Plugging piece and plugging ring for grouting behind wall of hard rock tunnel segment and construction method

By designing the sealing assembly in the sealing ring pipe sheet, using the combined structure of the sealing stop, elastomer and expansion bag, the problems of poor grouting quality and slurry leakage after the middle wall of the hard rock tunnel are solved, achieving high The sealing effect of strength.

CN118933861APending Publication Date: 2024-11-12CHINA RAILWAY 15TH BUREAU GROUP CORPORATION LIMITED +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410939727.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the construction of shield structure in hard rock tunnel, the grouting quality behind the wall is poor, and the slurry is prone to leak to the palm surface of the tunnel. The existing methods such as secondary grouting and double slurry forming hoops are difficult to effectively solve, and the bag structure is The overall strength is low and it is difficult to withstand the secondary grouting pressure.

Method used

A sealing member for back-grouting of hard rock tunnel pipe sheet is designed, including a sealing ring pipe sheet and a sealing component arranged in the sealing ring pipe sheet. The sealing component is composed of a sealing stop, an elastic body, The base, limiting column and expansion bag are composed of which are used to rotate the limiting column and release the elastic force of the elastic body to achieve the extension and locking of the blocking stop. The expansion bag is used to fill the gap between adjacent blocking stops to form a high-strength Blocking structure.

Benefits of technology

The grouting quality after the hard rock tunnel pipe wall is improved, slurry leakage is avoided, the overall strength of the sealing ring is enhanced, and the integrity of the grouting effect is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933861A_ABST
    Figure CN118933861A_ABST
Patent Text Reader

Abstract

The invention relates to a blocking piece and a blocking ring for hard rock tunnel segment backfill grouting and a construction method, the blocking piece comprises a blocking ring segment and a blocking assembly, and the blocking assembly comprises a blocking stop block, an elastic body, a base, a limiting column and an expansion bag; a grouting groove is formed in the plugging check block, expansion bags are arranged at the two ends of the grouting groove, and the bottom of the plugging check block is connected with the base through an elastic body. The limiting column is rotationally arranged on the blocking ring pipe piece and penetrates through the base and the blocking check block to penetrate into the grouting groove, a grouting hole is formed in the limiting column, and a V-shaped first sliding groove and a V-shaped second sliding groove are formed in the column face of the limiting column; the second through hole in the blocking stop block is provided with a boss which is matched with the first sliding groove and the second sliding groove in a sliding mode. The plugging ring is formed by annularly splicing a plurality of plugging pieces; the construction method comprises the steps of shield tunneling, duct piece splicing, plugging stop block releasing, duct piece inner grouting and duct piece wall back grouting. According to the method, the blocking effect of the hard rock tunnel segment backfill grouting can be improved, and the backfill grouting quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of shield construction, and in particular relates to a plugging piece and a plugging ring for back grouting of a hard rock tunnel segment wall, and a construction method. Background Art

[0002] Shield construction is one of the most widely used technologies in urban underground space construction. During the construction process, synchronous grouting behind the wall is often used to achieve timely support, prevent rock collapse, and control deformation. Synchronous grouting can achieve better results in soft rock tunnels, but for hard rock tunnels, due to the high strength of the surrounding rock and large pores in the broken rock, slurry often flows into the heading during the synchronous grouting process, which greatly increases the amount of slurry used and the grouting behind the wall is not full, resulting in poor grouting effect.

[0003] To solve this problem in hard rock tunnels, the main method at present is to use secondary grouting, that is, to grout the places where the synchronous grouting effect is poor through the lifting holes, but this method still has the problem of slurry loss. There is also a method of first using double liquid slurry to form a hoop and then performing secondary grouting. The quality of the double liquid slurry formed by this method is difficult to control, and the slurry blocking measures of the secondary grouting of this method, synchronous grouting and even double liquid slurry will still leak to the heading face. In addition, there is also a bag structure for wall sealing, but the overall strength of the bag and the grouting body is relatively low, and it is easy to fail to withstand the pressure of the secondary grouting and cause the sealing to fail. Summary of the invention

[0004] The purpose of the present invention is to provide a plugging piece, a plugging ring and a construction method for hard rock tunnel segment wall back grouting to solve the problem of poor quality of hard rock tunnel shield segment wall back grouting and easy leakage of slurry to the tunnel face.

