Construction method of fully-installed integrated local cast-in-place box house and box house cluster building structure

Through the construction method of fully equipped integrated local cast-in-place box houses and box house cluster building structures, the problems of low construction efficiency and poor structural stability of traditional box prefabricated buildings are solved, and integrated decoration assembly and rapid construction are realized, which has improved Construction efficiency and environmental compatibility.

CN118958483APending Publication Date: 2024-11-15CCFEB CIVIL ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411131719.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

Traditional box-type prefabricated building construction has problems such as low construction efficiency, poor quality of assembly nodes and poor structural stability, and it is impossible to achieve full decoration assembly and rapid construction.

Method used

The construction method of fully equipped integrated local cast-in-place box houses and box house cluster building structures is adopted, and the upper floor slabs, lower floor slabs, door and window structures, prefabricated vertical connecting components, thin-walled structure inner and outer layers, anchored steel bars, cast-in-place reinforcement beams and connect components such as struts to form an integral structure, and prefabricated decorative layer and pipeline pre-embedded in the factory, and local cast-in-place structure construction is carried out on site.

Benefits of technology

Achieve integrated decoration assembly, shorten the construction cycle, improve structural stability and construction efficiency, reduce the waste of decorative and electromechanical materials and the generation of construction waste, overcome the weaknesses of traditional assembly structures, and achieve rapid construction and environmental compatibility. sex.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958483A_ABST
    Figure CN118958483A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method of a fully-installed integrated local cast-in-place box house cluster building structure which comprises a prefabricated upper floor slab, a prefabricated lower floor slab and a door and window structure and is characterized by further comprising prefabricated vertical connecting components, a thin-wall structure inner layer, anchoring steel bars, a thin-wall structure outer layer, cast-in-place walls, cast-in-place reinforcing beams, connecting supporting rods and pull rods. The prefabricated vertical connecting component and the thin-wall structure inner layer are connected between the edge of the prefabricated upper floor slab and the edge of the prefabricated lower floor slab, so that the prefabricated vertical connecting component, the thin-wall structure inner layer, the prefabricated upper floor slab and the prefabricated lower floor slab jointly define a box type main body structure, and avoiding spaces for construction of cast-in-place reinforcing beams are reserved at the upper ends and the lower ends of the prefabricated vertical connecting component and the thin-wall structure inner layer. The problems that during construction of a traditional box type fabricated building, the construction efficiency is low, the quality of assembly joints is poor, and the structural stability is poor are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of prefabricated building construction, and specifically discloses a construction method for a fully integrated partially cast-in-place container house and a container house cluster building structure. Background Art

[0002] At present, the construction of box-type prefabricated buildings usually includes the following steps: parameter design, prefabricated box-type structure factory processing, building foundation construction, prefabricated box-type structure transportation to the site, prefabricated box-type structure on-site hoisting, prefabricated box-type structure connection and anchoring, water, electricity, pipeline connection and installation, interface processing, and building forming. However, there are the following problems and disadvantages:

[0003] (1) There are weaknesses in the installation and connection of box-type structures: Since the main load-bearing components of box-type prefabricated buildings are all processed in the factory and assembled on site, the main structural load-bearing components such as walls, columns, and beams are connected by later anchor bolts, resulting in poor overall structural integrity of the building;

[0004] (2) The box-type structure is heavy and the spatial layout is limited: Since the box-type components of box-type prefabricated buildings are all processed in the factory, all walls, columns and beams have been cast and formed, and the transportation and hoisting weight are heavy, making it impossible to achieve a large spatial layout.

[0005] (3) Long construction period: The reserved components are assembled and then poured at the nodes. The floor slab formwork frame must also be completely erected. All processes such as steel bar binding, water and electricity pre-embedding, and node (or surface layer) concrete pouring cannot be omitted, resulting in a long construction period;

[0006] (4) It is impossible to achieve full decorative assembly: Since the assembly nodes need to be connected and poured, most of the steel components are bare concrete parts. Summary of the invention

[0007] In view of the above problems, the present invention provides a construction method for a fully integrated partially cast-in-place container house and a container house cluster building structure, which solves the problems of low construction efficiency, poor assembly node quality and poor structural stability in the construction of traditional box-type prefabricated buildings.

[0008] The present invention is achieved through the following technical solutions.

[0009] On the one hand, the present invention provides a fully integrated partially cast-in-place box house, including a prefabricated upper floor, a prefabricated lower floor, and a door and window structure, characterized in that it also includes: a prefabricated vertical connecting member, a thin-walled structure inner layer, anchoring steel bars, a thin-walled structure outer layer, a cast-in-place wall, a cast-in-place reinforcement beam, a connecting brace and a hook;

