Construction method for profile steel framework of bridge cable bent tower
By pre-splitting and processing of the steel frame segments of the bridge cable tower in the factory, conducting interface testing and pre-assembly, combined with hoisting and assembly construction, the problems of large number of steel bars and complex welding in the construction of the existing bridge cable tower are solved, and the problem of improvement is improved Construction efficiency and safety achieve efficient bridge cable tower construction.
Patent Information
- Application Number
- CN202411323198.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-11-15
AI Technical Summary
The reinforced concrete construction technology of existing bridge cable towers has problems such as the large number of steel bars, complex construction, complex welding and binding processes, resulting in defects, high costs, and major safety hazards, and low construction efficiency.
Using the construction method of steel frames, the skeleton segments are first split and processed in the factory, pre-assembly and interface tests are carried out to form a closed rectangular structure, reduce the on-site processing volume, and complete the construction through lifting and assembly, and use the connecting structure combined with bolt welding and The guide blocks are quickly positioned and connected to ensure construction safety and efficiency.
It effectively reduces the workload of on-site steel bars and steel processing, improves construction efficiency, reduces the probability of interface test errors, and improves the safety of the construction site, the load-bearing capacity and deformation resistance of the structure.
Smart Images

Figure CN118958165A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridge tower construction, and in particular to a method for constructing a steel frame of a bridge tower. Background Art
[0002] Bridge towers are crucial structural components in modern bridge engineering, especially in cable-stayed bridges and suspension bridges. Reinforced concrete towers are a common structural form in current bridge engineering. The most common way to construct steel bars is still to process the individual components in the back field, and to tie them up manually on site. This is a labor-intensive operation with low technical requirements, strong adaptability to special-shaped structures, and high labor demand. The existing steel bar construction technology mainly involves tying the steel bars on site or making them into meshes and transporting them to the site for assembly. Then the whole is hoisted to the top of the tower for alignment and connection.
[0003] For large-span bridges, the amount of steel bars used in reinforced concrete towers is large and the number of steel bars is large, which makes the connection between steel bar components more difficult and leads to higher component construction costs.
[0004] The structure of steel and steel cable towers is complex. The traditional steel and steel bridge connection process increases the workload of on-site welding and steel bar binding. The on-site steel welding process is prone to defects, such as weld cracks, pores, slag inclusions, etc., which affect the connection strength and durability. The bound steel bars are prone to loosening or shifting during construction, resulting in uneven force and structural instability. The construction site conditions are complex and improper management can easily lead to quality problems and safety hazards. In addition, due to the complexity of the welding and binding process, labor and material costs are high. Summary of the invention
[0005] The technical problem to be solved by the present invention is to overcome the deficiencies in the prior art and provide a method for constructing a steel frame of a bridge pylon, which can effectively reduce the workload of on-site steel bar and steel processing, greatly improve construction efficiency, and ensure the safety of the construction site.
[0006] The present invention is achieved through the following technical solutions:
[0007] A method for constructing a steel frame of a bridge pylon comprises the following steps:
[0008] Step 1: Split the steel frame into multiple groups of vertically spliced frame segments along the axis, split the frame segments in advance according to the design drawing dimensions, and process the single-sided steel mesh units and steel frame units;
[0009] Step 2: fix the steel mesh unit to the side of the steel frame unit to form a single-sided frame unit;
[0010] Step 3, fixing and connecting two side edges of multiple groups of single-sided skeleton units to form skeleton segments, wherein the cross section of the assembled skeleton segments is a closed rectangular structure;
[0011] Step 4: Pre-assemble the skeleton segments vertically in the factory. The skeleton segments are divided into reference segments and sub-segments. The reference segments are placed on the tire frame as standard segments. The sub-segments are hoisted as the test segments to be tested and pre-assembled with the standard segments. After the test is qualified, the sub-segments are used as the reference segments for the subsequent sub-segments to be tested. The interface tests of the sub-segments are tested in turn to see if they meet the requirements.
