Large-span steel structure roof and modular hoisting method
Through the combination of modular lifting method and prefabricated U-shaped guide frame, the problems of large aerial workload and unstable lifting in the construction of large-span steel structure roofs are solved, and safe and stable lifting and shortening construction period are achieved.
Patent Information
- Application Number
- CN202411167601.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-12
AI Technical Summary
In the construction of large-span steel structure roofs, high-altitude workloads are large, safety risks are present, and the lifting process is unstable, resulting in low labour efficiency and long construction period.
Modular lifting method is adopted, first splicing the roof bare steel frame, color steel plate and attachment facilities on the ground to form an integral module, and then lift it to the top of the column as a whole to reduce high-altitude operations, and stable lifting is achieved through prefabricated U-shaped guide frames and elastic rollers. And fix the sun panel after lifting.
It significantly reduces the workload of high-altitude operations, improves the safety and stability of the lifting process, shortens the construction period, and reduces wind resistance, achieving a smoother lifting process.
Smart Images

Figure CN118933178A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel structure construction, in particular to a steel structure roof of a large-span steel structure stereoscopic warehouse and a method for hoisting the roof in an integral modular manner. Background Art
[0002] Currently, large-span steel structure warehouses with spans exceeding 36 meters are increasingly being used in large buildings such as exhibition halls, stadiums, auditoriums, warehouses, and factories. These warehouses consist of vertical columns and a steel roof supported by the columns. The columns can be either section steel or concrete. The steel roof consists of multiple longitudinally extending section steel trusses, with multiple transverse and diagonal steel pipes welded between each pair of adjacent section steel trusses. The upper chord steel pipes of each section steel truss are vertically welded to multiple transverse purlins. The roof panels are longitudinally fixed to the purlins with pneumatic nails. The panels consist of color-coated steel plates and translucent polycarbonate panels, which are arranged at intervals on the roof.
[0003] The process of hoisting and constructing a steel structure roof in the prior art is generally as follows: first, columns are erected on site; then, the steel frame of the roof is assembled on the ground; and a winch is installed on top of some of the columns. The steel frame of the steel structure roof is then hoisted to the top of the columns. Workers then work from a height to splice and fix the steel structure extension supports protruding from the roof at the edge of the roof, and position the extension supports on the columns. The roof panels are then installed, with workers climbing onto the roof and using air guns to nail the color-coated steel sheets, polycarbonate sheets, etc. to the roof purlins. Ancillary structures such as the lighting system and fire protection system are then installed, with workers spraying fire-retardant paint on the roof, installing wires and lamps, and installing water pipes and sprinklers.
[0004] The above-mentioned steel structure roof with existing technology has defects during construction. Because the roof steel frame is large in size, weight, and span, to ensure safety, only the bare steel frame of the roof can be hoisted. The roof panels, lighting system, fire protection system, etc. can only be carried out at high altitude after the hoisting is completed. Therefore, the subsequent high-altitude work is very labor-intensive, requiring more man-hours and also facing greater high-altitude working risks. Moreover, for smooth hoisting, the longitudinal dimension of each steel truss must be shorter than the spacing between the columns on both sides. Therefore, after hoisting, it is necessary to weld steel structure extension supports protruding from the roof at the end of the steel truss. These extension supports require workers to weld each steel strut and ball joint one by one at high altitude. This further increases the workload of high-altitude work, resulting in lower work efficiency and longer construction time. Summary of the Invention
[0005] A technical problem to be solved by the present invention is to provide a large-span steel structure roof which can significantly reduce the workload of high-altitude operations and has a safe and stable hoisting process.