[0010] The prefabricated vertical connecting members and the inner layer of the thin-walled structure are connected between the edges of the prefabricated upper floor slab and the prefabricated lower floor slab to enclose together with the prefabricated upper floor slab and the prefabricated lower floor slab to form a box-type main structure, and the upper and lower ends of the prefabricated vertical connecting members and the inner layer of the thin-walled structure are reserved with avoidance space for the construction of cast-in-place reinforcement beams; door and window openings are reserved inside the prefabricated vertical connecting members, and the door and window structures are installed in the door and window openings; the outer layer of the thin-walled structure is connected and fixed to the outer side of the inner layer of the thin-walled structure by connecting struts, so as to cooperate with the inner layer of the thin-walled structure to enclose a wall beam cavity; the inner layer of the thin-walled structure is connected to the outer layer of the thin-walled structure The surface on the side close to each other is a rough surface, and a hook extending toward the wall beam cavity is embedded; the anchor steel bars are reserved and arranged on one side of the outer periphery of the prefabricated upper floor slab and the prefabricated lower floor slab and on the left and right sides of the prefabricated vertical connecting components, and the anchor steel bars extend into the wall beam cavity; the cast-in-place reinforcement beams are arranged at the top and bottom of the cast-in-place wall, and the cast-in-place reinforcement beams and the cast-in-place wall are integrally formed by casting concrete in the wall beam cavity, so that the cast-in-place reinforcement beams and the cast-in-place wall are connected with the prefabricated upper floor slab, the prefabricated lower floor slab and the prefabricated vertical connecting components through the reserved anchor steel bars to form an integral structure.

[0011] Preferably, the prefabricated upper floor slab and the prefabricated lower floor slab have a thickness of 6 to 10 cm, and are both prefabricated by casting with C25 to C35 concrete and internal steel bars with a diameter of 6 to 12 mm.

[0012] Preferably, the width of the prefabricated vertical connecting member is 1.5 to 1.8 m, and a prefabricated vertical connecting member is arranged at an interval of 4 to 5 m on each side of the box-type building structure. When two or more prefabricated vertical connecting members cannot be arranged at the above intervals on each side of the box-type building structure, only one prefabricated vertical connecting member is arranged in the middle position of that side.

[0013] Preferably, the prefabricated vertical connecting member is prefabricated by casting with C20-C25 concrete and internal steel bars with a diameter of 12-20 mm.

[0014] Preferably, the container house of the present invention further comprises a reinforcement beam steel cage which is arranged at the top and bottom of the wall beam cavity and is constructed at the position of the cast-in-place reinforcement beam and is tied and fixed by connecting struts.

[0015] Preferably, the thin-walled structure inner layer and the thin-walled structure outer layer are assembled by standardized fiber cement boards, the fiber cement boards have a thickness of 30 to 50 mm, and have built-in fiber mesh and steel mesh.

[0016] Preferably, the container house of the present invention further comprises an inner wall decoration layer arranged on the indoor side surface of the inner layer of the thin-wall structure, and an outer wall decoration layer arranged on the indoor side surface of the outer layer of the thin-wall structure.

[0017] Preferably, the interior wall decoration layer is constructed by paint, ceramic tiles or wall cloth, and the exterior wall decoration layer is constructed by real paint or ceramic tiles.

[0018] Preferably, the draw hook is formed by bending a steel bar with a diameter of 4 to 6 mm, and the connecting strut is a steel bar with a diameter of 12 to 20 mm.

[0019] On the other hand, the present invention provides a construction method of a container house cluster building, which is characterized by comprising the following steps:

[0020] S1. Confirm design parameters

[0021] The structural design of the container room cluster building is performed using design software to determine the number, size and splicing method of the container rooms in the container room cluster building, as well as the size and construction parameters of the structural components of each container room, and form a construction design drawing; wherein, when adjacent container rooms in the container room cluster building have adjacent surfaces, no prefabricated vertical connecting components, thin-walled structure inner layers and anchoring steel bars are set at the adjacent surface positions of the adjacent container rooms, but sealing rubber strips are set at the bottom of one side of the prefabricated upper floor slab and prefabricated lower floor slab at the adjacent surface positions of the adjacent container rooms, or no prefabricated vertical connecting components and thin-walled structure inner layers are set at the bottom of one side of the prefabricated upper floor slab and prefabricated lower floor slab at the adjacent surface positions of the adjacent container rooms, but mutually connected thin-walled structure inner layers are set at the bottom of one side of the prefabricated upper floor slab and prefabricated lower floor slab at the adjacent surface positions of the adjacent container rooms to serve as templates for subsequent pouring of post-cast strips;

[0022] S2. Box-type main structure construction

[0023] According to the size of each container room determined in step S1, as well as the size and construction parameters of the structural components of each container room, the box-type main structure construction of each container room is completed in the factory according to the following steps: prefabricating the lower floor slab steel bar sheet and pre-embedding of pipelines → prefabricating the lower floor slab formwork installation and concrete pouring → prefabricating the vertical connecting member steel bar sheet and pre-embedding of pipelines → prefabricating the vertical connecting member formwork installation and concrete pouring → prefabricating the upper floor slab formwork installation → prefabricating the upper floor slab steel bar sheet and pre-embedding of pipelines → prefabricating the upper floor slab concrete pouring → demoulding → thin-walled structure inner layer installation → door and window structure installation; wherein, in the steps of prefabricating the steel bar sheet of the lower floor slab, the steel bar sheet of the prefabricated vertical connecting member and the steel bar sheet of the prefabricated upper floor slab, anchor steel bars are reserved on one side of the outer periphery of the prefabricated upper floor slab and the prefabricated lower floor slab and on the left and right sides of the prefabricated vertical connecting member to extend into the wall beam cavity; in the step of installing the inner layer of the thin-walled structure, hooks are pre-embedded in the rough surface of the inner layer of the thin-walled structure in advance;

