Method, device and equipment for determining minimum filling thickness of mining area and medium
By calculating the height of the water conduction fracture zone and the distance of coal water, combining lithologic coefficient and filling rate, the minimum filling thickness of the mining area is determined, which solves the problems of excessive filling height and waste of resources in the prior art, and realizes cost saving and aquatic layer effective protection.
Patent Information
- Application Number
- CN202411073877.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing filling and mining technology fails to effectively consider the correlation between the development height of the water conduction fracture zone and the aquifer layer, resulting in excessive filling height, increasing costs and wasting resources, while being unable to effectively protect the aquifer.
By obtaining the lithologic coefficient of the overlying rock layer on the working surface of the mining area, calculate the height of the water conduction fracture zone, determine whether to fill it, and calculate the critical mining thickness based on the height of the water conduction fracture zone and the distance of the coal water, combining the thickness of the coal seam, compaction rate and The filling rate determines the minimum filling thickness.
The cost of filling materials is reduced, resource waste is avoided, and the aquifer is timely protected, achieving maximum mining of coal resources and protection of groundwater resources.
Smart Images

Figure CN118940378A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of coal mine filling and water conservation mining, and in particular to a method, device, equipment and medium for determining the minimum filling thickness of a mining area. Background Art
[0002] Groundwater is the main freshwater resource in many parts of my country, especially in drought or water-scarce areas. It provides a stable water source for agriculture, industry and cities. According to statistics, groundwater supply in my country accounts for one-third of the total water supply, and about 70% of the country's population drinks groundwater. Coal mining activities can cause rock destruction and surface movement, affecting the stability of aquifers. This leads to problems such as groundwater level drop, surface water drying up, and geological environment deterioration. In order to solve the impact of coal mining on groundwater resources, backfill mining technology has been widely used. This technology uses backfill materials (such as waste rock, coal gangue, paste water materials, etc.) to fill the goaf during coal mining, reduce or avoid surface subsidence and rock movement, and thus protect groundwater resources.
[0003] Backfilling and water-retaining coal mining technology, as an important method of "three-down" coal mining, can effectively slow down surface subsidence. However, this technology does not take into account the correlation between the development height of the water-conducting fracture zone and the aquifer level. For safety reasons, the filling height is generally larger, resulting in higher costs.
[0004] Therefore, in order to save filling materials, control costs and achieve maximum exploitation of coal resources, it is urgent to propose a method to determine the minimum filling thickness that can effectively protect aquifers. Summary of the invention
[0005] The purpose of this application is to provide a method, device, equipment and medium for determining the minimum filling thickness of a mining area, which can reduce the cost of filling materials, avoid waste of resources, and timely protect the aquifer from being damaged.
[0006] To achieve the above objectives, this application provides the following solutions:
[0007] In a first aspect, the present application provides a method for determining the minimum filling thickness of a mining area, comprising:
[0008] Obtaining the lithology coefficient of the overlying rock formation on the working face of the mining area; the lithology coefficient of the overlying rock formation is determined by conducting geotechnical mechanics experiments on lithology samples of multiple different layers of the overlying rock formation;
[0009] Calculate the height of the water-conducting fracture zone based on the lithology coefficient of the overlying rock strata and the mining thickness of the working face in the mining area;
[0010] Determine whether to carry out mining and filling in the mining area according to the height of the water-conducting fracture zone, and obtain a determination result;
[0011] When the judgment result is yes, the critical mining thickness is calculated according to the height of the water-conducting fracture zone and the coal-water distance; the coal-water distance is the distance between the coal seam roof and the aquifer in the mining area; the critical mining thickness is used to characterize the mining thickness corresponding to the height of the water-conducting fracture zone to the aquifer layer;
[0012] The minimum filling thickness corresponding to the mining area is calculated based on the critical mining thickness, coal seam thickness, compaction rate and filling rate.
