One-time installation dry connection concrete shear wall / special-shaped column structure and construction method
By installing dry-connected concrete shear wall/special column structures at one time, using the design of multi-stage assembly and embedded steel bars, the problems of low construction efficiency and high connection cost in the existing technology are solved, and high efficiency and good seismic resistance are achieved Construction method.
Patent Information
- Application Number
- CN202411356736.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-09-27
AI Technical Summary
The existing concrete structure has low layering construction efficiency, prefabricated shear walls and special-shaped columns have many lifting times, many steel bar connections, high connection costs, and lack simple and efficient grouting quality inspection methods, resulting in a long construction cycle.
Adopt a one-time installation dry-connected concrete shear wall/special column structure, prefabricated multi-layer shear wall/special column assembly through multi-stage assembly, each section includes prefabricated shear wall/special column, prefabricated beam and overlapping board, prefabricated multi-layer shear The force wall/special column is prefabricated in a section with several layers, and longitudinally penetrated prestressed bars and ordinary steel bars are set up. The concrete area after the connection node is poured into the slab thickness range, and the integrated connection is achieved by using embedded steel and a small amount of prestressed bars.
It greatly reduces the number of components lifting times, reduces the number of steel bar connections, improves construction efficiency, reduces on-site wet operations, reduces costs, and provides energy dissipation and shock absorption effects under the action of earthquakes, and has strong structural recovery capabilities.
Smart Images

Figure CN118933186A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction, and in particular to a one-time installation dry-connected concrete shear wall / special-shaped column structure and a construction method. Background Art
[0002] Reinforced concrete columns are important load-bearing components in concrete structures. Based on their shapes, they can be divided into rectangular columns and special-shaped columns. Special-shaped columns have a variety of forms and are as thick as the building walls. They can organically combine the beauty of the building, the flexibility of the use function, and the reasonable load-bearing performance of the building structure. They are especially suitable for use in low-rise and multi-story residential buildings. Reinforced concrete shear walls have a similar shape to special-shaped columns, but the difference is that the ratio of the length to the thickness of the former is significantly greater than that of the latter.
[0003] At present, the main practice of prefabricated shear walls at home and abroad is to prefabricate shear walls in single layers, that is, to prefabricate them in one section within the range of the floor height. The process is to first install the prefabricated shear walls of this layer, then install the prefabricated beams and composite slabs of this layer, and then carry out the construction of the upper layer after completing the construction of the structure of this layer. The vertical reinforcement of the prefabricated shear wall is mainly connected by grouting sleeves. The grouting sleeve connection is achieved by pre-embedding the finished sleeve in the prefabricated concrete component, inserting the steel bar from the sleeve and injecting grouting material to achieve the steel bar connection. This technology is also the main method of mechanical connection of vertical steel bars of prefabricated components in China. Its disadvantages are that the number of steel bar alignments is large, the grouting quality is difficult to control, there is a lack of simple, efficient and reliable grouting quality detection methods, and the cost is high. Layered hoisting and longitudinal reinforcement sleeve grouting connection lead to a long structural construction period, and the advantages of prefabricated construction have not been fully demonstrated.
[0004] Moreover, the height of the post-cast concrete area of the traditional column connection node is generally within the range of the beam height, the post-cast area is large, and the amount of formwork and wet work required is large.
[0005] On the other hand, there is very little research in the industry on precast concrete special-shaped column structures, and no installation method has been proposed so far. Summary of the invention
[0006] In order to solve the problem of low efficiency of layered construction of existing concrete structures, the present invention provides a one-time installation dry-connected concrete shear wall / special-shaped column structure with simple structure and obvious construction convenience.