[0005] In order to achieve the above-mentioned object, the first technical solution adopted by the present invention is: a plugging piece for grouting behind the wall of a hard rock tunnel segment, comprising a plugging ring segment and a plugging assembly arranged in the plugging ring segment, wherein the plugging assembly comprises a plugging block, an elastic body, a base, a limiting column and an expansion bag; The plugging block is provided with a grouting groove, which opens at the top of the plugging block, and the expansion bags are provided at both ends of the grouting groove in the circumferential direction, and the expansion bags expand outward under the pressure of the slurry in the grouting groove; the bottom plate of the plugging block is connected to the base through a plurality of elastic bodies, and the elastic force released after the elastic body is compressed can push the plugging block to pop out from the opening on the outer circumferential surface of the plugging ring segment; The limiting column is rotatably connected to the plugging ring segment and is axially limited. The limiting column sequentially passes through the base and the bottom plate of the plugging block and extends into the grouting groove. A grouting hole is arranged in the limiting column. A first slide groove and a second slide groove connected at the ends are arranged on the cylindrical surface of the limiting column. The first slide groove and the second slide groove are arranged in a V shape, and the length of the first slide groove is greater than the length of the second slide groove. The bottom plate of the blocking block is provided with a second through hole for the limiting column to pass through, and a boss is arranged in the second through hole. When the boss is located in the second slide groove, the blocking block is locked in the blocking ring segment; when the boss is located in the first slide groove, the blocking segment is unlocked, and the blocking ring segment is ejected along the first slide groove under the elastic force of the elastic body; the boss is controlled to move from the second slide groove to the first slide groove by rotating the limiting column.

[0006] The plurality of elastic bodies are distributed on both sides of the second through hole.

[0007] As an option, the elastomer is a spring column, including a column and a spring sleeved on the column. The column is welded to the base and extends into the grouting groove from a first through hole opened on the bottom plate of the blocking block. Both ends of the spring abut against the base plate and the bottom plate of the blocking block.

[0008] Furthermore, a pad is provided at the end of the column located in the grouting groove, and the diameter of the pad is larger than the diameter of the first through hole.

[0009] As another option, the elastic body is a spring, one end of the spring is fixedly connected to the base, and the other end of the spring is fixedly connected to the bottom plate of the blocking block.

[0010] The expansion bag is a rubber bag.

[0011] A rubber pad is arranged on the top of the blocking block around the notch of the grouting groove.

[0012] The limiting column is installed in the lifting hole of the plugging ring segment, a limiting ring is arranged at the end of the limiting column, a recessed groove for accommodating the limiting ring is arranged at the lifting hole of the plugging ring segment, and the limiting ring is fixed in the recessed groove by an annular pressure cover.

[0013] The beneficial effects of this technical solution are as follows: the plugging piece of this solution is used as a component unit of the plugging ring, and a retractable plugging block is set in the plugging ring segment. After the plugging block is extended, it is closely attached to the surrounding rock to form a plugging structure, which is convenient for the subsequent implementation of the whole ring plugging of the plugging ring. Before the plugging block is extended, it is completely located in the plugging ring segment, so that the outer cylindrical surface of the plugging ring segment remains flat, which is convenient for the transportation of the segment and also avoids the scrapping of the segment due to the damage of the plugging block by bumping.

[0014] The structural design of the limit column is ingenious, and the blocking block can be unlocked by simply rotating the limit column, which is easy to operate.

[0015] The expansion bag can be provided to block the gap between adjacent blocking blocks, thereby preventing the blocking failure caused by slurry leakage.

[0016] The setting of the elastic body makes it easier to extend the blocking block, and provides a variety of elastic body setting forms, so that implementers can choose according to actual conditions.

[0017] The second technical solution proposed by the present invention is: a plugging ring for rear grouting of a hard rock tunnel segment wall, wherein the plugging ring is formed by circumferentially assembling a plurality of segments, and the segments are the above-mentioned plugging members.