[0006] One technical solution of the present invention is to provide a large-span steel structure roof, which includes multiple steel trusses extending longitudinally, and multiple transverse steel pipes and oblique steel pipes are welded between every two adjacent steel trusses; multiple transverse purlins are vertically welded to the upper chord steel pipes of each steel truss; the roof panels of the roof are longitudinal, and the roof panels include color steel plates and translucent sun panels; the color steel plates occupying most of the roof area are fixed to each purlin by air nails, and a translucent strip is formed between every two adjacent skylights, and each translucent strip is provided with a corresponding sun panel, each sun panel is placed on the side of the adjacent color steel plate, and the sun panel is detachably connected to the placed color steel plate by a C-shaped buckle.
[0007] Another technical problem to be solved by the present invention is to provide a method for modularly lifting a large-span steel structure roof, which can significantly reduce the workload of high-altitude operations and ensure a safe and stable lifting process.
[0008] Another technical solution of the present invention is to provide a method for modularly assembling a long-span steel structure roof, the steps of which include:
[0009] Workers assembled horizontal steel pipes, diagonal steel pipes and steel trusses on the ground to form the bare steel frame of the roof, and fixed purlins on the steel trusses;
[0010] Workers use pneumatic nails to fix the color-coated steel plates to the purlins on the ground, leaving light-transmitting strips between adjacent color-coated steel plates. They then spray fire-retardant paint and install accessories such as wires, lamps, water pipes, and sprinklers. Each skylight is then temporarily placed and snapped onto the side of the corresponding color-coated steel plate. In this way, the bare steel frame, color-coated steel plates, and accessories of the roof are integrated into a modular whole.
[0011] Install a winch on top of some columns and connect the winch traction rope to the bare steel frame of the roof; then hoist the modular roof as a whole to the top of the column; then assemble the extended support at the edge of the roof and place it on the column;
[0012] After hoisting and lowering into place, workers climbed onto the roof, removed the temporarily connected polycarbonate panels, and fixed the polycarbonate panels to the purlins in the light-transmitting area with pneumatic nails.
[0013] Compared with the existing technology, the large-span steel structure roof and modular lifting method using the above structure have the following advantages.
[0014] First, workers nail all the color steel plates to the purlins on the ground, thus completing the installation of roof panels in most areas of the roof. This first reduces the workload of high-altitude operations such as fixing color steel plates with air nails at high altitudes. Moreover, since most roof areas have been covered with color steel plates, there is space for operation and placement, so workers can carry out fire retardant coating spraying, wire and lamp installation, water pipe and sprinkler installation in advance on the ground, thereby further reducing the workload of high-altitude operations such as installing lighting systems and fire protection systems after hoisting. This saves time and effort, shortens construction periods, and also The risk of high-altitude operations is reduced. What is more valuable is that a small area is reserved before the roof is hoisted. The polycarbonate panels are deliberately not installed on the ground but are left to be nailed at high altitude after hoisting to form a hollow light-transmitting belt. This can effectively reduce the wind resistance during the hoisting process and make the hoisting process smoother and more stable. Furthermore, although the polycarbonate panels are not fixed to the purlins during hoisting, they are also clamped to the color steel plates in advance and hoisted together with the roof. Therefore, when installing the polycarbonate panels later, there is no need to hoist them from the ground. Instead, they can be directly removed and clamped to the color steel plates. After moving horizontally, they can be nailed and assembled very conveniently.
[0015] As a preferred structural feature, a steel side frame protruding from the edge of the roof is welded to the end of each steel truss, and every two adjacent steel side frames form a group, and the two steel side frames in the same group are welded to the same steel bottom beam to form a U-shaped guide frame; the columns supporting the roof correspond one to one with the U-shaped guide frames, and each column fits into the corresponding U-shaped guide frame; an elastic roller is rotatably installed on the inner side of the steel bottom beam of each U-shaped guide frame, and a vertical track is provided on the outer side of each column, and the elastic roller of each U-shaped guide frame slides with the track of the corresponding column; a prefabricated integral extended support is provided on the top of each column, and the two rectangular frames of the extended support are respectively welded to the two steel side frames of the corresponding U-shaped guide frame.