[0013] In a second aspect, the present application provides a device for determining a minimum filling thickness of a mining area, comprising:
[0014] The lithology coefficient acquisition module is used to: acquire the lithology coefficient of the overlying rock layer on the working face of the mining area; the lithology coefficient of the overlying rock layer is determined by conducting geotechnical mechanics experiments on lithology samples of multiple different layers of the overlying rock layer;
[0015] The water-conducting fracture zone height calculation module is used to calculate the water-conducting fracture zone height according to the lithology coefficient of the overlying rock layer and the mining thickness of the working face in the mining area;
[0016] A judgment module is used to: judge whether the mining area should be mined and filled according to the height of the water-conducting fracture zone, and obtain a judgment result;
[0017] The critical mining thickness calculation module is used to: when the judgment result is yes, calculate the critical mining thickness according to the height of the water-conducting fracture zone and the coal-water distance; the coal-water distance is the distance between the coal seam roof and the aquifer in the mining area; the critical mining thickness is used to characterize the mining thickness corresponding to the height of the water-conducting fracture zone to the aquifer layer;
[0018] The minimum filling thickness calculation module is used to calculate the minimum filling thickness corresponding to the mining area according to the critical mining thickness, coal seam thickness, compaction rate and filling rate.
[0019] In a third aspect, the present application provides a computer device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the above-mentioned method for determining the minimum filling thickness of a mining area.
[0020] In a fourth aspect, the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the above-mentioned method for determining the minimum filling thickness of a mining area.
[0021] According to the specific embodiments provided in this application, this application discloses the following technical effects:
[0022] The present application provides a method, device, equipment and medium for determining the minimum filling thickness of a mining area. It judges whether the mining area should be mined and filled by the height of the water-conducting fracture zone to avoid waste of resources. The critical mining thickness is further calculated by the height of the water-conducting fracture zone and the coal-water distance. The minimum filling thickness corresponding to the mining area is calculated according to the critical mining thickness, coal seam thickness, compaction rate and filling rate. The problems of resource waste and high cost in traditional filling mining technology are solved, the cost of filling materials is reduced, waste of resources is avoided, and the aquifer is protected from damage in time. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 This is an application environment diagram of a method for determining the minimum filling thickness of a mining area in an embodiment of the present application;
[0025] Figure 2 A schematic flow chart of a method for determining the minimum filling thickness of a mining area provided in one embodiment of the present application;
[0026] Figure 3 A schematic diagram of a specific process of a method for determining the minimum filling thickness of a mining area provided in one embodiment of the present application;
[0027] Figure 4 A schematic diagram of a critical mining scenario provided in an embodiment of the present application;
[0028] Figure 5 A schematic diagram of a mining scene after filling provided in an embodiment of the present application;
[0029] Figure 6 A schematic diagram of the functional modules of a device for determining the minimum filling thickness of a mining area provided in one embodiment of the present application.
[0030] Figure 7 A schematic diagram of the structure of a computer device provided in one embodiment of the present application. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0032] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, the present application is further described in detail below with reference to the accompanying drawings and specific implementation methods.
[0033] The method for determining the minimum filling thickness of a mining area provided in the embodiment of the present application can be applied to Figure 1 In the application environment shown. Among them, the terminal 102 communicates with the server 104 through the network. The data storage system can store the data that the server 104 needs to process. The data storage system can be set up separately, integrated on the server 104, or placed on the cloud or other servers. The terminal 102 can send the lithology coefficient of the overburden stratum to the server 104. After the server 104 receives the lithology coefficient of the overburden stratum, for the lithology coefficient of the overburden stratum, the server 104 calculates the height of the water-conducting fracture zone according to the lithology coefficient of the overburden stratum and the mining thickness of the working face of the mining area, and determines whether the mining area is mined and filled according to the height of the water-conducting fracture zone to obtain a judgment result. When the judgment result is yes, the critical mining thickness is calculated according to the height of the water-conducting fracture zone and the coal-water distance, and the minimum filling thickness corresponding to the mining area is calculated according to the critical mining thickness, coal seam thickness, compaction rate and filling rate. The server 104 can feedback the obtained minimum filling thickness corresponding to the mining area to the terminal 102. In addition, in some embodiments, the method for determining the minimum filling thickness of the mining area can also be implemented independently by the server 104 or the terminal 102. For example, the terminal 102 can directly calculate the minimum filling thickness based on the lithology coefficient of the overlying rock formation, or the server 104 can obtain the lithology coefficient of the overlying rock formation from the data storage system and calculate the minimum filling thickness based on the lithology coefficient of the overlying rock formation.