[0024] S3. On-site foundation construction

[0025] According to the construction design drawing of step S1, the building foundation base is constructed;

[0026] S4. Transportation and hoisting assembly of box-type main structure

[0027] After the building foundation is inspected and accepted, the box-type main structures of step S2 are transported to the site, and according to the container house splicing method determined in step S1, the box-type main structures are hoisted onto the foundation for splicing;

[0028] S5. Partial cast-in-place structure construction

[0029] According to the structural component dimensions and construction parameters of each container room determined in step S1, the partial cast-in-place structure construction of each container room is completed at the construction site in the following steps: a connecting strut is installed on the outer side of the inner layer of the thin-walled structure, and then the reinforcing beam steel cage is tied and fixed by connecting struts in the avoidance space reserved between the prefabricated vertical connecting components and the upper and lower ends of the inner layer of the thin-walled structure, and then the outer layer of the thin-walled structure with hooks embedded in the rough surface is installed and fixed to the outer side of the inner layer of the thin-walled structure by connecting struts, so as to cooperate with the inner layer of the thin-walled structure to enclose a wall beam cavity; then, concrete is cast in place in the wall beam cavity to complete the integrated construction of the cast-in-place wall and the cast-in-place reinforcing beam, so that the cast-in-place reinforcing beam and the cast-in-place wall are connected to the prefabricated upper floor slab, the prefabricated lower floor slab and the prefabricated vertical connecting components through the reserved anchor steel bars to form an integral structure, and the construction of the current container room is completed at this time;

[0030] S6. Waterproof treatment of joints in container-type building clusters

[0031] After the partial cast-in-place structure of each container house is constructed, waterproofing treatment is performed on the joints of the sealing rubber strips at the adjacent surfaces of the adjacent container houses.

[0032] Compared with the prior art, the present invention has the following beneficial effects:

[0033] 1. Integrated decoration assembly can be realized. In the present invention, the pre-embedding of pipelines can be completed when the box-type main structure is processed in the factory, and the decorative layer can be directly pre-attached to the inner layer and the outer layer of the thin-walled structure in the factory, thereby realizing the integrated decoration assembly of the box room, which can greatly reduce the subsequent decoration construction period of the box room.

[0034] 2. Rapid construction can be achieved. In the present invention, the box-type main structure can be prefabricated in the factory, and only the partial cast-in-place structure, i.e., cast-in-place reinforcement beams and cast-in-place walls, needs to be constructed on site. The partial cast-in-place structure construction directly uses the outer layer of the thin-walled structure and the inner layer of the thin-walled structure as the template, which can save the on-site template processing and installation and the processing and installation of the internal support frame in traditional construction. At the same time, the template does not need to be disassembled, which greatly saves the construction period, thereby realizing the rapid construction of the container room cluster building.

[0035] 3. It can overcome the problem of weak points in the main load-bearing components of the traditional assembled structure. Since the main load-bearing components of the traditional box-type assembled structure are all processed in the factory and assembled on site, the main structural load-bearing components such as wall columns and beams need to be connected with the help of later anchor bolts, and the overall structure of the building is poor. In the box-type main structure of the present invention, anchor steel bars are reserved on the outer side of the prefabricated upper floor slab and the prefabricated lower floor slab, as well as on the left and right sides of the prefabricated vertical connecting components. After the cast-in-place reinforcement beams and cast-in-place walls are cast, the reserved anchor steel bars can be connected with the prefabricated upper floor slab, the prefabricated lower floor slab and the prefabricated vertical connecting components to form an integral structure, thereby overcoming the problem of weak points in the main load-bearing components of the traditional box-type assembled structure.

[0036] 4. It can improve the environmental compatibility of construction. Most of the construction waste in construction comes from the packaging and tailings of masonry and decorative electromechanical materials; the construction method of the present invention can realize the factory prefabrication of full decoration and electromechanical pre-embedded, which can greatly reduce the waste of decoration and electromechanical materials and the generation of construction waste. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a three-dimensional structural schematic diagram of the box-type main structure in the present invention;

[0038] Figure 2 It is a schematic diagram of the three-dimensional structure of the box-type main structure in the present invention when the inner layer of the thin-wall structure is omitted;

[0039] Figure 3 It is a schematic diagram of the three-dimensional structure after the outer layer of the thin-wall structure is installed on the box-type main structure in the present invention;

[0040] Figure 4 A top view of the container house of the present invention;

[0041] Figure 5 for Figure 4 Cross-section at AA in the middle;

[0042] Figure 6 for Figure 4 Cross-section at the middle BB;

[0043] Figure 7 for Figure 4 Cross-section at the middle CC;

[0044] Figure 8 for Figure 4 Cross-section at DD;

[0045] Fig. 9 for Figure 6 The enlarged schematic diagram of point E in the middle;

[0046] Fig.10 This is a schematic diagram of the segmentation of the box house cluster building;

[0047] Fig.11 This is one of the three-dimensional structural schematic diagrams of the box-type main structure when the adjacent surface exists in the present invention;

[0048] Fig.12 The second three-dimensional structural schematic diagram of the box-type main structure when the adjacent surface exists in the present invention;

