Online monitoring and early warning method for lateral pin jamming fault of low-pressure cylinder of 300MW steam turbine

By analyzing the operating mechanism and fault mechanism of the low-pressure cylinder cross-pin of the turbine, the absolute expansion difference value is used as the status characterization parameter, combined with the DCS system and the LSTM algorithm, the online monitoring and early warning of the cross-pin inter-pin of the 300MW-level turbine low-pressure cylinder cross-pin inter-pin inter-pin, and the solution is Problems that are difficult to monitor in the prior art have improved monitoring accuracy and operation and maintenance efficiency.

CN118934105APending Publication Date: 2024-11-12HARBIN INST OF TECH +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411297229.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

At this stage, the fault of cross-pin pins of low-pressure cylinders of 300MW grade turbines is difficult to monitor and early warning online. Especially due to the structural characteristics and layout method, it is difficult to directly measure the gap between cross-pin pins and keyways of the low-pressure cylinders, and it is impossible to connect to a distributed control system (DCS) for real-time monitoring.

Method used

By analyzing the cross-pin operation mechanism and fault mechanism, the absolute expansion difference value Δα on both sides of the low-pressure cylinder is used as the cross-pin operation status characterization parameters, an absolute expansion displacement sensor is installed to measure the expansion difference, and a judgment standard is set in combination with the operation specifications, and the DCS system is used. It conducts multi-step prediction with the long and short-term memory neural network (LSTM) algorithm to achieve fault warning.

Benefits of technology

It realizes online monitoring and early warning of cross-pin jam failures of low-pressure cylinders of 300MW turbines, improves monitoring accuracy and response speed of operation and maintenance personnel, avoids deterioration of cross-pin operation status, and has great universality and promotional value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118934105A_ABST
    Figure CN118934105A_ABST
Patent Text Reader

Abstract

The invention discloses an online monitoring and early warning method for a lateral pin jamming fault of a low-pressure cylinder of a 300MW-level steam turbine, and the method comprises the following steps: S1, determining an absolute expansion difference value [delta] [alpha] of two sides of the low-pressure cylinder as a characterization parameter of a running state of a lateral pin by analyzing a working mechanism and a fault mechanism; s2, mounting a low-pressure cylinder absolute expansion displacement sensor; s3, calculating delta alpha according to absolute expansion data measured by the displacement sensors on the two sides; s4, formulating a judgment standard of a low-pressure cylinder transverse pin jamming fault based on the state characterization parameters according to an existing operation specification; and S4, the displacement sensors are connected with a DCS system, absolute expansion data measured by the displacement sensors on the two sides of the low-pressure cylinder are uploaded to a far end through the DCS system, multi-step prediction of transverse pin jamming is carried out according to delta alpha, and early warning of an abnormal state is achieved by combining setting of a gap between the transverse pin and a key groove in an operation specification. The method has high universality, is easy to implement in production, and has popularization and application values.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for monitoring the operating status of a steam turbine generator set in a power plant, and in particular to an online monitoring and early warning method for a large number of 300MW steam turbine low-pressure cylinder cross pin jamming faults currently in service. Background Art

[0002] In recent years, a large number of wind and solar energy have been connected to the grid, and their uncertainty has changed the original operation mode of the power system. Thermal power generating units, which still account for a considerable proportion, are facing more complex peak-shaving and frequency-regulating tasks, which has brought more challenges to the safe and reliable operation of the units.

[0003] The turbine pin system is a key device that ensures that the cylinder and other components slide in a directional manner during the thermal expansion process of the unit during startup, avoiding uneven thermal expansion that affects the dynamic and static clearances and causes abnormal vibration of the unit. The failure frequency of this system has become increasingly prominent as the number of unit starts and stops increases, and pin jamming is a common form of failure.

[0004] According to their functions, the types of sliding pins can be divided into transverse pins, longitudinal pins, vertical pins, angle pins, etc. Among them, the transverse pins are used to ensure the correct expansion of the cylinder in the transverse direction and limit the longitudinal movement of the cylinder to determine the axial position of the cylinder. Among the large number of medium and low parameter generators in service at this stage, the 300MW class steam turbine is taken as an example. There are four cat claw transverse pins on both sides of the high and medium pressure outer lower cylinders. Its physical structure allows the displacement sensor to be set up externally to measure the gap between the cat claw and the base in real time. By connecting to the remote distributed control system (DCS), it can meet the real-time monitoring of the working status of the cat claw transverse pin by the operation and maintenance personnel. For the low-pressure cylinder, its longitudinal temperature difference varies greatly, and the thermal stress generated by the temperature difference has a significant impact on the expansion state of the cylinder, which poses a great challenge to the monitoring and early warning of the operation status of its transverse pins. However, due to its structural characteristics and layout, it is difficult to directly measure the gap between the low-pressure cylinder transverse pin and the keyway, and it is impossible to connect the DCS system to monitor its working status in real time. Summary of the invention

