Debugging method for physical starting device of high-temperature gas cooled reactor

Through system power supply, pulse inspection and joint debugging methods, the lack of physical start device debugging of high-temperature gas-cooled reactors is solved, ensuring that the device performance and neutron source installation meet the requirements, and improving the charge and operation safety of the reactor.

CN118942749APending Publication Date: 2024-11-12HUANENG SHANDONG SHIDAOBAY NUCLEAR POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410981440.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The lack of debugging methods for physical start-up devices of high-temperature gas-cooled reactors leads to the inability to effectively monitor the neutron level in the reactor, affecting the charge and critical safety.

Method used

Provide a high-temperature air-cooled relay physical start device debugging method, including system power supply inspection, no input pulse inspection, input pulse inspection and stability inspection, as well as joint debugging of detector and cabinet to ensure that the device performance and neutron source installation are in compliance Require.

Benefits of technology

By comprehensively checking the performance of the physical start device, it ensures that it meets critical supervision needs during the physical process of high-temperature air-cooled reactors, improving the safety of loading and operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118942749A_ABST
    Figure CN118942749A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of debugging and operation of high-temperature gas cooled reactors, and discloses a debugging method for a physical starting device of a high-temperature gas cooled reactor, which comprises the following steps: firstly, connecting the to-be-debugged physical starting device of the high-temperature gas cooled reactor into a power supply, and verifying that a low-voltage power supply normally supplies power to a system by detecting a low-voltage output voltage value of each channel; after normal power supply of the system, no-input pulse check is carried out to confirm that the amplifier, the scaler and the high-voltage power supply can work normally; carrying out pulse input check, simulating a detector output signal by using a pulse generator signal to carry out system function check, and verifying that the cabinet part of the physical starting device works normally; checking the long-term stable operation capability of the system through a long-term stable test; and finally, connecting the detector with the cabinet for joint debugging, and verifying that the performance of the detector and the connecting line of the detector and the cabinet are normal. According to the invention, the performance of the physical starting device can be comprehensively tested, and whether the installation of the starting neutron source meets the requirements can be tested while the performance of the detector is tested.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of high temperature gas-cooled reactor debugging and operation, and in particular to a debugging method for a physical starting device of a high temperature gas-cooled reactor. Background Art

[0002] During the initial loading phase of the high-temperature gas-cooled reactor, the neutron flux level in the reactor is low, and the number of neutrons leaking into the counting tube of the nuclear measurement system installed in the inner hole of the cement shielding wall of the reactor compartment is small. The nuclear measurement system cannot detect effective neutron counts, and a physical starting device is required to monitor the neutron level in the reactor to ensure the safety of reactor loading and approaching criticality.

[0003] Since the core structure layout, starting neutron source installation, initial loading method, physical starting device installation location, etc. of the high-temperature gas-cooled reactor are quite different from those of the pressurized water reactor, the debugging method of the physical starting device is somewhat different from that of the pressurized water reactor. Currently, there is a lack of methods for debugging the physical starting device of the high-temperature gas-cooled reactor. Summary of the invention

[0004] In view of this, the present invention provides a debugging method for a physical starting device of a high temperature gas-cooled reactor to solve the problem of how to debug the physical starting device of a high temperature gas-cooled reactor to verify that the physical starting device meets the critical supervision requirements of the physical process of the high temperature gas-cooled reactor.

[0005] The present invention provides a debugging method for a physical startup device of a high temperature gas-cooled reactor, the method comprising:

[0006] Connect the physical start-up device of the high-temperature gas-cooled reactor to be debugged to the power supply, and verify that the low-voltage power supply is supplying power to the system normally by detecting the low-voltage output voltage value of each channel;

[0007] After the system is powered on normally, in the state of no input pulse, the amplifier, scaler and high-voltage power supply are tested by setting preset parameters to verify that the amplifier, scaler and high-voltage power supply are working properly;

[0008] After verifying that the amplifier, calibrator and high-voltage power supply are working properly, use the pulse generator signal to simulate the detector output signal to perform system input pulse inspection and verify that the cabinet part of the physical starting device is working properly;

[0009] When the cabinet of the physical startup device is working normally, the device is powered on and continuously works for a preset period of time to perform stability testing to test the system's ability to operate stably over a long period of time;

[0010] Connect the detector to the cabinet for joint debugging to verify that the detector performance and the connection lines between the detector and the cabinet are normal.

