Melting plant and method for operating such melting plant

By adopting a combination of multiple DC arc furnaces and power supply devices in the melting equipment, efficient power supply and rapid exchange of power supply devices for large DC arc furnaces is achieved, and the problems of uneven power distribution and high failure rate in the prior art are solved. , improves the operating efficiency and reliability of the equipment.

CN118936042APending Publication Date: 2024-11-12DAIDO STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410574935.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-05-10
Filing Date
2024-05-10
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing dual-type DC arc furnace melting equipment is difficult to effectively supply power when handling large furnaces, especially when the melting period where high power is required overlaps with the refining period with low power, which makes it difficult to improve the operating rate of the power supply device and the power distribution is not possible. Both are high failure rate problems.

Method used

A melting device consisting of two DC arc furnaces, more than four power supply devices and switching devices is designed, and selective power supply is achieved through the power control unit, allowing each DC arc furnace to supply power with more than 50% of the power supply capacity when required. , and switch the power of the power supply device during non-powered time to ensure efficient power supply and switch back-up power.

Benefits of technology

It realizes effective power supply to large DC arc furnaces, improves the operating rate of the power supply device, reduces the failure rate and equipment cost, and extends the service life, while improving the freedom of equipment layout.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118936042A_ABST
    Figure CN118936042A_ABST
Patent Text Reader

Abstract

The present invention relates to a melting apparatus and a method of operating the same, the melting apparatus comprising: two direct current electric arc furnaces, each of the two direct current electric arc furnaces comprising two or more graphite electrodes; a power supply unit including four or more power supply devices; a connection switching unit configured to selectively connect each of the power supply devices to one of the DC electric arc furnaces; and a power supply control unit configured to control power supply from each of the power supply devices to one of the DC electric arc furnaces, in which power supply to only any one of the two DC electric arc furnaces or power supply to the two DC electric arc furnaces at the same time can be selected, and during the simultaneous power supply, power supply to the DC electric arc furnaces is controlled. Power is supplied to any one of the DC electric arc furnaces by more than 50% of the capacity of all the power supply devices.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a melting device and an operating method of the melting device, and particularly to a melting device for melting steel by using two direct current arc furnaces and an operating method of the melting device. Background Art

[0002] The electric arc furnace generates an electric arc between electrodes and melts a metal material such as scrap metal by heating with the electric arc.

[0003] The basic configuration of a melting device including a DC power supply (used as a power supply for generating an arc) and a DC arc furnace is a combination of a power supply device and a DC arc furnace. However, in the process of molten steel, in addition to the melting period and the refining period in which electric power is used, there are other periods such as the slag removal period, the charging period, the tapping period, etc. in which electric power is not basically used. Therefore, there is a problem that it is difficult to increase the operating rate of the power supply device above a certain level.

[0004] As a melting device including a unit that increases the operating rate of a power supply device, there is known a dual-type DC arc furnace melting device in which two power supply devices, each having a 50% capacity, are configured to be selectively connected to two DC arc furnaces via a switching device (for example, Patent Document 1 described below).

[0005] However, since the melting equipment disclosed in the following Patent Document 1 has a configuration in which each furnace includes one electrode, it is difficult to cope with a large furnace requiring, for example, a melting power of 200 MW or more. In addition, since there are two power supply devices, when power is supplied to two furnaces at the same time, the power that can be supplied to each furnace is limited to a maximum of 50% of the capacity (half of the total capacity value of the power supply device), and it is difficult to distribute the power efficiently.

[0006] Patent Document 1: JP H6-331282A Summary of the invention

[0007] The present invention is made based on the above situation, and an object of the present invention is to provide a melting device that can effectively power two large DC arc furnaces, and an operating method of the melting device.

[0008] The melting device of the first aspect of the present invention is defined as follows. That is, the melting device comprises:

[0009] two DC electric arc furnaces, each of the two DC electric arc furnaces comprising more than two graphite electrodes;

[0010] A power supply unit comprising four or more power supply devices;

[0011] a connection switching unit configured to selectively connect each of the power supply devices to one of the DC arc furnaces; and

[0012] a power supply control unit configured to control the supply of power from each of the power supply devices to one of the DC arc furnaces, wherein

[0013] It is possible to choose to supply power to only any one of the two DC arc furnaces or to supply power to both DC arc furnaces simultaneously, and during the simultaneous power supply, supply power to any one DC arc furnace exceeding 50% of the capacity of all power supply devices (i.e., supply power to one of the two DC arc furnaces exceeding 50% of the capacity of all power supply devices).

