Pipeline leakage testing device and testing method for airborne refrigeration component
By designing a pipeline leakage testing device that is suitable for multiple on-board refrigeration components, using vacuum pressure method and helium leak detector, the problem that existing equipment cannot meet multiple testing needs at the same time is solved, achieving efficient and accurate Leakage testing reduces R&D investment and land occupation, and ensures the safety of the aircraft.
Patent Information
- Application Number
- CN202410981708.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-22
AI Technical Summary
The existing pipeline leakage testing equipment cannot meet the needs of multiple on-board refrigeration components at the same time, resulting in the need to design test devices separately for different refrigeration components, increasing development investment and footprint.
A pipeline leakage testing device including helium leak detector, vacuum chamber, gas circuit module and control cabinet was designed. Large leakage test and helium leakage test were carried out through the vacuum pressure method, and it was suitable for a variety of aircraft onboards. Refrigeration components, and equipped with a reservoir and assembly vehicle for easy testing and transportation.
Achieve the pipeline leakage testing requirements of a variety of airborne refrigeration components, improve the testing accuracy, save R&D investment and land occupation, ensure the safety of the aircraft and the stability of the system, and recover the refrigerant through the reservoir, protecting the vacuum pump , simplifies the testing process.
Smart Images

Figure CN118936788A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a pipeline leakage testing device and a testing method for an onboard refrigeration component. Background Art
[0002] Civil aviation technology tends to be integrated and automated. The components assembled on aircraft are generally more integrated and the R&D technology is more closed. In the process of maintenance and development of airborne refrigeration system components, the pipeline leakage test of different refrigeration components has different requirements for the test equipment, such as the large leakage test of PECS / ICS of Boeing aircraft, helium leakage test, SCU heat exchanger loop leakage test, and leakage test of air coolers and refrigerators on aircraft. Among them, PECS refers to the electronic power cooling system, ICS refers to the integrated cooling system, and SCU refers to the supplementary cooling component system. The existing pipeline leakage test equipment cannot meet the needs of pipeline leakage testing of multiple refrigeration components at the same time. There is an urgent need for a pipeline leakage test device that is compatible with the needs of different airborne refrigeration components. Summary of the invention
[0003] One of the purposes of the present invention is to provide a pipeline leakage testing device for an airborne refrigeration component, which can meet the needs of pipeline leakage testing of various airborne refrigeration components. There is no need to design corresponding testing devices separately for different airborne refrigeration components, which can reduce development investment.
[0004] The purpose of the present invention can be achieved through the following technical solutions.
[0005] A pipeline leakage test device for an onboard refrigeration component, comprising a helium leak detector and a workbench for placing the helium leak detector, and further comprising:
[0006] An openable and closable vacuum chamber for placing the onboard refrigeration component to be tested, the vacuum chamber being connected to the helium leak detector via a pipeline with a valve;
[0007] The gas circuit module comprises a first vacuum pump, a second vacuum pump, a liquid reservoir, and a pipeline system having a pressure gauge, a pressure regulator, an adjustable pressure relief valve, and a valve for connecting to the vacuum cavity and the onboard refrigeration component, wherein the first vacuum pump is connected to the vacuum cavity through a pipeline with a valve for evacuating the vacuum cavity, the pipeline inlet or pipeline outlet of the onboard refrigeration component is connected to the liquid reservoir through a pipeline with a first pressure gauge, a first valve, and a three-way valve, the liquid reservoir is connected to the second vacuum pump through a pipeline, the air and residual refrigerant in the onboard refrigeration component are extracted by the second vacuum pump, and the extracted residual refrigerant is stored in the liquid reservoir, and the first pressure gauge is used to detect the onboard refrigeration component The pressure inside the pipeline, the other valve port of the three-way valve is connected with an air source branch, a helium source branch and an onboard refrigeration component exhaust branch in parallel, the vacuum chamber is connected to the first exhaust port through a pipeline with a first adjustable pressure relief valve and a valve, the air source branch is connected to the onboard refrigeration component through a pipeline connected to the air source and having a first pressure regulator and a first air filter, and a pipeline between the three-way valve and the onboard refrigeration component to fill air into the onboard refrigeration component, the helium source branch is connected to the helium source and having a second pressure regulator, a second adjustable pressure relief valve and a second air filter, and a pipeline between the three-way valve and the onboard refrigeration component to fill helium into the onboard refrigeration component, and a second exhaust port is arranged on the exhaust branch of the onboard refrigeration component;
[0008] The control cabinet includes an industrial computer, a data acquisition module, an adjustable DC power supply and a monitor. The data acquisition module collects data of the pressure regulator, the adjustable pressure relief valve and the valve status, collects pressure information of the pressure gauge, collects leakage data detected by the helium leak detector and feeds it back to the industrial computer. The industrial computer is connected to the adjustable DC power supply, the first vacuum pump, the second vacuum pump, each valve and the monitor, and is used to monitor, control and display the test process.