[0011] The debugging method of the physical starting device of a high-temperature gas-cooled reactor provided in this embodiment first performs a system power supply check to verify that the low-voltage power supply can normally power the system, and then performs a no-input pulse check to confirm that the amplifier, calibrator and high-voltage power supply can work normally; then performs a pulse input check, uses a pulse generator signal to simulate the detector output signal to perform a system function check, and verifies that the cabinet part of the physical starting device works normally; then tests the long-term stable operation capability of the system through a long-term stability test; finally, connects the detector to the cabinet for joint debugging to verify that the detector performance and the connection line between the detector and the cabinet are normal. The present invention can more comprehensively test the performance of the physical starting device, and can also test whether the installation of the starting neutron source meets the requirements while testing the detector performance.

[0012] In an optional implementation, the physical starting device of the high temperature gas-cooled reactor to be debugged is connected to a power supply, and the low voltage output voltage value of each channel is detected to verify that the low voltage power supply is normally supplying power to the system, including:

[0013] Connect the physical start-up device of the high-temperature gas-cooled reactor to be debugged to the power supply, and turn on the power of each channel one by one, and check whether the low-voltage power indicator of each channel is on;

[0014] When the low-voltage power indicator light is on, the low-voltage output value of the preset test point on the panel is recorded, and the accuracy error of each low-voltage output value is detected to see if it meets the preset requirements. If the preset requirements are met, the low-voltage power supply will supply power to the system normally.

[0015] When performing system power supply verification, the embodiment of the present invention can check the low-voltage power supply status of each channel more comprehensively by turning on the power of each channel one by one and checking whether the multi-point low-voltage output values ​​meet the accuracy error.

[0016] In an optional implementation, after the system is powered on normally, in a state of no input pulse, a no input pulse test is performed by setting preset parameters to detect the amplifier, the scaler and the high-voltage power supply to verify that the amplifier, the scaler and the high-voltage power supply are working properly, including:

[0017] In the state of no input pulse, the output noise of the amplifier is tested by an oscilloscope to see whether it meets the preset requirements. If it meets the preset requirements, the amplifier is working normally.

[0018] The calibrator is set to different states and the time periods corresponding to the different states are set to detect whether the corresponding output meets the preset requirements. If the preset requirements are met, the calibrator works normally;

[0019] Based on the preset adjustment range and in preset steps, the high-voltage power supply panel dial is adjusted to detect whether the output voltage value meets the preset requirements. If the preset requirements are met, the high-voltage power supply works normally.

[0020] The embodiment of the present invention ensures that the system hardware devices function normally by checking the amplifier, the scaler and the high-voltage power supply.

[0021] In an optional implementation, the use of a pulse generator signal to simulate a detector output signal to perform a system input pulse test to verify that the cabinet portion of the physical starting device is working properly includes:

[0022] Set preset parameters for the pulse generator, and perform system function checks by connecting the pulse generator to the converter, the converter and the amplifier, the single-channel pulse analyzer and the amplifier, the calibrator and the single-channel pulse analyzer, and the single-channel pulse analyzer and the rate meter. When all function checks are normal, the cabinet part of the physical starting device works normally.

