Method for measuring far-shore finished steel pipe pile without construction platform

By using magnetic mini laser scanner and GNSS RTK technology on traffic boats, the measurement accuracy and safety of long-shore finished steel pipe piles under construction platform conditions are solved, and efficient and accurate measurement results are achieved.

CN118958386APending Publication Date: 2024-11-15CCCC SHEC FOURTH ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410498174.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The measurement of remote finished steel pipe piles in the prior art without a construction platform has problems such as low measurement efficiency, high safety risks, inability to meet construction requirements and short operating time.

Method used

Using magnetic mini laser scanner and GNSS RTK technology, three-dimensional laser scanning is carried out on traffic boats by installing measurement marking devices and laser scanners to obtain three-dimensional point cloud data of steel pipe piles, and perform spatial coordinate conversion and data splicing, and calculate The center coordinates, radius and angles between the inclined surface and the horizontal surface of the steel pipe pile top.

Benefits of technology

The measurement accuracy is achieved within 5mm and the plane and elevation accuracy is reached 3cm, which shortens the measurement time, improves the working efficiency, and ensures measurement safety in complex sea environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958386A_ABST
    Figure CN118958386A_ABST
Patent Text Reader

Abstract

The invention discloses a method for measuring a far-shore finished steel pipe pile without a construction platform, which utilizes three-dimensional laser scanning and GNSS RTK (Global Navigation Satellite System Real-Time Kinematic) measurement technology, and uses a magnetic type mini laser scanner operation support rod and a measurement identification device to carry out completion measurement on the spatial attitude of a top opening of the finished steel pipe pile. By the adoption of the technical scheme, the inner coincidence precision reaches 5 mm, the outer coincidence precision is based on the RTK measurement technology, the overall plane and elevation precision reaches 3 cm, and the design requirement for the sinking precision of the engineering steel pipe pile is met; the measurement field operation time is short, the scanning operation of each station of a field laser scanner only needs 20 seconds, the total indoor and outdoor operation time is about 30 minutes, and the operation efficiency is far higher than that of a conventional measurement means; meanwhile, compared with a conventional measurement means, the three-dimensional laser scanning technology is free of manual contact, the three-dimensional coordinates of the measurement points can be obtained, and the measurement work safety is greatly guaranteed in the complex sea area environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of measurement technology in bridge engineering, and more specifically, to a method for measuring a far-shore finished steel pipe pile without a construction platform. Background Art

[0002] After the steel pipe piles are sunk, the completion status of the cross-sea bridge needs to be measured. However, since the construction area is far away from the embankment, there is no construction platform in the construction area and it is in a pure water working environment. The existing technology can use the following measurement methods:

[0003] 1. Using GNSS RTK measurement technology (i.e. global navigation satellite system real-time kinematic positioning technology) to directly measure the finished product, a crane ship is required to work with the hanging basket, which results in low measurement efficiency and high safety risks in the measurement operation;

[0004] 2. The measurement technology using drone photography is greatly affected by the wind and waves at sea, the drone operation stability is low, the drone safety cannot be guaranteed, and the operation time is long. The results of on-site drone photography measurement technology experiments show that its measurement accuracy cannot meet the construction requirements; at the same time, affected by the rise and fall of the tide, the position of the pile top is below the normal water level, and the pile top can only be exposed above the water surface at low tide, and the effective measurement operation time throughout the day is short.

[0005] Using keywords such as "offshore; pile; measurement" to test existing public technical literature, the following results were obtained:

[0006] 1. Chinese patent document: "Measurement device and method for the contact state between the inner wall of steel pipe piles and the core-filled concrete in offshore wind farms", patent (application) number: 201610940418.X; the technical solution recorded is:

[0007] "A measuring device for the contact state between the inner wall of a steel pipe pile and the core-filled concrete in an offshore wind farm. The bottom of the steel pipe pile is sunk to fresh rock. After the steel pipe pile is sunk, a core-filled concrete steel cage is built in. A uniform spacing is left between the steel cage and the inner wall of the steel pipe pile to form a protective layer. The measuring device includes a casing, which is fixed to the steel cage. The end of the casing is connected to a pressure transmission plate. One end face of the pressure transmission plate faces the inner wall of the steel pipe pile, and the other end face is provided with a raised connection portion. A pressure sensor is provided in the connection portion. The connection portion is located inside the casing";

[0008] The technical effects recorded are:

[0009] "The above-mentioned measuring device measures the contact state between the steel pipe pile and the core-fill concrete, thereby monitoring the contact state between the steel pipe pile and the core-fill concrete. The measuring device has a simple structure and is easy to install and adjust. By setting a casing, the pressure sensor is prevented from being affected during the pouring construction, thereby ensuring the accuracy of the numerical value."

