Box girder top plate reinforcing steel bar block forming jig frame with roller trolley and using method of box girder top plate reinforcing steel bar block forming jig frame
By designing the box girder roof plate steel block forming tire frame with roller trolley, using the mobile platform and drive motor, the deformation and safety risks of steel blocks caused by operators in high altitude operations are solved, and work efficiency and safety are improved.
Patent Information
- Application Number
- CN202411318047.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-15
AI Technical Summary
During the binding and installation of the reinforcement blocks on the top plate of the box beam, the operator needs to stand on the reinforcement block, which can easily lead to deformation of the block and pose a safety risk for high-altitude operations, affecting the production quality and work efficiency.
Design a box beam roof plate reinforced block molding frame with roller trolley, adopting a horizontal frame, support frame and mobile platform structure. The stirrups are positioned in the comb tooth plate groove, and the longitudinal ribs are positioned in the longitudinal rib positioning groove, and are driven The motor and transmission belt realize the automatic movement of the mobile platform, and the operator can sit on the platform to tie it, reducing manual operation at high altitudes.
It improves work safety, reduces labor intensity, avoids deformation of steel bar blocks, shortens binding time, improves work efficiency, and reduces the risk of manual operation at high altitudes.
Smart Images

Figure CN118950897A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of box girder top plate steel bar block forming, in particular to a box girder top plate steel bar block forming tire frame with a roller trolley and a use method thereof. Background Art
[0002] Since the prefabricated box girder is a hollow structure, the top plate steel bars and the bottom web steel bars need to be made separately. At present, the binding of the top plate steel bars generally adopts the process of manual loose binding, and the positioning, installation and binding of the steel bars are completed by a large amount of manpower in the existing prefabricated tire frame. Because the block is long and wide, it has a large number of stirrup layers and the length of the longitudinal bars is long. When binding in the prefabricated tire frame, the working conditions in the tire frame are poor, the site is small, and the height of the tire frame is high. There is a high risk of a large number of people gathering at high altitude. When the steel bar blocks are tied and connected and the hook bars are installed, the operator needs to stand on the steel bar blocks to operate and construct. It is very easy to cause the thickness of the block to be trampled and deformed, thereby affecting the quality of the steel bar block production. At the same time, the operator needs to squat on the block tire frame for a long time to work, the labor intensity is high, and to a certain extent affects the work efficiency of the operator. Summary of the invention
[0003] The main purpose of the present invention is to provide a box beam top plate steel bar block forming frame with a roller trolley and a method for using the same, so as to solve the problem that when the steel bar blocks are tied and connected and the hook bars are installed, the operator needs to stand on the steel bar blocks to operate and construct, which can easily cause the thickness of the blocks to be deformed by trampling, thereby affecting the production quality of the steel bar blocks.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a box girder top plate steel block forming tire frame with a roller trolley, the two ends of the horizontal frame are connected to two support frames to form a base frame, multiple base frames are arranged in parallel and connected to each other to form a tire frame base, comb plates are symmetrically arranged on both sides of the tire frame base, and multiple comb grooves are evenly arranged on the comb plates. The two ends of the stirrups are placed in the comb grooves of the comb plates, and multiple longitudinal reinforcement positioning grooves are arranged on the horizontal frame at the bottom of the tire frame base. The longitudinal reinforcement positioning grooves are used to position the longitudinal reinforcement; A moving platform is also arranged above the tire frame base, and track grooves are also arranged at the ends of both sides of the tire frame base, and moving wheels at both ends of the moving platform are arranged inside the track grooves.
[0005] In a preferred embodiment, drive motors are provided at both ends of the mobile platform, and the drive motors are connected to the mobile wheels via a transmission belt.
[0006] In the preferred embodiment, a battery is also provided on the upper surface of the mobile platform, and the battery is electrically connected to the drive motor through a control handle; A storage box is also provided at one end of the upper surface of the mobile platform.
[0007] In a preferred embodiment, the comb plate is arranged at the inner end of the support frame, and the track groove is arranged at the outer end of the support frame.
[0008] In the preferred embodiment, a side limit baffle is further provided on one side of the tire frame base, the side limit baffle is arranged in the middle of the support frame, and the stirrups are positioned against the side limit baffle.