[0009] The present invention uses a vacuum pressure method to perform a large leak test and a helium leak test on an onboard refrigeration component, thereby improving the test accuracy of pipeline leakage, ensuring the pipeline integrity of the onboard refrigeration component, and providing a strong guarantee for the flight safety and stable operation of the system of civil aircraft. Through the vacuum cavity and a variety of pipeline connection methods, a pipeline leakage test device for an onboard refrigeration component of the present invention can be adapted to different onboard refrigeration components, avoiding the R&D investment of multiple sets of test devices, occupying a small area, saving costs, and using a test device to simultaneously meet the relevant test requirements of different onboard refrigeration components.
[0010] The present invention also includes an assembly vehicle for transporting airborne refrigeration components, the assembly vehicle includes a movable lifting platform, support columns are erected on both sides of the lifting platform, an assembly frame is installed between the support columns on both sides, both ends of the assembly frame are rotatably connected to the support columns through connecting rods and rotating rods, the assembly frame and the airborne refrigeration components are fixedly connected through a connecting assembly, the rotating rod is connected to a driving component for driving the airborne refrigeration component to rotate with the rotating rod, and the rotating rod is provided with a locking pin for locking the rotation position.
[0011] The lifting platform of the present invention is connected to the supporting frame of the assembly vehicle through the first bracket group and the second bracket group. The middle rotation connection of the first bracket group and the second bracket group is constructed as a scissors strut that is driven by an actuator to change the opening angle. The lower end of the first bracket group is movably connected to the long slide rail on the supporting frame, the upper end of the first bracket group is rotationally connected to the lifting platform, the lower end of the second bracket group is rotationally connected to the supporting frame, and the upper end of the second bracket group is movably connected to the long slide rail of the lifting platform.
[0012] The second object of the present invention is to provide a pipeline leakage test method for an onboard refrigeration component, using the above-mentioned pipeline leakage test device, comprising the steps of:
[0013] Before the test, all valves on the pipeline of the test device are closed, and the large leakage test of the airborne refrigeration component is started. The pipeline from the air source to the airborne refrigeration component is connected, so that the air can enter the airborne refrigeration component placed in the vacuum chamber through the first pressure regulator, the first air filter, the three-way valve, the first valve and the first pressure gauge. The air source is turned on, and the first pressure regulator and the three-way valve are adjusted to charge the airborne refrigeration component with compressed air. The pressure value displayed on the first pressure gauge is observed. When the displayed pressure value reaches the target test value and is maintained for 1 minute, the air source and the first valve are closed to stop charging compressed air, and then the judgment is made in the following manner:
[0014] If the first pressure gauge displays a value of P1 A < target test value, there is leakage in the pipeline of the onboard refrigeration component under test;
[0015] If the first pressure gauge displays a value of P1 A The target test value is set. Open the first vacuum pump and the valve of the pipeline between the first vacuum pump and the vacuum chamber to extract the air in the vacuum chamber. Keep this state for 5 minutes until the pressure in the vacuum chamber is less than 1psia. Record the value P1 displayed on the first pressure gauge at this time. B , according to P1 A -P1 B The obtained difference is used to determine whether the tested airborne component has leakage.
[0016] The large leak test is a rough leak inspection of onboard refrigeration components and is used to detect leaks in the pipelines of various refrigeration components on aircraft.
[0017] In some embodiments, when 25 psia ≥ target test value ≥ 20 psia, if P1A - P1B < 2 psia, there is no leakage in the pipeline of the tested onboard refrigeration component.
[0018] As a feasible implementation manner, when the vacuum chamber is evacuated, the first adjustable pressure relief valve is adjusted to control the degree of vacuuming so that the pressure display value of the first adjustable pressure relief valve is less than 1 psia.
[0019] A third object of the present invention is to provide a method for testing the pipeline leakage of an onboard refrigeration component, using the above-mentioned pipeline leakage testing device, comprising the steps of:
[0020] Before the test, all valves on the pipeline of the test device are closed, and the helium leakage test of the onboard refrigeration component is started. The second vacuum pump is turned on, and the air and residual refrigerant inside the onboard refrigeration component placed in the vacuum chamber are extracted by adjusting the three-way valve and the first valve. The residual refrigerant flows into the liquid storage tank, and the second vacuum pump is stopped. The first vacuum pump and the valve of the pipeline between the first vacuum pump and the vacuum chamber are opened to extract the air in the vacuum chamber. The first vacuum pump is stopped after the pressure in the vacuum chamber is less than 1psia, and the helium source is turned on. The second pressure regulator and the three-way valve are adjusted to fill the onboard refrigeration component with helium, and the first pressure gauge is observed. When the value displayed on the first pressure gauge reaches the target test value, the helium source and the first valve are closed, and the helium leak detector is turned on. The leakage rate required by the test item is set, and this state is maintained. It is observed whether the helium leak detector alarms within the required test time. If the helium leak detector alarms, there is leakage in the pipeline of the onboard refrigeration component under test.
[0021] Similarly, during the helium leakage test, when the vacuum chamber is evacuated, the first adjustable pressure relief valve is adjusted to control the degree of vacuuming, so that the pressure display value of the first adjustable pressure relief valve is less than 1 psia.
[0022] The present invention has the following beneficial effects:
[0023] 1. Through the vacuum cavity and a variety of pipeline connection methods, a pipeline leakage test device for an airborne refrigeration component of the present invention can be adapted to different airborne refrigeration components, avoiding the R&D investment of multiple sets of test devices, occupying a small area, saving costs, and using one test device to simultaneously meet the relevant test requirements of different airborne refrigeration components.
