PVC pipe mounting method
Through the inspection and cleaning components of split PVC pipes, the problem of poor installation quality of PVC pipes in the prior art is solved, stable and convenient installation and replacement are achieved, and the protection performance of the wires is improved.
Patent Information
- Application Number
- CN202411139506.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-12
AI Technical Summary
The existing PVC pipeline installation methods lack quality inspection and cleaning processes, resulting in poor installation quality. Moreover, the PVC pipeline is integrated, which is inconvenient for disassembly and assembly and replacement, affecting the protective performance of the conductors.
Split PVC pipes, elbows, through joints and tees are used for inspection and cleaning to ensure the straightness and arc of the pipes, assemble and install on-site, and fix the pipes through support brackets to ensure the stability of the installation.
Through the use of split components, the quality inspection and cleaning of PVC pipes is realized, the connection quality and installation stability are ensured, the disassembly and assembly are facilitated, and the protection performance of the wire is improved.
Smart Images

Figure CN118935089A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of PVC pipe installation, and in particular to a PVC pipe installation method. Background Art
[0002] PVC is the abbreviation of PVC, which is mainly composed of polyvinyl chloride and other ingredients are added to enhance its heat resistance, toughness and ductility. The top layer of this surface film is paint, the main component in the middle is polyvinyl chloride, and the bottom layer is back-coated adhesive. It is a synthetic material that is well-loved, popular and widely used in the world today. Its global usage ranks second among various synthetic materials. PVC pipe (divided into PVC-U pipe, PVC-M pipe and PVC-O pipe) is a rigid polyvinyl chloride pipe. It is made of polyvinyl chloride resin, stabilizer, lubricant, etc. and then extruded by hot pressing. It is the earliest plastic pipe to be developed and applied. It can be used for power supply, linkage, control, communication, public emergency lighting and emergency broadcasting line wiring.
[0003] For example, the Chinese patent with authorization announcement number CN103061515A discloses a method for pre-buried PVC wire conduit installation in a concrete hollow block filling wall. This method utilizes the cavity characteristics of the hollow block and the flexibility of the PVC wire conduit to conceal the PVC wire conduit in the hollow block wall at one time. The distribution box is installed by first reserving a hole in the wall and then installing the box. The junction box is installed by first drilling a hole in the wall and then installing the junction box.
[0004] The above-mentioned PVC wire pipe threading installation method has the advantage of ensuring the integrity of the wall structure during the installation process; however, the above-mentioned PVC wire pipe still has some disadvantages, such as: there is no quality inspection and pipe cleaning of the PVC pipe during installation, which affects the quality of the installation. At the same time, the PVC pipe is one-piece rather than split, which makes it inconvenient to disassemble and replace the PVC pipe when quality problems occur, affecting the protective performance of the wires. Summary of the invention
[0005] In view of the problems mentioned in the background technology, the purpose of the present invention is to provide a PVC pipe installation method to solve the problems mentioned in the background technology.
[0006] The above technical objectives of the present invention are achieved through the following technical solutions:
[0007] A PVC pipe installation method comprises the following steps:
[0008] Step 1: Prepare PVC pipes, confirm the required size of PVC pipes for the installation scenario, and prepare the corresponding number of split PVC straight pipes, split PVC elbows, split PVC straight joints, and split PVC tees;
[0009] Step 2: Check the PVC pipes. Check the straightness of the split PVC straight pipes, split PVC straight joints and split PVC tee joints to ensure the quality of the pipes. Check the curvature of the split PVC elbows to ensure the quality of the pipes.
[0010] Step 3: Clean the PVC pipes. Clean the outer and inner surfaces of the prepared split PVC straight pipes, split PVC elbows, split PVC straight joints, split PVC tee joints, as well as the outer surfaces of the pipe insertion ends and the inner surfaces of the pipe fitting sockets to remove dust and impurities to ensure the quality of the connection.
[0011] Step 4: Assemble the PVC pipes by plugging and assembling the split PVC straight pipes, and fastening and fixing the split PVC elbows, split PVC straight joints, and split PVC tee joints up and down;
[0012] Step 5: On-site installation of PVC pipes: plug in a large number of assembled split PVC straight pipes, split PVC elbows, split PVC straight joints, and split PVC tee joints according to the installation requirements of the installation scene;
[0013] Step 6: Installation inspection: Check the PVC pipes installed at the installation site to ensure that the insertion depth meets the requirements;
[0014] Step 7: Installation of support brackets. After the pipeline is installed, the installed PVC pipeline should be supported and fixed with multiple support brackets according to the on-site installation conditions to prevent the pipeline from being displaced or damaged by external forces.
