Construction method of underlying high-speed rail tunnel mountainside high-fill airport

By using mixed stone and support structures in mountain high-speed rail tunnels and airport construction, soil layers of different components are filled to form buffer layers, which solves the vibration impact problem in tunnels and airport construction and improves construction safety and stability.

CN118933907AActive Publication Date: 2024-11-12CHINA RAILWAY SEVENTH GRP CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411429321.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2024-11-12
Estimated Expiration
2044-10-14

AI Technical Summary

Technical Problem

When building high-speed rail or airports in mountainous areas, tunnel excavation and high-fill construction are difficult, and soil layer landfill during high-fill is not scientific enough, resulting in settlement and resonance causing damage to the road base. The existing technology is difficult to effectively solve these problems.

Method used

The construction method of the underside high-speed rail tunnel is adopted to build a shaped frame and a ladder-shaped support frame by stacking mixed stones under the tunnel opening, filling mixed soil and cement soil, and laying concrete on the top of the mountain to form a buffer layer To reduce the vibration impact of high-speed rail and aircraft during operation.

Benefits of technology

It effectively reduces the impact of vibration during high-speed rail and aircraft on tunnels and airport floors, alleviates construction risks, and improves the safety and stability of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933907A_ABST
    Figure CN118933907A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method of an underlying high-speed rail tunnel mountainside high-fill airport, and relates to a mountainside high-fill construction process. Comprising the following steps that mixed stone is stacked below a tunnel portal, n-shaped frame bodies A are built, open cut tunnels are built at the positions, corresponding to the portal, of the tops of the n-shaped frame bodies A, n-shaped frame bodies B are built between the multiple n-shaped frame bodies A in a staggered mode, ladder-shaped supporting frames are built at the tops of the n-shaped frame bodies B, and the space between the ladder-shaped supporting frames and a base plane is filled with mixed soil. Cement soil is filled between the ladder-shaped supporting frame and the height of the top of the mountain, and concrete is laid on a plane formed by the top of the mountain and the top of the cement soil; according to the method, the high-speed rail open cut tunnel is supported by the concrete frame and the stone in the valley near the mountain and under which the high-speed rail is laid, the valley is deeply filled with the filler and the supporting frame with different components, and when the high-speed rail or an airplane runs, the mixed soil in the middle layer is used as a buffer zone, so that the purpose of reducing mutual influence caused by resonance is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field , , , ,

[0001] The present invention relates to a construction technology for high fills beside mountains, and particularly to a construction method for a high fill airport beside a mountain with a high-speed railway tunnel beneath it. Background Art

[0002] With the gradual development of mountainous areas, the transportation development in mountainous areas has become crucial. Traditional rugged roads are no longer sufficient to meet the development needs. Building airports and high-speed railways in mountainous areas can effectively improve traffic capacity. However, it is difficult to build large-scale buildings such as high-speed railways or airports in the complex mountain environment. When building a high-speed railway, tunnel excavation, high fills or elevated structures are required. When building an airport, leveling measures such as high fills are needed. The construction volume is huge and there are many construction hazards. When building them in an overlapping manner, tunnel excavation and high fill leveling measures need to be carried out simultaneously. In order to reduce the damage to the road base caused by settlement or resonance, simple soil filling cannot be carried out during high fills, and thus a scientific construction method is required. Summary of the Invention

[0003] To overcome the deficiencies in the background art, the present invention discloses a construction method for a high fill airport beside a mountain with a high-speed railway tunnel beneath it. By using a concrete frame and stone support for the open cut tunnel of the high-speed railway in the valley beside the mountain and beneath the high-speed railway, and deeply filling the valley with fillers and support frames of different compositions, the mixed soil in the middle layer is used as a buffer zone when the high-speed railway or aircraft is in operation, achieving the purpose of reducing the mutual influence caused by resonance.