[0024] 2. The present invention is provided with a vacuum chamber, and adopts a vacuum pressure method to perform a large leak test and a helium leak test on the onboard refrigeration components, which can improve the test accuracy of pipeline leakage, ensure the pipeline integrity of the onboard refrigeration components, and provide a strong guarantee for the flight safety of civil aircraft and the stable operation of the system.
[0025] 3. The present invention is provided with a liquid storage device and a second vacuum pump, which can recover the residual refrigerant inside the onboard refrigeration component and protect the inside of the second vacuum pump from being contaminated by the residual refrigerant. The present invention can conveniently and quickly extract the residual refrigerant and internal gas of the onboard refrigeration component to improve the accuracy of the helium leak test.
[0026] 4. The design of the assembly vehicle of the present invention allows the lifting platform to be lowered to a low position during transportation to lower the center of gravity and ensure the stability of the assembly vehicle. A matching assembly frame is designed according to the weight and center of gravity of the onboard refrigeration components to fix the onboard refrigeration components and ensure that the assembly vehicle is stable and does not shake after the refrigeration components are loaded. The lifting platform can be adjusted to different heights to facilitate the inspection, disassembly and assembly of the refrigeration components. The locking pin plays a role in fixing and locking the position of the assembly frame to prevent the shaking of the refrigeration components caused by the movement of the assembly vehicle. The rotating rod and its driving component can operate the assembly frame to rotate and then drive the onboard refrigeration components to rotate, showing different angles for disassembly and assembly work.
[0027] 5. The control cabinet provided in the present invention realizes data collection and processing, monitors the test process and data in real time, provides data support to technical personnel in a timely manner, and improves the convenience of testing. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments with reference to the following drawings.
[0029] Figure 1 A schematic structural diagram of a pipeline leakage testing device for an onboard refrigeration device according to an embodiment of the present invention is shown;
[0030] Figure 2 A schematic diagram showing the principle of a pipeline leakage testing device for an onboard refrigeration device according to an embodiment of the present invention;
[0031] Figure 3 A schematic structural diagram of a vehicle for assembling a pipeline leakage test device for an onboard refrigeration device according to an embodiment of the present invention is shown;
[0032] Figure 4 A schematic diagram of a PECS / ICS large leakage test process of a pipeline leakage test method for an onboard refrigeration device according to an embodiment of the present invention is shown;
[0033] Figure 5 A schematic diagram of a PECS / ICS helium leakage test process of a pipeline leakage test method for an onboard refrigeration device according to an embodiment of the present invention is shown;
[0034] Figure 6A schematic diagram of an SCU heat exchanger loop leakage test process of a pipeline leakage test method for an onboard refrigeration device according to an embodiment of the present invention is shown.
[0035] in, Figures 1 to 6 The corresponding relationship between the reference numerals and the components is as follows:
[0036] 10-control cabinet, 20-gas circuit module, 30-helium leak detector, 40-vacuum chamber, 50-tooling table, 60-assembly vehicle, 101-data acquisition module, 202-first vacuum pump, 204-second vacuum pump, 206-liquid reservoir, 208-first pressure gauge, 210-first pressure regulator, 212-second pressure regulator, 214-first adjustable pressure relief valve, 216-second adjustable pressure relief valve, 218-second ball valve, 220-fourth ball valve, 222-sixth ball valve, 224-first exhaust port, 226-three-way valve, 228-second air filter, 230-helium source, 232 -first valve, 234-fifth ball valve, 236-second exhaust port, 238-air source, 240-first air filter, 602-support frame, 604-first bracket group, 606-second bracket group, 608-universal roller, 610-fixed roller, 612-foot brake block, 614-hand grip, 616-slide rail, 618-lifting platform, 620-support column, 622-assembly frame, 624-connecting rod, 626-rotating rod, 628-locking block, 630-locking bolt, 632-locking pin, 634-damping crank, 636-pedal rod, 638-hydraulic pump, 640-actuator. DETAILED DESCRIPTION
[0037] The technical solution of the present invention is described in detail below in conjunction with the accompanying drawings and embodiments so that those skilled in the art can better understand and implement the technical solution of the present invention.