[0018] The third technical solution proposed by the present invention is: a hard rock tunnel segment wall back grouting construction method, comprising the following steps: Step 1: Shield tunneling. No grouting is performed during the shield tunneling process. Step 2: After the excavation is completed, the segments are assembled. The segments are connected by reserved bolt holes and assembled in the order of one ring of blocking ring, N rings of ordinary rings, and one ring of blocking ring. The (N+1) rings of segments are regarded as a cycle, and the segments of two adjacent rings are assembled in staggered seams. The blocking ring is the blocking ring described in the second technical solution, and the ordinary ring is formed by circumferential assembly of multiple shield segments. Step 3: Rotate the limit column on the blocking ring so that the blocking block pops out and is close to the surrounding rock behind the segment wall; then use the grouting hole of the limit column to inject grout into the blocking block, and the expansion bag at the end of the blocking block expands outwards under the slurry pressure to block the unsealed area between adjacent blocking blocks, thereby achieving the blocking of the entire ring behind the segment wall; Step 4: drilling the hoisting holes on the common ring as grouting holes, and performing rear grouting on the wall of the segment between the two plugging rings; Step 5: Repeat the above four steps to complete the grouting of the hard rock tunnel segment wall.

[0019] The beneficial effects of this solution are as follows: the present invention utilizes the self-stabilizing ability of hard rock tunnels, eliminates synchronous grouting, and applies a ring of blocking rings in a fixed number of rings. High-strength blocking blocks are prefabricated on the blocking ring segments. After the segments are assembled, the blocking blocks are ejected from the segments through internal coordination, tightly fitting the tunnel surrounding rock to form a closed environment for grouting. Finally, grouting is performed in the closed area to complete the blocking of the slurry behind the segments, thereby achieving the purpose of improving the quality of grouting behind the wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0021] Figure 1 It is a structural perspective view of the plugging ring segment of the present invention; Figure 2 It is a structural cross-sectional view of the plugging ring segment of the present invention; Figure 3 is a perspective view of the blocking assembly of the present invention; Figure 4 It is a structural schematic diagram of the blocking block described in the present invention; Figure 5 is a cross-sectional view of the blocking block described in the present invention; Figure 6 It is a structural schematic diagram of the spring column and the base in the present invention; Figure 7 It is a structural schematic diagram of the limiting column of the present invention; Figure 8 It is a process flow chart of the back grouting construction method of the hard rock tunnel segment wall according to the present invention; Fig. 9 This is a schematic diagram of the three-stage construction of the present invention; Fig.10 This is a plan view of the back grouting construction of the hard rock tunnel segment wall of the present invention; Fig.11 This is a schematic diagram of assembling the common ring and the blocking ring of the present invention; Markings in the figure: 1. Sealing assembly; 2. Sealing ring segment; 3. Sealing block; 301. Bottom plate; 302. Side plate; 303. Rubber pad; 304. First through hole; 305. Second through hole; 306. Boss; 4. Spring column; 401. Spring; 402. Pad; 403. Column; 5. Base; 501. Center hole; 6. Limit column; 601. First slide groove; 602. Second slide groove; 603. Grouting hole; 604. Limit ring; 7. Rubber bag; 8. Ordinary ring segment; 9. Mortar behind the wall; 10. Surrounding rock; 11. Construction gap; 12. Unclosed area; 13. Rubber bag support area. DETAILED DESCRIPTION

[0022] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the invention in any way.

[0023] Example 1: Figure 1As shown, a plugging member for back grouting of a hard rock tunnel segment wall comprises a plugging ring segment 2 and a plugging assembly 1 arranged in the plugging ring segment 2. The structure of the plugging assembly 1 is shown in FIG. Figure 2 , 3 As shown, it includes a blocking block 3, a spring column 4, a base 5, a limiting column 6 and a rubber bag 7.

