Anti-drag jacking construction structure and construction method for super-large-section box culvert passing through road underneath
By using a slider structure and a multi-stage step jack combined with lubrication technology in the underpass construction, the problem of large friction resistance during the over-large section box culvert is solved, achieving more efficient construction and safety improvement.
Patent Information
- Application Number
- CN202411318041.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-15
AI Technical Summary
During the underpass construction, the roadbed translation or settlement deformation caused by excessive friction resistance during the overpassing process of the over-sized cross-section box culvert, which increases the construction difficulty and safety risks. The existing technology has not been ideal for this.
Using a skateboard structure, the skateboard is equipped with guide piers, back beams, jacks and reserved grouting channels. The friction resistance is reduced through the paraffin layer, talc powder layer and plastic film, and a long-distance top is achieved through the jack on the multi-stage step surface. Introduce lubrication and reinforcement connections of slurry and consolidation mortar.
It effectively reduces the friction resistance during the box culvert erection process, saves energy, improves construction efficiency, achieves longer distance erection, enhances the connection strength between the box culvert and the foundation, and reduces construction difficulty and safety risks.
Smart Images

Figure CN118959043A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underpass highway construction, in particular to a drag reduction jacking construction structure and a construction method for an ultra-large-section box culvert underpassing a highway. Background Art
[0002] With the continuous expansion and improvement of urban transportation networks, highway transportation, as an important part of urban transportation, has become increasingly important in terms of construction and maintenance. Especially when renovating and expanding transportation facilities on busy urban trunk roads or highways, how to minimize the impact of construction on normal traffic and ensure road safety during construction has become an important technical issue.
[0003] During the construction of underpass highway, when the overall size and weight of the box culvert are large, due to the huge cross-section of the box culvert and the thin covering layer of the underpass highway, the contact area between the box culvert and the roadbed soil is large during the jacking construction, resulting in a significant increase in frictional resistance, which is more likely to cause translation or settlement deformation of the highway roadbed and pavement, thereby increasing the construction difficulty and safety risks.
[0004] In traditional underpass highway construction, excavation is usually used. This method not only has a long construction period and high cost, but also has a great impact on the surrounding environment. Especially when constructing on busy traffic sections, it will cause great interference to normal traffic order. The top-pushing construction technology has gradually become a preferred construction method because of its less interference with the ground surface. However, for such a large-scale box culvert top-pushing construction, how to effectively reduce the friction resistance between the box culvert and the soil, and how to avoid the safety hazards caused by the movement of the roadbed have become key issues that need to be solved urgently.
[0005] Although the existing jacking construction technology has solved the above problems to a certain extent, the effect of the traditional method is not ideal when facing the jacking construction of super-large section box culverts. Summary of the invention
[0006] The technical problem to be solved by the present invention is to provide a drag-reducing jacking construction structure and a construction method for an ultra-large section box culvert under a highway, which can meet the low resistance demand of the jacking construction of the ultra-large section box culvert, effectively solve the problem of translation or settlement deformation of the high-speed roadbed and pavement caused by excessive friction resistance in the jacking construction in the prior art, reduce the difficulty of jacking construction, and improve construction safety.
[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is: a drag reduction jacking construction structure of a super-large-section box culvert under a highway, comprising a slide plate, the slide plate is cast on the original foundation in the foundation pit, the box culvert to be jacked is hoisted onto the slide plate, guide piers are arranged on both sides of the slide plate, the guide piers are located on both sides of the box culvert and are used for guiding the side of the slide plate during the jacking process of the box culvert; A back beam is arranged at one end of the slide plate, a jacking pipe is arranged between the back beam and the box culvert, a jack is arranged on one end of the jacking pipe close to the box culvert, one end of the jack is in contact with the wooden square at the end of the jacking pipe, and the other end is in contact with the box culvert.
[0008] In a preferred solution, a crushed stone cushion layer is provided under the slide plate, and a ground anchor beam is cast in the slide plate synchronously, and the ground anchor beam is cast together with the slide plate; Precast grooves are reserved during the casting process on both sides of the slide plate, and the guide piers are installed in the precast grooves.