[0023] In an optional embodiment, preset parameters are set for the pulse generator, and a system function check is performed by connecting the pulse generator to a converter, a converter and an amplifier, a single-channel pulse analyzer and an amplifier, a scaler and a single-channel pulse analyzer, and a single-channel pulse analyzer and a rate meter, respectively, including:

[0024] Set the output value of the high voltage power supply and the output frequency and amplitude of the pulse generator;

[0025] Connect the pulse generator and converter, use an oscilloscope to observe the output waveform of the converter, and check whether the output pulse amplitude meets the preset amplitude requirement;

[0026] Connect the pulse generator, amplifier and converter, set the amplifier's gain, use an oscilloscope to observe the output waveform, and check whether the output pulse amplitude meets the preset amplitude requirements and whether there is any distortion;

[0027] Adjust the amplifier output so that the pulse amplitude is the preset amplitude, connect the pulse generator, the single-channel pulse analyzer and the amplifier, gradually reduce the discrimination threshold from large to small, and use an oscilloscope to monitor the output of the single-channel pulse analyzer. When there is a square wave output, record the threshold setting value of the single-channel pulse analyzer at this time, observe the output waveform of the single-channel pulse analyzer with an oscilloscope, and detect whether the output waveform should be a standard pulse with an amplitude that meets the preset requirements;

[0028] Connect the calibrator and the single-channel pulse analyzer, set the calibrator to internal, automatic, working state, and set the timing time. When the counting indicator light goes out, check whether the counting value of the calibrator meets the preset requirements;

[0029] Set the parameters of the linear range, connect the single-channel pulse analyzer and the rate meter, and check whether the pointer indication of the logarithmic rate meter meets the preset requirements; gradually reduce the linear range gear, observe the pointer of the linear rate meter, and when the linear rate meter gear is adjusted to the preset gear, check whether the pointer indication value of the linear rate meter meets the preset requirements.

[0030] The embodiment of the present invention uses a pulse generator signal to simulate a detector output signal to perform a system function check and verify that the cabinet portion of the physical starting device is working properly.

[0031] In an optional implementation, when the cabinet portion of the physical starting device is working normally, the stability test is performed by continuously working for a preset time in the power-on state to test the long-term stable operation capability of the system, including:

[0032] The high-voltage power supply, pulse generator, amplifier, single-channel pulse analyzer, calibrator, and linear / logarithmic rate meter are set according to preset parameters. They work continuously for a preset time period in the power-on state. The outputs of the high-voltage power supply, amplifier, and single-channel pulse analyzer and the indication values ​​of the calibrator and linear / logarithmic rate meter are recorded at preset time intervals.

[0033] In the embodiment of the present invention, when the cabinet part of the physical starting device works normally, the operating stability of the equipment can be effectively tested by monitoring the output of each device under different continuous working time.

[0034] In an optional implementation, a high voltage power supply, a pulse generator, an amplifier, a single-channel pulse analyzer, a calibrator, and a linear / logarithmic rate table are set according to the parameters in the pulse input test.

[0035] When the embodiment of the present invention performs a long-term stability test on the system, the parameters in the pulse input test in the previous step are used, and experiments can be performed on the adjusted parameters conveniently and quickly.

[0036] In an optional implementation, the connecting the detector to the cabinet for joint debugging to verify that the performance of the detector and the connection line between the detector and the cabinet are normal include:

[0037] After the reactor startup neutron source is installed, the neutron counting tube is pulled to move in the hole of the reactor graphite reflector layer. The neutron counting tube moves up and down in the hole. The counting tube is moved to the height specified for the first loading test and fixed. The cumulative counts at different discrimination thresholds and at different operating voltages are recorded to verify that the detector performance and the connection lines between the detector and the cabinet are normal.

[0038] In an optional implementation, recording the cumulative counts at different discrimination thresholds and the cumulative counts at different operating voltages includes:

[0039] Fixed working voltage, record the cumulative counts of different discrimination thresholds;

[0040] Fixed the discrimination threshold and recorded the cumulative counts under different operating voltages.

[0041] The embodiment of the present invention can also check whether the installation of the startup neutron source meets the requirements while testing the performance of the detector.

[0042] In an optional implementation, when the inspection results in each step do not meet the preset requirements, the next step of functional inspection is performed after troubleshooting and repair.