[0014] According to the melting apparatus of the first aspect defined as above, each furnace has a configuration including two or more graphite electrodes, and can also cope with a large-capacity furnace (large furnace) requiring high power.

[0015] Furthermore, the two furnaces share four or more power supply devices, and the power of the power supply devices is exchanged when necessary, so that the operation rate of the power supply devices can be increased. In addition, in the melting equipment according to the first aspect, since more than 50% of all the power supply devices can supply power to one furnace during the simultaneous power supply, for example, even when the melting period requiring high power overlaps with the refining period requiring only low power in the two furnaces, appropriate power can be supplied to each furnace according to each furnace period.

[0016] Therefore, according to the melting equipment of the first aspect, power can be efficiently supplied to two large DC arc furnaces.

[0017] Here, the number of power supply devices provided in the power supply unit can be made larger than the total number of graphite electrodes provided in the two DC arc furnaces (second aspect).

[0018] For example, in the case where each of two DC arc furnaces has two graphite electrodes and the power supply unit has six power supply devices, during simultaneous power supply, the power from the power supply devices can be distributed to the corresponding furnaces at a ratio of 67% (the capacity of four power supply devices) and 33% (the capacity of two power supply devices) (third aspect).

[0019] In the melting plant, in addition to the power supply device necessary for supplying the maximum input power to each DC arc furnace, a backup power supply device can be connected to the DC arc furnace in a power-suppliable manner (fourth aspect).

[0020] In this manner, even when any power supply device fails, the power supply device for supplying power can be switched from the failed power supply device to the standby power supply device in a short time, thereby restarting the operation.

[0021] When power is supplied to a DC arc furnace from a backup power supply unit in addition to necessary power supply units during power supply, the number of power supply units operating during power supply increases, enabling each power supply unit to operate in a state with margin (a state of reduced output), and enabling the failure rate of the power supply units to be reduced, thereby extending their service life (fifth aspect).

[0022] A plurality of power supply devices may also be installed in two or more machine rooms respectively.

[0023] In this way, each group of multiple power supply devices can be arranged in a different area (machine room), and the degree of freedom of equipment layout can be improved (sixth aspect).

[0024] The method of operation of the melting equipment according to the seventh aspect of the present invention for melting steel in two DC arc furnaces is defined as follows. That is, the method comprises:

[0025] The furnace period of the DC arc furnace is divided into: a melting period including a maximum power period for supplying a maximum input power, a refining period for supplying a power less than the maximum input power, a slag removal period, a tapping period for tapping molten metal, and a charging period for adding metal raw materials;

[0026] When the maximum input power per furnace in the melting period is represented by Sd, and the total capacity value of the power supply device is represented by Seqip, the maximum input power is set to satisfy Seqip≥Sd; and

[0027] Power is supplied to each of the DC arc furnaces so that the maximum power period of one DC arc furnace overlaps with at least one of the slag removal period, steel tapping period and charging period of another DC arc furnace, and so that the period of the melting period of one DC arc furnace excluding the maximum power period and the refining period overlap with the period of the melting period of another DC arc furnace excluding the maximum power period and the refining period.

[0028] According to the operating method of the seventh aspect defined as above, since the maximum power periods in which the maximum input power is supplied in the two DC arc furnaces do not overlap, the equipment cost can be reduced by saving (reducing) the capacity of the power supply device. In addition, when the period other than the maximum power period in the melting period of the DC arc furnace overlaps with the refining period, the operation rate of the power supply device can be increased to perform efficient power supply. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 is a diagram showing a schematic configuration of a melting apparatus according to an embodiment of the present invention.

[0030] Figure 2 It shows that Figure 1Figure 2 shows an example of the conversion of input power during operation of a DC arc furnace.

[0031] Figure 3 is a diagram showing connection destinations of the power supply devices in an operation mode in which melting periods of two furnaces do not overlap with each other.

