Pier beam structure, construction support platform and construction method of pier beam structure

By using the connection design between the semi-precast cap beam formwork and the precast pier column, and the construction support platform, the transportation and splicing problems in bridge prefabrication and assembly were solved, the load-bearing capacity and durability of the bridge were improved, and the construction cost and difficulty were reduced.

CN118958124AInactive Publication Date: 2024-11-15JILIN UNIVERSITY
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411324311.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In existing bridge prefabrication and assembly technologies, fully prefabricated cap beams are heavy, making transportation and splicing difficult. Segmented prefabricated cap beams have large splicing accuracy errors, affecting load-bearing performance and making them prone to water seepage.

Method used

The semi-precast cap beam formwork is connected to the precast pier column. Through the design of the longitudinal reinforcement of the pier column, the reinforcement cage of the cap beam and the ring energy-dissipating angle steel, combined with the pouring of ultra-high performance concrete, an integrated structure is formed. A construction support platform is used for precise positioning and constraint to avoid bulging of the formwork.

Benefits of technology

It reduces the difficulty of transportation and splicing, improves the load-bearing capacity and durability of the cap beam, reduces construction costs and difficulties, and ensures splicing accuracy and overall stress performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958124A_ABST
    Figure CN118958124A_ABST
Patent Text Reader

Abstract

The invention discloses a pier beam structure, a construction support platform and a construction method of the pier beam structure, and belongs to the technical field of bridge construction. The problems that in an existing bridge prefabricating and assembling technology, the construction precision requirement is too high, water leakage is likely to happen to joints, and the integrity of a bent cap is poor are solved. The semi-prefabricated bent cap formwork comprises a semi-prefabricated bent cap formwork and at least two prefabricated pier columns, at least two bottom holes are formed in the bottom of the semi-prefabricated bent cap formwork, and each bottom hole corresponds to one prefabricated pier column; the top of each prefabricated pier column is provided with a post-pouring groove and a pier column longitudinal bar, one end of the pier column longitudinal bar penetrates through the post-pouring groove and is pre-buried in the prefabricated pier column, and the other end of the pier column longitudinal bar extends upwards; and when the semi-prefabricated cover beam formwork shell is hoisted to the top end of the prefabricated pier column, the pier column longitudinal bars penetrate through the bottom hole of the semi-prefabricated cover beam formwork shell and are inserted into the semi-prefabricated cover beam formwork shell, concrete is poured into the post-pouring grooves of the semi-prefabricated cover beam formwork shell and the prefabricated pier column, and integrated connection of the semi-prefabricated cover beam formwork shell and the prefabricated pier column is achieved. The method is mainly used for bridge construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and in particular relates to a pier-beam structure, a construction support platform and a construction method of the pier-beam structure. Background Art

[0002] Traditional cast-in-place bridges require the construction of ground-based supports, which have disadvantages such as long construction period, high resource consumption, serious environmental pollution, great construction difficulty, traffic impact and high subsequent maintenance costs. The prefabricated assembly technology of bridge structures pre-manufactures the various components of the bridge in the factory and then transports them to the site for assembly. It has the characteristics of high efficiency, safety and environmental protection, and has become the development trend of bridge construction in the world today.

[0003] The existing bridge prefabrication and assembly technologies are mainly divided into fully prefabricated cap beams and segmented prefabricated and assembled cap beams. Fully prefabricated cap beams are heavy and have particularly high requirements for cranes and transportation machinery. For segmented prefabricated and assembled cap beams, multiple sections are prefabricated in the factory in advance, and then the prefabricated multiple sections of spliced ​​cap beams are transported to the construction site and assembled into a whole. The splicing is difficult and the positioning accuracy error is large, which affects the bearing performance of the spliced ​​cap beam. Summary of the invention

[0004] In view of this, the present invention provides a pier-beam structure, a construction support platform and a construction method for the pier-beam structure, which utilizes a semi-prefabricated cap beam formwork to connect with a prefabricated pier column, and pours concrete to form the pier-beam structure, thereby reducing the transport cost and lifting difficulty of the cap beam, and eliminating the need for splicing at the construction site, thereby reducing the difficulty of splicing and the disadvantages caused by the joints.