[0049] The meanings of the symbols in the above figure are: prefabricated upper floor slab 1, prefabricated lower floor slab 2, prefabricated vertical connecting member 3, thin-walled structure inner layer 4, anchor steel bars 5, thin-walled structure outer layer 6, cast-in-place wall 7, cast-in-place reinforcement beam 8, connecting strut 9, hook 10, door and window structure 11, door and window openings 12, wall beam cavity 13, reinforcement beam steel cage 14, interior wall decoration layer 15, exterior wall decoration layer 16, sealing rubber strip 17, avoidance space 18, adjacent surface 19, container room 20. DETAILED DESCRIPTION

[0050] To facilitate understanding of the present invention, the present invention will be described more comprehensively below with reference to the relevant drawings. Several embodiments of the present invention are given in the drawings, but the present invention can be implemented in different forms and is not limited to the embodiments described in the text. On the contrary, these embodiments are provided to make the content disclosed in the present invention more thorough and comprehensive.

[0051] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which the present invention belongs. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0052] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0053] Example 1

[0054] For fully integrated partially cast-in-place container houses, please refer to Figures 1 to 9, including a prefabricated upper floor 1, a prefabricated lower floor 2, a door and window structure 11, a prefabricated vertical connecting member 3, a thin-walled structure inner layer 4, anchoring steel bars 5, a thin-walled structure outer layer 6, a cast-in-place wall 7, a cast-in-place reinforcement beam 8, a connecting strut 9 and a hook 10; wherein the prefabricated vertical connecting member 3 and the thin-walled structure inner layer 4 are connected between the edges of the prefabricated upper floor 1 and the prefabricated lower floor 2 to form a box-type main structure together with the prefabricated upper floor 1 and the prefabricated lower floor 2, and the upper and lower ends of the prefabricated vertical connecting member 3 and the thin-walled structure inner layer 4 are reserved with avoidance space for constructing the cast-in-place reinforcement beam 8; a door and window opening 12 is reserved inside the prefabricated vertical connecting member 3, and the door and window structure 11 is installed in the door and window opening 12; the thin-walled structure outer layer 6 is connected and fixed to the outer edge of the thin-walled structure inner layer 4 by the connecting strut 9 side, used to cooperate with the thin-walled structure inner layer 4 to enclose a wall beam cavity 13; the surface of the thin-walled structure inner layer 4 and the thin-walled structure outer layer 6 on the side close to each other is a rough surface, and a hook 10 extending toward the wall beam cavity 13 is pre-embedded; the anchor steel bar 5 is reserved and arranged on one side of the outer periphery of the precast upper floor 1 and the precast lower floor 2 and on the left and right sides of the precast vertical connecting member 3, and the anchor steel bar 5 extends into the wall beam cavity 13; the cast-in-place reinforcement beam 8 is arranged at the top and bottom of the cast-in-place wall 7, and the cast-in-place reinforcement beam 8 and the cast-in-place wall 7 are integrally formed by casting concrete in place in the wall beam cavity 13, so that the cast-in-place reinforcement beam 8 and the cast-in-place wall 7 are connected with the precast upper floor 1, the precast lower floor 2 and the precast vertical connecting member 3 through the reserved anchor steel bar 5 to form an integral structure;

[0055] Based on the above structure, the construction method of the container house of the present invention includes the following steps:

[0056] 1. Box-type main structure construction. Please refer to Figure 1 and Figure 2The box-type main structure can be prefabricated in the factory, and its specific prefabrication processing steps are as follows: prefabricate the steel bar sheet and pre-buried pipelines of the prefabricated lower floor slab → install the prefabricated lower floor slab formwork and pour concrete → prefabricate the steel bar sheet and pre-buried pipelines of the prefabricated vertical connecting member → install the prefabricated vertical connecting member formwork and pour concrete → install the prefabricated upper floor slab formwork → prefabricated steel bar sheet and pre-buried pipelines of the prefabricated upper floor slab → pour concrete of the prefabricated upper floor slab → remove the formwork → install the inner layer of the thin-walled structure → install the door and window structure; among them, the prefabricated vertical connecting member 3 is arched, and its upper and lower ends extend toward the box room to be respectively connected with the prefabricated upper floor slab and the prefabricated lower floor slab steel, and at the same time, reserve the avoidance space 18 for the construction of the cast-in-place reinforcement beam 8; in the prefabricated lower floor slab steel bar sheet , in the steel plate tying steps of the prefabricated vertical connecting components and the steel plate tying steps of the prefabricated upper floor slab, anchor steel bars 5 should be reserved on one side of the outer periphery of the prefabricated upper floor slab 1 and the prefabricated lower floor slab 2 and on the left and right sides of the prefabricated vertical connecting components 3 to extend into the wall beam cavity 13; in the installation step of the inner layer of the thin-walled structure, the draw hook 10 is pre-embedded in advance on the rough surface of the inner layer of the thin-walled structure; in the present invention, the box-type main structure is formed by the prefabricated vertical connecting components 3, the inner layer of the thin-walled structure 4, the prefabricated upper floor slab 1 and the prefabricated lower floor slab 2, and the overall stability of the structure is good, and the box-type main structure does not include the heavy cast-in-place wall 7 and the cast-in-place reinforcement beam 8, and the weight can be reduced by more than 30%, which can facilitate the subsequent transportation and hoisting construction;