[0009] In a preferred solution, a guide wheel is provided on the inner side wall of the guide pier, a lower cavity is provided at the bottom of the guide pier, the guide pier is located on one end of the top surface of the lower cavity, and a pressure plate is provided on the other end of the top surface of the lower cavity; The pressing plate is movably arranged on the top surface of the lower cavity through a pin shaft, a pressing block is arranged below the pressing plate, the pressing block passes through the top surface of the lower cavity and extends into the lower cavity, a first slope is arranged at the bottom of one side of the pressing block, a transverse sliding rod is arranged in the lower cavity, a second slope is arranged on the top surface of one end of the transverse sliding rod, and the first slope contacts the second slope; A rotating rod is provided on the top of one end of the transverse sliding rod away from the pressing block, and the rotating rod passes upward into the guide pier; The guide wheel is connected and fixed to a movable block arranged in the guide pier, and one end of a rotating rod extending into the guide pier is movably connected to the movable block.
[0010] In a preferred solution, a horizontal fixing rod is provided on the inner wall of the end of the lower cavity away from the pressing block, one end of the fixing rod is inserted into the transverse sliding rod, and a spring is sleeved on the part of the fixing rod located outside the transverse sliding rod.
[0011] In a preferred embodiment, a through hole is provided on the top surface of the lower cavity below the guide pier, the rotating rod passes through the through hole and is fixed by a rotating rod fixing pin in the through hole, and the two ends of the rotating rod are connected to the first hinge seat on the top surface of the transverse sliding rod and the second hinge seat on the end surface of the movable block.
[0012] In a preferred solution, a strip hole is provided at the upper end of the rotating rod, and the pin in the second hinge seat is arranged through the strip hole.
[0013] In a preferred solution, a multi-step surface is formed at the bottom of the box culvert end surface, and the jacks are divided into multiple groups and are respectively placed on different steps on the step surface.
[0014] In a preferred solution, a paraffin layer is poured on the top surface of the slide plate, a talcum powder layer is provided on the top surface of the paraffin layer, two layers of plastic films are applied on the talcum powder layer, and the joints of the plastic films are pressed and the cut edges face the jacking direction of the box culvert.
[0015] In the preferred scheme, a drag-reducing steel plate is provided on the top of the box culvert, and a plurality of reserved grouting channels are provided at the bottom of the forward end of the box culvert. The grouting inlet of the reserved grouting channel is located on the top surface of the box culvert bottom plate, and the grouting outlet is located on the ground of the box culvert bottom plate. During the jacking process of the box culvert, mud injection and lubrication are carried out through the reserved grouting channel.
[0016] The construction method of the drag reduction jacking construction structure of the super-large cross-section box culvert under the highway comprises the following steps: 1) Lay a layer of crushed stone cushion at the bottom of the foundation pit and cast the formed skateboard. During the casting process of the skateboard, cast the anchor beam simultaneously; 2) Set up the back beam and the multi-stage jacking pipe between the back beam and the box culvert, and set a jack at one end of the jacking pipe. Start the jack to make one end of the jacking rod contact the box culvert; 3) Install guide piers in the prefabricated grooves on both sides of the slide; 4) Through the sequential pushing of multiple groups of jacks corresponding to the multi-step surface, the single long-distance jacking of the box culvert is realized; 5) After completing a single jacking operation, continue to add jacking pipes and carry out the next jacking operation; 6) During the jacking process, grout is poured between the slide plate and the box culvert through the reserved grouting channel to achieve drag reduction and lubrication; 7) After the box culvert is jacked into place, consolidation mortar is poured between the slide plate and the box culvert through the reserved grouting channel to enhance the connection strength between the box culvert and the original foundation.
[0017] The present invention provides a drag reduction jacking construction structure and construction method for a super-large cross-section box culvert under a highway. By adopting the above structure and method, the following beneficial effects are achieved: (1) By laying a paraffin layer, a talcum powder layer and a plastic film on the top surface of the slide, the friction resistance between the slide and the box culvert during the jacking process is effectively reduced, and the driving force required for jacking is reduced, thereby saving energy consumption and improving construction efficiency; (2) The lateral movement of the guide wheel driven by the pressure plate can achieve the purpose of guiding box culverts of different widths and sizes, avoiding the problem that the fixed guide structure cannot effectively fix box culverts of different sizes; (3) By pushing forward with multiple groups of jacks on the multi-level step surface, a longer pushing distance can be achieved for a single box culvert, thus speeding up the construction progress; (4) The reserved grouting channel can, on the one hand, add mud to lubricate the space between the box culvert and the original foundation during the jacking process to further reduce resistance. On the other hand, it can also be used to inject mortar after the box culvert is jacked into place to strengthen the connection strength between the box culvert and the original foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1It is a schematic diagram of the overall structure of the present invention.
