By dividing energy storage clusters with the degree of electrical coupling and structural strength, and using the subjective and objective combination empowerment method to evaluate the active support capabilities of energy storage power plants, the problem of difficulty in evaluating the active support of energy storage power plants in the existing technology is solved. Achieve more efficient and stable utilization of active support capabilities.

CN118940964APending Publication Date: 2024-11-12ENERGY STORAGE RES INST OF CHINA SOUTHERN POWER GRID PEAK-FREQUENCY MODULATION POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411111359.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing technology lacks effective methods to evaluate the active support capabilities of energy storage power stations for the power grid, making it difficult to efficiently and stably use energy storage power stations to actively support the power grid.

Method used

By dividing energy storage clusters based on the comprehensive performance indicators of energy storage power plants, and using the subjective and objective combination empowerment method to establish a support matrix, determine the active support capacity evaluation level of the energy storage cluster, and ensure that the energy storage power plants with the degree of electrical coupling and structural strength are consistent with the degree of structural coupling and energy storage power plants. At the same time, it actively supports the power grid.

Benefits of technology

It improves the efficiency and stability of active support work, and improves the utilization rate of small-capacity energy storage power plants.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940964A_ABST
    Figure CN118940964A_ABST
Patent Text Reader

Abstract

The invention discloses an active support capability evaluation method, device and equipment and a readable storage medium, and belongs to the field of power systems.The method comprises the steps that firstly, an energy storage power station set is divided into multiple energy storage clusters based on comprehensive performance indexes and a preset division target, and then the energy storage clusters are divided into multiple energy storage clusters based on active support capability evaluation indexes; a support degree matrix (namely scores of the active support capability of each energy storage cluster) is established through a subjective and objective combination weighting method, and finally the scores can be simplified into evaluation levels of the active support capability, so that a user can select a storage cluster with a proper evaluation level. Therefore, each energy storage power station with consistent electrical coupling degree and structural strength in the energy storage cluster actively supports the power grid at the same time, the efficiency and stability of active support work are improved, and the utilization rate of the small-capacity energy storage power station can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power systems, and in particular to an active support capability evaluation method, device, equipment and a readable storage medium. Background Art

[0002] With the installation of a large number of new energy storage power stations and grid-connected power generation, the number of energy storage power stations connected to the power grid is large and the characteristics are complex. Energy storage power stations can actively support the power grid (that is, peak and frequency regulation of the power grid). Therefore, it is particularly important to understand the active support capability of energy storage power stations for the power grid. However, the relevant technology lacks a mature method for evaluating the active support capability of energy storage power stations for the power grid, which makes it difficult to efficiently and stably use energy storage power stations to actively support the power grid.

[0003] Therefore, how to provide a solution to the above technical problems is a problem that those skilled in the art need to solve at present. Summary of the invention

[0004] The purpose of the present invention is to provide an active support capability evaluation method, device, equipment and readable storage medium, so that users can select a storage cluster with an appropriate evaluation level, so that each energy storage power station in the energy storage cluster with "consistency in electrical coupling degree and structural strength" can actively support the power grid at the same time, which not only improves the efficiency and stability of the active support work, but also improves the utilization rate of small-capacity energy storage power stations.

[0005] In order to solve the above technical problems, the present invention provides an active support capability evaluation method, comprising:

[0006] Based on the comprehensive performance indicators of each energy storage power station in the energy storage power station set and the preset division target, the energy storage power station set is divided into a plurality of energy storage clusters, wherein the energy storage power station set includes each energy storage power station connected to the power grid, the comprehensive performance indicators include structural indicators and functional indicators, and the preset division target is to make each energy storage power station in the energy storage cluster consistent in terms of electrical coupling degree and structural strength;

[0007] Based on the active support capability evaluation index of each energy storage power station, a support degree matrix is ​​established through a subjective and objective combined weighting method, wherein the support degree matrix includes the score of each energy storage cluster's active support capability for the power grid;

[0008] According to the scores of the energy storage clusters, the evaluation level of the active support capability of the energy storage clusters for the power grid is determined, wherein the number of the evaluation levels is less than the number of the energy storage clusters.

[0009] On the other hand, based on the comprehensive performance indicators of each energy storage power station in the energy storage power station set and the preset division target, the energy storage power station set is divided into a plurality of energy storage clusters including:

[0010] For any pair of energy storage power stations in the energy storage power station set, determining the similarity of comprehensive performance indicators between two energy storage power stations in the pair of energy storage power stations;

[0011] Initializing a responsibility matrix and an availability matrix of the energy storage power station set, wherein the responsibility matrix includes the responsibility value of each energy storage power station pair in the energy storage power station set, and the availability matrix includes the availability of each energy storage power station pair in the energy storage power station set;

[0012] Iteratively updating the responsibility matrix and the availability matrix according to the similarity;

[0013] The energy storage power station set is divided into a plurality of energy storage clusters according to a comprehensive matrix, wherein the comprehensive matrix refers to: the sum of the responsibility matrix and the availability matrix after iterative update.

[0014] On the other hand, iteratively updating the responsibility matrix and the availability matrix according to the similarity includes:

[0015] For any energy storage power station pair in the energy storage power station set, based on the availability and similarity of the energy storage power station pair, the responsibility value of the energy storage power station pair is updated by a first relational expression;

[0016] For any energy storage power station pair in the energy storage power station set, based on the current responsibility value of the energy storage power station pair, the availability of the energy storage power station pair is updated by a second relational expression;

[0017] When the preset iteration criteria are met, stop updating the current responsibility matrix and availability matrix;

[0018] When the preset iteration standard is not met, the step of updating the responsibility value of any energy storage power station pair in the energy storage power station set based on the availability and similarity of the energy storage power station pair is performed.