[0016] The corresponding method feature is preferably that, before hoisting, workers weld a U-shaped guide frame protruding from the edge of the roof on the ground and make the U-shaped guide frame cover the corresponding column; and install elastic rollers on the steel bottom beam of the U-shaped guide frame and make the rollers slide and fit in the track of the corresponding column; during hoisting, the U-shaped guide frame supports the corresponding column in a balanced and stable manner, providing continuous, stable and powerful guidance for the roof being hoisted; when the roof is hoisted to a predetermined height and the extension bracket is assembled, the prefabricated extension support is lifted as a whole to the top of the column, and then the extension support is pushed horizontally into the corresponding U-shaped guide frame and the extension support is positioned at the top of the corresponding column; then the workers use a lifting car to weld the two rectangular frames of the extension support to the two steel side frames of the corresponding U-shaped guide frame.
[0017] The advantages of the above-described preferred structure and method are as follows.
[0018] First, workers can weld the steel side frames and steel bottom beams on the ground to form a U-shaped guide frame. The ground welding operation is convenient and the positioning is precise, so that the U-shaped guide frame can accurately fit the corresponding column and slide with the track on the outside of the column through rollers, so that the corresponding column can be supported more evenly and stably in all directions during lifting, providing continuous, stable and powerful guidance for the roof, further enhancing the smoothness, stability and safety of the lifting process; moreover, the extension bracket is a prefabricated integral structure, which is convenient for overall lifting, and is quickly pushed into the U-shaped guide frame along the openings of the two steel side frames of the U-shaped guide frame, and is quickly welded and fixed with the two steel side frames. Compared with the past process of welding the support rods one by one on the edge of the roof to assemble the extension support, the overall lifting, pushing and welding of the extension bracket in this application has a higher prefabrication rate and more convenient operation, further reduces the workload of high-altitude operations, and makes the support and positioning of the roof and the column more firm and stable.
[0019] It should also be emphasized that the core advantage of this application is that most of the roof panels, fire-retardant coatings, lighting systems, fire protection systems, etc. are integrated into the roof in advance to form a complete modular roof, and it is hoisted as a whole, thereby significantly reducing the amount of high-altitude work in the later stage. However, the integrated modular roof has many parts and accessories, and the tonnage is particularly large. The size and span of the bare steel frame itself are also large. Normal thinking will not and dare not hoist it as a whole; but the various features of this application are combined with each other and promote each other. For example, the U-shaped sleeve guide makes the hoisting stable, and the roller is just assembled on the bottom beam of the U-shaped guide frame and cooperates with the guide rail on the outside of the column inward to increase the hoisting stability, and combined with the hollow translucent belt to reduce the hoisting wind resistance. Multiple features complement each other, and under the joint action, the concept of large-tonnage modular overall hoisting is realized, thereby jointly achieving the overall effect of significantly reducing the amount of high-altitude work in the later stage. In addition to the guiding function during hoisting, the U-shaped guide frame also provides support and installation space for the integral extension bracket after hoisting, so that the roof can be quickly, conveniently and firmly supported and placed, and the amount of high-altitude work can be further reduced.
[0020] The C-shaped buckle structure is preferably, which includes a C-shaped plate, a nut and a bolt, the lower plate of the C-shaped plate is against the clamped color steel plate, the nut is welded to the upper plate of the C-shaped plate, the bolt and the nut are screwed together and the bolt rod passes through the through hole of the upper plate and is tightly against the clamped sun panel; this structure is very convenient to assemble and disassemble, and the color steel plate and the sun panel can be completed by tightening or loosening the bolt.