[0010] 2. Chinese patent document: "Instrument bracket for positioning offshore pile stabilization platform and observing the verticality of steel pipe piles", patent (application) number: 202021956151.1; the technical solution recorded is:

[0011] "An instrument bracket for positioning offshore pile stabilization platforms and observing the verticality of steel pipe piles, including an observation instrument for measuring the verticality of steel pipe piles and a measuring instrument for positioning pile stabilization platforms. The observation instrument conducts verticality observation of a single pile, saves time in setting up a tripod, and can achieve rapid leveling";

[0012] The technical effects recorded are:

[0013] "It has the advantages of convenient and fast construction, easy installation, high efficiency, reducing the workload of surveying personnel, and ensuring the stability of the instrument. The principle of the observation instrument is that the steel pipe bracket replaces the tripod, and the chassis and fixing bolts are used to place the total station. The fixed rail of the measuring instrument extends to the center of the steel pipe pile fixed by the pile holder, and the position of the measuring instrument is controlled by controlling the center position of the steel pipe pile; the measuring instrument can complete the instrument installation quickly and quickly lock the center position of the steel pipe pile, eliminating the traditional reliance on steel trestles to fix the instrument for positioning, saving manpower and time, high efficiency, and ensuring operation safety."

[0014] However, the technical solutions recorded in the above-mentioned public technical documents have not been able to solve the problems and defects existing in the prior art of platform-free offshore pipe pile measurement, such as "low measurement efficiency, high safety risks in measurement operations, measurement accuracy unable to meet construction requirements, short measurement operation time and low efficiency". Summary of the invention

[0015] The invention provides a method for measuring far-shore finished steel pipe piles without a construction platform, the purpose of which is to ensure measurement accuracy and improve measurement efficiency.

[0016] In order to achieve the above object, the technical solution adopted by the present invention is: the measurement method of the far-shore finished steel pipe pile without a construction platform comprises the following steps:

[0017] Step 1: Select a first steel pipe pile that has been sunk at one end of the side of the transportation ship berthing area, and install a first measurement mark magnetic base of a first measurement mark device of a magnetic mini laser scanner on the top side thereof;

[0018] Step 2: Obtain the center coordinates of the top surface of the first magnetic base; install a first measurement identification device on the first magnetic base;

[0019] Step 3: Select the second steel pipe pile that has been sunk at the other end of the same side of the transportation ship berthing area, and repeat steps 1 and 2, that is, install the second measurement identification magnetic base of the second measurement identification device of the magnetic mini laser scanner on the top side thereof; obtain the center coordinates of the top surface of the second magnetic base; and install the second measurement identification device on the second magnetic base;

[0020] Step 4: Select a sunken steel pipe pile in the middle of the same side of the transportation ship berthing area as the first station of the scanner, install the scanner magnetic base on the top side of the steel pipe pile, and install the mini laser scanner; perform measurement and data collection;

[0021] Step 5: After completing the scanning and measuring operation on this side, remove all the measuring devices; then repeat steps 1, 2, 3 and 4 on the other side of the transportation ship berthing area to obtain the third measurement mark, the fourth measurement mark and the second station measurement data collection of the scanner;

[0022] Step 6: Intelligently splice the collected data to generate a three-dimensional point cloud of the steel pipe pile group in a relatively independent spatial coordinate system;

[0023] Step 7: Perform spatial coordinate conversion to obtain a three-dimensional point cloud of the steel pipe pile in the construction space coordinate system;

[0024] Step 8, measuring the 3D spatial coordinates of the circumference of the top of the steel pipe pile on the 3D point cloud of the steel pipe pile;

[0025] Step 9: Calculate the spatial coordinates of the center of the top of the steel pipe pile, the radius, and the angle between the top slope and the horizontal plane; the distance from each point to the center of the circle and the difference between the distance and the fitting radius can also be obtained, reflecting the spatial posture of the top of the finished steel pipe pile after the construction is completed.

[0026] In the step 1, the base on the first measurement mark magnetic base is leveled using an adjustment screw.

