Method for repairing collapse of built non-pressure hydraulic tunnel
By adopting a comprehensive restoration method of anchor spray support and lining structure in pressurized hydraulic tunnels, the landslide problem is solved, and the construction is simple, safe and reliable, and the construction period is short, reducing project investment and profit losses, and ensuring the tunnel stable operation.
Patent Information
- Application Number
- CN202411234270.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-12
AI Technical Summary
The built pressurized hydraulic tunnels have collapsed due to the softening of the rock body and the unfavorable structural surface. If they are not repaired in time, they may lead to a larger-scale landslide, which will affect the project efficiency, and the restoration requires safety, simplicity and short construction period.
Comprehensive restoration methods of anchor spray support structure and lining structure are adopted, including implementing locking steel arch frames in the collapsed section, spraying concrete, laying system anchor rods and drainage holes, and using early strength concrete in lining concrete to provide support simultaneously and clean up to ensure construction safety and short construction period.
It has achieved landslide restoration with simplified construction, safe and reliable construction period, reduced project investment and profit losses, and improved the stability and support capacity of the tunnel.
Smart Images

Figure CN118933805A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnels in water conservancy and hydropower engineering, and in particular to a method for repairing collapse of an existing non-pressure hydraulic tunnel. Background Art
[0002] With the continuous construction of water conservancy and hydropower projects in my country, tunnel engineering has developed rapidly. In water conservancy projects such as power generation, water diversion and flood control, pressure-free tunnels are widely used. A considerable number of these pressure-free tunnels were built in the 20th century. At that time, in order to save investment, some tunnel sections with better surrounding rock did not use shotcrete support or secondary lining. Or, although support measures were taken for some better surrounding rock, there may be unfavorable structural surfaces that were not explored during the construction period. After years of operation, the softening of the rock mass by water and the development of unfavorable structural surfaces may lead to landslides.
[0003] If no timely measures are taken to repair the collapse of the unpressured tunnel, it is very likely to cause a larger collapse, thus affecting the power generation and flood control benefits of the tunnel project. The inspection and repair of tunnel collapses in this type of project has strict requirements on safety and construction period, so it is necessary to propose a measure that is simple to construct, safe and reliable, and has a shorter construction period.
[0004] Based on this, this case is brought forward. Summary of the invention
[0005] The purpose of the present invention is to provide a method for repairing collapse of an existing non-pressure water conservancy tunnel, which has the characteristics of simple construction, safety, reliability and short construction period, and can meet the needs of timely repairing collapse of an existing non-pressure water conservancy tunnel.
[0006] In order to achieve the above object, the technical solution of the present invention is as follows:
[0007] A method for repairing a collapsed existing non-pressure hydraulic tunnel comprises the following steps:
[0008] S1. Access road cleaning and temporary construction facilities installation;
[0009] S2. Implement anchor spraying support structure construction on the conventional tunnel section adjacent to the approach side, and simultaneously clean up the collapsed slag on the conventional tunnel section adjacent to the approach side;
[0010] S3. Carry out anchor spraying support structure and partial lining structure construction on the collapsed section, and simultaneously clean up the collapsed slag in the collapsed section;
[0011] S4. Carry out the remaining lining structure construction for the collapsed section, and at the same time, carry out the anchor spraying support structure construction for the conventional tunnel section far from the approaching side of the collapsed section, and simultaneously clean up the collapsed slag in the conventional tunnel section far from the approaching side;
[0012] S5. After removing the lining formwork of the lining structure of the collapsed section, the lining concrete shall be cured and the site shall be cleared simultaneously.
[0013] Furthermore, in step S2, the conventional tunnel section adjacent to the approach side is constructed with an anchor spraying support structure, and the construction sequence is supporting the steel mesh, setting up the steel arch frame, spraying concrete, arranging the system anchor rods and random drainage holes, and the random drainage holes should be arranged at the pre-marked rock surface seepage areas.