[0007] The technical solution to achieve the purpose of the present invention is: a one-time installation dry connection concrete shear wall / special-shaped column structure, including multiple sections of assembled concrete shear wall / special-shaped column structure, each section of concrete shear wall / special-shaped column structure includes prefabricated multi-layer shear wall / special-shaped column, prefabricated beam and composite slab,
[0008] The prefabricated multi-layer shear wall / special-shaped column is prefabricated in sections of several layers, and includes shear wall / special-shaped column body concrete, ordinary steel bars and a plurality of prestressed bars;
[0009] The top of each section of the prefabricated multi-layer shear wall / special-shaped column is flush with the lower edge of the floor slab of the same layer, and the bottom of each section is flush with the upper edge of the floor slab of the lower layer. The post-cast concrete area of the prefabricated multi-layer shear wall / special-shaped column connection node is only concentrated within the slab thickness range;
[0010] The prefabricated multi-layer shear wall / special-shaped column is provided with a plurality of holes which penetrate the shear wall / special-shaped column longitudinally and are used to accommodate prestressed tendons.
[0011] Ordinary steel bars include interconnected stirrups and ordinary longitudinal bars. The ordinary steel bars are only set in the shear wall / special-shaped column body, and are cast as a whole with the shear wall / special-shaped column body concrete, and do not pass through the shear wall / special-shaped column segment connection interface.
[0012] The prestressed tendons run longitudinally through the entire length of the component and pass through the shear wall / special-shaped column section connection interface.
[0013] Preferably, the prefabricated multi-story shear wall / special-shaped column is provided with a groove at each floor position, a raised shear key or a rough surface is provided at the lower end of each floor position, a notch and a short steel bar are provided on the side intersecting with the prefabricated beam, and the prefabricated multi-story shear wall / special-shaped column is connected to the adjacent layers of shear wall / special-shaped column concrete by embedded steel sections to form a whole.
[0014] Preferably, the structure of the dry-connected concrete shear wall / special-shaped column is L-shaped, T-shaped, cross-shaped, Z-shaped or I-shaped.
[0015] Preferably, each end of the one-time installed dry-connected concrete shear wall / special-shaped column structure is provided with at least one hole, and the hole is arranged to match the prestressed tendons.
[0016] Preferably, the prestressed tendon is arranged coaxially with the hole.
[0017] Preferably, a temporary fixing nut is provided at the upper end of the prestressed tendon.
[0018] Preferably, the longitudinal reinforcement at the bottom of the precast beam extends out from the end face. After the precast beam is installed in place, the longitudinal reinforcement at the bottom of the beam and the short steel bars are connected by connectors. The longitudinal reinforcement on the surface of the precast beam consists of fixed steel bars located in the middle of the beam and movable steel bars located at both ends of the beam. After the precast beam is installed in place, the movable steel bars are moved horizontally to the beam shear wall / special-shaped column node area.
[0019] Preferably, embedded sleeves are provided at each intermediate floor position of the prefabricated multi-story shear wall / special-shaped column to achieve bonding-free connection between prestressed tendons and cast-in-place concrete.
[0020] Preferably, after the prefabricated multi-story shear walls / special-shaped columns are hoisted into place at one time, the prefabricated beams and prefabricated base plates of the composite slabs are installed and the floor concrete is poured in order from low to high floors. The two ends of the prefabricated beams are supported on the side corbels of the prefabricated multi-story shear walls / special-shaped columns, and the composite slabs are placed on the prefabricated multi-story shear walls / special-shaped columns and prefabricated beams.
[0021] The present application also provides a construction method for installing a dry-connected concrete shear wall / special-shaped column structure in one go, comprising the following steps:
[0022] Step 1: prefabricate multi-layer shear walls / special-shaped columns 1, prefabricate precast beams 2, and composite slabs 3 in sections of multiple layers, and transport them to the area to be constructed;
[0023] Step 2: Install the prefabricated multi-story shear walls / special-shaped columns of this section at one time, and install corbels on the sides of the prefabricated multi-story shear walls / special-shaped columns intersecting with the prefabricated beams as temporary supports for the prefabricated beams;
[0024] Step 3: Install the precast beams and precast bottom plates of the composite slabs on the current floor in the order from the lowest floor to the highest floor;
[0025] Step 4: When installing the precast beam, use connectors to connect the bottom longitudinal reinforcement of the beam with the short reinforcement, move the movable reinforcement of the precast beam to the beam shear wall / special-shaped column node area; place the composite slab surface reinforcement;
[0026] Step 5: Install the formwork; pour the concrete of the floor surface and the connecting area;
[0027] Step 6, cyclically complete the installation and pouring of precast beams and composite slabs of the middle floors within the height range of the precast multi-story shear wall / special-shaped column of this section;
[0028] Step 7: Tension and lock the prestressed tendons at the top of the prefabricated multi-story shear wall / special-shaped column in this section at one time;
[0029] Step 8: hoist the upper prefabricated multi-layer shear wall / special-shaped column so that it is located on the top surface of the lower prefabricated multi-layer shear wall / special-shaped column and fix it;
[0030] Step 9: Install the precast beams and precast base plates of the upper precast multi-story shear walls / special-shaped columns within the height range in the order from low to high floors;
[0031] Step 10: Complete the construction of the entire building in a cycle.