[0012] Step 5. Label the skeleton segments tested in step 4, transport them to the construction site, hoist and assemble them, and complete the concrete pouring operation. After reaching the set strength, proceed with the subsequent skeleton segment hoisting construction.
[0013] It can be seen that in the above technical solution, the designers pre-split the steel frame into multiple groups of vertically spliced frame segments along the axis, and further split the frame segments and process single-sided steel mesh units and steel frame units to facilitate independent production and processing by the staff, and then assemble them into complete rectangular structure frame segments in the factory, which can be subsequently hoisted and assembled at the construction site, effectively reducing the workload of on-site steel bar and steel processing, greatly improving construction efficiency and ensuring the safety of the construction site; in addition, the frame segments are pre-assembled vertically in the factory, and the interface tests of each sub-segment are tested in turn to see if they meet the requirements, which greatly reduces the error probability of the interface test, further reduces the work pressure at the construction site and improves construction efficiency.
[0014] According to the above technical solution, preferably, the steel skeleton unit in step 1 includes multiple groups of vertical steel units and multiple groups of cross-arranged supporting connectors for connecting adjacent steel units, the cross-section of the steel unit is an I-section, and shear keys inserted into concrete are evenly arranged on the outer side of the flange of the steel unit.
[0015] It can be seen that in the above technical scheme, the steel frame unit of the present invention includes multiple groups of vertical steel units and multiple groups of cross-arranged support connectors for connecting adjacent steel units, so that the steel frame unit, as the main frame structure, can effectively combine the high strength of steel and the high stiffness of reinforced concrete, improve the bearing capacity and deformation resistance of the cable tower, and perform well in mechanical properties, construction efficiency, economic performance, etc.; and the shear key can effectively improve the connection integrity of concrete and steel units.
[0016] According to the above technical solution, preferably, the steel mesh unit in step 1 includes transverse steel bars, vertical steel bars and bracing bars, the transverse steel bars are cross-connected with the vertical steel bars, and the bracing bars are used to connect the inner and outer transverse steel bars.
[0017] According to the above technical solution, preferably, the interface test in step 4 includes the aligning and splicing of the steel section unit and the vertical reinforcement.
[0018] It can be seen that in the above technical solution, the accuracy of subsequent hoisting at the construction site is effectively guaranteed by the alignment and splicing of the steel units and the vertical reinforcements.
[0019] According to the above technical scheme, preferably, the steel units of adjacent skeleton segments in step 5 adopt a connection structure combined by bolts and welds. After the skeleton segments are hoisted into place using hoisting equipment, the steel units of some skeleton segments are first quickly fixed and connected using connecting components. After a preliminary stable connection state is formed, the hoisting equipment can be released from the hoisting state, and the welding equipment is used to complete the splicing connection of the remaining steel skeletons, and finally the assembly and splicing of the steel units in the skeleton segments is completed.
[0020] It can be seen that in the above technical solution, the construction sequence of bolting first and then welding can quickly achieve the initial stable connection of the skeleton segments, greatly reduce the time occupied by the lifting equipment, and improve construction efficiency.
[0021] According to the above technical solution, preferably, the connection assembly includes a guide block, a matching part and a connecting plate. The matching part is pre-welded and connected to the end of the steel section unit. The matching part and the connecting plate are both used to bolt and connect the upper and lower spliced steel section units. The guide block is pre-welded to the edge of the steel section unit for quickly positioning the hoisted and spliced skeleton segments.
[0022] It can be seen that in the above technical solution, the guide blocks are used to quickly position the hoisted and spliced skeleton segments, and then the matching parts and connecting plates are used to quickly bolt and connect the upper and lower spliced steel units, thereby achieving a preliminary stable connection state of the upper and lower adjacent skeleton segments.
