Engineering construction 5D visualization system and method based on cost progress management

By adopting a 5D visualization system based on cost progress management in infrastructure projects, using BIM three-dimensional model and WBS decomposition structure, the problems of quality, cost, progress integration and data management in infrastructure projects are solved, and real-time monitoring of project progress and costs are achieved and intuitive display, improving management efficiency.

CN118941229APending Publication Date: 2024-11-12GUIZHOU ELECTRIC POWER DESIGN INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410944716.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In infrastructure projects, it is difficult to effectively integrate and display elements such as quality, cost, and progress, and the project progress and cost data are stored in paper form, which is easy to be damaged and lost, affecting management efficiency.

Method used

Using a 5D visualization system for engineering construction based on cost progress management, including BIM three-dimensional model building module, cost management module, model identification module, time setting module, threshold setting module and visualization module, the BIM three-dimensional model is split into engineering through WBS decomposition structure Component, set the GUID unique identifier, update the construction progress information in real time, and set the automatic registration completion status through the threshold.

Benefits of technology

It improves information interoperability and communication efficiency, realizes in-depth summary and intuitive display of project costs and progress, eliminates the defects of paper materials, and provides more accurate and efficient decision-making support.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941229A_ABST
    Figure CN118941229A_ABST
Patent Text Reader

Abstract

The invention discloses an engineering construction 5D visualization system and method based on cost progress management. The engineering construction 5D visualization system comprises a BIM three-dimensional model establishment module, a cost management module, a model identification module, a time setting module, a threshold setting module, a data input module and a visualization module. Through introduction of the BIM technology, time setting and threshold setting, cost and progress are deeply summarized and presented in a more intuitive and vivid mode, a mapping relation is established between a BIM three-dimensional model and actual engineering through a WBS decomposition structure, information interoperability and timeliness are improved, and information exchange efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of digital construction of infrastructure projects, and in particular relates to a 5D visualization system and method for engineering construction based on cost and progress management. Background Art

[0003] In infrastructure projects, quality, cost and progress are the three core elements. How to effectively integrate these elements and display them intuitively has always been a challenge facing the industry. Through the introduction of BIM technology, these three elements are deeply summarized and presented in a more intuitive and vivid way, thus enabling engineering management to provide more accurate and efficient decision support.

[0004] Although BIM technology has the characteristics of informatization and visualization, the progress plan in actual projects will not remain unchanged. It will be gradually modified and improved as the project progresses. The incompleteness of project information and data has brought difficulties to the change of project progress and the effective control of costs. At the same time, in each construction process, a lot of data on project progress and costs will be generated, most of which are retained in paper versions, which are not easy to find and are easy to damage and lose. Summary of the invention

[0005] In order to solve the above problems, the present invention provides a 5D visualization system for engineering construction based on cost progress management, which enables managers to understand the progress of the project in real time, so as to plan the progress and cost of the project in a timely manner, and can also manage the data of the progress and cost of the project.

[0006] The technical solution adopted by the present invention is: a 5D visualization system and method for engineering construction based on cost schedule management, including a BIM three-dimensional model building module, a cost management module, a model identification module, a time setting module, a threshold setting module, a data input module and a visualization module; The BIM three-dimensional model building module is used to build a BIM three-dimensional model of the project; The model identification module uses the GUID as the globally unique identifier of the BIM three-dimensional model, and identifies the specified engineering component of the BIM three-dimensional model through the GUID unique identifier; The construction data management module splits the BIM three-dimensional model through the WBS decomposition structure, and divides the BIM three-dimensional model into one or more engineering components according to the level, and each engineering component is set with a GUID unique identifier, and the engineering component corresponds to the actual engineering part, specifically including the project name, unit, engineering quantity, current progress engineering quantity, cumulative progress engineering quantity, cumulative approved engineering quantity, engineering quantity percentage, amount, current progress amount, accumulated progress amount and accumulated approved amount; The data input module can input information of the GUID unique identifier, project name, unit, project quantity, current progress project quantity, cumulative progress project quantity, cumulative approved project quantity, project quantity percentage, amount, current progress amount, cumulative progress amount and cumulative approved amount for each project component; The time setting module obtains the start and end time of each engineering component; The threshold setting module sets the cost progress and engineering quantity of each engineering component; The visualization module updates the construction progress information of the BIM three-dimensional model in real time according to the data input by the data input module.

[0007] Furthermore, the threshold setting module sets a completion threshold P of the engineering component. When the cumulative progress amount / the cumulative approved amount>the completion threshold P, the engineering component is deemed to have completed construction, where ∑(cumulative progress amount)=amount 1+amount 2+amount 3+ … +amount n, where n represents the number of times the amount is reported.

[0008] Furthermore, the time setting module records the actual start time when each engineering component fills in the amount for the first time; when each engineering component meets the set threshold, the end time is automatically registered and set as the actual end time.