[0032] Figure 4 It shows that Figure 3 A diagram of the connection state between the DC arc furnace and the power supply device in state A.

[0033] Figure 5 It shows that Figure 3 A diagram of the connection state between the DC arc furnace and the power supply device in state B.

[0034] Figure 6 is a diagram showing connection destinations of power supply devices in an operation mode in which melting periods of two furnaces partially overlap.

[0035] Figure 7 is a diagram showing a main portion of a melting apparatus according to another embodiment of the present invention. DETAILED DESCRIPTION

[0036] Next, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

[0037] Figure 1 1 is a diagram showing a schematic configuration of a melting device according to an embodiment of the present invention. Figure 1 As shown, the melting device 1 according to the present embodiment is a melting device in which two DC arc furnaces 2A and 2B are installed as a group, and the melting device 1 further includes a power supply unit 15 , a connection switching unit 29 , and a power supply control unit 50 .

[0038] The DC electric arc furnaces 2A and 2B each include: a furnace body 3; a furnace cover 4 covering the upper part of the furnace body 3; two graphite electrodes 6 and 7 protruding from the vicinity of the center of the furnace cover 4 so as to be freely raised and lowered; and a furnace bottom electrode 9 provided at the approximate center of the bottom of the furnace body 3. An arc is generated between the metal material (scrap metal such as scrap steel) charged into the furnace body 3 and the tips of the graphite electrodes 6 and 7 to heat and melt the metal material. In the following description, the graphite electrodes of the DC electric arc furnace 2A are denoted as 6A and 7A, the furnace bottom electrode of the DC electric arc furnace 2A is denoted as 9A, the graphite electrodes of the DC electric arc furnace 2B are denoted as 6B and 7B, and the furnace bottom electrode of the DC electric arc furnace 2B is denoted as 9B.

[0039] In the DC arc furnaces 2A and 2B, molten steel (molten metal) in the furnace body 3 is tapped through a melting period, a refining period and a slag discharge period, wherein in the melting period, the metal material loaded into the furnace body 3 is melted to produce molten steel, in the refining period, the produced molten steel is subjected to temperature increase and composition adjustment, and in the slag discharge period, at least a portion of the slag is discharged outside the furnace.

[0040] Figure 2 1 is a diagram showing an example of conversion of input power in an operation sequence from charging metal materials to tapping molten steel in a DC arc furnace.

[0041] according to Figure 2 In the example shown, the period with a large input power is the melting period, and in particular, the latter period of the melting period is the maximum power period supplying the maximum input power Sd (390MW). The input power of the refining period performed after the melting period is less than the input power of the melting period, and in this example, the input power of the refining period is 130MW. The slag removal period, steel tapping period, and charging period performed after the refining period basically do not require power supply to the electrode.

[0042] like Figure 1 As shown, the power supply unit 15 includes: a power receiving transformer 18 connected to a three-phase AC power supply 16 via a main switch 17; and six power supply devices 20 (20-1 to 20-6) connected in parallel on the secondary side of the power receiving transformer 18. The power supply unit 15 supplies DC power to the graphite electrodes 6 and 7 and the furnace bottom electrode 9 of the DC arc furnaces 2A and 2B.

[0043] Each power supply device 20 includes an auxiliary switch 21, a furnace transformer 22 that steps down the AC power to a predetermined voltage, and a thyristor 23 that converts the AC power supplied from the furnace transformer 22 into a DC power. A cathode cable and an anode cable are connected to the thyristor 23. The DC power converted by the thyristor 23 is supplied to the graphite electrodes 6 and 7 of the arc furnace 2A or 2B via the cathode cable, and is supplied to the furnace bottom electrode 9 of the arc furnace 2A or 2B via the anode cable.

[0044] The power supply of the power supply devices 20-1 to 20-6 needs to cover the above-mentioned maximum input power Sd. The total capacity value Seqip of the six power supply devices needs to be equal to or greater than the maximum input power Sd (Seqip ≥ Sd). In this example, when the capacity of each power supply device is 70MW, Seqip is 420MW, which is greater than the above-mentioned maximum input power Sd (390MW).