[0019] On the other hand, the first relational expression includes:

[0020] ;

[0021] The second relational expression includes:

[0022] ;

[0023] ;

[0024] Among them, R is the responsibility matrix, s is the similarity, A is the responsibility matrix, R(i,k) represents the responsibility value of the energy storage station with sequence number i and the energy storage station with sequence number k, s(i,k) represents the similarity between the energy storage station with sequence number i and the energy storage station with sequence number k, A(i,k) represents the availability of the energy storage station with sequence number i and the energy storage station with sequence number k, R(k,k) represents the responsibility value of the energy storage station with sequence number k and itself, and A(k,k) represents the availability of the energy storage station with sequence number k and itself.

[0025] On the other hand, based on the active support capacity evaluation indicators of each energy storage power station, the support degree matrix is ​​established through the subjective and objective combined weighting method, including:

[0026] Obtain active support capability evaluation indicators of each energy storage power station, wherein the active support capability evaluation indicators include grid-side indicators and energy storage power station-side indicators related to the active support capability of the energy storage power station to the power grid, the grid-side indicators and the energy storage power station-side indicators both include primary technical indicators and secondary technical indicators, and the primary technical indicators include secondary technical indicators;

[0027] For any preset grid demand scenario, the subjective weight of the active support capability evaluation index of each energy storage power station under the grid demand scenario is determined by the hierarchical analysis method;

[0028] For any preset grid demand scenario, the objective weight of the active support capability evaluation index of each energy storage power station under the grid demand scenario is determined by the entropy weight method;

[0029] For any preset grid demand scenario, the weight distribution coefficient of each energy storage power station under the grid demand scenario is determined by a preset subjective and objective attribute consistency model, wherein the weight distribution coefficient includes a first distribution coefficient of subjective weight and a second distribution coefficient of objective weight;

[0030] For any preset grid demand scenario, the subjective weight and objective weight of each energy storage power station in the grid demand scenario are weighted by the corresponding weight allocation coefficient to obtain the score of each energy storage power station's active support capability for the grid in the grid demand scenario;

[0031] For any preset grid demand scenario, the cluster scores of each energy storage cluster in the grid demand scenario are constructed as a support matrix for the grid demand scenario, wherein the cluster score refers to the sum of the scores of each energy storage power station in the energy storage cluster in the grid demand scenario.

[0032] On the other hand, the subjective and objective attribute consistency model includes:

[0033] ;

[0034] Among them, H is the deviation degree of the preset subjective and objective attribute values, x ij is the standard value of the jth active support capability evaluation index of the energy storage power station with serial number i, i∈[1,2,3,…,m-1,m], j∈[1,2,3,…,n-1,n], m is the total number of energy storage power stations, n is the number of active support capability evaluation indicators, and are the subjective weight and objective weight of the energy storage power station with serial number i, α 1 is the first distribution coefficient, α 2 is the second distribution coefficient.

[0035] On the other hand, according to the scores of each energy storage cluster, the evaluation level of the active support capability of each energy storage cluster for the power grid is determined, including:

[0036] Divide the total score interval of each energy storage cluster into a preset number of sub-intervals, wherein the total score interval refers to the lowest score of the energy storage cluster to the highest score of the energy storage cluster;

[0037] For any subinterval, the median of the scores of the energy storage clusters in the subinterval is taken as a cluster center;

[0038] Cluster the scores of each energy storage cluster based on each cluster center;

[0039] If the score span in any cluster is not greater than the preset threshold, the clustering ends, and the evaluation level corresponding to each cluster is determined according to the numerical ranking of each cluster center, wherein the evaluation level of the cluster refers to: the evaluation level of the energy storage clusters corresponding to each score included in the cluster, and the evaluation level refers to: the evaluation level of the active support capability of the energy storage cluster for the power grid, and the numerical ranking of the cluster center is proportional to the evaluation level corresponding to the cluster;

[0040] If the score span in at least one cluster is greater than a preset threshold, the preset number is increased by one and the step of dividing the total score interval of each of the energy storage clusters into a preset number of sub-intervals is performed.

[0041] In order to solve the above technical problems, the present invention also provides an active support capability evaluation device, comprising:

[0042] A division module, for dividing the energy storage power station set into a plurality of energy storage clusters based on the comprehensive performance indicators of each energy storage power station in the energy storage power station set and a preset division target, wherein the energy storage power station set includes each energy storage power station connected to the power grid, the comprehensive performance indicators include structural indicators and functional indicators, and the preset division target is to make each energy storage power station in the energy storage cluster have consistency in terms of electrical coupling degree and structural strength;

[0043] Establish a module for establishing a support degree matrix through a subjective and objective combined weighting method based on the active support capability evaluation index of each energy storage power station, wherein the support degree matrix includes the score of the active support capability of each energy storage cluster for the power grid;

[0044] The determination module is used to determine the evaluation level of each energy storage cluster's active support capability for the power grid according to the score of each energy storage cluster, wherein the number of the evaluation levels is less than the number of the energy storage clusters.

[0045] In order to solve the above technical problems, the present invention also provides an active support capability evaluation device, comprising:

[0046] Memory for storing computer programs;

[0047] A processor is used to implement the steps of the active support capability assessment method as described above when executing the computer program.