[0014] Further, the step S3 includes the following process:
[0015] S31. Implement locking steel arch at the junction of the conventional tunnel section and the landslide section;
[0016] S32. Implement the process of spraying concrete, setting steel arches and arranging system anchor rods for the collapsed section;
[0017] S33. Weld the lining steel mesh of the lining structure on the water-facing side of the steel arch frame in the collapsed section, install the drainage pipe and erect the lining formwork;
[0018] S34. A locking steel arch is implemented again at the junction of the end of the collapsed section and the conventional tunnel section away from the approach side.
[0019] Furthermore, the locking steel arch frame includes three side-by-side steel arch frame I-beams, connecting steel plates, frame steel plates and connecting tie plates, wherein the three side-by-side steel arch frame I-beams are welded to the connecting steel plates and frame steel plates, and the three side-by-side steel arch frame I-beams are welded and fixed to the connecting tie plates around.
[0020] Furthermore, the implementation of the anchor spraying support structure of the collapse section should be carried out step by step. The construction workers should first stand in the adjacent conventional tunnel section that has been supported to spray concrete on the collapse section, and then implement the steel arch frame and system anchor rods in the collapse section that has completed the spraying of concrete.
[0021] Furthermore, step S4 includes the following process: pouring lining concrete for the collapsed section, wherein the drainage pipe can be used as an inlet hole and / or an exhaust hole, and the top elevation of the drainage pipe used as an exhaust hole should be lower than the top elevation of the drainage pipe used as an inlet hole. When the lining concrete is poured, the pouring is stopped when the drainage pipe used as an exhaust hole is slurry-out. At this time, the top elevation of the lining concrete pouring is the same as the top elevation of the drainage pipe used as an exhaust hole, thereby controlling the pouring thickness of the lining concrete.
[0022] Furthermore, the drainage pipes should be arranged in multiple rows in the landslide section, with no less than 3 holes in each row.
[0023] Furthermore, step S4 includes the following process: implementing an anchor spraying support structure in a conventional tunnel section away from the approach side, and the construction sequence is arranging a supporting steel mesh, setting a steel arch frame, spraying concrete, arranging system anchors and random drainage holes, and the random drainage holes should be arranged at pre-marked rock surface seepage areas.
[0024] Furthermore, the lining concrete of the lining structure should be early-strength concrete.
[0025] The advantages of the present invention are:
[0026] 1. Safe and reliable: By adopting anchor-sprayed support structure and lining structure for the collapsed section of the built pressure-free tunnel, the stable operation of the project is guaranteed. At the same time, the support and lining construction are gradually promoted from one side of the collapsed section to the other side during the construction period. A locking steel arch with stronger support force is set at the dangerous part, and the anchor-sprayed support structure is combined with the lining structure to provide protection for the construction area, which better maintains the safety during the construction period; 2. The construction is simple and the construction period is short, with little impact on the project benefits: the collapsed section only adopts the repair measures of anchor-sprayed support structure and lining structure, and the construction is simple; the construction of anchor-sprayed support structure, lining structure and slag cleaning is carried out synchronously, and the lining steel mesh is directly welded to the water-facing surface of the steel arch, without the need to set up additional steel bars, which facilitates the construction and saves the construction period. The lining structure adopts early-strength lining concrete, which greatly shortens the construction period and reduces the loss of project benefits;
[0027] 3. Low engineering investment: The present invention casts the "protective cover" formed by the steel arch frame and the lining steel mesh into the lining structure, thereby improving the bearing capacity of the lining structure. A locking steel arch frame with stronger supporting capacity is provided at the junction of the collapsed section and the conventional tunnel section for support. Therefore, only the secondary lining structure is used in the collapsed section, and the anchor spraying support structure is used in the upstream and downstream extension sections of the collapsed section. Compared with the conventional full-section secondary lining structure repair method, it saves engineering workload and reduces investment on the basis of ensuring a higher safety margin. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 is a flowchart of the repair method in the embodiment;
[0029] Figure 2 It is a longitudinal sectional schematic diagram of an embodiment scheme;
[0030] Figure 3 It is a schematic diagram of the plan layout of the embodiment scheme, that is, Figure 2 1-1 cross-sectional schematic diagram;
[0031] Figure 4 yes Figure 2 and Figure 3 A-A cross-sectional schematic diagram;
[0032] Figure 5 yes Figure 2 and Figure 3 B-B cross-sectional view of FIG.
