Implementation method for efficient dissolving cavity of gas storage containing interlayer salt cavern
By adopting blasting treatment and bidirectional water injection and halogen drainage technology in the salt hole gas storage, the problems of low salt rock grade and many interlayers are solved, efficient dissolution of salt rock and full utilization of sediment gaps are achieved, and gas storage of salt holes is shortened The construction cycle of the library has improved utilization efficiency.
Patent Information
- Application Number
- CN202411088987.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-12
AI Technical Summary
In the construction of the existing salt cave gas storage in China, there are problems such as low salt rock grade, many interlayers and high insoluble content, which leads to a long cavity formation period of the salt cave and insufficient utilization of sediment space, which affects the utilization efficiency of salt rock.
Blasting treatment is used to form cracks in the salt rock and interlayer of the proposed cavity, enhancing permeability, and accelerating salt karst dissolution and interlayer collapse through the two-way water injection and halogen drainage method of straight and directional wells, shortening the dissolution cavity period.
Through blasting treatment, the dissolution of salt karst is accelerated, the dissolution chamber period is shortened, the utilization efficiency of salt rocks is improved, and the utilization of sediment voids is increased, which solves the problem of collapse of thick interlayers and improves the economic and practicality of the salt cave gas storage.
Smart Images

Figure CN118934040A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of salt cavern gas storage construction in oil and gas storage and transportation, and in particular to a method for implementing a high-efficiency dissolution cavity of a salt cavern gas storage containing an interlayer. Background Art
[0002] As one of the important forms of underground energy storage, salt cavern energy storage can make full use of underground resource space to achieve large-scale and efficient storage of various forms of energy such as natural gas, hydrogen, and oil. It has the advantages of large storage capacity, high storage pressure, clean and environmentally friendly, safe and reliable, and good economy. Salt cavern cavity is an artificial underground cave formed in underground salt layer by water-soluble mining. The size and shape of salt caverns depend on different geological conditions, and their volume can be as high as one million cubic meters.
[0003] To mine salt rock, fresh water is injected into the underground salt rock layer, and the salt is dissolved and saturated brine is extracted to form a cavity. Salt rock has very low permeability and good creep behavior, stable mechanical properties, good airtightness and stability, and can adapt to changes in underground storage pressure and medium. Therefore, the utilization of underground salt rock cavities is increasingly valued by energy companies.
[0004] Compared with foreign countries, my country's salt rock has low grade, many interlayers, and high insoluble content, which leads to the shortcomings of long cavern building cycle and insufficient utilization of sediment space. Some salt rock resources have thick interlayers between salt layers that are difficult to collapse, which restricts the utilization efficiency of salt rock. Summary of the invention
[0005] The invention provides a method for implementing an efficient dissolution cavity of a salt cavern gas storage containing an interlayer, aiming to solve the problems in the prior art.
[0006] The technical solution of the present invention to solve the above technical problems is as follows:
[0007] A method for implementing an efficient dissolution cavity in a salt cavern gas storage reservoir containing an interlayer includes the following specific steps:
[0008] S1: before the cavity is made, the simulated cavity layer section containing interlayers is subjected to blasting treatment, so that an annular crushing zone, a fracture zone and an elastic vibration zone are formed in sequence from the inside to the outside of the destruction area, and cracks are formed in the salt rock and interlayers in the crushing zone and the fracture zone;
[0009] S2: A central pipe and an intermediate pipe with two ends open are lowered into the vertical well above the cavity, and the intermediate pipe is coaxially distributed outside the central pipe. Fresh water is injected into the central pipe, and the fresh water enters the rock formation at the bottom of the vertical well and is then discharged from the intermediate pipe to perform positive circulation water dissolution tank construction;
[0010] S3: Drilling a directional well next to the vertical well, the directional well being connected to the bottom of the cavity formed after the water-soluble trough is built; injecting fresh water into the intermediate pipe, the fresh water enters the cavity to form brine, and the brine is discharged from the central pipe and the directional well until the target cavity shape is formed;
[0011] During this process, the central tube and the intermediate tube are continuously lifted up according to the volume of the formed dissolution cavity until the dissolution cavity is completed.