[0048] In order to solve the above technical problems, the present invention also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the active support capability evaluation method as described above are implemented.

[0049] Beneficial effect: The present invention provides an evaluation method for active support capability. Considering that (1) some energy storage power stations have little chance to actively support the power grid due to their small capacity, and (2) each energy storage power station with a consistent degree of electrical coupling and structural strength is suitable for working at the same time, the present invention can first divide the energy storage power station set into multiple energy storage clusters based on comprehensive performance indicators and preset division targets, and then establish a support degree matrix (that is, the score of the active support capability of each energy storage cluster) through a subjective and objective combined weighting method based on the active support capability evaluation index. Finally, the score can be simplified into an evaluation level of active support capability, so that users can select a storage cluster with a suitable evaluation level, so that each energy storage power station in the energy storage cluster with "consistent degree of electrical coupling and structural strength" can actively support the power grid at the same time, which not only improves the efficiency and stability of the active support work, but also improves the utilization rate of small-capacity energy storage power stations.

[0050] The present invention also provides an active support capability evaluation device, equipment and computer-readable storage medium, which have the same beneficial effects as the above active support capability evaluation method. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the relevant technologies and the drawings required for use in the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0052] Figure 1 A schematic diagram of a flow chart of an active support capability evaluation method provided by the present invention;

[0053] Figure 2 A schematic flow chart of another active support capability evaluation method provided by the present invention;

[0054] Figure 3 A schematic diagram of a flow chart of an energy storage cluster rating method provided by the present invention;

[0055] Figure 4 A schematic diagram of the structure of an active support capability evaluation device provided by the present invention;

[0056] Figure 5 A schematic structural diagram of an active support capability evaluation device provided by the present invention. DETAILED DESCRIPTION

[0057] The core of the present invention is to provide an active support capability evaluation method, device, equipment and readable storage medium, so that users can select a storage cluster with an appropriate evaluation level, so that each energy storage power station in the energy storage cluster with "consistency in electrical coupling degree and structural strength" can actively support the power grid at the same time, which not only improves the efficiency and stability of the active support work, but also improves the utilization rate of small-capacity energy storage power stations.

[0058] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] Please refer to Figure 1 , Figure 1 A flow chart of an active support capability evaluation method provided by the present invention, the active support capability evaluation method comprising:

[0060] S101: Based on the comprehensive performance indicators of each energy storage power station in the energy storage power station set and the preset division target, the energy storage power station set is divided into a plurality of energy storage clusters, wherein the energy storage power station set includes each energy storage power station connected to the power grid, the comprehensive performance indicators include structural indicators and functional indicators, and the preset division target is to make each energy storage power station in the energy storage cluster consistent in terms of electrical coupling degree and structural strength;

[0061] Specifically, considering the technical problems in the above background technology, and considering that (1) some energy storage power stations have little chance to actively support the power grid due to their small capacity, and (2) the energy storage power stations with the same electrical coupling degree and structural strength are suitable for working at the same time, the embodiment of the present invention intends to divide the energy storage power station set into energy storage clusters with "consistent electrical coupling degree and structural strength", and then evaluate the active support capability based on the energy storage cluster, so as to facilitate the staff to carry out active support work for the power grid based on the energy storage cluster. Not only can the energy storage power stations with "consistent electrical coupling degree and structural strength" in the energy storage cluster actively support the power grid at the same time, thereby improving the efficiency and stability of the active support work, but also can improve the utilization rate of small-capacity energy storage power stations.

[0062] Specifically, based on the above considerations, in this step, the energy storage power station set can first be divided into multiple energy storage clusters based on the comprehensive performance indicators of each energy storage power station in the energy storage power station set and the preset division target. In order to achieve the preset division target, the embodiment of the present invention selects the comprehensive performance indicators of the energy storage power station related to "electrical coupling degree and structural strength", that is, including structural indicators and functional indicators. The two types of indicators can be set independently. For example, functional indicators can include energy storage capacity, power and climbing rate, while structural indicators can include modularity based on electrical distance, etc. The embodiment of the present invention does not limit this.

[0063] Specifically, the definition of modularity can be as follows:

[0064] ;

[0065] Where ρ is the modularity, m is the total number of energy storage power stations, i and j represent the serial numbers of two different energy storage power stations, and e ij is the weight of the edge between the energy storage station with sequence number i and the energy storage station with sequence number j. When the energy storage station with sequence number i is directly connected to the energy storage station with sequence number j, e ij =1, when the energy storage station with serial number i is not connected to the energy storage station with serial number j ij =0,c= , c is the sum of the weights of all edges in the energy storage power station set, k i = , ki represents the sum of the weights of all edges connected to the energy storage power station with sequence number i, k j = , k j It represents the sum of the weights of all edges connected to the energy storage station with sequence number j. When the energy storage station with sequence number i and the energy storage station with sequence number j are in the same energy storage cluster The value is 1 if yes, otherwise it is 0.

[0066] S102: Based on the active support capability evaluation index of each energy storage power station, a support degree matrix is ​​established through a subjective and objective combined weighting method, wherein the support degree matrix includes the score of each energy storage cluster's active support capability for the power grid;

[0067] Specifically, in order to facilitate the staff to intuitively distinguish the active support capabilities of each energy storage cluster, the embodiment of the present invention intends to score the active support capabilities of each energy storage cluster for the power grid, that is, to establish a support matrix, and the energy storage cluster is composed of various energy storage power stations. The active support capabilities of the constituent power stations can be evaluated by the "active support capability evaluation index of the energy storage power station", and the subjective and objective combined weighting method can analyze the "active support capability evaluation index of the energy storage power station" from both subjective and objective perspectives, so as to comprehensively and accurately derive the active support capability scores of each energy storage cluster. Therefore, in the embodiment of the present invention, based on the active support capability evaluation index of each energy storage power station, a support matrix can be established by the subjective and objective combined weighting method.

