Circuit control method and device, booster circuit, computer equipment and storage medium

By using two low-voltage switch tubes instead of high-voltage switch tubes in the Boost PFC circuit, the problem of high production costs of Boost PFC circuits is solved, and cost reduction and circuit stability are improved.

CN118944424APending Publication Date: 2024-11-12GREE ELECTRIC APPLIANCE INC OF ZHUHAI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410984462.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The production cost of Boost PFC circuit is relatively high, mainly due to the high production cost of high voltage switch tubes, which leads to an increase in the cost of the entire circuit.

Method used

Two low-voltage switch tubes are used instead of one high-voltage switch tube. Through the design and control method of the boost circuit, the sum of the voltage stress of the low-voltage switch tube meets the voltage stress requirements of the bus voltage, thereby reducing production costs.

Benefits of technology

It effectively reduces the production cost of Boost PFC circuit, simplifies the circuit structure, reduces the use of high-voltage switch tubes, reduces the inrush current, and improves the stability of the circuit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944424A_ABST
    Figure CN118944424A_ABST
Patent Text Reader

Abstract

The invention relates to a circuit control method and device, a booster circuit, computer equipment and a storage medium. The boost circuit comprises an alternating current power supply, a rectifier bridge, a first low-voltage switch tube, a second low-voltage switch tube, a boost inductor, a fly-wheel diode, a pre-charging circuit, a first capacitor, a second capacitor and a load resistor, the two low-voltage switch tubes are used for replacing a high-voltage switch tube, and the cost of the two low-voltage switch tubes is lower than that of the high-voltage switch tube. Therefore, the production cost of the boost circuit (Boost PFC circuit) is reduced, and the problem of high production cost of the existing Boost PFC circuit is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of circuit control, and in particular to a circuit control method, device, boost circuit, computer equipment and storage medium. Background Art

[0002] Boost PFC circuit is the most commonly used power factor correction circuit. It has the advantages of simple structure and controllability, and is widely used in energy storage systems, new energy vehicles, photovoltaic systems, wind power generation systems, rail transportation and other fields. However, its voltage stress is large, and the voltage it directly bears is the bus voltage. In order to ensure the design margin, a switch tube with a withstand voltage of 2 times the rated bus voltage is usually selected. However, the production cost of the high-voltage switch tube is high and usually needs to be customized. Therefore, the use of this high-voltage switch tube will lead to a high production cost for the Boost PFC circuit. Summary of the invention

[0003] The present application provides a circuit control method, device, boost circuit, computer equipment and storage medium to solve the problem of high production cost of existing Boost PFC circuits.

[0004] In a first aspect, the present application provides a boost circuit, the boost circuit comprising an AC power supply, a rectifier bridge, a first low-voltage switch tube, a second low-voltage switch tube, a boost inductor, a freewheeling diode, a pre-charging circuit, a first capacitor, a second capacitor and a load resistor, the two ends of the AC power supply are respectively connected to the first end and the second end of the rectifier bridge, the third end of the rectifier bridge is respectively connected to the positive electrode of the freewheeling diode and the drain of the first low-voltage switch tube, the negative electrode of the freewheeling diode is respectively connected to the first end of the first capacitor and the first end of the load resistor, the second end of the first capacitor is respectively connected to the second end of the pre-charging circuit and the first end of the second capacitor, the source of the first low-voltage switch tube is respectively connected to the first end of the pre-charging circuit and the drain of the second low-voltage switch tube, the source of the second low-voltage switch tube is respectively connected to the fourth end of the rectifier bridge, the second end of the second capacitor, and the second end of the load resistor, the gate of the first low-voltage switch tube and the gate of the second low-voltage switch tube are connected to a circuit control device, wherein the sum of the voltage stresses of the first low-voltage switch tube and the second low-voltage switch tube meets the voltage stress requirements of the bus voltage.

[0005] Optionally, the pre-charging circuit includes a pre-charging resistor and a pre-charging diode, the first end of the pre-charging resistor serves as the first end of the pre-charging circuit, and is used to be connected to the first low-voltage switching tube and the second low-voltage switching tube respectively, the second end of the pre-charging resistor is connected to the positive electrode of the pre-charging diode, and the negative electrode of the pre-charging diode serves as the second end of the pre-charging circuit, and is used to be connected to the first capacitor and the second capacitor respectively.

