrade in the construction section; After the filler layer of the construction section reaches the designed elevation, the fifth controller controls the roller body to compact the filler layer of the construction section; After the filling layer of the construction section is compacted, the processor calculates the amount of sand and gravel mixture based on the mix ratio of the raft concrete of the high-speed railway foundation and sends it to the outside; The first controller obtains the amount of the sand and gravel mixture, and transports the sand and gravel mixture to a mixer based on the amount of the sand and gravel mixture to prepare raft concrete; After the raft concrete is prepared, the processor sends a pouring signal to the outside; The second controller and the sixth controller respectively obtain the pouring signal; The second controller controls the transport vehicle body to transfer the raft concrete to the concrete placing machine body; The sixth controller controls the concrete placing machine body to pour the raft concrete in the construction section; When the stock of the raft concrete in the concrete placing boom body is lower than a preset threshold, the second controller controls the transport vehicle body to replenish the raft concrete in the concrete placing boom body until the raft concrete of the high-speed railway subgrade is poured.
Citation Information
Patent Citations
Blade control system, grader and control method thereof
CN110056026A
Intelligent roadbed operation system fused with 5G communication technology
CN115564396A
Automatic control method and system for scraper knife elevation of roadbed construction equipment
CN116011055A
Unmanned material shoveling device of intelligent loader and material shoveling method of unmanned material shoveling device
CN118257306A
Autonomous control of operations of powered earth-moving vehicles using data from on-vehicle perception systems
WO2024049813A1