Method for dynamically adjusting supporting parameters of drilling and blasting method mechanized tunnel surrounding rock excavation
Through intelligent inversion and failure proximity analysis of rock mechanic parameters, dynamic adjustment of tunnel surrounding rock excavation and support parameters is solved, and the shortcomings of surrounding rock damage evaluation and support parameters adjustment in mechanized tunnel construction are achieved, and construction stability and Improved security.
Patent Information
- Application Number
- CN202410999871.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-12
AI Technical Summary
The existing technology fails to effectively evaluate the degree of damage to the surrounding rock of mechanized tunnels and adjust targeted support parameters, resulting in difficult to ensure construction stability and safety.
Through intelligent inversion of rock mechanic parameters, rock shear test and Flac3D simulation, the damage proximity index is used to define the surrounding rock safety zone, disturbance zone, damage zone and damage zone, dynamically adjust the excavation and support parameters, and consider the advance support. effective range of protection.
The stability evaluation of mechanized tunnel construction and targeted reinforcement of potentially dangerous areas have been achieved, ensuring the safety and stability of construction.
Smart Images

Figure CN118940375A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel and underground engineering construction, and in particular to a method for dynamically adjusting supporting parameters of mechanized tunnel surrounding rock excavation using a drilling and blasting method. Background Art
[0002] After tunnel excavation, secondary stress concentration in the surrounding rock causes cracking and volume expansion of some low-strength rock masses, forming surrounding rock disturbance zones, damaged zones and destruction zones. The damage proximity index has been widely used to describe the degree of damage to the surrounding rock. In recent years, large-scale mechanized supporting construction of tunnels has been gradually promoted in the field of railway engineering. The appropriate step size of mechanized supporting operations of tunnels should meet certain requirements to make the connection of construction processes of equipment such as three-arm rock drilling trolleys smoother. In order to meet the requirements of surrounding rock stability under the conditions of long-foot excavation of mechanized tunnels and ensure the safety of mechanized construction of tunnels, it is necessary to verify the control parameters of the surrounding rock excavation method and the support design parameters before construction. However, there is currently no method for evaluating the stability of the surrounding rock according to the degree of damage and making targeted design adjustments to the method and support parameters. In addition, in the process of adjusting the support parameters, the support effect of the advance support has not been effectively evaluated. Therefore, there is an urgent need for a method that can quantitatively evaluate the degree of damage to the surrounding rock of mechanized tunnel construction, consider the effective support range of the advance support, and make targeted dynamic adjustments to the excavation and support parameters. Summary of the invention
[0003] In order to solve the deficiencies of the prior art, the present invention provides a mechanized tunnel surrounding rock stability evaluation and excavation method and support parameter dynamic adjustment method. The present invention determines accurate parameters through intelligent inversion of rock mass mechanical parameters and rock shear test, uses failure proximity to delineate surrounding rock safety zone, disturbance zone, damage zone and destruction zone, and dynamically designs and adjusts excavation control parameters and support design parameters according to the range of damage zone and destruction zone.
[0004] In order to achieve the above technical purpose, the technical solution adopted by the present invention is:
[0005] A method for dynamically adjusting supporting parameters of surrounding rock excavation in a mechanized tunnel using a drilling and blasting method mainly comprises the following steps:
[0006] S1. Statistical information on the physical and mechanical parameters, the magnitude and direction of the ground stress field of the surrounding rock of the tunnel excavation, sensitivity analysis of the rock mass parameters that affect the deformation and failure of the tunnel surrounding rock, obtain the main parameters that are more sensitive to the rock mass quality, and use BP neural network to perform intelligent inversion of the rock mass mechanical parameters;
[0007] S2. Using Flac 3D The initial stress field of the tunnel surrounding rock is calculated and the 3DThe initial stress field is saved and written using the self-written Fish language; the tunnel surrounding rock is simulated by using the step method or full-section method to excavate. 3D The excavation stress field formed after excavation disturbance is calculated and the excavation stress field is obtained by using Flac 3D Self-written Fish language is used to save and write the excavation stress field;
[0008] S3. After field sampling, shear tests are conducted through a rock shear test system. Rock shear tests are conducted under different normal stresses to determine the variation law of the maximum shear strain with the normal stress and obtain the ultimate plastic shear strain of the rock mass under different stress field conditions.
