Suspension bridge suspender force and bridge floor line shape adjusting method and system, storage medium and electronic equipment

By measuring and adjusting the boom force and bridge deck linear shape of the suspension bridge, using the stress-free length increment vector and influence matrix, the complexity and uncertainty of the boom force and bridge deck linear shape adjustment of the suspension bridge is solved, and the construction efficiency and Structural stability.

CN118940482APending Publication Date: 2024-11-12CHINA RAILWAY BRIDGE SCI RES INST LTD +3
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410957920.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the construction process, the adjustment of the suspension bridge is complicated and uncertain due to the deviation of the boom force and the bridge deck linear shape. Especially in special structures, the technical difficulty increases, and the flexible structure is prone to vibrating under live load, which makes it difficult to adjust the cable force.

Method used

By measuring the boom force of each cable clamp, calculating the combined force deviation, and constructing a stress-free length increment vector and influence matrix, adjusting the cable force and line shape, simplifying the construction process, improving efficiency, and reducing the subsequent adjustment workload.

Benefits of technology

The uniformity adjustment of the force deviation of the boom is achieved, the subsequent adjustment workload is reduced, the construction process is simplified, the construction efficiency is improved, and the vibration risk is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940482A_ABST
    Figure CN118940482A_ABST
Patent Text Reader

Abstract

The invention discloses a suspension bridge suspender force and bridge floor line shape adjusting method and system, a storage medium and electronic equipment. The method comprises the steps that the force of two suspenders under each cable clamp is measured, the actually-measured suspender resultant force is calculated according to the suspender force, and the suspender resultant force deviation is calculated according to the theoretical suspender resultant force and the actually-measured suspender resultant force; according to the suspender resultant force deviation, uniformity adjustment is conducted on the suspender resultant force under each cable clamp; adjusting suspender force deviation and bridge floor line shape; and calculating an unstressed length increment vector value under a set boundary condition according to the final cable force deviation value and the final bridge deck linear deviation value, and finishing final adjustment. According to the method, the total deviation of the cable clamping force is adjusted while the uniformity of the deviation of the suspender force is adjusted, so that only part of suspenders need to be adjusted in subsequent adjustment, the workload of the subsequent adjustment of the deviation of the suspender force is greatly reduced, the construction procedure is simplified, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bridge construction, and in particular to a method, system, storage medium and electronic equipment for adjusting the hanger force and bridge deck line shape of a suspension bridge. Background Art

[0002] Suspension bridges are generally flexible structures composed of main cables, stiffening beams, main towers, anchors and suspenders. The force on the suspension bridge structure is obviously nonlinear. Due to the small stiffness and large deformation of the main cable, when the hanger is tensioned, the nearby hanger force is greatly affected, while the displacement of the stiffening beam is relatively small. During the construction of the suspension bridge, there are various deviations, such as main cable erection deviation, hanger cutting deviation, stiffening beam construction deviation, cable guide construction deviation, hanger tensioning deviation, etc. These deviations will eventually affect the hanger force and bridge deck line shape of the completed bridge, so the hanger must be adjusted to make the hanger force and bridge deck line shape meet the requirements of the specifications when the bridge is finally completed.

[0003] There are several methods in the prior art to adjust the hanger force of a suspension bridge, including: in a ground-anchored suspension bridge, when the stress of part of the hanger is too large or part of it is in a relaxed state, a cable hoisting process is used for reset adjustment; a phased tensioning method is used for fine-tuning; a reasonable completed state of the suspension bridge is optimized by adjusting the stress-free length of the hanger; a node balance method and a comparison method are used. The node balance method uses the hanging point as the analysis object to establish an overdetermined equilibrium equation group, thereby obtaining the least squares solution of the main cable axial force and further determining the short hanger axial force; drawing on the influence matrix method for optimizing the cable force of a cable-stayed bridge, midasCivil optimization software is used, and a constrained minimum energy method is used to study the optimization of the hanger cable force of a tied arch bridge in the completed state.

