Optical storage direct-flexible system planning evaluation method considering reliability and economical efficiency
Through explicit topological variable optimization and adaptive ε-constraint technology, combined with current analysis, the dual-objective optimization problem of reliability evaluation in optical storage direct-flexible systems is solved, and the balance between system economy and reliability is achieved, providing The rich selection of planning solutions solves the problem that traditional methods cannot provide optimal solutions.
Patent Information
- Application Number
- CN202410793269.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-11-12
AI Technical Summary
The reliability evaluation method of traditional optical storage direct-flexible system is difficult to achieve an effective balance between system economy and reliability. Especially when the system scale is expanded and the user's requirements for power quality are improved, it is impossible to improve the structure of optical storage direct-flexible system. and the solution selection provides the optimal solution.
Using a dual Q strategy based on explicit topological variable optimization, combining reliability evaluation and current analysis of network topology, the problem is re-argued as a mixed integer linear programming (MILP) problem through linearization technology, and generated using adaptive ε-constraint technology. Optimal Pareto boundary, achieving dual-objective optimization configuration for system planning.
On the basis of ensuring computing efficiency and accuracy, the optical storage direct-flexible system provides a rich selection of planning solutions under specific cost and reliability requirements, achieving an effective balance between system economy and reliability, and solving the traditional The problem that the method cannot provide the optimal solution.
Smart Images

Figure CN118944038A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of photovoltaic storage direct-flexible system planning, and in particular to a photovoltaic storage direct-flexible system planning evaluation method taking reliability and economy into consideration. Background Art
[0002] With the increasing popularity of DC distributed generation (DCDG) such as solar photovoltaic power generation, electric vehicle charging stations, DC data centers, and DC loads of photovoltaic storage and flexible systems, the traditional AC distribution network system (AC-DNS) is undergoing fundamental changes. The rapid development of power electronic equipment has made photovoltaic storage and flexible systems (PEDF) more efficient and flexible than traditional AC-DNS.
[0003] The traditional PV-storage-direct-flexible system planning model aims to minimize economic costs, although it also meets safety constraints such as node voltage and line current. However, with the continuous expansion of the scale of PV-storage-direct-flexible systems and the continuous improvement of users' requirements for power quality, reliability has become a key factor that needs to be considered in the planning of PV-storage-direct-flexible systems. In addition, traditional reliability assessment methods are mostly limited to fixed network structures and rely on exhaustive enumeration or heuristic search to explore planning solutions. In actual engineering scenarios, it is difficult to find the optimal solution among multiple planning schemes relying solely on these methods.
[0004] In order to solve the above problems, the present invention proposes a reliability assessment method for planning a PV-storage-direct-flexible system based on an explicit topology variable optimization dual-Q strategy. By closely combining the reliability assessment of the network topology with the power flow analysis and using linearization technology, the complex reliability assessment and power flow analysis considering topology variables are reformulated as a mixed integer linear programming (MILP) problem, thereby improving the computational efficiency of the model. Finally, the optimal Pareto frontier is generated using adaptive ε-constraint technology to provide decision support for planners to balance system reliability and cost-effectiveness in decision-making. Compared with traditional methods, the method proposed in the present invention can achieve an effective balance between system economy and reliability and realize the optimal configuration of the dual objectives. Summary of the invention
[0005] In view of the above-mentioned problems, the present invention is proposed.
[0006] Therefore, the technical problem solved by the present invention is: to solve the problem that with the rapid development of new energy in the above background, the reliability evaluation process of the photovoltaic, storage, direct and flexible system has become more and more complicated. The traditional photovoltaic, storage, direct and flexible system reliability evaluation method can no longer provide the optimal solution for the improvement of the photovoltaic, storage, direct and flexible system structure and the selection of solutions due to the increasing complexity of the photovoltaic, storage, direct and flexible system. Compared with the traditional evaluation method, the present invention provides a novel photovoltaic, storage, direct and flexible system planning model, which achieves an effective balance between the economy and reliability of the system and realizes the optimal configuration of the two objectives. The solution method is both efficient and accurate, and can also provide an effective planning strategy for the photovoltaic, storage, direct and flexible system containing a large number of DC components, and provides a rich selection of solutions for the planning of the photovoltaic, storage, direct and flexible system under specific cost and reliability requirements.