[0009] S4. Use the failure index FD to analyze the damage degree of rock; use the yield proximity index YAI to describe the danger level of the material in the elastic stage; use the failure proximity index FAI to quantitatively analyze the stability of the surrounding rock;
[0010] S5, according to the damage proximity formula, using Flac 3D Write the Fish program to make a FAI cloud map of tunnel damage proximity;
[0011] S6. Delineate the tunnel surrounding rock safety zone, disturbance zone, damage zone and destruction zone based on the FAI cloud map, and formulate corresponding solutions based on the surrounding rock damage degree and the size of the damage zone;
[0012] S7. Implement the solution developed in step S6, recalculate and analyze the surrounding rock stability again until safety requirements are met.
[0013] Furthermore, in step S4, the calculation formula of the damage index FD is:
[0014]
[0015] In the formula, is the plastic shear strain, is the ultimate plastic shear strain.
[0016] Furthermore, in step S4, the calculation formula of the yield proximity YAI is:
[0017]
[0018] Where: are cohesion and internal friction angle respectively; θ σ is the stress Lode angle; σ t is the tensile strength; π , τ π are the normal stress and shear stress components on the π plane respectively; σ Ris the shear conversion stress; σ1 and σ3 are the maximum principal stress and the minimum principal stress, respectively.
[0019] Furthermore, in step S4, the calculation formula of the damage proximity FAI is:
[0020]
[0021] In the formula: ω = 1-YAI, which is the surrounding rock hazard coefficient.
[0022] Furthermore, in step S6, the standards for demarcating the tunnel surrounding rock safety zone, disturbance zone, damage zone and destruction zone are: the area with FAI < 0.8 is the safety zone, the area with 0.8 ≤ FAI < 1.0 is the disturbance zone, the area with 1.0 ≤ FAI < 2.0 is the damage zone, and the area with FAI ≥ 2.0 is the destruction zone.
[0023] Further, in step S6, the solution includes:
[0024] (1) The damage area is small: For step-method tunnels, adjust the excavation control parameters such as excavation advance, step height, etc.; for full-section tunnels, adjust the excavation control parameters such as excavation advance;
[0025] (2) The damage area is medium: strengthen local advance pre-support in the potential danger area;
[0026] (3) The damage area is large: the design parameters of the overall strengthening tunnel arch advance pre-support.
[0027] Further, step S7 includes:
[0028] S71. If method (1) is used, adjust the model excavation parameters, recalculate and analyze the surrounding rock stability again. If the safety requirements are met, stop the calculation. If the safety requirements are still not met after using the size parameters suitable for mechanized large-scale construction, choose to use method (2) or method (3) based on the current size of the damage zone.
[0029] Further, step S7 includes:
[0030] S72. If method (2) is adopted, firstly, the local advanced pre-support parameters are strengthened in the potential danger area, and the excavation stress field is obtained again, and compared with the excavation stress field obtained in step S2. The difference between the two is the support stress field formed by the local enhanced advanced pre-support:
[0031] σ 局部支护 =σ 开挖1 -σ 开挖2 (4)
[0032] Where: 局部支护 is the additional stress field formed by local enhanced advance pre-support, σ开挖1 is the stress field of surrounding rock excavation with local enhanced advance pre-support, σ 开挖2 is the original surrounding rock excavation stress field;
[0033] For the obtained local enhanced advance pre-support stress field, draw the support stress field contour line cloud map, take the 0.1Mpa contour line as the effective support range of the local enhanced advance pre-support, improve the surrounding rock parameters within the effective support range, recalculate and analyze the surrounding rock stability again, if it meets the safety requirements, stop the calculation; if it still does not meet the safety requirements, continue to strengthen the support parameters or use method (3) to adjust the advance pre-support parameters of the entire arch area.