[0027] In the step 2, the GNSS receiver is installed through the connecting screws on the base of the first measurement mark magnetic base, and the three-dimensional coordinates of the center position of the top surface of the base are obtained using RTK technology. After the coordinate measurement is completed, the GNSS receiver is removed and the first measurement mark device is installed; the adjustment screw is kept stationary during the disassembly and assembly process to keep the base level; at the same time, the cross mark pattern of the first measurement mark device is adjusted to face upward and be roughly horizontal, and then slightly toward the mini laser scanner stand position.

[0028] In the step 3, the second measurement identification device is installed on the base of the magnetic base. Same as step 2, the three-dimensional coordinates of the center position of the top surface of the base are obtained, and then the second measurement identification device is installed, and the direction of the second measurement identification device is adjusted.

[0029] In the step 4, the base of the scanner magnetic base is roughly leveled using the adjustment screw, the mini laser scanner is installed on the magnetic mini laser scanner work support rod scanner joint and turned on; the work support rod is adjusted to a suitable height, and then the bottom of the work support rod is installed on the base of the installed scanner magnetic base, and then the mobile phone APP is used to remotely control the mini laser scanner for measurement operations, which can complete digital point cloud scanning of the surface of visible structures within a radius of 0.5m to 45m around the scanner.

[0030] After the measurement work and field data collection work in step 5 are completed, all measurement devices are dismantled and stored.

[0031] In the step 6, random intelligent splicing processing software is used to import, intelligently splice and quality check the point cloud data obtained in the field. The two measuring stations can respectively scan the first measurement identification device, the second measurement identification device, the third measurement identification device and the fourth measurement identification device; the scanned point cloud data of the two measuring stations can be intelligently spliced ​​to generate a three-dimensional point cloud of the steel pipe pile group in a relatively independent spatial coordinate system.

[0032] In the step 7, the cross identification centers of the four measuring identification devices are found in the three-dimensional point cloud of the steel pipe pile group and the puncture points are marked and numbered, and then the three-dimensional coordinates of the cross identification centers of the identification plates of the four measuring identification devices collected in the field are imported; after software matching, the spatial coordinate conversion is performed to obtain the three-dimensional point cloud in the construction space coordinate system.

[0033] In the step 8, 6 points are evenly measured for subsequent spatial circular fitting of the top slope and inclination angle calculation; as needed, the three-dimensional coordinates of no less than 3 points are measured at the top of the steel pipe pile for fitting calculation.

[0034] In the step 9, excel is used to prepare a "calculation table of the center, radius and angle with the horizontal plane of the six points in the circular space on the inclined plane", and the six points measured in step 8 are input in the corresponding area under the "measurement coordinate system" in sequence. The calculation table can obtain the spatial coordinates of the center of the top of the steel pipe pile, the radius and the angle between the top inclined plane and the horizontal plane, and can also obtain the distance from each point to the center of the circle and the difference with the fitted radius, reflecting the spatial posture of the top of the finished steel pipe pile after the injection is completed.

[0035] The present invention adopts the above-mentioned technical scheme, and its internal conformity accuracy reaches 5mm, and the external conformity accuracy is based on RTK measurement technology. The overall plane and elevation accuracy reaches 3cm, which meets the design requirements of engineering steel pipe pile sinking accuracy; and the field measurement operation time is short, the field laser scanner only takes 20 seconds to scan each station, and the total time for indoor and outdoor work is about 30 minutes, and the operation efficiency is much higher than conventional measurement methods; at the same time, compared with conventional measurement methods, three-dimensional laser scanning technology can obtain the three-dimensional coordinates of the measuring points without manual contact, which greatly ensures the safety of measurement work in complex sea environments. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 is a schematic diagram of installing a first measurement identification device;

[0037] Figure 2 It is a schematic diagram of RTK coordinate acquisition of the measurement identification device;

[0038] Figure 3 It is a schematic diagram of the installation of the measuring identification device;

[0039] Figure 4 is a schematic diagram of installing a second measurement identification device;

[0040] Figure 5 It is a schematic diagram of the mini 3D laser scanner installed at measuring station 1;

[0041] Figure 6 This is a schematic diagram of the operation of the mini 3D laser scanner;

[0042] Figure 7 This is a schematic diagram of the mini 3D laser scanner installed at Station 2;

[0043] Figure 8 It is a schematic diagram of intelligent splicing of three-dimensional point cloud of steel pipe pile group;

[0044] Fig. 9 It is a schematic diagram of the central punctum of the cross logo;

[0045] Fig.10 It is a schematic diagram of the cross mark center point matching and space coordinate transformation;

[0046] Fig.11 It is a schematic diagram for measuring the six-point spatial coordinates of the top of the steel pipe pile;

[0047] Fig.12 It is a schematic diagram of the arrangement of all measurement identification devices and three-dimensional laser scanners of the present invention.