[0004] To achieve the above-mentioned invention purpose, the present invention adopts the following technical solutions: A construction method for a high fill airport beside a mountain with a high-speed railway tunnel beneath it, comprising the following steps: Step 1: Stack mixed stones below the tunnel entrance: Stack trapezoidal mixed stones along the length direction of the tunnel entrance on the mountain bottom base beside the mountain where the tunnel entrance is located in the mountain body, making the top of the trapezoidal mixed stones slightly lower than the lower edge of the tunnel entrance; Step 2: Build a "冂"-shaped frame A: Build multiple "冂"-shaped frames A with the top located between the trapezoidal mixed stones and the tunnel entrance and the two legs located on both sides of the trapezoidal mixed stones at intervals across the trapezoidal mixed stones on the top; Step 3: Build an open cut tunnel corresponding to the entrance on the top of the "冂"-shaped frame A: Build an open cut tunnel with an arc-shaped top and a horizontal bottom and internally connected and joined to the inside of the tunnel entrance on the top of multiple "冂"-shaped frames A; Step 4: Build a "冂"-shaped frame B alternately between multiple "冂"-shaped frames A: Build multiple "冂"-shaped frames B with the top located above the open cut tunnel alternately between multiple "冂"-shaped frames A; Step 5. Build a ladder-shaped support frame on the top of the "冂"-shaped frame B: Build a ladder-shaped support frame fixedly connected to multiple "冂"-shaped frames B along the length direction of the tunnel open cut on the top of the "冂"-shaped frame B. Step 6. Fill the mixed soil between the ladder-shaped support frame and the base surface: Spread and compact the mixed soil between the mountain bottom base surface outside the trapezoidal mixed stone material and the height where the top of the ladder-shaped support frame is located. Step 7. Fill the cement soil between the ladder-shaped support frame and the height of the mountain top: Spread the cement soil between the top of the mixed soil and the mountain top plane. Step 8. Lay concrete on the plane formed by the mountain top and the top of the cement soil: Spread the concrete on the plane formed by the top of the cement soil and the mountain top plane to form the airport floor.

[0005] For the construction method of the high-fill airport beside the mountain of the underlying high-speed railway tunnel, in Step 1, the trapezoidal mixed stone material consists of crushed stones and clay, and the ratio is that the crushed stone content accounts for 70%-80% of the total mass, and the clay content is 20%-30%.

[0006] For the construction method of the high-fill airport beside the mountain of the underlying high-speed railway tunnel, in Step 2, the materials of multiple "冂"-shaped frames A are all reinforced concrete, and the lower ends of the legs of multiple "冂"-shaped frames A all extend into the mountain bottom base surface.

[0007] For the construction method of the high-fill airport beside the mountain of the underlying high-speed railway tunnel, in Step 3, the material of the tunnel open cut is reinforced concrete.

[0008] For the construction method of the high-fill airport beside the mountain of the underlying high-speed railway tunnel, in Step 4, the materials of multiple "冂"-shaped frames B are all reinforced concrete, and the lower ends of the legs of multiple "冂"-shaped frames B all extend into the mountain bottom base surface.

[0009] For the construction method of the high-fill airport beside the mountain of the underlying high-speed railway tunnel, in Step 5, the material of the ladder-shaped support frame is reinforced concrete.

[0010] For the construction method of the high-fill airport beside the mountain of the underlying high-speed railway tunnel, in Step 6, the mixed soil consists of coarse-grained soil with the particle size between 0.075 and 60 mm and the mass of particles greater than or equal to 50% of the total mass.

[0011] For the construction method of the high-fill airport beside the mountain of the underlying high-speed railway tunnel, in Step 7, the ratio of the cement soil is that the cement content accounts for 10%-20% of the total mass, and the clay content is 80%-90%.

[0012] For the construction method of the high-fill airport beside the mountain of the underlying high-speed railway tunnel, in Step 8, the material of the concrete is reinforced concrete.