[0023] According to the above technical scheme, preferably, the vertical steel bars are divided into vertical fixed steel bars and vertical movable steel bars, the vertical fixed steel bars are fixedly connected to the transverse steel bars and the bracing bars, the upper and lower adjacent vertical fixed steel bars are connected by cone sleeves, the side of the steel section unit is provided with an upper limit frame and a lower limit frame, the vertical fixed steel bars and the vertical movable steel bars pass through the upper limit frame and the lower limit frame, and the upper limit frame is provided with a hanging component for temporarily locking the vertical movable steel bars, the upper and lower adjacent vertical movable steel bars are connected by straight threaded sleeves, the upper limit frame and the lower limit frame are both provided with reserved through holes for accommodating the vertical movable steel bars to pass through, the reserved through holes of the lower limit frame are larger than the reserved through holes of the upper limit frame, and when the vertical steel bars are connected, the vertical fixed steel bars and the vertical movable steel bars have adjustable space in the horizontal direction.
[0024] It can be seen that in the above technical scheme, the connection of the vertical steel bars adopts a mixed connection structure of a tapered sleeve and a straight threaded sleeve, wherein the tapered sleeve is used to connect the vertical fixed steel bars with high rigidity, and the vertical fixed steel bars are fixedly connected to the transverse steel bars and the bracing bars; wherein the straight threaded sleeve is used to connect the vertical movable steel bars, and the upper limit frame and the lower limit frame are both provided with reserved through holes for accommodating the vertical movable steel bars to pass through, and the reserved through holes of the lower limit frame are larger than the reserved through holes of the upper limit frame. When the vertical steel bars are connected, the vertical fixed steel bars and the vertical movable steel bars have adjustable space in the horizontal direction. This mixed connection structure is the key to effectively ensuring the smooth implementation of this patent.
[0025] According to the above technical solution, preferably, the hanging component is a cross buckle, and the cross buckle is fixedly connected to the upper limit frame for temporarily locking the vertical movable steel bars.
[0026] It can be seen that in the above technical solution, the cross buckle is fixedly connected to the upper limit frame and is used to temporarily lock the vertical movable steel bars. Releasing the cross buckle allows the vertical movable steel bars to be smoothly adjusted up and down.
[0027] The beneficial effects of the present invention are:
[0028] (1) The designers pre-split the steel skeleton into multiple groups of vertically spliced skeleton segments along the axis, and further split the skeleton segments and process the single-sided steel mesh units and steel skeleton units, which is convenient for the staff to independently produce and process them. Then, they are assembled into complete rectangular structure skeleton segments in the factory, and then hoisted and assembled at the construction site. This effectively reduces the workload of on-site steel and steel processing, greatly improves construction efficiency, and ensures the safety of the construction site.
[0029] (2) The skeleton segments are pre-assembled vertically in the factory, and the interface tests of each sub-segment are cycled in sequence to see if they meet the requirements, which greatly reduces the error probability of interface testing, further reduces the work pressure on the construction site, and improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 A schematic diagram of the process of the present invention is shown;
[0031] Figure 2 A schematic diagram of the process of vertical pre-assembly of the present invention is shown;
[0032] Figure 3 The isometric structural diagram of the skeleton segment in the present invention is shown;
[0033] Figure 4 A schematic diagram of the top view of the skeleton segment in the present invention is shown;
[0034] Figure 5 A schematic diagram of the front view structure of the skeleton units connected in the present invention is shown;
[0035] Figure 6 The front view structural schematic diagram of the vertical reinforcement adjustment in the present invention is shown;
[0036] Figure 7 The isometric structural diagram of the medium-sized steel units of the present invention when connected is shown;
[0037] Figure 8 The isometric structural diagram of the connecting plate and the guide block in the present invention is shown;
[0038] Description of reference numerals:
[0039] 1. Skeleton segment; 2. Steel mesh unit; 3. Steel skeleton unit; 4. Steel unit; 5. Support connector; 6. Shear key; 7. Transverse steel bar; 8. Vertical steel bar; 9. Guide block; 10. Matching piece; 11. Connecting plate; 12. Upper limit skeleton; 13. Lower limit skeleton; 14. Straight threaded sleeve. DETAILED DESCRIPTION
[0040] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and the best embodiment. Based on the embodiments in the invention, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the invention.