[0057] 2. Partial cast-in-place structure construction. Figure 3After the box-type main structure is processed, it is transported to the construction site and hoisted and lowered to the installation position. Then, the connecting struts 9 are installed on the outside of the thin-walled structure inner layer 4, and then the thin-walled structure outer layer 6 with the hooks 10 embedded in the rough surface is installed and fixed to the outside of the thin-walled structure inner layer 4 through the connecting struts 9 to form a wall beam cavity 13 in cooperation with the thin-walled structure inner layer 4; then, concrete is cast in place in the wall beam cavity 13 to complete the integral molding construction of the local cast-in-place structure, i.e., the cast-in-place wall 7 and the cast-in-place reinforcement beam 8, so as to The cast-in-place reinforcement beams 8 and the cast-in-place walls 7 are connected to the prefabricated upper floor 1, the prefabricated lower floor 2 and the prefabricated vertical connection members 3 through the reserved anchoring steel bars 5 to form an integral structure, and the construction of the current box house is completed at this time; in the present invention, the thin-walled structure outer layer 6 and the thin-walled structure inner layer 4 in the box-type main structure can be directly used as the template for the later construction of the cast-in-place walls 7 and the cast-in-place reinforcement beams 8, eliminating the on-site template processing and installation of the traditional construction, the processing and installation of the internal support frame, and greatly saving the construction period. , and the thin-walled structure outer layer 6 and the thin-walled structure inner layer 4 do not need to be disassembled, which can play a role in heat preservation and insulation and enhance the stress stability of the box room. At the same time, the outdoor side of the thin-walled structure outer layer 6 and the indoor side of the thin-walled structure inner layer 4 can be directly pre-attached with a decorative layer in the factory, thereby eliminating some of the decoration processes of the box room in the later stage, further saving construction time; in addition, the surface of the thin-walled structure inner layer 4 and the thin-walled structure outer layer 6 on the side close to each other is a rough surface, and a draw hook and a connecting rod are provided, so that the thin-walled structure inner layer 4, The outer layer 6 of the thin-walled structure is firmly combined with the cast-in-place structure; and, in the box-type main structure, anchor steel bars are reserved on one side of the outer periphery of the precast upper floor slab 1 and the precast lower floor slab 2 and on the left and right sides of the precast vertical connecting member 3. After the cast-in-place reinforcement beams 8 and the cast-in-place wall 7 are cast, the reserved anchor steel bars 5 can be connected with the precast upper floor slab 1, the precast lower floor slab 2 and the precast vertical connecting member 3 to form an integral structure, thereby overcoming the problem that traditional box-type prefabricated buildings need to rely on later anchor bolts for connection during assembly and have poor overall structure.

[0058] Furthermore, in a preferred embodiment, the prefabricated upper floor slab 1 and the prefabricated lower floor slab 2 have a thickness of 6 to 10 cm, and are both prefabricated by casting with C25 to C35 concrete and internal steel bars with a diameter of 6 to 12 mm.

[0059] In order to ensure the structural stability of the box-type main structure and reduce its weight at the same time, further, in a preferred embodiment, the width of the prefabricated vertical connecting member 3 is 1.5-1.8m, and the prefabricated vertical connecting member 3 is arranged at every 4-5m on each side of the box-type building structure, and when each side of the box-type building structure cannot be provided with 2 or more prefabricated vertical connecting members 3 at the above intervals, only one prefabricated vertical connecting member 3 is arranged in the middle position of that side.

[0060] Furthermore, in a preferred embodiment, the prefabricated vertical connection member 3 is prefabricated by casting with C20-C25 concrete and internal steel bars with a diameter of 12-20 mm.

[0061] Further, in a preferred embodiment, see Figure 6 and Fig. 9 The container house of the present invention also includes a reinforcement beam steel cage 14 arranged at the top and bottom of the wall beam cavity 13 for construction of cast-in-place reinforcement beams 8, and fixed by binding through connecting struts 9, thereby improving the strength of the cast-in-place reinforcement beams 8 after construction.

[0062] Furthermore, in a preferred embodiment, the thin-walled structure inner layer 4 and the thin-walled structure outer layer 6 are assembled using standardized fiber cement boards, the fiber cement boards have a thickness of 30 to 50 mm, and have built-in fiber mesh and steel mesh to ensure the strength of the fiber cement boards; preferably, thermal insulation materials are added to the fiber cement boards to improve the thermal insulation properties of the fiber cement boards.

[0063] Further, in a preferred embodiment, see Fig. 9 The box of the present invention further comprises an inner wall decoration layer 15 arranged on the indoor side surface of the thin-wall structure inner layer 4, and an outer wall decoration layer 16 arranged on the indoor side surface of the thin-wall structure outer layer 6.

[0064] Furthermore, in a preferred embodiment, the interior wall decoration layer 15 is constructed of paint, ceramic tiles or wall cloth, and the exterior wall decoration layer 16 is constructed of real paint or ceramic tiles; the interior wall decoration layer 15 and the exterior wall decoration layer 16 can be centrally painted or glued in advance in the factory by machinery or manual labor to achieve factory production.

[0065] Furthermore, in a preferred embodiment, the draw hook 10 is formed by bending a steel bar with a diameter of 4 to 6 mm, and the connecting strut 9 is a steel bar with a diameter of 12 to 20 mm.

