Calibration method of construction guiding system, construction guiding system and excavator

Through a simplified calibration method, the parameters are measured using GNSS antennas and inclination sensors, the accuracy and efficiency of the excavator construction guidance system are improved, and the problems of complex calibration and low accuracy in the prior art are solved, and are suitable for a variety of engineering vehicles.

CN118958424APending Publication Date: 2024-11-15SHANGHAI HUACE NAVIGATION TECH +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411026497.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing construction guidance system is complex in calibration and low in efficiency, resulting in low construction accuracy. Especially in excavator operation, it is easy to rework depending on the operating level of the operator.

Method used

The construction guidance system including GNSS antenna and inclination sensor is adopted. By measuring the installation parameters of the GNSS antenna and inclination sensor, the distance parameters of the robotic arm and the bucket, the calibration process is simplified, error accumulation is reduced, and coordinate calculation accuracy is improved.

Benefits of technology

It realizes efficient calibration of the construction guidance system, improves construction accuracy and efficiency, and reduces implementation costs. It is suitable for various engineering vehicles, especially excavators with smaller body sizes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958424A_ABST
    Figure CN118958424A_ABST
Patent Text Reader

Abstract

The invention provides a construction guiding system calibration method, a construction guiding system and an excavator, the construction guiding system is installed on the excavator, and the construction guiding system comprises a GNSS antenna, a tilt angle sensor and a processing device; a first sensor in the tilt angle sensor is mounted at the position of the excavator bucket, a second sensor in the tilt angle sensor is mounted on the small arm, and the GNSS antenna is mounted on an adjacent arm section of the small arm; the processing equipment is used for calculating coordinates of a bucket tip according to GNSS measurement data acquired by the GNSS antenna, angle data acquired by the tilt angle sensor, mounting parameters of the GNSS antenna, mounting parameters of the tilt angle sensor and distance parameters of a mechanical arm and an excavator bucket of the excavator, and outputting construction guide information based on the coordinates of the bucket tip; the calibration method comprises the steps that installation parameters of the GNSS antenna, installation parameters of the tilt angle sensor and distance parameters of the mechanical arm and the excavator bucket are measured and stored in the processing equipment. The method is simple in calibration process and high in calibration efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering machinery, and in particular to a calibration method of a construction guidance system, a construction guidance system and an excavator. Background Art

[0002] As an important earth-moving machine, excavators play an irreplaceable role in modern engineering construction. When using excavators to excavate and backfill, level the terrain, dig or pile up, it is necessary to accurately determine the location, depth and shape of the foundation pit. Otherwise, it depends on the professional level of the excavator operator, and unskilled operators are prone to rework. Therefore, construction guidance systems have appeared on the market to prompt operators.

[0003] After the construction guidance system is installed, it needs to be calibrated, that is, to measure some necessary parameters required for the operation of the system. However, the current construction guidance system is relatively complicated to calibrate and the calibration efficiency is low. Summary of the invention

[0004] The purpose of the embodiments of the present application is to provide an engineering vehicle construction guidance system and an engineering vehicle to improve the above-mentioned technical problems.

[0005] To achieve the above objectives, this application provides the following technical solutions:

[0006] In a first aspect, an embodiment of the present application provides a calibration method for a construction guidance system, wherein the construction guidance system is installed on an excavator, and the construction guidance system includes: a GNSS antenna, a tilt sensor, and a processing device; a first sensor of the tilt sensor is installed at the bucket of the excavator, a second sensor of the tilt sensor is installed on the forearm of the excavator, and the GNSS antenna is installed on an adjacent arm section of the forearm; the processing device is used to calculate the coordinates of the bucket tip according to the GNSS measurement data collected by the GNSS antenna, the angle data collected by the tilt sensor, the installation parameters of the GNSS antenna, the installation parameters of the tilt sensor, and the distance parameters between the mechanical arm of the excavator and the bucket, and output construction guidance information based on the coordinates of the bucket tip; the calibration method includes: measuring the installation parameters of the GNSS antenna and saving them in the processing device; measuring the installation parameters of the tilt sensor and saving them in the processing device; measuring the distance parameters between the mechanical arm and the bucket and saving them in the processing device.

[0007] The construction guidance system in the above method has the following advantages: first, the system includes fewer components, especially only two inclination sensors are needed to work normally, the installation is simple, and the implementation cost is low; second, the GNSS antenna and the inclination sensor are both installed on the mechanical arm of the excavator, which is close to the bucket, which is conducive to shortening the calculation path when calculating the bucket tip coordinates, reducing error accumulation, and improving the coordinate calculation accuracy, thereby improving the accuracy of construction guidance; third, during the operation of the excavator, it is mainly the forearm that moves, and the arm section adjacent to the forearm has a relatively small movement amplitude and a higher position. Therefore, installing the GNSS antenna on the arm section adjacent to the forearm is conducive to the antenna to search and receive satellite data more stably, thereby improving the calculation accuracy of the bucket tip coordinates; fourth, some engineering vehicles have a small body size and there is not enough space to install the GNSS antenna. The above system installs the GNSS antenna on the mechanical arm, which makes the system have a wider range of applications.

[0008] The above method is used to calibrate the above construction guidance system. Since the number of inclination sensors used in the system is small, the installation parameters of the inclination sensors that need to be calibrated are also small, which is conducive to improving the calibration efficiency. In addition, the method only needs to measure three types of parameters: the installation parameters of the GNSS antenna, the installation parameters of the inclination sensor, and the distance parameters of the mechanical arm and the bucket. The calibration process is relatively simple, which is also conducive to improving the calibration efficiency.

