Drilling device and method suitable for land and water junction position of shallow water bank slope

By installing an extension platform on the hull and using positioning columns, anchors, balanced water tanks and other technologies, the safety hazards and low construction efficiency of drilling methods at the water and land junction positions of shallow water slopes are solved, and efficient and precisely positioned drilling operations are achieved.

CN118958870APending Publication Date: 2024-11-15SHANGHAI WATERWAY ENG DESIGN & CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411188808.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The drilling method at the current water-land junction position of shallow water slopes has safety hazards, low construction efficiency and insufficient applicability, including instability inclination of the rig mounted on foam rafts, long time to set up scaffolding platforms, stranding of ship cantilever platforms and hole position deviations. .

Method used

The hull structure with an extension platform is adopted, and the drilling rig is connected through a boom and a sling, so as to achieve precise positioning and balance of the drilling rig in the middle of the hull, and the hull is fixed by using positioning columns and positioning anchors, and the hull is maintained in a balanced water tank and water pump to achieve drilling Horizontal placement and precise positioning of the equipment.

Benefits of technology

The drilling efficiency at the junction of shallow shore slopes is improved, the risk of hull stranding is avoided, construction time is shortened, and the drilling progress and precise positioning ability is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958870A_ABST
    Figure CN118958870A_ABST
Patent Text Reader

Abstract

A drilling rig suitable for the land and water junction position of a shallow water bank slope comprises drilling equipment, a ship body structure, an extension platform structure and a positioning system, the extension platform structure is connected with the front portion of the ship body structure through a movable connecting piece and a lifting rod, and the positioning system is arranged on the periphery of the ship body structure to position the ship body structure; the drilling equipment is placed on the extension platform structure. The ship body structure and the extension platform structure are utilized, the drilling machine can move from the middle of the ship body structure to the position above the platform structure, accurate positioning of the land and water junction position of the shallow water bank slope can be achieved, the stranding risk of the ship body structure too close to the shore is avoided, meanwhile, the drilling efficiency is improved, and the drilling progress is accelerated; and the drilling efficiency at the land and water junction of the shallow water bank slope can be greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of water transport and water conservancy technology, and relates to shallow water bank slope engineering survey, in particular to a drilling method at a water-land junction position in a shallow water bank slope engineering. Background Art

[0002] The existing drilling methods at the junction of land and water on shallow water slopes are more common, such as using a foam raft to carry a drilling rig, building a scaffolding platform, or using a cantilevered platform on one side of a ship or a hole in the middle to carry a drilling rig. The problems with the above drilling methods include:

[0003] (1) The method of carrying drilling rigs on foam rafts: Foam rafts are the most commonly used method in drilling operations and are suitable for drilling construction in shallow waters. The advantages are low cost and easy tying. However, its disadvantage is that it is generally suitable for drilling in shallow water areas. For shallow water slopes where land and water meet, foam rafts often cannot be put in place. When put in place, because half of the foam raft is water and the other half is land, the foam raft platform will tilt, causing the drilling rig to become unstable and causing serious safety accidents. Another disadvantage is that foam rafts are non-standard products and cannot obtain maritime permits in navigable rivers, so they are less suitable for use.

[0004] (2) Method of building scaffolding platform: At the junction of water and land on shallow water slopes, the method of building scaffolding platform is often used. The advantage of this method is that it is relatively direct, and the drill hole at the junction of water and land is directly converted into a land hole, which makes drilling convenient and fast; but its obvious disadvantage is that it affects the construction period. As we all know, a scaffolding platform with a length of 15m, a width of 5m, and a height of 10m takes at least 2 days for 4 skilled workers to quickly install and dismantle it, which seriously affects the progress of drilling construction; secondly, the scaffolding platform cannot be set up on the bank slope with tall trees and key buildings, and its applicability is relatively limited.