[0024] The blocking block 3 is mainly used to block the slurry behind the pipe wall, and its structure is as follows: Figure 4 As shown, the whole is an arc-shaped trough body, which is mainly composed of a bottom plate 301 and side plates 302 on both sides of the bottom plate 301 in the axial direction. The bottom plate 301 and the side plates 302 are prefabricated integral structures, and the rubber bag 7 is embedded in the prefabricated molding process. The rubber bag 7 is located at the two ends between the side plates 302. The rubber bag 7 and the side plates 302 and the bottom plate 301 can enclose a grouting groove for grouting. A rubber pad 303 is fixedly arranged at the top of the side plate 302. The rubber pad 303 produces a certain deformation after being subjected to external extrusion force, so that the uneven part of the surrounding rock surface can be filled, so that the outer cylindrical surface of the blocking block 3 is closely fitted with the surrounding rock. The first through hole 304 and the second through hole 305 are arranged at intervals along the circumferential direction on the bottom plate 301. One second through hole 305 is arranged, and a plurality of first through holes 304 are arranged, which are distributed on both sides of the second through hole 305. Preferably, the first through holes 304 on both sides of the second through hole 305 are arranged symmetrically. The first through hole 304 and the second through hole 305 are both connected to the grouting groove. The first through hole 304 is used to cooperate with the spring column 4, and the spring on the spring column 4 pushes the blocking block 3 to move in the blocking ring segment 2 and extend from the outer circumferential opening of the blocking ring segment 2. The second through hole 305 is used to be movably connected with the limit column 6, such as Figure 5 As shown, a boss 306 is provided on the hole wall of the second through hole 305 , and the boss 306 is slidably matched with the sliding groove on the limiting column 6 .

[0025] like Figure 6 As shown, the number of the spring columns 4 is the same as the number of the first through holes 304. The spring columns 4 are fixed on the arc-shaped base 5. The spring columns 4 include a column 403 and a spring 401 sleeved on the column 403. The column 403 is welded on the base 5. The outer diameter of the spring 401 is larger than the aperture of the first through hole 304, so that after the column 403 of the spring column 4 is installed through the first through hole 304, the spring 401 is squeezed between the base 5 and the bottom plate 301 of the blocking block 3. In order to prevent the spring column 4 from being separated from the blocking block 3, a pad 402 is also installed on the top of the column 403 of the spring column 4. The diameter of the pad 402 is larger than the diameter of the first through hole 304. A center hole 501 is set at the center of the base 5 for installing the limit column 6.

[0026] The limit column 6 is used to lock the blocking block during the segment assembly process and unlock it after the assembly is completed. Figure 7 As shown, the limit column 6 is a hollow cylinder, and the hollow part is a reserved grouting hole 603, and the grouting hole runs through both ends of the limit column 6; the slide groove on the cylindrical surface of the limit column 6 includes a first slide groove 601 and a second slide groove 602 arranged in a V shape, and the first slide groove 601 and the second slide groove 602 are both inclined relative to the axial direction of the limit column 6, and the length of the second slide groove 602 is smaller than the first slide groove 601, and the second slide groove 602 serves as a limit slide groove on the limit column 6. The limiting column 6 is rotatably installed in the center hole 501 of the base 5, and inserted into the second through hole 305 at the center of the bottom plate 301 of the blocking block 3. When the boss 306 in the second through hole 305 is stuck at the top of the second slide groove 602, the boss 306 can be prevented from sliding, thereby locking the blocking block 3. At this time, the distance between the blocking block 3 and the base 5 is small, and the spring 401 of the spring column 4 is compressed and energy is stored. At this time, the blocking block 3 is located in the blocking ring segment 2. When the limiting column 6 is rotated to a certain angle so that the boss 305 enters the first slide groove 301, the locking of the blocking block 3 by the limiting column 6 is released, and the elastic force of the spring 401 on the spring column 4 is released, pushing the boss 306 of the blocking block 3 to slide along the direction of the first slide groove 301, and the blocking block 3 is ejected from the blocking ring segment 2.

[0027] In order to facilitate the rotation of the limiting column 6, the operating end of the limiting column 6 is also provided with a hexagonal rotating hole, and the limiting column 6 is driven to rotate by rotating the hexagonal rotating hole with a hexagonal wrench.

[0028] After the first slide groove 601 is tilted, the limit column 6 can be further rotated during the pop-up process of the blocking block 3, so that the end face of the blocking block 3 is closer to the surrounding rock behind the pipe segment; at the same time, the pop-up speed of the blocking block can be slowed down to avoid the blocking block from getting stuck when it pops up quickly.