[0009] In an implementation of the first aspect, the GNSS antenna includes a main antenna and a secondary antenna, the installation position of the main antenna is closer to a first rotating shaft than the installation position of the secondary antenna, the first rotating shaft is the rotating shaft between the forearm and adjacent arm sections of the forearm, and measuring the installation parameters of the GNSS antenna includes: using a ranging device to measure the distance between the phase center of the main antenna and the first rotating shaft.

[0010] In an implementation manner of the first aspect, the GNSS antenna includes a main antenna and a sub-antenna, and measuring the installation parameters of the GNSS antenna includes: measuring an arm section width d1 at an installation position of the main antenna and measuring an arm section width d2 at an installation position of the sub-antenna using a ranging device; measuring a distance L1 between a phase center of the main antenna and a phase center of the sub-antenna using a ranging device; and calculating a heading installation angle of the GNSS antenna using a formula arcsin(|d1-d2| / L1).

[0011] In an implementation of the first aspect, the GNSS antenna includes a main antenna and a secondary antenna, and brackets are provided at the lower parts of the main antenna and the secondary antenna. The installation position of the main antenna is closer to a first rotating shaft than the installation position of the secondary antenna. The first rotating shaft is a rotating shaft between the forearm and adjacent arm sections of the forearm. Measuring the installation parameters of the GNSS antenna includes: controlling the excavator to rotate the adjacent arm sections of the forearm until a horizontal measuring tool is used to determine that a line connecting a lower edge of the bracket of the main antenna and the first rotating shaft is horizontal, and calculating the pitch installation angle of the GNSS antenna according to the GNSS measurement data.

[0012] In an implementation of the first aspect, a first rotating shaft is arranged between the forearm and adjacent arm sections of the forearm, and a second rotating shaft is arranged between the forearm and the bucket, and the measuring of the installation parameters of the inclination sensor includes: controlling the excavator to rotate the forearm until a vertical measuring tool is used to determine that a line connecting the first rotating shaft and the second rotating shaft is perpendicular to the horizontal ground, and then calculating the difference between 90° and the angle data collected by the second sensor to obtain the pitch installation angle of the second sensor.

[0013] In an implementation of the first aspect, the first sensor is installed on a first connecting rod between the end of the hydraulic drive rod of the forearm and the forearm, a third rotating shaft is arranged between one end of the first connecting rod and the forearm, and a fourth rotating shaft is arranged between the other end of the first connecting rod and the end of the hydraulic drive rod, and the measurement of the installation parameters of the inclination sensor includes: controlling the excavator to rotate the forearm until the line between the third rotating shaft and the fourth rotating shaft is determined to be horizontal by using a horizontal measuring tool, and obtaining the angle data collected by the first sensor as the pitch installation angle of the first sensor.

[0014] In an implementation of the first aspect, a first rotating shaft is arranged between the forearm and adjacent arm sections of the forearm, and measuring the installation parameters of the inclination sensor includes: controlling the excavator to rotate the forearm until the coordinate system of the first sensor and the coordinate system of the second sensor are aligned to the target coordinate system; wherein the target coordinate system is a coordinate system established with the first rotating shaft as the origin and the axial direction of the first rotating shaft as a coordinate axis direction; and calculating the relative installation angle between the first sensor and the second sensor in the target coordinate system based on the angle data collected by the first sensor and the second sensor.

[0015] In an implementation of the first aspect, the measuring of the installation parameters of the inclination sensor includes: controlling the excavator to make the bottom surface of the bucket close to the horizontal ground, obtaining the angle data collected by the first sensor at this time as the reading reference value of the first sensor, and obtaining the angle data collected by the second sensor at this time as the reading reference value of the second sensor.

[0016] In an implementation of the first aspect, a first rotating shaft is arranged between the forearm and adjacent arm sections of the forearm, a second rotating shaft is arranged between the forearm and the bucket, the first sensor is installed on a first connecting rod between the end of a hydraulic drive rod of the forearm and the forearm, a third rotating shaft is arranged between one end of the first connecting rod and the forearm, a fourth rotating shaft is arranged between the other end of the first connecting rod and the end of the hydraulic drive rod, a second connecting rod is arranged between the end of the hydraulic drive rod of the forearm and the bucket, and one end of the second connecting rod is connected to the end of the hydraulic drive rod via the fourth rotating shaft. The first end of the second connecting rod is connected to the bucket, and a fifth rotating shaft is arranged between the other end of the second connecting rod and the bucket; the distance parameters of the mechanical arm are measured, including: using a distance measuring device to measure the distance between the first rotating shaft and the second rotating shaft; using a distance measuring device to measure the distance between the second rotating shaft and the third rotating shaft; using a distance measuring device to measure the distance between the third rotating shaft and the fourth rotating shaft; using a distance measuring device to measure the distance between the fourth rotating shaft and the fifth rotating shaft; using a distance measuring device to measure the distance between the fifth rotating shaft and the first rotating shaft; using a distance measuring device to measure the distance between the fifth rotating shaft and the third rotating shaft.

[0017] In an implementation of the first aspect, a second rotating shaft is provided between the forearm and the bucket, and measuring the distance parameters of the mechanical arm includes: measuring the distance between the second rotating shaft and the bucket tip by using a distance measuring device; and measuring the width of the bucket tip by using a distance measuring device.

[0018] In the above implementations, the calibration of the construction guidance system can be completed by only measuring some angles or distances, and the calibration process is simple and the calibration efficiency is high.

[0019] In an implementation of the first aspect, the measuring equipment used in the calibration process includes: a horizontal measuring equipment, a vertical measuring equipment and a distance measuring equipment, the horizontal measuring equipment includes a bubble level, a digital level or a total station, the vertical measuring equipment includes a plumb bob, a digital level or a total station, and the distance measuring equipment includes a tape measure, a laser rangefinder or a total station.