[0038] Embodiment 1:
[0039] like Figures 1 to 3 As shown, a pipeline leakage test device for an onboard refrigeration component includes a helium leak detector 30 and a workbench 50 for placing the helium leak detector 30, and further includes:
[0040] The vacuum chamber 40 can be opened and closed, and is used to place the onboard refrigeration component to be tested. The vacuum chamber 40 is connected to the helium leak detector 30 through a pipeline with a valve, see Figure 2 , a second ball valve 218 is provided on the pipeline between the vacuum chamber 40 and the helium leak detector 30;
[0041] The gas circuit module 20 can be stored on the workbench 50, and includes a first vacuum pump 202, a second vacuum pump 204, a liquid reservoir 206, and a pipeline system having a pressure gauge, a pressure regulator, an adjustable pressure relief valve, and a valve for connecting with the vacuum chamber 40 and the onboard refrigeration component, wherein the first vacuum pump 202 is connected to the vacuum chamber 40 through a pipeline with a fourth ball valve 220 for evacuating the vacuum chamber 40, and the pipeline inlet or pipeline outlet of the onboard refrigeration component is connected to the liquid reservoir 206 through a pipeline with a first pressure gauge 208, a first valve 232, and a three-way valve 226, and the liquid reservoir 206 is connected to the second vacuum pump 204 through a pipeline, and the air and residual refrigerant in the onboard refrigeration component are extracted by the second vacuum pump 204, and the extracted residual refrigerant is stored in the liquid reservoir 206 for recovery, and the first pressure gauge 208 is used to detect the internal pressure of the pipeline of the onboard refrigeration component, and the three-way valve 226 has three adjustable The valve ports that can be switched on and completely shut off have two valve ports connected to the pipelines of the liquid storage tank 206 and the onboard refrigeration component respectively, and the other valve port is connected to the air source branch, the helium source branch and the onboard refrigeration component exhaust branch in parallel. The vacuum chamber 40 is connected to the first exhaust port 224 through a pipeline with a first adjustable pressure relief valve 214 and a sixth ball valve 222. The air source branch is connected to the air source 238 and has a first pressure regulator 210 and a first air filter 240. The onboard refrigeration component is filled with air through the pipeline between the three-way valve 226 and the onboard refrigeration component. The helium source branch is connected to the helium source 230 and has a second pressure regulator 212, a second adjustable pressure relief valve 216 and a second air filter 228. The pipeline between the three-way valve 226 and the onboard refrigeration component is filled with helium. The onboard refrigeration component exhaust branch is provided with a second exhaust port 236 and a fifth ball valve 234;
[0042] The control cabinet 10 includes an industrial computer, a data acquisition module 101, an adjustable DC power supply and a monitor. The data acquisition module 101 collects data of the pressure regulator, the adjustable pressure relief valve and the valve status, collects pressure information of the pressure gauge, collects leakage data detected by the helium leak detector 30 and feeds it back to the industrial computer. The industrial computer is connected to the adjustable DC power supply, the first vacuum pump 202, the second vacuum pump 204, each valve and the monitor, and is used to monitor, control and display the test process.
[0043] In one embodiment, the data acquisition module 101 is used to collect pressure information of sensors, valves and vacuum pumps, and leakage information of helium leak detectors. The collected pressure information and leakage information are transmitted to an industrial computer for processing, and the processed data is displayed on a monitor through a virtual instrument system of a control cabinet. Data collection and processing are achieved through sensors, virtual instruments and field bus technology, and highly integrated discrete manual valves and measuring instruments. Technicians can intuitively observe the pressure status of each node and the leakage of refrigeration components, and adjust or terminate the test parameters in a timely manner.
[0044] The air source 238 provides compressed air, and the first pressure regulator 210 adjusts the air pressure value to be output, which can protect the components in the pipeline and the onboard refrigeration components from being subjected to excessive pressure. The air filtered by the first air filter 240 is filled into the onboard refrigeration components located inside the vacuum chamber 40. During the rough leakage inspection, the first pressure gauge 208 can be used to observe whether there is leakage in the pipeline of the onboard refrigeration components. In order to improve the detection accuracy, the vacuum chamber 40 is evacuated, and the pressure difference change in the pipeline of the onboard refrigeration components before and after the first pressure gauge 208 is evacuated is observed, and the leakage of the onboard refrigeration components is detected by the vacuum pressure method.
[0045] The helium source 230 provides high-purity helium. The second pressure regulator 212 can adjust the helium pressure value to be output. The second adjustable pressure relief valve 216 is used to limit the output pressure, thereby protecting the components and refrigeration parts in the pipeline from being subjected to excessive pressure. The high-purity helium filtered by the second air filter 228 is filled into the onboard refrigeration part located inside the vacuum chamber 40. If there is a leak in the pipeline of the onboard refrigeration part, the helium will enter the vacuum chamber 40 in a vacuum state through the leak point, so that the helium leakage rate can be detected by the helium leak detector 30, and the slight leakage of the pipeline of the onboard refrigeration part can be detected, thereby achieving high-precision leakage detection to avoid the situation where slight leakage is not detected, thereby ensuring the normal operation of the onboard refrigeration part and its system.
[0046] In one embodiment: Figure 3As shown, an assembly vehicle 60 for transporting airborne refrigeration components is provided, and the assembly vehicle 60 includes a movable lifting platform 618, and support columns 620 are erected on both sides of the lifting platform 618. An assembly frame 622 is installed between the support columns 620 on both sides. The two ends of the assembly frame 622 are rotatably connected to the support columns 620 through connecting rods 624 and rotating rods 626. The assembly frame 622 is fixedly connected to the airborne refrigeration component through a connecting assembly. The rotating rod 626 is connected to a driving component for driving the airborne refrigeration component to rotate with the rotating rod 626. The rotating rod 626 is provided with a locking pin 632 for locking the rotation position. In this embodiment, the connecting assembly is composed of a locking block 628 and a locking bolt 630, which can firmly connect the airborne refrigeration component to the assembly frame 622. The driving component can use a worm reducer, and its damping crank 634 is operated to control the rotation of the rotating rod 626.