[0005] The technical solution adopted by the present invention to solve the above technical problems is:

[0006] A pier-beam structure comprises a semi-prefabricated cap beam formwork and at least two prefabricated pier columns, wherein at least two bottom holes are formed at the bottom of the semi-prefabricated cap beam formwork, and each bottom hole corresponds to a prefabricated pier column; at the top of each prefabricated pier column, a post-cast groove and pier column longitudinal reinforcement are formed, one end of the pier column longitudinal reinforcement passes through the post-cast groove and is pre-embedded in the prefabricated pier column, and the other end of the pier column longitudinal reinforcement extends upward; when the semi-prefabricated cap beam formwork is hoisted to the top of the prefabricated pier column, the pier column longitudinal reinforcement passes through the bottom holes of the semi-prefabricated cap beam formwork and is inserted into the semi-prefabricated cap beam formwork, and concrete is poured into the post-cast grooves of the semi-prefabricated cap beam formwork and the prefabricated pier column to realize an integrated connection between the semi-prefabricated cap beam formwork and the prefabricated pier column.

[0007] Furthermore, it also includes a cap beam reinforcement cage, which is placed in the semi-prefabricated cap beam formwork and connected to the pier column longitudinal reinforcement, and the cap beam reinforcement cage and the semi-prefabricated cap beam formwork are connected as a whole through poured concrete.

[0008] Furthermore, the joints between the semi-prefabricated cap beam formwork and the prefabricated pier column and the joints between the cap beam reinforcement cage and the pier column longitudinal reinforcement are coated with anti-corrosion polyurethane coating.

[0009] Furthermore, it also includes an annular energy-absorbing angle steel with a "T"-shaped cross-section. The annular energy-absorbing angle steel is sleeved on and connected to the upper end of the prefabricated pier column, and the upper surface of the annular energy-absorbing angle steel is attached to and connected to the lower surface of the semi-prefabricated cap beam formwork.

[0010] Furthermore, a steel skeleton is provided in the semi-prefabricated cap beam formwork, and is cast by ultra-high performance concrete modified with basalt fibers.

[0011] A construction support platform for preparing a pier-beam structure comprises a bottom support frame, two oblique compound triangular supports and two groups of lateral vertical triangular supports; an oblique compound triangular support is installed at each end of the bottom support frame in the length direction, and a group of lateral vertical triangular supports is installed at each end of the bottom support frame in the width direction, and the arrangement direction of each group of lateral vertical triangular supports is the same as the length direction of the bottom support frame; a semi-prefabricated cap beam formwork in the pier-beam structure matches a positioning groove surrounded by the oblique compound triangular supports and the lateral vertical triangular supports; when the bottom support frame is installed on a prefabricated pier column in the pier-beam structure, the semi-prefabricated cap beam formwork is placed in the positioning groove and positioned with the prefabricated pier column.

[0012] Furthermore, the oblique compound triangular support includes a triangular support frame and a supporting upright plate. The supporting upright plate is arranged at the top corner of the triangular support frame and is made integrally with the triangular support frame.

[0013] Furthermore, the bottom support frame includes two transverse support main beams and at least three groups of longitudinal distribution beams. The two transverse support main beams are arranged side by side, and the at least three groups of longitudinal distribution beams are arranged along the length direction of the transverse support main beams and connected to the two transverse support main beams. Sockets are formed between the two adjacent groups of longitudinal distribution beams and the two transverse support main beams to facilitate the penetration of the pier column longitudinal reinforcement; the oblique compound triangular braces are installed on the two groups of longitudinal distribution beams at both ends; the two groups of lateral vertical triangular braces are arranged opposite to each other, and the lateral vertical triangular braces in each group are installed at the end of the longitudinal distribution beam in the length direction.

[0014] Furthermore, it also includes at least two annular hoops, which are arranged along the length direction of the bottom support frame and connected to the bottom of the bottom support frame; each annular hoop is connected to one of the prefabricated piers to achieve the connection between the construction support platform and the prefabricated pier.