[0012] The beneficial effects of the present invention are as follows: the present invention forms cracks in the salt rock and interlayer of the simulated dissolution cavity by blasting, thereby enhancing permeability and increasing the contact area between brine and salt rock in the subsequent dissolution process, accelerating the dissolution of salt rock and the collapse of thick interlayers; a two-way brine drainage method of vertical well water injection and directional well brine drainage is established, and the salt rock gravel in the cavity and sediment is dissolved synchronously, further shortening the dissolution cycle; when injecting gas to drain brine, the brine in the sediment can be discharged by directional wells at the same time, thereby improving the utilization of the sediment voids in the cavity.
[0013] Based on the above technical solution, the present invention can also be improved as follows.
[0014] Furthermore, the step S1 includes S0: using modeling software to perform geological modeling on the reservoir construction area, and performing blasting simulation on the cavity-making layer section.
[0015] The beneficial effects of adopting the above further scheme are that the method is simple, the design is reasonable, the blasting of the cavity-forming layer is simulated in advance, the best blasting conditions are found, and the blasting effect is guaranteed.
[0016] Furthermore, the blasting simulation in S0 includes: the influence range of different explosive dosages on the reservoir construction stratum, the depth and number of segmented blasting, the crushing analysis of salt rock and interlayer rock after explosion, and the analysis of crack extension length and width after explosion.
[0017] The beneficial effects of adopting the above further scheme are that the method is simple, the design is reasonable, various parameters of blasting are simulated, the best blasting conditions are found, and the blasting effect is guaranteed.
[0018] Furthermore, before S0, the process also includes: drilling a water-soluble cavity-forming well in the proposed reservoir area, completing the well to the target cavity-forming layer section, lowering casing, and completing the drilling operation.
[0019] The beneficial effects of adopting the above further solution are that the method is simple, the design is reasonable, and the drilling operation is completed to facilitate the completion of the subsequent cavity creation.
[0020] Furthermore, the depth range of the target cavity-forming layer is 800-2500m.
[0021] The beneficial effect of adopting the above further solution is that the depth of the target cavity-making layer section is reasonably designed to ensure subsequent normal operation.
[0022] Furthermore, after the target cavity-forming layer section is determined, the core is taken out, and the types and properties of the interlayers and salt rocks in the cavity layer section and the rock mechanics parameters of the target layer depth are obtained by analyzing the core.
[0023] The beneficial effect of adopting the above further scheme is to extract cores during drilling, and obtain the types of interlayers and salt rocks in the dissolution cavity layer and the rock mechanics parameters of the target layer depth by analyzing the cores, so as to provide basic data for subsequent geological modeling and blasting simulation of the reservoir construction area.
[0024] Furthermore, multiple blastings are carried out in sections from bottom to top in the middle of the proposed cavity, with each blasting controlled at a depth of 5-10m.
[0025] The beneficial effects of adopting the above further scheme are that the method is simple, the design is reasonable, and the best blasting effect is achieved by adopting the method of multiple blasting in stages.
[0026] Furthermore, the influence range of the crushing zone and the fissure zone is controlled to be 0.6-0.8 times of the radius of the planned cavity.
[0027] The beneficial effect of adopting the above further solution is that the design is reasonable and the stability and sealing of the cavity are ensured.
[0028] Furthermore, between S1 and S2, the following is also included:
[0029] After all the planned blasting areas in the cavity-making layer are blasted, the drill bit is lowered to clear the well, and the milling pipe string and milling shoe are lowered to clean the wellbore.
[0030] The beneficial effect of adopting the above further scheme is that the method is simple, the design is reasonable, the debris after blasting in the wellbore is processed, and the subsequent cavity making string operation is facilitated to proceed smoothly.
[0031] Furthermore, after S3, S4 is also included: evaluating the sealing property of the dissolution cavity to complete the cavity creation operation.
[0032] The beneficial effect of adopting the above further scheme is to evaluate the sealing of the cavity through methods such as airtightness detection, complete the cavity making operation, and ensure the airtightness of the cavity. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of the simulated cavity layer section and the blasting area of the stratum section of the present invention;
[0034] Figure 2 It is a top view cross-sectional view of the impact range of explosive blasting in the cavity-making layer section of the present invention;
[0035] Figure 3 This is a schematic diagram of the water injection dissolution cavity of the salt cavern after blasting according to the present invention;
[0036] Figure 4 This is a flow chart for implementing the efficient dissolution cavity of the interlayer salt cavern gas storage reservoir of the present invention.