[0066] Example 2

[0067] A construction method for a container house cluster building comprises the following steps:

[0068] S1. Confirm design parameters

[0069] Use BIM design software such as Revit, Navisworks, AutoCAD, ArchiCAD, Tekla Structures, etc. to carry out structural design of the container room cluster building. During the design, first complete the preliminary design according to the owner's needs and planning index requirements, then adjust the design and divide the box structure according to the transportation and hoisting requirements and the stability of the box-type main structure, so as to determine the number, size and splicing method of the container rooms in the container room cluster building, as well as the size and construction parameters of the structural components of each container room, and form a construction design drawing; among them, please refer to Fig.10 , the box-type structure division should be standardized, generally divided into 3m × 6m in length and width, to facilitate processing, transportation and lifting; please refer to Fig.10 and Fig.11 When adjacent surfaces exist between adjacent container rooms in a container room cluster building, no prefabricated vertical connection member 3, thin-walled structure inner layer 4 and anchoring steel bar 5 are provided at the adjacent surface positions of the adjacent container rooms, but a sealing rubber strip 17 is provided at the bottom of one side of the prefabricated upper floor slab 1 and the prefabricated lower floor slab 2 at the adjacent surface positions of the adjacent container rooms. The purpose of providing the sealing rubber strip 17 is, firstly, to avoid damage to the floor slab caused by physical collision when adjacent container rooms are spliced, and secondly, to facilitate later waterproofing treatment and reserve deformation space; or, no prefabricated vertical connection member 3 and thin-walled structure inner layer 4 are provided at the adjacent surface positions of the adjacent container rooms, but mutually connected thin-walled structure inner layers 4 are provided at the bottom of one side of the prefabricated upper floor slab 1 and the prefabricated lower floor slab 2 at the adjacent surface positions of the adjacent container rooms to serve as templates for subsequent pouring of post-casting strips;

[0070] In order to facilitate on-site installation, the thin-walled structure inner layer 4 and the thin-walled structure outer layer 6 are designed to be assembled in blocks. The size of the standard block is generally 60cm×60cm. Each standard block is marked with a number and a block-detailed drawing is drawn to facilitate on-site installation of the standard block according to the number and block-detailed drawing.

[0071] S2. Box-type main structure construction

[0072] See also Figure 1 and Figure 2After the construction design drawing is reviewed, the dimensions of each container room determined in step S1, as well as the dimensions and construction parameters of the structural components of each container room, are used to complete the construction of the box-type main structure of each container room in the factory according to the following steps: prefabricate the lower floor slab steel bar sheet and pre-embed the pipeline → prefabricate the lower floor slab formwork installation and concrete pouring → prefabricate the vertical connection member steel bar sheet and pre-embed the pipeline → prefabricate the vertical connection member formwork installation and concrete pouring → prefabricate the upper floor slab formwork installation → prefabricate the upper floor slab steel bar sheet and pre-embed the pipeline Pre-embedding → pouring concrete for the prefabricated upper floor slab → removing the formwork → installing the inner layer of the thin-walled structure → installing the door and window structure; wherein, in the steps of tying the steel bars of the prefabricated lower floor slab, tying the steel bars of the prefabricated vertical connecting member, and tying the steel bars of the prefabricated upper floor slab, anchoring steel bars 5 are reserved on one side of the outer periphery of the prefabricated upper floor slab 1 and the prefabricated lower floor slab 2 and on the left and right sides of the prefabricated vertical connecting member 3 to extend into the wall beam cavity 13; in the step of installing the inner layer of the thin-walled structure, a hook 10 is pre-embedded in advance on the rough surface of the inner layer of the thin-walled structure;

[0073] S3. On-site foundation construction

[0074] According to the construction design drawing of step S1, the construction of the building foundation is carried out; this process can be carried out simultaneously with the construction of the box-type main structure to shorten the construction period;

[0075] S4. Transportation and hoisting assembly of box-type main structure

[0076] After the building foundation is inspected and accepted, a plan for the box-type structure to enter the site is formulated. According to the plan, each box-type main structure in step S2 is transported to the site by trailer. Generally, the weight of a box-type main structure is about 8-10 tons. According to the container room splicing method determined in step S1, each box-type main structure is hoisted to the foundation for splicing by a crane or a heavy tower crane. In order to facilitate hoisting, the box-type main structure is designed with pre-buried hoisting points in advance during design and processing. During on-site hoisting, a hanger is used to ensure that the structure is not damaged due to uneven force.