[0032] By adopting the above technical solution, the present invention has the following beneficial effects: (1) The prefabricated multi-layer shear wall / special-shaped column of the present application is prefabricated in sections of multiple layers, and the installation of dry-connected concrete shear wall / special-shaped column is carried out at one time. By adopting this method, the number of times the components are hoisted is greatly reduced, and no steel sleeve connection is required on site. The post-cast concrete area of the prefabricated multi-layer shear wall / special-shaped column connection node is only concentrated within the slab thickness range, while the height of the post-cast concrete area of the traditional connection node is generally within the beam height range, and the thickness of the beam (i.e., the height) is greater than the thickness of the cast-in-place slab. The problems of the existing prefabricated shear wall / special-shaped column with many hoisting times, a large number of steel bar connections, high connection costs, and a lot of on-site wet operations are solved, and the construction efficiency is greatly improved.
[0033] (2) The structure of the present invention is ingenious. The ordinary steel bars of the component do not pass through the connection interface, and only a small amount of prestressed bars pass through. On site, it is only necessary to hoist the prefabricated component into place, connect the prestressed bars and then tension them. The number of steel bar connections is small, and the number of sleeves is greatly reduced. This solves the problem of the large number of steel bar connections in the existing prefabricated assembly columns, the difficulty in controlling the connection quality, and the high connection cost.
[0034] (3) Under the action of an earthquake, the dry-connected concrete shear wall / special-shaped column swings and opens along the concave and convex joints at the bottom, which can effectively reduce the impact of the earthquake and play a role in energy dissipation and shock absorption. The structural damage is small, and after the earthquake, gravity and prestressed tendons provide restoring force, so the structure can be quickly restored to use.
[0035] (4) The one-time installation dry-connected concrete shear wall / special-shaped column structure proposed in this invention is simple in structure, easy to install, and has good seismic performance, and has obvious engineering advantages. The shear wall / special-shaped column body concrete is a finished product produced on demand in the factory and does not need to be cast in place during the construction process, which solves the technical problems of high cost and poor fire and corrosion resistance caused by the use of steel special-shaped columns in the prior art.
[0036] (5) In the present application, each layer of the one-time installed dry-connected concrete shear wall / special-shaped column structure is aligned and connected by embedded steel sections and a small amount of prestressed tendons, which reduces on-site screws, steel sleeves, etc., and there is no need to align the screw holes one by one during installation, thereby further improving efficiency.