[0005] (3) The method of using a cantilevered platform on one side of the ship or a hole in the middle to carry a drilling rig: This method is the current mainstream method of drilling holes on water. Its advantages are that it is easy to obtain maritime approval and the drilling construction is convenient and fast; however, its disadvantages are that the tonnage of ships with a cantilevered platform on one side is generally large, and they often cannot reach the intersection of shallow water slopes and land, and are stranded, often causing grounding accidents; at the same time, the disadvantage of the method of using a hole in the middle of the ship to carry a drilling rig platform is that the bow may touch the intersection of shallow water slopes and land, but the drilling position of the hole in the middle does not reach the drilling position required by the design, and the hole position often has deviations, which cannot meet the design requirements and has poor applicability. Summary of the invention

[0006] The object of the present invention is to provide a drilling device and method suitable for the water-land junction of a shallow water slope, so as to overcome the above-mentioned shortcomings and deficiencies of the prior art.

[0007] In order to achieve the above-mentioned object of the invention, the present invention adopts the following technical scheme:

[0008] A drilling device suitable for the junction of land and water on a shallow water slope comprises a hull structure, an extension platform structure, a positioning column and a positioning anchor. The extension platform structure is connected to the front of the hull structure through bolts and lifting rods, and the positioning column and the positioning anchor are located around the hull structure.

[0009] The hull structure includes: a hull, a drive, a balance water tank, and a pump. The balance water tank and the pump are located inside the hull, and the drive is at the tail of the hull.

[0010] Furthermore, the extension platform structure includes a platform plate, a suspension rod, a suspension cable, and a support body. The suspension rod is supported on the support body, and the balance of the platform plate is achieved through the suspension rod and the suspension cable.

[0011] Optionally, the positioning system includes positioning columns and positioning anchors, and the positioning columns and positioning anchors are arranged around the hull structure to position it.

[0012] Optionally, the extended platform structure includes a platform plate, a first boom, a first sling, a first support body, a first winch, a second boom, a second sling, a second support body, and a second winch; the first boom, the first sling, the first support body, the first winch, the second boom, the second sling, the second support body, and the second winch have the same composition and connection structure and are respectively arranged on the left and right sides of the front of the hull structure.

[0013] Optionally, the hinged end of the first boom is fixed to the hull through a hinged seat, and the other end is a movable end; one end of the support body is fixed to the hull, and the other end is vertically upward connected to a supporting point on the middle section of the support boom; one end of the sling is connected to the platform plate, and the other end is vertically upward connected to a winch through the movable end of the boom, and the winch drives the platform plate to rise or fall by driving the sling to rise or fall.

[0014] Optionally, the first suspension rod, the first sling, the first support body, the second suspension rod, the second sling, and the second support body are interconnected and coordinated so that the platform plate remains horizontal and the drilling equipment is placed horizontally on the platform plate.

[0015] Optionally, a slot is preset on the platform plate, in which the lower casing of the drilling equipment can be moved and fixed at a suitable position.

[0016] Optionally, the range of movement of the downward extending sleeve provided by the card slot is 0.3 to 0.5 m; the diameter of the positioning column is 10 to 15 cm, and after being inserted into the underwater mud surface, vertical fixation is achieved through four circular holes preset around the hull.

[0017] A drilling method suitable for a shallow water bank slope at the junction of water and land, comprising the following steps:

[0018] Step 1: First, hoist the drilling rig structure to the middle of the hull structure, and drive the hull structure to the vicinity of the water-land junction of the designated shallow water slope;

[0019] Step 2: by adjusting the angle of the suspender rod and the length of the sling, the extended platform structure is horizontally placed so that the platform plate is connected to the bank slope;

[0020] Step 3: Move the drilling rig structure onto the platform plate while keeping the hull balanced. Extend the lower casing of the drilling rig structure underwater and move it into position in the preset slot of the platform plate.