[0034] The terminal 102 may be, but is not limited to, various desktop computers, laptop computers, smart phones, and tablet computers. The server 104 may be implemented as an independent server or a server cluster consisting of multiple servers, or may be a cloud server.
[0035] In an exemplary embodiment, Figure 2 and Figure 3 As shown, a method for determining the minimum filling thickness of a mining area is provided. The method is executed by a computer device, and can be executed by a computer device such as a terminal or a server alone, or by a terminal and a server together. In the embodiment of the present application, the method is applied to Figure 1 The server 104 in the example is used for explanation, and the steps include the following steps 201 to 205.
[0036] in:
[0037] Step 201: Obtain the lithology coefficient of the overlying rock formation on the working face of the mining area; the lithology coefficient of the overlying rock formation is determined by performing geotechnical mechanics experiments on lithology samples of multiple different layers of the overlying rock formation.
[0038] Step 202: Calculate the height of the water-conducting fracture zone according to the lithology coefficient of the overlying rock formation and the mining thickness of the working face in the mining area.
[0039] Step 203: Determine whether to carry out mining and filling in the mining area according to the height of the water-conducting fracture zone, and obtain a determination result.
[0040] Step 204: When the judgment result is yes, the critical mining thickness is calculated according to the height of the water-conducting fracture zone and the coal-water distance; the coal-water distance is the distance between the coal seam roof and the aquifer in the mining area; the critical mining thickness is used to characterize the mining thickness corresponding to the development of the water-conducting fracture zone to the aquifer layer.
[0041] Step 205: Calculate the minimum filling thickness corresponding to the mining area according to the critical mining thickness, coal seam thickness, compaction rate and filling rate.
[0042] By implementing the above-mentioned steps 201 to 205, it is determined whether the mining area should be mined and filled by the height of the water-conducting fracture zone to avoid waste of resources. The critical mining thickness is further calculated by the height of the water-conducting fracture zone and the coal-water distance. The minimum filling thickness corresponding to the mining area is calculated according to the critical mining thickness, coal seam thickness, compaction rate and filling rate. This solves the problems of resource waste and high cost in traditional filling mining technology, reduces the cost of filling materials, avoids waste of resources, and timely protects the aquifer from being damaged.
[0043] In order to reasonably calculate the height of the water-conducting fracture zone, the geological occurrence and aquifer-related data of the mining area are measured, collected and analyzed, including but not limited to the width, thickness, depth of the working face, height of the aquifer layer, lithology, etc.
[0044] Obtain the burial depth H of the working face in the mining area and the thickness, burial depth and other mechanical parameters of each layer of the overlying rock strata on the working face in the mining area. According to the thickness of each layer of the overlying rock strata, determine the distance h0 between the coal seam roof and the aquifer in the mining area. In this application, the distance between the coal seam roof and the aquifer in the mining area is named the coal-water distance.
[0045] In step 201, lithology samples of multiple different layers of the overlying rock strata on the working face are collected, and the lithology coefficient f of the overlying rock strata is determined by performing geotechnical experiments on the lithology samples of multiple different layers.
[0046] In step 202, the height of the water-conducting fracture zone is calculated in combination with relevant data of the mining area, and its correlation with the aquifer layer is determined.