[0037] (6) The precast beams of this structure are easy to install, solving the problem of steel bar collision in the node area. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to make the content of the present invention more clearly understood, the present invention is further described in detail below according to specific embodiments and in conjunction with the accompanying drawings, wherein
[0039] Figure 1 This is a schematic diagram of the one-time installation of dry-connected concrete shear wall / special-shaped column structure of the present invention;
[0040] Figure 2 This is a schematic diagram of the structure of a prefabricated multi-layer (two layers are shown as one section) shear wall / special-shaped column of the present invention;
[0041] Figure 3 This is a schematic diagram of the structure of a prefabricated multi-layer (three layers are shown as one section) shear wall / special-shaped column of the present invention;
[0042] Figure 4 For the present invention Figure 3 The enlarged schematic diagram at A in the middle;
[0043] Figure 5 For the present invention Figure 3 A magnified schematic diagram of the structure at B in the middle;
[0044] Figure 6 For the present invention Figure 3 A magnified schematic diagram of the structure at C in the middle;
[0045] Figure 7 It is a cross-sectional view of a prefabricated multi-story special-shaped column (L-shaped);
[0046] Figure 8 It is a prefabricated multi-story shear wall (L-shaped) cross section;
[0047] Fig. 9 It is a cross-sectional view of a prefabricated multi-story special-shaped column (T-shaped);
[0048] Fig.10 This is the cross-sectional view of the prefabricated multi-story shear wall (T-shaped);
[0049] Fig.11 It is a cross-sectional view of a prefabricated multi-story special-shaped column (cross-shaped);
[0050] Fig.12 It is a prefabricated multi-layer shear wall (cross-shaped) cross section;
[0051] Fig.13 It is a cross-sectional view of a prefabricated multi-story special-shaped column (Z-shaped);
[0052] Fig.14 This is the cross-sectional view of the prefabricated multi-story shear wall (Z-shaped);
[0053] Fig.15 It is a cross-sectional view of a prefabricated multi-story special-shaped column (I-shaped);
[0054] Fig.16 It is a prefabricated multi-story shear wall (I-shaped) cross section;
[0055] Fig.17 It is a three-dimensional diagram of the precast beam (the movable steel bar 203 has not yet been moved to the beam shear wall / special-shaped column node area);
[0056] Fig.18 for Fig.17 The enlarged schematic diagram at D in the middle;
[0057] Fig.19 for Figure 1 Three-dimensional diagram of the node area at point E in the middle (the movable steel bar 203 has been moved to the beam shear wall / special-shaped column node area).
[0058] Fig. 20 It is a comparison diagram of the pouring area of the prior art and the pouring area of the present application. DETAILED DESCRIPTION
[0059] Embodiment 1
[0060] See Figures 1 to 20 The one-time installation dry connection concrete shear wall / special-shaped column structure of this embodiment includes a plurality of sections of assembled concrete shear wall / special-shaped column structures, each section of the concrete shear wall / special-shaped column structure includes a prefabricated multi-layer shear wall / special-shaped column 1, a prefabricated beam 2 and a composite slab 3.
[0061] The prefabricated multi-layer shear wall / special-shaped column 1 is prefabricated with several layers as one section, each section includes more than two layers of prefabricated shear wall / special-shaped column, and each prefabricated shear wall / special-shaped column includes shear wall / special-shaped column body concrete 101, ordinary steel bars 102 and a plurality of prestressed bars 103;
[0062] The top of each section of the prefabricated multi-layer shear wall / special-shaped column is flush with the lower edge of the floor slab of the current layer, and the bottom of each section is flush with the upper edge of the floor slab of the lower layer; the post-cast concrete area of the prefabricated multi-layer shear wall / special-shaped column connection node is only concentrated within the slab thickness range. In the prior art, the prefabricated beam is provided with longitudinal reinforcement, and the prefabricated beam is poured after insertion, so the cast-in-place area (such as the attached Fig. 20 The pouring area is from the bottom of the beam to the top of the floor slab. This pouring area is higher, so the formwork and wet work consumption are relatively large. In this application, the top of the dry-connected concrete special-shaped column is flush with the lower edge of the floor slab, and the bottom is flush with the upper edge of the lower floor slab. Therefore, the pouring area of this application (as shown in the attached figure) is Fig. 20 As shown in B), the template usage will be reduced, thus improving efficiency.
[0063] The prefabricated multi-layer shear wall / special-shaped column 1 is provided with a plurality of holes 110 which are longitudinally penetrated through the shear wall / special-shaped column body and are used to accommodate prestressed tendons.
[0064] The ordinary steel bars 102 include stirrups and ordinary longitudinal bars connected to each other. The ordinary steel bars 102 are only provided in the shear wall / special-shaped column body, and are cast as one with the shear wall / special-shaped column body concrete 101, and do not pass through the shear wall / special-shaped column segment connection interface.