[0068] S103: Determine, based on the scores of the energy storage clusters, an evaluation level of each energy storage cluster's active support capability for the power grid, wherein the number of evaluation levels is less than the number of energy storage clusters.

[0069] Specifically, considering that there may be certain errors in the scoring due to "data missing or outdated data during the scoring process", it is impossible to distinguish the strength of the active support capabilities between energy storage clusters with similar scores by relying on the scoring, and when there are many energy storage clusters, it is also difficult to select a suitable energy storage cluster. Therefore, in the embodiment of the present invention, the scoring is simplified to a smaller number of evaluation levels, so that energy storage clusters with relatively similar scores can be blurred into the same evaluation level, which can make it unnecessary for staff to distinguish between energy storage clusters with relatively similar scores for active support capabilities, reduce the difficulty of staff in identifying the active support capabilities of energy storage clusters, and improve work efficiency.

[0070] The present invention provides an evaluation method for active support capability. Considering that (1) some energy storage power stations have little chance to actively support the power grid due to their small capacity, and (2) various energy storage power stations with consistent electrical coupling degree and structural strength are suitable for working simultaneously, the present invention can first divide the energy storage power station set into multiple energy storage clusters based on comprehensive performance indicators and preset division targets, and then establish a support degree matrix (i.e., the score of the active support capability of each energy storage cluster) through a subjective and objective combined weighting method based on the active support capability evaluation index. Finally, the score can be simplified into an evaluation level of the active support capability, so that the user can select a storage cluster with a suitable evaluation level, so that various energy storage power stations in the energy storage cluster with "consistent electrical coupling degree and structural strength" can actively support the power grid at the same time, which not only improves the efficiency and stability of the active support work, but also improves the utilization rate of small-capacity energy storage power stations.

[0071] Based on the above embodiments:

[0072] As an optional embodiment, based on the comprehensive performance indicators of each energy storage power station in the energy storage power station set and the preset division target, the energy storage power station set is divided into multiple energy storage clusters including:

[0073] For any pair of energy storage power stations in the energy storage power station set, determining the similarity of comprehensive performance indicators between two energy storage power stations in the pair of energy storage power stations;

[0074] Initialize a responsibility matrix and an availability matrix of the energy storage power station set, wherein the responsibility matrix includes the responsibility value of each energy storage power station pair in the energy storage power station set, and the availability matrix includes the availability of each energy storage power station pair in the energy storage power station set;

[0075] Iteratively update the responsibility matrix and availability matrix based on similarity;

[0076] The energy storage power station collection is divided into multiple energy storage clusters according to the comprehensive matrix, where the comprehensive matrix refers to the sum of the iteratively updated responsibility matrix and the availability matrix.

[0077] Specifically, the embodiment of the present invention can adopt the principle of the neighbor propagation algorithm when dividing the energy storage cluster. The neighbor propagation algorithm is carried out between each energy storage power station through message (attraction and belonging), so that the center point of the energy storage cluster and each energy storage cluster can be adaptively determined. The basic idea of ​​the neighbor propagation algorithm is to treat all data points (energy storage power stations) as potential cluster centers, and then connect the data points to form a network (similarity matrix), and then calculate the cluster center of each sample through the message transmission of each edge in the network until m high-quality cluster centers are generated, and the remaining data points are assigned to the corresponding clusters.

[0078] Specifically, through the steps of the neighbor propagation algorithm as above, the energy storage power station can be efficiently and accurately divided into energy storage clusters that meet the preset division goals.

[0079] Specifically, dividing the energy storage power station set into multiple energy storage clusters according to the comprehensive matrix may include:

[0080] The sum of the iteratively updated responsibility matrix and the iteratively updated availability matrix is ​​used as a comprehensive matrix, wherein the comprehensive matrix includes comprehensive values ​​of each energy storage power station pair in the energy storage power station set, and the comprehensive value refers to: the sum of the availability and the responsibility value;

[0081] For energy storage power stations of a specified order, traverse all related power station pairs of energy storage power stations of the specified order, take the other energy storage power station in the related power station pair with the largest value as the center of the energy storage cluster of the specified order, and take the other energy storage power station in the related power station pair with a non-largest value as a member of the energy storage power station of the specified order, wherein the related power station pair refers to: an energy storage power station pair including the energy storage power station of the specified order, and the initial value of the specified order is 1;

[0082] Increase the specified order by one;

[0083] If the current specified order does not reach the total number of energy storage power stations, the step of "for the energy storage power stations of the specified order, traverse the related power station pairs of the energy storage power stations of the specified order, take the other energy storage power station in the related power station pair with the largest value as the center of the energy storage cluster of the specified order, and take the other energy storage power station in the related power station pair with a non-largest value as a member of the energy storage power station of the specified order" is executed;

[0084] If the current specified order reaches the total number of energy storage power stations, it will terminate.