[0021] Step 4: After the lower casing of the drilling rig structure is accurately positioned, install the positioning column and positioning anchor to fix the hull structure;

[0022] Step 5: Raise the drilling rig tripod and drilling rig structure to conduct core drilling and related in-situ testing;

[0023] Step 6: After the core drilling and related in-situ tests are completed, pull out the lower casing of the drilling rig structure, move the drilling rig structure to the middle of the hull structure, and keep the hull balanced. By raising the boom and tightening the slings, retract the platform plate of the extension platform to keep an angle with the vertical line;

[0024] Step 7: Start the drive of the hull structure to the next shallow water slope where the land and water meet, and start the cycle from step 2.

[0025] Optionally, in step three, when the drilling rig structure is moved to the platform plate, the synchronous pump pumps water into the balance water tank to keep the hull balanced; in step six, when the drilling rig structure is moved to the middle of the hull structure, the synchronous pump releases water into the balance water tank to keep the hull balanced.

[0026] Optionally, in step six, the platform plate of the extension platform is retracted to maintain an angle of 45° with the vertical line.

[0027] The beneficial effects of the present invention include:

[0028] Compared with the traditional technology, the present invention utilizes the hull structure and the extended platform structure, and the drilling rig can be moved from the middle of the hull structure to the platform structure, so as to achieve precise positioning at the junction of land and water on the shallow water slope and avoid the risk of the hull structure running aground too close to the shore. At the same time, the drilling efficiency is increased, the drilling progress is improved, and the drilling efficiency at the junction of land and water on the shallow water slope can be greatly improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following drawings are provided for display:

[0030] Figure 1 A side view of an embodiment of a drilling device suitable for use at the water-land junction of a shallow water slope according to the present invention.

[0031] Figure 2 A top view of an embodiment of a drilling device suitable for use at the water-land junction of a shallow water slope according to the present invention.

[0032] Figure 3 The present invention discloses a flow chart of a drilling method suitable for a shallow water bank slope at the junction of land and water.

[0033] Markings in the figure:

[0034] 100 hull structure; 101 hull; 102 drive; 103 balance water tank; 104 pump;

[0035] 200 extension platform structure; 201 platform plate; 202 first suspension rod; 203 first suspension rope; 204 first support body; 205 first hinged seat;

[0036] 2022 second suspension rod; 2032 second suspension rope; 2042 second support body; 2062 second winch;

[0037] 206 first winch; 207 card slot;

[0038] 300 positioning system; 301 positioning column; 302 positioning anchor; 400 shallow water slope; 500 water surface;

[0039] 600 drilling rig structure; 601 drilling rig tripod; 602 lower casing.

[0040] It should be noted that the above-mentioned drawings only show some embodiments of the present invention. For ordinary technicians in this field, they can also obtain drawings of other embodiments based on these drawings without paying any creative work. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and beneficial effects of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0042] For ease of description, spatially relative terms, such as "under", "below", "down", "above", "upper", etc., will be used when necessary to describe the relationship of one element or feature relative to another element or feature shown in the drawings. The spatially relative terms are intended to include different orientations of the device in use or operation other than the orientation shown in the drawings. For example, if the device in the figure is turned over, elements described as being "under" or "beneath" other elements or features will be oriented as being "above" the other elements or features.

[0043] Unless otherwise defined, the terms used herein have the same meaning as commonly understood by ordinary technicians in the field to which the invention belongs, and the terms should be understood to have the same meaning as in the context of the relevant technology and should not be understood in an idealized or overly formal way, except where explicitly defined in the present invention.

[0044] like Figure 1 , 2 As shown, a drilling device suitable for the junction of land and water in a shallow water slope 400 includes: a hull structure 100, an extension platform structure 200, and a positioning system 300. The extension platform structure 200 is connected to the front of the hull structure 100 through a movable connection structure such as bolts and lifting rods. The positioning system 300 includes a positioning column 301 and a positioning anchor 302. The positioning column 301 and the positioning anchor 302 are arranged around the hull structure 100 to position it.

[0045] The hull structure 100 includes: a hull 101, a driver 102, a balance water tank 103, and a pump 104. The balance water tank 103 and the pump 104 are arranged inside the hull 101, and the driver 102 is arranged at the tail of the hull 101 to drive the hull 101 to move.

