Flue gas waste heat recovery device and method
By using a cleaning ring driven by a solenoid valve and a hydraulic telescopic rod in the flue gas waste heat recovery device, combined with the impurity collection component, the problem of scale accumulation affecting heat exchange and the efficiency of flue gas waste heat recovery is improved.
Patent Information
- Application Number
- CN202411139374.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In a roasting furnace, the scale component is prone to accumulate on the heat exchange pipe after long-term heat exchange flow, forming a thick scale layer, affecting the heat exchange effect and resulting in low flue gas waste heat recovery efficiency.
A flue gas waste heat recovery device is designed, using a solenoid valve-controlled liquid inlet and outlet pipe, combined with a cleaning ring driven by a hydraulic telescopic rod, and an impurity collection component to clean the scale impurities on the heat exchange tube and heat conducting sheet to ensure heat exchange efficiency.
Effectively clean up scale impurities, reduce the impact on the heat transfer effect of heat exchange pipes and heat conductors, and improve the efficiency of waste heat recovery.
Smart Images

Figure CN118960026A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of waste heat recovery of roasting furnaces, and specifically relates to a flue gas waste heat recovery device and a method thereof. Background Art
[0002] During the combustion process of the roasting furnace, a large amount of high-temperature flue gas is generated. Discharging it directly into the atmosphere will cause a huge waste of resources and pollute the environment. In the face of this situation, a flue gas waste heat recovery device is set up to recycle the heat energy. In this case, water is generally used as the heat exchange medium.
[0003] However, it is worth considering that scale components are generally inevitable in water. After long-term heat exchange circulation, especially when the hot water itself contains more scale components, it will quickly accumulate and solidify on the heat exchange tube to form a layer of scale. The thicker scale layer will affect the heat exchange effect of the heat exchange tube and is not convenient for promotion and use.
[0004] Therefore, in order to solve the above problems, a related facility that better meets the usage requirements is needed. Summary of the invention
[0005] In view of the above situation, in order to overcome the defects of the prior art, the present invention provides a flue gas waste heat recovery device and method thereof, which effectively solves the problem in the above background technology that the thick scale layer will affect the heat exchange effect of the heat exchange tube.
[0006] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a flue gas waste heat recovery device, comprising an annular shell, wherein a liquid inlet pipe and a first liquid outlet pipe are respectively fixedly connected to the annular shell, and solenoid valves are provided on the liquid inlet pipe and the first liquid outlet pipe, and the top of the annular shell is respectively fixedly connected to the air inlet pipe and the air outlet pipe, a heat exchange pipe is provided in the annular shell, a plurality of heat conducting plates are fixedly connected to the outer wall of the heat exchange pipe, and the two ends of the heat exchange pipe are respectively fixedly connected to the air inlet pipe and the air outlet pipe, the heat exchange pipe and the inner wall of the annular shell are connected by a plurality of first connecting columns, a flue gas filtering structure adapted to the air inlet pipe is installed on the top of the annular shell, a cleaning ring is provided in the annular shell, and the heat exchange pipe and the heat conducting plates respectively penetrate the cleaning ring, a first hydraulic telescopic rod is fixedly connected to the top of the annular shell, the telescopic end of the first hydraulic telescopic rod is fixedly connected to the top of the cleaning ring, and an impurity collection assembly matching the first liquid outlet pipe is installed on the bottom of the annular shell.
[0007] Preferably, the smoke filtering structure includes a connecting pipe arranged above the air inlet pipe, the connecting pipe and the annular shell are fixedly connected by a first supporting column, an annular box is provided between the air inlet pipe and the connecting pipe, the annular shell is equipped with a station switching mechanism for driving the annular box to rotate, a plurality of fixed pipes are fixedly connected in the annular box, a plurality of avoidance holes are provided on the top inner wall and the bottom inner wall of the annular box, and two adjacent avoidance holes are respectively located above and below the fixed pipe, the bottom end of the connecting pipe and the top end of the air inlet pipe are fixedly connected with a first sealing ring in contact with the annular box, and a detachable filter unit is installed in the fixed pipe.
[0008] Preferably, the filter unit includes a first filter screen slidably disposed in a fixed tube, a magnet ring is fixedly connected to the bottom of the first filter screen, an iron ring is fixedly connected to the fixed tube, and the top of the iron ring is in contact with the bottom of the magnet ring.
[0009] Preferably, a handle is fixedly connected to the top of the first filter screen.
[0010] Preferably, the workstation switching mechanism includes a rotating shaft rotatably installed on the top of the annular shell, the top of the rotating shaft is fixedly connected to a support frame, and the annular box is fixedly sleeved on the outside of the support frame, a first lifting frame is provided above the support frame, the bottom of the first lifting frame and the top of the support frame are connected by a first tension spring, a plurality of first positioning columns are fixedly connected to the bottom of the first lifting frame, and the number of the first positioning columns and the fixed tube is the same, the first positioning column passes through the support frame, a plurality of positioning grooves are provided on the top of the annular shell, and the bottom end of the first positioning column is located in the corresponding positioning groove.