[0033] Figure 6 yes Figure 2 and Figure 3 C-C cross-sectional schematic diagram;
[0034] Figure 7 yes Figure 6 a-a cross-sectional schematic diagram;
[0035] Figure 8 yes Figure 2 and Figure 3 D-D cross-sectional schematic diagram;
[0036] Description of symbols
[0037] 1-existing pressure tunnel; 11-conventional tunnel section; 12-collapsed section; 13-collapsed slag;
[0038] 2-anchor spraying support structure; 21-support steel mesh; 22-steel arch frame; 23-locking steel arch frame; 23a-three side-by-side steel arch frame I-beams; 23b-connecting steel plate; 23c-erection steel plate; 23d-connecting tie plate; 24-system anchor rod; 25-spraying concrete; 26-random drainage holes;
[0039] 3- lining structure; 31- lining steel mesh; 32- drainage pipe; 33- lining concrete; 34- lining formwork. DETAILED DESCRIPTION
[0040] The present invention is further described in detail below in conjunction with the embodiments. It should be understood that the directions or positional relationships indicated by the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside" and "outside" herein are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention.
[0041] like Figures 1 to 8 As shown, this embodiment proposes a method for repairing collapse of an existing non-pressure hydraulic tunnel, comprising an existing non-pressure tunnel 1, an anchor spraying support structure 2 and a lining structure 3. Figure 1 , is a flow chart of the excavation support method of the present invention, and the specific repair steps are described as follows.
[0042] S1. Clear the access road and install temporary construction facilities such as water, electricity and ventilation to prepare for landslide repair work.
[0043] S2. Implement the anchor spraying support structure 2 for the conventional tunnel section 11 adjacent to the approach side. The construction sequence is supporting the steel mesh 21, setting the steel arch frame 22, spraying concrete 25, arranging the system anchor rods 24 and random drainage holes 26. The random drainage holes 26 should be arranged at the pre-marked rock surface seepage areas, and the collapsed slag 13 of the conventional tunnel section adjacent to the approach side should be cleaned up simultaneously.
[0044] S3. Carry out partial construction of the anchor-sprayed support structure 2 and the lining structure 3 for the collapsed section 12 step by step; first, implement the locking steel arch frame 23 at the junction of the conventional tunnel section 11 and the collapsed section 12 to provide strong support for the stress concentration that may be caused at the junction of the two; secondly, implement the processes of shotcrete 25, steel arch frame 22 and system anchor rod 24 of the anchor-sprayed support structure 2 for the collapsed section 12; finally, weld the lining steel mesh 31 of the lining structure 3 on the water-facing surface of the steel arch frame 22, install the drainage pipe 32 and erect the lining formwork 34, until the locking steel arch frame 23 is implemented again at the junction of the end of the collapsed section 12 and the conventional tunnel section 11 far away from the approach side; and simultaneously clean up the collapsed slag 13 in the collapsed section.
[0045] The implementation of the anchor spraying support structure 2 of the collapsed section 12 should be carried out step by step. The construction personnel should first stand at the supported adjacent conventional tunnel section 11 to spray concrete 25 on the collapsed section 12, and then implement the steel arch frame 22 and the system anchor rod 24 on the collapsed section 12 where the spraying concrete 25 has been completed. This step greatly reduces the safety risk caused by secondary collapse of the collapsed section 12 during construction.
[0046] In step S3, after the support of the collapsed section 12 is completed with the sprayed concrete 25, steel arch frame 22 and system anchor rod 24 of the anchor spraying support structure 2, the lining steel mesh 31 of the lining structure 3 is welded on the water-facing surface of the steel arch frame 22, and the drainage pipe 32 and lining formwork 34 are installed, thereby providing the construction area with a "double-layer protective cover" composed of the steel arch frame 22, the lining steel mesh 31 and the lining formwork 34, which greatly reduces the risk of safety accidents even in the event of a secondary collapse of the collapsed section 12.