[0048] in, Figure 8 to Figure 11 is a screenshot. DETAILED DESCRIPTION

[0049] The specific implementation modes of the present invention are further explained in detail below by describing the embodiments with reference to the accompanying drawings, so as to help those skilled in the art to have a more complete, accurate and in-depth understanding of the inventive concept and technical solution of the present invention.

[0050] like Figures 1 to 12 As shown, the present invention is a method for measuring finished steel pipe piles on the far shore without a construction platform, which is a three-dimensional laser scanning measurement method, mainly including the measurement of the spatial coordinates of the center of the top of the finished steel pipe pile, the radius and the angle with the horizontal plane. The present invention solves the problem of the completion measurement of finished steel pipe piles on the far shore without a construction platform, and uses a magnetic mini laser scanner working support rod and a measurement identification device to perform completion measurement of the spatial posture of the top of the finished steel pipe pile.

[0051] In order to solve the problems existing in the prior art and overcome its defects, and to achieve the invention purpose of ensuring measurement accuracy and improving measurement efficiency, the technical solution adopted by the present invention is:

[0052] like Figures 1 to 12 As shown, the method for measuring the far-shore finished steel pipe pile without a construction platform comprises the following steps:

[0053] Step 1, such as Figure 1 As shown:

[0054] A first steel pipe pile that has been sunk is selected at one end of one side of the transportation ship berthing area, and a first measurement mark magnetic base of a first measurement mark device of a magnetic mini laser scanner is installed on the top side thereof.

[0055] In the step 1, the base on the first measurement mark magnetic base is leveled using an adjustment screw.

[0056] Use a transport boat to dock at one side of the target area (i.e., docking position one), select a steel pipe pile at one end of docking position one, install the first measurement and identification device 1 magnetic base of the magnetic mini laser scanner on the side of the top of the steel pipe pile, and use the adjustment screw to level the base on the magnetic base.

[0057] Step 2, such as Figure 2 , Figure 3 As shown:

[0058] Obtain the center coordinates of the top surface of the first magnetic base; install a first measurement identification device on the first magnetic base;

[0059] Figure 2 It is a schematic diagram of RTK coordinate acquisition of the measurement identification device; Figure 3 This is the installation diagram of the measuring identification device

[0060] In the step 2, the GNSS receiver is installed through the connecting screws on the base of the first measurement mark magnetic base, and the three-dimensional coordinates (X1, Y1, H1) of the center position of the top surface of the base are obtained by using RTK technology. After the coordinate measurement is completed, the GNSS receiver is removed, and then the first measurement mark device is installed (the height from the center of the cross mark to the bottom is b); the adjustment screw is kept stationary during the disassembly and assembly process to keep the base horizontal; then the three-dimensional coordinates of the center of the cross mark on the identification plate of the first measurement mark device are (X1, Y1, H1+b). At the same time, the cross mark pattern of the first measurement mark device is adjusted to face upward and be roughly horizontal, and then slightly toward the mini laser scanner stand position.

[0061] Step 3, such as Figure 4 As shown:

[0062] Select the second steel pipe pile that has been sunk at the other end of the same side of the transportation ship berthing area, and repeat steps 1 and 2, namely: install the second measurement identification magnetic base of the second measurement identification device of the magnetic mini laser scanner on the top side thereof; obtain the center coordinates of the top surface of the second magnetic base; and install the second measurement identification device on the second magnetic base; Figure 4 Schematic diagram of installing the second measurement identification device.

[0063] In step 3, the second measurement identification device is installed on the base of the magnetic base. Similar to step 2, the three-dimensional coordinates of the center position of the top surface of the base are obtained, and then the second measurement identification device is installed and the direction of the second measurement identification device is adjusted.

[0064] A second measuring and marking device of a magnetic mini laser scanner is installed on the side of the top of the second steel pipe pile and the direction of the device is adjusted; the three-dimensional coordinates of the center of the cross mark on the top surface of the second measuring and marking device are (X2, Y2, H2+b).