[0004] However, these methods also have the following shortcomings: 1) The adjustment process of the hanger force is complicated and uncertain; 2) In some special structures, such as the Jiangyin Bridge, the cables are pin-connected and non-tensioned structures, and only one lifting point is reserved near the main beam cable anchor structure, which increases the technical difficulty; 3) Since the cable is a flexible structure with low stiffness, it will change its geometric shape when subjected to live loads, causing large flexural deformation of the bridge span structure, which is prone to vibration under dynamic loads such as wind loads and vehicle impact loads; 4) The four calculation models under different assumptions may lead to large differences in the calculation results of the hanger cable force, which brings difficulties to the smooth conversion of the system and the adjustment of the cable force. Summary of the invention

[0005] In view of the above defects or improvement needs of the prior art, the purpose of the present invention is to provide a method, system, storage medium and electronic device for adjusting the hanger force and bridge deck linear shape of a suspension bridge. The method adjusts the total deviation of the cable clamp force while adjusting the uniformity of the hanger force deviation. Therefore, subsequent adjustments only need to adjust part of the hangers, which greatly reduces the workload of subsequent hanger force deviation adjustments. The method also utilizes a stress-free length increment adjustment method, which does not need to consider the hanger adjustment sequence, and adjusts the cable force and linear shape completely in an incremental manner, thereby simplifying the construction process and improving construction efficiency.

[0006] In a first aspect, the present invention provides a method for adjusting the hanger force and bridge deck linear shape of a suspension bridge, comprising:

[0007] S100, measuring the forces of two suspension rods under each cable clamp, calculating the measured suspension rod resultant force according to the suspension rod forces, and calculating the suspension rod resultant force deviation according to the theoretical suspension rod resultant force and the measured suspension rod resultant force;

[0008] S200, adjusting the hanger rod resultant force under each cable clamp uniformly according to the hanger rod resultant force deviation;

[0009] S300, measuring the hanger force and bridge deck line shape of the whole bridge, and obtaining the hanger force deviation vector of the whole bridge and the bridge deck elevation deviation vector;

[0010] S400, constructing a stress-free length increment vector, and constructing an influence matrix of the stress-free length increment on the cable force and an influence matrix of the stress-free length increment on the bridge deck line shape according to the stress-free length increment vector, the whole bridge hanger force deviation vector and the bridge deck elevation deviation vector;

[0011] S500, calculating the final cable force deviation value according to the whole bridge hanger force deviation vector, the influence matrix of the stress-free length increment on the cable force and the stress-free length increment vector; calculating the final bridge deck linear deviation value according to the bridge deck elevation deviation vector, the influence matrix of the stress-free length increment on the cable force and the stress-free length increment vector;

[0012] S600, calculating the stress-free length increment vector value under the set boundary conditions according to the final cable force deviation value and the final bridge deck linear deviation value, and completing the final adjustment.

[0013] Furthermore, step S100 includes:

[0014] T i实测 =T i1 +T i2 ;△ i =T i -T i实测

[0015] Where, T i1 With Ti2 They represent the forces of the two suspension rods under the cable clamp numbered i; T i实测 represents the combined force of the suspension rod measured by the i cable clamp; T i Indicates the theoretical lifting force; i Indicates the resultant force deviation of cable clamp number i.

[0016] Further, step S200 includes:

[0017] S201. Construct the cable force influence matrix:

[0018]

[0019] Where, m represents the number of cable clamps; {TK} represents the cable force influence matrix; k represents the influence coefficient of the cable force influence matrix;

[0020] S202, when adjusting the force of the i-th cable clamp, the measured force deviation between the i-th and i+1 cable clamps is △ i and i+1 , then the resultant force after adjustment of the cable clamps numbered i and i+1 is:

[0021]

[0022] In the formula, △ i and i+1 Respectively represent the resultant force deviation of the cable clamp numbered i and i+1; T' i It represents the theoretical value of the suspension rod force of the cable clamp number i after the adjustment of the cable clamp number i and i+1; T' i+1 It represents the theoretical value of the suspension rod force of the cable clamp number i+1 after the cable clamp number i and i+1 are adjusted; T i实测 It indicates the actual measured value of the suspension rod force of the cable clamp No. i before the cable clamp No. i is adjusted;