[0047] In step S3, the lining steel mesh 31 of the lining structure 3 should be directly welded to the water-facing surface of the steel arch frame 22, without the need to set up additional steel bars, and at the same time, the "protective cover" formed by the steel arch frame 22 and the lining steel mesh 31 is cast in the lining structure 3, which improves the bearing capacity of the lining structure 3, facilitates construction, and saves construction time. At the same time, the drainage pipe 32 of the lining structure 3 can discharge the seepage water from the cave top of the collapsed section 12 during operation to reduce the external pressure on the lining structure 3 caused by the weight of the seepage water.
[0048] S4. Pour lining concrete 33 on the collapsed section 12, and support the conventional tunnel section 11 on the side away from the approaching site. The lining concrete 33 of the collapsed section 12 can be poured using the drainage pipe 32 as the injection hole and exhaust hole. The conventional tunnel section 11 away from the approaching site implements the anchor spraying support structure 2, and the construction sequence is supporting the steel mesh 21, setting the steel arch frame 22, spraying concrete 25, arranging the system anchor rod 24 and the random drainage hole 26. The random drainage hole 26 should be arranged at the pre-marked rock surface seepage place, and the collapsed slag 13 of this support section should be cleaned up simultaneously.
[0049] In step S4, the drainage pipe 32 of the lining structure 3 can be used as a pouring hole and an exhaust hole for pouring the lining concrete 33 during the construction period. Multiple rows of drainage pipes 32 should be set in the collapsed section, with no less than 3 holes in each row, so as to ensure uniform pouring of the lining concrete 33. At the same time, the top elevation of the drainage pipe 32 used as an exhaust hole should be slightly lower than the top elevation of the drainage pipe 32 used as a pouring hole. When the lining concrete 33 is poured, the pouring is stopped when the drainage pipe 32 used as an exhaust hole is slurry out. At this time, the top elevation of the lining concrete 33 pouring is the same as the top elevation of the drainage pipe 32 used as an exhaust hole, so as to control the pouring thickness of the lining concrete 33. In addition, the pouring of the lining concrete 33 of the lining structure 3 should be carried out simultaneously when the collapsed section 12 is supported away from the conventional tunnel section 11 on the access side, so as to shorten the construction period.
[0050] S5. After removing the lining formwork 34 of the lining structure 3 of the collapsed section 12, the lining concrete 33 is cured and the site is cleared simultaneously. The curing of the lining concrete 33 after the formwork is removed can also be adjusted to step S4 according to the actual construction situation, and implemented in time after the lining concrete 33 is poured, so as to shorten the construction period.
[0051] refer to Figure 6 and Figure 7 In this embodiment, the locking steel arch frame 23 is composed of three parallel steel arch frame I-beams 23a, connecting steel plates 23b, erecting steel plates 23c and connecting gusset plates 23d, wherein the three parallel steel arch frame I-beams 23a are welded to the connecting steel plates 23b and erecting steel plates 23c. The three parallel steel arch frame I-beams 23a and the connecting gusset plates 23d are welded and fixed around to provide strong support for the junction of the collapsed section 12 and the conventional tunnel section 11.
[0052] Preferably, the lining concrete 33 of the lining structure 3 should be early-strength concrete, so as to shorten the maintenance period and allow water to flow in time after the formwork is removed and the site is cleared, thereby reducing the loss of engineering benefits.
[0053] The above embodiments are only used to explain the concept of the present invention, rather than to limit the protection of the rights of the present invention. Any non-substantial changes to the present invention using this concept shall fall within the protection scope of the present invention.