[0019] Figure 2 It is a schematic diagram of the structure of the guidance system of the present invention.
[0020] Figure 3 It is a schematic diagram of the box culvert structure of the present invention.
[0021] Figure 4 It is a schematic diagram of the skateboard structure of the present invention.
[0022] In the figure: original foundation 1, slide plate 2, paraffin layer 201, talcum powder layer 202, plastic film 203, back beam 3, gravel cushion layer 4, anchor beam 5, prefabricated groove 6, guide pier 7, guide wheel 8, pressure plate 9, box culvert 10, step surface 1001, jack 11, jacking pipe 12, lower cavity 13, through hole 131, pressure block 14, first slope 141, lateral sliding rod 15, second slope 151, fixing rod 16, spring 17, first hinge seat 18, rotating rod 19, rotating rod fixing pin 191, strip hole 192, movable block 20, second hinge seat 2001, drag reduction steel plate 21, reserved grouting channel 22. DETAILED DESCRIPTION
[0023] Embodiment 1: like Figure 1-4 In the invention, a drag reduction jacking construction structure of a super-large-section box culvert under a highway comprises a slide plate 2, wherein the slide plate 2 is cast on an original foundation 1 in a foundation pit, and a box culvert 10 to be jacked is hoisted onto the slide plate 2, and guide piers 7 are arranged on both sides of the slide plate 2, and the guide piers 7 are located on both sides of the box culvert 10 and are used for guiding the side of the slide plate 2 during the jacking process of the box culvert 10; A back beam 3 is provided at one end of the slide plate 2, a jacking pipe 12 is provided between the back beam 3 and the box culvert 10, a jack 11 is provided on one end of the jacking pipe 12 close to the box culvert 10, one end of the jack 11 contacts the wooden block at the end of the jacking pipe 12, and the other end contacts the box culvert 10.
[0024] In a preferred solution, a crushed stone cushion layer 4 is provided under the slide plate 2, and a ground anchor beam 5 is cast in the slide plate 2 simultaneously, and the ground anchor beam 5 is cast together with the slide plate 2; Precast grooves 6 are reserved during the casting process on both sides of the slide plate 2 , and the guide piers 7 are installed in the precast grooves 6 .
[0025] In a preferred embodiment, a guide wheel 8 is provided on the inner wall of the guide pier 7, a lower cavity 13 is provided at the bottom of the guide pier 7, the guide pier 7 is located on one end of the top surface of the lower cavity 13, and a pressure plate 9 is provided on the other end of the top surface of the lower cavity 13; The pressing plate 9 is movably arranged on the top surface of the lower cavity 13 through a pin shaft, and a pressing block 14 is provided below the pressing plate 9, passing through the top surface of the lower cavity 13 and extending into the lower cavity 13, and a first slope 141 is provided at the bottom of one side of the pressing block 14, and a transverse sliding rod 15 is provided in the lower cavity 13, and a second slope 151 is provided on the top surface of one end of the transverse sliding rod 15, and the first slope 141 is in contact with the second slope 151; A rotating rod 19 is provided on the top of one end of the lateral sliding rod 15 away from the pressing block 14, and the rotating rod 19 passes upward into the guide pier 7; The guide wheel 8 is connected and fixed to a movable block 20 disposed in the guide pier 7 , and one end of a rotating rod 19 extending into the guide pier 7 is movably connected to the movable block 20 .
[0026] In a preferred embodiment, a horizontal fixing rod 16 is provided on the inner wall of the end of the lower cavity 13 away from the pressing block 14 , one end of the fixing rod 16 is inserted into the transverse sliding rod 15 , and a spring 17 is sleeved on the part of the fixing rod 16 outside the transverse sliding rod 15 .
[0027] In the preferred embodiment, a through hole 131 is provided on the top surface of the lower cavity 13 located below the guide pier 7, the rotating rod 19 passes through the through hole 131 and is fixed by a rotating rod fixing pin 191 in the through hole 131, and the two ends of the rotating rod 19 are connected to the first hinge seat 18 on the top surface of the transverse sliding rod 15 and the second hinge seat 2001 on the end surface of the movable block 20.