[0077] S5. Partial cast-in-place structure construction

[0078] See also Figures 3 to 9According to the structural component dimensions and construction parameters of each box room determined in step S1, the partial cast-in-place structure construction of each box room is completed at the construction site in the following steps: the connecting struts 9 are installed on the outside of the thin-walled structure inner layer 4, and then the reinforcing beam steel cage 14 is tied and fixed by the connecting struts 9 in the avoidance space reserved at the upper and lower ends of the prefabricated vertical connecting member 3 and the thin-walled structure inner layer 4; the reinforcing beam steel cage 14 can be processed in the factory with in-depth design in advance, and marked with numbers and transported to the construction site together with the corresponding box-type main structure. When installing the steel bars, they are tied and connected according to the drawings and marked with numbers; while the steel bars are tied, the pipelines of the adjacent box rooms are connected and fixed to ensure The pre-buried water and electricity pipelines of each container house are connected to provide conditions for the subsequent threading and water supply; then the outer layer 6 of the thin-walled structure with a hook 10 pre-buried on the rough surface is installed and fixed to the outer side of the inner layer 4 of the thin-walled structure through the connecting strut 9, so as to cooperate with the inner layer 4 of the thin-walled structure to enclose a wall beam cavity 13; then, concrete is cast in place in the wall beam cavity 13, and the integral forming construction of the cast-in-place wall 7 and the cast-in-place reinforcement beam 8 is completed, so that the cast-in-place reinforcement beam 8 and the cast-in-place wall 7 are connected to the prefabricated upper floor 1, the prefabricated lower floor 2 and the prefabricated vertical connection member 3 through the reserved anchor steel bar 5 to form an integral structure, and the construction of the current container house is completed at this time;

[0079] S6. Waterproof treatment of joints in container-type building clusters

[0080] After the partial cast-in-place structure of each container house is completed, please refer to Fig.11 , waterproof treatment is performed on the joints of the sealing rubber strips at the adjacent surfaces of the adjacent container houses; the waterproof treatment adopts the common method of the prior art, and the construction glue can be injected into the joints of the sealing rubber strips to bond the joints, and then asphalt can be filled above the sealing rubber strips and between the adjacent butted floor slabs; please refer to Fig.12 However, for the case where the bottom of the prefabricated upper floor 1 and the prefabricated lower floor 2 at the adjacent surface of the adjacent box room are respectively provided with a thin-walled structure inner layer 4 that is connected to each other and serves as a template for the subsequent pouring of the post-casting strip, no waterproofing treatment is required.

Claims

1. A fully integrated partially cast-in-place box house, comprising a prefabricated upper floor (1), a prefabricated lower floor (2), and a door and window structure (11), characterized in that: Also includes: Prefabricated vertical connecting member (3), thin-walled structure inner layer (4), anchoring steel bar (5), thin-walled structure outer layer (6), cast-in-place wall (7), cast-in-place reinforcement beam (8), connecting brace (9) and hook (10); The prefabricated vertical connecting member (3) and the thin-walled structure inner layer (4) are connected between the edges of the prefabricated upper floor slab (1) and the prefabricated lower floor slab (2) to enclose together with the prefabricated upper floor slab (1) and the prefabricated lower floor slab (2) to form a box-type main structure, and the upper and lower ends of the prefabricated vertical connecting member (3) and the thin-walled structure inner layer (4) are reserved with an escape space (18) for the construction of a cast-in-place reinforcement beam (8); the prefabricated vertical connecting member (3) is reserved with a door and window opening (12), and the door and window structure (11) is installed in the door and window opening (12); the thin-walled structure outer layer (6) is connected and fixed to the outer side of the thin-walled structure inner layer (4) through a connecting strut (9) to cooperate with the thin-walled structure inner layer (4) to enclose a wall beam cavity (13); the thin-walled structure inner layer (4) and the thin-walled structure outer layer (6) The surface on the side close to each other is a rough surface, and a hook (10) extending toward the wall beam cavity (13) is pre-buried; the anchor steel bar (5) is reserved and arranged on one side of the outer periphery of the prefabricated upper floor slab (1) and the prefabricated lower floor slab (2) and on the left and right sides of the prefabricated vertical connecting member (3), and the anchor steel bar (5) extends into the wall beam cavity (13); the cast-in-place reinforcement beam (8) is arranged at the top and bottom of the cast-in-place wall (7), and the cast-in-place reinforcement beam (8) and the cast-in-place wall (7) are integrally formed by casting concrete in the wall beam cavity (13), so that the cast-in-place reinforcement beam (8) and the cast-in-place wall (7) are connected to the prefabricated upper floor slab (1), the prefabricated lower floor slab (2) and the prefabricated vertical connecting member (3) through the reserved anchor steel bar (5) to form an integral structure.

2. The fully integrated partially cast-in-place container house according to claim 1, characterized in that: The thickness of the prefabricated upper floor slab (1) and the prefabricated lower floor slab (2) is 6 to 10 cm, and both are cast and prefabricated using C25 to C35 concrete and internal steel bars with a diameter of 6 to 12 mm.

3. The fully integrated partially cast-in-place container house according to claim 1, characterized in that: The width of the prefabricated vertical connection member (3) is 1.5 to 1.8 m, and one prefabricated vertical connection member (3) is arranged at intervals of 4 to 5 m on each side of the box-type building structure. When two or more prefabricated vertical connection members (3) cannot be arranged at the above intervals on each side of the box-type building structure, only one prefabricated vertical connection member (3) is arranged at the middle position of the side.

4. The fully integrated partially cast-in-place container house according to claim 1, characterized in that: The prefabricated vertical connecting member (3) is prefabricated by casting using C20-C25 concrete and internal steel bars with a diameter of 12-20 mm.

5. The fully integrated partially cast-in-place container house according to claim 1, characterized in that: It also includes a reinforcement beam steel cage (14) which is arranged at the top and bottom of the wall beam cavity (13) at the location of the cast-in-place reinforcement beam (8) and is tied and fixed by connecting the support rods (9).