[0009] In a preferred embodiment, a plurality of adjustment holes are provided on the support frame, and the side limit baffle is fixed to the upper surface of the support frame through a plurality of adjustment nuts passing through one of the adjustment holes.
[0010] In the preferred solution, movable plates are provided at both ends of the cross frame, the movable plates are fixed on the cross frame by screws, and a plurality of support positions are provided on the movable plates, and the support positions are used to position the longitudinal ribs of the wing plates.
[0011] In the preferred embodiment, a slot is provided at the lower end of the support and positioning member, the slot is clamped on the movable plate, a locking nut is provided on one side of the slot, the locking nut is threadedly connected to one side of the slot, and the end thereof rests on the movable plate to fix the support and positioning member.
[0012] In the preferred embodiment, the tire frame base is further provided with a plurality of temporary fixing frames, both ends of which are arranged on the comb plate, and the lower end of the temporary fixing frame is provided with a plurality of fixing hooks, and the side openings of the plurality of fixing hooks are in the same reverse direction; The width of the rod body of the temporary fixing frame is smaller than the width of the comb tooth groove.
[0013] The method includes: S1. Stack multiple stirrups on a mobile platform, use a control handle to control the mobile platform to move at a constant speed, and two construction workers stand on both sides of the forming frame to place the stirrups on the mobile platform in the comb grooves of the comb plate according to the designed distance, with one end of the stirrup against the side limit baffle; S2. Prepare the guide sleeve for steel bar insertion, insert the ends of 3 to 5 longitudinal bars into the guide sleeve flush, and vertically insert them into the stirrups from the end of the tire frame. The staff at the end continuously feeds the longitudinal bars into the stirrups. Under the restraint of the guide sleeve, the stirrups smoothly pass through each layer of stirrups; S3. Install the movable plate, install the support and positioning according to the position of the stirrup wing plate, and place the longitudinal reinforcement of the wing plate in the trough of the support and positioning; S4. Place the lower longitudinal reinforcement in the longitudinal reinforcement positioning groove for positioning; S5. Place multiple temporary fixing frames. The temporary fixing frames are first placed in the comb grooves where no stirrups are placed. The upper longitudinal reinforcements are gradually placed in the fixing hooks of the temporary fixing frames. The temporary fixing frames are lifted to prevent them from being at the top of the comb plate, and the upper longitudinal reinforcements are close to the upper part of the stirrups. S6. The operator prepares the materials, sits on the mobile platform, and controls the mobile platform to move slowly through the control handle. At the same time, the operator uses the tie wire to tie and fix the intersection of the upper and lower longitudinal reinforcements and the upper and lower stirrups; S7. After the binding is completed, move the temporary fixing frame, and the temporary fixing frame falls into the comb groove where no stirrups are placed. Then remove the real temporary fixing frame, move the mobile platform to the outermost position, lift the steel bar block with a crane, and the steel bar block is separated from the forming frame to complete the assembly of the steel bar block.
[0014] The present invention provides a box girder top plate steel bar block forming frame with a roller trolley and a use method thereof, which moves the production of the top plate steel bars of the prefabricated box girder from the prefabricated template to the flat ground. By using a special frame, the production of the top plate steel bars can be completed in advance, and the entire frame can be hoisted into the prefabricated template for installation, which reduces the time that the steel bar binding occupies the key line, and enables the steel bar production personnel to complete the work on the ground, greatly improving work safety. At the same time, a set of roller mobile platforms is added to the frame, and when the operator needs to construct above the block, the operator can sit on the mobile platform to perform steel bar binding and installation. The labor intensity of the operator is reduced to a certain extent. At the same time, the operator sits on the mobile platform to operate, which also avoids the traditional frame. The long-term manual stepping on the steel bar block causes the steel bar block to deform, and there are certain safety risks when the operator walks on the block. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 This is the overall structural diagram of the forming tire frame of the present invention for placing stirrups; Figure 2 This is a front view structural diagram of the molded tire frame of the present invention; Figure 3 This is a main structural diagram of a steel bar block of the present invention; Figure 4 This is a structural diagram of a molded tire frame of the present invention; Figure 5 This is a support positioning and installation structure diagram of the present invention; Figure 6 This is a diagram of the installation structure of the side limit baffle of the present invention; Figure 7 This is a front view of the installation structure of the side limit baffle of the present invention; Figure 8 This is a diagram of the installation structure of the temporary fixing frame of the present invention; Fig. 9 It is a structural diagram of the upper longitudinal reinforcement fixed by a temporary fixing frame of the present invention.