[0029] by Figure 3 Taking the example of further explanation of the unlocking process of the limit column 6, when unlocking, the limit column 6 is rotated clockwise so that the second slide groove 602 rotates relative to the boss 306, and the boss 306 moves downward along the second slide groove 602, and drives the blocking block 3 to move downward. When the boss 306 reaches the position where the second slide groove 602 is connected to the first slide groove 601, the limit column 6 continues to be rotated, and the boss 306 can enter the first slide groove 601. The length of the first slide groove 601 is much larger than the second slide groove 602. Therefore, the boss 306 is not constrained at this time, and the elastic force of the spring 401 is released, pushing the boss 306 to slide along the first slide groove 601, thereby realizing the pop-up of the blocking block 3.

[0030] Preferably, a limiting ring 604 is provided at the operating end of the limiting column 6, and a hoisting hole on the plugging ring segment 2 is provided with an annular recessed groove, through which the limiting column 6 is installed, and the limiting column 6 is fitted with the wall of the hoisting hole, and the limiting ring 604 is pressed into the recessed groove by an annular pressure cover, and the diameter of the annular pressure cover is larger than the diameter of the recessed groove, so that the annular pressure cover can be fixed to the plugging ring segment 2 by bolts, thereby limiting the limiting column 6 in the axial direction so that the limiting column 6 can only rotate.

[0031] Optionally, the axial positioning of the limit column 6 can also be achieved in the following manner: two or three radially extending limit rods are arranged at the end of the limit column 6, and an annular limit groove is arranged around the lifting hole on the sealing ring segment 2, and a notch is arranged on the annular limit groove. When the limit column 6 is installed, the limit rod enters the annular limit groove from the notch, and then an annular pressure cover is used to seal the notch, thereby realizing the axial limitation of the limit column 6 and ensuring the rotation of the limit column 6.

[0032] The plugging ring segment 2 is provided with an installation groove for installing the plugging assembly 1. The installation groove is open on the outer circumferential surface of the plugging ring segment 2. After the limit column 6 releases the limit, the plugging block 3 is ejected from the installation groove and contacts the surrounding rock behind the segment to form a plugging structure. Therefore, the size of the plugging block 3 in the circumferential direction is smaller than the size of the plugging ring segment 2. After the plugging ring segment 2 is assembled into a plugging ring along the circumference, the plugging block 3 is ejected. There must be a certain gap between adjacent plugging blocks 3, forming an unsealed area. If this area is not blocked, it will leak from here after grouting behind the wall. Therefore, the rubber bag 7 expands outward after grouting, and the unsealed area between adjacent plugging blocks 3 is filled through the expansion contact of adjacent rubber bags 7, thereby achieving complete blocking of the entire plugging ring.

[0033] Embodiment 2: This embodiment is based on Embodiment 1, and a spring is used to replace the spring column, that is, the column body of the spring column is omitted and only the spring is used. At this time, one end of the spring is fixedly connected to the base 5, and the other end is fixedly connected to the bottom plate 301 of the blocking block 3.

[0034] Example 3: A plugging ring for rear grouting of a hard rock tunnel segment wall is formed by circumferentially assembling a plurality of segments, wherein the segment is the plugging piece described in Example 1, i.e., a plugging ring segment 2 provided with a plugging assembly 1.

[0035] After the sealing ring is assembled, the limiting column 6 is rotated to release the sealing block 3, and grout is injected into the sealing block 3. The rubber bag 7 expands outward under the slurry pressure to close the gap between adjacent sealing blocks 3, thereby achieving sealing of the entire ring.

[0036] Example 4: A method for back grouting of hard rock tunnel segments, the process flow of which is as follows: Figure 8 As shown, including: Step 1: Shield tunneling: Select appropriate tunneling parameters for shield tunneling construction, utilize the self-stability of hard rock tunnels, and do not perform grouting during the shield tunneling process.

[0037] Step 2, segment assembly: After excavation is completed, the segments are assembled. The segments are connected with reserved bolt holes and assembled in the order of one blocking ring, five ordinary rings, and one blocking ring, that is, six rings of segments form a cycle.