[0065] Step 4, such as Figure 5 , Figure 6 As shown:

[0066] At the first docking position, a steel pipe pile in the middle is selected as the first working position of the scanner, and a magnetic base is installed on the side of the top of the steel pipe pile.

[0067] Select a sunken steel pipe pile in the middle of the same side of the transportation ship berthing area as the first operation position of the scanner, install the scanner magnetic base on the top side of the steel pipe pile, and install the mini laser scanner to perform measurement operations and data collection; Figure 5 It is a schematic diagram of the mini 3D laser scanner installed at measuring station 1; Figure 6 This is a schematic diagram of the operation of the mini 3D laser scanner.

[0068] In step 4, use the adjustment screw to roughly level the base of the scanner magnetic base, install the mini laser scanner (Leica BLK360) on the scanner joint of the magnetic mini laser scanner work support rod and turn on the machine; adjust the work support rod to a suitable height, and then install the bottom of the work support rod on the base of the installed scanner magnetic base, and then use the mobile phone APP (Leica BLK Live) to remotely control the mini laser scanner for measurement;

[0069] The scanning time of one measuring station is about 20 seconds. There is no need for precise leveling and station orientation in the field, and the operation is fast and efficient. It can complete digital point cloud scanning of the surface of visible structures within a radius of 0.5m to 45m around the scanner.

[0070] Step 5, such as Figure 7 As shown:

[0071] After completing the scanning and measuring operation on this side, remove all the measuring devices; then repeat steps 1, 2, 3 and 4 on the other side of the transportation ship berthing area to obtain the third measurement mark, the fourth measurement mark and the second station measurement data collection of the scanner;

[0072] Figure 7 This is a schematic diagram of the mini 3D laser scanner installed at Station 2.

[0073] After completing the scanning and measuring operation at docking position one, remove all measuring devices, then dock the transport ship at the other side of the target area (docking position two), repeat steps one, two, three, and four, and place magnetic mini laser scanner measuring identification devices 3 and 4 on the sides of the tops of the two steel pipe piles at both ends of docking position two, and collect the three-dimensional coordinates of the center of the cross identification of the identification plates of the measuring identification devices 3 and 4, which are (X3, Y3, H3+b) and (X4, Y4, H4+b), respectively. Place the mini laser scanner on the side of the top of a steel pipe pile in the middle of docking position two using the magnetic mini laser scanner operation support rod device to complete the three-dimensional laser scanning operation at the second station. At this point, the field data collection work is completed, and all measuring devices are removed for storage.

[0074] Step 6, such as Figure 8 As shown:

[0075] Intelligently splice the collected data to generate a three-dimensional point cloud of steel pipe pile groups in a relatively independent spatial coordinate system; Figure 8 Schematic diagram of intelligent splicing of three-dimensional point cloud of steel pipe pile groups.

[0076] In the step 6, the point cloud data obtained in the field are imported, intelligently spliced, and quality checked using random intelligent splicing processing software (Leica Cyclone Register360). The two survey stations can respectively scan the first measurement identification device, the second measurement identification device, the third measurement identification device, and the fourth measurement identification device; the scanned point cloud data of the two survey stations can be intelligently spliced ​​to generate a three-dimensional point cloud of the steel pipe pile group in a relatively independent spatial coordinate system.

[0077] Step 7, such as Fig. 9 and Fig.10 As shown:

[0078] Perform spatial coordinate conversion to obtain the three-dimensional point cloud of the steel pipe pile in the construction space coordinate system; Fig. 9 It is a schematic diagram of the central punctum of the cross logo; Fig.10 It is a schematic diagram of the cross mark center point matching and space coordinate transformation.

[0079] In the step 7, the cross identification centers of the four measuring identification devices are found in the three-dimensional point cloud of the steel pipe pile group and the puncture points are marked and numbered, and then the three-dimensional coordinates (Xi, Yi, Hi+b) (i=1, 2, 3, 4) of the cross identification centers of the identification plates of the four measuring identification devices collected in the field are imported; the spatial coordinate conversion is performed after software matching; at least three measuring identification center points are required, and the three-dimensional coordinates of four measuring identification center points are collected on site; the three-dimensional point cloud in the construction space coordinate system can be obtained.