[0015] Preferably, in the step 2, during the PVC pipe inspection, the straightness of the split PVC straight pipe, the split PVC straight joint and the split PVC three-way joint is measured with a ruler or other straight line tool, and the straightness of the split PVC elbow is measured with a triangle ruler.
[0016] Preferably, in the step 3, cleaning the PVC pipe, the pipe surface is cleaned by using sandpaper or a cleaning agent to remove dirt and an oxide layer.
[0017] Preferably, the step 2, PVC pipe inspection, also includes checking the design documents, delivery documents and the actual PVC pipes used in the construction before use, and replacing them if any damage, deformation, deterioration signs are found or the PVC pipes have been stored for more than a specified period of time.
[0018] Preferably, the split PVC straight pipe includes two semicircular straight pipes, two inserts and two sliding clips, the two inserts and the two sliding clips are respectively arranged on both sides of the two semicircular straight pipes, and the inserts are slidably connected with the sliding clips.
[0019] Preferably, the split PVC elbow includes two arc-shaped bent pipes, four first clamping blocks, four first buckles, two first positioning holes and two first positioning columns, the four first clamping blocks, four first buckles, two first positioning holes and two first positioning columns are respectively arranged on the surfaces of the two arc-shaped bent pipes, the first clamping blocks are connected to the first buckles, and the first positioning columns are inserted into the first positioning holes.
[0020] By adopting the above technical solution, through the two first positioning holes and two first positioning columns set on the two arc-shaped elbows, it is convenient to make the first clamping block and the first buckle accurately engage during the assembly process, so that the two arc-shaped elbows are firmly fixed, which facilitates the convenience of split PVC elbow insertion.
[0021] Preferably, the split PVC straight-through joint includes two semicircular pipe sheets, four second clamping blocks, four second buckles, two second positioning holes and two second positioning columns, the four second clamping blocks, four second buckles, two second positioning holes and two second positioning columns are respectively arranged on the two semicircular pipe sheets, the second clamping blocks and the second buckles are engaged with each other, and the second positioning columns are inserted into the second positioning holes.
[0022] By adopting the above technical solution, when the two second positioning holes and the two second positioning columns set on the two semicircular pipe sheets are inserted into each other, the accuracy of the engagement of the four second clamping blocks and the four second buckles can be improved, thereby greatly improving the firmness of the installation of the split PVC straight-through joint.
[0023] Preferably, the split PVC three-way joint includes two T-shaped semicircular pipe pieces, four third clamping blocks, four third buckles, four third positioning holes and four third positioning columns. The four third clamping blocks, four third buckles, four third positioning holes and four third positioning columns are distributed on the two T-shaped semicircular pipe pieces, the third clamping blocks and the third buckles are engaged with each other, and the third positioning columns are inserted into the third positioning holes.
[0024] By adopting the above technical solution, through the cooperation of the four third positioning holes and the four third positioning columns set on the two T-shaped semicircular pipe segments, the precision of the engagement of the four third clamping blocks with the four third buckles can be improved, thereby greatly improving the convenience of assembling the split PVC three-way joint of the two T-shaped semicircular pipe segments.
[0025] Preferably, drainage holes are provided on the surfaces of the semicircular straight pipe, the arc-shaped curved pipe, the semicircular pipe piece and the T-shaped semicircular pipe piece.
[0026] By adopting the above technical solution, the water inside the pipeline can be discharged in time through the drainage holes provided on the semicircular straight pipe, the arc-shaped curved pipe, the semicircular pipe segment and the T-shaped semicircular pipe segment.