[0034] Further, step S7 includes:
[0035] S73. If method (3) is adopted, firstly, the design parameters of the tunnel arch advance pre-support are strengthened as a whole, and the excavation stress field is obtained again, and compared with the excavation stress field obtained in step 2. The difference between the two is the support stress field formed by the overall strengthening advance pre-support:
[0036] σ 整体支护 =σ 开挖3 -σ 开挖2 (5)
[0037] Where: 整体支护 is the additional stress field formed by the overall enhanced advance pre-support, σ 开挖3 is the stress field of surrounding rock excavation with overall enhanced advance pre-support, σ 开挖2 is the original surrounding rock excavation stress field;
[0038] For the overall enhanced advance pre-support stress field obtained, the surrounding rock parameters within the effective support range are improved, and the surrounding rock stability is analyzed again after recalculation. If the safety requirements are met, the calculation is stopped; if the safety requirements are still not met, the advance pre-support parameters of the entire arch area are continued to be adjusted.
[0039] The beneficial effects of the present invention are:
[0040] The present invention provides a method for evaluating stability according to the degree of surrounding rock damage and making targeted design adjustments to construction methods and support parameters. In addition, in the process of adjusting the support parameters, the effective support range of the advance support is taken into consideration. The method can realize targeted dynamic adjustment of excavation and support parameters, realize stability evaluation of mechanized tunnel construction and targeted reinforcement of potential danger areas, and ensure the stability and safety of mechanized construction tunnels. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0042] Figure 1 It is a schematic diagram of the method flow of the present invention;
[0043] Fig. 2 (a) Initial stress field of surrounding rock;
[0044] Fig. 2(b) Stress field of surrounding rock excavation;
[0045] Figure 3(a) is the FAI cloud map of tunnel damage proximity;
[0046] Figure 3(b) is a diagram showing the division of tunnel damage areas;
[0047] Figure 4 Schematic diagram for adjusting tunnel excavation advance parameters;
[0048] Figure 5 The additional stress field formed for overall strengthening of advanced pre-support;
[0049] Figure 6 Schematic diagram of surrounding rock failure proximity zoning after recalculation. DETAILED DESCRIPTION
[0050] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians of the art without making creative work are within the scope of protection of the present application.
[0051] A method for dynamically adjusting the surrounding rock excavation support parameters of a mechanized tunnel using a drilling and blasting method, specifically comprising: taking a mechanized step construction method or a full-section tunnel as the research object, based on the rock mass failure proximity theory, using a shear test to determine the ultimate plastic shear strain of the rock mass on site, and using Flac 3DThe software can evaluate the damage and analyze the stability of the surrounding rock during the whole process of tunnel wall construction, and delineate the safe zone, disturbance zone, damage zone and destruction zone of the tunnel surrounding rock. According to the value of the surrounding rock damage degree and the size of the damage zone, the corresponding solution is formulated by comprehensive consideration: (1) adjusting the excavation control parameters such as excavation advance and step height; (2) strengthening the local advance pre-support of the potential danger zone; (3) strengthening the design parameters of the tunnel arch advance pre-support as a whole. Method (1) is used to adjust the model excavation parameters, and methods (2) and (3) are used to calculate the surrounding rock support stress field and effective support range, and to reinforce the local area of the surrounding rock or the entire arch area. After recalculation using the above three methods, it is analyzed again whether the surrounding rock stability meets the safety requirements.
[0052] The main steps include:
[0053] S1. Statistical information on the physical and mechanical parameters, the magnitude and direction of the ground stress field of the surrounding rock of the tunnel excavation is collected, and sensitivity analysis is performed on the rock mass parameters that affect the deformation and damage of the tunnel surrounding rock. The main parameters that are more sensitive to the rock mass quality are obtained, and the BP neural network is used to perform intelligent inversion of the rock mass mechanical parameters.
[0054] The physical and mechanical parameters of the surrounding rock include the tunnel depth H d , design height is H t , large-scale mechanized supporting construction is adopted, the excavation method is the step method or the full section method, and the control parameters of the method are: excavation footage l f , Upper step height H u (The full-section tunnel is designed to have a height of H t ) and the upper step length S l .
[0055] S2. Using Flac 3D The initial (original rock) stress field of the tunnel surrounding rock is calculated and the Flac 3D The initial stress field is saved and written using the self-written Fish language. Figure 2(a) is a FLAC 3D The calculated initial stress field of the surrounding rock is related to the local stress field and the geological conditions.
[0056] The tunnel surrounding rock is simulated by using the step method or full section method. 3D The excavation stress field formed after excavation disturbance is calculated and the excavation stress field is obtained by using Flac 3D The excavation stress field is saved and written using the self-written Fish language. Figure 2(b) shows the excavation stress field of the surrounding rock.