[0011] Preferably, the impurity collecting assembly includes a support plate fixedly mounted on the bottom end of the first liquid outlet pipe, the top of the support plate and the annular shell are fixedly connected by a fixing frame, the bottom of the support plate is rotatably connected with a first support sleeve and a second support sleeve, and the first support sleeve is located in the second support sleeve, the outer wall of the first support sleeve and the inner wall of the second support sleeve are fixedly connected by a plurality of partitions, the second support sleeve is equipped with a locking device that cooperates with the support plate, a second filter screen is provided between two adjacent partitions, the second filter screen is respectively in contact with the first support sleeve, the second support sleeve and the two adjacent partitions, a bottom plate is provided below the second filter screen, the bottom plate and the second filter screen are fixedly connected by at least one second supporting column, the top of the bottom plate is fixedly connected with a positioning ring, the positioning ring is respectively in contact with the first support sleeve, the second support sleeve and the two adjacent partitions, the bottom of the bottom plate is fixedly connected with the second liquid outlet pipe, the support plate is equipped with a supporting positioning member for supporting the bottom plate, and the bottom of the annular shell is fixedly connected with a plurality of supporting legs.
[0012] Preferably, the supporting positioning member includes a first C-shaped ring and a second C-shaped ring arranged below the supporting plate, the first C-shaped ring and the second C-shaped ring are respectively fixedly connected to the bottom of the supporting plate through a plurality of second connecting columns, and the second liquid outlet pipe is located between the first C-shaped ring and the second C-shaped ring, the tops of the first C-shaped ring and the second C-shaped ring are respectively in contact with the bottoms of the corresponding base plates, a second hydraulic telescopic rod is fixedly connected to the bottom of the annular shell, the telescopic end of the second hydraulic telescopic rod is fixedly connected to the second lifting frame, the top of the second lifting frame is fixedly connected to the first support block and the second support block, the first support block is adapted to the opening of the first C-shaped ring, the second support block is adapted to the opening of the second C-shaped ring, a plurality of accommodating grooves are respectively provided on the tops of the first support block and the second support block, support balls are provided in the accommodating grooves, and the tops of the support balls are in contact with the bottom of a corresponding base plate.
[0013] Preferably, the outer sleeve of the positioning ring is provided with a second sealing ring, and the bottom of the second sealing ring is fixedly connected to the top of the bottom plate, and the top of the second sealing ring is respectively in contact with the first supporting sleeve, the second supporting sleeve and two adjacent partitions.
[0014] Preferably, the locking device includes a movable ring sleeved on the outside of the second supporting sleeve, a plurality of supporting parts are fixedly connected to the outer wall of the second supporting sleeve, the supporting parts are located above the movable ring, a second positioning column passes through the supporting parts, a plurality of positioning holes are opened on the supporting plate, and the number of positioning holes, second positioning columns and second liquid outlet pipes is consistent, the top end of the second positioning column is located in the corresponding positioning hole, the bottom end of the second positioning column is fixedly connected to the top of the movable ring, the outer sleeve of the second positioning column is provided with a second tension spring, and the two ends of the second tension spring are respectively fixedly connected to the supporting part and the movable ring.
[0015] The present invention also provides a flue gas waste heat recovery method, using the flue gas waste heat recovery device as described above, comprising the following steps:
[0016] Step 1: Open the solenoid valve on the liquid inlet pipe, add water into the annular shell through the liquid inlet pipe, and the smoke exhaust pipe of the roasting furnace is fixedly connected to the air inlet pipe through the smoke filter structure;
[0017] Step 2: The flue gas that needs to be recovered by waste heat passes through the flue gas filter structure to filter impurities in the flue gas, and the flue gas enters the heat exchange tube through the air inlet pipe, and the water is heated by the heat exchange tube and the heat conducting sheet. The flue gas that has been recovered by waste heat is discharged through the air outlet pipe;
[0018] Step 3: The cleaning ring is driven to move back and forth in the vertical direction by the first hydraulic telescopic rod, and the scale impurities on the heat exchange tube and the heat conducting plate are cleaned by the cleaning ring;
[0019] Step 4: When the water in the annular shell needs to be discharged, the solenoid valve on the first liquid outlet pipe is opened, the water in the annular shell is discharged through the first liquid outlet pipe, and the scale impurities cleaned by the cleaning ring are collected by the impurity collection component.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] The cleaning ring is driven to move back and forth in the vertical direction by the first hydraulic telescopic rod, and the scale impurities on the heat exchange tubes and the heat conducting plate are cleaned by the cleaning ring. When the water in the annular shell needs to be discharged, the solenoid valve on the first liquid outlet pipe is opened, and the water in the annular shell is discharged through the first liquid outlet pipe, and the scale impurities cleaned by the cleaning ring are collected by the impurity collecting component, so as to facilitate the cleaning of the scale impurities on the heat exchange tubes and the heat conducting plate, reduce the influence of the scale impurities on the heat transfer effect of the heat exchange tubes and the heat conducting plate, and improve the waste heat recovery efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.
[0023] In the attached picture:
[0024] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0025] Figure 2 It is a schematic diagram of the structure of the first positioning column and the positioning groove separated according to the present invention;
[0026] Figure 3 It is a schematic diagram of the structure inside the annular box of the present invention;
[0027] Figure 4 It is a schematic diagram of the structure inside the annular shell of the present invention;
[0028] Figure 5 It is a schematic diagram of the structure of the heat exchange tube of the present invention;
[0029] Figure 6 It is a schematic diagram of the structure of the cleaning ring of the present invention;
[0030] Figure 7 It is a structural schematic diagram of the support plate of the present invention;
[0031] Figure 8 It is a structural schematic diagram of the first support sleeve, the second support sleeve and the partition assembly of the present invention;
[0032] Fig. 9 This is a schematic diagram of the structure of the second support column and the bottom plate being separated according to the present invention;
[0033] Fig.10It is a schematic diagram of the structure of the first C-shaped ring and the second C-shaped ring of the present invention;
[0034] Fig.11 It is a schematic diagram of the structure of the separated receiving groove and supporting ball of the present invention.