[0006] In a second aspect, the present application provides a circuit control method, the method comprising:

[0007] Obtaining the bus voltage of the boost circuit;

[0008] determining an operation stage of the boost circuit according to a bus voltage of the boost circuit;

[0009] When the operation phase of the boost circuit is a non-pre-charging phase, obtaining a reference voltage corresponding to the boost circuit in the non-pre-charging phase;

[0010] Determining a corresponding control duty cycle according to a voltage difference between a reference voltage corresponding to the boost circuit in a non-pre-charging stage and a bus voltage;

[0011] The on and off of the first low-voltage switch tube and the second low-voltage switch tube in the boost circuit are controlled according to the control duty cycle, wherein the sum of the voltage stresses of the first low-voltage switch tube and the second low-voltage switch tube meets the voltage stress requirement of the bus voltage.

[0012] Optionally, determining the operation phase of the boost circuit according to the bus voltage of the boost circuit comprises at least one of the following:

[0013] When the bus voltage of the boost circuit is less than a first preset voltage, determining that the operation stage of the boost circuit is a pre-charging stage, wherein when the boost circuit is in the pre-charging stage, the first low-voltage switch tube is in an on state, and the second low-voltage switch tube is in an off state;

[0014] When the bus voltage of the boost circuit is greater than or equal to the first preset voltage but less than the second preset voltage, determining that the operation phase of the boost circuit is a soft start phase;

[0015] When the bus voltage of the boost circuit is equal to the second preset voltage, the operation phase of the boost circuit is determined to be a normal operation phase, wherein the non-pre-charge phase includes the soft start phase and the normal operation phase.

[0016] Optionally, when the operation stage of the boost circuit is a non-pre-charging stage, obtaining a reference voltage corresponding to the boost circuit in the non-pre-charging stage includes:

[0017] When the operation phase of the boost circuit is the soft start phase, the sum of the bus voltage of the boost circuit and the preset voltage step is determined as the reference voltage corresponding to the boost circuit.

[0018] Optionally, when the operation stage of the boost circuit is a non-pre-charging stage, obtaining a reference voltage corresponding to the boost circuit in the non-pre-charging stage includes:

[0019] When the operation phase of the boost circuit is a normal operation phase, the second preset voltage is used as a reference voltage corresponding to the boost circuit.

[0020] Optionally, determining a corresponding control duty cycle according to a voltage difference between a reference voltage corresponding to the boost circuit in a non-pre-charging stage and a bus voltage includes:

[0021] Inputting the voltage difference between the reference voltage of the boost circuit and the bus voltage into a first regulating controller, and using the output of the first regulating controller as the desired current amplitude;

[0022] Obtaining a boost inductor current and an input steamed wave voltage of the boost circuit;

[0023] Determine a reference current according to the input steamed wave voltage and the expected current amplitude;

[0024] The current difference between the boost inductor current of the boost circuit and the reference current is input into the second regulating controller, and the output of the second regulating controller is used as the control duty cycle.

[0025] In a third aspect, the present application provides a circuit control device, the device comprising:

[0026] An acquisition module, used for acquiring the bus voltage of the boost circuit;

[0027] A determination module, used to determine the operation stage of the boost circuit according to the bus voltage of the boost circuit;

[0028] The acquisition module is further used for acquiring a reference voltage corresponding to the boost circuit in the non-pre-charging stage when the operation stage of the boost circuit is the non-pre-charging stage;

[0029] The determination module is further used to determine a corresponding control duty cycle according to a voltage difference between a reference voltage corresponding to the boost circuit in a non-pre-charging phase and a bus voltage;

[0030] A control module is used to control the on and off of a first low-voltage switch tube and a second low-voltage switch tube in the boost circuit according to the control duty cycle, wherein the sum of the voltage stresses of the first low-voltage switch tube and the second low-voltage switch tube meets the voltage stress requirement of the bus voltage.

[0031] In a fourth aspect, the present application provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned circuit control method when executing the computer program.

[0032] In a fifth aspect, the present application also provides a computer storage medium storing computer executable instructions, wherein the computer executable instructions are used to execute the above-mentioned circuit control method.