[0080] Step 8, such as Fig.11 As shown:

[0081] Measure the 3D spatial coordinates of the circumference of the top of the steel pipe pile on the 3D point cloud of the steel pipe pile; Fig.11 It is a schematic diagram for measuring the six-point spatial coordinates of the top of the steel pipe pile.

[0082] In step 8, 6 points are evenly measured for subsequent top slope spatial circular fitting and inclination angle calculation; as needed, the three-dimensional coordinates of no less than 3 points can be measured at the top of the steel pipe pile for fitting calculation, and 6 points are taken here.

[0083] Step 9, as shown in Table 1 below:

[0084] The spatial coordinates of the center of the top of the steel pipe pile, the radius and the angle between the top slope and the horizontal plane are calculated; the distance from each point to the center of the circle and the difference with the fitting radius can also be obtained, reflecting the spatial posture of the top of the finished steel pipe pile after construction is completed.

[0085] In the step 9, excel is used to prepare a "calculation table of the center, radius and angle with the horizontal plane of the six points in the circular space on the inclined plane", and the six points x (north coordinate), y (east coordinate), and H (elevation) measured in step 8 are entered in the corresponding areas under the "measurement coordinate system" in sequence. The calculation table can obtain the spatial coordinates of the center of the top of the steel pipe pile, the radius and the angle between the top inclined plane and the horizontal plane, and can also obtain the distance from each point to the center of the circle and the difference with the fitted radius, reflecting the spatial posture of the top of the finished steel pipe pile after the injection is completed.

[0086] Table 1: Calculation table of spatial posture of the top of finished steel pipe pile

[0087]

[0088] Remark:

[0089] Points 1 to 6 on the top circle should be arranged clockwise (or counterclockwise), and the matrix calculation formula should be copied and dragged as a whole in 6 rows.

[0090] In summary, the technical effects and technical progress achieved by the present invention using the above technical solution are as follows:

[0091] The present invention uses a three-dimensional laser scanning measurement method for finished steel pipe piles on the far shore without a construction platform. The internal accuracy reaches 5mm, and the external accuracy is based on RTK measurement technology. The overall plane and elevation accuracy reaches 3cm, which meets the design requirements for the steel pipe pile sinking accuracy of this project; and the field measurement operation time is short. The field laser scanner only takes 20 seconds to scan each station, and the total time for indoor and outdoor work is about 30 minutes. The operation efficiency is much higher than that of conventional measurement methods; at the same time, compared with conventional measurement methods, the three-dimensional laser scanning technology can obtain the three-dimensional coordinates of the measuring points without manual contact, which greatly ensures the safety of the measurement work in complex sea environments.

[0092] The present invention is described above by way of example in conjunction with the accompanying drawings. It is obvious that the specific implementation of the present invention is not limited to the above-mentioned method. As long as various non-substantial improvements are made using the method concept and technical solution of the present invention, or the concept and technical solution of the present invention are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.

Claims

1. A method for measuring finished steel pipe piles on the far shore without a construction platform, characterized in that: The measuring method comprises the following steps: Step 1: Select a first steel pipe pile that has been sunk at one end of the side of the transportation ship berthing area, and install a first measurement mark magnetic base of a first measurement mark device of a magnetic mini laser scanner on the top side thereof; Step 2: Obtain the center coordinates of the top surface of the first magnetic base; install a first measurement identification device on the first magnetic base; Step 3: Select the second steel pipe pile that has been sunk at the other end of the same side of the transportation ship berthing area, and repeat steps 1 and 2, that is, install the second measurement identification magnetic base of the second measurement identification device of the magnetic mini laser scanner on the top side thereof; obtain the center coordinates of the top surface of the second magnetic base; and install the second measurement identification device on the second magnetic base; Step 4: Select a sunken steel pipe pile in the middle of the same side of the transportation ship berthing area as the first station of the scanner, install the scanner magnetic base on the top side of the steel pipe pile, and install the mini laser scanner; perform measurement and data collection; Step 5: After completing the scanning and measuring operation on this side, remove all the measuring devices; then repeat steps 1, 2, 3 and 4 on the other side of the transportation ship berthing area to obtain the third measurement mark, the fourth measurement mark and the second station measurement data collection of the scanner; Step 6: Intelligently splice the collected data to generate a three-dimensional point cloud of the steel pipe pile group in a relatively independent spatial coordinate system; Step 7: Perform spatial coordinate conversion to obtain a three-dimensional point cloud of the steel pipe pile in the construction space coordinate system; Step 8, measuring the 3D spatial coordinates of the circumference of the top of the steel pipe pile on the 3D point cloud of the steel pipe pile; Step 9: Calculate the spatial coordinates of the center of the top of the steel pipe pile, the radius, and the angle between the top slope and the horizontal plane; the distance from each point to the center of the circle and the difference between the distance and the fitting radius can also be obtained, reflecting the spatial posture of the top of the finished steel pipe pile after the construction is completed.