[0043] The embodiment of the present invention debugs the system functions one by one, finds faults in time during the debugging process, and performs the next step of inspection after the repair inspection is passed, so as to ensure that the performance of the entire physical starting device is good and meet the critical supervision requirements of the high temperature gas-cooled reactor physical process. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0045] Figure 1 is a flow chart of a debugging method for a physical startup device of a high temperature gas-cooled reactor according to an embodiment of the present invention;

[0046] Figure 2 is a schematic diagram of a flow chart of a system no input pulse test according to an embodiment of the present invention;

[0047] Figure 3 It is a schematic diagram of a flow chart of input pulse inspection of a system according to an embodiment of the present invention. DETAILED DESCRIPTION

[0048] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0049] In this embodiment, a method for debugging a physical startup device of a high-temperature gas-cooled reactor is provided, which can be applied to debugging a physical startup device of a pebble-bed high-temperature gas-cooled reactor. Figure 1 is a flow chart of a debugging method for a physical startup device of a high temperature gas-cooled reactor according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:

[0050] Step S101, connecting the physical starting device of the high temperature gas-cooled reactor to be debugged to the power supply, and verifying that the low voltage power supply is normally supplying power to the system by detecting the low voltage output voltage value of each channel.

[0051] Specifically, connect the system to a 220VAC power supply, turn on the power of each channel one by one, and check whether the low-voltage power indicator of each channel is on. When the low-voltage power indicator is on, test the low-voltage output value from the panel's measurement point, which should be +24V, +12V, +6V, -6V, -12V and -24V. Record the test results and check whether the accuracy error of each low-voltage output value meets the preset requirements, for example, the accuracy error of each voltage is less than 1%. The output power error calculation formula is: Error = |Measured value - nominal value | / nominal value × 100%. If the accuracy error requirements are met, the low-voltage power supply is supplying power to the system normally. Otherwise, troubleshoot and repair the fault.

[0052] Step S102, after the system is powered on normally, in the state of no input pulse, the amplifier, the scaler and the high-voltage power supply are tested by setting preset parameters to verify that the amplifier, the scaler and the high-voltage power supply are working properly. Specifically, the system has no input pulse test, such as Figure 2 As shown, including:

[0053] Step S1021, in the state of no input pulse, use an oscilloscope to detect whether the output noise of the amplifier meets the preset requirements, and if it meets the preset requirements, the amplifier works normally; for example, in the state of no input pulse, use an oscilloscope to monitor the output noise of the channel amplifier, and its output noise should be less than 50Mv.

[0054] Step S1022, set the calibrator to different states and set the time period corresponding to the different states, detect whether the corresponding output meets the preset requirements, and if it meets the preset requirements, the calibrator works normally; for example, set the channel calibrator to self-check and automatic state, set the time period to 10s, and the output should be 327680±10.

[0055] Step S1023, based on the preset adjustment interval and the preset step length, adjust the high-voltage power panel dial to detect whether the output voltage value meets the preset requirements. If the preset requirements are met, the high-voltage power supply works normally. For example, slowly adjust the channel high-voltage power panel dial from zero to 300, read the panel digital display unit, and the display result should be 300±2.

[0056] Step S103, after verifying that the amplifier, calibrator and high-voltage power supply are working properly, the pulse generator signal is used to simulate the detector output signal to perform a system input pulse test to verify that the cabinet part of the physical starting device is working properly.

[0057] The embodiment of the present invention sets preset parameters for the pulse generator, and performs a system function check by connecting the pulse generator to a converter, a converter and an amplifier, a single-channel pulse analyzer and an amplifier, a calibrator and a single-channel pulse analyzer, and a single-channel pulse analyzer and a rate meter, respectively, to verify that the cabinet part of the physical starting device is working properly.