[0015] A construction method for a pier-beam structure uses a construction support platform to prepare the pier-beam structure. The specific construction process is as follows:

[0016] S1, roughening the surface of the post-casting groove of the precast pier column and the inner surface of the semi-precast cap beam formwork to increase the bonding strength between the concrete and the precast pier column and the semi-precast cap beam formwork;

[0017] S2, assembling a construction support platform according to the outer diameter of the prefabricated pier column and the size of the semi-prefabricated cap beam formwork, and installing the construction support platform on the upper end of the prefabricated pier column;

[0018] S3, hoist the semi-prefabricated cap beam formwork into the positioning groove of the construction support platform, pour concrete into the post-casting grooves of the semi-prefabricated cap beam formwork and the prefabricated pier column, and realize the integrated connection between the semi-prefabricated cap beam formwork and the prefabricated pier column.

[0019] S4, dismantle the construction support platform and complete the construction of the pier and beam structure.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] 1. The semi-prefabricated cap beam formwork of the present invention adopts a hollow shell structure, which is light in weight, reduces transportation costs and hoisting difficulties, and does not require splicing at the construction site, reducing the difficulty of splicing and the disadvantages caused by joints. The semi-prefabricated cap beam formwork and the prefabricated piers are connected as a whole through the design of the post-cast trough of the prefabricated piers, the longitudinal reinforcement of the piers, the cap beam steel cage and the annular energy-absorbing angle steel, and the pouring of concrete, forming a composite cap beam with strong bearing capacity and low construction difficulty, thereby improving the lateral force resistance, lateral stiffness and overall force performance of the cap beam.

[0022] 2. The semi-prefabricated cap beam formwork and the prefabricated pier column in the present invention are positioned via the construction support platform; at the same time, the construction support platform has a restraining effect on the semi-prefabricated cap beam formwork, which can avoid the problem of expansion of the semi-prefabricated cap beam formwork due to deformation of the pouring concrete. In addition, the construction support platform in the present invention can be disassembled and reused after the semi-prefabricated cap beam construction and curing are completed.

[0023] 3. In the present invention, anti-corrosion polyurethane coating is applied at the joints between the semi-prefabricated cap beam formwork and the prefabricated pier column, as well as at the joints between the cap beam reinforcement cage and the pier column longitudinal reinforcement, thereby preventing water seepage and improving the durability of the semi-prefabricated cap beam. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The accompanying drawings are incorporated as part of this application and are used to provide a further understanding of the present invention.

[0025] Figure 1 Schematic diagram of the coordination between the pier-beam structure and the construction support platform Figure 1 .

[0026] Figure 2 This is a structural diagram of the coordination between the construction support platform and the prefabricated piers.

[0027] Figure 3 It is a cross-sectional view of the coordination between the pier-beam structure and the construction support platform.

[0028] Figure 4 Schematic diagram of the coordination between the pier-beam structure and the construction support platform Figure 2 .

[0029] Figure 5 for Figure 3 A local enlarged schematic diagram of point A in the middle.

[0030] Figure 6 It is a structural schematic diagram of the annular clamp.

[0031] Explanation of the reference numerals: 1-semi-prefabricated cap beam formwork; 11-bottom hole; 12-steel skeleton; 121-longitudinal stirrups of formwork; 122-transverse reinforcement of formwork; 2-prefabricated pier; 21-post-cast trough; 22-longitudinal reinforcement of pier; 3-cap beam reinforcement cage; 4-annular energy-absorbing angle steel; 5-bottom support frame; 51-transverse supporting main beam; 52-longitudinal distribution beam; 6-oblique compound triangular brace; 7-lateral vertical triangular brace; 8-annular clamp; 9-high-strength bolt. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The following embodiments are used to illustrate the present invention but are not used to limit the scope of the present invention.