[0057] S3. After field sampling, shear tests are carried out through the rock shear test system. Shear tests of rock mass under different normal stresses are carried out to determine the variation law of maximum shear strain with normal stress and obtain the ultimate plastic shear strain of rock mass under different stress field conditions.
[0058] During the construction of S4 and soft rock tunnels using large mechanized equipment such as drilling rigs, the rock mass near the tunnel wall is easily damaged and destroyed due to the disturbance of the surrounding rock by mechanized construction.
[0059] The damage degree of rock is analyzed by the failure degree (FD) index, which is the ratio between the plastic shear strain of rock and the ultimate plastic shear strain:
[0060]
[0061] In the formula, is the plastic shear strain, is the ultimate plastic shear strain.
[0062] The yield proximity index YAI is used to describe the degree of danger of the material in the elastic stage:
[0063]
[0064] Where: are cohesion and internal friction angle respectively; θ σ is the stress Lode angle; σ t is the tensile strength; π , τ π are the normal stress and shear stress components on the π plane respectively; σ R is the shear conversion stress; σ1 and σ3 are the maximum principal stress and the minimum principal stress, respectively.
[0065] The failure proximity index FAI is used to quantitatively analyze the stability of surrounding rock:
[0066]
[0067] In the formula: ω = 1-YAI, which is the risk factor of surrounding rock. The area with FAI < 0.8 is defined as the safe area, the area with 0.8 ≤ FAI < 1.0 is defined as the disturbed area, the area with 1.0 ≤ FAI < 2.0 is defined as the damaged area, and the area with FAI ≥ 2.0 is defined as the destroyed area.
[0068] S5, according to the damage proximity formula, using Flac 3D A Fish program was written to generate a FAI cloud map of tunnel damage proximity. Figure 3(a) is a FAI cloud map of tunnel damage proximity.
[0069] S6. Delineate the tunnel surrounding rock safety zone, disturbance zone, damage zone and destruction zone based on the FAI cloud map. Figure 3(b) shows the tunnel damage zone division diagram. According to the surrounding rock damage degree and the size of the damage zone, formulate the corresponding solution by comprehensive consideration:
[0070] (1) The damage area is small: For step-type tunnels, the excavation control parameters such as excavation advance and step height are adjusted in the size parameter combination suitable for mechanized large-scale construction; for full-section tunnels, the excavation control parameters such as excavation advance are adjusted;
[0071] (2) Medium damage area: Strengthen local advance pre-support in potential danger areas, increase the stability of surrounding rock in dangerous areas, and eliminate corresponding construction risks;
[0072] (3) The damage area is large: the design parameters of the overall strengthening tunnel arch advance pre-support.
[0073] S7. Adjust the model excavation parameters, or reinforce the local area of the surrounding rock or the entire area of the arch, recalculate and analyze the surrounding rock stability again until the safety requirements are met; the specific method is:
[0074] S71. Use method (1) to adjust the model excavation parameters, recalculate and analyze the surrounding rock stability again. If the safety requirements are met, stop the calculation. If the safety requirements are still not met after using size parameters suitable for mechanized large-scale construction, choose to use method (2) or method (3) based on the current size of the damage zone. Figure 4 Schematic diagram for adjusting tunnel excavation advance parameters.
[0075] S72. Using method (2), firstly strengthen the local advance pre-support parameters in the potential danger area, re-obtain the excavation stress field, and compare it with the excavation stress field obtained in step S2. The difference between the two is the support stress field formed by the local enhanced advance pre-support:
[0076] σ 局部支护 =σ 开挖1 -σ 开挖2 (4)
[0077] Where: 局部支护 is the additional stress field formed by local enhanced advance pre-support, σ 开挖1 is the stress field of surrounding rock excavation with local enhanced advance pre-support, σ 开挖2 This is the stress field of the original surrounding rock excavation.
[0078] For the locally enhanced advance pre-support stress field obtained above, a contour map of the support stress field is drawn, and the 0.1Mpa contour line is taken as the effective support range of the locally enhanced advance pre-support. The surrounding rock parameters (elastic modulus, cohesion, internal friction angle, etc.) within the effective support range are improved, and the surrounding rock stability is analyzed again after recalculation. If the safety requirements are met, the calculation is stopped; if the safety requirements are still not met, the support parameters are continued to be strengthened or the advance pre-support parameters of the entire arch area are adjusted using method (3).