[0028] In a preferred solution, a strip hole 192 is provided at the upper end of the rotating rod 19 , and the pin shaft in the second hinge seat 2001 is arranged through the strip hole 192 .
[0029] In a preferred solution, a multi-step surface 1001 is formed at the bottom of the end surface of the box culvert 10 , and the jacks 11 are divided into multiple groups and are respectively placed on different steps on the step surface 1001 .
[0030] In a preferred embodiment, a paraffin layer 201 is cast on the top surface of the slide plate 2, a talcum powder layer 202 is provided on the top surface of the paraffin layer 201, and two layers of plastic film 203 are applied on the talcum powder layer 202. The plastic film 203 is pressed at the seams and the cut edges face the jacking direction of the box culvert 10.
[0031] In the preferred scheme, a drag-reducing steel plate 21 is provided on the top of the box culvert 10, and a plurality of reserved grouting channels 22 are provided at the bottom of the forward end of the box culvert 10. The grout inlet of the reserved grouting channel 22 is located on the top surface of the bottom plate of the box culvert 10, and the grout outlet is located on the ground of the bottom plate of the box culvert 10. During the jacking process of the box culvert 10, mud injection and lubrication are carried out through the reserved grouting channel 22.
[0032] Embodiment 2: Based on the drag reduction jacking construction structure of the super-large cross-section box culvert under the highway described in Example 1, the construction method includes the following steps: 1) A layer of crushed stone cushion 4 is laid at the bottom of the foundation pit and the formed slide plate 2 is cast. During the casting process of the slide plate 2, the anchor beam 5 is cast simultaneously; 2) a back beam 3 and a multi-stage jacking pipe 12 are arranged between the back beam 3 and the box culvert 10, and a jack 11 is arranged at one end of the jacking pipe 12, and the jack 11 is started to make one end of the jacking rod contact the box culvert 10; 3) Install guide piers 7 in the prefabricated grooves 6 on both sides of the slide plate 2; 4) A single long-distance jacking of the box culvert 10 is achieved by sequentially pushing the corresponding multiple groups of jacks 11 on the multi-step surface 1001; 5) After completing a single jacking operation, continue to add jacking pipe 12 and carry out the next jacking operation; 6) During the jacking process, grout is poured between the slide plate 2 and the box culvert 10 through the reserved grouting channel 22 to achieve drag reduction and lubrication; 7) After the box culvert 10 is pushed into place, consolidation mortar is poured between the slide plate 2 and the box culvert 10 through the reserved grouting channel 22 to enhance the connection strength between the box culvert 10 and the original foundation 1.
[0033] More specific: 1. Foundation pit treatment: First, dig the foundation pit at the predetermined location, clean up the debris in the foundation pit, and ensure that the bottom of the foundation pit is flat.
[0034] Slide plate casting: A 20 cm thick slide plate 2 is cast on the foundation 1 in the foundation pit, and a 20 cm thick gravel cushion layer 4 is laid under the slide plate 2 to enhance the load-bearing capacity and stability of the slide plate. At the same time, an anchor beam 5 is cast in the slide plate 2 to enhance the overall rigidity of the slide plate.
[0035] Reserve prefabricated grooves: reserve prefabricated grooves 6 on both sides of the slide plate 2 to facilitate the subsequent installation of guide piers 7.
[0036] 2. Install guide piers and jacking equipment Installation of guide piers: Guide piers 7 are installed in the prefabricated grooves 6 on both sides of the slide plate 2. Guide wheels 8 are installed on the inner wall of the guide piers 7, and a lower cavity 13 is set at the bottom of the guide piers 7. The guide pier 7 is installed at one end of the top surface of the lower cavity 13, and a movable pressure plate 9 is set at the other end. The pressure plate 9 is movably set on the top surface of the lower cavity 13 through a pin shaft, and a pressure block 14 is set below it, which passes through the top surface of the lower cavity 13 and extends into the lower cavity 13.
[0037] Arrangement of back beam and jacking pipe: a back beam 3 is arranged at one end of the slide plate 2, and a jacking pipe 12 is arranged between the back beam 3 and the box culvert 10. A jack 11 is arranged at one end of the jacking pipe 12 close to the box culvert 10, so that one end of the jack 11 contacts the wooden square at the end of the jacking pipe 12, and the other end contacts the box culvert 10.