[0037] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0038] 1. The shape of the simulated cavity; 2. The diameter of the cavity; 3. The blasting range; 4. The position of the segmented filling of explosives; 5. The height of the cone at the top of the salt cavity; 6. The height of the cylinder in the middle of the salt cavity; 7. The height of the cone at the bottom of the salt cavity; 8. The blasting elastic vibration zone; 9. The blasting gap zone; 10. The blasting crushing zone; 11. The inner wall of the simulated cavity; 12. Vertical well; 13. Directional well; 14. Brine in the cavity; 15. The flow direction of brine; 16. Sediment in the cavity; 17. Interlayer. DETAILED DESCRIPTION
[0039] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0040] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0041] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0042] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0043] Example 1
[0044] like Figures 1 to 4As shown, this embodiment provides a method for implementing an efficient dissolution cavity of a salt cavern gas storage containing an interlayer, including the following specific steps:
[0045] S1: blasting the simulated cavity of the salt layer containing the interlayer 17 at a set depth, forming an annular crushing zone, a fracture zone and an elastic vibration zone in the destruction area from the inside to the outside, and forming cracks in the salt rock and the interlayer in the crushing zone and the fracture zone;
[0046] The shape of the cavity after the cavity is generally composed of a bottom cone, a middle cylinder, and an upper cone. In order to ensure the quality of the cavity, the bottom layer of the cavity to be built is not blasted with explosives to prevent the bottom from collapsing too quickly and affecting the quality and stability of the cavity and trench. The cone-shaped top layer of the cavity to be built is not blasted to avoid the influence of irregular collapse of salt rock dissolution on the stability of the cavity during the process of the cavity top closing.
[0047] As a preferred method, the cavity formation layer is blasted from bottom to top to avoid problems such as blockage of the wellbore after the upper blasting, which restricts the implementation of subsequent blasting;
[0048] Preferably, the simulated salt cavern cavity has a cavity height of 100 to 250 m and a diameter of 40 to 100 m; the ratio of the cone height at the upper part of the simulated cavity to the cylindrical height in the middle part of the cavity and the cone height at the bottom of the cavity is about 1:2:1.
[0049] Preferably, the middle part of the proposed cavity is blasted multiple times from bottom to top in sections, with each blasting controlled at a depth of 5 to 10 m.
[0050] Preferably, for interlayers 5 to 10 m thick, multiple blasting at the same depth is used to process the rock, so that the surrounding rock is more crushable and easier to collapse and dissolve.
[0051] Preferably, in order to ensure the sealing and stability of the cavity, the influence range of the blasting and crushing zone and the fissure zone is generally controlled to be 0.6 to 0.8 times the radius of the proposed cavity.
[0052] Preferably, by blasting the cavity-forming layer, multiple cracks are formed in the salt rock for reservoir construction within a certain range, which can not only accelerate the collapse of the salt rock, but also increase the contact area between brine and salt rock, thereby accelerating dissolution.
[0053] S2: A central pipe and an intermediate pipe with two ends open are lowered into the vertical well above the cavity, and the intermediate pipe is coaxially distributed outside the central pipe. Fresh water is injected into the central pipe, and the fresh water enters the rock formation at the bottom of the vertical well and is then discharged from the intermediate pipe to perform positive circulation water dissolution tank construction;
[0054] Preferably, a larger space should be reserved at the bottom of the trench, which should be 1.5 times the volume of the conventional water-soluble cavity-making trench.
[0055] S3: Drilling a directional well next to the vertical well, the directional well being connected to the bottom of the cavity formed after the water-soluble trough is built; injecting fresh water into the intermediate pipe, the fresh water enters the cavity to form brine, and the brine is discharged from the central pipe and the directional well until the target cavity shape is formed;
[0056] During this process, the central tube and the intermediate tube are continuously lifted up according to the shape of the formed cavity until the cavity is dissolved.
[0057] The bottom of the cavity created by the vertical well is used as the target of directional well drilling, and the directional well is connected with the trough area at the bottom of the cavity. After the directional well cementing and other construction operations are completed, the vertical well begins reverse circulation water dissolution cavity creation, and the directional well is used as a brine drainage well for brine drainage. After the brine above the cavity sediment surface is drained, the vertical well is used as a single gas injection well, and the directional well is used as the main brine drainage channel to drain the brine in the sediment.