[0035] In the figure: 1, annular shell; 2, liquid inlet pipe; 3, first liquid outlet pipe; 4, air inlet pipe; 5, air outlet pipe; 6, heat exchange pipe; 7, heat conductive sheet; 8, cleaning ring; 9, first hydraulic telescopic rod; 10, first connecting column; 11, connecting pipe; 12, first supporting column; 13, annular box; 14, fixing pipe; 15, avoidance hole; 16, first filter screen; 17, magnet ring; 18, iron ring; 19, first sealing ring; 20, handle; 21, rotating shaft; 22, supporting frame; 23, first lifting frame; 24, first tension spring; 25, first positioning column; 26, positioning groove; 27, supporting plate; 2 8. Fixed frame; 29. First support sleeve; 30. Second support sleeve; 31. Partition; 32. Bottom plate; 33. Second liquid outlet pipe; 34. Second filter screen; 35. Second support column; 36. Positioning ring; 37. Second sealing ring; 38. First C-shaped ring; 39. Second C-shaped ring; 40. Second connecting column; 41. Second lifting frame; 42. Second hydraulic telescopic rod; 43. First support block; 44. Second support block; 45. Receiving groove; 46. Support ball; 47. Movable ring; 48. Support part; 49. Second positioning column; 50. Second tension spring; 51. Positioning hole; 52. Support leg. DETAILED DESCRIPTION
[0036] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments; based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0037] Embodiment 1, by Figure 1 , Figure 2 , Figure 4 , Figure 5 , Figure 6 and Figure 7The present invention comprises an annular shell 1, to which a liquid inlet pipe 2 and a first liquid outlet pipe 3 are respectively fixedly connected, and solenoid valves are arranged on the liquid inlet pipe 2 and the first liquid outlet pipe 3, and an air inlet pipe 4 and an air outlet pipe 5 are respectively fixedly connected at the top of the annular shell 1, a heat exchange pipe 6 is arranged in the annular shell 1, and a plurality of heat conducting plates 7 are fixedly connected to the outer wall of the heat exchange pipe 6, and the two ends of the heat exchange pipe 6 are respectively fixedly connected to the air inlet pipe 4 and the air outlet pipe 5, the heat exchange pipe 6 and the inner wall of the annular shell 1 are connected through a plurality of first connecting columns 10, a smoke filtering structure adapted to the air inlet pipe 4 is installed on the top of the annular shell 1, a cleaning ring 8 is arranged in the annular shell 1, and the heat exchange pipe 6 and the heat conducting plates 7 respectively penetrate the cleaning ring 8, and a first connecting column 10 is fixedly connected to the top of the annular shell 1 A hydraulic telescopic rod 9, the telescopic end of the first hydraulic telescopic rod 9 is fixedly connected to the top of the cleaning ring 8, and an impurity collecting assembly matched with the first liquid outlet pipe 3 is installed at the bottom of the annular shell 1; the cleaning ring 8 is driven to reciprocate in the vertical direction by the first hydraulic telescopic rod 9, and the scale impurities on the heat exchange tube 6 and the heat conducting plate 7 are cleaned by the cleaning ring 8. When the water in the annular shell 1 needs to be discharged, the solenoid valve on the first liquid outlet pipe 3 is opened, and the water in the annular shell 1 is discharged through the first liquid outlet pipe 3, and the scale impurities cleaned by the cleaning ring 8 are collected by the impurity collecting assembly, which is convenient for cleaning the scale impurities on the heat exchange tube 6 and the heat conducting plate 7, reducing the influence of the scale impurities on the heat transfer effect of the heat exchange tube 6 and the heat conducting plate 7, and improving the waste heat recovery efficiency.