[0047] As a feasible embodiment, the lifting platform 618 is connected to the support frame 602 of the assembly vehicle 60 through the first bracket group 604 and the second bracket group 606. The middle rotation connection between the first bracket group 604 and the second bracket group 606 is constructed as a scissors strut that changes the opening angle by being driven by an actuator 640. The lower end of the first bracket group 604 is movably connected to the long slide rail 616 on the support frame 602, the upper end of the first bracket group 604 is rotationally connected to the lifting platform 618, the lower end of the second bracket group 606 is rotationally connected to the support frame 602, and the upper end of the second bracket group 606 is movably connected to the long slide rail of the lifting platform 618. The actuator 640 is driven by the hydraulic pump 638 to drive the rod of the actuator 640 to extend and retract to control the lifting and lowering of the lifting platform 618. It should be noted that the onboard refrigeration components weigh hundreds of pounds and are of great value, and the positions of the assembly frame 622 and the support column 620 relative to the lifting platform 618 are set according to the center of gravity of the onboard refrigeration components to ensure smooth transportation of the onboard refrigeration components. In this embodiment, the support frame 602 is equipped with universal rollers 608, fixed rollers 610, foot brake blocks 612 and hand grips 614 to facilitate the movement and control of the assembly vehicle.
[0048] The design of the assembly vehicle 60 allows the lifting platform to be lowered to a low position during transportation to lower the center of gravity and ensure the stability of the assembly vehicle 60. A matching assembly frame 622 is designed according to the weight and center of gravity of the onboard refrigeration components to fix the onboard refrigeration components and ensure that the assembly vehicle 60 is stable and does not shake after the refrigeration components are loaded. The lifting platform 618 can be adjusted to different heights to facilitate the inspection, disassembly and assembly of the onboard refrigeration components. The locking pin 632 plays a role in fixing and locking the position of the assembly frame 622 to prevent the shaking of the refrigeration components caused by the movement of the assembly vehicle 60. The rotating rod 626 and its driving component can operate the assembly frame 622 to rotate and then drive the onboard refrigeration components to rotate, showing different angles for disassembly and assembly work.
[0049] Embodiment 2:
[0050] This embodiment provides a pipeline leakage test method for an airborne refrigeration component. The pipeline leakage test device of Embodiment 1 is used to perform a large leakage test of the airborne refrigeration component PECS / ICS. This embodiment takes the Boeing 787 aircraft as an example. PECS refers to the electronic power cooling system, and ICS refers to the integrated cooling system.
[0051] Test process such as Figure 4 As shown, before the test, all valves on the pipeline of the test device are closed, and the large leakage test of the onboard refrigeration component is started. The pipeline from the air source 238 to the onboard refrigeration component is connected, so that air can enter the onboard refrigeration component placed in the vacuum chamber 40 through the first pressure regulator 210, the first air filter 240, the three-way valve 226, the first valve 232 and the first pressure gauge 208. The air source 238 is opened, and the first pressure regulator 210 and the three-way valve 226 are adjusted to charge the onboard refrigeration component with compressed air. The pressure value displayed on the first pressure gauge 208 is observed. When the displayed pressure value is the target test value of 20-25psia and is maintained for 1 minute, the air source 238 and the first valve 232 are closed to stop charging compressed air, and then the judgment is made in the following manner:
[0052] If the first pressure gauge displays a value of P1 A < target test value, there is leakage in the pipeline of the onboard refrigeration component under test;
[0053] If the first pressure gauge displays a value of P1 A The first vacuum pump 202 and the fourth ball valve 220 of the pipeline between the first vacuum pump 202 and the vacuum chamber 40 are opened to pump out the air in the vacuum chamber 40 until the pressure in the vacuum chamber 40 is less than 1 psia. This state is maintained for 5 minutes, and the value P1 displayed on the first pressure gauge is recorded at this time. B , according to P1 A -P1 B The difference is used to determine whether the tested onboard component has leakage. If P1A-P1B<2psia, there is no leakage in the pipeline of the tested onboard refrigeration component. When the vacuum chamber 40 is evacuated, the first adjustable pressure relief valve 214 is adjusted to control the degree of vacuuming, so that the pressure display value of the first adjustable pressure relief valve 214 is less than 1psia.
[0054] After the test is completed, the vacuum chamber is vented through the first exhaust port 224, and the onboard refrigeration component is vented through the second exhaust port 236, so that they return to a natural state.
[0055] Embodiment 3:
[0056] This embodiment provides a pipeline leakage test method for an airborne refrigeration component. The pipeline leakage test device of Embodiment 1 is used to perform a helium leakage test on an airborne refrigeration component PECS / ICS. This embodiment takes the Boeing 787 aircraft as an example. PECS refers to the electronic power cooling system, and ICS refers to the integrated cooling system.