[0020] In the above implementation, the calibration process can support a variety of measuring devices, which is convenient for users to flexibly choose according to their actual situation. In particular, in addition to supporting the use of total stations, the calibration process also supports the use of some simple measuring devices, which is conducive to saving implementation costs (total stations are relatively expensive), lowering the threshold for use (total stations require a high level of professionalism), and improving calibration efficiency (total stations start up relatively slowly).

[0021] In a second aspect, an embodiment of the present application provides a construction guidance system for installation on an excavator, the construction guidance system comprising: a GNSS antenna, a tilt sensor and a processing device; a first sensor of the tilt sensor is installed at the bucket of the excavator, a second sensor of the tilt sensor is installed on the forearm of the excavator, and the GNSS antenna is installed on an adjacent arm section of the forearm; the processing device is used to calculate the coordinates of the bucket tip according to the GNSS measurement data collected by the GNSS antenna, the angle data collected by the tilt sensor, the installation parameters of the GNSS antenna, the installation parameters of the tilt sensor, and the distance parameters between the mechanical arm of the excavator and the bucket, and output construction guidance information based on the coordinates of the bucket tip; wherein the installation parameters of the GNSS antenna, the installation parameters of the tilt sensor, and the distance parameters between the mechanical arm and the bucket are obtained according to the method provided in the first aspect or any one of the implementations of the first aspect.

[0022] The above-mentioned construction guidance system has the following advantages: first, the system includes fewer components, especially only two inclination sensors are needed to work normally, the installation is simple, and the implementation cost is low; second, the GNSS antenna and the inclination sensor are both installed on the mechanical arm of the excavator, which is close to the bucket, so it is beneficial to shorten the calculation path when calculating the bucket tip coordinates, reduce error accumulation, improve the coordinate calculation accuracy, and thus improve the accuracy of construction guidance; third, during the operation of the excavator, the forearm mainly moves, and the arm section adjacent to the forearm has a relatively small movement amplitude and a higher position. Therefore, installing the GNSS antenna on the arm section adjacent to the forearm is conducive to the antenna to search and receive satellite data more stably, thereby improving the calculation accuracy of the bucket tip coordinates; fourth, some engineering vehicles have a small body size and do not have enough space to install the GNSS antenna. The above-mentioned system installs the GNSS antenna on the mechanical arm, which makes the system have a wider range of applications; fifth, since the construction guidance system adopts the method provided by the first aspect or any one of the implementation methods of the first aspect for parameter calibration, the calibration speed is fast, and it can be put into use quickly, saving operation time.

[0023] In a third aspect, an embodiment of the present application provides an excavator, comprising a construction guidance system provided by the second aspect or any one implementation of the second aspect. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0025] Figure 1 A possible structure of the construction guidance system provided by the embodiment of the present application is shown;

[0026] Figure 2 A possible installation method of the construction guidance system provided in the embodiment of the present application on a two-section boom excavator is shown;

[0027] Figure 3 A possible process of the calibration method of the construction guidance system provided in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0028] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.

[0029] The terms "comprises," "comprising," or any other variation thereof are intended to encompass non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements, but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus. In the absence of further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article, or apparatus that includes the element.

[0030] The terms "first", "second", etc. are only used to distinguish one entity or operation from another entity or operation, and should not be understood as indicating or implying relative importance, nor should they be understood as requiring or implying any such actual relationship or order between these entities or operations.

[0031] The calibration method of the construction guidance system provided in the embodiment of the present application is used to measure the parameters in the construction guidance system provided in the embodiment of the present application. After configuring these parameters into the construction guidance system, the construction guidance system can output construction guidance information to provide construction guidance to the operator of the excavator. The following first introduces the construction guidance system, and then introduces the calibration method for the construction guidance system.

[0032] Figure 1 A possible structure of the construction guidance system provided by the embodiment of the present application is shown. Figure 1 The construction guidance system 100 includes a tilt sensor 110, a processing device 120, and a GNSS antenna 130, wherein the tilt sensor 110 and the GNSS antenna 130 are both circuit-connected to the processing device 120, the tilt sensor 110 may further include a first sensor and a second sensor, and the GNSS antenna 130 may further include a main antenna and a secondary antenna. In the embodiment of the present application, the circuit connection may include a wired connection or a wireless connection.

[0033] The construction guidance system 100 can be installed on an excavator to output construction guidance information to the operator of the excavator to assist the operator in better operating the excavator for construction work. The excavator includes a vehicle body and a mechanical arm. One end of the mechanical arm is connected to the vehicle body, and a bucket is installed at the other end. The mechanical arm includes two or more arm sections, and the mechanical arm and the vehicle body, the arm sections, and the arm section and the bucket are all rotatably connected.

[0034] There are two main types of excavators: one is a two-section boom excavator, Figure 2 A possible installation method of the construction guidance system 100 provided in the embodiment of the present application on a two-section boom excavator 20 is shown. Figure 2 The mechanical arm of the two-section arm excavator 20 includes two arm sections, namely a small arm 204 close to the bucket 214 and a large arm 200 close to the vehicle body; the other is a three-section arm excavator, which includes three arm sections and an intermediate arm is provided between the large arm and the small arm.

[0035] Let's combine Figure 2 The detailed structure of the two-section boom excavator 20 is introduced first, and then the installation method of the construction guidance system 100 on the two-section boom excavator 20 is introduced.

[0036] A first rotating shaft 203 is provided between the upper arm 200 and the lower arm 204 , and a second rotating shaft 208 is provided between the lower arm 204 and the bucket 214 .

[0037] The boom 200, the arm 204 and the bucket 214 are all provided with corresponding hydraulic drive rods 206 for driving them. The following text mainly describes the hydraulic drive rod 206 corresponding to the arm 204. Figure 2 On the right side of the middle and small arms 204 is the corresponding hydraulic drive rod 206 .