[0016] In the figure: moving platform 1; moving wheel 101; support frame 2; adjustment hole 201; track groove 3; steel bar block 4; stirrup 401; lower longitudinal reinforcement 402; upper longitudinal reinforcement 403; wing plate longitudinal reinforcement 404; storage box 5; side limit baffle 6: adjustment nut 601; temporary fixing frame 7; fixing hook 701; comb plate 8; comb groove 801; control handle 9; battery 10; drive motor 11; transmission belt 1101; movable plate 12; support positioning 13; locking nut 14; longitudinal reinforcement positioning groove 15; cross frame 16. DETAILED DESCRIPTION
[0017] Example 1 like Figures 1 to 9 As shown, a box girder top plate steel block forming tire frame with a roller trolley, the two ends of the cross frame 16 are connected to the two support frames 2 to form a base frame, and multiple base frames are arranged in parallel and connected to each other to form a tire frame base. Comb plates 8 are symmetrically arranged on both sides of the tire frame base, and multiple comb grooves 801 are evenly arranged on the comb plates 8. The two ends of the stirrups 401 are placed inside the comb grooves 801 of the comb plates 8. The cross frame 16 at the bottom of the tire frame base is provided with multiple longitudinal reinforcement positioning grooves 15, and the longitudinal reinforcement positioning grooves 15 are used to position the longitudinal reinforcement; A moving platform 1 is further provided above the tire frame base, and track grooves 3 are further provided at both ends of the tire frame base. Moving wheels 101 at both ends of the moving platform 1 are arranged inside the track grooves 3 .
[0018] The two ends of the cross frame 16 are connected to the two support frames 2 to form a base frame, which is the basic unit of the entire tire frame system. Multiple such base frames are arranged in parallel and connected to each other to form a tire frame base. Such a structure ensures the stability and load-bearing capacity of the tire frame base. Comb plates 8 are symmetrically provided on both sides of the tire frame base, and a plurality of comb grooves 801 are evenly provided on the comb plates 8, which serve to provide fixed support points for the stirrups 401. The two ends of the stirrups 401 are placed inside the comb grooves 801 of the comb plates 8, so that the stirrups 401 can be firmly maintained in the preset position to facilitate subsequent steel bar binding operations; a plurality of longitudinal bar positioning grooves 15 are provided on the cross frame 16 at the bottom of the tire frame base, and these positioning grooves are used to position the longitudinal bars to ensure that the longitudinal steel bars will not shift during the binding process, thereby ensuring the overall accuracy and quality of the steel bar skeleton.
[0019] A mobile platform 1 is also provided above the tire frame base, which can move in the track grooves 3 set at the two side ends of the tire frame base. The design of the track grooves 3 allows the moving wheels 101 at both ends of the mobile platform 1 to slide smoothly inside them, thereby realizing flexible movement of the platform. The operator can control the movement of the mobile platform 1 through the control handle 9, so as to perform efficient work without the need for frequent walking, reduce the physical exertion of the staff, and improve the safety of work to a certain extent, avoiding the deformation of the steel bar blocks caused by long-term manual stepping on the steel bar blocks in the traditional tire frame system and the safety hazards during walking.
[0020] In the actual operation, the stirrups 401 are placed in the comb grooves 801 of the comb plate 8 according to the distance required by the design, and then a guide sleeve is prepared for the steel bar insertion, and a group of 3 to 5 longitudinal bars are inserted into the guide sleeve with their ends flush, and vertically inserted into the stirrups 401 from the end of the tire frame. The personnel at the end continuously feed the longitudinal bars into the stirrups. Under the constraint of the guide sleeve, the stirrups can smoothly pass through each layer of stirrups to meet the expected structural requirements; After preparing all necessary materials, the operator can sit on the mobile platform 1 and control the slow movement of the mobile platform 1 by controlling the handle 9. At the same time, the operator can use the binding wire to tie and fix the upper and lower layers of longitudinal reinforcement and the upper and lower layers of stirrups at the intersection to complete the assembly of the steel skeleton.