[0046] Further, the extended platform structure includes a platform plate 201, a first suspension rod 202, a first sling 203, a first support body 204, a first hoist 206, a second suspension rod 2022, a second sling 2032, a second support body 2042, and a second hoist 2062; the first suspension rod 202, the first sling 203, the first support body 204, the first hoist 206, the second suspension rod 2022, the second sling 2032, the second support body 2042, and the second hoist 2062 have the same composition and connection structure, and are respectively arranged on the left and right sides of the front of the hull structure 100; the first suspension rod 202, the first sling 203, the first support body 204, and the first hoist 206 are taken as an example to illustrate as follows:

[0047] The hinged end of the first boom 202 is fixed to the hull 101 through a hinged seat 205, and the other end is a movable end; one end of the support body 204 is fixed to the hull 101, and the other end is vertically upwardly connected to a supporting point on the middle section of the first boom 202; one end of the first sling 203 is connected to the platform plate 201, and the other end is vertically upwardly connected to the winch 206 through the movable end of the first boom 202. The winch 206 drives the sling 203 to rise or fall, thereby driving the platform plate 201 to rise or fall.

[0048] Through the mutual cooperation of the first suspension rod 202, the first sling 203, the first support body 204, the second suspension rod 2022, the second sling 2032, and the second support body 2042, the platform plate 201 remains horizontal and does not tilt upward or downward, and the drilling rig structure 600 can be placed horizontally on the platform plate 201.

[0049] In addition, a slot 207 is preset on the platform plate 201 for the lower extension sleeve 602 of the drilling rig structure 600 to move therein and be fixed at a suitable position. The slot 207 allows the lower extension sleeve 602 to move within a range of 0.3 to 0.5 m; the positioning column 301 has a diameter of 10 cm to 15 cm, and after being inserted into the underwater mud surface, it is vertically fixed through the four circular holes preset around the hull; the positioning anchors 302 are arranged around the hull 101 and can be used to further fix the hull 101.

[0050] like Figure 3 As shown, a method for drilling using the above-mentioned drilling device suitable for the water-land junction position of a shallow water slope comprises the following steps:

[0051] Step 1: hoist the drilling rig structure 600 to the middle of the hull structure 100, and drive the hull structure 100 to the vicinity of the water-land junction of the designated shallow water slope 400 through the driver 102;

[0052] Step 2: By adjusting the angles of the first suspender 202 and the second suspender 2022 and the lengths of the first sling 203 and the second sling 2032, the extended platform structure 200 is horizontally placed so that the platform plate 201 is connected to the shallow water slope 400. The first suspender 202 and the second suspender 2022 are connected to the surface of the hull 101 through the first hinge seat 205 and the second hinge seat 2052, respectively, and are supported by the first support body 204 and the second support body 2042 respectively; the lengths of the first sling 203 and the second sling 2032 are adjusted by the first winch 206 and the second winch 2062 installed on the hull 101.

[0053] Step 3: Move the drilling rig structure 600 onto the platform plate 201 (synchronously pumping water from the balance water tank 103 by the pump 104 to increase the load and keep the hull 101 balanced). The lower extension sleeve 602 of the drilling rig structure 600 extends below the water surface 500 and can be moved and positioned in the preset slot 207 of the platform plate 201. The weight of the drilling rig structure 600 is about 1.5 tons, and the volume of water pumped by the pump 104 to the balance water tank 103 is kept at 1.5m 3 The total load of the hull 101 is about 10 tons, and the maximum draft is about 0.6 to 0.8 meters, so as to maintain the safety of the hull 101 while taking into account the flexibility of the shallow water slope 400 water-land handover position.