[0038] The end of the hydraulic drive rod 206 of the arm 204 is the end close to the bucket 214. A first connecting rod 210 is provided between the end of the hydraulic drive rod 206 and the arm 204, and a second connecting rod 212 is provided between the end of the hydraulic drive rod 206 and the bucket 214. A third rotating shaft 207 is provided between one end of the first connecting rod 210 and the arm 204, and a fourth rotating shaft 211 is provided between the other end of the first connecting rod 210 and the end of the hydraulic drive rod 206. One end of the second connecting rod 212 is connected to the end of the hydraulic drive rod 206 through the fourth rotating shaft 211 (the fourth rotating shaft 211 is shared with the first connecting rod 210), and a fifth rotating shaft 213 is provided between the other end of the second connecting rod 212 and the bucket 214.

[0039] The front end of the bucket 214 has a toothed portion for directly contacting the excavated object. The tip of the toothed portion is called a bucket tip 216, and the back side (i.e., the side protruding outward) of the bucket 214 close to the bucket tip 216 is called the bottom surface 215 of the bucket 214.

[0040] The GNSS antenna 130 can be installed on the side or top of the arm 200. The calibration method described below takes the case of installation on the side as an example. The GNSS antenna 130 can include a main antenna and a secondary antenna. Figure 2 Among them, the one closer to the first rotating shaft 203 is the main antenna 202, and the other is the auxiliary antenna 201. The two antennas are installed on the same side of the arm 200. Of course, the two antennas can also be installed on different sides of the arm 200.

[0041] The GNSS antenna 130 can be divided into two parts: an antenna bracket and an antenna body. Taking the main antenna 202 as an example, Figure 2 The black ellipse represents the antenna body, and the black square and the black straight line represent the antenna bracket, which is used to support the antenna body. During installation, the antenna body can be made to exceed the top of the arm 200 to reduce obstruction and improve the reception quality of satellite signals. The distance between the main antenna 202 and the auxiliary antenna 201 is called the baseline distance, which needs to be greater than a certain distance threshold, such as a preset value between 0.5m and 2m.

[0042] The GNSS antenna 130 is circuit-connected to the processing device 120. If a wired connection is used, the connection line can be routed along the surface of the arm section of the robotic arm to reduce the risk of line damage. Of course, it is not ruled out that in some implementations, space for routing the construction guidance system 100 is reserved inside the robotic arm, and the connection line can also be routed from inside the robotic arm.

[0043] The GNSS antenna 130 can collect GNSS measurement data from satellites and send the GNSS measurement data to the processing device 120 for further processing. The present application does not limit the type of GNSS system, for example, it can be a GPS system, a BeiDou system, etc.

[0044] The tilt sensor 110 may include a first sensor and a second sensor. Figure 2 In the figure, the second sensor 205 is installed on the side of the forearm 204, and of course it is not excluded that it is installed on the top, bottom and other positions of the forearm 204. The first sensor 209 is installed on the first connecting rod 210, and of course it is not excluded that it is installed on the second connecting rod 212, bucket 214 and other positions. Therefore, the installation position of the first sensor 209 can also be generally referred to as the bucket 214. However, when explaining the calibration method later, the case of installation on the first connecting rod 210 is taken as an example.

[0045] The inclination sensor 110 is circuit-connected to the processing device 120. If a wired connection is adopted, the connection line can be routed along the surface of the arm section of the robotic arm. Of course, it is not ruled out that in some implementations, space for routing the construction guidance system 100 is reserved inside the robotic arm, and in this case, the connection line can also be routed from the inside of the robotic arm.

[0046] The inclination sensor 110 can collect angle data of the mechanical part where it is located, and send the angle data to the processing device 120 for further processing. The mechanical part where the inclination sensor 110 is located refers to the mechanical part where it is installed. For example, if the inclination sensor 110 is installed on the forearm 204, the mechanical part here refers to the forearm 204. If the inclination sensor 110 is installed on the first connecting rod 210, the mechanical part here refers to the first connecting rod 210, and so on. The angle data may include the attitude angle information of the mechanical part where the inclination sensor 110 is located.

[0047] The tilt sensor 110 may be a gyroscope, an inertial measurement unit (IMU) or the like.

[0048] After receiving the GNSS measurement data and the angle data, the processing device 120 can calculate the coordinates of the bucket tip 216 of the bucket 214 according to the two data and the calibration data (described later) saved in advance. After the processing device 120 calculates the coordinates of the bucket tip 216, it can further output construction guidance information corresponding to the coordinates. The construction guidance information has multiple possible contents: for example, the construction guidance information can be the coordinates of the bucket tip 216 itself; for another example, the construction guidance information can include the coordinates of the bucket tip 216 and the reference coordinates of the work target (such as a slope), and the operator can compare the two coordinates to determine whether the construction requirements are met, wherein the reference coordinates of the work target can be located in the construction drawings, and the construction drawings can be imported into the processing device 120 in advance, or can be directly designed on the processing device 120; for another example, the construction guidance information can include the coordinates of the bucket tip 216 and the difference between it and the reference coordinates of the work target, and so on.

[0049] There are many ways to output the construction guidance information, such as displaying it on a display, or broadcasting it through a speaker, etc. The display and the speaker may be the hardware of the processing device 120 itself, or may be hardware outside the processing device 120 (such as hardware built into the excavator).

[0050] The processing device 120 can be a single device or a combination of several devices. For example, the processing device 120 can be a tablet computer, in which a GNSS module is integrated. The GNSS module is connected to the GNSS antenna 130 circuit and is responsible for calculating the position information and direction information of the excavator based on the GNSS measurement data collected by the GNSS antenna 130, and then sending it to the processor of the tablet computer. The processor of the tablet computer obtains the coordinates of the bucket tip 216 based on the position information, direction information, angle data and calibration data combined with a specific algorithm. This implementation method of the processing device 120 has a high degree of integration, which is conducive to saving implementation costs, and the tablet computer is relatively light, which is conducive to the disassembly and assembly of the construction guidance system 100. Of course, the tablet computer here can also be replaced by other mobile display terminals, that is, terminal devices that are easy to carry and have display and data processing functions, such as handheld devices.