[0021] In a preferred embodiment, driving motors 11 are provided at both ends of the mobile platform 1 , and the driving motors 11 are connected to the moving wheels 101 via a transmission belt 1101 .
[0022] Both ends of the mobile platform 1 are provided with drive motors 11, which are the power source of the mobile platform 1 and are responsible for providing it with power to move forward and backward; the drive motor 11 is connected to the moving wheel 101 through a transmission belt 1101, and the function of the transmission belt 1101 is to transmit the power generated by the drive motor 11 to the moving wheel 101, so that the mobile platform 1 can move smoothly in the track groove 3. The mobile platform 1 adopts an electric drive mode, which is not only environmentally friendly and energy-saving, but also has low operating noise, is suitable for use at the construction site, can effectively reduce noise pollution, and improve the comfort of the operating environment at the construction site.
[0023] In the preferred embodiment, a battery 10 is also provided on the upper surface of the mobile platform 1, and the battery 10 is electrically connected to the driving motor 11 through the control handle 9; A storage box 5 is also provided at one end of the upper surface of the mobile platform 1 .
[0024] A battery 10 is also provided on the upper surface of the mobile platform 1. The battery 10 is electrically connected to the drive motor 11 through the control handle 9. The battery 10 provides power support for the mobile platform 1, so that it can operate independently without an external power supply; the battery 10 is a detachable structure, which is convenient for the replacement and charging of the battery. The power supply time is about 30 hours, which ensures the demand for long-term continuous work; a storage box 5 is also provided at one end of the upper surface of the mobile platform 1. The storage box 5 is used to place tools or materials such as wire tying required for tying steel bars, which is convenient for operators to take at hand and improves work efficiency.
[0025] In the preferred embodiment, the comb plate 8 is arranged at the inner end of the support frame 2, and the track groove 3 is arranged at the outer end of the support frame 2. Figure 2 In the structure shown, the comb plate 8 and the track groove 3 are both installed on a support frame 2 that can bear force, and the support frame 2 adopts a triangular stable structure.
[0026] In the preferred embodiment, a side limit baffle 6 is further provided on one side of the tire frame base, and the side limit baffle 6 is arranged in the middle of the support frame 2, and the stirrup 401 is positioned against the side limit baffle 6. A side limit baffle 6 is further provided on one side of the tire frame base, and the side limit baffle 6 is arranged in the middle of the support frame 2, and its function is to position one end of the stirrup 401 to prevent the stirrup 401 from lateral displacement during the binding process; when the stirrup 401 is placed, it will be positioned against the side limit baffle 6 to ensure that the position of the stirrup is accurate, thereby ensuring the structural stability of the steel skeleton.
[0027] In a preferred embodiment, a plurality of adjustment holes 201 are provided on the support frame 2 , and the side limit baffle 6 is fixed to the upper surface of the support frame 2 through a plurality of adjustment nuts 601 passing through one of the adjustment holes 201 .
[0028] The support frame 2 is provided with multiple adjustment holes 201, and the side limit baffle 6 is fixed to the upper surface of the support frame 2 through multiple adjustment nuts 601 passing through one of the adjustment holes 201. Such a design allows the position of the side limit baffle 6 to be adjusted according to actual needs; the position of the side limit baffle 6 can be adjusted according to the length of the stirrup 401 to ensure that the stirrup 401 can be correctly positioned during binding. The design of multiple adjustment holes 201 provides a variety of installation position options, thereby enhancing the flexibility and adaptability of the system.
[0029] In the preferred embodiment, movable plates 12 are provided at both ends of the cross frame 16, and the movable plates 12 are fixed on the cross frame 16 by screws. The movable plates 12 are provided with a plurality of support positions 13, and the support positions 13 are used to position the longitudinal ribs 404 of the wing plates. The movable plates 12 are provided at both ends of the cross frame 16, and the movable plates 12 are fixed on the cross frame 16 by screws. Such a design allows the movable plates 12 to adjust their positions as needed; the movable plates 12 are provided with a plurality of support positions 13, and the support positions 13 are used to position the longitudinal ribs 404 of the wing plates to ensure that they are in the correct position; The flange stirrups 401 with flange flanges need to be installed with flange longitudinal reinforcements 404 at the flange positions, and the support positioning 13 is specifically used to position the flange longitudinal reinforcements 404 to ensure the accuracy and stability of the steel structure.