[0033] The above technical solution provided by the embodiment of the present application has the following advantages over the prior art: the boost circuit provided by the embodiment of the present application includes an AC power supply, a rectifier bridge, a first low-voltage switch tube, a second low-voltage switch tube, a boost inductor, a freewheeling diode, a pre-charging circuit, a first capacitor, a second capacitor and a load resistor, the two ends of the AC power supply are respectively connected to the first end and the second end of the rectifier bridge, the third end of the rectifier bridge is respectively connected to the positive electrode of the freewheeling diode and the drain of the first low-voltage switch tube, the negative electrode of the freewheeling diode is respectively connected to the first end of the first capacitor and the first end of the load resistor, and the The second end of the first capacitor is respectively connected to the second end of the pre-charging circuit and the first end of the second capacitor, the source of the first low-voltage switch tube is respectively connected to the first end of the pre-charging circuit and the drain of the second low-voltage switch tube, the source of the second low-voltage switch tube is respectively connected to the fourth end of the rectifier bridge, the second end of the second capacitor, and the second end of the load resistor, the gate of the first low-voltage switch tube and the gate of the second low-voltage switch tube are connected to the circuit control device, wherein the sum of the voltage stresses of the first low-voltage switch tube and the second low-voltage switch tube meets the voltage stress requirement of the bus voltage.

[0034] Based on the above-mentioned boost circuit, two low-voltage switching tubes are used to replace one high-voltage switching tube, and the cost of the two low-voltage switching tubes is lower than that of one high-voltage switching tube, thereby reducing the production cost of the boost circuit (Boost PFC circuit) to solve the problem of high production cost of the existing Boost PFC circuit. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.

[0036] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0037] One or more embodiments are exemplarily described by pictures in the corresponding drawings, and these exemplified descriptions do not constitute limitations on the embodiments. Elements with the same reference numerals in the drawings represent similar elements, and unless otherwise stated, the figures in the drawings do not constitute proportional limitations.

[0038] Figure 1 A schematic diagram of a boost circuit provided in an embodiment of the present application;

[0039] Figure 2 A schematic diagram of a boost circuit provided in an embodiment of the present application;

[0040] Figure 3 A schematic diagram of a flow chart of a circuit control method provided in an embodiment of the present application;

[0041] Figure 4 A schematic diagram of a flow chart of a circuit control method provided in an embodiment of the present application;

[0042] Figure 5 A structural block diagram of a circuit control device provided in an embodiment of the present application;

[0043] Figure 6 A schematic diagram of the internal structure of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0044] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0045] The disclosure below provides many different embodiments or examples to implement different structures of the present invention. In order to simplify the disclosure of the present invention, the parts and settings of specific examples are described below. Of course, they are only examples, and the purpose is not to limit the present invention. In addition, the present invention can repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed.

[0046] Figure 1 FIG. 1 is an application environment diagram of a circuit control method in an embodiment. Figure 1The circuit control method is applied to a circuit control system. The circuit control system includes a boost circuit and a circuit control device. The boost circuit includes an AC power supply, a rectifier bridge, a first low-voltage switch tube, a second low-voltage switch tube, a boost inductor, a freewheeling diode, a pre-charging circuit, a first capacitor, a second capacitor and a load resistor. The two ends of the AC power supply are respectively connected to the first end and the second end of the rectifier bridge, the third end of the rectifier bridge is respectively connected to the positive electrode of the freewheeling diode and the drain of the first low-voltage switch tube, the negative electrode of the freewheeling diode is respectively connected to the first end of the first capacitor and the first end of the load resistor, the second end of the first capacitor is respectively connected to the second end of the pre-charging circuit and the first end of the second capacitor, the source of the first low-voltage switch tube is respectively connected to the first end of the pre-charging circuit and the drain of the second low-voltage switch tube, the source of the second low-voltage switch tube is respectively connected to the fourth end of the rectifier bridge, the second end of the second capacitor, and the second end of the load resistor, the gate of the first low-voltage switch tube and the gate of the second low-voltage switch tube are connected to the circuit control device, wherein the sum of the voltage stresses of the first low-voltage switch tube and the second low-voltage switch tube meets the voltage stress requirements of the bus voltage.

[0047] Specifically, Figure 1 As shown in the figure, the boost circuit is the Boost PFC circuit, AC indicates the AC power supply, which is used to provide three-phase AC power; DB indicates the rectifier bridge, S1 indicates the first low-voltage switch tube, S2 indicates the second low-voltage switch tube, L is the boost inductor, D1 is the freewheeling diode, C1 is the first capacitor, C2 is the second capacitor, and R is the load resistor. The rectifier bridge is composed of four diodes.