[0023] T i+1实测 It indicates the measured value of the suspension rod force of the No. i+1 cable clamp before the No. i+1 cable clamp is adjusted;

[0024] S203, when adjusting the suspension rod force of the i+1th cable clamp, the measured force deviation of the cable clamps numbered i+1 and i+2 is △' i+1 and i+2 , then the resultant force after adjustment of the cable clamps numbered i+ and i+1 is:

[0025]

[0026] In the formula, △′ i+1 and i+2 Respectively represent the resultant force deviation of the cable clamps numbered i+1 and i+2; T” i+1 It represents the theoretical value of the suspension rod force of the i+1 cable clamp after the i+1 and i+2 cable clamps are adjusted; T' i+2It represents the theoretical value of the suspension rod force of the i+2 cable clamp after the i+1 and i+2 cable clamps are adjusted; T' i+1实测 It indicates the measured value of the suspension rod force of the cable clamp number i+1 after the suspension force of the cable clamp number i is adjusted; T' i+2实测 It indicates the measured value of the suspension rod force of the cable clamp No. i+2 after the suspension force of the cable clamp No. i is adjusted;

[0027] In this way, the suspension force of the entire bridge is adjusted from the main tower to both sides.

[0028] Furthermore, the full-bridge suspender force deviation vector in step S300 is:

[0029] {△T}=[△T1△T2…△T m ] T ;

[0030] Furthermore, the bridge deck elevation deviation vector is:

[0031] {△Z}=[△Z1△Z2…△Z m ] T

[0032] In the formula, {△T} represents the deviation vector of the whole bridge hanger force; {△Z} represents the bridge deck elevation deviation vector; T represents the vector transposition sign;

[0033] Furthermore, the stress-free length increment vector in step S400 is:

[0034] {△L}=[△L1△L2…△L m ] T

[0035] Where {△L} represents the stress-free length increment vector.

[0036] Furthermore, the final cable force deviation value and the final bridge deck line deviation value in step S500 are calculated as:

[0037] {△T 终}={△T}+{WTK}×{△L}; {△Z 终}={△Z}+{WZK}×{△L}

[0038] Where, {WTK} represents the influence matrix of stress-free length increment on cable force; {WZK} represents the influence matrix of stress-free length increment on bridge deck line shape; {△T 终} represents the final cable force deviation value; {△Z 终} represents the final bridge deck linear deviation value.

[0039] Furthermore, the boundary condition in step S600 is:

[0040] {△T终}∈[△T 下 , △T 上 ],{△Z 终}∈[△Z 下 , △Z 上 ], {△L}∈[△L 下 ,△

[0041] L 上 ]

[0042] Where, △T 下 Indicates the lower limit of cable force deviation; △T 上 Indicates the upper limit of cable force deviation; △Z 下 Indicates the lower limit of bridge deck linear deviation; △L 下 Indicates the lower limit of the anchor head adjustment amount.

[0043] In a second aspect, the present invention provides a suspension bridge hanger force and bridge deck linear adjustment system, which is implemented by applying any step of the suspension bridge hanger force and bridge deck linear adjustment method, including:

[0044] The first module is used to calculate the resultant force of the boom and the deviation of the resultant force of the boom according to the force of the boom under each cable clamp;

[0045] The second module is used to adjust the uniformity of the resultant force of each cable clamp suspender rod according to the resultant force deviation of the suspender rod;

[0046] The third module is used to obtain the whole bridge hanger force deviation vector and the bridge deck elevation deviation vector according to the hanger force and bridge deck linearity of the whole bridge;

[0047] The fourth module is used to construct a stress-free length increment vector, and to construct an influence matrix of the stress-free length increment on the cable force and an influence matrix of the stress-free length increment on the bridge deck line shape according to the stress-free length increment vector, the whole bridge hanger force deviation vector and the bridge deck elevation deviation vector;

[0048] The fifth module is used to calculate the final cable force deviation value according to the full-bridge hanger force deviation vector, the influence matrix of the stress-free length increment on the cable force, and the stress-free length increment vector; and calculate the final bridge deck linear deviation value according to the bridge deck elevation deviation vector, the influence matrix of the stress-free length increment on the cable force, and the stress-free length increment vector;

[0049] The sixth module is used to calculate the stress-free length increment vector value under the set boundary conditions according to the final cable force deviation value and the final bridge deck linear deviation value to complete the final adjustment.