[0033] Embodiment 1:

[0034] Since the fully prefabricated cap beam is a beam that is prefabricated in the factory and transported to the construction site before being connected to the pier, the fully prefabricated cap beam has a large self-weight and places particularly high demands on cranes and transportation machinery. For the segmented prefabricated assembled cap beam, multiple segments are prefabricated in the factory in advance, and then the prefabricated multiple segment spliced ​​cap beams are transported to the construction site and assembled into a whole. The construction process has very high requirements for splicing accuracy and prestressing configuration. Whether it is a wet joint, dry joint or glue joint between two adjacent segments of assembled cap beams, it is necessary to ensure the flatness of the joint surface and the accuracy of the splicing position, which increases the difficulty of construction, and water seepage is prone to occur at the joints, affecting durability. When configuring the prestressed tendons, the embedded steel bars need to be accurately positioned and sleeved in the embedded sleeves. The construction process needs to strictly control the construction error, and the connection integrity is poor, which affects the bearing performance of the spliced ​​cap beam.

[0035] Hence, see Figures 1 to 5The present embodiment provides a pier-beam structure, including a semi-prefabricated cap beam formwork 1 and at least two prefabricated pier columns 2; the semi-prefabricated cap beam formwork 1 is a shell-shaped structure that is hollow inside and has no cover; the semi-prefabricated cap beam formwork 1 is a semi-prefabricated part, which is prefabricated in advance in a factory through a mold. During prefabrication, a steel skeleton 12 welded by longitudinal stirrups 121 of the formwork and transverse steel bars 122 of the formwork is placed in the mold, and then ultra-high performance concrete modified with basalt fiber is poured into the mold, and the concrete is demoulded after solidification and drying, and finally a semi-prefabricated cap beam formwork 1 is formed. The semi-prefabricated cap beam formwork 1 is cast by ultra-high performance concrete modified by basalt fiber. This modified concrete has the characteristics of high strength and high durability, so the durability of the cap beam formed in this embodiment is improved.

[0036] Among them, when the semi-prefabricated cap beam mold 1 is prefabricated, at least two bottom holes 11 are reserved in advance at the bottom of the semi-prefabricated cap beam mold 1; each bottom hole 11 corresponds to a prefabricated pier 2, and the position of the bottom hole 11 corresponds to the position of the prefabricated pier 2, and the inner diameter of the bottom hole 11 is larger than the inner diameter of the top post-casting groove 21 of the prefabricated pier 2, and smaller than the outer diameter of the prefabricated pier 2.

[0037] Combination Figure 3 The prefabricated pier column 2 is prefabricated in the factory in advance. The top of each prefabricated pier column 2 is provided with a post-casting groove 21 and a pier column longitudinal reinforcement 22. One end of the pier column longitudinal reinforcement 22 passes through the post-casting groove 21 and is embedded in the prefabricated pier column 2, and the other end of the pier column longitudinal reinforcement 22 extends upward and out of the post-casting groove 21. When the semi-prefabricated cap beam formwork 1 is hoisted to the top of the prefabricated pier column 2, the bottom hole 11 at the bottom of the semi-prefabricated cap beam formwork 1 corresponds to the prefabricated pier column 2 one by one, and the semi-prefabricated cap beam formwork 1 moves downward, so that the pier column longitudinal reinforcement 22 at the top of each prefabricated pier column 2 passes through the corresponding bottom hole 11 and is inserted into the semi-prefabricated cap beam formwork 1, until the bottom of the semi-prefabricated cap beam formwork 1 contacts and presses on the top surface of the prefabricated pier column 2. Concrete is poured into the post-casting groove 21 of the semi-precast cap beam formwork 1 and the precast pier column 2. When the concrete solidifies and dries, the semi-precast cap beam formwork 1 and the precast pier column 2 are connected as a whole via the concrete and the pier column longitudinal reinforcement 22.