[0058] As a preference, vertical well water-dissolving cavity construction and directional well drilling can be carried out simultaneously. For directional wells, the risk of brine outflow and blowout after drilling connection must be considered, and wellhead devices such as drilling blowout prevention must be installed.
[0059] Preferably, during the vertical well water dissolution cavity making process, reverse circulation cavity making is adopted, and directional wells are used to assist in brine drainage; the interlayer after blasting is more likely to collapse, the salt rock contact surface is increased, and it is more likely to dissolve, forming a sediment containing salt rock gravel at the bottom of the cavity, which is not fully dissolved. The directional well brine drainage serves as a brine drainage channel for the salt rock dissolution in the bottom sediment, which makes the cavity making quality and efficiency higher.
[0060] As a preferred method, after the cavity making is completed, the cavity making string should be lifted up in time and replaced with a single gas injection string; gas should be injected into the vertical well and brine should be discharged from the directional well to improve the utilization of the pore space of the sediment.
[0061] In this embodiment, cracks are formed in the salt rock and interlayer of the simulated dissolution cavity by blasting, so as to enhance the permeability and increase the contact area between brine and salt rock in the subsequent dissolution process, accelerate the dissolution of salt rock and the collapse of thick interlayers; a two-way brine drainage method of vertical well water injection and directional well brine drainage is established, and the salt rock gravel in the cavity and sediment is dissolved synchronously, further shortening the dissolution cycle; when injecting gas to drain brine, the brine in the sediment can be discharged by directional wells at the same time, thereby improving the utilization of the sediment voids in the cavity.
[0062] Example 2
[0063] On the basis of Example 1, in this example, the step before S1 includes S0: using modeling software to perform geological modeling of the reservoir construction area, and performing blasting simulation on the cavity-making layer section.
[0064] The method is simple and reasonably designed. The blasting of the cavity-forming layer is simulated in advance to find the best blasting conditions and ensure the blasting effect.
[0065] Example 3
[0066] On the basis of Example 2, in this example, the blasting simulation in S0 includes: the impact range of different explosive dosages on the reservoir construction stratum, the depth and number of segmented blasting, the crushing analysis of salt rock and interlayer rock after the explosion, and the analysis of the length and width of crack extension after the explosion.
[0067] The method is simple and reasonably designed. It simulates various parameters of blasting, finds the best blasting conditions and ensures the blasting effect.
[0068] As a preferred method: taking the wellbore as the charging center, simulating the destruction areas of different degrees from near to far after the explosion, including the crushing area, the crack area and the elastic vibration area.
[0069] As a preference, the goal of blasting simulation should be to increase the number and width of cracks in the fissure zone as much as possible and to control the length of the cracks.
[0070] Preferably, the blasting simulation should strictly control the crushing zone and the fissure zone after the explosion to be within the range of the dissolution cavity, and the elastic vibration zone should have no effect on the stability and sealing of the cavity after the dissolution cavity.
[0071] Example 4
[0072] On the basis of any one of Examples 2 to 3, in this embodiment, before S0, the process further includes: drilling a water-soluble cavity-forming well in the proposed reservoir area, completing the well to the target cavity-forming layer section, lowering casing, and completing the drilling operation.
[0073] The method is simple and reasonably designed, and the drilling operation is completed to facilitate the subsequent cavity creation.
[0074] Example 5
[0075] On the basis of Example 4, in this example, the depth range of the target cavity-forming layer is 800-2500m.
[0076] The depth of the target cavity-making layer is designed reasonably to ensure subsequent normal operations.
[0077] Preferably, in this embodiment, the depth of the target cavity-forming layer section is preferably 1500 m.
[0078] Example 6
[0079] On the basis of any one of Examples 4 to 5, in this example, after the target cavity-forming layer segment is formed, the core is taken out, and the type and properties of the interlayer and salt rock in the cavity segment and the rock mechanics parameters of the target layer depth are obtained by analyzing the core.
[0080] Cores are taken out during drilling and analyzed to obtain the types of interlayers and salt rocks in the dissolution cavity section and the rock mechanics parameters of the target layer depth, providing basic data for subsequent geological modeling and blasting simulation of the reservoir construction area.