[0051] For another example, the GNSS module can also be implemented as an independent device, such as a GNSS receiver, which is connected to the tablet computer circuit and sends the calculated position information and direction information to the tablet computer. The processor inside the tablet computer calculates the coordinates of the bucket tip 216.

[0052] The processing device 120 can be a device that comes with the excavator, such as the excavator's own on-board equipment, or it can be an external device, such as a separate tablet computer (the tablet computer is not included in the excavator when it is manufactured). For example, a bracket can be installed in the excavator's cab and the tablet computer can be placed on the bracket, thereby providing construction guidance for the excavator that does not originally have a construction guidance function.

[0053] The above description of the construction guidance system 100 is basically based on Figure 2 The system is described in detail with reference to the two-section arm excavator 20 in the embodiment of the present invention. However, the system is also suitable for a three-section arm excavator. In the three-section arm excavator, the GNSS antenna 130 is installed on the middle arm, the installation method of the tilt sensor 110 remains unchanged, and the functions realized by the system are similar. Therefore, for excavators of different forms, the installation method of the GNSS antenna 130 can also be uniformly summarized as being installed on the adjacent arm sections of the forearm.

[0054] To briefly summarize the above-mentioned construction guidance system 100, the system installs a GNSS antenna 130 and a tilt sensor 110 on the engineering vehicle to collect GNSS measurement data and angle data respectively, and calculates the coordinates of the bucket tip 216 of the excavator based on the collected data and calibration data, and finally outputs construction guidance information corresponding to the coordinates, thereby completing construction guidance for the excavator operator, which is conducive to improving construction accuracy.

[0055] In addition, the GNSS antenna 130 and the tilt sensor 110 in the above system are both installed on the robotic arm, which is close to the bucket 214, so that when calculating the coordinates of the bucket tip 216, it is helpful to shorten the calculation path, reduce error accumulation, and improve the coordinate calculation accuracy, thereby improving the accuracy of construction guidance.

[0056] In addition, during the operation of the excavator, it is mainly the forearm 204 that moves, and the arm sections adjacent to the forearm 204 have relatively small movements and are located at higher positions. Therefore, installing the GNSS antenna 130 on the adjacent arm sections of the forearm 204 is beneficial for the antenna to search and receive satellite data more stably, thereby improving the calculation accuracy of the coordinates of the bucket tip 216.

[0057] In addition, some engineering vehicles are small in size and do not have enough space to install the GNSS antenna 130 (especially the baseline distance requirement between the GNSS antennas 130 may also need to be considered). The above system installs the GNSS antenna 130 on the boom 200 or the middle arm of the excavator, so that the system has a wider range of applications. Figure 2The larger excavator includes a cabin and a platform at the rear of the cabin, so in the control scheme, the GNSS antenna 130 can be installed on the platform, but the smaller excavator only has a cabin without a platform. At this time, the control scheme cannot install the GNSS antenna 130. The solution of the present application does not have this problem and is applicable to both large and small excavators.

[0058] Figure 3 A possible process of the calibration method of the construction guidance system 100 provided in the embodiment of the present application is shown. Figure 3 , the method comprising:

[0059] Step S310 : measuring installation parameters of the GNSS antenna 130 and saving the parameters in the processing device 120 .

[0060] Step S320 : measuring installation parameters of the tilt sensor 110 and storing them in the processing device 120 .

[0061] Step S330 : measuring the distance parameters between the robot arm (the upper arm 200 , the middle arm or the lower arm 204 ) and the bucket 214 and saving the distance parameters in the processing device 120 .

[0062] The calibration data mentioned above at least includes the installation parameters of the GNSS antenna 130, the installation parameters of the tilt sensor 110, and the distance parameters of the mechanical arm and the bucket 214 in the above steps. The installation parameters of the GNSS antenna 130 refer to physical parameters related to the installation position of the GNSS antenna 130, such as angle, distance and other parameters; similarly, the installation parameters of the tilt sensor 110 refer to physical parameters related to the installation position of the tilt sensor 110; the distance parameters of the mechanical arm and the bucket 214 refer to the distance between certain specific points on the mechanical arm or the bucket.

[0063] The so-called calibration is the process of measuring the above-mentioned installation parameters or distance parameters. These parameters can be measured by specific measuring equipment, or can also be obtained with the help of GNSS measurement data collected by the GNSS antenna 130 and the angle data collected by the inclination sensor 110. During the measurement process, the excavator may also be controlled to cooperate.

[0064] For example, measurement equipment used in the calibration process may include, but is not limited to:

[0065] (1) Level measuring equipment: can be used to detect whether the line between two points is horizontal; the level measuring equipment may include a bubble level, a digital level or a total station.

[0066] (2) Vertical measuring equipment: can be used to detect whether the line between two points is perpendicular to the horizontal ground; vertical measuring equipment may include a plumb bob, a digital level or a total station.

[0067] (3) Distance measuring equipment: can be used to measure the distance between two points; distance measuring equipment may include a tape measure, a laser rangefinder or a total station.

[0068] It can be seen that the calibration process of this application can support a variety of measuring equipment, which is convenient for users to flexibly choose according to their actual situation. In particular, in addition to supporting the use of equipment such as total stations, the calibration process also supports the use of some simple measuring equipment, which is conducive to saving implementation costs, lowering the threshold for use, and improving calibration efficiency. Because relatively speaking, the operation of total stations is relatively complicated, usually requires professional operation, and it is slow to start up. Of course, total stations also have advantages. Their measurement accuracy is relatively high, and the equipment is highly integrated and has rich functions.