[0057] Test process such as Figure 5 As shown, before the test, all valves on the pipeline of the test device are closed, and the helium leakage test of the onboard refrigeration component is started. The second vacuum pump 204 is turned on, and the air and residual refrigerant inside the onboard refrigeration component placed in the vacuum chamber 40 are pumped out by adjusting the three-way valve 226 and the first valve 232. The residual refrigerant flows into the liquid storage tank 206, and the second vacuum pump 204 is stopped. The first vacuum pump 202 and the fourth ball valve 220 of the pipeline between the first vacuum pump 202 and the vacuum chamber 40 are opened to pump out the air in the vacuum chamber 40. When the pressure in the vacuum chamber 40 is less than 1 psia, the first vacuum pump 202 is stopped, the helium source 230 is turned on, and the second pressure regulator 212 and the three-way valve 226 are adjusted to fill the onboard refrigeration component with helium. The first pressure gauge 208 is observed, and the helium source and the first valve 232 are closed when the first pressure gauge 208 displays the target test value of 76±1 psia. At this time, the value P10 displayed by the first pressure gauge 208 is 76±1 psia. Turn on the helium leak detector 30, set the leakage rate required by the test item, maintain this state, and observe whether the helium leak detector alarms within the required test time. If the helium leak detector 30 alarms, the pipeline of the onboard refrigeration component under test leaks. In this embodiment, the leakage rate is set to be no greater than 3.23×10 -4 atm-cc / sec, maintain this state, and observe the leakage test data within 5 minutes, 10 minutes and 15 minutes from the beginning of the test. The leakage rate of the test is greater than 3.23×10 -4 atm-cc / sec, the helium leak detector 30 alarms, indicating that there is leakage in the onboard refrigeration component being tested. If there is no alarm, there is no leakage.
[0058] During the leakage test, when the vacuum chamber is evacuated, the first adjustable pressure relief valve 214 is adjusted to control the degree of vacuuming, so that the pressure display value PV0 of the first adjustable pressure relief valve 214 is less than 1 psia.
[0059] After the test is completed, the vacuum chamber is vented through the first exhaust port 224, and the onboard refrigeration component is vented through the second exhaust port 236, so that they return to a natural state.
[0060] Embodiment 4:
[0061] The present embodiment provides a pipeline leakage test method for an onboard refrigeration component. The pipeline leakage test device of Embodiment 1 is used to perform a helium leakage test on a heat exchanger circuit of an onboard refrigeration component SCU. The present embodiment takes a Boeing 787 aircraft as an example, and the SCU is its supplementary component cooling system.
[0062] Test process such as Figure 6 As shown, before the test, all valves on the pipeline of the test device are closed, and the helium leakage test of the onboard refrigeration component is started. The second vacuum pump 204 is turned on, and the air and residual refrigerant inside the onboard refrigeration component placed in the vacuum chamber 40 are pumped out by adjusting the three-way valve 226 and the first valve 232. The residual refrigerant flows into the liquid storage tank 206, and the second vacuum pump 204 is stopped. The first vacuum pump 202 and the fourth ball valve 220 of the pipeline between the first vacuum pump 202 and the vacuum chamber 40 are opened to pump out the air in the vacuum chamber 40. When the pressure in the vacuum chamber 40 is less than 1psia, the first vacuum pump 202 is stopped, the helium source 230 is turned on, and the second pressure regulator 212 and the three-way valve 226 are adjusted to fill the onboard refrigeration component with helium. The first pressure gauge 208 is observed. When the value displayed on the first pressure gauge 208 is the target test value of 200±10psig, the helium source and the first valve 232 are closed. At this time, the first pressure gauge 208 displays a value P1 HX The helium leak detector 30 is turned on, and the leakage rate required by the test item is set. This state is maintained to observe whether the helium leak detector alarms within the required test time. If the helium leak detector 30 alarms, the pipeline of the onboard refrigeration component under test is leaking. In this embodiment, the leakage rate is set to be no greater than 2.4×10 -4 atm-cc / sec, the test time required to maintain this state, if the leakage rate tested is greater than 2.4×10 -4 atm-cc / sec, the helium leak detector 30 alarms, indicating that there is leakage in the onboard refrigeration component being tested. If there is no alarm, there is no leakage.
[0063] During the leakage test, when the vacuum chamber is evacuated, the first adjustable pressure relief valve 214 is adjusted to control the degree of evacuation, so that the pressure display value PV of the first adjustable pressure relief valve 214 is HX <1psia.
[0064] After the test is completed, the vacuum chamber is vented through the first exhaust port 224, and the onboard refrigeration component is vented through the second exhaust port 236, so that they return to a natural state.
[0065] According to an embodiment of the present invention, it also includes:
[0066] Obtain pipeline monitoring parameter information, extract pressure mutation data, pipeline overtemperature data and vacuum abnormality data;
[0067] The pressure mutation data, pipeline overtemperature data and vacuum abnormality data are processed by a preset pipeline evaluation model to obtain a structural vulnerability index;
[0068] The average structural vulnerability index of the same type of pipelines in history is obtained through a preset pipeline monitoring database, and then the structural vulnerability index is corrected through a preset vulnerability correction model to obtain a structural vulnerability correction index;
[0069] Comparing the structural vulnerability correction index with a preset correction index threshold to obtain a correction index deviation rate;
[0070] Determining whether the correction index deviation rate is greater than a preset correction index deviation rate threshold;
[0071] If the correction index deviation rate is greater than or equal to the correction index deviation rate threshold, the structural vulnerability correction index does not meet the requirements;
[0072] If the correction index deviation rate is less than the correction index deviation rate threshold, the structural vulnerability correction index meets the requirements;
[0073] The calculation formula of the pipeline evaluation model is:
[0074]
[0075] Among them, G ψ is the structural vulnerability index, p b 、w s 、z y They are pressure mutation data, pipeline overtemperature data and vacuum abnormality data, respectively. ln is the natural logarithm. α, β, γ and δ are preset characteristic coefficients (the characteristic coefficients are obtained by querying the preset pipeline monitoring database).