[0048] Before the boost circuit control is turned on, the second capacitor is charged through the pre-charging circuit, and the first capacitor and the second capacitor are connected in series. In the soft start stage and the normal working stage of the Boost PFC circuit, the inductive current only flows through the freewheeling diode to charge the first capacitor and the second capacitor. When the capacitance of the first capacitor and the capacitance of the second capacitor are the same, the voltage of the first capacitor and the voltage of the second capacitor are also equal, and the voltage stress of the first low-voltage switch tube corresponds to the maximum voltage of the first capacitor, and the voltage stress of the second low-voltage switch tube corresponds to the maximum voltage of the second switch tube, and the bus voltage is the sum of the voltages of the first capacitor and the second capacitor. Therefore, the voltage stress corresponding to each low-voltage switch tube is only half of the bus voltage, which is half the voltage stress of the high-voltage switch tube of the traditional Boost PFC circuit. Two low-voltage switch tubes are used to replace the high-voltage switch tube, and the cost of the two low-voltage switch tubes is lower than the cost of one high-voltage switch tube, thereby reducing the production cost of the boost circuit (Boost PFC circuit) to solve the problem of high production cost of the existing Boost PFC circuit.

[0049] In one embodiment, the pre-charging circuit includes a pre-charging resistor and a pre-charging diode. The first end of the pre-charging resistor serves as the first end of the pre-charging circuit, and is used to be connected to the first low-voltage switch tube and the second low-voltage switch tube respectively. The second end of the pre-charging resistor is connected to the positive electrode of the pre-charging diode. The negative electrode of the pre-charging diode serves as the second end of the pre-charging circuit, and is used to be connected to the first capacitor and the second capacitor respectively.

[0050] Specifically, Figure 2 As shown, PTC indicates the pre-charging resistor, and D2 indicates the pre-charging diode. In the traditional Boost PFC circuit, a relay is used at the front end of the rectifier bridge as a pre-charging circuit, but in this embodiment, a pre-charging diode and a pre-charging resistor are used at the rear end of the switch tube to charge the second capacitor, thereby avoiding a large surge current when the Boost PFC circuit is started, and compared with the traditional Boost PFC circuit, the relay pre-charging circuit is reduced, further reducing the production cost of the Boost PFC circuit, and simplifying the complexity of the Boost PFC circuit.

[0051] In one embodiment, Figure 3 is a flow chart of a circuit control method in one embodiment, referring to Figure 3 , a circuit control method is provided. This embodiment mainly uses the method applied to a circuit control device as an example, and the circuit control method specifically includes the following steps:

[0052] Step S210, obtaining the bus voltage of the boost circuit.

[0053] Specifically, the bus voltage of the boost circuit is the sum of the voltage of the first capacitor and the voltage of the second capacitor in the boost circuit, so the bus voltage is determined by collecting the voltages of the first capacitor and the second capacitor.

[0054] Step S220: determining the operation phase of the boost circuit according to the bus voltage of the boost circuit.

[0055] Specifically, the bus voltage corresponding to different operation stages of the boost circuit is different. The operation stages of the boost circuit specifically include the pre-charging stage and the non-pre-charging stage. The pre-charging stage refers to the process of pre-charging before the boost circuit control is turned on. The non-pre-charging stage refers to the operation process after the pre-charging stage is completed. The non-pre-charging stage specifically includes the soft start stage and the normal operation stage. The soft start stage refers to the process of soft starting the boost circuit after the pre-charging stage is completed. The normal operation stage refers to entering the normal operation state after the soft start stage is completed. As the operation stage changes, the bus voltage is in an increasing state.

[0056] Step S230, when the operation phase of the boost circuit is a non-pre-charging phase, obtaining a reference voltage corresponding to the boost circuit in the non-pre-charging phase.

[0057] Specifically, the non-pre-charging stage means that the boost circuit has successfully gone through the pre-charging stage, which also refers to the process of boosting the bus voltage from 0 to a stable voltage. After the bus voltage is boosted to a stable voltage, the reference voltage corresponding to the boost circuit in the current stage is obtained. The reference voltage is the expected voltage for the bus voltage to continue to be boosted, that is, the expected bus voltage continues to be boosted to the reference voltage.

[0058] Step S240, determining a corresponding control duty cycle according to a voltage difference between a reference voltage corresponding to the boost circuit in a non-pre-charging stage and a bus voltage.

[0059] Specifically, a control duty cycle corresponding to the boost circuit is generated according to a voltage difference between a current bus voltage and a corresponding reference voltage, and the control duty cycle is used to simultaneously control the on and off of a first low-voltage switch tube and a second low-voltage switch tube in the boost circuit.