[0030] In the preferred embodiment, a slot is provided at the lower end of the support positioning 13, which is clamped on the movable plate 12. A locking nut 14 is provided on one side of the slot. The locking nut 14 is threadedly connected to one side of the slot, and the end thereof rests against the movable plate 12 to fix the position of the support positioning 13.
[0031] A slot is provided at the lower end of the support positioning 13, and the slot is stuck on the movable plate 12. This design allows the support positioning 13 to be easily moved on the movable plate 12; a locking nut 14 is provided on one side of the slot, and the locking nut 14 is threadedly connected to one side of the slot, and the end of the locking nut rests on the movable plate 12 to fix the position of the support positioning 13. The support positioning 13 can be tightened or released by rotating the locking nut 14, which facilitates the movement of the position of the support positioning 13 to adapt to the wing plate longitudinal ribs 404 in different positions, ensuring that the wing plate longitudinal ribs 404 can be accurately positioned.
[0032] In the preferred embodiment, a plurality of temporary fixing frames 7 are further provided on the tire frame base, both ends of the temporary fixing frames 7 are arranged on the comb plate 8, a plurality of fixing hooks 701 are provided at the lower end of the temporary fixing frames 7, and the side openings of the plurality of fixing hooks 701 are in the same reverse direction; The width of the rod of the temporary fixing frame 7 is smaller than the width of the comb tooth groove 801 .
[0033] A plurality of temporary fixing frames 7 are also provided on the tire frame base, and both ends of the temporary fixing frames 7 are arranged on the comb plate 8, and their function is to provide temporary support during the steel bar binding process; a plurality of fixing hooks 701 are provided at the lower end of the temporary fixing frame 7, and the side openings of these fixing hooks 701 are in the same direction and are used to mount the longitudinal steel bars; the rod width of the temporary fixing frame 7 is smaller than the width of the comb groove 801, so as to ensure that the temporary fixing frame 7 can be smoothly placed in the comb groove 801 on the comb plate 8.
[0034] The stirrups 401 are placed in the comb tooth grooves 801 of the comb tooth plate 8 according to the designed distance. Empty comb tooth grooves 801 are reserved between the stirrups 401 in the present application. This design is to ensure that the spacing between the stirrups meets the design requirements; the comb tooth grooves 801 of the comb tooth plate 8 are densely designed, and the main purpose is to reduce the weight of the comb tooth plate 8. In the actual production process, the stirrups 401 are usually placed with one comb tooth groove 801, that is, there is an empty comb tooth groove 801 between two stirrups 401.
[0035] When placing multiple temporary fixing frames 7, first place them in the comb grooves 801 where no stirrups 401 are placed, then gradually place the upper longitudinal reinforcement 403 in the fixing hooks 701 of the temporary fixing frames 7, and then lift the temporary fixing frames 7 and place them on the top of the comb plate 8 so that the upper longitudinal reinforcement 403 is close to the upper part of the stirrups 401, so as to ensure the stability and accuracy of the steel structure.
[0036] After the binding is completed, the temporary fixing frame 7 is moved, and the temporary fixing frame 7 falls into the comb groove 801 where no stirrups 401 are placed. Then the real temporary fixing frame 7 is removed, the mobile platform 1 is moved to the outermost position, the crane lifts the steel block, and the steel block 4 is separated from the forming frame to complete the assembly of the steel block.
[0037] Example 2 Further illustrate with reference to Example 1, Figure 1-9 The structure shown, S1, stack multiple stirrups 401 on the mobile platform 1, control the mobile platform 1 to move at a constant speed with the control handle 9, two construction workers stand on both sides of the forming tire frame, place the stirrups 401 on the mobile platform 1 in the comb groove 801 of the comb plate 8 according to the designed distance, and one end of the stirrup 401 is against the side limit baffle 6; The stirrups 401 are placed in the comb tooth grooves 801 of the comb tooth plate 8 according to the designed distance. Empty comb tooth grooves 801 are reserved between the stirrups 401 in the present application. This design is to ensure that the spacing between the stirrups meets the design requirements; the comb tooth grooves 801 of the comb tooth plate 8 are densely designed, and the main purpose is to reduce the weight of the comb tooth plate 8. In the actual production process, the stirrups 401 are usually placed with one comb tooth groove 801, that is, there is an empty comb tooth groove 801 between two stirrups 401.
