Fuel cabin carrying precision control method and fuel cabin

Through the installation method of segmented structure and precise positioning monitoring, the problems of complexity and difficulty in controlling the accuracy of traditional fuel chambers are solved, and the high-precision installation of MARKⅢ fuel chambers is realized, which simplifies the operation process and reduces construction costs and cycles.

CN118953623AActive Publication Date: 2024-11-15HUDONG ZHONGHUA SHIPBUILDINGGROUP +1

Patent Information

Application Number
CN202410885434.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-11-15
Estimated Expiration
2044-07-03

AI Technical Summary

Technical Problem

The traditional MARKⅢ fuel tank loading method is complex and difficult to meet the requirements of high-precision design, resulting in a long construction cycle and large rework, and poses a potential maintenance risk.

Method used

The segmented structure is adopted, and the high-precision installation of the fuel compartment is ensured by setting up a coordinate system, confirming the segmented size, calculating and correcting the cabin size, positioning monitoring nodes, conducting reference line review and matching installation.

Benefits of technology

It realizes the high-precision installation of the MARKⅢ fuel chamber, simplifies operation, reduces rework, reduces construction costs and cycles, and improves the convenience of subsequent system packing and filling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118953623A_ABST
    Figure CN118953623A_ABST
Patent Text Reader

Abstract

The invention discloses a method for controlling the carrying precision of a fuel cabin and the fuel cabin, and the method sequentially comprises the steps: setting a coordinate system, converting design coordinates of nodes, confirming the size data of segments, calculating and confirming the cabin body size of the closed fuel cabin, obtaining a cabin body correction scheme, carrying out the assembly of the segments to form a block, and carrying out the rechecking and correction of a reference line on the block. And carrying out involution carrying simulation analysis on the block, and carrying out line-line involution carrying on the block. According to the method, the high-precision requirement of the MARK III type fuel cabin decahedron on the square degree can be met through segmented node positioning and total assembly carrying datum line involution, the number of positioning monitoring is reduced, operation is easy, the rework amount is small, boxing and box filling of a follow-up maintenance system are facilitated, the fuel cabin construction cost is reduced, and the fuel cabin construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of shipbuilding, and in particular to a fuel tank loading accuracy control method and a fuel tank. Background Art

[0002] In the field of modern shipping, dual-fuel ships powered by liquefied natural gas are the main driving force for development. Orders for dual-fuel container ships are increasing day by day. The efficient and accurate loading of fuel tanks has become a key technology in the construction of dual-fuel ships, especially MARKⅢ fuel tanks. Since all standard containers are placed in MARKⅢ fuel tanks, the size and shape of the fuel tanks after loading must meet high-precision design requirements. Figure 1 As shown, dozens of management points are set on each segment of the MARK III fuel tank during manufacturing. The traditional construction method needs to adjust the coordinates of each management point to meet the design requirements in order to meet the requirements for loading to the fuel tank. The traditional fuel tank loading method is not only complicated and difficult to operate, with a large amount of rework, but also difficult to meet the control requirements for the squareness of the decahedron of the MARK III fuel tank, which brings great hidden dangers to the subsequent maintenance system packaging and filling, and prolongs the ship construction period. Summary of the invention

[0003] In view of the defects existing in the prior art, the present application provides a method for controlling the loading accuracy of a fuel tank, so as to solve the technical problems in the prior art such as the difficulty in controlling the loading accuracy of a fuel tank, high manufacturing cost and long shipbuilding period.

[0004] In order to achieve the purpose of the above invention, the technical solution provided by the present invention is as follows:

[0005] A method for controlling the loading accuracy of a fuel tank, wherein the fuel tank comprises a plurality of segments including three intersecting plates of a large deck, wherein the three intersecting plates intersect with a bulkhead plate, an inner bottom plate, or an inner shell plate, and three plates of a sloping plate, and the segments including the intersection of the three plates are defined as node segments, and a reference line is drawn on each segment in the fuel tank. The method for controlling the loading accuracy of the fuel tank comprises the following steps:

[0006] S1. Establish a coordinate system with the bow and stern direction as the X-axis, the Y-axis in the horizontal plane perpendicular to the X-axis, and the Z-axis in the vertical plane perpendicular to the X-axis. Define the intersection of three plates in the node segment as node 1. According to the design coordinate position of the management point in the node segment in the fuel tank design drawing, calculate the design coordinates of each node in the node segment;