[0038] The blocking ring is the blocking ring described in Example 2, i.e., it is composed of a plurality of blocking ring segments 2 assembled in a circumferential direction, and the common ring is composed of a common ring segment 8 assembled in a circumferential direction, and the common ring segment 8 refers to a conventional shield segment in the art. The segments of adjacent rings are assembled in a staggered manner, such as Fig.10 , 11 shown.

[0039] After the assembly is completed, the blocking block 3 at the blocking ring position is located inside the blocking ring segment 2. Fig. 9 As shown in (1), since the excavation diameter of the shield machine cutterhead is larger than the outer diameter of the segment, after the segment is assembled and removed from the shield tail, an annular construction gap 11 can be formed between the segment and the surrounding rock 10.

[0040] Step 3: Blocking behind the wall: Use a hexagonal wrench or other tool to rotate the limit column 6 through the hexagonal rotation hole on the inner side of the blocking ring segment 2, so that the boss 306 on the blocking block 3 enters the first slide groove 601 from the second slide groove 602. At this time, the elasticity of the spring 401 on the spring column 4 is released, the blocking block 3 is ejected, and cooperates with the rubber pad 301 to completely fit the surrounding rock behind the segment wall, as shown in FIG. Fig. 9 As shown in (2), there is an unsealed area 12 between adjacent blocking blocks 3. Then, grouting is performed from the inside of the segment into the blocking block 3 using the grouting holes 602 reserved on the limiting column 6. The slurry enters the blocking block 3 through the limiting column 6. The rubber bag 7 is subjected to the grouting pressure and expands in volume to fill the unsealed area 12, thus completing the complete blocking of the entire ring behind the segment wall. Fig. 9 (3) as shown.

[0041] The grouting material in the plugging ring segment 2 can be selected as a double-liquid slurry with a faster solidification speed. The grouting effect mainly depends on the grouting pressure and the overflow of the grouting material from the grouting hole 602.

[0042] Step 4: Segment wall back grouting: After the wall back plugging is completed, the segment wall back grouting between the two plugging rings can be carried out. Since the plugging structure 1 on the two plugging rings can form a solid plugging space, the total grouting volume behind the wall is used as the main criterion for the completion of grouting, and the grouting pressure is used as the auxiliary criterion for the completion of grouting.

[0043] During grouting, the hoisting holes of the common annular segments 8 are punched as grouting holes, and grouting equipment is used to perform grouting on the back of the segment wall.

[0044] Determination of grouting volume and grouting pressure: Taking the shield tunnel with a segment outer diameter of 6.2m, a cutter head diameter of 6.48m, and a width of 15cm for the construction gap 11 behind the wall as an example, the grouting filling coefficient behind the segment wall of the hard rock tunnel is generally 1.1~1.2. Therefore, the grouting volume Q behind the two-ring plugging ring wall is the product of the shield tail building gap V and the grouting filling coefficient λ, Q=λV=22~24.1m 3 The grouting pressure is 1.1 to 1.2 times of the static water and soil pressure. Generally, the grouting pressure is controlled at 0.2 to 0.3 MPa. During the construction process, the grouting pressure needs to be strictly controlled to ensure that the slurry can completely fill the wall of the pipe segment without being too large to cause the pipe segment to rupture. When the grouting volume reaches 22m 3 When the grouting pressure rises significantly, the grouting behind the segment wall can be stopped.

[0045] Repeat the above four steps to complete the back grouting of the hard rock tunnel segment wall.

[0046] The above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit the same. Those skilled in the art should understand that the specific implementation modes of the present invention may be modified or replaced by equivalents with reference to the above embodiments. Any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention are within the scope of protection of the pending claims.