[0054] Step 4: After the lower extension casing 602 of the drilling rig structure 600 is accurately positioned, the positioning column 301 and the positioning anchor 302 are installed to fix the hull structure 100. Among them, the lower extension casing 602 can move left and right in the preset slot 207 of the platform plate 201, and the movement range is about 0.3 to 0.5m. It is a fine-tuning means for the ship to remain stationary and the drilling machine to move, so as to meet the needs of accurate positioning; the positioning column 301 has a diameter of about 10cm to 15cm, and after being inserted into the underwater mud surface, it can be vertically fixed through the four circular holes preset around the hull; the positioning anchor 302 is set around the hull and can be used to further fix the hull 101; the number of positioning columns 301 and positioning anchors 302 used depends on the water flow conditions of the water area, and can be used in full or in part, in order to ensure the balance and stability of the hull 101 during the exploration operation.

[0055] Step 5: Raise the drilling rig tripod 601 and the drilling rig structure 600 to perform coring and related in-situ testing. The coring and in-situ testing are performed in accordance with relevant specifications.

[0056] Step 6: After the core drilling and related in-situ tests are completed, pull out the lower casing 602 of the drilling rig structure 600, move the drilling rig structure 600 to the middle of the hull structure 100 (synchronously the pump 104 releases water from the balance water tank 103 to reduce the load to keep the hull 101 balanced), and by raising the first boom 202, the second boom 2022 and tightening the first sling 203, the second sling 2032, the platform plate 201 of the extended platform structure 200 is retracted to maintain an angle of about 45° with the vertical line. Among them, the first boom 202 and the second boom 2022 are raised and the first sling 203 and the second sling 2032 are tightened, and the first winch 206 and the second winch 2062 installed on the hull 101 are adjusted; the purpose of retracting the platform plate 201 of the extended platform structure 200 to maintain an angle of about 45° with the vertical line is to facilitate the safe movement of the hull structure 100, positioning at the next position, etc.

[0057] Step 7: Start the driver 102 of the hull structure 100 to the next shallow water slope where the land and water meet, and start the cycle operation from step 2.

[0058] It should be noted that the well-known components and structures used in the present invention, as well as the existing technologies that can be selected by those skilled in the art based on the description of the present invention, are not described in detail here.

[0059] The present invention adopts a hull structure with an extension platform. After the hull structure reaches the designated shallow water slope water-land junction position, the extension platform can be lowered by a suspender and a sling, and the drilling rig structure can be moved to the extension platform to achieve drilling operations at the shallow water slope water-land junction position; at the same time, in order to maintain the front and rear balance of the hull, a balance water tank and a pump are arranged in the hull behind the hull structure. When the drilling rig structure moves forward to the extension platform, water is injected into the balance water tank by the pump to achieve hull balance; after the operation is completed, the drilling rig structure is moved backward and water is pumped out from the balance water tank by the pump to achieve hull balance, and the hull structure is started to move to the next shallow water slope water-land junction position to carry out a new round of drilling operations. The present invention can achieve precise positioning at the shallow water slope water-land junction position through the above method, avoid the risk of the hull structure being stranded too close to the shore, and at the same time increase the efficiency of drilling, improve the progress of drilling, and greatly improve the drilling efficiency at the shallow water slope water-land junction position.

[0060] The above description of the embodiments is to facilitate the understanding and use of the present invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the protection scope of the present invention.

Claims

1. A drilling device suitable for use at the junction of water and land on a shallow water slope, characterized in that: include: Drilling equipment, hull structure, extension platform structure, positioning system, the extension platform structure is connected to the front of the hull structure through a movable connecting piece and a lifting rod, and the positioning system is arranged around the hull structure to position it; The drilling equipment is placed on the extended platform structure.

2. The drilling device suitable for use at the junction of water and land on a shallow water slope according to claim 1, characterized in that: The hull structure comprises: a hull, a driver, a balance water tank, and a pump. The balance water tank and the pump are located inside the hull, and the driver is arranged at the tail of the hull.

3. The drilling device suitable for use at the junction of water and land on a shallow water slope according to claim 1, characterized in that: The extended platform structure comprises a platform plate, a suspension rod, a suspension cable and a support body. The suspension rod is supported on the support body, and the platform plate is balanced by the suspension rod and the suspension cable.