[0041] In the description of the invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside" and "outside" etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the invention.
[0042] As shown in the figure, the present invention provides a method for constructing a steel frame of a bridge pylon, comprising the following steps:
[0043] Step 1, split the steel skeleton along the axis into multiple groups of vertically spliced skeleton segments 1, split the skeleton segments 1 in advance according to the design drawing size and process the single-sided steel mesh unit 2 and steel skeleton unit 3; wherein the steel skeleton unit 3 includes multiple groups of vertical steel units 4 and multiple groups of cross-arranged support connectors 5 for connecting adjacent steel units 4, the cross section of the steel unit 4 is an I-shaped cross section, and the outer side of the flange of the steel unit 4 is evenly arranged with shear keys 6 inserted into concrete, so that the steel skeleton unit 3 as the main skeleton structure can effectively combine the high strength of the steel and the high rigidity of the reinforced concrete, improve the bearing capacity and deformation resistance of the cable tower, and perform well in terms of mechanical properties, construction efficiency, and economic performance; and the shear key 6 can effectively improve the connection integrity of the concrete and the steel unit 4, the steel mesh unit 2 includes transverse steel bars 7, vertical steel bars 8 and bracing bars, the transverse steel bars 7 are cross-connected with the vertical steel bars 8, and the bracing bars are used to connect the inner and outer transverse steel bars 7;
[0044] Step 2: fix the steel mesh unit 2 to the side of the steel frame unit 3 to form a single-sided frame unit;
[0045] Step 3, fixing and connecting two side edges of multiple groups of single-sided skeleton units to form a skeleton segment 1, wherein the cross section of the assembled skeleton segment 1 is a closed rectangular structure;
[0046] Step 4: pre-assemble the skeleton segment 1 vertically in the factory. The skeleton segment 1 is divided into a reference segment and a sub-segment. The reference segment is placed on the tire frame as a standard segment. The sub-segment is hoisted as a test segment to be tested and pre-assembled with the standard segment. After the test is qualified, the sub-segment is used as a reference segment for subsequent sub-segments to be tested. The interface test of each sub-segment is cyclically tested in turn to see if it meets the requirements; and the interface test includes the alignment splicing of the steel unit 4 and the vertical steel bar 8; through the alignment splicing of the steel unit 4 and the vertical steel bar 8, the accuracy of the subsequent hoisting at the construction site is effectively guaranteed;
[0047] Step 5. Transport the skeleton segment 1 numbered after the test in step 4 to the construction site, hoist and assemble it, and complete the concrete pouring operation. After reaching the set strength, proceed with the subsequent hoisting construction of the skeleton segment 1.
[0048] The designers pre-split the steel frame into multiple groups of vertically spliced frame segments 1 along the axis, and further split the frame segment 1 and process the single-sided steel mesh unit 2 and steel frame unit 3 to facilitate independent production and processing by the staff, and then assemble them into complete rectangular structure frame segments 1 in the factory, which can be hoisted and assembled at the construction site later, effectively reducing the workload of on-site steel bar and steel processing, greatly improving construction efficiency and ensuring the safety of the construction site; in addition, the frame segment 1 is pre-assembled vertically in the factory, and the interface test of each sub-segment is cycled in turn to see if it meets the requirements, which greatly reduces the error probability of the interface test, further reduces the work pressure at the construction site and improves construction efficiency.
[0049] Optionally, in a possible implementation, in step 5, the steel units 4 of adjacent skeleton segments 1 adopt a connection structure combined with bolts and welds. After the skeleton segments 1 are hoisted into place using lifting equipment, the steel units 4 of some skeleton segments 1 are first quickly fixed and connected using connection components. After a preliminary stable connection state is formed, the lifting equipment can be released from the lifting state, and the welding equipment is used to complete the splicing connection of the remaining steel skeletons. Finally, the assembly and splicing of the steel units 4 in the skeleton segments 1 are completed. By using the construction sequence of bolting first and then welding, the preliminary stable connection of the skeleton segments 1 can be quickly achieved, and the time occupied by the lifting equipment can be greatly reduced, thereby improving construction efficiency.