[0058] In one embodiment, if Figure 3 As shown, specifically including:

[0059] Step S1031, set the output value of the high voltage power supply and the output frequency and amplitude of the pulse generator. For example, the dial reading of the channel high voltage power supply panel is kept at 300; set the output frequency of the pulse generator to about 1kHz and the amplitude to about 30mV negative pulse.

[0060] Step S1032, connect the pulse generator and the converter, use an oscilloscope to observe the output waveform of the converter, and detect whether the output pulse amplitude meets the preset amplitude requirement; for example, the output pulse amplitude should be 30±5mV.

[0061] Step S1033, connect the pulse generator, amplifier and converter, and set the amplifier gain, use an oscilloscope to observe the output waveform, and detect whether the output pulse amplitude meets the preset amplitude requirement and whether there is any distortion; for example, set the amplifier gain to 100, use an oscilloscope to observe the output waveform, the output pulse amplitude should be 3±1V, and there should be no distortion.

[0062] Step S1034, adjust the amplifier output so that the pulse amplitude is a preset amplitude, connect the pulse generator, the single-channel pulse analyzer and the amplifier, gradually reduce the discrimination threshold from large to small, and monitor the output of the single-channel pulse analyzer with an oscilloscope. When there is a square wave output, record the threshold setting value of the single-channel pulse analyzer at this time, observe the output waveform of the single-channel pulse analyzer with an oscilloscope, and detect whether the output waveform should be a standard pulse that meets the preset requirements; for example, adjust the amplifier output so that the pulse amplitude is about 3V, connect the single-channel pulse analyzer and the amplifier, then gradually reduce the discrimination threshold from large to small, and monitor the output of the single-channel pulse analyzer with an oscilloscope. When there is a square wave output, record the threshold setting value of the single-channel pulse analyzer at this time, the setting value should be 3±1V, and then observe the output waveform of the single-channel pulse analyzer with an oscilloscope. The output waveform should be a standard pulse with an amplitude of 5±1V.

[0063] Step S1035, connect the calibrator and the single-channel pulse analyzer, set the calibrator to internal, automatic, working state, and set the timing time. When the counting indicator light goes out, check whether the counting value of the calibrator meets the preset requirements; for example, adjust the timing time to 10s. At this time, when the counting indicator light goes out, the counting value of the calibrator should be 10±1k (the error of the calibrator display value here mainly depends on the accuracy of the pulse generator).

[0064] Step S1036, set the parameters of the linear range, connect the single-channel pulse analyzer and the rate meter, and detect whether the pointer indication of the logarithmic rate meter meets the preset requirements; gradually reduce the linear range gear, observe the pointer of the linear rate meter, and when the linear rate meter gear is adjusted to the preset gear, detect whether the linear rate meter pointer indication value meets the preset requirements. For example, adjust the linear range to 1MHz, connect the single-channel pulse analyzer and the rate meter, observe that the pointer indication of the logarithmic rate meter is about 103, and record the logarithmic rate indication value; gradually reduce the linear range gear, observe the pointer of the linear rate meter, and when the linear rate meter gear is adjusted to 3kHz, the linear rate meter pointer is about 1 (do not exceed the range).

[0065] Step S104, when the cabinet part of the physical startup device works normally, it is powered on and works continuously for a preset time to perform stability inspection to inspect the long-term stable operation capability of the system.

[0066] Specifically, set the high voltage power supply, pulse generator, amplifier, single channel, scaler, linear / logarithmic rate meter according to the requirements of the pulse input test, and work continuously for 24 hours in the power-on state to perform stability test. For example, the high voltage power supply, amplifier, single channel output, scaler, and linear / logarithmic rate indication can be recorded according to Table 1.

[0067] Table 1

[0068]

[0069] Step S105, connecting the detector to the cabinet for joint debugging to verify that the performance of the detector and the connection line between the detector and the cabinet are normal.