[0045] The total capacity value Seqip of all power supply devices may be the same as the maximum input power Sd. However, by making Seqip slightly larger than Sd and operating the power supply device 20 with a margin for 100% capacity of the power supply device 20, the failure rate of the power supply device 20 can be reduced. Therefore, Seqip ≥ Sd is preferred, and Seqip> Sd is more preferred.

[0046] On the other hand, too large a Seqip may lead to an increase in equipment cost. From the perspective of saving power capacity, 2×Sd>Seqip is preferred.

[0047] The connection switching unit 29 includes 12 types of switching devices 30 (30-1 to 30-6) and 32 (32-1 to 32-6) arranged between the power supply device 20 and the DC arc furnaces 2A and 2B. Each of the switching devices 30 and 32 includes a common contact (contact) x and two switching contacts (contacts) a and b. The common contact x is connected to the DC output terminal of the thyristor 23 via a cable, the switching contacts a and b of the switching device 30 are connected to the graphite electrode 6 or 7 of the DC arc furnace 2A or 2B via a cable, and the switching contacts a and b of the switching device 32 are connected to the furnace bottom electrode 9 of the DC arc furnace 2A or 2B via a cable.

[0048] That is, each power supply device 20 can be selectively connected to any one of the DC arc furnaces via the switching devices 30 and 32 constituting the connection switching unit 29 .

[0049] The power control unit 50 controls the power supply to the DC arc furnaces 2A and 2B based on a preset power mode. The above-mentioned power supply devices 20-1 to 20-6 and the switching devices 30 (30-1 to 30-6) and 32 (32-1 to 32-6) are connected to the power control unit 50. For the power supply devices 20-1 to 20-6, the power control unit 50 controls the start and stop of power supply, and also controls the output of the power supply device during power supply.

[0050] In addition, for each of the switching devices 30 and 32, the power supply control unit 50 switches and controls the conduction between the internal contacts x, a, and b so that each power supply device 20 is connected to a predetermined arc furnace. At this time, a pair of switching devices connected to the common power supply device 20 (for example, switching devices 30-1 and 32-1 both connected to the power supply device 20-1) are switched and controlled so that the same arc furnace is selected as a connection target.

[0051] Next, the power supply operation during the operation of the melting equipment 1 according to the present embodiment will be described.

[0052] Here, first of all, Figure 3As shown, a case where the respective melting periods of the DC arc furnaces 2A and 2B do not overlap with each other will be described.

[0053] When the scrap metal is charged into the DC arc furnace 2A, Figure 3 In the state A shown, the connection targets of the four power supply devices 20-2, 20-3, 20-5 and 20-6 corresponding to the input power (260MW) at the start of the melting period are switched to the DC arc furnace 2A side by the connection switching unit 29 to form a power supply circuit, and the scrap metal in the furnace is started to be heated by the arcs from the graphite electrodes 6A and 7A of the DC arc furnace 2A.

[0054] On the other hand, the DC arc furnace 2B is in the refining period in the state A, receives power from the remaining two power supply devices 20-1 and 20-4, and heats molten steel at an input power of 130 MW.

[0055] Figure 4 1 is a diagram showing a connection state of the DC arc furnaces 2A, 2B and the power supply devices 20 - 1 to 20 - 6 in state A.

[0056] Later, in Figure 3 In the state B shown, when the DC arc furnace 2A is in the later period of the melting period, the power supply devices 20-1 and 20-4 are further switched to the DC arc furnace 2A side, and the DC arc furnace 2A receives power from all six power supply devices to promote scrap metal melting with the maximum input power Sd (390MW).

[0057] On the other hand, the DC arc furnace 2B is in a non-energized state in a state B, and slag removal, steel tapping, and charging of new scrap metal are performed.

[0058] Figure 5 1 is a diagram showing the connection state of the DC arc furnaces 2A, 2B and the power supply devices 20 - 1 to 20 - 6 in state B.

[0059] Later, in Figure 3 In the illustrated state C, the DC arc furnace 2A that has finished the melting period receives power supply from the power supply devices 20 - 1 and 20 - 4 , and then performs refining.