[0081] Example 7
[0082] On the basis of Example 6, in this example, the middle part of the simulated cavity is subjected to multiple blasting from bottom to top, and the controlled depth of each blasting is 5-10m. The method is simple, reasonably designed, and adopts the method of multiple blasting in sections to achieve the best blasting effect.
[0083] Example 8
[0084] On the basis of Example 7, in this example, the influence range of the crushing zone and the crack zone is controlled to be 0.6-0.8 times of the radius of the proposed cavity. This scheme is reasonably designed and ensures the stability and sealing of the cavity.
[0085] Example 9
[0086] On the basis of the above embodiments, in this embodiment, between S1 and S2, the following is further included:
[0087] After all the blasting in the planned blasting area of the cavity formation section is completed, drill down
[0088] The well is cleared, the casing milling pipe string and casing milling shoes are lowered, and the wellbore is cleaned.
[0089] The method is simple and reasonably designed, and can process the debris after blasting in the wellbore, so as to facilitate the smooth progress of the subsequent cavity making string operation.
[0090] As a preference, the casing milling pipe string and other cleaning equipment should be operated continuously after entering the well. When casing milling operation cannot be performed, the casing milling pipe should be moved to a safe well section.
[0091] As a preference, if the wellbore is heavily clogged, the casing milling cleaning should be carried out in sections and circulated during the cleaning process.
[0092] Example 10
[0093] On the basis of the above embodiments, in this embodiment, after S3, S4 is also included: evaluating the sealing property of the dissolution cavity to complete the cavity creation operation.
[0094] This solution evaluates the airtightness of the cavity through methods such as airtightness testing, completes the cavity creation operation, and ensures the airtightness of the cavity.
[0095] The dissolving cavity implementation method of the present invention:
[0096] The first step is to drill a water-soluble cavity well in the proposed reservoir area, complete the well to the target cavity-forming layer, lower the casing, and complete the drilling operation.
[0097] In the second step, after the target cavity-forming layer section is determined, the core is taken out, and the types and properties of the interlayers and salt rocks in the cavity layer section and the rock mechanics parameters of the target layer depth are obtained by analyzing the core. The main parameters affecting the salt rock dissolution rate are tested to provide basic data for subsequent geological modeling and blasting simulation of the reservoir construction area.
[0098] The third step is to use modeling software to model the geology of the reservoir construction area and conduct blasting simulation for the cavity-forming layer.
[0099] The fourth step is that the shape of the cavity after the cavity is generally composed of a bottom cone, a middle cylinder, and an upper cone. In order to ensure the quality of the cavity, the bottom layer of the cavity to be built is not blasted with explosives to prevent the bottom from collapsing too quickly and affecting the speed of cavity building. The cone-shaped top layer of the cavity to be built is not blasted to avoid the influence of irregular collapse of salt rock on the stability of the cavity during the process of cavity top closing.
[0100] The fifth step is to complete the blasting of all the planned blasting areas in the cavity-making layer, lower the drill bit to clear the well, put in the milling pipe string and milling shoes, and clean the wellbore.
[0101] Step 6: lowering a central pipe and an intermediate pipe with open ends into a vertical well above the cavity, wherein the intermediate pipe is coaxially arranged outside the central pipe, and water is injected into the central pipe. After the water enters the cavity, it is discharged from the intermediate pipe to perform positive circulation water dissolution tank construction;
[0102] The seventh step is to drill a directional well next to the vertical well, the bottom of the directional well is connected to the bottom of the cavity; inject water into the intermediate pipe, the water enters the cavity to form brine, and the brine is discharged from the central pipe and the directional well until a cavity is formed.
[0103] The eighth step is to evaluate the sealing of the cavity through methods such as airtightness testing to complete the cavity creation operation.
[0104] Compared with the prior art, the present invention has the following advantages and effects:
[0105] The present invention establishes a process flow for accelerating the water-soluble cavity formation of salt cavern storage and a method for treating interlayers. Rock cracks are formed in the salt rock and interlayers of the proposed cavity by explosive blasting, thereby enhancing permeability, increasing the contact surface between brine and salt rock, accelerating the dissolution of salt rock, and shortening the cavity dissolution cycle. For target reservoir construction areas containing thick interlayers, blasting treatment can also be used to solve the problem of thick interlayers not being easy to collapse, thereby increasing the utilization space of salt rock in the reservoir construction area.