[0070] Specifically, after the reactor is started and the neutron source is installed, a hand-held wire rope is used to pull the neutron counting tube to move in the reactor graphite reflector channel / nuclear measurement system spare channel. The neutron counting tube should be able to move up and down smoothly in the channel. Move the counting tube to the height specified in the first loading test and fix it. Then record the cumulative counts at different discrimination thresholds and the cumulative counts at different operating voltages to verify that the detector performance and the connection lines between the detector and the cabinet are normal. The process includes:

[0071] 1. Fix the working voltage and record the cumulative counts of different discrimination thresholds, which can be recorded in Table 2.

[0072] Table 2

[0073]

[0074] 2. Fix the discrimination threshold and record the cumulative counts under different working voltages, which can be recorded in Table 3.

[0075] Table 3

[0076]

[0077] The debugging method of the physical starting device of a high-temperature gas-cooled reactor provided by the embodiment of the present invention first performs a system power supply check to verify that the low-voltage power supply can supply power to the system normally, and then performs a no-input pulse check to confirm that the amplifier, calibrator and high-voltage power supply can work normally; then performs a pulse input check, uses a pulse generator signal to simulate the detector output signal to perform a system function check, and verifies that the cabinet part of the physical starting device works normally; then performs a long-term stable test to test the long-term stable operation capability of the system; finally, the detector is connected to the cabinet for joint debugging to verify that the detector performance and the connection line between the detector and the cabinet are normal. The present invention can more comprehensively test the performance of the physical starting device, and can also test whether the installation of the starting neutron source meets the requirements while testing the detector performance.

[0078] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for debugging a physical startup device of a high temperature gas-cooled reactor, characterized in that: The method comprises: Connect the physical start-up device of the high-temperature gas-cooled reactor to be debugged to the power supply, and verify that the low-voltage power supply is supplying power to the system normally by detecting the low-voltage output voltage value of each channel; After the system is powered on normally, in the state of no input pulse, the amplifier, scaler and high-voltage power supply are tested by setting preset parameters to verify that the amplifier, scaler and high-voltage power supply are working properly; After verifying that the amplifier, calibrator and high-voltage power supply are working properly, use the pulse generator signal to simulate the detector output signal to perform system input pulse inspection and verify that the cabinet part of the physical starting device is working properly; When the cabinet of the physical startup device is working normally, the device is powered on and continuously works for a preset period of time to perform stability testing to test the system's ability to operate stably over a long period of time; Connect the detector to the cabinet for joint debugging to verify that the detector performance and the connection lines between the detector and the cabinet are normal.

2. The method according to claim 1, characterized in that The physical starting device of the high temperature gas-cooled reactor to be debugged is connected to the power supply, and the low voltage output voltage value of each channel is detected to verify that the low voltage power supply is normally supplying power to the system, including: Connect the physical starting device of the high-temperature gas-cooled reactor to be debugged to the power supply, and turn on the power of each channel one by one, and check whether the low-voltage power indicator light of each channel is on; when the low-voltage power indicator light is on, record the low-voltage output value of the preset test point on the panel, and check whether the accuracy error of each low-voltage output value meets the preset requirements. If the preset requirements are met, the low-voltage power supply will supply power to the system normally.

3. The method according to claim 1, characterized in that After the system is powered on normally, in the state of no input pulse, the amplifier, the scaler and the high-voltage power supply are tested by setting preset parameters to verify that the amplifier, the scaler and the high-voltage power supply are working properly, including: In the state of no input pulse, the output noise of the amplifier is tested by an oscilloscope to see whether it meets the preset requirements. If it meets the preset requirements, the amplifier is working normally. The calibrator is set to different states and the time periods corresponding to the different states are set to detect whether the corresponding output meets the preset requirements. If the preset requirements are met, the calibrator works normally; Based on the preset adjustment range and in preset steps, the high-voltage power supply panel dial is adjusted to detect whether the output voltage value meets the preset requirements. If the preset requirements are met, the high-voltage power supply works normally.