[0060] On the other hand, the connection destinations of the remaining four power supply devices 20-2, 20-3, 20-5 and 20-6 are switched to the DC arc furnace 2B side to form a power supply circuit, and the scrap metal charged in the furnace starts to be heated by arcs from the graphite electrodes 6B and 7B in the DC arc furnace 2B.

[0061] When the refining period of DC arc furnace 2A is over, Figure 3In the state D, the molten steel is tapped after deslagging in the DC arc furnace 2A. Thereafter, new scrap metal is charged into the furnace.

[0062] On the other hand, the DC arc furnace 2B is in the later period of the melting period, the power supply devices 20-1 and 20-4 are further switched to the DC arc furnace 2B side, and the DC arc furnace 2B receives power from all six power supply devices to promote scrap metal melting with the maximum input power Sd (390MW).

[0063] According to the above Figure 3 In the example of , since the maximum power periods in which the maximum input power Sd is supplied in the two DC arc furnaces do not overlap, the equipment cost can be reduced by saving (reducing) the capacity of the power supply device 20. In addition, when the period other than the maximum power period in the melting period of one DC arc furnace overlaps with the refining period of another DC arc furnace, the operation rate of the power supply device 20 can be increased to perform efficient power supply.

[0064] Next, if Figure 6 As shown, a case where a portion of the melting period of the DC arc furnace 2A and the melting period of the DC arc furnace 2B overlap will be described.

[0065] Figure 6 The state A' and the subsequent state B' shown are Figure 3 State A and state B shown are identical.

[0066] exist Figure 6 In the subsequent state C' shown, while the melting period of the DC arc furnace 2A continues, the melting period in the DC arc furnace 2B also starts, and the melting period of the DC arc furnace 2A and the melting period of the DC arc furnace 2B overlap a part. Therefore, in the state C', the connection destination of the power supply devices 20-2, 20-5, and 20-6 is switched to the DC arc furnace 2B side, the DC arc furnace 2A receives power from the three power supply devices and continues heating in the melting period, and the DC arc furnace 2B receives power from the three power supply devices and starts heating in the melting period.

[0067] When the melting period of the DC arc furnace 2A ends, Figure 6 In the subsequent state D' shown, the DC arc furnace 2A receives power from the power supply devices 20-1 and 20-4 and performs subsequent refining.

[0068] On the other hand, the connection destination of the power supply device 20 - 3 is switched to the DC arc furnace 2B side, and the DC arc furnace 2B receives power supply from a total of four power supply devices 20 , and scrap metal melting is promoted.

[0069] When the refining period of DC arc furnace 2A is over, Figure 6In the subsequent state F' in the DC arc furnace 2A, the molten steel is tapped after deslagging. Thereafter, new scrap metal is charged into the furnace.

[0070] On the other hand, the power supply devices 20-1 and 20-4 are further switched to the DC arc furnace 2B side, and the DC arc furnace 2B receives power from all six power supply devices, further promoting scrap metal melting at the maximum input power Sd (390 MW).

[0071] In addition, Figure 6 In the example of , since the maximum power periods in which the maximum input power Sd is supplied in the two DC arc furnaces do not overlap, the equipment cost can be reduced by saving (reducing) the capacity of the power supply device 20. In addition, between the two DC arc furnaces, in the case where the period other than the maximum power period in the melting period overlaps with the refining period, or in the case where the period other than the maximum power period in the melting period overlaps, the operation rate of the power supply device 20 can be increased to perform efficient power supply.

[0072] As described above, according to the melting apparatus 1 of the present embodiment, each furnace has a configuration including two graphite electrodes 6 and 7, and can also correspond to a large-capacity furnace (large furnace) requiring high power.

[0073] Furthermore, the six power supply devices 20 - 1 to 20 - 6 are shared by the two furnaces 2A and 2B, and the power of the power supply devices is exchanged when necessary, so that the non-power-on time can be minimized and the operation rate of the power supply devices can be improved.

[0074] Furthermore, in the melting equipment 1 according to the present embodiment, during the simultaneous power supply period (i.e., during the simultaneous power supply period to two DC arc furnaces), power exceeding 50% of the capacity of all power supply devices is supplied to any one DC arc furnace. For example, when the total capacity value of the six power supply devices is regarded as 100% capacity, during the simultaneous power supply period, the supplied power can be distributed to each furnace at a ratio of 33:67 in addition to being distributed to each furnace at a ratio of 50:50. Therefore, for example, even when a melting period requiring high power overlaps with a refining period requiring only low power in the two furnaces, appropriate power can be supplied to each furnace according to each furnace period.

