Building data processing method and device, equipment and storage medium

Through the encoding and classification of building data and the construction of three-dimensional model, linkage control instructions are generated, and the problem of inaccurate monitoring of equipment operation status in the existing technology is solved, real-time monitoring and precise control of equipment are realized, and the level of intelligent operation and maintenance of buildings is improved. .

CN118964891APending Publication Date: 2024-11-15BEIJING ZHONGCHUANGHUIGU DATA TECH CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411040659.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing building control system has insufficient accuracy in real-time monitoring and control of equipment operation status, resulting in insufficient accuracy in equipment control.

Method used

By obtaining the physical structure data, equipment status data and operation monitoring data of the building, a preset asset coding system is used for classification and encoding, a three-dimensional model is built, and the linkage relationship is marked in the model according to the device linkage rules, and linkage control instructions are generated to achieve Real-time monitoring and precise control of the equipment.

Benefits of technology

Real-time monitoring and precise control of equipment operation are realized, the level of intelligent operation and maintenance of buildings is improved, the automatic optimization capability of equipment coordination and linkage is improved, and the stable and reliable operation and economic benefits of equipment are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118964891A_ABST
    Figure CN118964891A_ABST
Patent Text Reader

Abstract

The invention provides a building data processing method and device, equipment and a storage medium, and relates to the technical field of data processing, and the method comprises the steps: classifying physical structure data, state data and operation monitoring data, and sequentially obtaining a physical structure data set, a state data set and an operation monitoring data set; the physical structure data set, the state data set and the operation monitoring data set are preprocessed and then stored in a data medium station, three-dimensional model data in the physical structure data set are extracted through the data medium station, and a three-dimensional model of the building is constructed according to the three-dimensional model data; marking an equipment linkage relationship in the three-dimensional model according to the state data set and a preset equipment linkage rule; and in combination with the operation monitoring data set and the equipment linkage relationship, a linkage control instruction is generated, and linkage operation of all equipment in the building is controlled according to the linkage control instruction. The technical effect of the application is that real-time monitoring and accurate control of equipment operation are realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of automated data processing, and in particular to a method, device, equipment and storage medium for processing building data. Background Art

[0002] With the development of society, people have higher and higher requirements for the building environment. They not only need the building functions to be perfect, but also hope that the building interior can provide a safe, comfortable and efficient use environment. The quality of the building's internal environment is closely related to the coordinated operation of various equipment systems in the building. Therefore, how to achieve effective monitoring and intelligent and precise control of the equipment systems in the building is a key technical issue in the current development of building intelligence.

[0003] In the existing building control system, the operating status of the building and the various devices therein is obtained by monitoring the external and internal environments of the building. However, the above method requires a large number of data acquisition devices, and after obtaining the data, control instructions are formed. In the process of controlling the equipment, the corresponding control instructions need to be determined through a set program. Since the operating conditions of the equipment are dynamically changing, the pre-set program cannot make a fast and optimized response to the real-time status of the equipment, resulting in inaccurate control of the equipment. Summary of the invention

[0004] The present application provides a building data processing method, device, equipment and storage medium for realizing real-time monitoring and precise control of equipment operation.

[0005] In a first aspect, the present application provides a method for processing building data, the method comprising: obtaining physical structure data of a building, status data of equipment in the building, and operation monitoring data of the building; classifying the physical structure data, the status data, and the operation monitoring data according to a preset asset coding system, and obtaining a physical structure data set, a status data set, and an operation monitoring data set in turn; pre-processing the physical structure data set, the status data set, and the operation monitoring data set and storing them in a data middle platform, extracting three-dimensional model data from the physical structure data set through the data middle platform, and constructing a three-dimensional model of the building based on the three-dimensional model data; marking equipment linkage relationships in the three-dimensional model according to the status data set and preset equipment linkage rules; generating linkage control instructions in combination with the operation monitoring data set and the equipment linkage relationship, and controlling the linkage operation of each equipment in the building according to the linkage control instructions.