[0038] S2. Prepare the guide sleeve for steel bar insertion, insert the ends of 3 to 5 longitudinal bars into the guide sleeve flush, and vertically insert them into the stirrup 401 from the end of the tire frame. The staff at the end continuously feeds the longitudinal bars into the stirrups. Under the restraint of the guide sleeve, the stirrups smoothly pass through each layer of stirrups; S3, install the movable plate 12, install the support positioning 13 according to the position of the wing plate of the stirrup 401, and place the wing plate longitudinal reinforcement 404 in the groove of the support positioning 13; S4, placing the lower longitudinal reinforcement 402 in the longitudinal reinforcement positioning groove 15 for positioning; S5, placing multiple temporary fixing frames 7, first placing the temporary fixing frames 7 in the comb tooth grooves 801 where no stirrups 401 are placed, gradually placing the upper longitudinal reinforcements 403 in the fixing hooks 701 of the temporary fixing frames 7, lifting the temporary fixing frames 7 to prevent them from being at the top of the comb tooth plates 8, and the upper longitudinal reinforcements 403 being close to the upper part of the stirrups 401; S6. The operator prepares the materials, sits on the mobile platform 1, and controls the mobile platform 1 to move slowly by the control handle 9. At the same time, the operator uses the binding wire to tie and fix the intersection of the upper and lower longitudinal reinforcements and the upper and lower stirrups; S7. After the binding is completed, the temporary fixing frame 7 is moved, and the temporary fixing frame 7 falls into the comb groove 801 where no stirrups 401 are placed. Then the real temporary fixing frame 7 is removed, the mobile platform 1 is moved to the outermost position, the crane lifts the steel bar block, and the steel bar block 4 is separated from the forming frame to complete the assembly of the steel bar block.
[0039] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A box beam top plate steel bar block forming tire frame with a roller trolley, characterized by: The two ends of the cross frame (16) are connected to the two support frames (2) to form a base frame, and the multiple base frames are arranged in parallel and connected to each other to form a tire frame base. Comb plates (8) are symmetrically provided on both sides of the tire frame base, and the comb plates (8) are evenly provided with multiple comb grooves (801). The two ends of the stirrups (401) are placed inside the comb grooves (801) of the comb plates (8). The cross frame (16) at the bottom of the tire frame base is provided with multiple longitudinal reinforcement positioning grooves (15), and the longitudinal reinforcement positioning grooves (15) are used to position the longitudinal reinforcement; A moving platform (1) is also provided above the tire frame base, and track grooves (3) are also provided at both ends of the tire frame base. Moving wheels (101) at both ends of the moving platform (1) are arranged inside the track grooves (3).
2. The box beam top plate steel bar block forming frame with a roller trolley according to claim 1, characterized in that: Both ends of the mobile platform (1) are provided with a driving motor (11), and the driving motor (11) is connected to the moving wheel (101) via a transmission belt (1101).
3. The box beam top plate steel bar block forming frame with a roller trolley according to claim 2, characterized in that: A storage battery (10) is also provided on the upper surface of the mobile platform (1), and the storage battery (10) is electrically connected to the driving motor (11) via a control handle (9); A storage box (5) is also provided at one end of the upper surface of the mobile platform (1).
4. The box beam top plate steel bar block forming frame with a roller trolley according to claim 1, characterized in that: The comb plate (8) is arranged at an inner end position of the support frame (2), and the track groove (3) is arranged at an outer end position of the support frame (2).
5. The box beam top plate steel bar block forming frame with a roller trolley according to claim 1, characterized in that: A lateral limit baffle (6) is also provided on one side of the tire frame base. The lateral limit baffle (6) is arranged at the middle position of the support frame (2), and the stirrup (401) is positioned against the lateral limit baffle (6).
6. The box beam top plate steel bar block forming frame with a roller trolley according to claim 1, characterized in that: The support frame (2) is provided with a plurality of adjustment holes (201), and the side limit baffle (6) is fixed to the upper surface of the support frame (2) by passing through one of the adjustment holes (201) via a plurality of adjustment nuts (601).