[0005] In view of the defects of existing small and medium-sized steam turbines in detecting the operating status of the low-pressure cylinder cross pin, the present invention provides an online monitoring and early warning method for the jamming fault of the low-pressure cylinder cross pin of a 300MW steam turbine. This method converts the sliding pin clearance that is difficult to measure directly into the difference in absolute expansion between the left and right sides of the cylinder to characterize the operating status of the cross pin by analyzing the cross pin operating mechanism and jamming fault mechanism. At the same time, combined with the threshold setting of the clearance between the cross pin and the keyway in the field operation specification, fault early warning can be achieved through multi-step prediction of time series.

[0006] The objective of the present invention is achieved through the following technical solutions:

[0007] An online monitoring and early warning method for a 300MW steam turbine low-pressure cylinder cross pin jamming fault comprises the following steps:

[0008] Step S1, by analyzing the working mechanism and the failure mechanism, determining the absolute expansion difference Δα on both sides of the low-pressure cylinder as a parameter characterizing the operation state of the cross pin;

[0009] Step S2, installing the low-pressure cylinder absolute expansion displacement sensor: on both sides of the low-pressure cylinder, radially install displacement sensors close to the top of the cross pin, respectively, to measure the absolute expansion of the low-pressure cylinder, so that the absolute expansion of the low-pressure cylinder is similar to the displacement of the sliding pin expanding outward, and the displacement sensors on both sides of the low-pressure cylinder meet the following conditions: the left and right probes are symmetrically set up, the probes are close to the top of the cross pin, arranged along the radial direction of the cross pin, and are rigidly connected to the upper part;

[0010] Step S3, calculating the absolute expansion difference Δα on both sides of the low-pressure cylinder according to the absolute expansion data measured by the displacement sensors on both sides;

[0011] Step S4: According to the existing operation specifications and based on the state characterization parameters, a judgment standard applicable to the stuck fault of the cross pin of the low-pressure cylinder of the 300MW steam turbine is formulated:

[0012] (1) The actual operating specifications of the power plant set the threshold value of the key-keyway clearance for a 300MW steam turbine as follows:

[0013]

[0014] Among them, β 1l and β 1r They are the actual clearances between the left and right side cross pins and the side walls of the keyway;

[0015] (2) Combined with the threshold setting for the actual operation of the unit, the rule for determining whether the cross pin is stuck or not based on the absolute expansion difference Δα on both sides of the low-pressure cylinder is as follows:

[0016]

[0017] Step S4, the displacement sensor is connected to the DCS system, and the absolute expansion data measured by the displacement sensors on both sides of the low-pressure cylinder are uploaded to the remote end through the DCS system. A multi-step prediction of cross pin jamming is performed based on the absolute expansion difference Δα on both sides of the low-pressure cylinder, and combined with the setting of the cross pin and keyway clearance in the operating specifications, an early warning of abnormal conditions can be achieved.

[0018] Compared with the prior art, the present invention has the following advantages:

[0019] 1. The present invention converts monitoring parameters that are difficult to collect into state characterization parameters that are easier to obtain by analyzing the operating status of the low-pressure cylinder cross pin of a 300MW steam turbine and mathematically analyzing the fault mechanism.

[0020] 2. During the startup of the steam turbine generator set, the online monitoring and early warning method of the present invention can timely upload the jamming situation of the single-side cross pin through the DCS system and feedback it to the on-site operation and maintenance personnel to avoid further deterioration of the cross pin operation status.

[0021] 3. The present invention reasonably formulates a single-side cross pin jamming fault caused by an abnormal expansion difference between cylinders on both sides while ensuring that relevant operating indicators of the existing power plant remain unchanged.

[0022] 4. The online monitoring and early warning method proposed in the present invention can measure simultaneously on-site and remotely, and is based on a widely used time series multi-step prediction algorithm, which improves the accuracy of monitoring and early warning.