[0006] By adopting the above technical solutions, through the coding classification and integrated utilization of heterogeneous data such as building physical structure, equipment status and operation monitoring, the equipment linkage relationship is marked on the constructed digital three-dimensional model, and the monitoring and analysis of the real-time status of the equipment and the intelligent generation of corresponding linkage control instructions are realized, so as to achieve the coordinated linkage operation of various equipment in a closed loop. It realizes the effective utilization of heterogeneous building data, real-time perception and intelligent response of equipment operation, automatic optimization of equipment coordination and linkage, and comprehensive improvement of the level of intelligent building operation and maintenance, and overall realizes the efficient integration of multi-source building data, real-time monitoring of equipment operation, and precise control of equipment.

[0007] Optionally, the physical structure data includes equipment information, component information and connection relationships between equipment, the status data includes operating parameters of equipment, and the operation monitoring data includes performance indicators of equipment. The physical structure data, the status data and the operation monitoring data are classified according to a preset asset coding system to obtain a physical structure data set, a status data set and an operation monitoring data set in sequence, including: encoding the equipment information, the component information and the connection relationship between the equipment according to the preset asset coding system to obtain the encoded physical structure data set; encoding the operating parameters of the equipment according to the preset asset coding system to obtain the encoded status data set; encoding the performance indicators of the equipment according to the preset asset coding system to obtain the encoded operation monitoring data set.

[0008] By adopting the above technical solution and systematically encoding various types of data in the building, the orderly organization and management of multi-source heterogeneous data inside the building is achieved, which is conducive to the subsequent indexing, storage, search and calculation of the data set, and improves the efficiency of data processing and application. Compared with the original data, the format of the encoded data set is unified and the content is structured, which is convenient for intelligent algorithms to perform statistical learning and in-depth analysis of the data. In addition, the coding system can be continuously expanded and optimized to adapt to new data types. The coding transformation and effective integration of multi-source data inside the building are realized, which is conducive to the correlation analysis between heterogeneous data, provides a data foundation for data-based building intelligence, and improves the level of intelligent monitoring, operation and management of buildings.

[0009] Optionally, the extracting of three-dimensional model data from the physical structure dataset through the data center and constructing a three-dimensional model of the building based on the three-dimensional model data includes: converting the format of the physical structure dataset to generate a target dataset that meets the format requirements of a building information model; extracting geometric information data consisting of equipment information, component information and connection relationships between equipment, as well as design attribute data of equipment and components from the target dataset; converting the geometric information data into three-dimensional model data, and generating a preliminary three-dimensional model of the building based on the three-dimensional model data; and importing the design attribute data into the preliminary three-dimensional model to generate a three-dimensional model of the building.

[0010] By adopting the above technical solution, the physical structure data set is formatted and converted to conform to the standard format of the building information model, and then the geometric information and design attributes of the equipment and components are extracted from the converted data set, and the geometric information data is converted into three-dimensional model data to construct a preliminary three-dimensional model of the building. Finally, the design attribute data is imported into the three-dimensional model to form a complete three-dimensional model of the building. It is possible to automatically and efficiently extract three-dimensional model related information from the physical structure data set, and quickly generate a digital three-dimensional model of the building only through data conversion and loading, which greatly improves the construction efficiency of the three-dimensional model, lays a data foundation for subsequent intelligent analysis and application, and helps to promote the improvement of the level of intelligence in the construction field.

[0011] Optionally, marking the device linkage relationship in the three-dimensional model according to the status data set and preset device linkage rules includes: parsing the status data set to obtain operating parameters of each device; pre-determining a first device pair with a linkage relationship according to the device linkage rules; adjusting the first device pair according to the operating parameters of each device to obtain a second device pair; marking the second device pair in the three-dimensional model, and connecting the second device pair through lines to obtain a device linkage topology network, and storing the device linkage topology network in the data middle station.

[0012] By adopting the above technical solution, the equipment operating parameters and the preset equipment linkage rules are obtained by parsing the status data set to determine the first equipment pair with linkage relationship. Then, the first equipment pair is adjusted according to the operating parameters to obtain the second equipment pair, which is annotated on the three-dimensional model to form an equipment linkage topological network. The intelligent extraction and annotation of the equipment linkage relationship is realized. It no longer simply relies on the manually preset linkage rules. Instead, with the support of operating parameters, the equipment linkage combination can be dynamically adjusted and optimized, making the linkage relationship more accurate and reasonable, and better reflecting the actual operating characteristics of the equipment. The final three-dimensional visual linkage topological network intuitively displays the collaborative relationship between devices and provides support for the subsequent formulation of linkage control strategies.