[0038] Combination Figure 3In order to increase the bearing capacity of the cap beam after pouring, the present embodiment further includes a cap beam reinforcement cage 3. The shape of the cap beam reinforcement cage 3 is the same as the shape of the inner surface of the semi-prefabricated cap beam form 1. Before the concrete of the semi-prefabricated cap beam form 1 is poured, the cap beam reinforcement cage 3 is first placed in the semi-prefabricated cap beam form 1 and welded to the pier column longitudinal reinforcement 22. Then, the concrete is poured. The cap beam reinforcement cage 3 and the semi-prefabricated cap beam form 1 are connected as a whole via the poured concrete and the pier column longitudinal reinforcement 22. Since the cap beam reinforcement cage 3 itself is made of steel bars, it has a strong bearing capacity, which increases the bearing capacity of the concrete after pouring; at the same time, the connection between the cap beam reinforcement cage 3 and the pier column longitudinal reinforcement 22 increases the connection strength between the semi-prefabricated cap beam form 1 and the prefabricated pier 2. Therefore, the bearing performance of the cap beam after pouring in the present embodiment is increased, and the connection strength with the prefabricated pier 2 is also increased.

[0039] Combination Figure 3 and Figure 5 In order to further increase the connection strength between the semi-prefabricated cap beam formwork 1 and the prefabricated pier 2, the present embodiment further includes an annular energy-absorbing angle steel 4 with a "T"-shaped cross section, specifically a cylindrical structure with a flange at one end. The annular energy-absorbing angle steel 4 is sleeved on the upper end of the prefabricated pier 2, and a circle of rubber pads with screw holes is arranged between the annular energy-absorbing angle steel 4 and the prefabricated pier 2 to protect the surface of the prefabricated pier 2 and increase the friction between the annular energy-absorbing angle steel 4 and the prefabricated pier 2. The annular energy-absorbing angle steel 4 is fixed to the prefabricated pier 2 via bolts. The flange of the annular energy-absorbing angle steel 4 is flush with the top surface of the prefabricated pier 2 and fits with the lower surface of the semi-prefabricated cap beam formwork 1. The flange of the annular energy-absorbing angle steel 4 is connected to the lower surface of the semi-prefabricated cap beam formwork 1 via bolts. The design of the annular energy-absorbing angle steel 4 further increases the connection strength between the semi-prefabricated cap beam formwork 1 and the prefabricated pier 2, thereby increasing the bearing capacity of the bridge.

[0040] Among them, the joints between the semi-prefabricated cap beam formwork 1 and the prefabricated pier 2 and the connection between the cap beam reinforcement cage 3 and the pier longitudinal reinforcement 22 are coated with anti-corrosion polyurethane coating, which prevents the occurrence of water seepage and improves the durability of the semi-prefabricated cap beam.

[0041] In this embodiment, since the semi-prefabricated cap beam formwork 1 is a hollow shell structure, it is light in weight, which reduces the transportation cost and the difficulty of lifting. It does not need to be spliced ​​at the construction site, which reduces the difficulty of splicing and the disadvantages caused by the joints. The semi-prefabricated cap beam formwork 1 and the prefabricated pier 2 are connected as a whole through the design of the pier longitudinal reinforcement 22, the cap beam steel cage 3 and the annular energy-absorbing angle steel 4 and the pouring of concrete, forming a composite cap beam with strong bearing capacity and low construction difficulty, thereby improving the coordinated force bearing capacity of the composite cap beam.

[0042] Embodiment 2:

[0043] Although the design of the semi-prefabricated cap beam formwork 1 can reduce transportation costs and lifting difficulty, and does not require assembly, the existing semi-prefabricated cap beam formwork 1 and the prefabricated pier 2 cannot be accurately hoisted and positioned during the assembly process, which prolongs the splicing and hoisting time of the two, and the construction efficiency is low. Moreover, when pouring concrete into the semi-prefabricated formwork, the semi-prefabricated formwork is prone to deformation, resulting in expansion of the formwork.