[0007] S2. confirming the size data of each segment, wherein the size data of each segment includes the length, width, and height of the segment. If the confirmed segment size is significantly different from the segment design size and exceeds the design accuracy requirement, the segment is corrected;

[0008] S3. Based on the data confirmed in S2, the dimensions of the fuel tank after the block assembly is assembled are calculated and confirmed, and the dimensions of the fuel tank include the length, width, height and storage capacity of the fuel tank. The calculated dimensions of the tank are compared with the designed dimensions of the tank, and a correction scheme for the dimensions of the tank is obtained based on the comparison results, so that the corrected dimensions of the tank are consistent with the designed dimensions of the tank;

[0009] S4, grouping all the segments into different segments, and positioning and monitoring each node during the grouping process, and adjusting each node to the node design coordinates calculated in S1;

[0010] S5. Review and correct the reference lines on each master section to make the positional relationship between the reference lines meet the design requirements, and obtain the corrected master section;

[0011] S6. Perform a simulation analysis on the combined loading of the total section to confirm whether there is a surplus in the combined loading. If there is a surplus, the total section is cut;

[0012] S7. The total sections are loaded according to the baselines, and the corresponding baselines on different total sections are aligned during the loading process.

[0013] In one embodiment, the origin of the coordinate system in S1 is set at rib 0 of the hull.

[0014] In one embodiment, in S1, a measuring point is set on each of the three plates forming the node, and the distance from each measuring point to the boundary line of the three plates can be measured, and the design coordinates of each measuring point are converted into the design coordinates of the internal node; in step S4, the three measuring points corresponding to each node are adjusted and placed at the design coordinates of each measuring point, so that each node is adjusted and placed at the node design coordinates calculated in S1.

[0015] In one embodiment, a radiographic sheet is provided at each measurement point.

[0016] In one embodiment, the reference lines include bulkhead lines and hull centerlines, section centerlines, and overall section centerlines.

[0017] In one embodiment, in S7 , the error range of the corresponding reference line alignment is ±1 mm.

[0018] In one embodiment, the fuel tank is a MARKⅢ type fuel tank.

[0019] The present invention also provides a fuel tank, which is mounted using the above-mentioned fuel tank mounting accuracy control method.

[0020] Compared with the prior art, this application has at least the following beneficial effects:

[0021] During the loading process of the fuel tank, the present invention converts the design coordinates of the node in the segment through the design coordinates of the segment structure management point, and comprehensively uses the segment nodes as the key points of positioning and monitoring in the process from segment production to segment assembly and loading. Through the segment node positioning and the alignment of the overall assembly baseline, not only can the high-precision requirement of the MARKⅢ type fuel tank decahedron on the regularity be met, but also the number of positioning and monitoring is reduced, the operation is simple, the amount of rework is small, the subsequent system packaging and filling are convenient, and the construction cost and cycle of the fuel tank are reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the distribution of management points in a certain segmented structure of a fuel tank in the prior art;

[0023] Figure 2 This is a three-dimensional schematic diagram of node distribution in a fuel tank in an embodiment of the present application;

[0024] Figure 3 This is a schematic cross-sectional diagram of node distribution in a fuel tank in an embodiment of the present application;

[0025] Figure 4 It is a schematic diagram of the overall section after the baseline in the embodiment of the present application has been reviewed and corrected;

[0026] Figure 5 It is a schematic diagram of the fuel tank formed by aligning the reference lines of the total sections in the embodiment of the present application;

[0027] Figure 6 This is a schematic diagram of the distribution of measurement points within a node segment in an embodiment of the present application;

[0028] Figure 7 It is a schematic diagram of coordinate conversion of measurement points within a node segment in an embodiment of the present application.

[0029] The specific description of the reference numerals is as follows: 01, management point; 1, node; 2, measurement point; 3, reference line; 301, bulkhead line; 302, hull centerline; 4, deck; 5, inner bottom plate; 6, inner shell plate; 7, bulkhead plate; 8, inclined plate; DETAILED DESCRIPTION

[0030] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is described below by the specific embodiments shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0031] The terms used in this disclosure are for the purpose of describing specific embodiments only and are not intended to limit the disclosure. The singular forms of "a", "said" and "the" used in this disclosure and the appended claims are also intended to include plural forms unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.

[0032] It should be understood that although the terms first, second, third, etc. may be used in the present disclosure to describe various information, such information should not be limited to these terms and should not be understood as indicating or implying relative importance. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present disclosure, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".