[0050] In a third aspect, the present invention provides a computer-readable storage medium, in which a computer program is stored. The computer program is loaded and executed by a processor to implement any step of the above-mentioned method for adjusting the hanger force and bridge deck line shape of a suspension bridge.

[0051] In a fourth aspect, the present invention provides an electronic device comprising a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the processor implements any step of the above-mentioned method for adjusting the hanger force and bridge deck line shape of a suspension bridge when loading and executing the computer program.

[0052] Beneficial effects of the present invention:

[0053] 1. The present invention provides a method for adjusting the hanger force and bridge deck line shape of a suspension bridge. The method adjusts the uniformity of the hanger force deviation while also adjusting the total deviation of the cable clamp force. Therefore, subsequent adjustments only need to be made to part of the hangers, greatly reducing the workload of subsequent hanger force deviation adjustments.

[0054] 2. The present invention provides a method for adjusting the hanger force and bridge deck line shape of a suspension bridge. The method utilizes a stress-free length increment adjustment method and can adjust the cable force and line shape completely in an incremental manner without considering the hanger adjustment sequence, thereby simplifying the construction process and improving construction efficiency.

[0055] Additional aspects and advantages of the present application will be partially given in the following description, which will become apparent from the following description, or will be understood through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0057] Figure 1 is a flow chart of a method for adjusting the hanger force and bridge deck line shape of a suspension bridge in an embodiment of the present invention;

[0058] Figure 2 It is a three-dimensional diagram of a suspension bridge in an embodiment of the present invention. DETAILED DESCRIPTION

[0059] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0060] Those skilled in the art will appreciate that, unless otherwise stated, the singular forms "a", "an", "said" and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present application refers to the presence of the features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.

[0061] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical terms and scientific terms) used herein have the same meaning as the general understanding of those skilled in the art to which this application belongs. It should also be understood that terms such as those defined in general dictionaries should be understood to have the same meaning as in the context of the prior art, and will not be interpreted with an idealized or overly formal meaning unless specifically defined as in the embodiments of this application.

[0062] The present invention provides a method, system, storage medium and electronic device for adjusting the hanger force and bridge deck linear shape of a suspension bridge. The method adjusts the total deviation of the cable clamp force while adjusting the uniformity of the hanger force deviation, so subsequent adjustments only need to adjust part of the hangers, which greatly reduces the workload of subsequent hanger force deviation adjustments; the method also uses a stress-free length increment adjustment method, and there is no need to consider the hanger adjustment sequence, and the cable force and linear shape are adjusted completely in an incremental manner, which simplifies the construction process and improves construction efficiency.

[0063] Example 1

[0064] like Figure 1 As shown, an embodiment of the present invention provides a method for adjusting the hanger force and bridge deck linear shape of a suspension bridge, comprising:

[0065] S100, measuring the forces of two suspension rods under each cable clamp, calculating the measured suspension rod resultant force according to the suspension rod forces, and calculating the suspension rod resultant force deviation according to the theoretical suspension rod resultant force and the measured suspension rod resultant force;

[0066] S200, adjusting the hanger rod resultant force under each cable clamp uniformly according to the hanger rod resultant force deviation;

[0067] S300, measuring the hanger force and bridge deck line shape of the whole bridge, and obtaining the hanger force deviation vector of the whole bridge and the bridge deck elevation deviation vector;

[0068] S400, constructing a stress-free length increment vector, and constructing an influence matrix of the stress-free length increment on the cable force and an influence matrix of the stress-free length increment on the bridge deck line shape according to the stress-free length increment vector, the whole bridge hanger force deviation vector and the bridge deck elevation deviation vector;

[0069] S500, calculating the final cable force deviation value according to the whole bridge hanger force deviation vector, the influence matrix of the stress-free length increment on the cable force and the stress-free length increment vector; calculating the final bridge deck linear deviation value according to the bridge deck elevation deviation vector, the influence matrix of the stress-free length increment on the cable force and the stress-free length increment vector;

[0070] S600, calculating the stress-free length increment vector value under the set boundary conditions according to the final cable force deviation value and the final bridge deck linear deviation value, and completing the final adjustment.