[0060] Step S250, controlling the on and off of the first low-voltage switch tube and the second low-voltage switch tube in the boost circuit according to the control duty cycle, wherein the sum of the voltage stresses of the first low-voltage switch tube and the second low-voltage switch tube meets the voltage stress requirement of the bus voltage.

[0061] Specifically, a control signal is output according to the control duty cycle, and the control signal is used to simultaneously control the on and off of the first low-voltage switch tube and the second low-voltage switch tube in the boost circuit, so as to control the voltage of the first capacitor and the second capacitor in the boost circuit. Since the sum of the voltages of the first capacitor and the second capacitor is the bus voltage, controlling the first low-voltage switch tube and the second low-voltage switch tube according to the control duty cycle can achieve the effect of accurately controlling the bus voltage. The boost circuit utilizes two low-voltage switch tubes to replace one high-voltage switch tube, and the cost of the two low-voltage switch tubes is lower than the cost of one high-voltage switch tube, thereby reducing the production cost of the boost circuit (Boost PFC circuit) to solve the problem of high production cost of the existing Boost PFC circuit.

[0062] In one embodiment, determining the operation stage of the boost circuit according to the bus voltage of the boost circuit comprises at least one of the following:

[0063] When the bus voltage of the boost circuit is less than a first preset voltage, determining that the operation stage of the boost circuit is a pre-charging stage, wherein when the boost circuit is in the pre-charging stage, the first low-voltage switch tube is in an on state, and the second low-voltage switch tube is in an off state;

[0064] When the bus voltage of the boost circuit is greater than or equal to the first preset voltage but less than the second preset voltage, determining that the operation phase of the boost circuit is a soft start phase;

[0065] When the bus voltage of the boost circuit is equal to the second preset voltage, the operation phase of the boost circuit is determined to be a normal operation phase, wherein the non-pre-charge phase includes the soft start phase and the normal operation phase.

[0066] Specifically, refer to Figure 4 The first preset voltage is used to define whether the boost circuit has completed voltage pre-charging. It can be adaptively set according to actual applications. When the bus voltage is less than the first preset voltage, it means that the boost circuit has not been controlled to start. At this time, the boost circuit is still performing voltage pre-charging. At this time, the first low-voltage switch tube in the boost circuit is in the on state, and the second low-voltage switch tube is in the off state. The inductor current charges the second capacitor through the pre-charging diode and the pre-charging resistor until the bus voltage reaches the first preset voltage, which is considered to be completed.

[0067] When the bus voltage is greater than or equal to the first preset voltage but less than the second preset voltage, it indicates that the boost circuit has completed voltage pre-charging, but the bus voltage has not yet reached the operating voltage of the boost circuit. The boost circuit is determined to be in the soft start stage, that is, the second preset voltage indicates the operating voltage of the boost circuit. The boost circuit is not determined to enter the normal working stage until the bus voltage is boosted to the second preset voltage.

[0068] According to the boost process of the bus voltage, the boost circuit sequentially passes through the pre-charge stage and the soft start stage until the normal working stage.

[0069] In one embodiment, when the operation phase of the boost circuit is a non-pre-charging phase, obtaining a reference voltage corresponding to the boost circuit in the non-pre-charging phase includes:

[0070] When the operation phase of the boost circuit is the soft start phase, the sum of the bus voltage of the boost circuit and the preset voltage step is determined as the reference voltage corresponding to the boost circuit.

[0071] Specifically, when the operation stage of the boost circuit is the soft start stage, it is still necessary to gradually control the bus voltage of the boost circuit to continue to boost. Therefore, the voltage after superimposing the preset voltage step on the bus voltage is used as the reference voltage for continuing to boost the bus voltage. Whenever the bus voltage is boosted to the reference voltage, the preset voltage step is superimposed to update the reference voltage, which is used to control the bus voltage to boost based on the reference voltage until the bus voltage is boosted to the second preset voltage, that is, the boost circuit enters the normal working stage.

[0072] During the soft start phase, the bus voltage is boosted based on a reference voltage, and the reference voltage is boosted as the bus voltage is boosted. The reference voltage is boosted based on a preset voltage step, and the preset voltage step can be adaptively set according to actual applications.

[0073] In one embodiment, when the operation phase of the boost circuit is a non-pre-charging phase, obtaining a reference voltage corresponding to the boost circuit in the non-pre-charging phase includes:

[0074] When the operation phase of the boost circuit is a normal operation phase, the second preset voltage is used as a reference voltage corresponding to the boost circuit.