[0007] In order to solve the above technical problems, the present invention provides the following technical solutions: a planning and evaluation method for a PV-storage direct-flexible system considering reliability and economy, comprising:
[0008] Establish the topology model of the PV-storage direct-flexible system;
[0009] Based on the topological model, construct the objective function;
[0010] According to the objective function, an explicit reliability evaluation based on topological variables is constructed;
[0011] Perform power flow constraints based on reliability assessment;
[0012] Based on the power flow constraint results, node voltage and line current constraints are performed;
[0013] According to the constraint conditions, runoff constraints are carried out;
[0014] Optimize the model and form a system planning solution.
[0015] As a preferred solution of the PV-storage-direct-flexible system planning and evaluation method considering reliability and economy described in the present invention, wherein: the establishment of the PV-storage-direct-flexible system topology model includes collecting topology data of the PV-storage-direct-flexible system; defining the load characteristics of each node; determining the location and capacity parameters of distributed resources in the PV-storage-direct-flexible system;
[0016] The objective function constructed includes minimizing the total cost and the selected reliability metric RM of the PV-storage direct-flexible system, which can be expressed as:
[0017] minf=[C PEDF ,RM]
[0018] C PEDF =C INV +C MO +C EP
[0019] Where RM represents the selected reliability measure, C PEDF represents the total cost, C INV represents the investment cost, C MO represents the operation and maintenance cost, C EP represents the energy production cost.
[0020] As a preferred solution of the planning and evaluation method of the photovoltaic, storage, direct and flexible system considering reliability and economy described in the present invention, wherein: the explicit reliability evaluation includes simulating possible fault scenarios in the system, assuming that the fault is caused by a specific accident, including a single point fault or a multi-point fault, the photovoltaic, storage, direct and flexible system will operate normally in a radial structure, and when a fault occurs, the distributed generation DG supports island power supply, while ignoring the influence of relay protection time;
[0021] Develop a calculation method for expected unpowered energy EENS, which is calculated by integrating the energy losses caused by branch faults and node equipment failures. The Big M method is used to automatically adjust the EENS value according to the branch type. When a branch is selected, specific conditions are set to calculate the loss, otherwise the loss is set to zero. When calculating EENS, the interruption time and power reduction of each branch are considered;
[0022] Considering the island operation assumption, if the DG capacity is sufficient to compensate the load demand, the power reduction is set to zero; otherwise, the power reduction is set to the difference between the demand and the DG capacity to reflect the contribution of DG to reducing the unsupplied energy;
[0023] The virtual Kirchhoff current law KCL is applied to calculate the load demand downstream of the branch and the distributed generation power available downstream of the branch. The load demand is divided into positive and negative parts and adjusted according to the AC / DC characteristics of the node and substation;
[0024] The system average interruption frequency index SAIFI and the system average interruption duration index SAIDI are formed. SAIFI calculates the number of customer interruptions caused by branch and node failures and determines the number of customers affected by branch failures based on the comparison between downstream demand and available DG power. If the DG capacity is sufficient, all customer demands are met; otherwise, the number of affected customers is calculated proportionally.
[0025] SAIDI determines the duration of customer outages by calculating the repair time of branch and node failures, determines the number of downstream customers of the branch through virtual KCL, ensures the consistency of demand and capacity calculations, and finally summarizes the total annual customer outages caused by node-related equipment failures.
[0026] As a preferred solution of the planning and evaluation method of the photovoltaic-storage-direct-flexible system considering reliability and economy described in the present invention, wherein: the flow constraint includes using the first and second constraint flow conditions to give voltage balance equations for different types of branches, the A-type branch calculates the voltage drop according to the line impedance and current, and the B-type branch adjusts the voltage according to the type of connection node;
[0027] Set the node voltage. The node voltage is set according to the node type. For DC nodes, the voltage value is used directly. For AC nodes, it is converted into a DC side voltage through a voltage source converter VSC.