[0079] S73. Using method (3), firstly, the design parameters of the tunnel arch advance pre-support are strengthened as a whole, and the excavation stress field is obtained again. The excavation stress field is compared with the excavation stress field obtained in step 2. The difference between the two is the support stress field formed by the overall strengthening advance pre-support:
[0080] σ 整体支护 =σ 开挖3 -σ 开挖2 (5)
[0081] Where: 整体支护 is the additional stress field formed by the overall enhanced advance pre-support, σ 开挖3 is the stress field of surrounding rock excavation with overall enhanced advance pre-support, σ 开挖2 This is the stress field of the original surrounding rock excavation. Figure 5 To strengthen the additional stress field formed by the overall advance pre-support.
[0082] For the overall enhanced advance pre-support stress field obtained above, the surrounding rock parameters within the effective support range are improved, and the surrounding rock stability is analyzed again after recalculation. If the safety requirements are met, the calculation is stopped; if the safety requirements are still not met, the advance pre-support parameters of the entire arch area are continued to be adjusted. Figure 6 Schematic diagram of surrounding rock failure proximity zoning after recalculation.
[0083] Of course, the present invention may have many other embodiments. Without departing from the spirit and essence of the present invention, technicians familiar with the field may make various corresponding changes and deformations based on the present invention, but these corresponding changes and deformations should all fall within the scope of protection of the claims attached to the present invention.
Claims
1. A method for dynamically adjusting surrounding rock excavation support parameters of a mechanized tunnel using a drilling and blasting method, characterized in that: The main steps include: S1. Statistical information on the physical and mechanical parameters, the magnitude and direction of the ground stress field of the surrounding rock of the tunnel excavation, sensitivity analysis of the rock mass parameters that affect the deformation and failure of the tunnel surrounding rock, obtain the main parameters that are more sensitive to the rock mass quality, and use BP neural network to perform intelligent inversion of the rock mass mechanical parameters; S2. Using Flac 3D The initial stress field of the tunnel surrounding rock is calculated and the 3D Self-written Fish language is used to save and write the initial stress field; The tunnel surrounding rock is simulated by using the step method or full section method. 3D The excavation stress field formed after excavation disturbance is calculated and the excavation stress field is obtained by using Flac 3D Self-written Fish language is used to save and write the excavation stress field; S3. After field sampling, shear tests are conducted through a rock shear test system. Rock shear tests are conducted under different normal stresses to determine the variation law of the maximum shear strain with the normal stress and obtain the ultimate plastic shear strain of the rock mass under different stress field conditions. S4. Use the failure index FD to analyze the damage degree of rock; use the yield proximity index YAI to describe the danger level of the material in the elastic stage; use the failure proximity index FAI to quantitatively analyze the stability of the surrounding rock; S5, according to the damage proximity formula, using Flac 3D Write the Fish program to make a FAI cloud map of tunnel damage proximity; S6. Delineate the tunnel surrounding rock safety zone, disturbance zone, damage zone and destruction zone based on the FAI cloud map, and formulate corresponding solutions based on the surrounding rock damage degree and the size of the damage zone; S7. Implement the solution developed in step S6, recalculate and analyze the surrounding rock stability again until safety requirements are met.
2. The method for dynamically adjusting surrounding rock excavation support parameters of mechanized tunnel using drilling and blasting method according to claim 1 is characterized in that: In step S4, the calculation formula of the damage index FD is: In the formula, is the plastic shear strain, is the ultimate plastic shear strain.
3. The method for dynamically adjusting surrounding rock excavation support parameters of mechanized tunnel using drilling and blasting method according to claim 2 is characterized by: In step S4, the calculation formula of yield proximity YAI is: Where: c, are cohesion and internal friction angle respectively; θ σ is the stress Lode angle; σ t is the tensile strength; π , σ π are the normal stress and shear stress components on the π plane respectively; σ R is the shear conversion stress; σ1 and σ3 are the maximum principal stress and the minimum principal stress, respectively.