[0075] Specifically, when the boost circuit is in a normal working stage, the bus voltage is a second preset voltage. In order to maintain the boost circuit to work stably at the second preset voltage, the second preset voltage is used as a reference voltage for the boost circuit. The boost circuit is then controlled to continuously generate a control duty cycle according to the second preset voltage to maintain the bus voltage stable at the second preset voltage, so as to achieve stable operation.

[0076] In one embodiment, determining the corresponding control duty cycle according to the voltage difference between the reference voltage corresponding to the boost circuit in the non-pre-charging stage and the bus voltage includes:

[0077] Inputting the voltage difference between the reference voltage of the boost circuit and the bus voltage into a first regulating controller, and using the output of the first regulating controller as the desired current amplitude;

[0078] Obtaining a boost inductor current and an input steamed wave voltage of the boost circuit;

[0079] Determine a reference current according to the input steamed wave voltage and the expected current amplitude;

[0080] The current difference between the boost inductor current of the boost circuit and the reference current is input into the second regulating controller, and the output of the second regulating controller is used as the control duty cycle.

[0081] Specifically, refer to Figure 4, the voltage difference between the bus voltage and the corresponding reference voltage is input into the first regulating controller (PID controller), and the first regulating controller performs proportional regulation and integral regulation according to the voltage difference, so as to output the expected current amplitude that makes the bus voltage reach the reference voltage, and then determines the reference current according to the expected current amplitude and the acquired input steamed wave voltage, and then inputs the current difference between the reference current and the inductor current into the second regulating controller (PID controller), and the second regulating controller performs proportional regulation and integral regulation according to the current difference, so as to output the control duty cycle that makes the bus voltage reach the reference voltage. Regardless of whether the boost circuit is in the soft start stage or the normal working stage, the corresponding control duty cycle is generated according to the above process, and the first low-voltage switch tube and the second low-voltage switch tube in the boost circuit are controlled according to the control duty cycle, so that the bus voltage reaches the reference voltage corresponding to the control duty cycle, and the effect of accurately controlling the bus voltage can be achieved.

[0082] Figure 3 and Figure 4 FIG. 1 is a flow chart of a circuit control method in one embodiment. It should be understood that although Figure 3 and Figure 4 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 3 and Figure 4 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.

[0083] In one embodiment, Figure 5 As shown, a circuit control device is provided, comprising:

[0084] An acquisition module 310 is used to acquire a bus voltage of a boost circuit;

[0085] A determination module 320, configured to determine an operation phase of the boost circuit according to a bus voltage of the boost circuit;

[0086] The acquisition module 310 is further used to acquire a reference voltage corresponding to the boost circuit in the non-pre-charging stage when the operation stage of the boost circuit is the non-pre-charging stage;

[0087] The determination module 320 is further configured to determine a corresponding control duty cycle according to a voltage difference between a reference voltage corresponding to the boost circuit in the non-pre-charging stage and the bus voltage;

[0088] The control module 330 is used to control the on and off of the first low-voltage switch tube and the second low-voltage switch tube in the boost circuit according to the control duty cycle, wherein the sum of the voltage stresses of the first low-voltage switch tube and the second low-voltage switch tube meets the voltage stress requirement of the bus voltage.

[0089] In one embodiment, the determining module 320 is further configured to implement at least one of the following:

[0090] When the bus voltage of the boost circuit is less than a first preset voltage, determining that the operation stage of the boost circuit is a pre-charging stage, wherein when the boost circuit is in the pre-charging stage, the first low-voltage switch tube is in an on state, and the second low-voltage switch tube is in an off state;

[0091] When the bus voltage of the boost circuit is greater than or equal to the first preset voltage but less than the second preset voltage, determining that the operation phase of the boost circuit is a soft start phase;

[0092] When the bus voltage of the boost circuit is equal to the second preset voltage, the operation phase of the boost circuit is determined to be a normal operation phase, wherein the non-pre-charge phase includes the soft start phase and the normal operation phase.

[0093] In one embodiment, the acquisition module 310 is further used for:

[0094] When the operation phase of the boost circuit is the soft start phase, the sum of the bus voltage of the boost circuit and the preset voltage step is determined as the reference voltage corresponding to the boost circuit.

[0095] In one embodiment, the acquisition module 310 is further used for:

[0096] When the operation phase of the boost circuit is a normal operation phase, the second preset voltage is used as a reference voltage corresponding to the boost circuit.