[0021] As a preference, an operating gap for docking the extended support is reserved at the lower end of each color steel plate and the end of the steel truss. An end steel plate is provided at the lower end of each color steel plate to cover the operating gap, and each end steel plate is detachably connected to the lower end of the corresponding color steel plate by a C-shaped buckle; each sun panel is divided into two sections, the sum of the lengths of the upper and lower sections of the sun panel is equal to the sum of the lengths of the color steel plate and the corresponding end steel plate; each color steel plate is provided with three C-shaped buckles, the upper, middle and lower parts of the color steel plate and the upper end of the corresponding upper section of the sun panel are connected by the upper The C-shaped buckle is clamped, the middle section of the color steel plate, the lower end of the upper section sun panel and the upper end of the lower section sun panel overlap and the overlapping part is clamped by the middle C-shaped buckle, the lower end of the color steel plate, the lower end of the lower section sun panel and the corresponding end steel plate overlap and the overlapping part is clamped by the lower C-shaped buckle; the advantages of the above structure are as follows: first, the operating space at the end of each steel truss is hollowed out, so that workers can take a lifting car to push and weld the extension support at the edge of the roof, so that the extension support can be smoothly placed in place; and after the support is in place, it can be convenient to The end steel plate is used to cover the hollow area at the lower end of the color steel plate to fill the roof; the end steel plate is also connected to the lower end of the color steel plate through a C-shaped buckle, which is convenient for disassembly and assembly, and the end steel plate is also hoisted as a whole with the roof, and no subsequent separate hoisting is required; furthermore, each sun panel is divided into two sections, upper and lower, and partially overlapped, so that it is convenient to overlap the two sections of sun panels and temporarily connect them to the corresponding color steel plate side during the overall hoisting, and also to ensure the operating space at the end of the steel truss, and the extended support is docked and After they are in place, the two sections of sun panels can be quickly disassembled so that the lower end of the lower section of sun panels just covers the hollow area at the lower end of the light-transmitting strip. Moreover, the process of workers nailing the sun panels and end steel plates at high altitude is more convenient. Only a slight movement is needed to make each plate reach the predetermined position, such as moving the upper section of sun panels sideways, moving the lower section of sun panels sideways and downwards, and moving the end steel plate downwards to reach the nailing position. This makes it unnecessary to move a large range of roof operations in the later stage, which is more convenient, more labor-saving and more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of the large-span steel structure roof of the present invention.
[0023] Figure 2 yes Figure 1 Schematic diagram of the enlarged structure of part A.
[0024] Figure 3 yes Figure 1 Schematic diagram of the enlarged structure of part B.
[0025] Figure 4 yes Figure 1 Schematic diagram of the enlarged structure of part C.
[0026] Figure 5 It is a schematic structural diagram of the extended support of the large-span steel structure roof of the present invention after being disassembled from the U-shaped guide frame.
[0027] Figure 6 Figure 5 Schematic diagram of the enlarged structure of part D.
[0028] As shown in the figure: 1. Steel truss, 1.1. Upper chord steel pipe, 2. Horizontal steel pipe, 3. Diagonal steel pipe, 4. Purlin, 5. Color steel plate, 6.1. Upper section sun panel, 6.2. Lower section sun panel, 7. Translucent strip, 8. C-shaped buckle, 9. End steel plate, 10. Elastic roller, 11. Column, 12. Track, 13. Extended support, 13.1. Cross support, 13.2. Ball joint, 13.3. Diagonal brace, 13.4. Rectangular frame, 14. U-shaped guide frame, 14.1. Steel side frame, 14.2. Steel bottom beam. DETAILED DESCRIPTION
[0029] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0030] like Figures 1 to 6 As shown, the large-span steel structure roof of the present invention includes multiple steel trusses 1 extending longitudinally, and multiple transverse steel pipes 2 and diagonal steel pipes 3 are welded between every two adjacent steel trusses 1; the upper chord steel pipes 1.1 of each steel truss 1 are vertically welded to multiple transverse purlins 4; the roof panels of the roof are fixed on the purlins 4, and the roof panels are longitudinal and include color-coated steel plates 5 and translucent solar panels.