[0027] In summary, the present invention mainly has the following beneficial effects:
[0028] First, in the PVC pipe installation method, the straightness of the split PVC straight pipe, the split PVC straight joint and the split PVC tee joint can be checked through the PVC pipe inspection to ensure the quality of the pipe, and the curvature of the split PVC elbow can be checked to ensure the quality of the pipe. The outer surface, inner surface, outer surface of the pipe insertion end and inner surface of the pipe fitting receiving socket of the prepared split PVC straight pipe, split PVC elbow, split PVC straight joint and split PVC tee joint are cleaned to remove dust and impurities, thereby ensuring the quality of the connection;
[0029] Second, in the PVC pipe installation method, the split PVC straight pipe is plugged in and assembled, and the split PVC elbow, split PVC straight joint, and split PVC tee joint are fixedly connected by upper and lower snap-fitting. A large number of assembled split PVC straight pipes, split PVC elbows, split PVC straight joints, and split PVC tees can be plugged in according to the installation requirements of the installation scene, which is convenient for disassembly and assembly of PVC pipes. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a flowchart of the present invention;
[0031] Figure 2 This is a structural diagram of a split PVC straight pipe of the present invention;
[0032] Figure 3 This is a structural diagram of a split PVC elbow of the present invention;
[0033] Figure 4 It is a structural diagram of a split type PVC straight-through joint of the present invention;
[0034] Figure 5 It is a structural diagram of a split type PVC three-way joint of the present invention.
[0035] Figure numerals: 1. semicircular straight pipe; 2. insert strip; 3. sliding clip strip; 4. arc-shaped bent pipe; 5. first clamp block; 6. first buckle; 7. first positioning hole; 8. first positioning column; 9. semicircular pipe piece; 10. second clamp block; 11. second buckle; 12. second positioning hole; 13. second positioning column; 14. T-shaped semicircular pipe piece; 15. third clamp block; 16. third buckle; 17. third positioning hole; 18. third positioning column; 19. drainage through hole. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] refer to Figure 1-Figure 5 , a PVC pipe installation method, comprising the following steps:
[0038] Step 1: Prepare PVC pipes, confirm the required size of PVC pipes for the installation scenario, and prepare the corresponding number of split PVC straight pipes, split PVC elbows, split PVC straight joints, and split PVC tees;
[0039] Step 2: Check the PVC pipes. Check the straightness of the split PVC straight pipes, split PVC straight joints and split PVC tee joints to ensure the quality of the pipes. Check the curvature of the split PVC elbows to ensure the quality of the pipes.
[0040] Step 3: Clean the PVC pipes. Clean the outer and inner surfaces of the prepared split PVC straight pipes, split PVC elbows, split PVC straight joints, split PVC tee joints, as well as the outer surfaces of the pipe insertion ends and the inner surfaces of the pipe fitting sockets to remove dust and impurities to ensure the quality of the connection.
[0041] Step 4: Assemble the PVC pipes by plugging and assembling the split PVC straight pipes, and fastening and fixing the split PVC elbows, split PVC straight joints, and split PVC tee joints up and down;
[0042] Step 5: On-site installation of PVC pipes: plug in a large number of assembled split PVC straight pipes, split PVC elbows, split PVC straight joints, and split PVC tee joints according to the installation requirements of the installation scene;
[0043] Step 6: Installation inspection: Check the PVC pipes installed at the installation site to ensure that the insertion depth meets the requirements;
[0044] Step 7: Installation of support brackets. After the pipeline is installed, the installed PVC pipeline should be supported and fixed with multiple support brackets according to the on-site installation conditions to prevent the pipeline from being displaced or damaged by external forces.
[0045] refer to Figure 1-Figure 5Step 2: During the PVC pipe inspection, use a ruler or other straight line tool to measure the straightness of the split PVC straight pipe, split PVC straight joint and split PVC tee joint, and use a triangle ruler to measure the straightness of the split PVC elbow.
[0046] refer to Figure 1-Figure 5 , Step 3, in PVC pipe cleaning, clean the pipe surface by using sandpaper or detergent to remove dirt and oxide layer.
[0047] refer to Figure 1-Figure 5 Step 2: PVC pipe inspection, which also includes checking the design documents, delivery documents and actual objects of the PVC pipes used in construction before use. If any damage, deformation, deterioration signs are found or the pipes have been stored for more than the prescribed period, they should be replaced.
[0048] refer to Figure 1-Figure 5 The split PVC straight pipe includes two semicircular straight pipes 1, two inserts 2 and two sliding clips 3. The two inserts 2 and the two sliding clips 3 are respectively arranged on both sides of the two semicircular straight pipes 1, and the inserts 2 are engaged and slidably connected with the sliding clips 3.