[0071] Specifically, this embodiment first uses the frequency measurement method to accurately measure and adjust the tension of all hangers in a suspension bridge, including:

[0072] Install high-precision accelerometers and displacement meters at the midpoint and both ends of each boom, with a total of 360 sensor points, and ensure that the connection between the sensor and the boom is stable to avoid displacement during the measurement process;

[0073] Furthermore, high-precision accelerometers and displacement meters were installed at the midpoint and both ends of each boom, with a total of 360 sensor points, and the connection between the sensor and the boom was ensured to be stable to avoid displacement during the measurement process;

[0074] Furthermore, a high-performance data logger was selected, the sampling rate was set to 1000 Hz, the acquisition time was 10 minutes, and all sensors were ensured to be synchronized with the data logger;

[0075] Furthermore, natural wind was selected as the excitation source, wind speed and direction were recorded, and low-frequency vibration was artificially applied as auxiliary excitation;

[0076] Furthermore, data collection and recording were performed in three time periods: morning, noon, and evening to cover different environmental conditions;

[0077] Furthermore, using digital signal processing software, the collected time domain signal is Fourier transformed to be converted into a frequency domain signal, and a Hanning window function is applied to reduce spectrum leakage;

[0078] Furthermore, the peaks in the spectrum are identified, corresponding to the natural frequencies of the bridge, and the dynamic characteristics of the hanger are estimated through the distribution of the peaks;

[0079] Finally, the actual tension of each hanger is obtained according to the relationship between the natural frequency and the hanger tension.

[0080] Wherein, the S100 includes: Figure 2 As shown in the figure, after all the hangers of the whole bridge are installed, the spectrum method as mentioned above is used to measure the hanger force of the whole bridge, among which the two hangers under the cable clamp numbered i have a force T i1 With T i2, the measured force of the suspension rod of the i cable clamp is T i实测 =T i1 +T i2 , lifting force deviation △ i =T i -T i实测 , T i is the theoretical lifting force.

[0081] Further, step S200 includes:

[0082] S201. Construct the cable force influence matrix:

[0083]

[0084] Where, m represents the number of cable clamps; {TK} represents the cable force influence matrix; k represents the influence coefficient of the cable force influence matrix;

[0085] S202, when adjusting the force of the i-th cable clamp, the measured force deviation between the i-th and i+1 cable clamps is △ i and i+1 , then the resultant force after adjustment of the cable clamps numbered i and i+1 is:

[0086]

[0087] In the formula, △ i and i+1 Respectively represent the resultant force deviation of the cable clamp numbered i and i+1; T' i It represents the theoretical value of the suspension rod force of the cable clamp number i after the adjustment of the cable clamp number i and i+1; T' i+1 It represents the theoretical value of the suspension rod force of the cable clamp number i+1 after the cable clamp number i and i+1 are adjusted; T i实测 It indicates the actual measured value of the suspension rod force of the cable clamp No. i before the cable clamp No. i is adjusted;

[0088] T i+1实测 It indicates the measured value of the suspension rod force of the No. i+1 cable clamp before the No. i+1 cable clamp is adjusted;

[0089] S203, when adjusting the suspension rod force of the i+1th cable clamp, the measured force deviation of the cable clamps numbered i+1 and i+2 is △' i+1 and i+2 , then the resultant force after adjustment of the cable clamps numbered i+ and i+1 is:

[0090]

[0091] In the formula, △′ i+1 and i+2 Respectively represent the resultant force deviation of the cable clamps numbered i+1 and i+2; T” i+1 It represents the theoretical value of the suspension rod force of the i+1 cable clamp after the i+1 and i+2 cable clamps are adjusted; T'i+2 It represents the theoretical value of the suspension rod force of the i+2 cable clamp after the i+1 and i+2 cable clamps are adjusted; T' i+1实测 It indicates the measured value of the suspension rod force of the cable clamp number i+1 after the suspension force of the cable clamp number i is adjusted; T' i+2实测 It indicates the measured value of the suspension rod force of the cable clamp No. i+2 after the suspension force of the cable clamp No. i is adjusted;

[0092] In this way, the suspension force of the entire bridge is adjusted from the main tower to both sides.