[0065] The prestressed tendons run through the entire length of the component longitudinally and pass through the shear wall / special-shaped column segment connection interface. The present invention proposes a one-time installed dry-connected concrete shear wall / special-shaped column structure and construction method. The structure adopts a new type of vertical component-prefabricated multi-layer shear wall / special-shaped column. The prefabricated multi-layer shear wall / special-shaped column is prefabricated in multiple layers and has extremely high hoisting efficiency. The prefabricated multi-layer shear wall / special-shaped column can be connected as a whole through embedded steel and a small amount of prestressed tendons. It only needs to be hoisted in place once on site, and then the prefabricated beams and composite plates are installed, and finally tensioned at the top once. By adopting this method, the number of component hoisting is greatly reduced, and no steel sleeve connection is required on site. The problems of many hoisting times, many steel bar connections, and high connection costs of existing prefabricated shear walls / special-shaped columns are solved. In addition, the prefabricated multi-layer shear wall / special-shaped column has strong flexibility and a variety of cross-sectional forms. It can not protrude from the wall surface, solving the problem of rectangular columns exposed on the wall surface affecting the appearance. At the same time, the prefabricated beams of the structure are easy to install, solving the problem of steel bar collision in the node area. The one-time installed dry-connected concrete shear wall / special-shaped column structure proposed in this invention has simple structure, fast construction and cost-saving, and has good engineering advantages and economic benefits.
[0066] The prefabricated multi-story shear wall / special-shaped column 1 is provided with grooves at each floor position, a raised shear key 108 or a rough surface is provided at the lower end of each floor position, a notch 111 and a short steel bar 105 are provided on the side intersecting with the prefabricated beam 2, and the prefabricated multi-story shear wall / special-shaped column 1 is connected to the adjacent layers of shear wall / special-shaped column concrete 101 by pre-embedded steel sections 109 to form a whole.
[0067] The structure of the dry-connected concrete shear wall / special-shaped column is L-shaped, T-shaped, cross-shaped, Z-shaped or I-shaped.
[0068] Each end of the one-time installed dry-connected concrete shear wall / special-shaped column structure is provided with at least one hole, and the hole is arranged to match the prestressed tendons.
[0069] The prestressed tendon 103 and the hole 110 are arranged coaxially.
[0070] A temporary fixing nut 107 is provided at the upper end of the prestressed tendon 103 .
[0071] The bottom longitudinal reinforcement 201 of the precast beam 2 extends out from the end face. After the precast beam 2 is installed in place, the bottom longitudinal reinforcement 201 of the beam is connected to the short steel bar 105 by using the connector 204. The beam surface longitudinal reinforcement of the precast beam 2 is composed of a fixed steel bar 202 located in the middle of the beam and a movable steel bar 203 located at both ends of the beam. After the precast beam 2 is installed in place, the movable steel bar 203 is moved horizontally to the beam shear wall / special-shaped column node area.
[0072] Pre-embedded sleeves 106 are provided at the positions of the intermediate floors of the prefabricated multi-story shear walls / special-shaped columns to achieve non-bonding between the prestressed tendons 103 and the cast-in-place concrete.
[0073] After the prefabricated multi-story shear wall / special-shaped column 1 is hoisted into place at one time, the prefabricated beams and prefabricated base plates of the composite slabs are installed and the floor concrete is poured in order from low to high floors. The two ends of the prefabricated beams 2 are supported on the side corbels 113 of the prefabricated multi-story shear wall / special-shaped column 1, and the composite slab 3 is placed on the prefabricated multi-story shear wall / special-shaped column 1 and the prefabricated beams 2.