[0009] Furthermore, the status setting rule for each engineering component is that when the current actual time is less than the preset start time, the BIM 3D model display color is gray, indicating that construction has not started; when the current actual time is greater than the start time and less than the preset completion time, the BIM 3D model color changes to yellow, indicating that construction is under progress; when the current actual time is greater than the preset completion time, the BIM 3D model color changes to green, indicating that construction has been completed.

[0010] Furthermore, the 5D visualization method for engineering construction based on cost schedule management includes the following steps: S1. Establish a BIM 3D model of the project through the BIM 3D model building module; S2. The cost management module splits the BIM 3D model through the WBS decomposition structure and divides the BIM 3D model into one or more engineering components; S3. Enter the GUID unique identifier, project name, unit, project quantity, current progress quantity, cumulative progress quantity, cumulative approved quantity, quantity percentage, amount, current progress amount, cumulative progress amount and cumulative approved amount of each project component; S4. The time setting module records the actual start time when each engineering component is first reported; S5. The threshold setting module sets the cost progress threshold of each engineering component, and automatically registers the end time when each engineering component meets the set threshold; S6. Locate the BIM three-dimensional model through the GUID unique identifier in the model identification module, compare the start time and end time of each component in the time setting module according to the actual time of the engineering component input data, and display the BIM three-dimensional model; S7. Double-click the BIM 3D model to display the GUID unique identifier, project name, unit, project quantity, current progress quantity, cumulative progress quantity, cumulative approved quantity, quantity percentage, amount, current progress amount, cumulative progress amount and cumulative approved amount of each engineering component corresponding to the BIM 3D model.

[0011] The beneficial effects of the present invention are as follows: through the WBS decomposition structure, a mapping relationship is established between the BIM three-dimensional model and the actual project, which improves the interoperability and timeliness of information, increases the efficiency of information exchange, and through the introduction of BIM technology, deeply summarizes the project cost and progress, and presents them in a more intuitive and vivid 5D visualization way. At the same time, the problem that paper materials are difficult to find, easy to damage and lose is eliminated. Thus, more accurate and efficient decision support is provided for project management. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the system composition of the present invention; DETAILED DESCRIPTION

[0014] The 5D visualization system for engineering construction based on cost and progress management includes BIM 3D model building module, cost management module, model identification module, time setting module, threshold setting module, data input module and visualization module; The BIM three-dimensional model building module is used to build a BIM three-dimensional model of the project; The model identification module uses the GUID as a globally unique identifier of the BIM three-dimensional model, and can identify the specified engineering component of the BIM three-dimensional model through the GUID; GUID (Globally Unique Identifier) ​​is a 128-bit binary digital identifier generated by an algorithm to ensure the uniqueness of the identifier.

[0015] The construction data management module splits the BIM three-dimensional model through the WBS decomposition structure, and divides the BIM three-dimensional model into one or more engineering components according to the level, and each engineering component is set with a GUID unique identifier, and the engineering component corresponds to the actual engineering part, specifically including the project name, unit, engineering quantity, current progress engineering quantity, cumulative progress engineering quantity, cumulative approved engineering quantity, engineering quantity percentage, amount, current progress amount, accumulated progress amount and accumulated approved amount; The data input module can input information of the GUID unique identifier, project name, unit, project quantity, current progress project quantity, cumulative progress project quantity, cumulative approved project quantity, project quantity percentage, amount, current progress amount, cumulative progress amount and cumulative approved amount for each project component; The time setting module obtains the start and end time of each engineering component; The threshold setting module sets the cost progress and engineering quantity of each engineering component; The visualization module updates the construction progress information of the BIM three-dimensional model in real time according to the data input by the data input module.

[0016] Furthermore, the threshold setting module sets a completion threshold P of the engineering component. When the cumulative progress amount / the cumulative approved amount>the completion threshold P, the engineering component is deemed to have completed construction, where ∑(cumulative progress amount)=amount 1+amount 2+amount 3+ …+amount n, where n represents the number of times the amount is reported. The completion threshold P is set to a value of 90%-95%.

[0017] Furthermore, the time setting module records the actual start time when each engineering component fills in the amount for the first time; when each engineering component meets the set threshold, the end time is automatically registered and set as the actual end time.

[0018] Furthermore, the status setting rule for each engineering component is that when the current actual time is less than the preset start time, the BIM 3D model display color is gray, indicating that construction has not started; when the current actual time is greater than the start time and less than the preset completion time, the BIM 3D model color changes to yellow, indicating that construction is under progress; when the current actual time is greater than the preset completion time, the BIM 3D model color changes to green, indicating that construction has been completed.