[0050] Optionally, in a possible embodiment, the connection assembly includes a guide block 9, a matching piece 10 and a connecting plate 11, the matching piece 10 is pre-welded and connected to the end of the steel unit 4, the matching piece 10 and the connecting plate 11 are both used to bolt and connect the upper and lower spliced steel units 4, the guide block 9 is pre-welded to the edge of the steel unit 4, and is used to quickly position the hoisted and spliced skeleton segment 1, the hoisted and spliced skeleton segment 1 is quickly positioned by the guide block 9, and then the matching piece 10 and the connecting plate 11 are used to quickly bolt and connect the upper and lower spliced steel units 4, thereby achieving a preliminary stable connection state of the upper and lower adjacent skeleton segments 1.
[0051] Optionally, in a possible implementation, the vertical steel bars 8 are divided into vertical fixed steel bars and vertical movable steel bars, the vertical fixed steel bars are fixedly connected to the transverse steel bars 7 and the bracing bars, the upper and lower adjacent vertical fixed steel bars are connected by cone sleeves, the side of the steel section unit 4 is provided with an upper limit frame 12 and a lower limit frame 13, the vertical fixed steel bars and the vertical movable steel bars pass through the upper limit frame 12 and the lower limit frame 13, and the upper limit frame 12 is provided with a hanging component for temporarily locking the vertical movable steel bars, the upper and lower adjacent vertical movable steel bars are connected by a straight threaded sleeve 14, the upper limit frame 12 and the lower limit frame 13 are both provided with reserved through holes for accommodating the vertical movable steel bars to pass through, the reserved through holes of the lower limit frame 13 are larger than the reserved through holes of the upper limit frame 12, when When the vertical steel bars 8 are connected, the vertical fixed steel bars and the vertical movable steel bars have adjustable space in the horizontal direction; the connection of the vertical steel bars 8 adopts a mixed connection structure connected by a tapered sleeve and a straight threaded sleeve 14, wherein the tapered sleeve is used to connect the vertical fixed steel bars with high rigidity, and the vertical fixed steel bars are fixedly connected to the transverse steel bars 7 and the bracing bars; wherein the straight threaded sleeve 14 is used to connect the vertical movable steel bars, and the upper limit frame 12 and the lower limit frame 13 are both provided with reserved through holes for accommodating the vertical movable steel bars to pass through, and the reserved through holes of the lower limit frame 13 are larger than the reserved through holes of the upper limit frame 12. When the vertical steel bars 8 are connected, the vertical fixed steel bars and the vertical movable steel bars have adjustable space in the horizontal direction. This mixed connection structure can effectively guarantee the key to the smooth implementation of this patent.
[0052] Optionally, in a possible implementation, the hanging component is a cross buckle, which is fixedly connected to the upper limit frame 12 and is used to temporarily lock the vertical movable steel bars. Releasing the cross buckle allows the vertical movable steel bars to be smoothly adjusted up and down.
[0053] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A method for constructing a steel frame of a bridge tower. It is characterized in that The steps include: Step 1: Split the steel frame into multiple groups of vertically spliced frame segments along the axis, split the frame segments in advance according to the design drawing dimensions, and process the single-sided steel mesh units and steel frame units; Step 2: fix the steel mesh unit to the side of the steel frame unit to form a single-sided frame unit; Step 3, fixing and connecting two side edges of multiple groups of single-sided skeleton units to form skeleton segments, wherein the cross section of the assembled skeleton segments is a closed rectangular structure; Step 4: Pre-assemble the skeleton segments vertically in the factory. The skeleton segments are divided into reference segments and sub-segments. The reference segments are placed on the tire frame as standard segments. The sub-segments are hoisted as the test segments to be tested and pre-assembled with the standard segments. After the test is qualified, the sub-segments are used as the reference segments for the subsequent sub-segments to be tested. The interface tests of the sub-segments are tested in turn to see if they meet the requirements. Step 5. Label the skeleton segments tested in step 4, transport them to the construction site, hoist and assemble them, and complete the concrete pouring operation. After reaching the set strength, proceed with the subsequent skeleton segment hoisting construction.