2. The method for measuring far-shore finished steel pipe piles without a construction platform according to claim 1, characterized in that: In the step 1, the base on the first measurement mark magnetic base is leveled using an adjustment screw.

3. The method for measuring far-shore finished steel pipe piles without a construction platform according to claim 1, characterized in that: In the step 2, the GNSS receiver is installed through the connecting screws on the base of the first measurement mark magnetic base, and the three-dimensional coordinates of the center position of the top surface of the base are obtained using RTK technology; after the coordinate measurement is completed, the GNSS receiver is removed, and then the first measurement mark device is installed; during the disassembly and assembly process, the adjustment screw is kept stationary to keep the base level; at the same time, the cross mark pattern of the first measurement mark device is adjusted to face upward and be roughly horizontal, and then slightly toward the mini laser scanner stand position.

4. The method for measuring far-shore finished steel pipe piles without a construction platform according to claim 1, characterized in that: In step 3, the second measurement identification device is installed on the base of the magnetic base. Similar to step 2, the three-dimensional coordinates of the center position of the top surface of the base are obtained, and then the second measurement identification device is installed and the direction of the second measurement identification device is adjusted.

5. The method for measuring far-shore finished steel pipe piles without a construction platform according to claim 1, characterized in that: In the step 4, the base of the scanner magnetic base is roughly leveled using the adjustment screw, the mini laser scanner is installed on the magnetic mini laser scanner work support rod scanner joint and turned on; the work support rod is adjusted to a suitable height, and then the bottom of the work support rod is installed on the base of the installed scanner magnetic base, and then the mobile phone APP is used to remotely control the mini laser scanner for measurement operations, which can complete digital point cloud scanning of the surface of visible structures within a radius of 0.5m to 45m around the scanner.

6. The method for measuring far-shore finished steel pipe piles without a construction platform according to claim 1, characterized in that: After the measurement work and field data collection work in step 5 are completed, all measurement devices are dismantled and stored.

7. The method for measuring far-shore finished steel pipe piles without a construction platform according to claim 1, characterized in that: In the step 6, random intelligent splicing processing software is used to import, intelligently splice and quality check the point cloud data obtained in the field. The two measuring stations can respectively scan the first measurement identification device, the second measurement identification device, the third measurement identification device and the fourth measurement identification device; the scanned point cloud data of the two measuring stations can be intelligently spliced ​​to generate a three-dimensional point cloud of the steel pipe pile group in a relatively independent spatial coordinate system.

8. The method for measuring far-shore finished steel pipe piles without a construction platform according to claim 1, characterized in that: In the step 7, the cross identification centers of the four measuring identification devices are found in the three-dimensional point cloud of the steel pipe pile group and the puncture points are marked and numbered, and then the three-dimensional coordinates of the cross identification centers of the identification plates of the four measuring identification devices collected in the field are imported; after software matching, the spatial coordinate conversion is performed to obtain the three-dimensional point cloud in the construction space coordinate system.

9. The method for measuring far-shore finished steel pipe piles without a construction platform according to claim 1, characterized in that: In the step 8, 6 points are evenly measured for subsequent spatial circular fitting of the top slope and inclination angle calculation; as needed, the three-dimensional coordinates of no less than 3 points are measured at the top of the steel pipe pile for fitting calculation.

10. The method for measuring far-shore finished steel pipe piles without a construction platform according to claim 1, characterized in that: In the step 9, excel is used to prepare a "calculation table of the center, radius and angle with the horizontal plane of six points in the circular space on the inclined plane", and the six points measured in step 8 are input in the corresponding area under the "measurement coordinate system" in sequence. The calculation table can obtain the spatial coordinates of the center of the top of the steel pipe pile, the radius and the angle between the top inclined plane and the horizontal plane, and can also obtain the distance from each point to the center of the circle and the difference with the fitting radius, reflecting the spatial posture of the top of the finished steel pipe pile after the injection is completed.