Claims

1. A plugging piece for back grouting of hard rock tunnel segments, characterized by: It includes a plugging ring segment and a plugging component arranged in the plugging ring segment, wherein the plugging component includes a plugging block, an elastic body, a base, a limiting column and an expansion bag; The plugging block is provided with a grouting groove, which opens at the top of the plugging block, and the expansion bags are provided at both ends of the grouting groove in the circumferential direction, and the expansion bags expand outward under the pressure of the slurry in the grouting groove; the bottom plate of the plugging block is connected to the base through a plurality of elastic bodies, and the elastic force released after the elastic body is compressed can push the plugging block to pop out from the opening on the outer circumferential surface of the plugging ring segment; The limiting column is rotatably connected to the plugging ring segment and is axially limited. The limiting column sequentially passes through the base and the bottom plate of the plugging block and extends into the grouting groove. A grouting hole is arranged in the limiting column. A first slide groove and a second slide groove connected at the ends are arranged on the cylindrical surface of the limiting column. The first slide groove and the second slide groove are arranged in a V shape, and the length of the first slide groove is greater than the length of the second slide groove. The bottom plate of the blocking block is provided with a second through hole for the limiting column to pass through, and a boss is arranged in the second through hole. When the boss is located in the second slide groove, the blocking block is locked in the blocking ring segment; when the boss is located in the first slide groove, the blocking segment is unlocked, and the blocking ring segment is ejected along the first slide groove under the elastic force of the elastic body; the boss is controlled to move from the second slide groove to the first slide groove by rotating the limiting column.

2. The plugging piece for back grouting of hard rock tunnel segment wall according to claim 1, characterized in that: The plurality of elastic bodies are distributed on both sides of the second through hole.

3. The plugging piece for back grouting of hard rock tunnel segment wall according to claim 2 is characterized in that: The elastic body is a spring column, including a column and a spring sleeved on the column. The column is welded to the base and extends into the grouting groove from a first through hole opened on the bottom plate of the blocking block. Both ends of the spring abut against the base plate and the bottom plate of the blocking block.

4. The plugging piece for back grouting of hard rock tunnel segment wall according to claim 3 is characterized by: A pad is provided at the end of the column located in the grouting groove, and the diameter of the pad is greater than the diameter of the first through hole.

5. The plugging piece for back grouting of hard rock tunnel segment wall according to claim 2, characterized in that: The elastic body is a spring, one end of which is fixedly connected to the base, and the other end of which is fixedly connected to the bottom plate of the blocking block.

6. The plugging piece for back grouting of hard rock tunnel segment wall according to claim 1, characterized in that: The expansion bag is a rubber bag.

7. The plugging piece for back grouting of hard rock tunnel segment wall according to claim 1, characterized in that: A rubber pad is arranged on the top of the blocking block around the notch of the grouting groove.

8. The plugging piece for back grouting of hard rock tunnel segment wall according to claim 1, characterized in that: The limiting column is installed in the lifting hole of the plugging ring segment, a limiting ring is arranged at the end of the limiting column, a recessed groove for accommodating the limiting ring is arranged at the lifting hole of the plugging ring segment, and the limiting ring is fixed in the recessed groove by an annular pressure cover.

9. A plugging ring for back grouting of hard rock tunnel segments, characterized by: The blocking ring is formed by circumferentially assembling a plurality of pipe segments, and the pipe segments are the blocking pieces according to any one of claims 1 to 8.

10. A method for grouting a hard rock tunnel segment wall, characterized in that: The steps include: Step 1: Shield tunneling. No grouting is performed during the shield tunneling process. Step 2: After the excavation is completed, the segments are assembled. The segments are connected by reserved bolt holes and assembled in the order of one ring of blocking ring, N rings of ordinary rings, and one ring of blocking ring. The (N+1) rings of segments are regarded as a cycle, and the segments of two adjacent rings are assembled in staggered seams. The blocking ring is the blocking ring as claimed in claim 9, and the ordinary ring is formed by circumferential assembly of multiple shield segments. Step 3: Rotate the limit column on the blocking ring so that the blocking block pops out and is close to the surrounding rock behind the segment wall; then use the grouting hole of the limit column to inject grout into the blocking block, and the expansion bag at the end of the blocking block expands outwards under the slurry pressure to block the unsealed area between adjacent blocking blocks, thereby achieving the blocking of the entire ring behind the segment wall; Step 4: drilling the hoisting holes on the common ring as grouting holes, and performing rear grouting on the wall of the segment between the two plugging rings; Step 5: Repeat the above four steps to complete the grouting of the hard rock tunnel segment wall.