[0047] The empirical formula for the height of the water-conducting fracture zone corresponding to different lithologies, that is, the calculation formula for the height of the water-conducting fracture zone is as follows:
[0048]
[0049] Wherein, Hli is the height of the water-conducting fracture zone; M is the mining thickness of the working face in the mining area; a, b and c are empirical parameters. Wherein, the empirical parameters are determined according to the lithology coefficient of the overlying rock formation, which can be divided into the following three cases based on the lithology coefficient of the overlying rock formation:
[0050] 1) When f>8, the overlying rock layer is a hard rock layer, then a=1.2, b=2.0, c=8.9;
[0051] 2) When 3<f≤8, the overlying rock layer is a medium-hard rock layer, then a=1.6, b=3.6, c=5.6;
[0052] 3) When f≤3, the overlying rock layer is a weak rock layer, then a=3.1, b=5.1, c=4.0.
[0053] It should be noted that the calculation formula for the height of the water-conducting fracture zone, namely formula (1), is applicable to coal seam occurrence conditions with an inclination of 0 to 54°.
[0054] Step 203 specifically includes: when the height of the water-conducting fracture zone is greater than the coal-water distance, the judgment result is yes; when the height of the water-conducting fracture zone is not greater than the coal-water distance, the judgment result is no.
[0055] Specifically: When the water-conducting fracture zone height H li ≤h0, then there is no need to adopt backfill mining technology; when the height of the water-conducting fracture zone H li >h0, backfill mining technology is required.
[0056] When the backfill mining technology is not adopted, the critical mining thickness corresponding to the height of the water-conducting fracture zone developed to the aquifer layer is calculated.
[0057] Since there are many factors affecting the height of the water-conducting fracture zone and the mining operation is complicated, a safety factor n needs to be added for safety. The value range of the safety factor is 0.6 to 0.8. li =nh0. According to the empirical formula of the height of the water-conducting fracture zone, the critical mining thickness can be obtained. Substituting nh0 into formula (1), the calculation formula of the critical mining thickness is as follows:
[0058]
[0059] Among them, M 临 is the critical mining thickness; n is the safety factor; h0 is the coal-water distance.
[0060] Critical mining scenarios such as Figure 4 shown.
[0061] Since the filling material will be gradually compacted by the overlying rock when the mining area is filled with filling technology, this application calculates the minimum filling thickness for time-effective protection of the aquifer using the filling mining technology by combining the coal seam thickness, critical mining thickness, compaction rate and filling rate. The calculation formula for the minimum filling thickness is as follows:
[0062]
[0063] Among them, M 填 Indicates the minimum filling thickness; M 煤 is the thickness of the coal seam; u is the compaction rate; v is the filling rate.
[0064] The filling thickness at this time is the minimum filling thickness corresponding to the backfill mining technology. By forming a compacted area in the goaf, the overlying rock layer can be effectively supported, which can not only protect the aquifer from being damaged, but also effectively reduce the degree of surface subsidence. Figure 5 shown.
[0065] The present application also provides an application scenario, which applies the above-mentioned method for determining the minimum filling thickness of the mining area. Specifically: the method for determining the minimum filling thickness of the mining area provided in this embodiment can be applied in the coal mining scenario. The coal mining scenario includes a lithology coefficient measurement link, a minimum filling thickness determination link and a material filling link; the lithology coefficient of the overburden enters the minimum filling thickness determination link from the lithology coefficient measurement link, obtains the corresponding minimum filling thickness, and enters the downstream material filling link. The method for determining the minimum filling thickness of the mining area provided in this embodiment belongs to the minimum filling thickness determination link. Specifically, in the process of determining the minimum filling thickness link for the lithology coefficient of the overburden, the height of the water-conducting fracture zone can be calculated according to the lithology coefficient of the overburden and the mining thickness of the working face of the mining area, and whether the mining area is mined and filled is determined according to the height of the water-conducting fracture zone to obtain a judgment result. When the judgment result is yes, the critical mining thickness is calculated according to the height of the water-conducting fracture zone and the coal-water distance, and the corresponding minimum filling thickness of the mining area is calculated according to the critical mining thickness, the coal seam thickness, the compaction rate and the filling rate.