[0076] The calculation formula of the vulnerability correction model is:
[0077]
[0078] Among them, C φ is the structural vulnerability correction index, G ψ is the structural vulnerability index, G a is the average structural vulnerability index, ln is the natural logarithm, σ, ρ, π are the preset characteristic coefficients (the characteristic coefficients are obtained by querying the preset pipeline monitoring database).
[0079] It should be noted that in order to improve the reliability of the pipeline structure and reduce the existence of hidden faults, the pipeline monitoring parameter information is first obtained, and the pressure mutation data, pipeline overtemperature data and vacuum abnormality data are extracted. The data is processed through the preset pipeline evaluation model to obtain the structural vulnerability index. The pressure mutation data refers to the sudden change of the pressure data in the pipeline, which exceeds the normal or expected pressure fluctuation range in a very short time. It is necessary to further check whether it is a signal problem or a pipeline structure problem. The pipeline overtemperature data refers to the pipeline temperature exceeding the pipeline temperature range during normal testing. There may be many reasons for the overtemperature. Excessive power consumption of the equipment and blockage of the pipeline system will cause excessive temperature. Monitoring the pipeline temperature can avoid damage to the equipment and personal safety hazards. The vacuum abnormality data refers to the gas rarefaction in the pipeline deviating from the normal or expected range. This may be caused by poor system sealing, reduced performance of the vacuum pump, and leakage of the vacuum pipeline. Further investigation is required. The pressure mutation data, pipeline overtemperature data and vacuum abnormality data can be obtained through the corresponding data collector integrated with sensors. The average structural fragility index of historical pipelines of the same type is obtained through a preset pipeline monitoring database, and then the structural fragility index is corrected through a preset fragility correction model to obtain a structural fragility correction index. The structural fragility correction index reflects whether the overall structure of the pipeline and each accessory are normal and reliable. The structural fragility correction index is compared with a preset correction index threshold to obtain a correction index deviation rate, and it is determined whether the correction index deviation rate is greater than a preset correction index deviation rate threshold. If the correction index deviation rate is greater than or equal to the correction index deviation rate threshold, the structural fragility correction index does not meet the requirements. For example, the correction index deviation rate is 2%, and the correction index deviation rate threshold is 2%. If the correction index deviation rate is less than the correction index deviation rate threshold, the structural fragility correction index meets the requirements. For example, the correction index deviation rate is 1%, and the correction index deviation rate threshold is 2%.
[0080] The present invention can also be used for testing similar onboard refrigeration components of other aircraft and for testing onboard refrigeration components such as air coolers and refrigerators. The corresponding pipeline interface accessories and test parameters can be adjusted according to test requirements.
[0081] The above embodiments are only preferred embodiments of the present invention, but cannot be used as limitations of the invention. Any modifications and improvements based on the concept of the present invention should fall within the protection scope of the present invention. The specific protection scope shall be subject to the claims.
Claims
1. A pipeline leakage test device for an onboard refrigeration component, comprising a helium leak detector and a workbench for placing the helium leak detector, characterized in that: Also includes: An openable and closable vacuum chamber for placing the onboard refrigeration component to be tested, the vacuum chamber being connected to the helium leak detector via a pipeline with a valve; The gas circuit module comprises a first vacuum pump, a second vacuum pump, a liquid reservoir, and a pipeline system having a pressure gauge, a pressure regulator, an adjustable pressure relief valve, and a valve for connecting to the vacuum cavity and the onboard refrigeration component, wherein the first vacuum pump is connected to the vacuum cavity through a pipeline with a valve for evacuating the vacuum cavity, the pipeline inlet or pipeline outlet of the onboard refrigeration component is connected to the liquid reservoir through a pipeline with a first pressure gauge, a first valve, and a three-way valve, the liquid reservoir is connected to the second vacuum pump through a pipeline, the air and residual refrigerant in the onboard refrigeration component are extracted by the second vacuum pump, and the extracted residual refrigerant is stored in the liquid reservoir, and the first pressure gauge is used to detect the onboard refrigeration component The pressure inside the pipeline, the other valve port of the three-way valve is connected with an air source branch, a helium source branch and an onboard refrigeration component exhaust branch in parallel, the vacuum chamber is connected to the first exhaust port through a pipeline with a first adjustable pressure relief valve and a valve, the air source branch is connected to the onboard refrigeration component through a pipeline connected to the air source and having a first pressure regulator and a first air filter, and a pipeline between the three-way valve and the onboard refrigeration component to fill air into the onboard refrigeration component, the helium source branch is connected to the helium source and having a second pressure regulator, a second adjustable pressure relief valve and a second air filter, and a pipeline between the three-way valve and the onboard refrigeration component to fill helium into the onboard refrigeration component, and a second exhaust port is arranged on the exhaust branch of the onboard refrigeration component; The control cabinet includes an industrial computer, a data acquisition module, an adjustable DC power supply and a monitor. The data acquisition module collects data of the pressure regulator, the adjustable pressure relief valve and the valve status, collects pressure information of the pressure gauge, collects leakage data detected by the helium leak detector and feeds it back to the industrial computer. The industrial computer is connected to the adjustable DC power supply, the first vacuum pump, the second vacuum pump, each valve and the monitor, and is used to monitor, control and display the test process.