[0093] Furthermore, the full-bridge suspender force deviation vector in step S300 is:

[0094] {△T}=[△T1△T2…△T m ] T ;

[0095] Furthermore, the bridge deck elevation deviation vector is:

[0096] {△Z}=[△Z1△Z2…△Z m ] T

[0097] In the formula, {△T} represents the deviation vector of the whole bridge hanger force; {△Z} represents the bridge deck elevation deviation vector; T represents the vector transposition sign;

[0098] Furthermore, the stress-free length increment vector in step S400 is:

[0099] {△L}=[△L1△L2…△L m ] T

[0100] Where {△L} represents the stress-free length increment vector.

[0101] Furthermore, the final cable force deviation value and the final bridge deck line deviation value in step S500 are calculated as:

[0102] {△T 终}={△T}+{WTK}×{△L}; {△Z 终}={△Z}+{WZK}×{△L}

[0103] Where, {WTK} represents the influence matrix of stress-free length increment on cable force; {WZK} represents the influence matrix of stress-free length increment on bridge deck line shape; {△T 终} represents the final cable force deviation value; {△Z 终} represents the final bridge deck linear deviation value.

[0104] Furthermore, the boundary condition in step S600 is:

[0105] {△T 终}∈[△T 下 , △T 上 ],{△Z 终}∈[△Z 下 , △Z 上 ], {△L}∈[△L 下 ,△

[0106] L 上 ]

[0107] Where, △T 下 Indicates the lower limit of cable force deviation; △T 上 Indicates the upper limit of cable force deviation; △Z 下 Indicates the lower limit of bridge deck linear deviation; △L 下 Indicates the lower limit of the anchor head adjustment amount.

[0108] Furthermore, an embodiment of the present invention further provides a suspension bridge hanger force and bridge deck linear adjustment system, which is implemented by applying any step of the suspension bridge hanger force and bridge deck linear adjustment method, including:

[0109] The first module is used to calculate the resultant force of the boom and the deviation of the resultant force of the boom according to the force of the boom under each cable clamp;

[0110] The second module is used to adjust the uniformity of the resultant force of each cable clamp suspender rod according to the resultant force deviation of the suspender rod;

[0111] The third module is used to obtain the whole bridge hanger force deviation vector and the bridge deck elevation deviation vector according to the hanger force and bridge deck linearity of the whole bridge;

[0112] The fourth module is used to construct a stress-free length increment vector, and to construct an influence matrix of the stress-free length increment on the cable force and an influence matrix of the stress-free length increment on the bridge deck line shape according to the stress-free length increment vector, the whole bridge hanger force deviation vector and the bridge deck elevation deviation vector;

[0113] The fifth module is used to calculate the final cable force deviation value according to the full-bridge hanger force deviation vector, the influence matrix of the stress-free length increment on the cable force, and the stress-free length increment vector; and calculate the final bridge deck linear deviation value according to the bridge deck elevation deviation vector, the influence matrix of the stress-free length increment on the cable force, and the stress-free length increment vector;

[0114] The sixth module is used to calculate the stress-free length increment vector value under the set boundary conditions according to the final cable force deviation value and the final bridge deck linear deviation value to complete the final adjustment.

[0115] Furthermore, an embodiment of the present invention also provides a computer-readable storage medium, in which a computer program is stored. The computer program is loaded and executed by a processor to implement any step of the above-mentioned method for adjusting the hanger force and bridge deck line shape of a suspension bridge.

[0116] In a fourth aspect, an embodiment of the present invention further provides an electronic device, comprising a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the processor implements any step of the above-mentioned method for adjusting the hanger force and bridge deck line shape of a suspension bridge when loading and executing the computer program.