[0038] 3. Drag reduction measures Surface treatment of the slide plate: A 3mm thick paraffin layer 201 mixed with 15% engine oil, a 0.2mm-1.0mm talcum powder layer 202 and a plastic film 203 are laid on the top surface of the slide plate 2 in order to reduce the friction during the jacking of the box culvert 10. The joint of the plastic film 203 is stubbled 20cm and the stubble faces the jacking direction of the box culvert 10.
[0039] Box culvert end face treatment: a multi-step surface 1001 is formed at the bottom of the end face of the box culvert 10, and multiple groups of jacks 11 are arranged on different steps to ensure uniform force during the jacking process of the box culvert 10 and to achieve jacking in stages.
[0040] Drag reduction steel plate setting: a drag reduction steel plate 21 is set on the top of the box culvert 10, and a reserved grouting channel 22 is set at the bottom of the forward end of the box culvert 10 to facilitate the injection of mud through the reserved grouting channel 22 during the jacking process, thereby further reducing the jacking resistance.
[0041] 4. Jacking construction The jacking starts: the box culvert 10 to be jacked is hoisted onto the slide plate 2, and the box culvert 10 is pushed forward by the jack 11.
[0042] Guide adjustment: During the jacking process, when the box culvert 10 is pressed on the pressure plate 9, the guide wheel 8 moves laterally and releases the side wall of the box culvert 10 to ensure that the guide wheel 8 can guide the box culverts 10 of different widths.
[0043] Grouting lubrication: During the jacking process of the box culvert 10, slurry is injected through the reserved grouting channel 22 to reduce the friction between the box culvert 10 and the soil, thereby ensuring the smooth progress of the jacking.
[0044] After the construction is completed, consolidation mortar is injected through the reserved grouting channel 22 to form a consolidation block between the original foundation 1 and the box culvert 10 , thereby strengthening the connection strength of the box culvert 10 on the original foundation 1 .
[0045] Security Monitoring During the jacking process, the position and posture of the box culvert 10 are monitored in real time to ensure safety during the jacking process. At the same time, the changes in the ground during the jacking process are monitored, and timely measures are taken to prevent the ground from shifting or settling and deforming.
Claims
1. A drag reduction jacking construction structure for a super-large cross-section box culvert under a highway, comprising a slide plate (2), characterized in that: The slide plate (2) is cast on the original foundation (1) in the foundation pit, and the box culvert (10) to be jacked is hoisted onto the slide plate (2). Guide piers (7) are provided on both sides of the slide plate (2). The guide piers (7) are located on both sides of the box culvert (10) and are used to guide the side of the slide plate (2) during the jacking process of the box culvert (10); A back beam (3) is provided at one end of the slide plate (2), a jacking pipe (12) is provided between the back beam (3) and the box culvert (10), a jack (11) is provided on one end of the jacking pipe (12) close to the box culvert (10), one end of the jack (11) is in contact with a wooden block at the end of the jacking pipe (12), and the other end is in contact with the box culvert (10).
2. The drag reduction jacking construction structure for a super-large cross-section box culvert under a highway according to claim 1 is characterized by: A crushed stone cushion layer (4) is provided below the slide plate (2), and a ground anchor beam (5) is cast synchronously in the slide plate (2). The ground anchor beam (5) is cast together with the slide plate (2); Precast grooves (6) are reserved during the casting process on both sides of the slide plate (2), and the guide piers (7) are installed in the precast grooves (6).
3. The drag reduction jacking construction structure for a super-large cross-section box culvert under a highway according to claim 1 or 2, characterized in that: A guide wheel (8) is provided on the inner side wall of the guide pier (7), a lower cavity (13) is provided at the bottom of the guide pier (7), the guide pier (7) is located on one end of the top surface of the lower cavity (13), and a pressure plate (9) is provided on the other end of the top surface of the lower cavity (13); The pressure plate (9) is movably arranged on the top surface of the lower cavity (13) through a pin shaft, and a pressure block (14) is provided below the pressure plate (9) and passes through the top surface of the lower cavity (13) and extends into the lower cavity (13). A first slope (141) is provided at the bottom of one side of the pressure block (14). A transverse sliding rod (15) is provided in the lower cavity (13), and a second slope (151) is provided on the top surface of one end of the transverse sliding rod (15), and the first slope (141) is in contact with the second slope (151). A rotating rod (19) is provided at the top of one end of the transverse sliding rod (15) away from the pressing block (14), and the rotating rod (19) passes upward into the guide pier (7); The guide wheel (8) is connected and fixed to a movable block (20) disposed in the guide pier (7), and one end of a rotating rod (19) extending into the guide pier (7) is movably connected to the movable block (20).