[0031] Before lifting, the color steel plates 5 that occupy most of the roof area are fixed to each purlin 4 by air nails. A light-transmitting strip 7 is formed in the gap between every two adjacent skylights. Each light-transmitting strip 7 is provided with a corresponding sun panel. Each sun panel is placed on the side of the adjacent color steel plate 5 and the sun panel is detachably connected to the placed color steel plate 5 by a C-shaped buckle 8.
[0032] The C-shaped buckle 8 includes a C-shaped plate, a nut and a bolt. The lower plate of the C-shaped plate is against the clamped color steel plate 5, and the nut is welded to the upper plate of the C-shaped plate. The bolt and the nut are screwed together and the bolt rod passes through the through hole of the upper plate and is tightly pressed against the clamped solar panel.
[0033] The lower end of each color-coated steel plate 5, that is, the end of the steel truss 1, has a clearance for docking with the extension support 13. Each lower end of each color-coated steel plate 5 is equipped with an end steel plate 9 to cover the clearance after the roof is hoisted and placed. Before hoisting and after ground assembly, each end steel plate 9 is also removably attached to the lower end of the corresponding color-coated steel plate 5 by a C-shaped clip 8. Each sun panel is divided into two sections, the upper sun panel 6.1 and the lower sun panel 6.2. The total length of the superimposed length is equal to the total length of the color-coated steel plate 5 and the corresponding end steel plate 9.
[0034] Each color steel plate 5 is provided with three C-shaped buckles 8, upper, middle and lower. The upper end of the color steel plate 5 is connected to the upper end of the corresponding upper section sun panel 6.1 by the upper C-shaped buckle 8. The middle section of the color steel plate 5 overlaps with the lower end of the upper section sun panel 6.1 and the upper end of the lower section sun panel 6.2, and the overlapping portion is connected by the middle C-shaped buckle 8. The lower end of the color steel plate 5, the lower end of the lower section sun panel 6.2 and the corresponding end steel plate 9 overlap, and the overlapping portion is connected by the lower C-shaped buckle 8.
[0035] Each steel truss 1 has a steel side frame 14.1 welded to its end, projecting beyond the edge of the roof. Two adjacent steel side frames 14.1 form a group, such as the first and second, the third and fourth, and the fifth and sixth. Two steel side frames 14.1 in the same group are welded to the same steel bottom beam 14.2 to form a U-shaped guide frame 14. The columns 11 supporting the roof correspond one-to-one with the U-shaped guide frames 14, with each column 11 fitting within its corresponding U-shaped guide frame 14. An elastic roller 10 is rotatably mounted on the inner side of the steel bottom beam 14.2 of each U-shaped guide frame 14 via a wheel frame. A vertical channel steel track 12 is provided on the outer side of each column 11, and the elastic roller 10 of each U-shaped guide frame 14 slides in engagement with the track 12 of the corresponding column 11.
[0036] Each column 11 is topped with a prefabricated integral extension support 13, which is pre-welded on the ground and hoisted as a whole to the top of the column 11. Each extension support 13 includes a cross support 13.1, a ball joint 13.2, eight diagonal braces 13.3, and two left and right rectangular frames 13.4. The ball joint 13.2 is welded to the cross support 13.1. The ball joint 13.2 is welded to the four corners of the left rectangular frame 13.4 via the four diagonal braces 13.3 on the left, and the ball joint 13.2 is welded to the four corners of the right rectangular frame 13.4 via the four diagonal braces 13.3 on the right. When the roof is hoisted to the top of the column 11, the extension support 13 is hoisted and pushed horizontally into the corresponding U-shaped guide frame 14, and the two rectangular frames 13.4 of the extension support 13 are respectively welded to the two steel side frames 14.1 of the corresponding U-shaped guide frame 14.
[0037] The method for modularly hoisting the large-span steel structure roof of the present invention comprises the following steps.
[0038] Workers assemble the horizontal steel pipes 2, the oblique steel pipes 3 and the steel trusses 1 on the ground to form a bare steel frame for the roof, and fix the purlins 4 on the steel trusses 1.