6. The fully integrated partially cast-in-place container house according to claim 1, characterized in that: The thin-walled structure inner layer (4) and the thin-walled structure outer layer (6) are assembled using standardized fiber cement boards, the fiber cement boards have a thickness of 30 to 50 mm, and have built-in fiber mesh and steel mesh.

7. The fully integrated partially cast-in-place container house according to claim 1, characterized in that: It also includes an inner wall decoration layer (15) arranged on the indoor side surface of the thin-wall structure inner layer (4), and an outer wall decoration layer (16) arranged on the indoor side surface of the thin-wall structure outer layer (6).

8. The fully integrated partially cast-in-place container house according to claim 7, characterized in that: The interior wall decoration layer (15) is constructed from paint, ceramic tiles or wall cloth, and the exterior wall decoration layer (16) is constructed from real paint or ceramic tiles.

9. The fully integrated partially cast-in-place container house according to claim 1, characterized in that: The draw hook (10) is made of steel bars with a diameter of 4 to 6 mm, and the connecting support rod (9) is a steel bar with a diameter of 12 to 20 mm.

10. A construction method for a container house cluster building, characterized in that The steps include: S1. Confirm design parameters The structural design of the container room cluster building is performed using design software to determine the number, size and splicing method of the container rooms in the container room cluster building, as well as the size and construction parameters of the structural components of each container room, and to form a construction design drawing; wherein, when adjacent container rooms in the container room cluster building have adjacent surfaces (19), no prefabricated vertical connecting components (3), thin-walled structural inner layers (4) and anchoring steel bars (5) are provided at the adjacent surface positions of the adjacent container rooms, but a sealing rubber strip (17) is provided at the bottom of one side of the prefabricated upper floor slab (1) and prefabricated lower floor slab (2) at the adjacent surface positions of the adjacent container rooms, or no prefabricated vertical connecting components (3) and thin-walled structural inner layers (4) are provided at the adjacent surface positions of the adjacent container rooms, but mutually connected thin-walled structural inner layers (4) are provided at the bottom of one side of the prefabricated upper floor slab (1) and prefabricated lower floor slab (2) at the adjacent surface positions of the adjacent container rooms to serve as a template for subsequent post-casting; S2. Box-type main structure construction According to the size of each container room determined in step S1, as well as the size and construction parameters of the structural components of each container room, the box-type main structure construction of each container room is completed in the factory according to the following steps: prefabricate the lower floor slab steel bar sheet and pre-embed the pipeline → prefabricate the lower floor slab formwork installation and concrete pouring → prefabricate the vertical connection member steel bar sheet and pre-embed the pipeline → prefabricate the vertical connection member formwork installation and concrete pouring → prefabricate the upper floor slab formwork installation → prefabricate the upper floor slab steel bar sheet and pre-embed the pipeline → prefabricate the upper floor slab concrete pouring Construction → demoulding → installation of the inner layer of the thin-walled structure → installation of the door and window structure; wherein, in the steps of tying the steel bars of the prefabricated lower floor slab, tying the steel bars of the prefabricated vertical connecting components and tying the steel bars of the prefabricated upper floor slab, anchoring steel bars (5) are reserved on one side of the outer periphery of the prefabricated upper floor slab (1) and the prefabricated lower floor slab (2) and on the left and right sides of the prefabricated vertical connecting components (3) to extend into the wall beam cavity (13); in the step of installing the inner layer of the thin-walled structure, a draw hook (10) is pre-embedded in advance on the rough surface of the inner layer of the thin-walled structure; S3. On-site foundation construction According to the construction design drawing of step S1, the building foundation base is constructed; S4. Transportation and hoisting assembly of box-type main structure After the building foundation is inspected and accepted, the box-type main structures of step S2 are transported to the site, and according to the container house splicing method determined in step S1, the box-type main structures are hoisted onto the foundation for splicing; S5. Partial cast-in-place structure construction According to the structural component dimensions and construction parameters of each container house determined in step S1, the partial cast-in-place structure construction of each container house is completed at the construction site in the following steps: a connecting rod (9) is installed on the outer side of the thin-walled structure inner layer (4), and then the reinforcing beam steel cage (14) is tied and fixed in the escape space reserved at the upper and lower ends of the prefabricated vertical connecting member (3) and the thin-walled structure inner layer (4) through the connecting rod (9), and then the thin-walled structure outer layer (6) with a hook (10) embedded in the rough surface is installed and fixed to the thin-walled structure outer layer (6) through the connecting rod (9). The outer side of the inner layer (4) of the wall structure is formed to cooperate with the inner layer (4) of the thin-wall structure to enclose a wall beam cavity (13); then, concrete is poured in the wall beam cavity (13) to complete the integral construction of the cast-in-place wall (7) and the cast-in-place reinforcement beam (8), so that the cast-in-place reinforcement beam (8) and the cast-in-place wall (7) are connected to the prefabricated upper floor slab (1), the prefabricated lower floor slab (2) and the prefabricated vertical connection member (3) through the reserved anchoring steel bars (5) to form an integral structure, and at this time, the construction of the current container house is completed; S6. Waterproof treatment of joints in container-type building clusters After the partial cast-in-place structure of each container house is constructed, waterproofing treatment is performed on the joints of the sealing rubber strips at the adjacent surfaces of the adjacent container houses.