[0085] There are many ways to calculate the similarity, such as negative Euclidean distance, etc., which are not limited in the embodiment of the present invention. The negative Euclidean distance is expressed as follows:

[0086] ;

[0087] Among them, s represents the similarity, represents the similarity between the energy storage power station with serial number i and the energy storage power station with serial number k, x i is the comprehensive performance index of the energy storage power station with serial number i, x k It is the comprehensive performance index of the energy storage power station with serial number k.

[0088] Among them, each value in the initialized responsibility matrix and availability matrix can be zero.

[0089] Of course, in addition to the above-mentioned specific methods, other methods may be used to "divide the energy storage power station set into multiple energy storage clusters based on the comprehensive performance indicators of each energy storage power station in the energy storage power station set and preset division targets", which is not limited in the embodiments of the present invention.

[0090] As an optional embodiment, iteratively updating the responsibility matrix and the availability matrix according to the similarity includes:

[0091] For any energy storage power station pair in the energy storage power station set, based on the availability and similarity of the energy storage power station pair, the responsibility value of the energy storage power station pair is updated through the first relational expression;

[0092] For any energy storage power station pair in the energy storage power station set, based on the current responsibility value of the energy storage power station pair, the availability of the energy storage power station pair is updated through the second relational expression;

[0093] When the preset iteration criteria are met, stop updating the current responsibility matrix and availability matrix;

[0094] When the preset iteration standard is not met, a step of updating the responsibility value of the energy storage power station pair based on the availability and similarity of the energy storage power station pair is performed for any energy storage power station pair in the energy storage power station set.

[0095] Specifically, through the above method, the responsibility matrix and the availability matrix can be iteratively updated according to the similarity efficiently and stably.

[0096] As an optional embodiment, the first relational expression includes:

[0097] ;

[0098] The second relationship includes:

[0099] ;

[0100] ;

[0101] Among them, R is the responsibility matrix, s is the similarity, A is the responsibility matrix, R(i,k) represents the responsibility value of the energy storage station with sequence number i and the energy storage station with sequence number k, s(i,k) represents the similarity between the energy storage station with sequence number i and the energy storage station with sequence number k, A(i,k) represents the availability of the energy storage station with sequence number i and the energy storage station with sequence number k, R(k,k) represents the responsibility value of the energy storage station with sequence number k and itself, and A(k,k) represents the availability of the energy storage station with sequence number k and itself.

[0102] Specifically, through the above first and second relationship formulas, the iterative update of the responsibility matrix and the availability matrix can be performed more efficiently and accurately.

[0103] Of course, in addition to the above specific forms, the first relational expression and the second relational expression may also be in other specific forms, which are not limited in the embodiments of the present invention.

[0104] Specifically, the expression of the comprehensive matrix can be: S(i,k)=R(i,k)+A(i,k), where S is the comprehensive matrix, and S(i,k) is the comprehensive value of the energy storage power station with serial number i and the energy storage power station with serial number k.

[0105] As an optional embodiment, based on the active support capability evaluation index of each energy storage power station, a support degree matrix is ​​established by a subjective and objective combined weighting method, including:

[0106] Obtain active support capability evaluation indicators of each energy storage power station, wherein the active support capability evaluation indicators include grid-side indicators and energy storage power station-side indicators related to the active support capability of the energy storage power station to the grid, and both the grid-side indicators and the energy storage power station-side indicators include primary technical indicators and secondary technical indicators, and the primary technical indicators include secondary technical indicators;

[0107] For any preset grid demand scenario, the subjective weight of the active support capacity evaluation index of each energy storage power station under the grid demand scenario is determined by the hierarchical analysis method;

[0108] For any preset grid demand scenario, the objective weight of the active support capability evaluation index of each energy storage power station under the grid demand scenario is determined by the entropy weight method;

[0109] For any preset grid demand scenario, the weight distribution coefficient of each energy storage power station under the grid demand scenario is determined by a preset subjective and objective attribute consistency model, wherein the weight distribution coefficient includes a first distribution coefficient of subjective weight and a second distribution coefficient of objective weight;

[0110] For any preset grid demand scenario, the subjective weight and objective weight of each energy storage power station in the grid demand scenario are weighted by the corresponding weight allocation coefficient to obtain the score of each energy storage power station's active support capability for the grid in the grid demand scenario;

[0111] For any preset grid demand scenario, the cluster scores of each energy storage cluster in the grid demand scenario are constructed as a support matrix for the grid demand scenario, where the cluster score refers to the sum of the scores of each energy storage power station in the energy storage cluster in the grid demand scenario.

[0112] Specifically, considering that the active support capability evaluation index "related to the active support capability of the energy storage power station for the power grid" includes not only the indicators on the energy storage power station side, but also the indicators on the power grid side, the active support capability evaluation index in the embodiment of the present invention includes the power grid side indicators and the energy storage power station side indicators related to the active support capability of the energy storage power station for the power grid, and both the power grid side indicators and the energy storage power station side indicators include the first-level technical indicators and the second-level technical indicators, and the first-level technical indicators include the second-level technical indicators; thereby, the active support capability evaluation index used in the embodiment of the present invention is relatively comprehensive, which is conducive to improving the accuracy of the scoring of the active support capability of the energy storage cluster.

[0113] For details, please refer to the following Table 1, which is an active support capability evaluation index table:

[0114] Table 1

[0115]

[0116] Among them, the first-level technical indicators of the energy storage power station side indicators in Table 1 include safety, flexibility and economy.