[0013] Due to the adoption of the above technical solution, the present invention has the following beneficial effects: The construction method of the high-filled airport beside the mountain and under the high-speed railway tunnel according to the present invention uses a concrete frame and stone support for the open-cut tunnel of the high-speed railway in the valley beside the mountain and under the high-speed railway, and deeply fills the valley with fillers and support frames of different components. When the high-speed railway or the airplane is operating, the mixed soil in the middle layer is used as a buffer zone, achieving the purpose of reducing the mutual influence caused by resonance; the design of the present invention is reasonable, using rigid and flexible supports together, greatly alleviating the mutual influence of the vibration generated when the high-speed railway passes through the tunnel and the vibration generated when the airplane takes off and lands, effectively solving the disadvantages of many hidden dangers in high-filled embankments, and having wide popularization value. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a flow chart of the construction steps of the present invention; Figure 2 It is a schematic structural diagram of the first construction step of the present invention; Figure 3 It is a schematic structural diagram of the second construction step of the present invention; Figure 4 It is a schematic structural diagram of the third construction step of the present invention; Figure 5 It is a schematic structural diagram of the fourth construction step of the present invention; Figure 6 It is a schematic structural diagram of the fifth construction step of the present invention; Figure 7 It is a three-dimensional structural schematic diagram of the cooperation of the open-cut tunnel of the present invention, the "冂"-shaped frame body A, the "冂"-shaped frame body B and the ladder-shaped support frame; Figure 8 It is a schematic structural diagram of the sixth construction step of the present invention; Figure 9 It is a schematic structural diagram of the seventh construction step of the present invention; Figure 10 It is a schematic structural diagram of the eighth construction step of the present invention.

[0015] In the figure: 1, mountaintop plane; 2, tunnel entrance; 3, mountain bottom base surface; 4, trapezoidal mixed stone materials; 5, mountain body; 6, "冂"-shaped frame body A; 7, open-cut tunnel; 8, "冂"-shaped frame body B; 9, ladder-shaped support frame; 10, mixed soil; 11, cement soil; 12, concrete; 13, airport floor. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0016] The present invention can be more detailedly explained through the following embodiments. The present invention is not limited to the following embodiments. The purpose of disclosing the present invention is to protect all changes and improvements within the scope of the present invention; Combined with the attached Figures 1 to 10 The construction method of the high-filled airport beside the mountain and under the high-speed railway tunnel described above includes the following steps: Step 1. Stack mixed stones below the tunnel entrance: Stack trapezoidal mixed stones 4 along the length direction of the tunnel entrance 2 on the mountain bottom base surface 3 beside the mountain where the tunnel entrance 2 is provided in the mountain body 5, making the top of the trapezoidal mixed stones 4 slightly lower than the lower edge of the tunnel entrance 2. The trapezoidal mixed stones 4 are composed of crushed stones and clay, and their ratio is that the crushed stone content accounts for 70%-80% of the total mass, and the clay content is 20%-30%; Step 2. Build the "冂"-shaped frame A: Build multiple "冂"-shaped frames A6 with the top between the trapezoidal mixed stones 4 and the tunnel entrance 2 and the two legs on both sides of the trapezoidal mixed stones 4 at intervals across the trapezoidal mixed stones 4 on the top of the trapezoidal mixed stones 4. The materials of the multiple "冂"-shaped frames A6 are all reinforced concrete, and the lower ends of the legs of the multiple "冂"-shaped frames A6 are all inserted into the mountain bottom base surface 3; Step 3. Build a tunnel open cut corresponding to the entrance at the top of the "冂"-shaped frame A: Build a tunnel open cut 7 with an arc-shaped top and a horizontal bottom and internally connected and connected to the inside of the tunnel entrance 2 at the top of the multiple "冂"-shaped frames A6. The material of the tunnel open cut 7 is reinforced concrete; Step 4. Build the "冂"-shaped frame B alternately between the multiple "冂"-shaped frames A: Build multiple "冂"-shaped frames B8 with the top above the tunnel open cut 7 alternately between the multiple "冂"-shaped frames A6. The materials of the multiple "冂"-shaped frames B8 are all reinforced concrete, and the lower ends of the legs of the multiple "冂"-shaped frames B8 are all inserted into the mountain bottom base surface 3; Step 5. Build a ladder-shaped support frame on the top of the "冂"-shaped frame B: Build a ladder-shaped support frame 9 fixedly connected to the multiple "冂"-shaped frames B8 along the length direction of the tunnel open cut 7 on the top of the "冂"-shaped frame B8. The material of the ladder-shaped support frame 9 is reinforced concrete; Step 6. Fill the mixed soil between the ladder-shaped support frame and the base surface: Spread and compact the mixed soil 10 between the mountain bottom base surface 3 outside the trapezoidal mixed stones 4 and the height where the top of the ladder-shaped support frame 9 is located. The mixed soil 10 is composed of coarse-grained soil with the particle size between 0.075 and 60 mm and the particle mass greater than or equal to 50% of the total mass; Step 7. Fill the cement soil between the ladder-shaped support frame and the top of the mountain body: Spread the cement soil 11 between the top of the mixed soil 10 and the mountain top plane 1. The ratio of the cement soil 11 is that the cement content accounts for 10%-20% of the total mass, and the clay content is 80%-90%; Step 8. Lay concrete on the plane formed by the top of the mountain body and the top of the cement soil: Spread the concrete 12 on the plane formed by the top of the cement soil 11 and the mountain top plane 1 to form the airport floor 13. The material of the concrete 12 is reinforced concrete.