[0049] refer to Figure 1-Figure 5 The split PVC elbow comprises two arc-shaped elbows 4, four first clamping blocks 5, four first buckles 6, two first positioning holes 7 and two first positioning columns 8. The four first clamping blocks 5, four first buckles 6, two first positioning holes 7 and two first positioning columns 8 are respectively arranged on the surfaces of the two arc-shaped elbows 4. The first clamping blocks 5 and the first buckles 6 are connected to each other. The first positioning columns 8 are inserted into the first positioning holes 7. The two first positioning holes 7 and the two first positioning columns 8 set on the two arc-shaped elbows 4 facilitate the precise engagement of the first clamping blocks 5 and the first buckles 6 during the assembly process, so that the two arc-shaped elbows 4 are firmly fixed, which facilitates the convenience of insertion of the split PVC elbow.
[0050] refer to Figure 1-Figure 5 The split PVC straight-through joint includes two semicircular pipe sheets 9, four second clamping blocks 10, four second buckles 11, two second positioning holes 12 and two second positioning columns 13. The four second clamping blocks 10, the four second buckles 11, the two second positioning holes 12 and the two second positioning columns 13 are respectively arranged on the two semicircular pipe sheets 9, the second clamping blocks 10 and the second buckles 11 are engaged with each other, and the second positioning columns 13 are inserted into the second positioning holes 12. When the two second positioning holes 12 and the two second positioning columns 13 set on the two semicircular pipe sheets 9 are inserted with each other, the accuracy of the engagement of the four second clamping blocks 10 and the four second buckles 11 can be improved, and the firmness of the installation of the split PVC straight-through joint can be greatly improved.
[0051] refer to Figure 1-Figure 5The split PVC three-way joint comprises two T-shaped semicircular pipe segments 14, four third clamping blocks 15, four third buckles 16, four third positioning holes 17 and four third positioning columns 18. The four third clamping blocks 15, four third buckles 16, four third positioning holes 17 and four third positioning columns 18 are distributed on the two T-shaped semicircular pipe segments 14. The third clamping blocks 15 and the third buckles 16 are engaged with each other, and the third positioning columns 18 are inserted into the third positioning holes 17. Through the cooperation of the four third positioning holes 17 and the four third positioning columns 18 set on the two T-shaped semicircular pipe segments 14, the precision performance of the engagement of the four third clamping blocks 15 and the four third buckles 16 can be improved, and the convenience of assembling the split PVC three-way joint by the two T-shaped semicircular pipe segments 14 is greatly improved.
[0052] refer to Figure 1-Figure 5 Drainage holes 19 are provided on the surfaces of the semicircular straight pipe 1, the arc-shaped curved pipe 4, the semicircular pipe segment 9 and the T-shaped semicircular pipe segment 14. The drainage holes 19 provided on the semicircular straight pipe 1, the arc-shaped curved pipe 4, the semicircular pipe segment 9 and the T-shaped semicircular pipe segment 14 facilitate timely discharge of moisture inside the pipeline.
[0053] Principle and advantages of use:
[0054] Step 1: Prepare PVC pipes, confirm the required size of PVC pipes for the installation scenario, and prepare the corresponding number of split PVC straight pipes, split PVC elbows, split PVC straight joints, and split PVC tees;
[0055] Step 2: Check the PVC pipes. Check the straightness of the split PVC straight pipes, split PVC straight joints and split PVC tee joints to ensure the quality of the pipes. Check the curvature of the split PVC elbows to ensure the quality of the pipes.
[0056] Step 3: Clean the PVC pipes. Clean the outer and inner surfaces of the prepared split PVC straight pipes, split PVC elbows, split PVC straight joints, split PVC tee joints, as well as the outer surfaces of the pipe insertion ends and the inner surfaces of the pipe fitting sockets to remove dust and impurities to ensure the quality of the connection.
[0057] Step 4: Assemble the PVC pipes by plugging and assembling the split PVC straight pipes, and fastening and fixing the split PVC elbows, split PVC straight joints, and split PVC tee joints up and down;
[0058] Step 5: On-site installation of PVC pipes: plug in a large number of assembled split PVC straight pipes, split PVC elbows, split PVC straight joints, and split PVC tee joints according to the installation requirements of the installation scene;
[0059] Step 6: Installation inspection: Check the PVC pipes installed at the installation site to ensure that the insertion depth meets the requirements;
[0060] Step 7: Installation of support brackets. After the pipeline is installed, the installed PVC pipeline should be supported and fixed with multiple support brackets according to the on-site installation conditions to prevent the pipeline from being displaced or damaged by external forces.