4. The method according to claim 3, characterized in that The method of using the pulse generator signal to simulate the detector output signal to perform system input pulse inspection and verify that the cabinet part of the physical starting device is working properly includes: Set preset parameters for the pulse generator, and perform system function checks by connecting the pulse generator to the converter, the converter and the amplifier, the single-channel pulse analyzer and the amplifier, the calibrator and the single-channel pulse analyzer, and the single-channel pulse analyzer and the rate meter. When all function checks are normal, the cabinet part of the physical starting device works normally.

5. The method according to claim 4, characterized in that Set preset parameters for the pulse generator and perform system function checks by connecting the pulse generator to the converter, converter and amplifier, single-channel pulse analyzer and amplifier, scaler and single-channel pulse analyzer, single-channel pulse analyzer and rate meter, including: Set the output value of the high voltage power supply and the output frequency and amplitude of the pulse generator; Connect the pulse generator and converter, use an oscilloscope to observe the output waveform of the converter, and check whether the output pulse amplitude meets the preset amplitude requirement; Connect the pulse generator, amplifier and converter, set the amplifier's gain, use an oscilloscope to observe the output waveform, and check whether the output pulse amplitude meets the preset amplitude requirements and whether there is any distortion; Adjust the amplifier output so that the pulse amplitude is the preset amplitude, connect the pulse generator, the single-channel pulse analyzer and the amplifier, gradually reduce the discrimination threshold from large to small, and use an oscilloscope to monitor the output of the single-channel pulse analyzer. When there is a square wave output, record the threshold setting value of the single-channel pulse analyzer at this time, observe the output waveform of the single-channel pulse analyzer with an oscilloscope, and detect whether the output waveform should be a standard pulse with an amplitude that meets the preset requirements; Connect the calibrator and the single-channel pulse analyzer, set the calibrator to internal, automatic, working state, and set the timing time. When the counting indicator light goes out, check whether the counting value of the calibrator meets the preset requirements; Set the parameters of the linear range, connect the single-channel pulse analyzer and the rate meter, and check whether the pointer indication of the logarithmic rate meter meets the preset requirements; gradually reduce the linear range gear, observe the pointer of the linear rate meter, and when the linear rate meter gear is adjusted to the preset gear, check whether the pointer indication value of the linear rate meter meets the preset requirements.

6. The method according to claim 4, characterized in that When the cabinet of the physical startup device is working normally, the stability test is performed by continuously working for a preset time in the power-on state to test the long-term stable operation capability of the system, including: The high-voltage power supply, pulse generator, amplifier, single-channel pulse analyzer, calibrator, and linear / logarithmic rate meter are set according to preset parameters. They work continuously for a preset time period in the power-on state. The outputs of the high-voltage power supply, amplifier, and single-channel pulse analyzer and the indication values ​​of the calibrator and linear / logarithmic rate meter are recorded at preset time intervals.

7. The method according to claim 6, characterized in that Set the high voltage power supply, pulse generator, amplifier, single channel pulse analyzer, scaler, and linear / logarithmic rate meter according to the parameters in the pulse input test.

8. The method according to claim 1, characterized in that The detector is connected to the cabinet for joint debugging to verify that the performance of the detector and the connection line between the detector and the cabinet are normal, including: After the reactor startup neutron source is installed, the neutron counting tube is pulled to move in the hole of the reactor graphite reflector layer. The neutron counting tube moves up and down in the hole. The counting tube is moved to the height specified for the first loading test and fixed. The cumulative counts at different discrimination thresholds and at different operating voltages are recorded to verify that the detector performance and the connection lines between the detector and the cabinet are normal.

9. The method according to claim 7, characterized in that: The recording of the accumulated counts at different discrimination thresholds and the accumulated counts at different operating voltages includes: Fixed working voltage, record the cumulative counts of different discrimination thresholds; Fixed the discrimination threshold and recorded the cumulative counts under different operating voltages.

10. The method according to any one of claims 1 to 9, characterized in that: When the inspection results in each step do not meet the preset requirements, the next step of functional inspection is carried out after troubleshooting and repair.