[0028] For DC nodes, the third constraint power flow condition is used to ensure current balance, including outgoing line current, load consumption and current provided by distributed generation;
[0029] For AC nodes, the fourth constraint power flow condition is used to consider current conversion, load demand and power generation input, and voltage conversion is performed through VSC;
[0030] For AC nodes connected to Class B lines, the fifth constraint power flow condition is used to solve the specific current outflow situation;
[0031] The sixth constrained power flow condition is used to ensure current balance at the substation nodes.
[0032] As a preferred solution of the planning and evaluation method of the PV-storage direct-flexible system considering reliability and economy described in the present invention, the first constraint power flow condition is expressed as:
[0033]
[0034] Among them, A i,b is the node i branch b association matrix; Ω B is the set of all branches.
[0035] The second constrained power flow condition is expressed as,
[0036]
[0037] Among them, K c is the converter constant; M c Converter modulation index; M is a large number.
[0038] The third constraint power flow condition is expressed as,
[0039]
[0040] in, and are the AC load demand and DC load demand at node i respectively; η REC is the rectifier efficiency; ηINV is the inverter efficiency; and are the AC generator power and DC generator power at node i respectively; is the binary variable of DC node i.
[0041] The fourth constraint power flow condition is expressed as,
[0042]
[0043] Among them, Ω ND is the set of all load nodes.
[0044] The fifth constraint power flow condition is expressed as:
[0045]
[0046] The sixth constraint power flow condition is expressed as,
[0047]
[0048] Among them, Ω NS is the set of all substation nodes; P s is the output power of substation s.
[0049] As a preferred solution of the planning and evaluation method of the photovoltaic storage direct-flexible system considering reliability and economy described in the present invention, the node voltage and line current constraints are expressed as follows:
[0050]
[0051] in, is a binary variable of type A branch; Ω N The set of all nodes.
[0052] As a preferred solution of the planning and evaluation method of the photovoltaic storage direct-flexible system considering reliability and economy described in the present invention, the runoff constraint includes making the total number of selected branches match the total number of nodes in the system minus the number of nodes of the substation to ensure that the radial configuration is maintained in the system, which is expressed as:
[0053]
[0054] Among them, y b is the binary investment variable of branch b.
[0055] As a preferred solution of the planning and evaluation method of the PV-storage direct-flexible system considering reliability and economy described in the present invention, wherein: the optimization of the model includes using linearization technology to process nonlinear elements, converting the original problem into a mixed integer linear programming (MILP) framework, so that the dual-objective APEDF planning model is reshaped into a dual-objective MILP form;
[0056] An adaptive ε-constraint algorithm is used to optimize redundant steps and navigate to the Pareto frontier to improve computational efficiency.
[0057] A computer device includes a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the steps of the above-mentioned method for planning and evaluating a photovoltaic-storage-direct-flexible system taking into account reliability and economy are implemented.
[0058] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned method for planning and evaluating a PV-storage direct-flexible system taking into account reliability and economy.
[0059] Beneficial effects of the present invention: The planning and evaluation method for a photovoltaic, storage, direct and flexible system that takes reliability and economy into consideration provided by the present invention proposes a novel photovoltaic, storage, direct and flexible park planning model based on traditional evaluation methods, which effectively solves the problem that, under the background of rapid development of new energy, traditional photovoltaic, storage, direct and flexible system reliability evaluation methods can no longer provide optimal solutions for the improvement of the photovoltaic, storage, direct and flexible system structure and the selection of solutions due to the increasing complexity of photovoltaic, storage, direct and flexible systems. The method in this application achieves an effective balance between system economy and reliability, and realizes the optimal configuration of the two objectives. The solution method is both efficient and accurate, and can also provide effective planning strategies for photovoltaic, storage, direct and flexible systems containing a large number of DC components, providing a rich selection of solutions for the planning of photovoltaic, storage, direct and flexible systems under specific cost and reliability requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0061] Figure 1 An overall flow chart of a planning and evaluation method for a PV-storage direct-flexible system taking into account reliability and economy is provided for one embodiment of the present invention. Figure 2A modified 13-bus-26 candidate branch test system topology diagram in a method for planning and evaluating an optical-storage direct-flexible system taking into account reliability and economy is provided in accordance with an