4. The drilling device suitable for use at the junction of water and land on a shallow water slope according to claim 1, characterized in that: The positioning system comprises a positioning column and a positioning anchor, and the positioning column and the positioning anchor are arranged around the hull structure to position it.

5. The drilling device suitable for use at the junction of water and land on a shallow water slope according to claim 1, characterized in that: The extended platform structure includes a platform plate, a first hoisting rod, a first sling, a first supporting body, a first winch, a second hoisting rod, a second sling, a second supporting body, and a second winch; the first hoisting rod, the first sling, the first supporting body, the first winch, the second hoisting rod, the second sling, the second supporting body, and the second winch have the same composition and connection structure, and are respectively arranged on the left and right sides of the front of the hull structure.

6. The drilling device suitable for use at the junction of water and land on a shallow water slope according to claim 5, characterized in that: The hinged end of the first boom is fixed to the hull through a hinged seat, and the other end is a movable end; one end of the support body is fixed to the hull, and the other end is vertically connected to a supporting point on the middle section of the support boom; one end of the sling is connected to the platform plate, and the other end is vertically connected to the winch through the movable end of the boom, and the winch drives the platform plate to rise or fall by driving the sling to rise or fall.

7. The drilling device suitable for use at the junction of land and water on a shallow water slope according to claim 5, characterized in that: The first suspension rod, the first sling, the first support body, the second suspension rod, the second sling and the second support body are connected and coordinated with each other, so that the platform plate is kept horizontal and the drilling equipment is placed horizontally on the platform plate.

8. The drilling device suitable for use at the junction of water and land on a shallow water slope according to claim 1, characterized in that: The platform plate is pre-equipped with a slot for the lower casing of the drilling equipment to move in and be fixed at a suitable position.

9. The drilling device suitable for use at the junction of water and land on a shallow water slope according to claim 8, characterized in that: The clamping groove allows the downward extension sleeve to move within a range of 0.3 to 0.5 m. The positioning column has a diameter of 10 to 15 cm and is inserted into the underwater mud surface to be vertically fixed through four circular holes preset around the hull.

10. A drilling method suitable for the junction of water and land on a shallow water slope, comprising the following steps: Step 1: First, hoist the drilling rig structure to the middle of the hull structure, and drive the hull structure to the vicinity of the water-land junction of the designated shallow water slope; Step 2: by adjusting the angle of the suspender rod and the length of the sling, the extended platform structure is horizontally placed so that the platform plate is connected to the bank slope; Step 3: Move the drilling rig structure onto the platform plate while keeping the hull balanced. Extend the lower casing of the drilling rig structure underwater and move it into position in the preset slot of the platform plate. Step 4: After the lower casing of the drilling rig structure is accurately positioned, install the positioning column and positioning anchor to fix the hull structure; Step 5: Raise the drilling rig tripod and drilling rig structure to conduct core drilling and related in-situ testing; Step 6: After the core drilling and related in-situ tests are completed, pull out the lower casing of the drilling rig structure, move the drilling rig structure to the middle of the hull structure while keeping the hull balanced), and raise the boom and tighten the slings to retract the platform plate of the extension platform to keep an angle with the vertical line; Step 7: Start the drive of the hull structure to the next shallow water slope where the land and water meet, and start the cycle from step 2.

11. The drilling method applicable to the water-land junction of shallow water slope according to claim 10, characterized in that: In step 3, when the drilling rig structure is moved onto the platform plate, the synchronous pump pumps water from the balance water tank to keep the hull balanced; In step six, when the drilling rig structure is moved to the middle of the hull structure, the synchronous pump releases water into the balance water tank to keep the hull balanced.

12. The drilling method applicable to the water-land junction of shallow water slope according to claim 10, characterized in that: In step six, the platform plate of the extension platform is retracted to maintain an angle of 45° with the vertical line.