[0117] It should be understood that, although the steps in the flowchart of the accompanying drawings are displayed in sequence as indicated by the arrows, these steps are not necessarily executed in sequence in the order indicated by the arrows. Unless otherwise specified herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least a part of the steps in the flowchart of the accompanying drawings may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and their execution order is not necessarily sequential, but can be executed in turn or alternately with other steps or at least a part of the sub-steps or stages of other steps.

[0118] The above description is only a partial implementation method of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A method for adjusting the hanger force and bridge deck line shape of a suspension bridge, characterized in that: include: S100, measuring the forces of two suspension rods under each cable clamp, calculating the measured suspension rod resultant force according to the suspension rod forces, and calculating the suspension rod resultant force deviation according to the theoretical suspension rod resultant force and the measured suspension rod resultant force; S200, adjusting the hanger rod resultant force under each cable clamp uniformly according to the hanger rod resultant force deviation; S300, measuring the hanger force and bridge deck line shape of the whole bridge, and obtaining the hanger force deviation vector of the whole bridge and the bridge deck elevation deviation vector; S400, constructing a stress-free length increment vector, and constructing an influence matrix of the stress-free length increment on the cable force and an influence matrix of the stress-free length increment on the bridge deck line shape according to the stress-free length increment vector, the whole bridge hanger force deviation vector and the bridge deck elevation deviation vector; S500, calculating the final cable force deviation value according to the whole bridge hanger force deviation vector, the influence matrix of the stress-free length increment on the cable force and the stress-free length increment vector; calculating the final bridge deck linear deviation value according to the bridge deck elevation deviation vector, the influence matrix of the stress-free length increment on the cable force and the stress-free length increment vector; S600, calculating the stress-free length increment vector value under the set boundary conditions according to the final cable force deviation value and the final bridge deck linear deviation value, and completing the final adjustment.

2. A suspension bridge hanger force and bridge deck linear adjustment method according to claim 1, characterized in that: Step S100 includes: T i实测 =T i1 +T i2 ;△ i =T i -T i实测 Where, T i1 With T i2 They represent the forces of the two suspension rods under the cable clamp numbered i; T i实测 represents the combined force of the suspension rod measured by the i cable clamp; T i Indicates the theoretical lifting force; i Indicates the resultant force deviation of cable clamp number i.

3. A suspension bridge hanger force and bridge deck linear adjustment method according to claim 2, characterized in that: Step S200 includes: S201. Construct the cable force influence matrix: Where, m represents the number of cable clamps; {TK} represents the cable force influence matrix; k represents the influence coefficient of the cable force influence matrix; S202, when adjusting the force of the i-th cable clamp, the measured force deviation between the i-th and i+1 cable clamps is △ i and i+1 , then the resultant force after adjustment of the cable clamps numbered i and i+1 is: In the formula, △ i and i+1 Respectively represent the resultant force deviation of the cable clamp numbered i and i+1; T' i It represents the theoretical value of the suspension rod force of the cable clamp number i after the adjustment of the cable clamp number i and i+1; T' i+1 It represents the theoretical value of the suspension rod force of the cable clamp number i+1 after the cable clamp number i and i+1 are adjusted; T i实测 It indicates the measured value of the suspension rod force of the cable clamp No. i before the cable clamp No. i is adjusted; T i+1实测 It indicates the measured value of the suspension rod force of the No. i+1 cable clamp before the No. i+1 cable clamp is adjusted; S203, when adjusting the suspension rod force of the i+1th cable clamp, the measured force deviation of the cable clamps numbered i+1 and i+2 is △' i+1 and i+2 , then the resultant force after adjustment of the cable clamps numbered i+ and i+1 is: In the formula, △′ i+1 and i+2 Respectively represent the resultant force deviation of the cable clamps numbered i+1 and i+2; T” i+1 It represents the theoretical value of the suspension rod force of the i+1 cable clamp after the i+1 and i+2 cable clamps are adjusted; T' i+2 It represents the theoretical value of the suspension rod force of the i+2 cable clamp after the i+1 and i+2 cable clamps are adjusted; T' i+1实测 It indicates the measured value of the suspension rod force of the cable clamp number i+1 after the suspension force of the cable clamp number i is adjusted; T' i+2实测 It indicates the measured value of the suspension rod force of the cable clamp No. i+2 after the suspension force of the cable clamp No. i is adjusted; In this way, the suspension force of the entire bridge is adjusted from the main tower to both sides.