embodiment of the present invention. Figure 3 A Pareto optimal planning result diagram based on the DCDN method in a planning and evaluation method for a PV-storage direct-flexible system taking into account reliability and economy is provided in one embodiment of the present invention. Figure 4 A Pareto optimal planning result diagram based on the ADHDN method in a planning and evaluation method for a PV-storage direct-flexible system taking into account reliability and economy is provided in one embodiment of the present invention. Figure 5 An optimal planning scheme diagram of a distribution network based on a DCDN method in a planning and evaluation method for a photovoltaic-storage direct-flexible system taking into account reliability and economy is provided in one embodiment of the present invention. Figure 6 An optimal planning scheme diagram of the distribution network based on the ACHDN method in a planning and evaluation method for a photovoltaic storage direct-flexible system taking into account reliability and economy is provided in one embodiment of the present invention. Figure 7 A Pareto front result diagram based on NSGA-II and ε-constraint method identification in a PV-storage direct-flexible system planning and evaluation method considering reliability and economy provided in one embodiment of the present invention. Figure 8 A relationship diagram based on economic and reliability indicators and DG penetration level in a PV-storage direct-flexible system planning and evaluation method considering reliability and economy provided by an embodiment of the present invention. Fig. 9 A relationship diagram between economic and reliability indicators and DC component ratios in a method for planning and evaluating a photovoltaic-storage-direct-flexible system taking into account reliability and economy provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0062] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0063] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0064] Example 1
[0065] Reference Figure 1 , which is an embodiment of the present invention, provides a planning and evaluation method for a PV-storage direct-flexible system considering reliability and economy, comprising:
[0066] The first step is to establish the topology model of the PV-storage direct-flexible system:
[0067] (1) Collect the topological data of the PV-storage-direct-flexible system, including power supply area division, node location, line connection relationship, switch status, etc.
[0068] (2) Define the load characteristics of each node, such as peak and valley load, power factor, etc.
[0069] (3) Determine the location and capacity parameters of distributed resources such as distributed power sources and energy storage devices in the PV-storage direct-flexible system.
[0070] Step 2: Construct the objective function:
[0071] Construct an objective function and establish a dual-Q optimization-based PV-storage-direct-flexible system planning to achieve the dual optimization goals of cost and reliability. Use formula (1) to make the PV-storage-direct-flexible system meet the total cost C PEDF and the selected reliability metric RM is minimized. PEDF It is divided into three main parts: investment cost C INV , Operation and maintenance costs C MO and energy production cost C EP The details are shown in formula (2).
[0072] minf=[C PEDF ,RM] (1)
[0073] C PEDF =C INV +C MO +C EP (2)
[0074] The total investment cost takes into account the capital investment of all nodes and branches of the PV-storage direct-flexible system. The relationship between the various components of the network and the corresponding investment decision variables is shown in formula (3). The node-level investment cost includes the cost of circuit breakers, rectifiers and inverters; while the investment in branches (dc-dc direct connection (type A) and ac-dc conversion connection (type B) through VSC) involves the installation cost of the line itself, the voltage source converter (VSC) and the relevant circuit breakers. The calculation of maintenance costs is similar to the investment cost, and is quantified through the corresponding formula to ensure full coverage and accurate calculation of system operation and maintenance costs, as shown in formula (4). As for the power generation cost, the cost of purchasing electricity from the main power grid is combined with the net power cost generated by distributed generation resources (including ACDG and DCDG). The calculation method is shown in formula (5).
[0075]
[0076] in, and are the investment costs of AC node i and DC node i respectively; and are the investment costs of node A-type transmission line and node B-type transmission line respectively; and are the maintenance costs of AC node i and DC node i respectively; and are the maintenance costs of node A-type transmission line and node B-type transmission line respectively; Pr is the annual average electricity price; and Unit generation cost of AC and DC DG;
[0077] and Unit power generation subsidy for AC and DC DG
[0078] Step 3: Construct explicit reliability evaluation based on topological variables:
[0079] An explicit reliability assessment method based on topological variables is constructed to reflect the mechanism of the mathematical relationship between the investment decision of the active photovoltaic storage direct-flexible system (APEDF) with a high proportion of distributed energy and the reliability assessment based on topological variables. The importance of voltage source converter (VSC) faults in APEDF and their impact on system reliability are considered.