[0044] Hence, see Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 6 , this embodiment provides a construction support platform for the preparation of pier-beam structure, including a bottom support frame 5, two oblique compound triangular supports 6, two annular hoops 8 and two groups of lateral vertical triangular supports 7. The two annular hoops 8 are arranged one by one with the two prefabricated pier columns 2. The annular hoop 8 is composed of two semi-hoop bodies and hoop bolts. The two semi-hoop bodies are arranged on both sides of the prefabricated pier column 2 and arranged below the annular energy-absorbing angle steel 4. The two semi-hoop bodies are fixedly connected by hoop bolts so that the annular hoop 8 is fixedly connected with the prefabricated pier column 2. Threaded holes are provided at the opposite ends of the annular hoop 8 to connect with the bottom support frame 5. Among them, the tightening torque of the hoop bolt needs to meet the calculation requirements. In addition, a circle of rubber pads is provided between the prefabricated pier column 2 and the annular hoop 8 to protect the surface of the prefabricated pier column 2 from damage, and to enhance the friction between the annular hoop 8 and the prefabricated pier column 2, so as to ensure the stability of the connection between the construction support platform and the prefabricated pier column 2.

[0045] Combination Figure 1 and Figure 2 The bottom support frame 5 is a rectangular frame structure composed of two transverse support beams 51 and three groups of longitudinal distribution beams 52. The two transverse support beams 51 are arranged side by side and spaced apart. The ends of each transverse support beam 51 and two annular hoop 8 on the same side are connected by high-strength bolts 9. The three groups of longitudinal distribution beams 52 are arranged along the length direction of the transverse support beams 51 and connected to the two transverse support beams 51. Sockets are formed between the two adjacent groups of longitudinal distribution beams 52 and the two transverse support beams 51. The sockets are opposite to the positions of the prefabricated piers 2, so as to facilitate the penetration of the pier longitudinal reinforcement 22 at the top of the prefabricated pier 2. The longitudinal distribution beams 52 in each group are laid on the two transverse support beams 51 at a certain interval and fixed in position by welding.

[0046] Combination Figure 1 and Figure 2The oblique compound triangular brace 6 includes a triangular support frame and a supporting vertical plate. The supporting vertical plate is vertically arranged at the top corner of the triangular support frame and is made integrally with the triangular support frame. The triangular support frame is fixedly installed on a set of longitudinal distribution beams 52 at the end; the distance between two oblique compound triangular braces 6 is the length of the semi-prefabricated cap beam formwork 1; two sets of lateral vertical triangular braces 7 are arranged oppositely, and the lateral vertical triangular braces 7 in each set are installed at the end of the longitudinal distribution beam 52 in the length direction, and the distance between the two sets of lateral vertical triangular braces 7 is the width of the semi-prefabricated cap beam formwork 1.

[0047] Among them, the annular clamp 8, the transverse supporting main beam 51, the longitudinal distribution beam 52, the oblique compound triangular support 6 and the lateral vertical triangular support 7 are all made of high-strength steel, can withstand large loads, and have good toughness and stability.

[0048] In this embodiment, the oblique compound triangular braces 6 and the lateral vertical triangular braces 7 enclose a positioning groove, and the semi-prefabricated cap beam formwork 1 is placed in the positioning groove. The side walls on both sides of the width direction of the semi-prefabricated cap beam formwork 1 are fitted with the lateral vertical triangular braces 7, and the side walls on both sides of the length direction of the semi-prefabricated cap beam formwork 1 are fitted with the oblique compound triangular braces 6, thereby realizing the positioning between the semi-prefabricated cap beam formwork 1 and the construction support platform; the construction support platform and the prefabricated pier 2 are precisely positioned via the connection between the annular clamp 8 and the bottom support frame 5, thereby ensuring the precise positioning between the semi-prefabricated cap beam formwork 1 and the prefabricated pier 2. At the same time, when concrete is poured into the semi-prefabricated cap beam formwork 1, the flow, coagulation, thermal expansion and contraction of the concrete will cause the semi-prefabricated cap beam formwork 1 to deform. The semi-prefabricated cap beam formwork 1 is constrained by the oblique compound triangular brace 6 and the lateral vertical triangular brace 7, which can avoid the problem of expansion of the formwork due to deformation of the semi-prefabricated cap beam formwork 1; therefore, the construction support platform improves the defects of inaccurate positioning of the prefabricated composite cap beam hoisting and expansion of the formwork during construction and pouring. In addition, the construction support platform in this embodiment can be disassembled and reused after the semi-prefabricated cap beam construction and curing are completed.