[0033] In the description of the present invention, unless otherwise specified and limited, it should be noted that the terms "installed", "connected" and "connected" should be understood in a broad sense. For example, it can be a mechanical connection or the internal connection between two components. It can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to the specific circumstances.

[0034] In order to better understand the technical solution of the present invention, the present invention is described in detail below with reference to the accompanying drawings.

[0035] This embodiment takes a MARK III fuel tank as an example to provide a method for controlling the loading accuracy of a fuel tank, wherein the fuel tank includes a plurality of segments including three intersecting plates of a large deck, wherein the three intersecting plates are any one of a nail plate 4, an inner bottom plate 5, or an inner shell plate 6, and a bulkhead plate 7 and an inclined plate 8, and the segments including the intersection of the three plates are defined as node segments, and a reference line is drawn on each segment in the fuel tank. The method for controlling the loading accuracy of the fuel tank includes the following steps:

[0036] S1. Establish a coordinate system. The coordinate system takes the bow and stern direction as the X-axis, the Y-axis in the horizontal plane perpendicular to the X-axis, and the Z-axis in the vertical plane perpendicular to the X-axis. In this embodiment, the hull rib position No. 0 is set as the origin of the coordinate system, and the intersection point of the three plates in the node segment is defined as node 1. Figure 2 , 3 As shown, there are eight nodes 1 in the fuel tank. The design coordinates of the node 1 in each node segment are calculated based on the design coordinate position of the management point 01 in the node segment in the fuel tank design diagram.

[0037] S2. Confirm the size data of each segment, which includes the length, width, and height of the segment. If the confirmed segment size is significantly different from the segment design size and exceeds the design accuracy requirement, the segment is corrected.

[0038] Due to various factors such as seasonal temperature and transportation, the segments may be deformed. The dimensions of the segments during assembly and loading may deviate significantly from the dimensions during design. If the segment deformation is too large, it will affect the loading accuracy of the fuel tank. In order to ensure the loading accuracy, the segments with large deformations need to be corrected before assembly.

[0039] S3. Based on the data confirmed in S2, calculate and confirm the dimensions of the fuel tank after the sections are assembled. The dimensions of the fuel tank include the length, width, height and storage capacity of the fuel tank. Compare the calculated dimensions of the tank with the designed dimensions of the tank. Based on the comparison results, a correction plan for the dimensions of the tank is derived to make the corrected dimensions consistent with the designed dimensions of the tank.

[0040] For example, if the calculated length of the fuel tank is greater than the designed length of the fuel tank, the tank size correction solution is to cut the sections that make up the tank bottom in the length direction so that the corrected tank length is consistent with the designed length of the tank. S3 is used to prepare for the subsequent tank assembly and loading.

[0041] S4. All the segments are grouped together to form different segments, and each node 1 is located and monitored during the grouping process, and each node is adjusted and placed at the node design coordinates calculated in S1.

[0042] S5. Review and correct the reference lines on each general section to make the positional relationship between the reference lines 3 meet the design requirements, and obtain the corrected general section, such as Figure 4 shown.

[0043] For example, when block 1 and block 2 are assembled to form block 1, and the bulkhead line of block 1 is not perpendicular to the centerline of the hull, the bulkhead line is redrawn on block 1 to make it perpendicular to the centerline of the hull. S5 can greatly reduce the cumulative deviation from block manufacturing to block assembly.

[0044] S6. Carry out simulation analysis on the combined loading of the total section to confirm whether there is any surplus in the combined loading. If there is any surplus, the total section is cut.

[0045] S7, the whole section is loaded with the reference lines, and the corresponding reference lines on different whole sections are aligned during the loading process, such as Figure 5 shown.

[0046] When placing the coordinates of the adjustment points, it is not easy to accurately locate the coordinates of the monitoring nodes because of the weld angle caused by welding at the intersection of the three plates. In this embodiment, in S1, in order to accurately locate the coordinates of the intersection of the three plates, a measuring point 2 is set on each of the three plates forming the node, such as Figure 6 , 7 As shown, the distance from each measuring point 2 to the boundary line of the three plates can be known through measurement, and the design coordinates of each measuring point 2 can be converted through the design coordinates of the internal node 1.

[0047] In step S4, three measuring points 2 corresponding to each node are adjusted and placed at the design coordinates of each measuring point, so that each node is adjusted and placed at the node design coordinates calculated in S1.