[0038] Embodiment 2, based on embodiment 1, Figure 1 , Figure 2 , Figure 3 and Figure 4It is given that the smoke filtering structure includes a connecting pipe 11 arranged above the air inlet pipe 4, the connecting pipe 11 and the annular shell 1 are fixedly connected by a first supporting column 12, an annular box 13 is arranged between the air inlet pipe 4 and the connecting pipe 11, the annular shell 1 is equipped with a station switching mechanism for driving the annular box 13 to rotate, a plurality of fixed pipes 14 are fixedly connected in the annular box 13, a plurality of avoidance holes 15 are opened on the top inner wall and the bottom inner wall of the annular box 13, and two adjacent avoidance holes 15 are respectively located above and below the fixed pipe 14, the bottom end of the connecting pipe 11 and the top end of the air inlet pipe 4 are fixedly connected with a first sealing ring 19 in contact with the annular box 13, a detachable filter unit is installed in the fixed pipe 14, the filter unit includes a first filter screen 16 slidably arranged in the fixed pipe 14, and a magnet ring 17 is fixedly connected to the bottom of the first filter screen 16 , an iron ring 18 is fixedly connected in the fixed tube 14, and the top of the iron ring 18 is in contact with the bottom of the magnet ring 17, a handle 20 is fixedly connected to the top of the first filter screen 16, and the station switching mechanism includes a rotating shaft 21 rotatably mounted on the top of the annular shell 1, and the top of the rotating shaft 21 is fixedly connected to a support frame 22, and the annular box 13 is fixedly sleeved on the outside of the support frame 22, and a first lifting frame 23 is provided above the support frame 22, and the bottom of the first lifting frame 23 and the top of the support frame 22 are connected by a first tension spring 24, and a plurality of first positioning columns 25 are fixedly connected to the bottom of the first lifting frame 23, and the number of the first positioning columns 25 and the fixed tube 14 is the same, and the first positioning columns 25 pass through the support frame 22, and a plurality of positioning grooves 26 are provided on the top of the annular shell 1, and the bottom ends of the first positioning columns 25 are located in the corresponding positioning grooves 26;
[0039] The connecting pipe 11 is fixedly connected to the smoke exhaust pipe of the roasting furnace, and the smoke enters a corresponding fixed pipe 14 through the connecting pipe 11, and the impurities in the smoke are filtered by the first filter 16 in the fixed pipe 14. The design of the first sealing ring 19 increases the sealing performance of the connection between the air intake pipe 4 and the connecting pipe 11 and the annular box 13. When there are many impurities on the first filter 16, the staff drives the first lifting frame 23 to move up, and the first tension spring 24 is in a stretched state. The first lifting frame 23 drives the first positioning column 25 to move up relative to the annular shell 1, so that the bottom end of the first positioning column 25 is disengaged from the corresponding positioning groove 26, thereby releasing the limitation on the position of the support frame 22, the rotating shaft 21 and the annular box 13. The staff drives the annular box 13 to rotate, and the air intake pipe 4 and the connecting pipe The first sealing ring 19 on 11 slides relative to the annular box 13. When the next fixed pipe 14 moves between the air inlet pipe 4 and the connecting pipe 11, the staff releases the first lifting frame 23, and the first tension spring 24 drives the first lifting frame 23 and the first positioning column 25 to move downward. The bottom end of the first positioning column 25 is inserted into the corresponding positioning groove 26, so that the annular box 13, the support frame 22 and the rotating shaft 21 can be fixed relative to the annular shell 1 again, and the first filter screen 16 that needs to be cleaned is no longer located between the air inlet pipe 4 and the connecting pipe 11. The staff drives the first filter screen 16 to move upward through the handle 20, so that the magnet ring 17 on the first filter screen 16 is no longer magnetically attracted to the iron ring 18, and the first filter screen 16 can be pulled out from the fixed pipe 14, which is convenient for cleaning the first filter screen 16.
[0040] Embodiment 3, based on embodiment 1, Figure 4 , Figure 7 , Figure 8 , Fig. 9 , Fig.10 and Fig.11The impurity collecting assembly includes a support plate 27 fixedly mounted on the bottom end of the first liquid outlet pipe 3, the top of the support plate 27 and the annular shell 1 are fixedly connected by a fixing frame 28, the bottom of the support plate 27 is rotatably connected with a first support sleeve 29 and a second support sleeve 30, and the first support sleeve 29 is located in the second support sleeve 30, the outer wall of the first support sleeve 29 and the inner wall of the second support sleeve 30 are fixedly connected by a plurality of partitions 31, the second support sleeve 30 is equipped with a locking device matched with the support plate 27, a second filter screen 34 is arranged between two adjacent partitions 31, the second filter screen 34 is respectively in contact with the first support sleeve 29, the second support sleeve 30 and the two adjacent partitions 31, a bottom plate 32 is arranged below the second filter screen 34, the bottom plate 32 and the second filter screen 3 The bottom of the bottom plate 32 is fixedly connected to the bottom plate 32 by at least one second supporting column 35, a positioning ring 36 is fixedly connected to the top of the bottom plate 32, and the positioning ring 36 is respectively in contact with the first supporting sleeve 29, the second supporting sleeve 30 and the two adjacent partitions 31, and a second liquid outlet pipe 33 is fixedly connected to the bottom of the bottom plate 32, and a supporting positioning member for supporting the bottom plate 32 is installed on the support plate 27, and a plurality of supporting legs 52 are fixedly connected to the bottom of the annular housing 1, and the supporting positioning member includes a first C-shaped ring 38 and a second C-shaped ring 39 arranged below the support plate 27, and the first C-shaped ring 38 and the second C-shaped ring 39 are respectively fixedly connected to the bottom of the support plate 27 by a plurality of second connecting columns 40, and the second liquid outlet pipe 33 is located between the first C-shaped ring 38 and the second C-shaped ring 39, and the first C-shaped ring 38 and The top of the second C-shaped ring 39 is in contact with the bottom of the corresponding bottom plate 32, the bottom of the annular shell 1 is fixedly connected with a second hydraulic telescopic rod 42, the telescopic end of the second hydraulic telescopic rod 42 is fixedly connected with a second lifting frame 41, the top of the second lifting frame 41 is fixedly connected with a first support block 43 and a second support block 44, the first support block 43 is adapted to the opening of the first C-shaped ring 38, the second support block 