[0039] Workers use pneumatic nails to fix the color steel plates 5 on the purlins 4 on the ground, and reserve light-transmitting strips 7 between adjacent color steel plates 5; then they spray fire-retardant paint and install wires, lamps, water pipes, sprinklers and other accessory facilities; then they temporarily place each lighting panel and clip it to the side of the corresponding color steel plate 5, and temporarily clip the end steel plate 9 to the lower end of the corresponding color steel plate 5; in this way, the bare steel frame, color steel plates 5 and accessory facilities of the roof are integrated into a modular whole.
[0040] Workers weld each U-shaped guide frame 14 protruding from the edge of the roof on the ground and make each U-shaped guide frame 14 cover the corresponding column 11; and install the elastic roller 10 on the steel bottom beam 14.2 of each U-shaped guide frame 14 and make the roller slide in the track 12 of the corresponding column 11.
[0041] A winch is installed on the top of some columns 11, and the winch traction rope is connected to the bare steel frame of the roof. Generally, the winch is installed on the top of half or three columns 11, and the remaining columns 11 are not installed. Then the modular roof is hoisted as a whole to the top of the column 11. When hoisting the roof, the U-shaped guide frame 14 supports the corresponding column 11 in a balanced and stable manner, providing continuous, stable and powerful guidance for the roof during hoisting.
[0042] After the roof is hoisted to the desired height, the extension supports 13 are assembled at the roof edge and positioned on the corresponding columns 11. The prefabricated extension supports 13 are hoisted integrally to the top of the columns 11, then laterally pushed into the corresponding U-shaped guide frames 14, with the ball joints 13.2 and cross supports 13.1 of the extension supports 13 positioned on the top of the corresponding columns 11. Workers then use a lift truck to weld the two rectangular frames 13.4 of the extension supports 13 to the two steel side frames 14.1 of the corresponding U-shaped guide frames 14.
[0043] Of course, the above-mentioned process of assembling and placing the extension supports 13 is carried out in two batches. First, the first batch of extension supports 13 corresponding to the part of the column 11 without the winch are assembled, and the first batch of extension supports 13 are placed on the part of the column 11 without the winch; then the winch of the part of the column 11 with the winch is removed, and then the second batch of extension supports 13 corresponding to the part of the column 11 from which the winch has just been removed are assembled, and the second batch of extension supports 13 are placed on the part of the column 11 from which the winch has just been removed.
[0044] After the roof is hoisted and put into place, the workers climb onto the roof, remove the temporarily connected sun panels and end steel plates 9, and use pneumatic nails to fix the sun panels to the purlins 4 in the area of the light-transmitting strips 7, so that the sun panels cover the corresponding light-transmitting strips 7, and nail the end steel plates 9 to the purlins 4 in the operating gap at the lower end of the color steel plates 5.
Claims
1. A large-span steel structure roof, which includes multiple steel trusses extending longitudinally, multiple transverse steel pipes and oblique steel pipes are welded between every two adjacent steel trusses; the upper chord steel pipes of each steel truss are vertically welded with multiple transverse purlins; the roof panel of the roof is longitudinal, and the roof panel includes color steel plates and light-transmitting sunlight panels; the characteristics are: The color steel plates that occupy most of the roof area are fixed on each purlin by air nails. The gap between every two adjacent skylights forms a light-transmitting belt. Each light-transmitting belt is provided with a corresponding sun panel. Each sun panel is placed on the side of the adjacent color steel plates and is detachably connected to the placed color steel plates by C-shaped buckles.