[0061] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A PVC pipe installation method, characterized in that: The following steps are involved: Step 1: Prepare PVC pipes, confirm the required size of PVC pipes for the installation scenario, and prepare the corresponding number of split PVC straight pipes, split PVC elbows, split PVC straight joints, and split PVC tees; Step 2: Check the PVC pipes. Check the straightness of the split PVC straight pipes, split PVC straight joints and split PVC tee joints to ensure the quality of the pipes. Check the curvature of the split PVC elbows to ensure the quality of the pipes. Step 3: Clean the PVC pipes. Clean the outer and inner surfaces of the prepared split PVC straight pipes, split PVC elbows, split PVC straight joints, split PVC tee joints, as well as the outer surfaces of the pipe insertion ends and the inner surfaces of the pipe fitting sockets to remove dust and impurities to ensure the quality of the connection. Step 4: Assemble the PVC pipes by plugging and assembling the split PVC straight pipes, and fastening and fixing the split PVC elbows, split PVC straight joints, and split PVC tee joints up and down; Step 5: On-site installation of PVC pipes: plug in a large number of assembled split PVC straight pipes, split PVC elbows, split PVC straight joints, and split PVC tee joints according to the installation requirements of the installation scene; Step 6: Installation inspection: Check the PVC pipes installed at the installation site to ensure that the insertion depth meets the requirements; Step 7: Installation of support brackets. After the pipeline is installed, the installed PVC pipeline should be supported and fixed with multiple support brackets according to the on-site installation conditions to prevent the pipeline from being displaced or damaged by external forces.
2. A PVC pipe installation method according to claim 1, characterized in that: In the step 2, during the PVC pipe inspection, the straightness of the split PVC straight pipe, the split PVC straight joint and the split PVC three-way joint is measured by a ruler or other straight line tool, and the straightness of the split PVC elbow is measured by a triangle ruler.
3. A PVC pipe installation method according to claim 1, characterized in that: In the step 3, in the PVC pipe cleaning, the pipe surface is cleaned by using sandpaper or a cleaning agent to remove dirt and an oxide layer.
4. A PVC pipe installation method according to claim 1, characterized in that: The step 2, PVC pipe inspection, also includes checking the design documents, delivery documents and the actual PVC pipes used in the construction before use, and replacing them if damaged rings, deformation, deterioration signs or storage exceeds the prescribed period are found.
5. A PVC pipe installation method according to claim 1, characterized in that: The split PVC straight pipe comprises two semi-circular straight pipes (1), two inserting strips (2) and two sliding clips (3), wherein the two inserting strips (2) and the two sliding clips (3) are respectively arranged on both sides of the two semi-circular straight pipes (1), and the inserting strips (2) are slidably connected to the sliding clips (3) by snapping.
6. A PVC pipe installation method according to claim 1, characterized in that: The split PVC elbow comprises two arc-shaped curved pipes (4), four first clamping blocks (5), four first buckles (6), two first positioning holes (7) and two first positioning columns (8); the four first clamping blocks (5), the four first buckles (6), the two first positioning holes (7) and the two first positioning columns (8) are respectively arranged on the surfaces of the two arc-shaped curved pipes (4); the first clamping blocks (5) and the first buckles (6) are connected to each other; and the first positioning columns (8) are inserted into the first positioning holes (7).
7. A PVC pipe installation method according to claim 1, characterized in that: The split PVC straight-through joint comprises two semicircular pipe sheets (9), four second clamping blocks (10), four second buckles (11), two second positioning holes (12) and two second positioning columns (13); the four second clamping blocks (10), the four second buckles (11), the two second positioning holes (12) and the two second positioning columns (13) are respectively arranged on the two semicircular pipe sheets (9); the second clamping blocks (10) and the second buckles (11) are mutually engaged; and the second positioning columns (13) are inserted into the second positioning holes (12).
8. A PVC pipe installation method according to claim 1, characterized in that: The split PVC three-way joint comprises two T-shaped semicircular tube pieces (14), four third clamping blocks (15), four third buckles (16), four third positioning holes (17) and four third positioning columns (18); the four third clamping blocks (15), the four third buckles (16), the four third positioning holes (17) and the four third positioning columns (18) are distributed on the two T-shaped semicircular tube pieces (14); the third clamping blocks (15) and the third buckles (16) are engaged with each other; and the third positioning columns (18) are inserted into the third positioning holes (17).
9. A PVC pipe installation method according to claim 1, characterized in that: Drainage holes (19) are provided on the surfaces of the semicircular straight pipe (1), the arc-shaped curved pipe (4), the semicircular pipe piece (9) and the T-shaped semicircular pipe piece (14).