44 is adapted to the opening of the second C-shaped ring 39, the top of the first support block 43 and the second support block 44 are respectively provided with a plurality of accommodating grooves 45, the accommodating grooves 45 are provided with supporting balls 46, and the top of the supporting balls 46 is in contact with the bottom of a corresponding bottom plate 32, the outer sleeve of the positioning ring 36 is provided with a second sealing ring 37, and the bottom of the second sealing ring 37 and The top of the bottom plate 32 is fixedly connected, and the top of the second sealing ring 37 is respectively in contact with the first support sleeve 29, the second support sleeve 30 and the two adjacent partitions 31. The locking device includes a movable ring 47 sleeved on the outside of the second support sleeve 30. A plurality of support portions 48 are fixedly connected to the outer wall of the second support sleeve 30. The support portion 48 is located above the movable ring 47. A second positioning column 49 runs through the support portion 48. A plurality of positioning holes 51 are opened on the support plate 27, and the number of positioning holes 51, the second positioning column 49 and the second liquid outlet pipe 33 is consistent. The top of the second positioning column 49 is located in the corresponding positioning hole 51. The bottom end of the second positioning column 49 is fixedly connected to the top of the movable ring 47. The outer sleeve of the second positioning column 49 is provided with a second tension spring 50.The two ends of the second tension spring 50 are fixedly connected to the support portion 48 and the movable ring 47 respectively;
[0041] When it is necessary to discharge the water in the annular shell 1, the solenoid valve on the first liquid outlet pipe 3 is opened, and the water in the annular shell 1 is discharged to between the first support sleeve 29 and the second support sleeve 30 through the first liquid outlet pipe 3, and the discharged water is filtered through a second filter screen 34 located below the first liquid outlet pipe 3, and the filtered water is discharged through the corresponding second liquid outlet pipe 33, and the filtered scale impurities stay above the second filter screen 34. When the scale impurities collected on the second filter screen 34 located below the first liquid outlet pipe 3 reach a preset amount, the staff drives the movable ring 47 and the second positioning column 49 to move downward, the second tension spring 50 is in a tensioned state, and the top end of the second positioning column 49 is no longer located in the positioning hole 51, and the staff drives the movable ring 47 and The second support sleeve 30 rotates, and the second support sleeve 30 and the first support sleeve 29 drive the positioning ring 36, the bottom plate 32 and the second liquid outlet pipe 33 to rotate synchronously. The bottom plate 32 slides on the top of the second C-shaped ring 39 and the first C-shaped ring 38. When the next second filter screen 34 moves to the bottom of the first liquid outlet pipe 3, the movable ring 47 and the second support sleeve 30 stop rotating, and the staff loosens the movable ring 47. The second tension spring 50 drives the movable ring 47 and the second positioning column 49 to move up, and the top of the second positioning column 49 is inserted into the corresponding positioning hole 51. The second support sleeve 30 and the first support sleeve 29 are fixed relative to the support plate 27 and the annular shell 1, so that the second filter screen 34 that has not collected scale impurities can be moved to the bottom of the first liquid outlet pipe 3. When it is needed When the second filter screen 34 to be cleaned is located above the first support block 43 and the second support block 44, the support balls 46 on the first support block 43 and the second support block 44 respectively support the corresponding bottom plate 32, and the second hydraulic telescopic rod 42 drives the second lifting frame 41, the first support block 43 and the second support block 44 to move downward, and the support balls 46 no longer limit the bottom plate 32 and the second filter screen 34, so that the bottom plate 32 and the second filter screen 34 located above the second lifting frame 41 can move downward, and the staff drives the bottom plate 32 to move downward relative to the first support sleeve 29 and the second support sleeve 30, so that the bottom plate 32 drives the second filter screen 34 to be pulled out from between the first support sleeve 29 and the second support sleeve 30 through the second support column 35, completing the second filter screen 34. 4 is removed to facilitate cleaning of the second filter screen 34. The design of the positioning ring 36 reduces the possibility of the bottom plate 32 and the second filter screen 34 shaking in the horizontal direction relative to the first support sleeve 29 and the second support sleeve 30. The design of the second sealing ring 37 increases the sealing between the bottom plate 32 and the first support sleeve 29, the second support sleeve 30 and the corresponding two partitions 31. Similarly, the above-mentioned disassembly steps can be reversed to insert the cleaned second filter screen 34 between the first support sleeve 29 and the second support sleeve 30 again. When the first support sleeve 29 and the second support sleeve 30 rotate again, the bottom plate 32 located above the second lifting frame 41 slides from the top of the support ball 46 to the top of the first C-shaped ring 38 and the second C-shaped ring 39.When the next bottom plate 32 and the second filter screen 34 are moved to the top of the second lifting frame 41, the next second filter screen 34 can be replaced and cleaned.
[0042] A flue gas waste heat recovery method of this embodiment uses the flue gas waste heat recovery device as described above, and includes the following steps:
[0043] Step 1: Open the solenoid valve on the liquid inlet pipe 2, add water into the annular housing 1 through the liquid inlet pipe 2, and the smoke exhaust pipe of the roasting furnace is fixedly connected to the air inlet pipe 4 through the smoke filter structure;
[0044] Step 2: The flue gas that needs to recover waste heat passes through the flue gas filter structure to filter impurities in the flue gas, and the flue gas enters the heat exchange tube 6 through the air inlet pipe 4, and the water is heated by the heat exchange tube 6 and the heat conducting sheet 7. The flue gas after waste heat recovery is discharged through the air outlet pipe 5;
[0045] Step 3: The cleaning ring 8 is driven to move back and forth in the vertical direction by the first hydraulic telescopic rod 9, and the scale impurities on the heat exchange tube 6 and the heat conducting plate 7 are cleaned by the cleaning ring 8;
[0046] Step 4: When the water in the annular housing 1 needs to be discharged, the solenoid valve on the first liquid outlet pipe 3 is opened, the water in the annular housing 1 is discharged through the first liquid outlet pipe 3, and the scale impurities cleaned by the cleaning ring 8 are collected by the impurity collection component.