2. The pipeline leakage testing device for an onboard refrigeration component according to claim 1, characterized in that: It also includes an assembly vehicle for transporting airborne refrigeration components, the assembly vehicle includes a movable lifting platform, support columns are erected on both sides of the lifting platform, an assembly frame is installed between the support columns on both sides, both ends of the assembly frame are rotatably connected to the support columns through connecting rods and rotating rods, the assembly frame and the airborne refrigeration components are fixedly connected through a connecting assembly, the rotating rod is connected to a driving component for driving the airborne refrigeration component to rotate with the rotating rod, and the rotating rod is provided with a locking pin for locking the rotation position.
3. The pipeline leakage testing device for an onboard refrigeration component according to claim 2, characterized in that: The lifting platform is connected to the support frame of the assembly vehicle through the first bracket group and the second bracket group. The middle rotation connection between the first bracket group and the second bracket group is constructed as a scissors brace that is driven by an actuator to change the opening angle. The lower end of the first bracket group is movably connected to the long slide rail on the support frame, the upper end of the first bracket group is rotationally connected to the lifting platform, the lower end of the second bracket group is rotationally connected to the support frame, and the upper end of the second bracket group is movably connected to the long slide rail of the lifting platform.
4. A method for testing pipeline leakage of an onboard refrigeration component, characterized in that: The pipeline leakage testing device according to any one of claims 1 to 3 comprises the following steps: Before the test, all valves on the pipeline of the test device are closed, and the large leakage test of the airborne refrigeration component is started. The pipeline from the air source to the airborne refrigeration component is connected, so that the air can enter the airborne refrigeration component placed in the vacuum chamber through the first pressure regulator, the first air filter, the three-way valve, the first valve and the first pressure gauge. The air source is turned on, and the first pressure regulator and the three-way valve are adjusted to charge the airborne refrigeration component with compressed air. The pressure value displayed on the first pressure gauge is observed. When the displayed pressure value reaches the target test value and is maintained for 1 minute, the air source and the first valve are closed to stop charging compressed air, and then the judgment is made in the following manner: If the first pressure gauge displays a value of P1 A < target test value, there is leakage in the pipeline of the onboard refrigeration component under test; If the first pressure gauge displays a value of P1 A The target test value is set. Open the first vacuum pump and the valve of the pipeline between the first vacuum pump and the vacuum chamber to extract the air in the vacuum chamber. Keep this state for 5 minutes until the pressure in the vacuum chamber is less than 1psia. Record the value P1 displayed on the first pressure gauge at this time. B , according to P1 A -P1 B The obtained difference is used to determine whether the tested airborne component has leakage.
5. The pipeline leakage testing method of the onboard refrigeration component according to claim 4 is characterized in that: When 25psia≥target test value≥20psia, if P1A-P1B<2psia, there is no leakage in the pipeline of the onboard refrigeration component under test.
6. The pipeline leakage testing method of the onboard refrigeration component according to claim 4 is characterized in that: When the vacuum chamber is evacuated, the first adjustable pressure relief valve is adjusted to control the degree of vacuuming, so that the pressure display value of the first adjustable pressure relief valve is less than 1 psia.
7. A method for testing pipeline leakage of an onboard refrigeration component, characterized in that: The pipeline leakage testing device according to any one of claims 1 to 3 comprises the following steps: Before the test, all valves on the pipeline of the test device are closed, and the helium leakage test of the onboard refrigeration component is started. The second vacuum pump is turned on, and the air and residual refrigerant inside the onboard refrigeration component placed in the vacuum chamber are extracted by adjusting the three-way valve and the first valve. The residual refrigerant flows into the liquid storage tank, and the second vacuum pump is stopped. The first vacuum pump and the valve of the pipeline between the first vacuum pump and the vacuum chamber are opened to extract the air in the vacuum chamber. The first vacuum pump is stopped after the pressure in the vacuum chamber is less than 1psia, and the helium source is turned on. The second pressure regulator and the three-way valve are adjusted to fill the onboard refrigeration component with helium, and the first pressure gauge is observed. When the value displayed on the first pressure gauge reaches the target test value, the helium source and the first valve are closed, and the helium leak detector is turned on. The leakage rate required by the test item is set, and this state is maintained. It is observed whether the helium leak detector alarms within the required test time. If the helium leak detector alarms, there is leakage in the pipeline of the onboard refrigeration component under test.
8. The pipeline leakage testing method of the onboard refrigeration component according to claim 7, characterized in that: When the vacuum chamber is evacuated, the first adjustable pressure relief valve is adjusted to control the degree of vacuuming, so that the pressure display value of the first adjustable pressure relief valve is less than 1 psia.
Citation Information
Patent Citations
Pipeline connecting piece performance testing system
CN107238477A
Apparatus and method for detecting sealing performance of battery system cabinet
CN109357819A
Leakage testing device for spaceflight low-temperature composite material storage box
CN109932141A
Exhaust pipe assembly leak detection method and device
CN112362255A
Refrigeration device sealing performance detection system and method and storage medium
CN114486104A