Claims
1. A method for repairing collapse of an existing non-pressure hydraulic tunnel, characterized in that: The following steps are involved: S1. Access road cleaning and temporary construction facilities installation; S2. Implement anchor spraying support structure construction on the conventional tunnel section adjacent to the approach side, and simultaneously clean up the collapsed slag on the conventional tunnel section adjacent to the approach side; S3. Carry out anchor spraying support structure and partial lining structure construction on the collapsed section, and simultaneously clean up the collapsed slag in the collapsed section; S4. Carry out the remaining lining structure construction for the collapsed section, and at the same time, carry out the anchor spraying support structure construction for the conventional tunnel section far from the approaching side of the collapsed section, and simultaneously clean up the collapsed slag in the conventional tunnel section far from the approaching side; S5. After removing the lining formwork of the lining structure of the collapsed section, the lining concrete shall be cured and the site shall be cleared simultaneously.
2. A method for repairing collapse of an existing non-pressure hydraulic tunnel as claimed in claim 1, characterized in that: In step S2, the conventional tunnel section adjacent to the approach side is constructed with an anchor spraying support structure, and the construction sequence is supporting the steel mesh, setting the steel arch frame, spraying concrete, arranging the system anchor rods and random drainage holes, and the random drainage holes should be arranged at the pre-marked rock surface seepage areas.
3. A method for repairing collapse of an existing non-pressure hydraulic tunnel as claimed in claim 1, characterized in that: Step S3 The process includes: S31. Implement locking steel arch at the junction of the conventional tunnel section and the landslide section; S32. Implement the process of spraying concrete, setting steel arches and arranging system anchor rods for the collapsed section; S33. Weld the lining steel mesh of the lining structure on the water-facing side of the steel arch frame in the collapsed section, install the drainage pipe and erect the lining formwork; S34. A locking steel arch is implemented again at the junction of the end of the collapsed section and the conventional tunnel section away from the approach side.
4. A method for repairing collapse of an existing non-pressure hydraulic tunnel as claimed in claim 3, characterized in that: The locking steel arch frame includes three side-by-side steel arch frame I-beams, connecting steel plates, frame steel plates and connecting tie plates, wherein the three side-by-side steel arch frame I-beams are welded to the connecting steel plates and frame steel plates, and the three side-by-side steel arch frame I-beams are welded and fixed to the connecting tie plates around.
5. A method for repairing collapse of an existing non-pressure hydraulic tunnel as claimed in claim 3, characterized in that: The implementation of the anchor spraying support structure of the collapse section should be carried out step by step. The construction personnel should first stand in the adjacent conventional tunnel section that has been supported to spray concrete on the collapse section, and then implement the steel arch frame and system anchor rods in the collapse section where the spraying of concrete has been completed.
6. A method for repairing collapse of an existing non-pressure hydraulic tunnel as claimed in claim 3, characterized in that: The step S4 comprises the following process: pouring lining concrete for the collapsed section, wherein the drainage pipe can be used as an inlet hole and / or an exhaust hole, and the top elevation of the drainage pipe used as an exhaust hole should be lower than the top elevation of the drainage pipe used as an inlet hole. When the lining concrete is poured, the pouring is stopped when the drainage pipe used as an exhaust hole begins to discharge slurry. At this time, the top elevation of the lining concrete pouring is the same as the top elevation of the drainage pipe used as an exhaust hole, thereby controlling the pouring thickness of the lining concrete.
7. A method for repairing collapse of an existing non-pressure hydraulic tunnel as claimed in claim 6, characterized in that: The drainage pipes should be arranged in multiple rows in the landslide section, with no less than 3 holes in each row.
8. A method for repairing collapse of an existing non-pressure hydraulic tunnel as claimed in claim 1, characterized in that: The step S4 includes the following process: implementing the anchor spraying support structure in the conventional tunnel section away from the approach side, and the construction sequence is arranging the supporting steel mesh, setting the steel arch frame, spraying concrete, arranging the system anchor rods and random drainage holes, and the random drainage holes should be arranged at the pre-marked rock surface seepage areas.
9. A method for repairing collapse of an existing non-pressure hydraulic tunnel as claimed in claim 1, characterized in that: The lining concrete of the lining structure should be early-strength concrete.