[0074] During the implementation process, the construction method of installing the dry-connected concrete shear wall / special-shaped column structure at one time includes the following steps:
[0075] Step 1: prefabricate multi-layer shear walls / special-shaped columns 1, prefabricate precast beams 2, and composite slabs 3 in sections of multiple layers, and transport them to the area to be constructed;
[0076] Step 2: Install the prefabricated multi-layer shear wall / special-shaped column 1 of this section at one time, and install the corbel 113 on the side of the prefabricated multi-layer shear wall / special-shaped column 1 intersecting with the prefabricated beam 2 as a temporary support for the prefabricated beam 2;
[0077] Step 3: Install the precast beams 2 and precast bottom plates of the composite slab 3 of the current layer in the order from the lower layer to the higher layer;
[0078] Step 4: When installing the precast beam, use the connector 204 to connect the bottom longitudinal reinforcement 201 of the beam with the short reinforcement 105, move the movable reinforcement 203 of the precast beam 2 to the beam shear wall / special-shaped column node area; place the composite slab surface reinforcement;
[0079] Step 5: Install the formwork; pour the concrete of the floor surface and the connecting area;
[0080] Step 6, cyclically complete the installation and pouring of precast beams and composite slabs of the middle floors within the height range of the precast multi-story shear wall / special-shaped column of this section;
[0081] Step 7: tension the prestressed tendons 103 at the top of the prefabricated multi-layer shear wall / special-shaped column 1 in this section and tighten them;
[0082] Step 8: hoist the upper prefabricated multi-layer shear wall / special-shaped column 1 so that it is located on the top surface of the lower prefabricated multi-layer shear wall / special-shaped column 1 and fixed;
[0083] Step 9: Install the prefabricated bottom plate of the prefabricated beam 2 and the composite plate 3 within the height range of the upper prefabricated multi-story shear wall / special-shaped column in the order from the lower floor to the higher floor;
[0084] Step 10: Complete the construction of the entire building in a cycle.
[0085] The specific embodiments described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A one-time installation dry-connected concrete shear wall / special-shaped column structure, Features: It comprises a multi-section assembled concrete shear wall / special-shaped column structure, each section of the concrete shear wall / special-shaped column structure comprises a prefabricated multi-layer shear wall / special-shaped column (1), a prefabricated beam (2) and a composite slab (3). The prefabricated multi-layer shear wall / special-shaped column (1) is prefabricated in sections of several layers, and comprises shear wall / special-shaped column body concrete (101), ordinary steel bars (102) and a plurality of prestressed bars (103); The top of each section of the prefabricated multi-layer shear wall / special-shaped column is flush with the lower edge of the floor slab of the same layer, and the bottom of each section is flush with the upper edge of the floor slab of the lower layer. The post-cast concrete area of the prefabricated multi-layer shear wall / special-shaped column connection node is only concentrated within the slab thickness range; The prefabricated multi-layer shear wall / special-shaped column (1) is provided with a plurality of holes (110) which are longitudinally penetrated through the shear wall / special-shaped column body and are used to accommodate prestressed tendons. The common steel bars (102) include stirrups and common longitudinal bars connected to each other. The common steel bars (102) are only arranged in the shear wall / special-shaped column body, and are cast as one with the shear wall / special-shaped column body concrete (101), and do not pass through the shear wall / special-shaped column segment connection interface. The prestressed tendons run longitudinally through the entire length of the component and pass through the shear wall / special-shaped column section connection interface.
2. The one-time installation dry connection concrete shear wall / special-shaped column structure according to claim 1, Features: The prefabricated multi-layer shear wall / special-shaped column (1) is provided with a groove or a rough surface at each floor position, a raised shear key (108) or a rough surface is provided at the lower end of each floor position, a notch (111) and a short steel bar (105) are provided on the side surface intersecting with the prefabricated beam (2), and the prefabricated multi-layer shear wall / special-shaped column (1) is connected to the adjacent layers of shear wall / special-shaped column concrete (101) by pre-embedded steel sections (109) to form a whole.
3. The one-time installation dry connection concrete shear wall / special-shaped column structure according to claim 1, Features: The dry-connected concrete shear wall / special-shaped column is L-shaped, T-shaped, cross-shaped, Z-shaped or I-shaped.
4. The one-time installation dry connection concrete shear wall / special-shaped column structure according to claim 1, Features: Each end of the one-time installed dry-connected concrete shear wall / special-shaped column structure is provided with at least one hole, and the hole is arranged to match the prestressed tendons.
5. The one-time installation dry connection concrete shear wall / special-shaped column structure according to claim 1, Features: The prestressed tendon (103) and the hole (110) are arranged coaxially.
6. The one-time installation dry connection concrete shear wall / special-shaped column structure according to claim 1, Features: A temporary fixing nut (107) is arranged at the upper end of the prestressed tendon (103).