[0106] In the method of the present invention, the vertical well water dissolution cavity formation can realize the dissolution of the inner wall of the cavity; the vertical well water injection and directional well brine drainage can further form a seepage dissolution channel for the salt rock gravel collapsed to the bottom of the cavity after blasting, further shortening the cavity dissolution cycle. At the same time, the directional well can be used to discharge the brine in the sediment to improve the utilization of the sediment void space. A one-injection and two-row water injection cavity dissolution method of vertical well water injection and brine drainage and directional well brine drainage is established, and the cavity wall and the salt rock gravel in the sediment are dissolved synchronously, further shortening the cavity dissolution cycle.
[0107] This method shortens the water-soluble cavity making cycle, solves the problem that thick interlayers are not easy to collapse, takes into account many advantages such as the utilization of sediment gaps, and has high practicability and significant economic benefits.
[0108] Attached Figure 1 To Attachment Figure 3 The meanings of the various numbers are as follows: shape of the simulated cavity 1, cavity diameter 2, blasting range 3, segmented filling position of explosives 4, upper cone height of the salt cavity 5, middle cylinder height of the salt cavity 6, bottom cone height of the salt cavity 7, blasting elastic vibration zone 8, blasting gap zone 9, blasting crushing zone 10, inner wall of the simulated cavity 11, vertical well 12, directional well 13, brine in the cavity 14, brine flow direction 15 and sediment in the cavity 16.
[0109] Taking a salt cave reservoir area as an example, the effectiveness of the technical method is further illustrated, and the implementation of the present invention is described as follows:
[0110] S100: The buried depth of a salt mine is between 1500 and 2000m. In order to ensure the stability of the salt cavity, ensure that the salt cavity has a certain height and effective volume, can form a certain scale of working gas volume, and ensure a certain operating efficiency. Select areas with good geological data quality as favorable blocks for gas storage construction. The average stratum thickness of the salt group in the main reservoir construction area is 185m, the buried depth of the cavity formation section is 1600-1770m, the salt content is 60%, and there are seven interlayers in the reservoir construction section, including two extremely thick interlayers of 6m and 8.5m, which are located in the middle and upper middle parts of the cavity formation cavity respectively.
[0111] S200: Salt cavity morphology Combined with the cavity morphology of stability evaluation, the salt cavity morphology is designed. The upper part of the salt cavity is conical, the lower part is conical, and the middle part is cylindrical. The upper ellipsoid is 50m high and 70m in diameter; the middle cylinder is 70m in diameter and 80m in height; the lower cone is 40m high and 70m in diameter.
[0112] The design parameters of a salt cavern cavity in the reservoir construction area are as follows:
[0113] Table 1 Salt cavern cavity morphological parameters
[0114]
[0115] The design depth of a salt cavity in the reservoir construction area is as follows:
[0116] Table 2 Salt cavern cavity design depth parameters
[0117]
[0118] S300: Drilling vertical wells and coring in the target reservoir construction area. The drilling depth is 1780m, of which the cementing section depth is 1570m and the coring section depth is 1570-1780m. The casing is lowered to complete the drilling operation.
[0119] S400: Rock mechanics and salt rock dissolution analysis. Obtain the interlayer composition, salt rock components, and mechanical parameters of the dissolution cavity section; test and obtain the main parameters affecting the salt rock dissolution rate. The mineral composition of the salt rock is mainly halite, containing a small amount of anhydrite and mud, with trace iron, organic matter, authigenic quartz, celestite, pyrite and carbonate rock. The NaCl content of the salt layer is 64% to 96%, with an average of 90%, and the crystals are 2 to 10 mm, presenting as automorphic, semi-automorphic, medium-coarse granular aggregates. The interlayer is mainly gypsum mudstone, mudstone, and lime-bearing mudstone, with an average porosity of 4.2%, a permeability of 0.0016-0.011mD, and an average of 0.016mD. The mechanical parameters of the salt layer and interlayer were determined through conventional triaxial compression, shear, and tensile tests. Provide basic data for the next step of geological modeling and blasting simulation.
[0120] S500: Geological modeling of the reservoir construction area and explosive blasting simulation.