[0080] (1) Assume that the fault is caused by a specific accident, including single-point or multi-point faults. The PV-storage direct-flexible system operates normally in a radial structure, and distributed generation (DG) supports island power supply in the event of a fault. The relay protection time is negligible.
[0081] (2) Formulate EENS. The calculation method of EENS is summarized by formula (6). This method considers branch faults and node device failure Energy loss caused by branch fault Calculated by formula (7), the large M method is used to automatically adjust according to the branch type selection Specifically, when a branch is selected, a specific condition is set to calculate the loss, otherwise, the loss is set to zero. When , the interruption time and power reduction of each branch are considered, as shown in equations (8) and (9). The interruption time varies from branch to branch, taking into account the impact of VSC on class B branches. In addition, in equation (11), based on the island operation assumption, if the DG capacity is sufficient to compensate for the load demand, the power reduction is set to zero; otherwise, it is set to the difference between the demand and the DG capacity, reflecting the contribution of DG to reducing the unsupplied energy.
[0082]
[0083] in, The duration of the branch interruption; is the failure rate of branch b; The maintenance time for branch b; Indicates the power cut; is the power demand of each load point downstream of branch b; is the DG capacity of each load point downstream of branch b.
[0084] Calculate the downstream load demand of the branch by applying the virtual Kirchhoff's Current Law (KCL) and taking into account the power supply and demand of the node and the available DG power downstream of the branch Specifically, constraints (10)-(12) first transform It is divided into positive and negative parts and specifies how the load nodes and substations adjust their calculations according to their AC / DC characteristics to ensure compatibility. Similarly, constraints (13)-(15) are calculated using similar steps. Ensure consistency with demand-side calculations.
[0085]
[0086]
[0087] Use formula (18) to calculate the network equivalent error of network simulation Considering different types of node connections, represents the sum of the expected load losses of node i due to the faults of the inverter, rectifier, AC and DC circuit breakers associated with the node, as shown in formula (16).
[0088]
[0089] (3) Form the system average interruption frequency index (SAIFI) and the system average interruption duration index (SAIDI).
[0090] For SAIFI, use equation (17) to express its fault due to branch b and node i fails Equations (18) and (19) explain how to With available DG power , calculate the number of customers affected by the failure of branch b. If the DG is sufficient, all customers can be supplied; otherwise, the number of affected customers is calculated proportionally. Equations (20)-(22) use the virtual KCL to determine the number of downstream customers of branch b, following a similar approach to demand and capacity calculations. Equation (23) summarizes the total annual customer interruption caused by equipment failures associated with node i, i.e. Also consider the layout of the connected devices on the node. These steps thoroughly evaluate all aspects of system reliability.
[0091]
[0092]
[0093] Among them, y b is the binary investment variable of branch b; is the total number of customers of node i.
[0094] Similar to SAIFI, the calculation of SAIDI can be completed using equations (24)-(26), as shown below.
[0095]
[0096] Step 4: Perform power flow constraints:
[0097] Power flow model is established for different types of nodes and branches. According to Kirchhoff's voltage law (KVL), the branch voltage balance equation is given by constraints (27)-(28), where the line impedance Z is calculated according to the type and length of the branch. The voltage drop of type A branch is obtained using constraint (27), and type B branch is adjusted according to the connected node type using constraint (28).
[0098] Among them, the node voltage V i according to The value of the DC node V i Direct use, for AC node V i Converted to V by VSC i / Kc M c , which represents the DC side voltage. Equations (27) and (28) are specifically shown as follows.
[0099]
[0100] In equations (29) and (30), positive values represent the power entering node i, and negative values represent the power leaving node i. Equation (29) ensures the current balance of the DC node, including the outgoing line current, DC and AC load consumption, and the current provided by distributed generation. Equation (30) handles similar considerations for the AC node, taking into account the current conversion of different types of lines, load demand, and generation input, while using the modulation factor M c and constant K c Voltage conversion is performed through VSC. Equation (31) solves the specific current outflow situation of the AC node connected to the Class B line. Equation (32) focuses on the current balance of the substation node. Equations (29), (30), (31), and (32) are specifically shown as follows.