7. The one-time installation dry connection concrete shear wall / special-shaped column structure according to claim 1, Features: The bottom longitudinal reinforcement (201) of the precast beam (2) extends out from the end face. After the precast beam (2) is installed in place, the bottom longitudinal reinforcement (201) and the short reinforcement (105) are connected by a connector (204). The surface longitudinal reinforcement of the precast beam (2) is composed of a fixed reinforcement (202) located in the middle of the beam and a movable reinforcement (203) located at both ends of the beam. After the precast beam (2) is installed in place, the movable reinforcement (203) is horizontally moved to the beam shear wall / special-shaped column node area.
8. The one-time installation dry-connected concrete shear wall / special-shaped column structure according to claim 7, Features: Pre-buried sleeves (106) are arranged at the positions of each intermediate floor of the prefabricated multi-layer shear wall / special-shaped column to realize non-bonding between the prestressed tendons (103) and the cast-in-place concrete.
9. The one-time installation dry-connected concrete shear wall / special-shaped column structure according to claim 7, Features: After the prefabricated multi-story shear wall / special-shaped column (1) is hoisted into place at one time, the prefabricated beams and prefabricated bottom plates of the composite slab are installed in order from the lower floors to the higher floors, and the floor slab concrete is poured. The two ends of the prefabricated beams (2) are supported on the side brackets (113) of the prefabricated multi-story shear wall / special-shaped column (1), and the composite slab (3) is placed on the prefabricated multi-story shear wall / special-shaped column (1) and the prefabricated beams (2).
10. A construction method for one-time installation of a dry-connected concrete shear wall / special-shaped column structure as claimed in any one of claims 1 to 9, Features: The steps include: Step 1: prefabricate multi-layer shear walls / special-shaped columns (1) with multiple layers as a section, prefabricate prefabricated beams (2), prefabricated bottom plates of composite slabs (3), and transport them to the area to be constructed; Step 2: Install the prefabricated multi-layer shear wall / special-shaped column (1) of this section at one time, and install the corbel (113) on the side of the prefabricated multi-layer shear wall / special-shaped column (1) intersecting with the prefabricated beam (2) as a temporary support for the prefabricated beam (2); Step 3: Install the prefabricated beams (2) and prefabricated bottom plates of the composite slabs (3) of the current layer in order from the lower layer to the higher layer; Step 4: When installing the precast beam, use the connector (204) to connect the bottom longitudinal reinforcement (201) of the beam with the short reinforcement (105), move the movable reinforcement (203) of the precast beam (2) to the beam shear wall / special-shaped column node area; and place the composite slab surface reinforcement; Step 5: Install the formwork; pour the concrete of the floor surface and the connecting area; Step 6, cyclically complete the installation and pouring of precast beams and composite slabs of the middle floors within the height range of the precast multi-story shear wall / special-shaped column of this section; Step 7: tensioning and locking the prestressed tendons (103) at the top of the prefabricated multi-layer shear wall / special-shaped column (1) in this section at one time; Step 8, hoisting the upper prefabricated multi-layer shear wall / special-shaped column (1) so that it is located on the top surface of the lower prefabricated multi-layer shear wall / special-shaped column (1) and fixing it; Step 9, in order from low to high floors, install the prefabricated beams (2) and prefabricated bottom plates of the composite slabs (3) within the height range of the upper prefabricated multi-story shear walls / special-shaped columns; Step 10: Complete the construction of the entire building in a cycle.
Citation Information
Patent Citations
Assembly connecting structure and assembly connecting method of assembled concrete frame and shear wall combination
CN102808465A
Assembly integral type concrete frame structure of dry-wet mixed connection of nodes and construction method
CN106677339A
Assembled prestressed concrete frame system and construction method thereof
CN108005304A
Prefabricated reinforced concrete shear wall and construction method
CN111424850A
Prefabricated and assembled integral concrete shear wall structure and construction method
CN116988592A
Cited By
Supporting-free few-formwork assembly type main control building structure with high-performance connection and construction method of supporting-free few-formwork assembly type main control building structure
CN119711809A