[0121] The blasting simulation of the cavity formation layer was carried out using numerical simulation software such as LS-DYNA. The simulation of the different degrees of damage areas in the rock from near to far with the wellbore as the charging center is called the crushing zone, the crack zone and the elastic vibration zone. The rock is subjected to the highest explosive load loading rate in the crushing zone, and the intensity of the stress wave there is much greater than the dynamic compressive strength of the rock, so the rock is crushed. As the explosive stress wave propagates to a distance, when its intensity is less than the dynamic compressive strength of the rock, the crushing zone will no longer be formed in the rock. When the rock is radially compressed, it will be accompanied by annular tensile stress. Since the dynamic tensile strength of the rock is much less than its dynamic compressive strength, the rock will be tensilely damaged under the action of the annular tensile stress and form radial tensile cracks (crack zone). Outside the crack zone, as the stress wave continues to decay, no obvious damage will appear in the rock at this time. It can be considered that the rock in this area only produces elastic vibration, so it is called the elastic vibration zone.
[0122] The blasting simulation mainly includes: the influence range of different explosive dosages on the reservoir construction stratum, the crushing properties of salt rock and interlayer rock; the depth and number of optimal segmented blasting; and the analysis of the crack extension depth after the explosion.
[0123] S600: Blasting is carried out. The cavity after the cavity is made up of a bottom cone, a middle cylinder and an upper cone. In order to ensure the quality of the cavity, the bottom layer of the cavity to be built is not blasted with explosives to prevent the bottom from collapsing and affecting the speed of cavity building and trenching. The conical top layer of the cavity to be built is not blasted to avoid the influence of irregular collapse of salt rock on the stability of the cavity during the process of cavity dissolution and top closing.
[0124] The depth of the proposed blasting layer is 1650-1730m, a total of 80m deep; the cavity-making layer section is blasted from bottom to top to avoid problems such as blocking the wellbore after the upper blasting, which restricts the implementation of subsequent blasting; the middle part of the proposed cavity is blasted from bottom to top in sections, and the blasting depth is controlled to be 5-10m; there are 6 interlayers in the reservoir construction section, including two extremely thick interlayers of 6m and 8.5m, which are located in the middle and upper middle parts of the cavity-making cavity respectively; for the 5-10m thick interlayer, the rock is processed by multiple blastings at the same depth to make the surrounding rock more crushable and easier to dissolve; in order to ensure the sealing and stability of the cavity, the diameter of the proposed cavity is 70m, and the diameter range of the crushing zone and fracture zone generated by the blasting is generally within 56m. From bottom to top, multiple blastings are carried out, and the thick interlayers are blasted multiple times at the same depth to complete the blasting operation of the target cavity-making layer section.
[0125] S700: Wellbore milling operation. After all the blasting in the planned blasting area of the cavity formation section is completed, the drill bit is lowered to clear the well, and the milling string and milling shoe are lowered to clean the wellbore residue after the explosion. The milling string and other cleaning equipment should operate continuously after entering the well; if the wellbore is blocked a lot, the milling cleaning should be carried out in sections and circulated during the cleaning; when cleaning to a certain depth, the drill bit is used to clear the well and ream the hole once.
[0126] S900: Vertical well water injection cavity, directional well drilling brine drainage. The bottom of the cavity of the vertical well is used as the target of directional well drilling, and the directional well is connected with the trough area at the bottom of the cavity. After the directional well cementing and other operations are completed, the vertical well starts reverse circulation water dissolution cavity creation. After the cavity is dissolved, the directional well is used as a brine drainage well to drain the brine. When the brine above the sediment surface in the cavity is drained, the vertical well is used as a single gas injection well, and the directional well is used as the main brine drainage channel to drain the brine in the cavity sediment. In the process of vertical well water dissolution cavity creation, reverse circulation cavity creation is adopted, and the directional well is used to assist brine drainage. Salt rock after blasting is more likely to collapse, and salt-containing rock sediment is easily formed at the bottom of the cavity, and the dissolution is not sufficient. Directional well brine drainage is used as a brine drainage channel for salt rock dissolution in the bottom sediment, which makes the cavity creation quality and efficiency higher. After the cavity creation is completed, the cavity creation string is lifted up in time, and the vertical well is replaced with a single gas injection string. Start gas injection in the vertical well and brine drainage in the directional well to improve the utilization of sediment gaps.
[0127] S1000: Air tightness test, cavity creation is completed. The cavity tightness is evaluated through the existing cavity tightness test method, and the cavity creation operation is completed.