[0069] The obtained calibration data is saved in the processing device 120 and can be used to calculate the coordinates of the shovel tip 216. The saving method includes inputting through the interface provided by the processing device 120, or transmitting through the transmission interface provided by the processing device 120, and so on.

[0070] The execution order of steps S310 to S330 is not limited. Since the number of inclination sensors 110 used in the construction guidance system 100 is small, the installation parameters of the inclination sensors 110 that need to be calibrated are also small, which is conducive to improving the calibration efficiency. In addition, the method only needs to measure three types of parameters: the installation parameters of the GNSS antenna 130, the installation parameters of the inclination sensor 110, and the distance parameters of the mechanical arm and the bucket 214. The calibration process is relatively simple, which is also conducive to improving the calibration efficiency.

[0071] Next, we will combine Figure 2 The two-section arm excavator 20 in the figure introduces the possible implementation methods of the above steps S310~S330. For the three-section arm excavator, it is only necessary to replace the main arm 200 in the following content with the middle arm. In addition, the first rotating shaft 203 should also be replaced with the rotating shaft between the middle arm and the small arm.

[0072] In one implementation, step S310 includes: using a distance measuring device to measure the distance between the phase center of the main antenna 202 and the first rotation axis 203. This distance is one of the installation parameters of the GNSS antenna 130, because the installation position of the main antenna 202 determines the value of the distance.

[0073] The phase center of the main antenna 202 is the center position of the antenna body of the main antenna 202, which is the positioning position calculated according to the GNSS measurement data. Optionally, when installing the GNSS antenna 130, the main antenna 202 can be installed as close to the first rotating shaft 203 as possible to shorten the distance and reduce the measurement error, for example, it can be installed in a preset distance interval near the first rotating shaft 203.

[0074] In one implementation, step S310 includes:

[0075] (1) Use a distance measuring device to measure the arm section width d1 at the installation position of the main antenna 202, and the arm section width d2 at the installation position of the auxiliary antenna 201. For example, the width of the upper arm 200 gradually narrows from the vehicle body to the lower arm 204, then d2>d1.

[0076] (2) Using a distance measuring device, measure the distance L1 between the phase center of the main antenna 202 and the phase center of the secondary antenna 201. L1 is the baseline distance mentioned above.

[0077] (3) The heading installation angle of the GNSS antenna is calculated using the formula arcsin(|d1-d2| / L1), and the heading installation angle is also one of the installation parameters of the GNSS antenna 130. Of course, if it is known in advance that the width of the boom 200 is the same, the heading installation angle can also be directly obtained as 0°.

[0078] In one implementation, step S310 includes: the operator controls the excavator to rotate the boom 200 until a line connecting the lower edge of the bracket of the main antenna 202 and the first rotating shaft 203 is determined to be horizontal using a horizontal measuring tool, and then the pitch installation angle of the GNSS antenna 130 is calculated based on the currently obtained GNSS measurement data. The pitch installation angle is also one of the installation parameters of the GNSS antenna 130.

[0079] In particular, if the brackets of the main antenna 202 and the auxiliary antenna 201 are installed close to the upper edge (or lower edge) of the upper arm 200, and the upper edge (or lower edge) is a straight line, the pitch installation angle of the GNSS antenna 130 can be directly determined to be 0°, and the above steps do not need to be performed.

[0080] It should be understood that the above-mentioned “connection line is horizontal” should be understood as the connection line is basically horizontal, including the case where there is a slight tilt, as long as the degree of tilt is within the acceptable range for users. The following “connection line is horizontal” and “connection line is vertical” can be understood similarly.

[0081] In one implementation, step S320 includes: the operator controls the excavator to rotate the arm 204 until the vertical measurement tool is used to determine that the line between the first rotating shaft 203 and the second rotating shaft 208 is perpendicular to the horizontal ground, and calculates the difference between 90° and the angle data currently collected by the second sensor 205 to obtain the pitch installation angle of the second sensor 205, which is one of the installation parameters of the inclination sensor 110.

[0082] In one implementation, step S320 includes: the operator controls the excavator to rotate the arm 204 until the line between the third rotating shaft 207 and the fourth rotating shaft 211 is determined to be horizontal by using a horizontal measuring tool, and obtains the angle data currently collected by the first sensor 209 as the pitch installation angle of the first sensor 209, and the pitch installation angle is also one of the installation parameters of the inclination sensor 110.

[0083] In one implementation, step S320 includes:

[0084] (1) The operator controls the excavator to rotate the arm 204 until the coordinate system of the first sensor 209 and the coordinate system of the second sensor 205 are aligned with the target coordinate system.

[0085] The target coordinate system is a coordinate system established with the first rotating shaft 203 as the origin and the axial direction of the first rotating shaft 203 as a coordinate axis direction (for example, the Y-axis direction). The first sensor 209 and the second sensor 205 have their own reference coordinate systems. After the sensors are installed, the two coordinate systems are usually not aligned, that is, the corresponding coordinate axes are not parallel. The so-called "alignment to the target coordinate system" is to make the two coordinate systems parallel to the corresponding coordinate axes of the target coordinate system through the rotation of the forearm 204, for example, the Y axes of the two coordinate systems are parallel to the Y axis of the target coordinate system.

[0086] (2) According to the angle data currently collected by the first sensor 209 and the second sensor 205 , the relative installation angle between the first sensor 209 and the second sensor 205 is calculated in the target coordinate system. The relative installation angle is also one of the installation parameters of the inclination sensor 110 .