4. The drag reduction jacking construction structure for a super-large cross-section box culvert under a highway according to claim 3 is characterized by: A horizontal fixing rod (16) is provided on the inner wall of one end of the lower cavity (13) away from the pressing block (14); one end of the fixing rod (16) is inserted into the transverse sliding rod (15); and a spring (17) is sleeved on the part of the fixing rod (16) located outside the transverse sliding rod (15).
5. The drag reduction jacking construction structure for a super-large cross-section box culvert under a highway according to claim 3 is characterized by: A through hole (131) is provided on the top surface of the lower cavity (13) below the guide pier (7), the rotating rod (19) passes through the through hole (131) and is fixed by a rotating rod fixing pin (191) in the through hole (131), and the two ends of the rotating rod (19) are connected to a first hinge seat (18) on the top surface of the transverse sliding rod (15) and a second hinge seat (2001) on the end surface of the movable block (20).
6. The drag reduction jacking construction structure for a super-large cross-section box culvert under a highway according to claim 4 is characterized by: The upper end of the rotating rod (19) is provided with a strip hole (192), and the pin shaft in the second hinge seat (2001) is arranged through the strip hole (192).
7. The drag reduction jacking construction structure for a super-large cross-section box culvert under a highway according to claim 1 is characterized by: The bottom of the end face of the box culvert (10) forms a multi-level stepped surface (1001), and the jacks (11) are divided into multiple groups and are respectively placed on different levels of steps on the stepped surface (1001).
8. The drag reduction jacking construction structure for a super-large cross-section box culvert under a highway according to claim 1 is characterized by: A paraffin layer (201) is cast on the top surface of the slide plate (2), a talcum powder layer (202) is provided on the top surface of the paraffin layer (201), two layers of plastic films (203) are applied on the talcum powder layer (202), and the plastic films (203) are cut at the joints with the cut edges facing the jacking direction of the box culvert (10).
9. The drag reduction jacking construction structure for a super-large cross-section box culvert under a highway according to claim 1, characterized in that: The top of the box culvert (10) is provided with a drag-reducing steel plate (21), and the bottom of the forward end of the box culvert (10) is provided with a plurality of reserved grouting channels (22), the grout inlet of the reserved grouting channel (22) is located on the top surface of the bottom plate of the box culvert (10), and the grout outlet is located on the ground of the bottom plate of the box culvert (10). During the jacking process of the box culvert (10), mud injection and lubrication are performed through the reserved grouting channel (22).
10. A drag reduction jacking construction method for a super-large cross-section box culvert under a highway according to any one of claims 1 to 9, characterized in that The following steps are involved: 1) laying a crushed stone cushion layer (4) at the bottom of the foundation pit and casting a formed slide plate (2), and casting a ground anchor beam (5) simultaneously during the casting process of the slide plate (2); 2) a back beam (3) and a multi-stage jacking pipe (12) are arranged between the back beam (3) and the box culvert (10), and a jack (11) is arranged at one end of the jacking pipe (12), and the jack (11) is activated to make one end of the jacking rod contact the box culvert (10); 3) Installing guide piers (7) in the prefabricated grooves (6) on both sides of the slide plate (2); 4) A single long-distance jacking of the box culvert (10) is achieved by sequentially pushing with corresponding groups of jacks (11) on the multi-step surface (1001); 5) After completing a single jacking operation, continue to add jacking pipes (12) and carry out the next jacking operation; 6) During the jacking process, grout is injected between the slide plate (2) and the box culvert (10) through the reserved grouting channel (22) to achieve drag reduction and lubrication; 7) After the box culvert (10) is pushed into place, consolidation mortar is poured between the slide plate (2) and the box culvert (10) through the reserved grouting channel (22) to enhance the connection strength between the box culvert (10) and the original foundation (1).