[0075] Next, Figure 7 1 is a diagram showing a main part of another embodiment according to the present invention. Figure 7 In the figure, the description of the cables connecting the power supply device to the furnace bottom electrode of the electric arc furnace and the switching device 42 is omitted.

[0076] The melting device 1B in this example includes two DC arc furnaces 2A and 2B, a power supply unit 15B, and a connection switching unit 29B, and has the same basic configuration as that of the above-described melting device 1. The same reference numerals are used to denote configurations common to the above-described melting device 1 among components constituting the melting device 1B, and description of the common configurations is omitted.

[0077] The power supply unit 15B in this example includes two backup power supply devices 40 (40-1 and 40-2) in addition to the power supply devices 20-1 to 20-6 necessary for supplying the maximum input power Sd to each DC arc furnace. Here, the backup power supply device 40 is a power supply device that is not used for power input when the furnace period of one or another arc furnace is the maximum power period. The capacity of each power supply device 40 can be, for example, 70MW, which is similar to the capacity of the power supply device 20.

[0078] Between the power supply device 40 (40-1 and 40-2) and the DC arc furnaces 2A and 2B, switching devices 41 (41-1 and 41-2) and 42 (42-1 and 42-2, both not shown) constituting the connection switching unit 29B are arranged. The switching devices 41 and 42 each include a common contact x and two switching contacts a and b. The common contact x is connected to the DC output terminal of the thyristor 23 via a cable, the switching contacts a and b of the switching device 41 are connected to the graphite electrode 6 or 7 of the DC arc furnace 2A or 2B via a cable, and the switching contacts a and b of the switching device 42 are connected to the furnace bottom electrode 9 of the DC arc furnace 2A or 2B via a cable.

[0079] That is, each power supply device 40 can be selectively connected to any one of the DC arc furnaces via the switching devices 41 and 42 constituting the connection switching unit 29B.

[0080] In the melting equipment 1B configured as described above, during operation (when the furnace period of at least one or the other arc furnace is the maximum power period), the backup power supply device 40 (40-1 and 40-2) is not used, and it is possible to perform predetermined power supply to the DC arc furnace using only the power supply devices 20-1 to 20-6, similarly to the case of the melting equipment 1. On the other hand, when any one of the power supply devices 20-1 to 20-6 fails, the power supply device for power supply can be switched from the failed power supply device to the backup power supply device 40 (40-1 and 40-2) in a short time to restart the operation.

[0081] In the melting equipment 1B, only when the furnace period of one or the other arc furnace is not in the maximum power period, it is also possible to perform power supply to the DC arc furnace from the backup power supply devices 40-1 and 40-2 other than the power supply devices 20-1 to 20-6. For example, when one DC arc furnace is in a period other than the maximum power period in the melting period and the other DC arc furnace is in the refining period, 270 MW of power can be supplied to the one DC arc furnace by using six power supply devices, and 130 MW of power can be supplied to the other DC arc furnace by using two power supply devices.

[0082] In this way, the number of power supply devices operated during power supply increases from six to eight, and each power supply device can be operated with a margin (in a state where the output of each power supply device is reduced), and the service life of the power supply device can be extended.

[0083] The embodiments of the present invention have been described in detail above, but these embodiments are merely examples, and the present invention can be configured to undergo various changes without departing from the gist of the present invention.

[0084] (1) For example, the number of graphite electrodes and power supply devices constituting the melting device of the present invention is not limited to the above-described embodiment and can be appropriately changed. The above-described embodiment is an example of supplying power to two DC arc furnaces by using six power supply devices, but the number of power supply devices supplied in the above-described embodiment can also be changed to five or seven or more. When the number of power supply devices increases, the power supplied to the furnace can be distributed in a finer ratio during simultaneous power supply.

[0085] (2) There is no particular restriction on the structure of the furnace bottom electrode of a DC arc furnace, and the following structures may be appropriately adopted: a type using a large number of steel bars (contact pins) having a relatively small diameter (multi-pin method), a type using one to three steel bars (billets) having a relatively large diameter (billet method), a type using the conductivity of the brick itself instead of steel bars (contact body type), etc.