[0101]
[0102] Step 5: Constrain node voltage and line current:
[0103] Equations (33) and (34) are used to constrain the node voltage and line current, as shown below.
[0104]
[0105] Step 6: Perform Radiality Constraints:
[0106] In order to ensure that the radial configuration is maintained in the system, the branch selection process must meet two basic criteria. Among them, the total number of selected branches is matched to the total number of nodes in the system minus the number of nodes in the substation using equation (35), as shown below. In addition, equations (20) to (22) are used to maintain network connectivity and ensure a balance in the number of users.
[0107]
[0108] Step 7: Optimize the model:
[0109] (1) Linearization techniques are used to process nonlinear elements such as absolute value terms, bilinear terms, logical expressions, and piecewise functions, and the original problem is transformed into a solvable mixed integer linear programming (MILP) framework, so that the bi-objective APEDF planning model is reshaped into a bi-objective MILP form.
[0110] (2) An adaptive ε-constraint algorithm is used to optimize redundant steps and effectively navigate to the Pareto frontier, thereby improving computational efficiency.
[0111] Example 2
[0112] An embodiment of the present invention is different from the previous embodiment in that:
[0113] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.
[0114] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.
[0115] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.
[0116] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0117] Example 3
[0118] Reference Figure 2-Figure 9 , which is an embodiment of the present invention, provides a computing platform load balancing method based on particle swarm genetic algorithm. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.
[0119] This embodiment provides a reliability assessment method for PV-storage-direct-flexible campus planning based on explicit topology variable optimization of dual-Q strategy. The specific implementation method is the same as above and will not be repeated here. This embodiment uses an improved system example for analysis. The detailed structure of the system is as follows: Figure 2 The test system contains 13 buses and 26 candidate branches. The basic AC voltage is set to 4.16kV and the DC voltage is set to 6.8kV. The total AC load of the system is 1.29MW and the DC load is 1.55MW. Among them, the total capacity of ACDG connected to the grid is 0.08MW and the total capacity of DCDG connected to the grid is 0.32MW. The detailed data of line parameters, load and distributed generation capacity are shown in Tables 1 and 2.
[0120] Table 1 Data comparison table
[0121]
[0122]
[0123] Table 2 Data comparison table
[0124]
[0125] Through the MATLAB / Simulink platform, a model is established to compare and analyze the planning models of the photovoltaic storage direct-flexible power system. Among them, the photovoltaic storage direct-flexible power grid system (PEDF) and APEDF are focused on, and their performance is evaluated based on the optimization results represented by the Pareto frontier. The specific results are as follows Figure 3 and 4As shown, each point on the Pareto front represents a distribution system configuration that can achieve optimization under cost budget and reliability standards.
[0126] Figure 5 and 6 It further demonstrates the optimal solution for the PEDF and APEDF models selected by the decision-making technique in this application. It has the following advantages:
[0127] (1) A wide range of trade-off options: the APEDF model shows the widest possible trade-offs between cost and reliability;
[0128] (2) Balance and optimize cost and reliability, as shown in the figure PEDF has limitations in both economy and reliability due to the high failure rate and investment cost associated with DC equipment and VSC, while APEDF finds a more balanced solution between cost (PEDF cost = 2232.45k$) and reliability (EENS = 25.65MWh), showing its advantage in dual-objective optimization.
[0129] (3) Reasonable standards for evaluating DC systems.
[0130] The performance of different multi-objective optimization algorithms is compared, and the multi-objective optimization algorithms such as NSGA-II, the traditional ε-constrained method and the adaptive ε-constrained method used in this paper are compared. All algorithms are evaluated in the same search grid configuration, with a uniform grid resolution set at N = 400 points. The specific results are shown in Table 3 and Fig. 9 As shown in the figure, compared with the ε-constrained method, NSGA-II produces fewer Pareto non-dominated solutions, the overall quality of the solution is relatively poor, and there are a large number of discrete variables (equivalent to 2 12 ×2 26 ×3 26 ), which exceeds the capabilities of traditional traversal or heuristic algorithms (such as NSGA-II).