4. A suspension bridge hanger force and bridge deck linear adjustment method according to claim 1, characterized in that: The full-bridge suspender force deviation vector in step S300 is: {△T}=[△T1△T2…△T m ] T ; Furthermore, the bridge deck elevation deviation vector is: {△Z}=[△Z1△Z2…△Z m ] T In the formula, {△T} represents the deviation vector of the whole bridge hanger force; {△Z} represents the deviation vector of the bridge deck elevation; T represents the vector transposition sign.

5. A suspension bridge hanger force and bridge deck linear adjustment method according to claim 1, characterized in that: The stress-free length increment vector in step S400 is: {△L}=[△L1△L2…△L m ] T Where {△L} represents the stress-free length increment vector.

6. A method for adjusting the hanger force and bridge deck line shape of a suspension bridge according to any one of claims 1 to 5, characterized in that: The final cable force deviation value and the final bridge deck linear deviation value in step S500 are calculated as: {△T 终 }={△T}+{WTK}×{△L};{△Z 终 }={△Z}+{WZK}×{△L} Where, {WTK} represents the influence matrix of stress-free length increment on cable force; {WZK} represents the influence matrix of stress-free length increment on bridge deck line shape; {△T 终 } represents the final cable force deviation value; {△Z 终 } represents the final bridge deck linear deviation value.

7. A suspension bridge hanger force and bridge deck linear adjustment method according to claim 6, characterized in that: The boundary conditions in step S600 are: {△T 终 }∈[△T 下 ,△T 上 ],{△Z 终 }∈[△Z 下 ,△Z 上 ],{△L}∈[△L 下 ,△L 上 ] Where, △T 下 Indicates the lower limit of cable force deviation; △T 上 Indicates the upper limit of cable force deviation; △Z 下 Indicates the lower limit of bridge deck linear deviation; △L 下 Indicates the lower limit of the anchor head adjustment amount.

8. A suspension bridge hanger force and bridge deck linear adjustment system, which is implemented by using the suspension bridge hanger force and bridge deck linear adjustment method according to any one of claims 1 to 8, characterized in that: include: The first module is used to calculate the resultant force of the boom and the deviation of the resultant force of the boom according to the force of the boom under each cable clamp; The second module is used to adjust the uniformity of the resultant force of each cable clamp suspender rod according to the resultant force deviation of the suspender rod; The third module is used to obtain the whole bridge hanger force deviation vector and the bridge deck elevation deviation vector according to the hanger force and bridge deck linearity of the whole bridge; The fourth module is used to construct a stress-free length increment vector, and to construct an influence matrix of the stress-free length increment on the cable force and an influence matrix of the stress-free length increment on the bridge deck line shape according to the stress-free length increment vector, the whole bridge hanger force deviation vector and the bridge deck elevation deviation vector; The fifth module is used to calculate the final cable force deviation value according to the full-bridge hanger force deviation vector, the influence matrix of the stress-free length increment on the cable force, and the stress-free length increment vector; and calculate the final bridge deck linear deviation value according to the bridge deck elevation deviation vector, the influence matrix of the stress-free length increment on the cable force, and the stress-free length increment vector; The sixth module is used to calculate the stress-free length increment vector value under the set boundary conditions according to the final cable force deviation value and the final bridge deck linear deviation value to complete the final adjustment.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, which is loaded and executed by a processor to implement a method for adjusting the hanger force and bridge deck line shape of a suspension bridge according to any one of claims 1 to 7.

10. An electronic device comprising a processor, a memory, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor loads and executes the computer program, a method for adjusting the hanger force and bridge deck line shape of a suspension bridge according to any one of claims 1-7 is implemented.

Citation Information

Cited By

  • Suspender cable force retest adjusting method based on intelligent tensioning system

    CN120470873A