[0066] In view of the impact of mining on aquifers, this application adopts a filling method to support the overlying rock layer in the goaf, prevent the formation of water-conducting fissures in the aquifer, and protect the water resources in the aquifer. Different from the previous filling and water-preserving mining technology, the minimum filling thickness is calculated by limiting the height of the water-conducting fracture zone. The calculated result can make full use of the filling material, reduce manpower and material resources, and reduce coal losses.
[0067] Based on the same inventive concept, the embodiment of the present application also provides a mining area minimum filling thickness determination device for implementing the above-mentioned mining area minimum filling thickness determination method. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above-mentioned method, so the specific limitations in one or more mining area minimum filling thickness determination device embodiments provided below can refer to the limitations of the mining area minimum filling thickness determination method above, and will not be repeated here.
[0068] In an exemplary embodiment, Figure 6 As shown, a device for determining the minimum filling thickness of a mining area is provided, comprising:
[0069] The lithology coefficient acquisition module T1 is used to: acquire the lithology coefficient of the overlying rock layer on the working face of the mining area; the lithology coefficient of the overlying rock layer is determined by performing geotechnical mechanics experiments on lithology samples of multiple different layers of the overlying rock layer;
[0070] The water-conducting fracture zone height calculation module T2 is used to calculate the height of the water-conducting fracture zone according to the lithology coefficient of the overlying rock layer and the mining thickness of the working face in the mining area;
[0071] A judgment module T3 is used to: judge whether the mining area should be mined and filled according to the height of the water-conducting fracture zone, and obtain a judgment result;
[0072] The critical mining thickness calculation module T4 is used to: when the judgment result is yes, calculate the critical mining thickness according to the height of the water-conducting fracture zone and the coal-water distance; the coal-water distance is the distance between the coal seam roof and the aquifer in the mining area; the critical mining thickness is used to characterize the mining thickness corresponding to the height of the water-conducting fracture zone to the aquifer layer;
[0073] The minimum filling thickness calculation module T5 is used to calculate the minimum filling thickness corresponding to the mining area according to the critical mining thickness, coal seam thickness, compaction rate and filling rate.
[0074] In an exemplary embodiment, a computer device is provided. The computer device may be a server or a terminal. The internal structure diagram thereof may be as follows: Figure 7As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store the calculation data of the minimum filling thickness of the mining area. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for determining the minimum filling thickness of the mining area is implemented.
[0075] Those skilled in the art will understand that Figure 7 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0076] In an exemplary embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program.
[0077] In an exemplary embodiment, a computer-readable storage medium is provided, storing a computer program, and when the computer program is executed by a processor, the steps in the above method embodiments are implemented.
[0078] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.
[0079] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM may be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).
[0080] The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. The non-relational database may include a distributed database based on blockchain, etc., but is not limited thereto. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but is not limited thereto.
[0081] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0082] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and core ideas of this application. At the same time, for those skilled in the art, according to the ideas of this application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting this application.
Claims
1. A method for determining the minimum filling thickness of a mining area, characterized in that: The method for determining the minimum filling thickness of the mining area comprises: Obtaining the lithology coefficient of the overlying rock formation on the working face of the mining area; the lithology coefficient of the overlying rock formation is determined by conducting geotechnical mechanics experiments on lithology samples of multiple different layers of the overlying rock formation; Calculate the height of the water-conducting fracture zone based on the lithology coefficient of the overlying rock strata and the mining thickness of the working face in the mining area; Determine whether to carry out mining and filling in the mining area according to the height of the water-conducting fracture zone, and obtain a determination result; When the judgment result is yes, the critical mining thickness is calculated according to the height of the water-conducting fracture zone and the coal-water distance; the coal-water distance is the distance between the coal seam roof and the aquifer in the mining area; the critical mining thickness is used to characterize the mining thickness corresponding to the height of the water-conducting fracture zone to the aquifer layer; The minimum filling thickness corresponding to the mining area is calculated based on the critical mining thickness, coal seam thickness, compaction rate and filling rate.