4. The method for dynamically adjusting supporting parameters of surrounding rock excavation in mechanized tunnels using drilling and blasting method according to claim 3 is characterized by: In step S4, the calculation formula of the damage proximity FAI is: In the formula: ω = 1-YAI, which is the surrounding rock hazard coefficient.
5. The method for dynamically adjusting surrounding rock excavation support parameters of mechanized tunnel using drilling and blasting method according to claim 4 is characterized in that: In step S6, the standards for demarcating the tunnel surrounding rock safety zone, disturbance zone, damage zone and destruction zone are: the area with FAI < 0.8 is the safety zone, the area with 0.8 ≤ FAI < 1.0 is the disturbance zone, the area with 1.0 ≤ FAI < 2.0 is the damage zone, and the area with FAI ≥ 2.0 is the destruction zone.
6. The method for dynamically adjusting supporting parameters of surrounding rock excavation in mechanized tunnels using drilling and blasting method according to claim 5 is characterized by: In step S6, the solution includes: (1) The damage area is small: For step-method tunnels, adjust the excavation control parameters such as excavation advance, step height, etc.; for full-section tunnels, adjust the excavation control parameters such as excavation advance; (2) The damage area is medium: strengthen local advance pre-support in the potential danger area; (3) The damage zone is large: overall strengthening of the design parameters of the tunnel arch advance pre-support.
7. The method for dynamically adjusting surrounding rock excavation support parameters of mechanized tunnel using drilling and blasting method according to claim 6 is characterized by: Step S7 includes: S71. If method (1) is used, adjust the model excavation parameters, recalculate and analyze the surrounding rock stability again. If the safety requirements are met, stop the calculation. If the safety requirements are still not met after using the size parameters suitable for mechanized large-scale construction, choose to use method (2) or method (3) based on the current size of the damage zone.
8. The method for dynamically adjusting surrounding rock excavation support parameters of mechanized tunnel using drilling and blasting method according to claim 6 is characterized by: Step S7 includes: S72. If method (2) is adopted, firstly, the local advanced pre-support parameters are strengthened in the potential danger area, and the excavation stress field is obtained again, and compared with the excavation stress field obtained in step S2. The difference between the two is the support stress field formed by the local enhanced advanced pre-support: s 局部支护 =s 开挖1 -s 开挖2 (4) Where: 局部支护 is the additional stress field formed by local enhanced advance pre-support, σ 开挖1 is the stress field of surrounding rock excavation with local enhanced advance pre-support, σ 开挖2 is the original surrounding rock excavation stress field; For the obtained local enhanced advance pre-support stress field, draw the support stress field contour line cloud map, take the 0.1Mpa contour line as the effective support range of the local enhanced advance pre-support, improve the surrounding rock parameters within the effective support range, recalculate and analyze the surrounding rock stability again, if it meets the safety requirements, stop the calculation; if it still does not meet the safety requirements, continue to strengthen the support parameters or use method (3) to adjust the advance pre-support parameters of the entire arch area.
9. The method for dynamically adjusting supporting parameters of surrounding rock excavation in mechanized tunnels using drilling and blasting method according to claim 6, characterized in that: Step S7 includes: S73. If method (3) is adopted, firstly, the design parameters of the tunnel arch advance pre-support are strengthened as a whole, and the excavation stress field is obtained again, and compared with the excavation stress field obtained in step 2. The difference between the two is the support stress field formed by the overall strengthening advance pre-support: s 整体支护 =s 开挖3 -s 开挖2 (5) Where: 整体支护 is the additional stress field formed by the overall enhanced advance pre-support, σ 开挖3 is the stress field of surrounding rock excavation with overall enhanced advance pre-support, σ 开挖2 is the original surrounding rock excavation stress field; For the overall enhanced advance pre-support stress field obtained, the surrounding rock parameters within the effective support range are improved, and the surrounding rock stability is analyzed again after recalculation. If the safety requirements are met, the calculation is stopped; if the safety requirements are still not met, the advance pre-support parameters of the entire arch area are continued to be adjusted.
Citation Information
Patent Citations
Construction method for constructing corrosion denudation middle-low mountainous area tunnel
CN116838366A
Safety early warning method and device for full-section tunneling of tunnel featuring dynamic water and weak surrounding rock
US20220112806A1