[0019] The 5D visualization method for engineering construction based on cost schedule management includes the following steps: S1. Establish a BIM 3D model of the project through the BIM 3D model building module; S2. The cost management module splits the BIM 3D model through the WBS decomposition structure and divides the BIM 3D model into one or more engineering components; S3. Enter the GUID unique identifier, project name, unit, project quantity, current progress quantity, cumulative progress quantity, cumulative approved quantity, quantity percentage, amount, current progress amount, cumulative progress amount and cumulative approved amount of each project component; S4. The time setting module records the actual start time when each engineering component is first reported; S5. The threshold setting module sets the cost progress threshold of each engineering component, and automatically registers the end time when each engineering component meets the set threshold; S6. Locate the BIM three-dimensional model through the GUID unique identifier in the model identification module, compare the start time and end time of each component in the time setting module according to the actual time of the engineering component input data, and display the BIM three-dimensional model; S7. Double-click the BIM 3D model to display the GUID unique identifier, project name, unit, project quantity, current progress quantity, cumulative progress quantity, cumulative approved quantity, quantity percentage, amount, current progress amount, cumulative progress amount and cumulative approved amount of each engineering component corresponding to the BIM 3D model.

[0020] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the scope of protection of the present invention.

Claims

1. 5D visualization system for engineering construction based on cost and schedule management, Features: It includes BIM 3D model building module, cost management module, model identification module, time setting module, threshold setting module, data input module and visualization module; The BIM three-dimensional model building module is used to build a BIM three-dimensional model of the project; The model identification module uses the GUID as the globally unique identifier of the BIM three-dimensional model, and identifies the specified engineering component of the BIM three-dimensional model through the GUID unique identifier; The construction data management module splits the BIM three-dimensional model through the WBS decomposition structure, and divides the BIM three-dimensional model into one or more engineering components according to the level, and each engineering component is set with a GUID unique identifier, and the engineering component corresponds to the actual engineering part, specifically including the project name, unit, engineering quantity, current progress engineering quantity, cumulative progress engineering quantity, cumulative approved engineering quantity, engineering quantity percentage, amount, current progress amount, cumulative progress amount and cumulative approved amount; The data input module can input data of GUID unique identifier, project name, unit, project quantity, current progress project quantity, cumulative progress project quantity, cumulative approved project quantity, project quantity percentage, amount, current progress amount, cumulative progress amount and cumulative approved amount for each project component; The time setting module obtains the start and end time of each engineering component; The threshold setting module sets the cost progress and engineering quantity of each engineering component; The visualization module updates the construction progress information of the BIM three-dimensional model in real time according to the data input by the data input module.

2. According to claim 1, the 5D visualization system for engineering construction based on cost and schedule management, Features: The threshold setting module sets a completion threshold P of the engineering component. When the cumulative progress amount / the cumulative approved amount>the completion threshold P, the engineering component is deemed to have completed construction, where ∑(cumulative progress amount)=amount 1+amount 2+amount 3+ …+amount n, where n represents the number of times the amount is reported.

3. According to the 5D visualization system for engineering construction based on cost schedule management according to claim 2, Features: The time setting module records the actual start time when each project component fills in the amount for the first time; when each project component meets the set threshold, the end time is automatically registered and set as the actual end time.

4. According to claim 3, the 5D visualization system for engineering construction based on cost and schedule management, Features: The status setting rules for each engineering component are as follows: if the current actual time is less than the preset start time, the BIM 3D model display color is gray, indicating that construction has not started; if the current actual time is greater than the start time and less than the preset completion time, the BIM 3D model color turns yellow, indicating that construction is underway; if the current actual time is greater than the preset completion time, the BIM 3D model color turns green, indicating that construction has been completed.

5. A 5D visualization method for engineering construction based on cost schedule management as claimed in any of claims 1 to 4, comprising the following steps: S1. Establish a BIM 3D model of the project through the BIM 3D model building module; S2. The cost management module splits the BIM 3D model through the WBS decomposition structure and divides the BIM 3D model into one or more engineering components; S3. Enter the GUID unique identifier, project name, unit, project quantity, current progress quantity, cumulative progress quantity, cumulative approved quantity, quantity percentage, amount, current progress amount, cumulative progress amount and cumulative approved amount of each project component; S4. The time setting module records the actual start time when each engineering component is first reported; S5. The threshold setting module sets the cost progress threshold of each engineering component, and automatically registers the end time when each engineering component meets the set threshold; S6. Locate the BIM three-dimensional model through the GUID unique identifier in the model identification module, compare the start time and end time of each component in the time setting module according to the actual time of the engineering component input data, and display the BIM three-dimensional model; S7. Double-click the BIM 3D model to display the GUID unique identifier, project name, unit, project quantity, current progress quantity, cumulative progress quantity, cumulative approved quantity, quantity percentage, amount, current progress amount, cumulative progress amount and cumulative approved amount of each engineering component corresponding to the BIM 3D model.