[0048] In this embodiment, the reference lines include the bulkhead line 301 and the hull centerline 302, the segment centerline, and the overall segment centerline. In S7, the error range of the corresponding reference line alignment is ±1 mm.

[0049] In this embodiment, a radiation sheet is provided at each measuring point, so as to facilitate the positioning and monitoring of the measuring point.

[0050] This embodiment also provides a fuel tank, which is mounted using the above-mentioned fuel tank mounting accuracy control method.

[0051] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.

Claims

1. A method for controlling the loading accuracy of a fuel tank, characterized in that: The fuel tank comprises a plurality of sections including three plates intersecting the large deck, wherein the three plates intersect the nail plate, the inner bottom plate or the inner shell plate, the bulkhead plate and the inclined plate, and the sections including the three plates intersecting are defined as node sections. A reference line is drawn on each section in the fuel tank, and the fuel tank loading accuracy control method comprises the following steps: S1. Establish a coordinate system with the bow and stern direction as the X-axis, the Y-axis in the horizontal plane perpendicular to the X-axis, and the Z-axis in the vertical plane perpendicular to the X-axis. Define the intersection of three plates in the node segment as node 1. According to the design coordinate position of the management point in the node segment in the fuel tank design drawing, calculate the design coordinates of each node in the node segment; S2. confirming the size data of each segment, wherein the size data of each segment includes the length, width, and height of the segment. If the confirmed segment size is significantly different from the segment design size and exceeds the design accuracy requirement, the segment is corrected; S3. Based on the data confirmed in S2, the dimensions of the fuel tank after the block assembly is assembled are calculated and confirmed, and the dimensions of the fuel tank include the length, width, height and storage capacity of the fuel tank. The calculated dimensions of the tank are compared with the designed dimensions of the tank, and a correction scheme for the dimensions of the tank is obtained based on the comparison results, so that the corrected dimensions of the tank are consistent with the designed dimensions of the tank; S4, grouping all the segments into different segments, and positioning and monitoring each node during the grouping process, and adjusting each node to the node design coordinates calculated in S1; S5. Review and correct the reference lines on each master section to make the positional relationship between the reference lines meet the design requirements, and obtain the corrected master section; S6. Perform a simulation analysis on the combined loading of the total section to confirm whether there is a surplus in the combined loading. If there is a surplus, the total section is cut; S7. The total sections are loaded according to the baselines, and the corresponding baselines on different total sections are aligned during the loading process.

2. The method for controlling the fuel tank loading accuracy according to claim 1, characterized in that: The origin of the coordinate system in S1 is set at the 0th rib of the hull.

3. The method for controlling the fuel tank loading accuracy according to claim 1, characterized in that: In S1, a measuring point is set on each of the three plates forming the node. The distance from each measuring point to the boundary line of the three plates can be measured, and the design coordinates of each measuring point are converted into the design coordinates of the internal node. In step S4, the three measuring points corresponding to each node are adjusted and placed at the design coordinates of each measuring point, so that each node is adjusted and placed at the node design coordinates calculated in S1.

4. The method for controlling the fuel tank loading accuracy according to claim 3, characterized in that: A radiographic sheet is set up at each measurement point.

5. The method for controlling the fuel tank loading accuracy according to claim 1, characterized in that: The reference lines include bulkhead lines and the hull centerline, section centerline, and overall section centerline.

6. The method for controlling the fuel tank loading accuracy according to claim 5, characterized in that: In S7, the error range of the corresponding reference line alignment is ±1mm.

7. The method for controlling the fuel tank loading accuracy according to claim 1, characterized in that: The fuel tank is a MARK III type fuel tank.

8. A fuel tank, characterized in that: The fuel tank is mounted using the fuel tank mounting accuracy control method as described in any one of claims 1-7.

Citation Information

Patent Citations

  • Control method for ship-body section carrying accuracy based on OTS

    CN107499454A

  • Precision control process for refitting ship into single-shell fuel tank

    CN112591033A

  • Method for controlling carrying precision of ship body broadside double-beveled segmented horizontal type total assembly

    CN115140266A

  • Precision control method for broadside segment of dual-fuel container ship and broadside segment

    CN116767450A

  • Assembly and carrying method of ultra-large marine LNG fuel cabin

    CN116873149A

Cited By

  • Ring section displacement method

    CN119734806A

  • Method for controlling closing precision of arc-shaped segmented wall plates of B-type fuel tank of LNG ship

    CN121573122A