2. The method for determining the minimum filling thickness of a mining area according to claim 1, characterized in that: The calculation formula of the water-conducting fracture zone height is as follows: Among them, H li is the height of the water-conducting fracture zone; M is the mining thickness of the working face in the mining area; a, b and c are empirical parameters.
3. The method for determining the minimum filling thickness of a mining area according to claim 1, characterized in that: According to the height of the water-conducting fracture zone, it is judged whether the mining area should be mined and filled, and the judgment result is obtained, which specifically includes: When the height of the water-conducting fracture zone is greater than the coal-water distance, the judgment result is yes; when the height of the water-conducting fracture zone is not greater than the coal-water distance, the judgment result is no.
4. The method for determining the minimum filling thickness of a mining area according to claim 2, characterized in that: The calculation formula of the critical mining thickness is as follows: Among them, M 临 is the critical mining thickness; n is the safety factor; h0 is the coal-water distance.
5. The method for determining the minimum filling thickness of a mining area according to claim 4, characterized in that: The calculation formula of the minimum filling thickness is as follows: Among them, M 填 Indicates the minimum filling thickness; M 煤 is the thickness of the coal seam; u is the compaction rate; v is the filling rate.
6. The method for determining the minimum filling thickness of a mining area according to claim 4, characterized in that: The safety factor ranges from 0.6 to 0.
8.
7. The method for determining the minimum filling thickness of a mining area according to claim 2, characterized in that: The empirical parameters are determined according to the lithology coefficient of the overlying rock formation.
8. A device for determining the minimum filling thickness of a mining area, characterized in that: The device for determining the minimum filling thickness of the mining area comprises: The lithology coefficient acquisition module is used to: acquire the lithology coefficient of the overlying rock layer on the working face of the mining area; the lithology coefficient of the overlying rock layer is determined by conducting geotechnical mechanics experiments on lithology samples of multiple different layers of the overlying rock layer; The water-conducting fracture zone height calculation module is used to calculate the water-conducting fracture zone height according to the lithology coefficient of the overlying rock layer and the mining thickness of the working face in the mining area; A judgment module is used to: judge whether the mining area should be mined and filled according to the height of the water-conducting fracture zone, and obtain a judgment result; The critical mining thickness calculation module is used to: when the judgment result is yes, calculate the critical mining thickness according to the height of the water-conducting fracture zone and the coal-water distance; the coal-water distance is the distance between the coal seam roof and the aquifer in the mining area; the critical mining thickness is used to characterize the mining thickness corresponding to the height of the water-conducting fracture zone to the aquifer layer; The minimum filling thickness calculation module is used to calculate the minimum filling thickness corresponding to the mining area according to the critical mining thickness, coal seam thickness, compaction rate and filling rate.
9. A computer device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the method for determining the minimum filling thickness of a mining area according to any one of claims 1 to 7.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for determining the minimum filling thickness of a mining area according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Thin-base-rock shallow coal-layer water-retaining production suitable-condition classification method
CN101070759A
Filling rate design and control method for solid filing in coal mining
CN103899352A
Solid filling mining design method under water body
CN104074541A
Water-preserved mining method of close-distance coal seam group
CN104453903A
Method for predicting maximum height of filling mining diversion fissure zone
CN104866914A
Cited By
Fully mechanized caving face filling mining method
CN120889572A
Evaluation method for water-preserved mining in terms of in-situ protection of confined water in mine floor
WO2026118516A1