[0086] (3) provided in the melting device according to the above-mentioned embodiment and Figure 1 The multiple (six) power supply devices shown in FIG. 1 can be divided into two groups and installed in separate machine rooms. When each group of multiple power supply devices is arranged in a different area (machine room), the degree of freedom of equipment layout can be improved.

[0087] (4) In the present invention, since the total capacity value Seqip of the power supply device can be equal to or greater than the maximum input power Sd, the entire capacity of the power supply device can be used. Figure 3In the example of the operating mode shown, the input power of the DC arc furnace 2A in state A can be changed to 280MW, the input power of the DC arc furnace 2A in state B can be changed to 420MW, and the input power of the DC arc furnace 2A in state C can be changed to 140MW.

[0088] This application is based on Japanese patent application No. 2023-078187 filed on May 10, 2023, the entire contents of which are incorporated herein by reference.

[0089] Reference numerals list

[0090] 1. 1B melting equipment

[0091] 2A, 2B DC electric arc furnace

[0092] 6, 6A, 6B, 7, 7A, 7B graphite electrodes

[0093] 15.15B Power supply unit

[0094] 20, 20-1, 20-2, 20-3, 20-4, 20-5, 20-6 power supply

[0095] 29, 29B connection switching unit

[0096] 30, 30-1, 30-2, 30-3, 30-4, 30-5, 30-6 switching device

[0097] 32, 32-1, 32-2, 32-3, 32-4, 32-5, 32-6 switching device

[0098] 40, 40-1, 40-2 backup power supply device

[0099] 41, 41-1, 41-2 switching device

[0100] 42, 42-1, 42-2 switching device

[0101] 50 Power Control Unit

Claims

1. A melting device, include: Two DC electric arc furnaces, each of the two DC electric arc furnaces comprising more than two graphite electrodes; A power supply unit comprising four or more power supply devices; a connection switching unit configured to selectively connect each of the power supply devices to one of the DC arc furnaces; as well as a power supply control unit configured to control the supply of power from each of the power supply devices to one of the DC arc furnaces, It is possible to choose to supply power to only any one of the two DC arc furnaces or to supply power to both DC arc furnaces simultaneously, and during the simultaneous power supply, the power supplied to any one DC arc furnace exceeds 50% of the capacity of all the power supply devices.

2. The melting device according to claim 1, in, The number of the power supply devices provided in the power supply unit is greater than the total number of the graphite electrodes provided in the two DC arc furnaces.

3. The melting device according to claim 2, in, Each of the two DC arc furnaces includes two graphite electrodes, and the power supply unit includes six or more power supply devices.

4. The melting equipment according to any one of claims 1 to 3, further comprising a backup power supply device in addition to the power supply device necessary to supply the maximum input power to each DC arc furnace, in, The backup power supply device is connected to the DC arc furnace in a power supply manner.

5. The melting device according to claim 4, in, During power supply, in addition to the necessary power supply device, power is also supplied to the DC arc furnace from the backup power supply device.

6. The melting device according to any one of claims 1 to 3, in, The plurality of power supply devices are respectively installed in more than two machine cavities.

7. A method for operating a melting plant according to any one of claims 1 to 6, the method being used for melting steel in the two DC arc furnaces, the method include: The furnace period of the DC arc furnace is divided into: a melting period including a maximum power period for supplying a maximum input power, a refining period for supplying a power less than the maximum input power, a slag removal period, a steel tapping period for tapping molten metal, and a charging period for adding metal raw materials; When the maximum input power of each furnace in the melting period is represented by Sd, and the total capacity value of the power supply device is represented by Seqip, the maximum input power is set to satisfy Seqip≥Sd; as well as Power is supplied to each of the DC arc furnaces so that the maximum power period of one DC arc furnace overlaps with at least one of the slag removal period, the steel tapping period and the charging period of another DC arc furnace, and so that the period of the melting period of the one DC arc furnace excluding the maximum power period and the refining period overlap with the period of the melting period of the other DC arc furnace excluding the maximum power period and the refining period.