[0047] Working principle: when working, the solenoid valve on the liquid inlet pipe 2 is opened, and water is added into the annular shell 1 through the liquid inlet pipe 2. The smoke exhaust pipe of the roasting furnace is fixedly connected to the air inlet pipe 4 through the smoke filter structure. The smoke that needs to recover waste heat passes through the smoke filter structure to filter impurities in the smoke, and the smoke enters the heat exchange tube 6 through the air inlet pipe 4. The water is heated by the heat exchange tube 6 and the heat conducting sheet 7. The smoke after waste heat recovery is discharged through the air outlet pipe 5. The cleaning ring 8 is driven to reciprocate in the vertical direction by the first hydraulic telescopic rod 9. The scale impurities on the heat exchange tube 6 and the heat conducting sheet 7 are cleaned by the cleaning ring 8. When the water in the annular shell 1 needs to be discharged, the solenoid valve on the first liquid outlet pipe 3 is opened, and the water in the annular shell 1 is discharged through the first liquid outlet pipe 3, and the scale impurities cleaned by the cleaning ring 8 are collected by the impurity collecting component, which is convenient for cleaning the scale impurities on the heat exchange tube 6 and the heat conducting sheet 7, reducing the influence of scale impurities on the heat transfer effect of the heat exchange tube 6 and the heat conducting sheet 7, and improving the waste heat recovery efficiency.
[0048] The connecting pipe 11 is fixedly connected to the smoke exhaust pipe of the roasting furnace, and the smoke enters a corresponding fixed pipe 14 through the connecting pipe 11, and the impurities in the smoke are filtered by the first filter 16 in the fixed pipe 14. The design of the first sealing ring 19 increases the sealing performance of the connection between the air intake pipe 4 and the connecting pipe 11 and the annular box 13. When there are many impurities on the first filter 16, the staff drives the first lifting frame 23 to move up, and the first tension spring 24 is in a stretched state. The first lifting frame 23 drives the first positioning column 25 to move up relative to the annular shell 1, so that the bottom end of the first positioning column 25 is disengaged from the corresponding positioning groove 26, thereby releasing the limitation on the position of the support frame 22, the rotating shaft 21 and the annular box 13. The staff drives the annular box 13 to rotate, and the air intake pipe 4 and the connecting pipe The first sealing ring 19 on 11 slides relative to the annular box 13. When the next fixed pipe 14 moves between the air inlet pipe 4 and the connecting pipe 11, the staff releases the first lifting frame 23, and the first tension spring 24 drives the first lifting frame 23 and the first positioning column 25 to move downward. The bottom end of the first positioning column 25 is inserted into the corresponding positioning groove 26, so that the annular box 13, the support frame 22 and the rotating shaft 21 are fixed relative to the annular shell 1 again, and the first filter screen 16 to be cleaned is no longer located between the air inlet pipe 4 and the connecting pipe 11. The staff drives the first filter screen 16 to move upward through the handle 20, so that the magnet ring 17 on the first filter screen 16 is no longer magnetically attracted to the iron ring 18, and the first filter screen 16 can be pulled out from the fixed pipe 14, which is convenient for cleaning the first filter screen 16;
[0049] When it is necessary to discharge the water in the annular shell 1, the solenoid valve on the first liquid outlet pipe 3 is opened, and the water in the annular shell 1 is discharged to between the first support sleeve 29 and the second support sleeve 30 through the first liquid outlet pipe 3, and the discharged water is filtered through a second filter screen 34 located below the first liquid outlet pipe 3, and the filtered water is discharged through the corresponding second liquid outlet pipe 33, and the filtered scale impurities stay above the second filter screen 34. When the scale impurities collected on the second filter screen 34 located below the first liquid outlet pipe 3 reach a preset amount, the staff drives the movable ring 47 and the second positioning column 49 to move downward, the second tension spring 50 is in a tensioned state, and the top end of the second positioning column 49 is no longer located in the positioning hole 51, and the staff drives the movable ring 47 and The second support sleeve 30 rotates, and the second support sleeve 30 and the first support sleeve 29 drive the positioning ring 36, the bottom plate 32 and the second liquid outlet pipe 33 to rotate synchronously. The bottom plate 32 slides on the top of the second C-shaped ring 39 and the first C-shaped ring 38. When the next second filter screen 34 moves to the bottom of the first liquid outlet pipe 3, the movable ring 47 and the second support sleeve 30 stop rotating, and the staff loosens the movable ring 47. The second tension spring 50 drives the movable ring 47 and the second positioning column 49 to move up, and the top of the second positioning column 49 is inserted into the corresponding positioning hole 51. The second support sleeve 30 and the first support sleeve 29 are fixed relative to the support plate 27 and the annular shell 1, so that the second filter screen 34 that has not collected scale impurities can be moved to the bottom of the first liquid outlet pipe 3. When it is needed When the second filter screen 34 to be cleaned is located above the first support block 43 and the second support block 44, the support balls 46 on the first support block 43 and the second support block 44 respectively support the corresponding bottom plate 32, and the second hydraulic telescopic rod 42 drives the second lifting frame 41, the first support block 43 and the second support block 44 to move downward, and the support balls 46 no longer limit the bottom plate 32 and the second filter screen 34, so that the bottom plate 32 and the second filter screen 34 located above the second lifting frame 41 can move downward, and the staff drives the bottom plate 32 to move downward relative to the first support sleeve 29 and the second support sleeve 30, so that the bottom plate 32 drives the second filter screen 34 to be pulled out from between the first support sleeve 29 and the second support sleeve 30 through the second support column 35, completing the second filter screen 34. 4 is removed to facilitate cleaning of the second filter screen 34. The design of the positioning ring 36 reduces the possibility of the bottom plate 32 and the second filter screen 34 shaking in the horizontal direction relative to the first support sleeve 29 and the second support sleeve 30. The design of the second sealing ring 37 increases the sealing between the bottom plate 32 and the first support sleeve 29, the second support sleeve 30 and the corresponding two partitions 31. Similarly, the above-mentioned disassembly steps can be reversed to insert the cleaned second filter screen 34 between the first support sleeve 29 and the second support sleeve 30 again. When the first support sleeve 29 and the second support sleeve 30 rotate again, the bottom plate 32 located above the second lifting frame 41 slides from the top of the support ball 46 to the top of the first C-shaped ring 38 and the second C-shaped ring 39.When the next bottom plate 32 and the second filter screen 34 are moved to the top of the second lifting frame 41, the next second filter screen 34 can be replaced and cleaned.