[0017] In the present disclosure, trapezoidal mixed stones 4 are piled up at the bottom of the open cut tunnel 7 of the connecting tunnel 2, and the open cut tunnel 7 of the tunnel is supported by multiple "冂"-shaped frameworks A6 spanning the trapezoidal mixed stones 4, providing a rigid support for the open cut tunnel 7 of the tunnel. A buffer transition zone for landfill is formed by fully paving mixed soil 10 between the mountain bottom base surface 3 outside the trapezoidal mixed stones 4 and the height where the top of the ladder-shaped support frame 9 is located. Multiple "冂"-shaped frameworks B8 with their tops located above the open cut tunnel 7 of the tunnel are交错修建 (interleavingly constructed) between multiple "冂"-shaped frameworks A6, and a ladder-shaped support frame 9 that担在 (rests on) the tops of multiple "冂"-shaped frameworks B8 and fixes multiple "冂"-shaped frameworks B8 together serves as a rigid support for fully paving cement soil 11 between the top of the mixed soil 10 and the mountaintop plane 1. By fully paving concrete 12 on the plane formed by the top of the cement soil 11 and the mountaintop plane 1 as the airport floor 13, a soft soil buffer zone formed by the mixed soil 10 reduces the vibration caused by the high-speed rail shuttling in the open cut tunnel 7 and the vibration caused by the aircraft on the airport floor 13. This not only reduces the impact of the vibrations of the two on each other but also does not affect the stability of the open cut tunnel 7 of the tunnel and the airport floor 13 itself.

[0018] Parts not detailed in the present invention are prior art. It should be noted that for the unclear Chinese expressions like "交错修建" and "担在", the translations here are tentative and may need to be adjusted according to more accurate context or specific technical terms.