[0131] Table 3 Comparison of experimental results
[0132] method Iterations Time(s) NSGA-II 400 86383 Traditional ε-constraint method 400 77260 Suggested approach 36 54
[0133] A performance difference threshold of 0% is consistently applied in the algorithm settings to ensure the optimality of the solution. Figure 7The analysis shows that the optimization target value obtained by the traditional ε-constraint method is exactly the same as the optimization target value obtained by the adaptive ε-constraint method, that is, their accuracy is consistent. However, compared with the non-adaptive method, the adaptive ε-constraint method significantly reduces the number of iterations. The adaptive ε-constraint method can skillfully predict the upcoming Pareto candidate solution through slack variables, greatly reducing the computational requirements of each iteration cycle, thereby accelerating the solution process and improving overall efficiency.
[0134] The impact of DG (distributed generation) penetration rate and DC component ratio on the cost and reliability indicators of the PV-storage-direct-flexible system is analyzed in depth. Figure 8 and 9 As shown. Figure 8 It can be seen that with the increase of DG penetration, the system cost gradually decreases, that is, the load reduces the dependence on external lines and equipment expansion, thereby reducing the cost. At the same time, the EENS value decreases with the increase of DG penetration, indicating that the local absorption capacity of DG reduces the load shedding caused by VSC failure, thereby improving the overall reliability of the system.
[0135] Depend on Fig. 9 It can be seen that as the proportion of DC increases, the system cost shows a trend of first increasing and then decreasing, while EENS shows a trend of stable growth, that is, in a system containing only AC components, the optimal plan can achieve the lowest cost and the highest reliability. As the proportion of DC components increases, the cost and EENS of the optimal solution will increase, that is, only when the proportion of DC components reaches a certain level, the investment in DC equipment will become more reasonable, thus effectively balancing cost and reliability.
[0136] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. A planning and evaluation method for a PV-storage direct-flexible system considering reliability and economy. It is characterized in that include: Establish the topology model of the PV-storage direct-flexible system; Based on the topological model, construct the objective function; According to the objective function, an explicit reliability evaluation based on topological variables is constructed; Perform power flow constraints based on reliability assessment; Based on the power flow constraint results, node voltage and line current constraints are performed; According to the constraint conditions, runoff constraints are carried out; Optimize the model and form a system planning solution.
2. The planning and evaluation method for a PV-storage direct-flexible system considering reliability and economy as claimed in claim 1, Features: The establishment of the PV-storage-direct-flexible system topology model includes collecting topological data of the PV-storage-direct-flexible system; defining the load characteristics of each node; determining the location and capacity parameters of distributed resources in the PV-storage-direct-flexible system; The objective function constructed includes minimizing the total cost and the selected reliability metric RM of the PV-storage direct-flexible system, which can be expressed as: minf=[C PEDF ,RM] C PEDF =C INV +C MO +C EP Where RM represents the selected reliability measure, C PEDF represents the total cost, C INV represents the investment cost, C MO represents the operation and maintenance cost, C EP represents the energy production cost.
3. The planning and evaluation method for a PV-storage direct-flexible system considering reliability and economy as described in claim 2, Features: The explicit reliability assessment includes simulating possible fault scenarios in the system, assuming that the fault is caused by a specific accident, including a single-point fault or a multi-point fault. The PV-storage direct-flexible system will operate normally in a radial structure. When a fault occurs, the distributed generation DG supports island power supply, while ignoring the impact of relay protection time. Develop a calculation method for expected unpowered energy EENS, which is calculated by integrating the energy losses caused by branch faults and node equipment failures. The Big M method is used to automatically adjust the EENS value according to the branch type. When a branch is selected, specific conditions are set to calculate the loss, otherwise the loss is set to zero. When calculating EENS, the interruption time and power reduction of each branch are considered; Considering the island operation assumption, if the DG capacity is sufficient to compensate the load demand, the power reduction is set to zero; otherwise, the power reduction is set to the difference between the demand and the DG capacity to reflect the contribution of DG to reducing the unsupplied energy; The virtual Kirchhoff current law KCL is applied to calculate the load demand downstream of the branch and the distributed generation power available downstream of the branch. The load demand is divided into positive and negative parts and adjusted according to the AC / DC characteristics of the node and substation; The system average interruption frequency index SAIFI and the system average interruption duration index SAIDI are formed. SAIFI calculates the number of customer interruptions caused by branch and node failures and determines the number of customers affected by branch failures based on the comparison between downstream demand and available DG power. If the DG capacity is sufficient, all customer demands are met; otherwise, the number of affected customers is calculated proportionally. SAIDI determines the duration of customer outages by calculating the repair time of branch and node failures, determines the number of downstream customers of the branch through virtual KCL, ensures the consistency of demand and capacity calculations, and finally summarizes the total annual customer outages caused by node-related equipment failures.