[0097] In one embodiment, the determining module 320 is further configured to:

[0098] Inputting the voltage difference between the reference voltage of the boost circuit and the bus voltage into a first regulating controller, and using the output of the first regulating controller as the desired current amplitude;

[0099] Obtaining a boost inductor current and an input steamed wave voltage of the boost circuit;

[0100] Determine a reference current according to the input steamed wave voltage and the expected current amplitude;

[0101] The current difference between the boost inductor current of the boost circuit and the reference current is input into the second regulating controller, and the output of the second regulating controller is used as the control duty cycle.

[0102] like Figure 6 As shown, an embodiment of the present application provides a computer device, including a processor 711, a communication interface 712, a memory 713 and a communication bus 714, wherein the processor 711, the communication interface 712, and the memory 713 communicate with each other through the communication bus 714;

[0103] Memory 713, used for storing computer programs;

[0104] The processor 711 is used to implement the circuit control method provided by any one of the aforementioned method embodiments when executing the program stored in the memory 713.

[0105] Those skilled in the art will understand that Figure 6 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0106] In one embodiment, the circuit control device provided by the present application can be implemented in the form of a computer program. The computer program can be Figure 6 The computer device shown in the figure is run on the computer device. The memory of the computer device can store various program modules constituting the circuit control device, for example, Figure 5 The acquisition module 310, the determination module 320 and the control module 330 are shown. The computer program composed of various program modules enables the processor to execute the circuit control method of each embodiment of the present application described in this specification.

[0107] Figure 6 The computer device shown can be Figure 5The acquisition module 310 in the circuit control device shown acquires the bus voltage of the boost circuit. The computer device can determine the operation stage of the boost circuit according to the bus voltage of the boost circuit through the determination module 320. The computer device can obtain the reference voltage corresponding to the boost circuit in the non-pre-charge stage through the acquisition module 310 when the operation stage of the boost circuit is the non-pre-charge stage. The computer device can determine the corresponding control duty cycle according to the voltage difference between the reference voltage corresponding to the boost circuit in the non-pre-charge stage and the bus voltage through the determination module 320. The computer device can control the on and off of the first low-voltage switch tube and the second low-voltage switch tube in the boost circuit according to the control duty cycle through the control module 330, wherein the sum of the voltage stresses of the first low-voltage switch tube and the second low-voltage switch tube meets the voltage stress requirement of the bus voltage.

[0108] An embodiment of the present application further provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the circuit control method provided by any of the aforementioned method embodiments is implemented.

[0109] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0110] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a general hardware platform, and of course, by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the relevant technology can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0111] It should be understood that the terms used herein are only for the purpose of describing specific example embodiments and are not intended to be limiting. Unless the context clearly indicates otherwise, the singular forms "one", "an" and "said" as used herein may also be meant to include plural forms. The terms "include", "comprise", "contain", and "have" are inclusive, and therefore specify the existence of stated features, steps, operations, elements and / or parts, but do not exclude the existence or addition of one or more other features, steps, operations, elements, parts, and / or combinations thereof. The method steps, processes, and operations described herein are not interpreted as necessarily requiring them to be performed in the specific order described or illustrated, unless the execution order is clearly indicated. It should also be understood that additional or alternative can be used.

[0112] The foregoing is merely a specific embodiment of the present invention, which enables those skilled in the art to understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features claimed herein.

Claims

1. A boost circuit, characterized in that: The boost circuit includes an AC power supply, a rectifier bridge, a first low-voltage switch tube, a second low-voltage switch tube, a boost inductor, a freewheeling diode, a pre-charging circuit, a first capacitor, a second capacitor and a load resistor. The two ends of the AC power supply are respectively connected to the first end and the second end of the rectifier bridge. The third end of the rectifier bridge is respectively connected to the positive electrode of the freewheeling diode and the drain of the first low-voltage switch tube. The negative electrode of the freewheeling diode is respectively connected to the first end of the first capacitor and the first end of the load resistor. The second end of the first capacitor is respectively connected to the second end of the pre-charging circuit and the first end of the second capacitor. The source of the first low-voltage switch tube is respectively connected to the first end of the pre-charging circuit and the drain of the second low-voltage switch tube. The source of the second low-voltage switch tube is respectively connected to the fourth end of the rectifier bridge, the second end of the second capacitor and the second end of the load resistor. The gate of the first low-voltage switch tube and the gate of the second low-voltage switch tube are connected to a circuit control device. The sum of the voltage stresses of the first low-voltage switch tube and the second low-voltage switch tube meets the voltage stress requirement of the bus voltage.