[0117] Specifically, to better illustrate the embodiments of the present invention, please refer to Figure 2 , Figure 2 A flow chart of another active support capability evaluation method provided by the present invention, including comprehensive structural and functional indicators (i.e., determining comprehensive performance indicators), grouping based on the nearest neighbor propagation algorithm (i.e., dividing the energy storage power station set into multiple energy storage clusters based on the nearest neighbor propagation algorithm), a multi-level and multi-dimensional energy storage cluster indicator system (determining active support capability evaluation indicators of energy storage power stations), establishing a support matrix using a subjective and objective combined weighting method (i.e., establishing a support matrix based on the active support capability evaluation indicators of each energy storage power station using a subjective and objective combined weighting method), and hierarchical evaluation of energy storage clusters (i.e., determining the evaluation level of each energy storage cluster's active support capability for the power grid based on the score of each energy storage cluster).

[0118] Specifically, for any preset grid demand scenario, the subjective weights of the active support capability evaluation indicators of each energy storage power station under the grid demand scenario can be determined by the hierarchical analysis method, including:

[0119] Each first-level technical indicator in the active support capability evaluation index is forward-oriented and standardized (normalized); for the power grid demand scenario, the first judgment matrix corresponding to each first-level technical indicator is constructed; the maximum eigenvalue corresponding to each first judgment matrix is ​​solved; for any first-level indicator weight, the first-level indicator weight under the power grid demand scenario is obtained according to the maximum eigenvalue;

[0120] Each secondary technical indicator in the active support capability evaluation index is forward-oriented and standardized (normalized); for the power grid demand scenario, a second judgment matrix corresponding to each secondary technical indicator is constructed; the maximum eigenvalue corresponding to each second judgment matrix is ​​solved; for any secondary indicator weight, the secondary indicator weight under the power grid demand scenario is obtained according to the maximum eigenvalue;

[0121] For any energy storage power station, the sum of the primary indicator weight and the secondary indicator weight is taken as the subjective weight of the energy storage power station in the grid demand scenario.

[0122] Among them, the preset power grid demand scenario can be flexibly set, for example, it can include peak load regulation, frequency regulation and emergency power support, etc., which is not limited in the embodiment of the present invention.

[0123] Specifically, the support matrix can be:

[0124] ;

[0125] Among them, U is the support matrix, a qz It is the score of the active support capability of the energy storage cluster with serial number q in the grid demand scenario with serial number z.

[0126] As an optional embodiment, the subjective and objective attribute consistency model includes:

[0127] ;

[0128] Among them, H is the deviation degree of the preset subjective and objective attribute values, x ij is the standard value of the jth active support capability evaluation index of the energy storage power station with serial number i, i∈[1,2,3,…,m-1,m], j∈[1,2,3,…,n-1,n], m is the total number of energy storage power stations, n is the number of active support capability evaluation indicators, and are the subjective weight and objective weight of the energy storage power station with serial number i, α 1 is the first distribution coefficient, α 2 is the second distribution coefficient.

[0129] Specifically, the subjective and objective attribute consistency model in the embodiment of the present invention is relatively concise, and the weight distribution coefficient of each energy storage power station in the grid demand scenario can be determined efficiently and accurately through the subjective and objective attribute consistency model.

[0130] Of course, in addition to this specific form, the subjective and objective attribute consistency model may also be in other specific forms, which are not limited in the embodiments of the present invention.

[0131] As an optional embodiment, according to the scores of each energy storage cluster, determining the evaluation level of each energy storage cluster's active support capability for the power grid includes:

[0132] The total score interval of each energy storage cluster is divided into a preset number of sub-intervals, wherein the total score interval refers to the lowest score of the energy storage cluster to the highest score of the energy storage cluster;

[0133] For any subinterval, the median of the scores of the energy storage clusters in the subinterval is taken as a cluster center;

[0134] Cluster the scores of each energy storage cluster based on each cluster center;

[0135] If the score span in any cluster is not greater than the preset threshold, the clustering ends, and the evaluation level corresponding to each cluster is determined according to the numerical ranking of each cluster center, wherein the evaluation level of the cluster refers to: the evaluation level of the energy storage clusters corresponding to each score included in the cluster, and the evaluation level refers to: the evaluation level of the active support capability of the energy storage cluster for the power grid, and the numerical ranking of the cluster center is proportional to the evaluation level corresponding to the cluster;

[0136] If the score span in at least one cluster is greater than a preset threshold, the preset number is increased by one and the step of dividing the total score interval of each energy storage cluster into a preset number of sub-intervals is performed.

[0137] Specifically, to better illustrate the embodiments of the present invention, please refer to Figure 3 , Figure 3 A flow chart of a method for rating an energy storage cluster provided by the present invention. In the embodiment of the present invention, the number of cluster centers can be determined (i.e., confirmation of the current preset number) so as to divide the total score interval of each energy storage cluster into a preset number of sub-intervals. Then, the median of each sub-interval can be selected as the initial cluster center, i.e., "for any sub-interval, the median of the score of the energy storage cluster in the sub-interval is used as a cluster center". Then, the preset clustering algorithm can be used to cluster the scores, i.e., "cluster the scores of each energy storage cluster based on each cluster center". Then, it is judged whether "the score span in each cluster is not greater than the preset threshold". If so (i.e., if the score span in any cluster is not greater than the preset threshold), the rating can be performed according to the size of the cluster center (i.e., the evaluation level corresponding to each cluster is determined according to the numerical sorting of each cluster center). If not (i.e., if the score span in at least one cluster is greater than the preset threshold), a cluster center can be added (i.e., the preset number is increased by one) and the action of determining the number of cluster centers is performed.