2. The large-span steel structure roof according to claim 1 is characterized in that: A steel side frame protruding from the edge of the roof is welded to the end of each steel truss, and each two adjacent steel side frames form a group. The two steel side frames in the same group are welded to the same steel bottom beam to form a U-shaped guide frame; the columns supporting the roof correspond to the U-shaped guide frames one by one, and each column is sleeved in the corresponding U-shaped guide frame; an elastic roller is rotatably installed on the inner side of the steel bottom beam of each U-shaped guide frame, and a vertical track is provided on the outer side of each column, and the elastic roller of each U-shaped guide frame is slidably matched with the track of the corresponding column; A prefabricated integral extension support is provided on the top of each column, and two rectangular frames of the extension support are respectively welded to two steel side frames corresponding to the U-shaped guide frame.
3. The large-span steel structure roof according to claim 1 is characterized in that: The C-shaped buckle includes a C-shaped plate, a nut and a bolt. The lower plate of the C-shaped plate abuts against the clamped color steel plate, the nut is welded to the upper plate of the C-shaped plate, the bolt and the nut are screwed together, and the bolt rod passes through the through hole of the upper plate and abuts against the clamped solar panel.
4. The large-span steel structure roof according to claim 2 is characterized in that: An operating gap for docking the extended support is reserved at the lower end of each color steel plate and the end of the steel truss. An end steel plate for covering the operating gap is provided at the lower end of each color steel plate. Each end steel plate is also detachably connected to the lower end of the corresponding color steel plate by a C-shaped buckle. Each sun panel is divided into two sections, the sum of the lengths of the upper and lower sun panels is equal to the sum of the lengths of the color steel plate and the corresponding end steel plate. Each color steel plate is provided with three C-shaped buckles, the upper end of the color steel plate and the upper end of the corresponding upper section sun panel are clamped by the upper C-shaped buckle, the middle section of the color steel plate, the lower end of the upper section sun panel and the upper end of the lower section sun panel overlap, and the overlapping part is clamped by the middle C-shaped buckle, the lower end of the color steel plate, the lower end of the lower section sun panel and the corresponding end steel plate overlap, and the overlapping part is clamped by the lower C-shaped buckle.
5. A method for modularly assembling the long-span steel structure roof according to any one of claims 1 to 4, characterized in that: The steps include: Workers spliced horizontal steel pipes, diagonal steel pipes and steel trusses on the ground to form a bare steel frame for the roof, and fixed purlins on the steel trusses; Workers use pneumatic nails to fix the color steel plates on the purlins on the ground, and reserve light-transmitting strips between adjacent color steel plates; then spray fire-retardant paint and install wires, lamps, water pipes, sprinklers and other accessory facilities; then temporarily put each lighting board aside and snap it onto the side of the corresponding color steel plate; in this way, the bare steel frame, color steel plate and accessory facilities of the roof are integrated into a modular whole; Install the winch on the top of some columns and connect the winch traction rope to the bare steel frame of the roof; then hoist the modular roof as a whole to the top of the column; then assemble the extended support on the edge of the roof and place it on the column; After hoisting and lowering into place, workers climbed onto the roof, removed the temporarily connected polycarbonate panels, and fixed the polycarbonate panels to the purlins in the light-transmitting area with pneumatic nails.
6. The method for modularly assembling a large-span steel structure roof according to claim 5 is characterized in that: The steps include: Before hoisting, workers welded a U-shaped guide frame protruding from the edge of the roof on the ground and made the U-shaped guide frame cover the corresponding column; and installed elastic rollers on the steel bottom beam of the U-shaped guide frame and made the rollers slide and fit in the track of the corresponding column; During hoisting, the U-shaped guide frame supports the corresponding column in a balanced and stable manner, providing continuous, stable and powerful guidance for the roof during hoisting; When the roof is hoisted to the predetermined height and the extended support is assembled, the prefabricated extended support is lifted as a whole to the top of the column, and then the extended support is pushed horizontally into the corresponding U-shaped guide frame and placed on the top of the corresponding column; then workers use a lifting vehicle to weld the two rectangular frames of the extended support to the two steel side frames of the corresponding U-shaped guide frame.
Citation Information
Cited By
A steel truss connection node
CN224885035U