[0050] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A flue gas waste heat recovery device, comprising an annular casing (1), characterized in that: The annular shell (1) is respectively fixedly connected with a liquid inlet pipe (2) and a first liquid outlet pipe (3), and both the liquid inlet pipe (2) and the first liquid outlet pipe (3) are provided with solenoid valves. The top end of the annular shell (1) is respectively fixedly connected with an air inlet pipe (4) and an air outlet pipe (5). A heat exchange pipe (6) is provided inside the annular shell (1). A plurality of heat conducting plates (7) are fixedly connected to the outer wall of the heat exchange pipe (6), and both ends of the heat exchange pipe (6) are respectively fixedly connected to the air inlet pipe (4) and the air outlet pipe (5). The heat exchange pipe (6) and the inner wall of the annular shell (1) are The annular shell (1) is connected via a plurality of first connecting columns (10), a smoke filter structure matched with the air inlet pipe (4) is installed on the top of the annular shell (1), a cleaning ring (8) is arranged inside the annular shell (1), and the heat exchange tube (6) and the heat conducting plate (7) respectively penetrate the cleaning ring (8), a first hydraulic telescopic rod (9) is fixedly connected to the top of the annular shell (1), the telescopic end of the first hydraulic telescopic rod (9) is fixedly connected to the top of the cleaning ring (8), and an impurity collection component matched with the first liquid outlet pipe (3) is installed on the bottom of the annular shell (1).
2. A flue gas waste heat recovery device according to claim 1, characterized in that: The smoke filtering structure comprises a connecting pipe (11) arranged above the air intake pipe (4); the connecting pipe (11) and the annular shell (1) are fixedly connected via a first supporting column (12); an annular box (13) is arranged between the air intake pipe (4) and the connecting pipe (11); the annular shell (1) is provided with a station switching mechanism for driving the annular box (13) to rotate; a plurality of fixed pipes (14) are fixedly connected inside the annular box (13); a plurality of avoidance holes (15) are provided on the top inner wall and the bottom inner wall of the annular box (13); and two adjacent avoidance holes (15) are respectively located above and below the fixed pipe (14); the bottom end of the connecting pipe (11) and the top end of the air intake pipe (4) are fixedly connected with a first sealing ring (19) in contact with the annular box (13); and a detachable filtering unit is installed inside the fixed pipe (14).
3. A flue gas waste heat recovery device according to claim 2, characterized in that: The filter unit comprises a first filter screen (16) slidably arranged in a fixed tube (14); a magnet ring (17) is fixedly connected to the bottom of the first filter screen (16); an iron ring (18) is fixedly connected to the inside of the fixed tube (14); and the top of the iron ring (18) is in contact with the bottom of the magnet ring (17).
4. A flue gas waste heat recovery device according to claim 3, characterized in that: A handle (20) is fixedly connected to the top of the first filter screen (16).
5. The flue gas waste heat recovery device according to claim 2, characterized in that: The workstation switching mechanism comprises a rotating shaft (21) rotatably mounted on the top of the annular shell (1), the top of the rotating shaft (21) is fixedly connected to a support frame (22), and the annular box (13) is fixedly sleeved on the outside of the support frame (22), a first lifting frame (23) is arranged above the support frame (22), the bottom of the first lifting frame (23) and the top of the support frame (22) are connected by a first tension spring (24), a plurality of first positioning columns (25) are fixedly connected to the bottom of the first lifting frame (23), and the number of the first positioning columns (25) and the fixed tube (14) is the same, the first positioning columns (25) penetrate the support frame (22), a plurality of positioning grooves (26) are opened on the top of the annular shell (1), and the bottom ends of the first positioning columns (25) are located in the corresponding positioning grooves (26).