[0087] After the coordinate system alignment is completed in step (1), the coordinate system of the first sensor 209 and the coordinate system of the second sensor 205 can be unified into the target coordinate system. Then, the relative installation angle between the first sensor 209 and the second sensor 205 can be calculated by combining the angle data collected by the two sensors, the chain rule of the rotation matrix and the principle of fixed-axis rotation.

[0088] In one implementation, step S320 includes: the operator first drives the excavator to the horizontal ground, and then controls the excavator to make the bottom surface 215 of the bucket 214 close to the horizontal ground, such as Figure 2 Then, the angle data collected by the first sensor 209 is obtained as the reading reference value of the first sensor 209 , and the angle data collected by the second sensor 205 is obtained as the reading reference value of the second sensor 205 . Both of these reading reference values ​​are installation parameters of the inclination sensor 110 .

[0089] In one implementation, step S330 includes:

[0090] (1) using a distance measuring device to measure the distance between the first rotating shaft 203 and the second rotating shaft 208;

[0091] (2) using a distance measuring device to measure the distance between the second rotating shaft 208 and the third rotating shaft 207;

[0092] (3) using a distance measuring device to measure the distance between the third rotating shaft 207 and the fourth rotating shaft 211;

[0093] (4) using a distance measuring device to measure the distance between the fourth rotating shaft 211 and the fifth rotating shaft 213;

[0094] (5) using a distance measuring device to measure the distance between the fifth rotating shaft 213 and the first rotating shaft 203;

[0095] (6) Use a distance measuring device to measure the distance between the fifth rotation axis 213 and the third rotation axis 207.

[0096] There is no execution order requirement for the above steps (1) to (6), and the above six distances are all distance parameters of the robot arm.

[0097] In one implementation, step S330 includes:

[0098] (1) Using a distance measuring device to measure the distance between the second rotating shaft 208 and the bucket tip 216;

[0099] (2) The width of the bucket tip 216 is measured using a distance measuring device. The width of the bucket tip 216 can be understood as the distance between the two outermost teeth of the bucket 214.

[0100] There is no execution order requirement for the above steps (1) to (2), and the above distances and widths are distance parameters of the bucket 214.

[0101] In the above implementations of steps S310 to S330, the calibration of the construction guidance system 100 can be completed by measuring some angles or distances, and the calibration process is simple and the calibration efficiency is high. Similarly, if the construction guidance system 100 supports the above calibration method, the construction guidance system 100 can be calibrated quickly and put into use, saving operation time.

[0102] It should also be pointed out that the above implementation methods of steps S310 to S330 may be implemented in full or in part, and some parameters may be obtained by other means. For example, if the manufacturer of the excavator provides a high-precision three-dimensional model of the excavator, the model may be directly imported into the relevant software, and the required distance parameters may be measured directly from the model without the need for measurement based on the actual object.

[0103] The embodiment of the present application also provides an excavator, which is equipped with the construction guidance system 100 provided in the embodiment of the present application (including any one of its implementation methods), so that the excavator can effectively guide the vehicle operator during construction, which is conducive to improving construction accuracy, and the excavator can quickly complete system calibration and put into operation.

[0104] The construction guidance system 100 may be installed in the excavator after the excavator is manufactured, or may be built into the excavator when the excavator is manufactured. If the construction guidance system 100 is installed in the excavator, it may share some hardware with the excavator. For example, the system may not include a display but directly connect to the display of the excavator itself.

[0105] The above description is only an embodiment of the present application and is not intended to limit the scope of protection of the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, scheme combination, improvement, etc. made within the spirit and principle of the present application shall be included in the scope of protection of the present application.

Claims

1. A calibration method for a construction guidance system, It is characterized in that The construction guidance system is installed on an excavator, and the construction guidance system includes: a GNSS antenna, a tilt sensor, and a processing device; a first sensor of the tilt sensor is installed at the bucket of the excavator, a second sensor of the tilt sensor is installed on the forearm of the excavator, and the GNSS antenna is installed on an adjacent arm section of the forearm; The processing device is used to calculate the coordinates of the bucket tip according to the GNSS measurement data collected by the GNSS antenna, the angle data collected by the tilt sensor, the installation parameters of the GNSS antenna, the installation parameters of the tilt sensor, and the distance parameters between the mechanical arm of the excavator and the bucket, and output construction guidance information based on the coordinates of the bucket tip; The calibration method comprises: measuring installation parameters of the GNSS antenna and storing them in the processing device; measuring installation parameters of the tilt sensor and storing them in the processing device; The distance parameter between the mechanical arm and the bucket is measured and stored in the processing device.

2. The method according to claim 1, It is characterized in that The GNSS antenna includes a main antenna and a secondary antenna, the main antenna is installed closer to a first rotation axis than the secondary antenna, the first rotation axis is a rotation axis between the forearm and adjacent arm sections of the forearm, and the measuring of the installation parameters of the GNSS antenna includes: The distance between the phase center of the main antenna and the first rotation axis is measured by using a distance measuring device.

3. The method according to claim 1, It is characterized in that The GNSS antenna includes a main antenna and a secondary antenna, and measuring the installation parameters of the GNSS antenna includes: Using a distance measuring device to measure a boom section width d1 at the installation position of the main antenna, and to measure a boom section width d2 at the installation position of the secondary antenna; Measuring the distance L1 between the phase center of the main antenna and the phase center of the secondary antenna by using a distance measuring device; The heading installation angle of the GNSS antenna is calculated using the formula arcsin(|d1-d2| / L1).

4. The method according to claim 1, It is characterized in that The GNSS antenna includes a main antenna and a secondary antenna, the main antenna and the secondary antenna are both provided with brackets at their lower parts, the main antenna is installed closer to a first rotating shaft than the secondary antenna, the first rotating shaft is a rotating shaft between the forearm and adjacent arm sections of the forearm, and the measuring of the installation parameters of the GNSS antenna includes: The excavator is controlled to rotate adjacent arm sections of the forearm until a line connecting a lower edge of the bracket of the main antenna and the first rotating shaft is determined to be horizontal by a horizontal measuring tool, and a pitch installation angle of the GNSS antenna is calculated according to the GNSS measurement data.