[0138] The preset clustering algorithm may be of various types, for example, k-means++ (an improved K-means clustering algorithm), etc., which is not limited in the embodiment of the present invention.

[0139] Specifically, through the above steps, the scores can be clustered into a smaller number of evaluation levels, and the score span (that is, the absolute value of the difference between the minimum score and the maximum score) of the scores included in the cluster of the same evaluation level is less than the preset threshold, so that energy storage clusters with similar scores can be classified into the same evaluation level.

[0140] Specifically, the initial value of the preset number can be set independently. For example, the elbow method can be used to determine the initial value of the preset number according to the numerical distribution of the score. The embodiment of the present invention is not limited here.

[0141] The preset threshold value may be independently set, for example, may be 0.1, etc., and the embodiment of the present invention does not limit this.

[0142] Please refer to Figure 4 , Figure 4 A schematic diagram of the structure of an active support capability evaluation device provided by the present invention, the active support capability evaluation device comprising:

[0143] A division module 41 is used to divide the energy storage power station set into a plurality of energy storage clusters based on the comprehensive performance indicators of each energy storage power station in the energy storage power station set and a preset division target, wherein the energy storage power station set includes each energy storage power station connected to the power grid, the comprehensive performance indicators include structural indicators and functional indicators, and the preset division target is to make each energy storage power station in the energy storage cluster consistent in terms of electrical coupling degree and structural strength;

[0144] Establishing module 42, for establishing a support degree matrix through a subjective and objective combined weighting method based on the active support capability evaluation index of each energy storage power station, wherein the support degree matrix includes the score of each energy storage cluster's active support capability for the power grid;

[0145] The determination module 43 is used to determine the evaluation level of each energy storage cluster's active support capability for the power grid according to the scores of each energy storage cluster, wherein the number of evaluation levels is less than the number of energy storage clusters.

[0146] For an introduction to the active support capability evaluation device provided in an embodiment of the present invention, please refer to the aforementioned embodiment of the active support capability evaluation method, and the embodiment of the present invention will not be described in detail here.

[0147] Please refer to Figure 5 , Figure 5 A schematic diagram of the structure of an active support capability evaluation device provided by the present invention, the active support capability evaluation device comprising:

[0148] A memory 51, used for storing computer programs;

[0149] The processor 52 is used to implement the steps of the active support capability assessment method in the aforementioned embodiment when executing the computer program.

[0150] For an introduction to the active support capability evaluation device provided in an embodiment of the present invention, please refer to the aforementioned embodiment of the active support capability evaluation method, and the embodiment of the present invention will not be described in detail here.

[0151] The present invention also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the method for evaluating active support capability in the aforementioned embodiment are implemented.

[0152] For an introduction to the computer-readable storage medium provided in an embodiment of the present invention, please refer to the aforementioned embodiment of the active support capability evaluation method, and the embodiment of the present invention will not be described in detail here.

[0153] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments, and the same and similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description. It should also be noted that in this specification, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is any such actual relationship or order between these entities or operations. Moreover, the term "include", "comprise" or any other variant thereof is intended to cover non-exclusive inclusion, so that the process, method, article or equipment including a series of elements includes not only those elements, but also includes other elements that are not explicitly listed, or also includes elements inherent to such process, method, article or equipment. In the absence of more restrictions, the elements defined by the sentence "including one..." do not exclude the existence of other identical elements in the process, method, article or equipment including the element.

[0154] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for evaluating active support capability, characterized in that: include: Based on the comprehensive performance indicators of each energy storage power station in the energy storage power station set and the preset division target, the energy storage power station set is divided into a plurality of energy storage clusters, wherein the energy storage power station set includes each energy storage power station connected to the power grid, the comprehensive performance indicators include structural indicators and functional indicators, and the preset division target is to make each energy storage power station in the energy storage cluster consistent in terms of electrical coupling degree and structural strength; Based on the active support capability evaluation index of each energy storage power station, a support degree matrix is ​​established through a subjective and objective combined weighting method, wherein the support degree matrix includes the score of each energy storage cluster's active support capability for the power grid; According to the scores of the energy storage clusters, the evaluation level of the active support capability of the energy storage clusters for the power grid is determined, wherein the number of the evaluation levels is less than the number of the energy storage clusters.

2. The method for evaluating active support capability according to claim 1, characterized in that: Based on the comprehensive performance indicators of each energy storage power station in the energy storage power station set and the preset division target, the energy storage power station set is divided into multiple energy storage clusters including: For any pair of energy storage power stations in the energy storage power station set, determining the similarity of comprehensive performance indicators between two energy storage power stations in the pair of energy storage power stations; Initializing a responsibility matrix and an availability matrix of the energy storage power station set, wherein the responsibility matrix includes the responsibility value of each energy storage power station pair in the energy storage power station set, and the availability matrix includes the availability of each energy storage power station pair in the energy storage power station set; Iteratively updating the responsibility matrix and the availability matrix according to the similarity; The energy storage power station set is divided into a plurality of energy storage clusters according to a comprehensive matrix, wherein the comprehensive matrix refers to: the sum of the responsibility matrix and the availability matrix after iterative update.

3. The method for evaluating active support capability according to claim 2, characterized in that: Iteratively updating the responsibility matrix and the availability matrix according to the similarity includes: For any energy storage power station pair in the energy storage power station set, based on the availability and similarity of the energy storage power station pair, the responsibility value of the energy storage power station pair is updated by a first relational expression; For any energy storage power station pair in the energy storage power station set, based on the current responsibility value of the energy storage power station pair, the availability of the energy storage power station pair is updated by a second relational expression; When the preset iteration criteria are met, stop updating the current responsibility matrix and availability matrix; When the preset iteration standard is not met, the step of updating the responsibility value of any energy storage power station pair in the energy storage power station set based on the availability and similarity of the energy storage power station pair is performed.