2. A method for constructing a steel frame of a bridge pylon according to claim 1, It is characterized in that The steel skeleton unit in step 1 includes multiple groups of vertical steel units and multiple groups of cross-arranged supporting connectors for connecting adjacent steel units. The cross-section of the steel unit is an I-section, and shear keys inserted into concrete are evenly arranged on the outer side of the flange of the steel unit.
3. A method for constructing a steel frame of a bridge pylon according to claim 2, It is characterized in that The steel mesh unit in step 1 includes transverse steel bars, vertical steel bars and bracing bars, wherein the transverse steel bars are cross-connected with the vertical steel bars, and the bracing bars are used to connect the inner and outer transverse steel bars.
4. A method for constructing a steel frame of a bridge pylon according to claim 3, It is characterized in that The interface test in step 4 includes the joint splicing of steel units and vertical reinforcement.
5. A method for constructing a steel frame of a bridge pylon according to claim 4, It is characterized in that In step 5, the steel units of adjacent skeleton segments adopt a bolt-welded connection structure. After the skeleton segments are hoisted into place using hoisting equipment, the steel units of some skeleton segments are first quickly fixed and connected using connection components. After a preliminary stable connection state is formed, the hoisting equipment can be released from the hoisting state, and the welding equipment is used to complete the splicing connection of the remaining steel skeletons, and finally the assembly and splicing of the steel units in the skeleton segments is completed.
6. A method for constructing a steel frame of a bridge pylon according to claim 5, It is characterized in that The connection assembly includes a guide block, a matching piece and a connecting plate. The matching piece is pre-welded and connected to the end of the steel unit. The matching piece and the connecting plate are both used to bolt and connect the upper and lower spliced steel units. The guide block is pre-welded to the edge of the steel unit for quickly positioning the skeleton segments for hoisting and splicing.
7. A method for constructing a steel frame of a bridge pylon according to claim 6, It is characterized in that The vertical steel bars are divided into vertical fixed steel bars and vertical movable steel bars. The vertical fixed steel bars are fixedly connected to the transverse steel bars and the bracing bars. The upper and lower adjacent vertical fixed steel bars are connected by cone sleeves. The side of the steel section unit is provided with an upper limit frame and a lower limit frame. The vertical fixed steel bars and the vertical movable steel bars pass through the upper limit frame and the lower limit frame, and the upper limit frame is provided with a hanging component for temporarily locking the vertical movable steel bars. The upper and lower adjacent vertical movable steel bars are connected by straight threaded sleeves.
8. A method for constructing a steel frame of a bridge pylon according to claim 7, It is characterized in that The upper limit frame and the lower limit frame are both provided with reserved through holes for accommodating the vertical movable steel bars to pass through. The reserved through holes of the lower limit frame are larger than the reserved through holes of the upper limit frame. When the vertical steel bars are connected, the vertical fixed steel bars and the vertical movable steel bars have adjustable space in the horizontal direction.
9. A method for constructing a steel frame of a bridge pylon according to claim 8, It is characterized in that The hanging component is a cross buckle, which is fixedly connected to the upper limit frame and is used for temporarily locking the vertical movable steel bars.
Citation Information
Cited By
Construction method and system for blocked reinforcing steel bar component horizontally matched with closed stirrup and main reinforcing steel bar
CN120967809A
Steel concrete tower column construction control method and cable bent tower steel shell assembly
CN121023928A
Construction control method for steel-concrete tower column and cable tower steel shell assembly
CN121023928B