[0023] 5. The method proposed in the present invention has great universality, is easy to implement in production, and has value for promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is the cross-sectional view of the low-pressure cylinder cross pin of a 300MW steam turbine;

[0025] Figure 2 This is a schematic diagram of the installation of a single-side cylinder absolute expansion sensor;

[0026] Figure 3 This is a flow chart of the low-pressure cylinder cross pin jamming fault warning method. DETAILED DESCRIPTION

[0027] The technical solution of the present invention is further described below in conjunction with the accompanying drawings, but is not limited thereto. Any modification or equivalent replacement of the technical solution of the present invention without departing from the spirit and scope of the technical solution of the present invention should be included in the protection scope of the present invention.

[0028] The present invention provides an online monitoring and early warning method for the stuck fault of the cross pin of the low-pressure cylinder of a 300MW-class steam turbine. By analyzing the operation mechanism and fault mechanism of the cross pin, the keyway clearance of the sliding pin that is difficult to directly collect is reasonably converted into the absolute expansion difference on both sides of the low-pressure cylinder that is easier to obtain, which is used to characterize whether the cross pin has a stuck fault; according to the existing operating specifications, based on the state characterization parameters, a judgment standard applicable to the stuck fault of the cross pin of the low-pressure cylinder of a 300MW steam turbine is formulated to provide data reference and decision support for operation and maintenance personnel, thereby realizing online monitoring and fault early warning of the cross pin of the low-pressure cylinder; at the same time, considering the time series characteristics of the characterization parameters, the long short-term memory neural network (LSTM) algorithm with higher computational efficiency is used to perform multi-step prediction of the difference, and combined with the setting of the cross pin and keyway clearance in the operating specifications, the early warning target of over-expansion is achieved. The displacement sensor that measures the absolute expansion of the low-pressure cylinder displays the changes of the characterization parameters in real time at the remote end through the DCS system, which is convenient for the operation and maintenance personnel to receive and process. Figure 3As shown, the specific steps include:

[0029] Step S1, analyzing the actual monitoring difficulties of the low-pressure cylinder cross pin operation status:

[0030] The internal space of the low-pressure cylinder cross pin is small and the external structure is complicated. In the actual operation of the unit, it is difficult to directly monitor the cross pin gap by drilling holes on the pressure block or base and setting up displacement sensors. It is necessary to further convert the difficult-to-collect operating status monitoring parameters into relatively easy-to-collect parameters through theoretical analysis to characterize the actual operating status of the cross pin.

[0031] Step S2, installing the low-pressure cylinder absolute expansion displacement sensor:

[0032] On both sides of the low-pressure cylinder, displacement sensors are installed radially, close to the top of the cross pin, to measure the absolute expansion of the cylinder, so that the absolute expansion of the cylinder is close to the displacement of the sliding pin. The displacement sensors on both sides of the low-pressure cylinder meet the following conditions: the left and right probes are symmetrically installed, the probes are close to the top of the cross pin, arranged along the radial direction of the cross pin, and are rigidly connected to the top. The cross-sectional view of the low-pressure cylinder cross pin of a 300MW steam turbine is shown in the figure, and the installation diagram of the single-side cylinder absolute expansion sensor is shown in the figure. Figure 2 shown.

[0033] Step S3: Calculate the absolute expansion difference Δα on both sides of the low-pressure cylinder based on the absolute expansion data measured by the displacement sensors on both sides:

[0034] In the cold state, the measured value of the cylinder and the probe on both sides is α 0l and α 0r Equal, that is:

[0035] α 0l =α 0r

[0036] Under the starting condition, the measured values ​​of the distance between the probe and the cylinders on both sides are α 1l and α 1r At this time, the absolute expansion volume on both sides of the low-pressure cylinder is α l and α r They are:

[0037] α l =α 0l -α 1l

[0038] α r =α 0r -α 1r

[0039] The absolute expansion difference Δα on both sides of the low-pressure cylinder is:

[0040] Δα=|α l -αr |

[0041] Step S4, determining the characterization parameters of the low-pressure cylinder cross pin operation state:

[0042] There is a certain reserved gap β between the cross pin and the keyway 0l and β 0r Due to the small structure space, it is difficult to directly collect the two by setting up sensors. Under normal conditions, the gaps on both sides are equal, that is:

[0043] β 0l =β 0r

[0044] When the low-pressure cylinder is heated, the cylinder and the cross pin expand evenly to both ends at the same time. The keyway can guide the cylinder to expand in a directional manner. At this time, the side wall of the keyway also expands outward due to the heat. Under ideal conditions, the actual gap between the left and right cross pins and the side wall of the keyway is β 1l and β 1r Equal to or slightly less than the initial value β 0l and β 0r .