4. The method for evaluating active support capability according to claim 3, characterized in that: The first relational expression includes: ; The second relational expression includes: ; ; Among them, R is the responsibility matrix, s is the similarity, A is the responsibility matrix, R(i,k) represents the responsibility value of the energy storage station with sequence number i and the energy storage station with sequence number k, s(i,k) represents the similarity between the energy storage station with sequence number i and the energy storage station with sequence number k, A(i,k) represents the availability of the energy storage station with sequence number i and the energy storage station with sequence number k, R(k,k) represents the responsibility value of the energy storage station with sequence number k and itself, and A(k,k) represents the availability of the energy storage station with sequence number k and itself.

5. The method for evaluating active support capability according to claim 1, characterized in that: Based on the active support capacity evaluation indicators of each energy storage power station, the support degree matrix is ​​established through the subjective and objective combined weighting method, including: Obtain active support capability evaluation indicators of each energy storage power station, wherein the active support capability evaluation indicators include grid-side indicators and energy storage power station-side indicators related to the active support capability of the energy storage power station to the power grid, the grid-side indicators and the energy storage power station-side indicators both include primary technical indicators and secondary technical indicators, and the primary technical indicators include secondary technical indicators; For any preset grid demand scenario, the subjective weight of the active support capability evaluation index of each energy storage power station under the grid demand scenario is determined by the hierarchical analysis method; For any preset grid demand scenario, the objective weight of the active support capability evaluation index of each energy storage power station under the grid demand scenario is determined by the entropy weight method; For any preset grid demand scenario, the weight distribution coefficient of each energy storage power station under the grid demand scenario is determined by a preset subjective and objective attribute consistency model, wherein the weight distribution coefficient includes a first distribution coefficient of subjective weight and a second distribution coefficient of objective weight; For any preset grid demand scenario, the subjective weight and objective weight of each energy storage power station in the grid demand scenario are weighted by the corresponding weight allocation coefficient to obtain the score of each energy storage power station's active support capability for the grid in the grid demand scenario; For any preset grid demand scenario, the cluster scores of each energy storage cluster in the grid demand scenario are constructed as a support matrix for the grid demand scenario, wherein the cluster score refers to the sum of the scores of each energy storage power station in the energy storage cluster in the grid demand scenario.

6. The method for evaluating active support capability according to claim 5, characterized in that: The subjective and objective attribute consistency model includes: ; Among them, H is the deviation degree of the preset subjective and objective attribute values, x ij is the standard value of the jth active support capability evaluation index of the energy storage power station with serial number i, i∈[1,2,3,…,m-1,m], j∈[1,2,3,…,n-1,n], m is the total number of energy storage power stations, n is the number of active support capability evaluation indicators, and are the subjective weight and objective weight of the energy storage power station with serial number i, α1 is the first allocation coefficient, and α2 is the second allocation coefficient.

7. The method for evaluating active support capability according to any one of claims 1 to 6, characterized in that: According to the scores of each energy storage cluster, the evaluation level of each energy storage cluster's active support capability for the power grid is determined, including: Divide the total score interval of each energy storage cluster into a preset number of sub-intervals, wherein the total score interval refers to the lowest score of the energy storage cluster to the highest score of the energy storage cluster; For any subinterval, the median of the scores of the energy storage clusters in the subinterval is taken as a cluster center; Cluster the scores of each energy storage cluster based on each cluster center; If the score span in any cluster is not greater than the preset threshold, the clustering ends, and the evaluation level corresponding to each cluster is determined according to the numerical ranking of each cluster center, wherein the evaluation level of the cluster refers to: the evaluation level of the energy storage clusters corresponding to each score included in the cluster, and the evaluation level refers to: the evaluation level of the active support capability of the energy storage cluster for the power grid, and the numerical ranking of the cluster center is proportional to the evaluation level corresponding to the cluster; If the score span in at least one cluster is greater than a preset threshold, the preset number is increased by one and the step of dividing the total score interval of each of the energy storage clusters into a preset number of sub-intervals is performed.

8. An active support capability assessment device, characterized in that: include: A division module, for dividing the energy storage power station set into a plurality of energy storage clusters based on the comprehensive performance indicators of each energy storage power station in the energy storage power station set and a preset division target, wherein the energy storage power station set includes each energy storage power station connected to the power grid, the comprehensive performance indicators include structural indicators and functional indicators, and the preset division target is to make each energy storage power station in the energy storage cluster have consistency in terms of electrical coupling degree and structural strength; Establish a module for establishing a support degree matrix through a subjective and objective combined weighting method based on the active support capability evaluation index of each energy storage power station, wherein the support degree matrix includes the score of the active support capability of each energy storage cluster for the power grid; The determination module is used to determine the evaluation level of each energy storage cluster's active support capability for the power grid according to the score of each energy storage cluster, wherein the number of the evaluation levels is less than the number of the energy storage clusters.

9. An active support capability assessment device, characterized in that: include: Memory for storing computer programs; A processor, configured to implement the steps of the active support capability assessment method as claimed in any one of claims 1 to 7 when executing the computer program.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the active support capability assessment method according to any one of claims 1 to 7 are implemented.