[0049] Embodiment 3:

[0050] This embodiment provides a construction method for a pier-beam structure, and the specific construction process is as follows:

[0051] S1, roughening the surface of the post-casting groove 21 of the precast pier 2 to increase the bonding force between the concrete and the precast pier 2;

[0052] S2, sequentially installing the annular energy dissipation angle steel 4 and the annular clamp 8 on the prefabricated pier 2, wherein the upper surface of the annular energy dissipation angle steel 4 is flush with the top surface of the prefabricated pier 2;

[0053] S3, install the transverse support main beam 51 on the two annular hoops 8, lay the longitudinal distribution beam 52 on the transverse support main beam 51, and install the lateral vertical triangular brace 7 and the oblique compound triangular brace 6 on the longitudinal distribution beam 52 to enclose a positioning groove;

[0054] S4, hoist the semi-prefabricated cap beam formwork 1 into the positioning groove enclosed by the construction support platform, and the pier column longitudinal reinforcement 22 passes through the bottom hole 11 of the semi-prefabricated cap beam formwork 1 and is inserted into the semi-prefabricated cap beam formwork 1; before the semi-prefabricated cap beam formwork 1 is supported on the top of the prefabricated pier 2, an anti-corrosion polyurethane coating is applied to the joint between the bottom of the semi-prefabricated cap beam formwork 1 and the prefabricated pier 2; after the semi-prefabricated cap beam formwork 1 is supported on the top of the prefabricated pier 2, the annular energy-absorbing angle steel 4 is connected to the semi-prefabricated cap beam formwork 1 by bolts;

[0055] S5, removing rust from the pier column longitudinal reinforcement 22, and roughening the inner surface of the semi-prefabricated cap beam formwork 1 to increase the bonding force between the concrete and the semi-prefabricated cap beam formwork 1;

[0056] S6, hoisting the cap beam reinforcement cage 3 into the semi-prefabricated cap beam formwork 1, welding the cap beam reinforcement cage 3 and the pier column longitudinal reinforcement 22 together, and coating the connection between the cap beam reinforcement cage 3 and the pier column longitudinal reinforcement 22 with anti-corrosion polyurethane coating;

[0057] S7, pour concrete into the post-casting groove 21 of the semi-precast cap beam formwork 1 and the precast pier 2; after the pouring construction and curing are completed, ensure that there is no mold expansion in the semi-precast cap beam formwork 1, remove the construction support platform, and leave it for the next repeated construction.

[0058] The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the concept of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the scope of protection determined by the claims of the present invention.

Claims

1. A pier-beam structure, Features: It includes a semi-prefabricated cap beam mold and at least two prefabricated piers. The bottom of the semi-prefabricated cap beam mold is provided with at least two bottom holes, and each bottom hole corresponds to a prefabricated pier. The top of each prefabricated pier is provided with a post-cast groove and pier column longitudinal reinforcement. One end of the pier column longitudinal reinforcement passes through the post-cast groove and is pre-embedded in the prefabricated pier, and the other end of the pier column longitudinal reinforcement extends upward. When the semi-prefabricated cap beam mold is hoisted to the top of the prefabricated pier, the pier column longitudinal reinforcement passes through the bottom hole of the semi-prefabricated cap beam mold and is inserted into the semi-prefabricated cap beam mold, and concrete is poured into the post-cast grooves of the semi-prefabricated cap beam mold and the prefabricated pier, so as to realize the integrated connection between the semi-prefabricated cap beam mold and the prefabricated pier.

2. A pier-beam structure according to claim 1, Features: It also includes a cap beam reinforcement cage, which is placed in a semi-prefabricated cap beam formwork and connected to the pier column longitudinal reinforcement, and the cap beam reinforcement cage and the semi-prefabricated cap beam formwork are connected as a whole through poured concrete.

3. A pier-beam structure according to claim 2, Features: The joints between the semi-prefabricated cap beam formwork and the prefabricated pier column, as well as the connections between the cap beam reinforcement cage and the pier column longitudinal reinforcement are all coated with anti-corrosion polyurethane coating.