[0045] When a jam occurs on one side, the outward expansion of the keyway sidewall is blocked, and the cylinder continues to be heated. At this time, the clearance between the sliding pin and the keyway decreases and approaches the alarm threshold. When Δα exceeds the warning value of the clearance between the sliding pin and the keyway, it means that the clearance of the sliding pin on one side is at least at the alarm threshold. Therefore, the absolute expansion difference Δα on both sides of the low-pressure cylinder can be used as a parameter to measure whether the cross pin has a jam failure.

[0046] Step S5: The threshold value of the key-keyway clearance of a 300MW steam turbine according to the actual operation specification of the power plant is set as follows:

[0047]

[0048] When a jam occurs on one side, the clearance between the sliding pin and the keyway decreases and the expansion difference on both sides of the cylinder increases. Combined with the threshold setting for the actual operation of the unit, the rules for determining whether the cross pin is jammed based on the expansion difference on both sides of the low-pressure cylinder are as follows:

[0049]

[0050] Step S6, upload the absolute expansion data of both sides to the remote end through the DCS system. After the difference between the two, perform multi-step prediction of cross pin jamming through the LSTM algorithm, calculate the model evaluation index, measure the accuracy of the algorithm, and combine it with the setting of the cross pin and keyway clearance in the operating specifications to achieve early warning of abnormal conditions.

Claims

1. A 300MW steam turbine low-pressure cylinder cross pin jamming fault online monitoring and early warning method, characterized in that The method comprises the following steps: Step S1, by analyzing the working mechanism and the failure mechanism, determining the absolute expansion difference Δα on both sides of the low-pressure cylinder as a parameter characterizing the operation state of the cross pin; Step S2, installing the low-pressure cylinder absolute expansion displacement sensor: on both sides of the low-pressure cylinder, radially install displacement sensors close to the top of the cross pin, respectively, to measure the absolute expansion of the low-pressure cylinder, so that the absolute expansion of the low-pressure cylinder is close to the displacement of the sliding pin outward expansion; Step S3, calculating the absolute expansion difference Δα on both sides of the low-pressure cylinder according to the absolute expansion data measured by the displacement sensors on both sides; Step S4: According to the existing operation specifications and based on the state characterization parameters, a judgment standard applicable to the stuck fault of the cross pin of the low-pressure cylinder of the 300MW steam turbine is formulated: (1) The actual operating specifications of the power plant set the threshold value of the key-keyway clearance for a 300MW steam turbine as follows: Among them, β 1l and β 1r They are the actual clearances between the left and right side cross pins and the side walls of the keyway; (2) Combined with the threshold setting for the actual operation of the unit, the rule for determining whether the cross pin is stuck or not based on the absolute expansion difference Δα on both sides of the low-pressure cylinder is as follows: Step S4, the displacement sensor is connected to the DCS system, and the absolute expansion data measured by the displacement sensors on both sides of the low-pressure cylinder are uploaded to the remote end through the DCS system. A multi-step prediction of cross pin jamming is performed based on the absolute expansion difference Δα on both sides of the low-pressure cylinder, and combined with the setting of the cross pin and keyway clearance in the operating specifications, an early warning of abnormal conditions can be achieved.

2. The method for online monitoring and early warning of a 300MW steam turbine low-pressure cylinder cross pin jamming fault according to claim 1 is characterized in that In step S2, the displacement sensors on both sides of the low-pressure cylinder meet the following conditions: the left and right probes are symmetrically mounted, the probes are tightly attached to the upper part of the cross pin, arranged radially along the cross pin, and are rigidly connected to the upper part.

3. The method for online monitoring and early warning of a 300MW steam turbine low-pressure cylinder cross pin jamming fault according to claim 1 is characterized in that In step S3, the absolute expansion difference Δα on both sides of the low-pressure cylinder is calculated as follows: In the cold state, the measured value of the cylinder and the probe on both sides is α 0l and α 0r Equal, that is: α 0l =α 0r Under the starting condition, the measured values ​​of the distance between the probe and the cylinders on both sides are α 1l and α 1r , at this time the absolute expansion volume on both sides of the low pressure cylinder is α l and α r They are: α l =α 0l -α 1l α r =α 0r -α 1r The absolute expansion difference Δα on both sides of the low-pressure cylinder is: Dα=|α l -a r |。

Citation Information

Cited By

  • Capacitive cylinder differential expansion measuring device for steam turbine

    CN120651088A

  • A capacitive cylinder expansion differential measuring device for steam turbines

    CN120651088B