2. The boost circuit according to claim 1, characterized in that: The pre-charging circuit includes a pre-charging resistor and a pre-charging diode. The first end of the pre-charging resistor serves as the first end of the pre-charging circuit, and is used to be connected to the first low-voltage switching tube and the second low-voltage switching tube respectively. The second end of the pre-charging resistor is connected to the positive electrode of the pre-charging diode. The negative electrode of the pre-charging diode serves as the second end of the pre-charging circuit, and is used to be connected to the first capacitor and the second capacitor respectively.

3. A circuit control method, characterized in that: The method comprises: Obtaining the bus voltage of the boost circuit; determining an operation stage of the boost circuit according to a bus voltage of the boost circuit; When the operation phase of the boost circuit is a non-pre-charging phase, obtaining a reference voltage corresponding to the boost circuit in the non-pre-charging phase; Determining a corresponding control duty cycle according to a voltage difference between a reference voltage corresponding to the boost circuit in a non-pre-charging stage and a bus voltage; The on and off of the first low-voltage switch tube and the second low-voltage switch tube in the boost circuit are controlled according to the control duty cycle, wherein the sum of the voltage stresses of the first low-voltage switch tube and the second low-voltage switch tube meets the voltage stress requirement of the bus voltage.

4. The method according to claim 3, characterized in that Determining the operation stage of the boost circuit according to the bus voltage of the boost circuit includes at least one of the following: When the bus voltage of the boost circuit is less than a first preset voltage, determining that the operation stage of the boost circuit is a pre-charging stage, wherein when the boost circuit is in the pre-charging stage, the first low-voltage switch tube is in an on state, and the second low-voltage switch tube is in an off state; When the bus voltage of the boost circuit is greater than or equal to the first preset voltage but less than the second preset voltage, determining that the operation phase of the boost circuit is a soft start phase; When the bus voltage of the boost circuit is equal to the second preset voltage, the operation phase of the boost circuit is determined to be a normal operation phase, wherein the non-pre-charge phase includes the soft start phase and the normal operation phase.

5. The method according to claim 4, characterized in that When the operation phase of the boost circuit is a non-pre-charging phase, obtaining a reference voltage corresponding to the boost circuit in the non-pre-charging phase includes: When the operation phase of the boost circuit is the soft start phase, the sum of the bus voltage of the boost circuit and the preset voltage step is determined as the reference voltage corresponding to the boost circuit.

6. The method according to claim 4, characterized in that When the operation phase of the boost circuit is a non-pre-charging phase, obtaining a reference voltage corresponding to the boost circuit in the non-pre-charging phase includes: When the operation phase of the boost circuit is a normal operation phase, the second preset voltage is used as a reference voltage corresponding to the boost circuit.

7. The method according to claim 3, characterized in that The step of determining a corresponding control duty cycle according to a voltage difference between a reference voltage corresponding to the boost circuit in the non-pre-charging stage and a bus voltage comprises: Inputting the voltage difference between the reference voltage of the boost circuit and the bus voltage into a first regulating controller, and using the output of the first regulating controller as the desired current amplitude; Obtaining a boost inductor current and an input steamed wave voltage of the boost circuit; Determine a reference current according to the input steamed wave voltage and the expected current amplitude; The current difference between the boost inductor current of the boost circuit and the reference current is input into the second regulating controller, and the output of the second regulating controller is used as the control duty cycle.

8. A circuit control device, characterized in that: The device comprises: An acquisition module, used for acquiring the bus voltage of the boost circuit; A determination module, used to determine the operation stage of the boost circuit according to the bus voltage of the boost circuit; The acquisition module is further used for acquiring a reference voltage corresponding to the boost circuit in the non-pre-charging stage when the operation stage of the boost circuit is the non-pre-charging stage; The determination module is further used to determine a corresponding control duty cycle according to a voltage difference between a reference voltage corresponding to the boost circuit in a non-pre-charging phase and a bus voltage; A control module is used to control the on and off of a first low-voltage switch tube and a second low-voltage switch tube in the boost circuit according to the control duty cycle, wherein the sum of the voltage stresses of the first low-voltage switch tube and the second low-voltage switch tube meets the voltage stress requirement of the bus voltage.

9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 3 to 7 is implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 3 to 7 is implemented.