[0128] Taking this implementation as an example, the original conventional cavity making cycle is 36 months. Through blasting treatment before cavity making, the salt rock dissolution surface is increased, and the collapse and dissolution of salt rock are accelerated, it can be shortened to 28 months. The construction cycle is greatly shortened, and the utilization of sediment gaps is considered at the same time, which increases the gas storage capacity of a single cavity by more than 15%. The engineering problem of thick interlayers that cannot collapse is solved, and the utilization space of salt rock is increased. Based on this patented method, the economy of building a warehouse and the problem of thick interlayer collapse are greatly improved, and it has good practicality and application value.
[0129] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0130] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
[0131] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for implementing an efficient dissolution cavity in a salt cavern gas storage reservoir containing an interlayer, characterized in that: The specific steps include: S1: before the cavity is made, the simulated cavity layer section containing interlayers is subjected to blasting treatment, so that an annular crushing zone, a fracture zone and an elastic vibration zone are formed in sequence from the inside to the outside of the destruction area, and cracks are formed in the salt rock and interlayers in the crushing zone and the fracture zone; S2: A central pipe and an intermediate pipe with two ends open are lowered into the vertical well. The intermediate pipe is coaxially distributed outside the central pipe. Fresh water is injected into the central pipe. The fresh water enters the rock formation at the bottom of the vertical well and is then discharged from the intermediate pipe to perform positive circulation water dissolution tank construction; S3: Drilling a directional well next to the vertical well, the directional well being connected to the bottom of the cavity formed after the water-soluble trough is built; injecting fresh water into the intermediate pipe, the fresh water enters the cavity to form brine, and the brine is discharged from the central pipe and the directional well until the target cavity shape is formed; During this process, the central tube and the intermediate tube are continuously lifted up according to the volume of the formed dissolution cavity until the dissolution cavity is completed.
2. The method for implementing the high-efficiency dissolution cavity of the interlayer salt cavern gas storage according to claim 1 is characterized in that: The step S1 includes S0: using modeling software to perform geological modeling of the reservoir construction area, and performing blasting simulation on the cavity-making layer section.
3. The method for implementing the high-efficiency dissolution cavity of the interlayer salt cavern gas storage according to claim 2 is characterized in that: The blasting simulation in S0 includes: the influence range of different explosive dosages on the reservoir construction stratum, the depth and number of segmented blasting, the crushing analysis of salt rock and interlayer rock after explosion, and the analysis of crack extension length and width after explosion.
4. The method for implementing the high-efficiency dissolution cavity of the interlayer salt cavern gas storage according to claim 2 is characterized in that: The process before S0 also includes: drilling a water-soluble cavity-forming well in the proposed reservoir area, completing the well to the target cavity-forming layer section, lowering casing, and completing the drilling operation.
5. The method for implementing the high-efficiency dissolution cavity of the interlayer salt cavern gas storage according to claim 4 is characterized in that: The depth of the target cavity-forming layer ranges from 800 to 2500 m.
6. The method for implementing the high-efficiency dissolution cavity of the interlayer salt cavern gas storage according to claim 4 is characterized in that: After the target cavity-forming layer section is determined, the core is taken out, and the types and properties of the interlayers and salt rocks in the cavity layer section and the rock mechanics parameters of the target layer depth are obtained by analyzing the core.
7. The method for implementing the high-efficiency dissolution cavity of the interlayer salt cavern gas storage according to any one of claims 1 to 6, characterized in that: The middle part of the proposed cavity is blasted in sections from bottom to top, with each blasting controlled at a depth of 5-10m.
8. The method for implementing the high-efficiency dissolution cavity of the interlayer salt cavern gas storage according to any one of claims 1 to 6, characterized in that: The influence range of the crushing zone and the fissure zone is controlled to be 0.6-0.8 times of the radius of the planned cavity.
9. The method for implementing the high-efficiency dissolution cavity of the interlayer salt cavern gas storage according to any one of claims 1 to 6, characterized in that: Also included between the S1 and the S2: After all the planned blasting areas in the cavity-making layer are blasted, the drill bit is lowered to clear the well, and the milling pipe string and milling shoe are lowered to clean the wellbore.
10. The method for implementing the efficient dissolution cavity of the interlayer salt cavern gas storage according to any one of claims 1 to 6, characterized in that: The step S3 also includes S4: evaluating the sealing property of the dissolution cavity to complete the cavity creation operation.