7. The box beam top plate steel bar block forming frame with a roller trolley according to claim 1, characterized in that: Movable plates (12) are also provided at both ends of the cross frame (16). The movable plates (12) are fixed to the cross frame (16) by screws. A plurality of support positions (13) are provided on the movable plates (12). The support positions (13) are used to position the wing plate longitudinal ribs (404).
8. The box beam top plate steel bar block forming frame with a roller trolley according to claim 1, characterized in that: A slot is provided at the lower end of the support positioning member (13), the slot being clamped on the movable plate (12), a locking nut (14) being provided on one side of the slot, the locking nut (14) being threadedly connected to one side of the slot, and the end of the locking nut (14) being pressed against the movable plate (12) to fix the position of the support positioning member (13).
9. The box beam top plate steel bar block forming frame with a roller trolley according to claim 1, characterized in that: The tire frame base is also provided with a plurality of temporary fixing frames (7), both ends of the temporary fixing frames (7) are arranged on the comb plate (8), the lower end of the temporary fixing frames (7) is provided with a plurality of fixing hooks (701), and the side openings of the plurality of fixing hooks (701) are in the same direction; The width of the rod body of the temporary fixing frame (7) is smaller than the width of the comb tooth groove (801).
10. The method for using the box beam top plate steel bar block forming cradle with a roller trolley according to any one of claims 1 to 9, characterized in that: The method includes: S1. A plurality of stirrups (401) are stacked on a mobile platform (1), and a control handle (9) is used to control the mobile platform (1) to move at a constant speed. Two construction workers stand on both sides of the forming frame and place the stirrups (401) on the mobile platform (1) in the comb tooth grooves (801) of the comb tooth plate (8) according to the designed distance, with one end of the stirrups (401) resting against the side limit baffle (6); S2. Prepare a guide sleeve for inserting steel bars. Insert the ends of 3 to 5 longitudinal bars in a group into the guide sleeve flush with each other. Insert the longitudinal bars vertically into the stirrups (401) from the end of the tire frame. The staff at the end continuously inserts the longitudinal bars into the stirrups. The stirrups are restrained by the guide sleeve and smoothly pass through each layer of stirrups. S3, installing the movable plate (12), installing the support positioning (13) according to the position of the wing plate of the stirrup (401), and placing the wing plate longitudinal reinforcement (404) in the groove of the support positioning (13); S4, placing the lower longitudinal reinforcement (402) in the longitudinal reinforcement positioning groove (15) for positioning; S5, placing a plurality of temporary fixing frames (7), wherein the temporary fixing frames (7) are first placed in the comb tooth grooves (801) where no stirrups (401) are placed, and the upper longitudinal reinforcements (403) are gradually placed in the fixing hooks (701) of the temporary fixing frames (7), and the temporary fixing frames (7) are lifted to prevent them from being at the top of the comb tooth plate (8), and the upper longitudinal reinforcements (403) are close to the upper part of the stirrups (401); S6. The operator prepares the materials, sits on the mobile platform (1), and controls the mobile platform (1) to move slowly by means of the control handle (9). At the same time, the operator uses a binding wire to tie and fix the intersection of the upper and lower longitudinal reinforcements and the upper and lower stirrups; S7. After the binding is completed, the temporary fixing frame (7) is moved, and the temporary fixing frame (7) falls into the comb groove (801) where no stirrups (401) are placed. Then, the real temporary fixing frame (7) is removed, the mobile platform (1) is moved to the outermost position, the crane lifts the steel bar block, and the steel bar block (4) is separated from the forming frame, thereby completing the assembly of the steel bar block.
Citation Information
Patent Citations
Steel bar binding jig frame for component prefabrication
CN112847775A
Clamp assisting in manufacturing reinforcement cage
CN209760829U
Multifunctional prefabricated box girder top plate steel bar binding jig frame
CN212241552U
Box girder top plate reinforcing steel bar jig frame with movable binding device
CN215549668U
Prefabricated T-beam top plate steel bar binding jig frame
CN219543600U
Cited By
Construction method of fabricated cast-in-place box girder steel bar component
CN120556370A
A construction method for prefabricated cast-in-place box girder steel reinforcement components
CN120556370B