5. The method according to claim 1, It is characterized in that A first rotating shaft is provided between the forearm and the adjacent arm sections of the forearm, a second rotating shaft is provided between the forearm and the bucket, and the installation parameters of the inclination sensor are measured, including: The excavator is controlled to rotate the forearm until a vertical measurement tool is used to determine that a line between the first rotating shaft and the second rotating shaft is perpendicular to the horizontal ground, and a difference between 90° and the angle data collected by the second sensor is calculated to obtain a pitch installation angle of the second sensor.

6. The method according to claim 1, It is characterized in that The first sensor is mounted on a first connecting rod between the end of the hydraulic drive rod of the forearm and the forearm, a third rotating shaft is arranged between one end of the first connecting rod and the forearm, and a fourth rotating shaft is arranged between the other end of the first connecting rod and the end of the hydraulic drive rod, and the installation parameters of the inclination sensor are measured, including: The excavator is controlled to rotate the forearm until a line between the third rotating shaft and the fourth rotating shaft is determined to be horizontal by a horizontal measuring tool, and angle data collected by the first sensor is obtained as a pitch installation angle of the first sensor.

7. The method according to claim 1, It is characterized in that A first rotating shaft is provided between the forearm and the adjacent arm sections of the forearm, and the measuring of the installation parameters of the inclination sensor includes: Controlling the excavator to rotate the forearm until the coordinate system of the first sensor and the coordinate system of the second sensor are aligned with a target coordinate system; wherein the target coordinate system is a coordinate system established with the first rotating shaft as the origin and the axial direction of the first rotating shaft as a coordinate axis direction; According to the angle data collected by the first sensor and the second sensor, a relative installation angle between the first sensor and the second sensor is calculated in the target coordinate system.

8. The method according to claim 1, It is characterized in that The measuring of the installation parameters of the inclination sensor comprises: The excavator is controlled to keep the bottom surface of the bucket close to the horizontal ground, and the angle data collected by the first sensor at this time is obtained as a reference value of the reading of the first sensor, and the angle data collected by the second sensor at this time is obtained as a reference value of the reading of the second sensor.

9. The method according to claim 1, It is characterized in that A first rotating shaft is provided between the forearm and the adjacent arm sections of the forearm, a second rotating shaft is provided between the forearm and the bucket, the first sensor is installed on a first connecting rod between the end of the hydraulic drive rod of the forearm and the forearm, a third rotating shaft is provided between one end of the first connecting rod and the forearm, a fourth rotating shaft is provided between the other end of the first connecting rod and the end of the hydraulic drive rod, a second connecting rod is provided between the end of the hydraulic drive rod of the forearm and the bucket, one end of the second connecting rod is connected to the end of the hydraulic drive rod through the fourth rotating shaft, and a fifth rotating shaft is provided between the other end of the second connecting rod and the bucket; The measuring of the distance parameter of the robotic arm comprises: Measuring the distance between the first rotating shaft and the second rotating shaft by using a distance measuring device; Measuring the distance between the second rotating shaft and the third rotating shaft by using a distance measuring device; Measuring the distance between the third rotating shaft and the fourth rotating shaft by using a distance measuring device; Measuring the distance between the fourth rotating shaft and the fifth rotating shaft by using a distance measuring device; Measuring the distance between the fifth rotating shaft and the first rotating shaft by using a distance measuring device; The distance between the fifth rotating shaft and the third rotating shaft is measured by using a distance measuring device.

10. The method according to claim 1, It is characterized in that A second rotating shaft is provided between the forearm and the bucket, and the distance parameter of the mechanical arm is measured, including: Measuring the distance between the second rotating shaft and the bucket tip by using a distance measuring device; The width of the bucket tip is measured using a distance measuring device.

11. The method according to any one of claims 1 to 10, It is characterized in that The measuring equipment used in the calibration process includes: horizontal measuring equipment, vertical measuring equipment and distance measuring equipment. The horizontal measuring equipment includes a bubble level, a digital level or a total station, the vertical measuring equipment includes a plumb bob, a digital level or a total station, and the distance measuring equipment includes a tape measure, a laser rangefinder or a total station.

12. A construction guidance system, It is characterized in that Used to be installed on an excavator, the construction guidance system comprises: a GNSS antenna, a tilt sensor and a processing device; a first sensor of the tilt sensor is installed at the bucket of the excavator, a second sensor of the tilt sensor is installed on the forearm of the excavator, and the GNSS antenna is installed on the adjacent arm section of the forearm; The processing device is used to calculate the coordinates of the bucket tip according to the GNSS measurement data collected by the GNSS antenna, the angle data collected by the tilt sensor, the installation parameters of the GNSS antenna, the installation parameters of the tilt sensor, and the distance parameters between the mechanical arm of the excavator and the bucket, and output construction guidance information based on the coordinates of the bucket tip; The installation parameters of the GNSS antenna, the installation parameters of the tilt sensor, and the distance parameters between the mechanical arm and the bucket are obtained according to the method described in any one of claims 1-10.

13. An excavator, It is characterized in that Comprising the construction guidance system as claimed in claim 12.

Citation Information

Patent Citations

  • Antenna wave beam attitude control method and system

    CN107785663A

  • Excavator construction quality real-time monitoring system and method

    CN113266047A

  • Dynamic compensation method for improving performance of vehicle-mounted phased-array antenna

    CN114927884A

  • Mechanical equipment model parameter calibration method and device, electronic equipment and storage medium

    CN117076821A

  • Digital construction guiding system of excavator

    CN216616003U