4. The planning and evaluation method for a PV-storage direct-flexible system considering reliability and economy as claimed in claim 3, Features: The power flow constraint comprises using the first and second constrained power flow conditions to provide voltage balance equations for different types of branches, calculating the voltage drop for type A branches according to line impedance and current, and adjusting the voltage for type B branches according to the type of connected nodes; Set the node voltage. The node voltage is set according to the node type. For DC nodes, the voltage value is used directly. For AC nodes, it is converted into a DC side voltage through a voltage source converter VSC. For DC nodes, the third constraint power flow condition is used to ensure current balance, including outgoing line current, load consumption and current provided by distributed generation; For AC nodes, the fourth constraint power flow condition is used to consider current conversion, load demand and power generation input, and voltage conversion is performed through VSC; For AC nodes connected to Class B lines, the fifth constraint power flow condition is used to solve the specific current outflow situation; The sixth constrained power flow condition is used to ensure current balance at the substation nodes.
5. The planning and evaluation method for a PV-storage direct-flexible system considering reliability and economy as claimed in claim 4, Features: The first constrained power flow condition is expressed as, Among them, A i,b is the node i branch b association matrix; Ω B is the set of all branches. The second constrained power flow condition is expressed as, Among them, K c is the converter constant; M c Converter modulation index; M is a large number. The third constraint power flow condition is expressed as, in, and are the AC load demand and DC load demand at node i respectively; η REC is the rectifier efficiency; η INV is the inverter efficiency; and are the AC generator power and DC generator power at node i respectively; is a binary variable of DC node i. The fourth constraint power flow condition is expressed as, Among them, Ω ND is the set of all load nodes. The fifth constraint power flow condition is expressed as: The sixth constraint power flow condition is expressed as, Among them, Ω NS is the set of all substation nodes; P s is the output power of substation s.
6. The planning and evaluation method for a PV-storage direct-flexible system considering reliability and economy as claimed in claim 5, Features: The node voltage and line current constraints are expressed as, in, is a binary variable of type A branch; Ω N The set of all nodes.
7. The planning and evaluation method for a PV-storage direct-flexible system considering reliability and economy as claimed in claim 6, Features: The radial constraint includes making the total number of selected branches match the total number of nodes in the system minus the number of nodes in the substation to ensure that the radial configuration is maintained in the system, which is expressed as: Among them, y b is the binary investment variable of branch b.
8. The planning and evaluation method for a PV-storage direct-flexible system considering reliability and economy as claimed in claim 7, Features: The optimization of the model includes using linearization technology to process nonlinear elements, converting the original problem into a mixed integer linear programming (MILP) framework, so that the dual-objective APEDF planning model is reshaped into a dual-objective MILP form; An adaptive ε-constraint algorithm is used to optimize redundant steps and navigate to the Pareto frontier to improve computational efficiency.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the steps of the method for planning and evaluating a PV-storage direct-flexible system considering reliability and economy are implemented as described in any one of claims 1 to 8.
10. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method for planning and evaluating a PV-storage direct-flexible system considering reliability and economy are implemented as described in any one of claims 1 to 8.
Citation Information
Cited By
Optical storage direct flexible system configuration method for highway electric vehicle charging scene
CN120749858A
Photovoltaic storage direct flexible system configuration method for expressway electric vehicle charging scene
CN120749858B