6. The flue gas waste heat recovery device according to claim 1, characterized in that: The impurity collecting assembly comprises a support plate (27) fixedly mounted on the bottom end of the first liquid outlet pipe (3); the top of the support plate (27) and the annular shell (1) are fixedly connected via a fixing frame (28); the bottom of the support plate (27) is rotatably connected with a first support sleeve (29) and a second support sleeve (30); the first support sleeve (29) is located inside the second support sleeve (30); the outer wall of the first support sleeve (29) and the inner wall of the second support sleeve (30) are fixedly connected via a plurality of partitions (31); the second support sleeve (30) is provided with a locking device matched with the support plate (27); a second filter screen (34) is provided between two adjacent partitions (31); the second filter screen (34) is respectively connected to the first filter screen (29); and the second filter screen (34) is connected to the second filter screen (34). The support sleeve (29), the second support sleeve (30) and the two adjacent partitions (31) are in contact with each other; a bottom plate (32) is provided below the second filter screen (34); the bottom plate (32) and the second filter screen (34) are fixedly connected via at least one second support column (35); a positioning ring (36) is fixedly connected to the top of the bottom plate (32); the positioning ring (36) is respectively in contact with the first support sleeve (29), the second support sleeve (30) and the two adjacent partitions (31); a second liquid outlet pipe (33) is fixedly connected to the bottom of the bottom plate (32); a support plate (27) is provided with a support positioning member for supporting the bottom plate (32); and a plurality of support legs (52) are fixedly connected to the bottom of the annular shell (1).
7. The flue gas waste heat recovery device according to claim 6, characterized in that: The supporting positioning member comprises a first C-shaped ring (38) and a second C-shaped ring (39) which are arranged below the supporting plate (27); the first C-shaped ring (38) and the second C-shaped ring (39) are respectively fixedly connected to the bottom of the supporting plate (27) through a plurality of second connecting columns (40); the second liquid outlet pipe (33) is located between the first C-shaped ring (38) and the second C-shaped ring (39); the tops of the first C-shaped ring (38) and the second C-shaped ring (39) are respectively in contact with the bottoms of the corresponding bottom plates (32); the bottom of the annular housing (1) is fixedly connected to a second hydraulic telescopic rod (42); the second The telescopic end of the hydraulic telescopic rod (42) is fixedly connected to the second lifting frame (41), and the top of the second lifting frame (41) is fixedly connected to the first supporting block (43) and the second supporting block (44), the first supporting block (43) is matched with the opening of the first C-shaped ring (38), and the second supporting block (44) is matched with the opening of the second C-shaped ring (39), and the top of the first supporting block (43) and the second supporting block (44) are respectively provided with a plurality of receiving grooves (45), and the receiving grooves (45) are provided with supporting balls (46), and the top of the supporting balls (46) is in contact with the bottom of a corresponding bottom plate (32).
8. The flue gas waste heat recovery device according to claim 6, characterized in that: The outer sleeve of the positioning ring (36) is provided with a second sealing ring (37), and the bottom of the second sealing ring (37) is fixedly connected to the top of the bottom plate (32), and the top of the second sealing ring (37) is respectively in contact with the first supporting sleeve (29), the second supporting sleeve (30) and the two adjacent partitions (31).
9. The flue gas waste heat recovery device according to claim 6, characterized in that: The locking device comprises a movable ring (47) sleeved on the outside of the second support sleeve (30), a plurality of support parts (48) are fixedly connected on the outer wall of the second support sleeve (30), the support parts (48) are located above the movable ring (47), a second positioning column (49) passes through the support parts (48), a plurality of positioning holes (51) are opened on the support plate (27), and the number of the positioning holes (51), the second positioning columns (49) and the second liquid outlet pipe (33) are consistent, the top end of the second positioning column (49) is located in the corresponding positioning hole (51), the bottom end of the second positioning column (49) is fixedly connected to the top of the movable ring (47), the second positioning column (49) is sleeved on the outside of the second positioning column (49), and the two ends of the second tension spring (50) are respectively fixedly connected to the support part (48) and the movable ring (47).
10. A flue gas waste heat recovery method, using the flue gas waste heat recovery device according to claim 1, characterized in that: The following steps are involved: Step 1: Open the solenoid valve on the liquid inlet pipe (2), add water into the annular housing (1) through the liquid inlet pipe (2), and the smoke exhaust pipe of the roasting furnace is fixedly connected to the air inlet pipe (4) through the smoke filter structure; Step 2: The flue gas that needs to recover waste heat passes through a flue gas filter structure to filter out impurities in the flue gas, and the flue gas enters the heat exchange tube (6) through an air inlet pipe (4), and water is heated by the heat exchange tube (6) and a heat conducting sheet (7), and the flue gas that has been recovered through waste heat is discharged through an air outlet pipe (5); Step 3: The cleaning ring (8) is driven to move back and forth in the vertical direction by the first hydraulic telescopic rod (9), and the scale impurities on the heat exchange tube (6) and the heat conducting plate (7) are cleaned by the cleaning ring (8); Step 4: When it is necessary to discharge the water in the annular housing (1), the solenoid valve on the first liquid outlet pipe (3) is opened, and the water in the annular housing (1) is discharged through the first liquid outlet pipe (3), and the scale impurities cleaned by the cleaning ring (8) are collected by the impurity collection component.
Citation Information
Patent Citations
Energy-saving and emission-reducing method based on flue gas waste heat recovery and reheating technology
CN111912248A
Petroleum fracturing fluid wastewater pretreatment device
CN113368565A
Flue gas waste heat recovery device
CN216620696U
A waste gas circulation waste heat utilization device for drying kiln
CN220959756U
Oil smoke waste gas monitoring device
CN221513922U
Cited By
Flue gas waste heat utilization system
CN120008395A
Coal bed gas filtering device and method
CN120733525A