Claims

1. A construction method for a high-altitude filling airport next to a mountain with a high-speed railway tunnel underneath, characterized in that: It includes the following steps: Step 1: Stack mixed stones below the tunnel entrance: On the mountainside bottom base surface (3) below the tunnel entrance (2) provided in the mountain body (5), stack trapezoidal mixed stones (4) along the length direction of the tunnel entrance (2) so that the top of the trapezoidal mixed stones (4) is slightly lower than the lower edge of the tunnel entrance (2); Step 2: Build a "冂”-shaped frame A: At intervals across the top of the trapezoidal mixed stones (4), build multiple "冂”-shaped frames A (6) with the top located between the trapezoidal mixed stones (4) and the tunnel entrance (2) and the two legs located on both sides of the trapezoidal mixed stones (4); Step 3: Build a tunnel open cut corresponding to the entrance at the top of the "冂”-shaped frame A: Build a tunnel open cut (7) with an arc-shaped top and a horizontal bottom and internally connected and joined to the inside of the tunnel entrance (2) at the top of multiple "冂”-shaped frames A (6); Step 4: Build "冂”-shaped frames B staggered between multiple "冂”-shaped frames A: Build multiple "冂”-shaped frames B (8) with the top located above the tunnel open cut (7) staggered between multiple "冂”-shaped frames A (6); Step 5: Build a ladder-shaped support frame on the top of the "冂”-shaped frame B: Along the length direction of the tunnel open cut (7) at the top of the "冂”-shaped frame B (8), build a ladder-shaped support frame (9) fixedly connected to multiple "冂”-shaped frames B (8); Step 6: Fill mixed soil between the ladder-shaped support frame and the base surface: Spread and compact mixed soil (10) between the mountain bottom base surface (3) outside the trapezoidal mixed stones (4) and the height where the top of the ladder-shaped support frame (9) is located; Step 7: Fill cement soil between the ladder-shaped support frame and the height of the mountain top: Spread cement soil (11) between the top of the mixed soil (10) and the mountain top plane (1); Step 8: Lay concrete on the plane formed by the mountain top and the top of the cement soil: Spread concrete (12) on the plane formed by the top of the cement soil (11) and the mountain top plane (1) to form an airport floor (13).

2. The method for constructing a high-altitude airport with a high-speed railway tunnel next to a mountain according to claim 1 is characterized by: In Step 1, the trapezoidal mixed stones (4) are composed of crushed stones and clay, and their ratio is that the crushed stone content accounts for 70%-80% of the total mass and the clay content is 20%-30%.

3. The construction method of a high-altitude mountain-filled airport with a high-speed railway tunnel below according to claim 1 is characterized by: In Step 2, the materials of multiple "冂”-shaped frames A (6) are all reinforced concrete, and the lower ends of the legs of multiple "冂”-shaped frames A (6) all extend into the mountain bottom base surface (3).

4. The construction method of a high-altitude mountain-filled airport with a high-speed railway tunnel below according to claim 1 is characterized by: In Step 3, the material of the tunnel open cut (7) is reinforced concrete.

5. The construction method of a high-altitude mountain-filled airport with a high-speed railway tunnel below according to claim 1 is characterized by: In Step 4, the materials of multiple "冂”-shaped frames B (8) are all reinforced concrete, and the lower ends of the legs of multiple "冂”-shaped frames B (8) all extend into the mountain bottom base surface (3).

6. The construction method of a mountain-side high-fill airport with a high-speed railway tunnel below according to claim 1 is characterized by: In Step 5, the material of the ladder-shaped support frame (9) is reinforced concrete.

7. The construction method of a mountain-side high-fill airport with a high-speed railway tunnel below according to claim 1 is characterized by: In Step 6, the mixed soil (10) is composed of coarse-grained soil with particles having a particle size between 0.075 and 60 mm and a mass greater than or equal to 50% of the total mass.

8. The construction method of a mountain-side high-fill airport with a high-speed railway tunnel below according to claim 1 is characterized by: In Step 7, the ratio of the cement soil (11) is that the cement content accounts for 10%-20% of the total mass and the clay content is 80%-90%.

9. The construction method of a mountain-side high-fill airport with a high-speed railway tunnel below according to claim 1 is characterized by: In Step 8, the material of the concrete (12) is reinforced concrete.

Citation Information

Patent Citations

  • Shallow burial soil area shield driving stratum strengthening system and construction method thereof

    CN104712341A

  • Construction method of foundation pit above tunnel

    CN109610505A

  • Excavation protection structure for unsymmetrical loading tunnel portal and construction method of excavation protection structure

    CN109811773A

  • A non-uniform settlement control structure for an airfield pavement roadbed passed by a high-speed rail tunnel and a construction process

    CN109881547A

  • Thick-layer soil foundation tunnel open cut tunnel high fill structure and constructing method

    CN111218942A