4. The pier-beam structure according to claim 1, Features: It also includes an annular energy-absorbing angle steel with a "T"-shaped cross-section. The annular energy-absorbing angle steel is sleeved on and connected to the upper end of the prefabricated pier column, and the upper surface of the annular energy-absorbing angle steel is attached to and connected to the lower surface of the semi-prefabricated cap beam formwork.

5. The pier-beam structure according to claim 1, Features: The semi-prefabricated cap beam formwork is equipped with a steel frame and is cast with ultra-high performance concrete modified with basalt fiber.

6. A construction support platform for preparing the pier-beam structure according to any one of claims 1 to 5, Features: It includes a bottom support frame, two oblique compound triangular supports and two groups of lateral vertical triangular supports; one oblique compound triangular support is installed at each end of the length direction of the bottom support frame, and one group of lateral vertical triangular supports is installed at each end of the width direction of the bottom support frame, and the arrangement direction of each group of lateral vertical triangular supports is the same as the length direction of the bottom support frame; the positioning groove enclosed by the oblique compound triangular supports and the lateral vertical triangular supports matches the semi-prefabricated cap beam formwork; when the bottom support frame is installed on the prefabricated pier column in the pier-beam structure, the semi-prefabricated cap beam formwork is placed in the positioning groove and positioned with the prefabricated pier column.

7. A construction support platform for preparing pier-beam structures according to claim 6, Features: The oblique compound triangular support comprises a triangular support frame and a supporting upright plate. The supporting upright plate is arranged at the top corner of the triangular support frame and is made integrally with the triangular support frame.

8. A construction support platform for preparing pier-beam structures according to claim 6, Features: The bottom support frame includes two transverse support main beams and at least three groups of longitudinal distribution beams. The two transverse support main beams are arranged side by side, and at least three groups of longitudinal distribution beams are arranged along the length direction of the transverse support main beams and connected to the two transverse support main beams. Sockets are formed between the two adjacent groups of longitudinal distribution beams and the two transverse support main beams to facilitate the penetration of the pier column longitudinal reinforcement; the oblique compound triangular braces are installed on the two groups of longitudinal distribution beams at both ends; the two groups of lateral vertical triangular braces are arranged opposite to each other, and the lateral vertical triangular braces in each group are installed at the end of the longitudinal distribution beam in the length direction.

9. A construction support platform for preparing pier-beam structures according to claim 6, Features: It also includes at least two annular hoops, which are arranged along the length direction of the bottom support frame and connected to the bottom of the bottom support frame; each annular hoop is connected to one of the prefabricated pier columns to achieve the connection between the construction support platform and the prefabricated pier column.

10. A construction method for a pier-beam structure, Features: The pier-beam structure is prepared by using the construction support platform described in any one of claims 6 to 9, and the specific construction process is as follows: S1, roughening the surface of the post-casting groove of the precast pier column and the inner surface of the semi-precast cap beam formwork to increase the bonding strength between the concrete and the precast pier column and the semi-precast cap beam formwork; S2, assembling a construction support platform according to the outer diameter of the prefabricated pier column and the size of the semi-prefabricated cap beam formwork, and installing the construction support platform on the upper end of the prefabricated pier column; S3, hoist the semi-prefabricated cap beam formwork into the positioning groove of the construction support platform, pour concrete into the post-casting grooves of the semi-prefabricated cap beam formwork and the prefabricated pier column, and realize the integrated connection between the semi-prefabricated cap beam formwork and the prefabricated pier column. S4, dismantle the construction support platform and complete the construction of the pier and beam structure.

Citation Information

Patent Citations

  • Construction method of bent cap

    CN101922143A

  • Bridge pier capping beam hoop steel beam template system and construction method thereof

    CN108505448A

  • Semi-prefabricated UHPC shell overlap cover beam and prefabricated pier stud connecting structure and construction method thereof

    CN110258302A

  • Bracket system for construction of bent cap with inclined struts and double hoops

    CN118127933A

  • Bent cap concrete placement template steel hoop braced system

    CN208293427U