[0013] Optionally, the operation monitoring data set and the equipment linkage relationship are combined to generate a linkage control instruction, and the linkage operation of each device in the building is controlled according to the linkage control instruction, including: obtaining historical operating parameters of each device, and determining the normal operating range of each device according to the historical operating parameters; determining the real-time operating status parameters of each device according to the operation monitoring data set; judging whether the real-time operating status parameters of each device are in the corresponding normal operating range; when the real-time status parameters of a target device are not in the corresponding normal operating range, querying the linkage relationship of the target device, and generating a linkage control instruction for the target device according to the linkage relationship of the target device; and controlling the linkage operation of the target device and the linkage device of the target device according to the linkage control instruction.

[0014] By adopting the above technical solution, the normal range is determined by obtaining the historical operating parameters of the equipment, and the real-time operating status is monitored to determine whether it is abnormal. If the target equipment status is abnormal, a linkage control instruction is generated according to its linkage relationship to control the target equipment and its linkage equipment to achieve coordinated operation. Real-time monitoring and judgment of the equipment operation status and corresponding closed-loop linkage control are realized. When the equipment status is abnormal, the abnormal equipment can be quickly located, and the drive adjustment can be carried out using its linkage relationship to ensure that the equipment parameters return to the normal range and avoid state deterioration. Intelligent linkage closed-loop control of building equipment is realized, and active intervention can be made on abnormal equipment status to ensure stable and reliable operation of the equipment, which not only improves the intelligence level of the building system, but also enhances the economic benefits and comfort of building operation.

[0015] Optionally, after controlling the linked operation of each device in the building according to the linked control instruction, it also includes: collecting target status data and target performance indicators of each device after the linked operation; judging whether the status and performance of each device after the linked operation are normal according to the target status data and the target performance indicators; and regenerating the linked control instruction of the device when the status and / or performance of any device after the linked operation is abnormal.

[0016] By adopting the above technical solution, after the equipment linkage operation is implemented according to the linkage control instructions, the target state data and performance indicators of the equipment are further collected to determine whether the equipment status and performance after the linkage operation are normal. If there is still an abnormality, the linkage control instructions of the equipment are regenerated for adjustment. This technical means realizes the closed-loop inspection and continuous optimization of the equipment linkage control effect. The system can intelligently judge the control effect based on the feedback status after the linkage operation, and start a new round of closed-loop control when necessary, and perform multiple rounds of iterations until the equipment status and performance are normal. This optional solution realizes the closed-loop inspection and intelligent optimization of the linkage control of building equipment, ensures the effect of linkage control, puts the building equipment in a more stable and reliable state, provides a continuously safe and comfortable internal environment for the building, and further improves the intelligent level of building operation and maintenance management.

[0017] Optionally, the method also includes: acquiring energy consumption data of each device; determining the economic efficiency of the operation of each device based on the energy consumption data of each device; when the economic efficiency of an abnormal device is lower than a threshold, regenerating the linkage control instructions of the abnormal device and adjusting the operating parameters of the abnormal device.

[0018] By adopting the above technical solution, the economic efficiency of each device is determined by obtaining the energy consumption data of the device. If there is an abnormal device with an efficiency lower than the threshold, the linkage control instructions of the device are regenerated and the operating parameters are adjusted. The monitoring and optimization of the economic efficiency of equipment operation are realized. The system can intelligently judge the energy consumption of the equipment, locate the equipment with low economic efficiency, and improve the economic efficiency of the equipment through linkage control instructions and parameter adjustment.

[0019] In a second aspect, the present application provides a building data processing device, which includes: an acquisition module, a classification module, a processing module, a labeling module and a combination module; wherein the acquisition module is used to acquire the physical structure data of the building, the status data of the equipment in the building and the operation monitoring data of the building; the classification module is used to classify the physical structure data, the status data and the operation monitoring data according to a preset asset coding system, and obtain a physical structure data set, a status data set and an operation monitoring data set in sequence; the processing module is used to store the physical structure data set, the status data set and the operation monitoring data set in a data middle platform after pre-processing, extract the three-dimensional model data in the physical structure data set through the data middle platform, and construct a three-dimensional model of the building according to the three-dimensional model data; the labeling module is used to label the equipment linkage relationship in the three-dimensional model according to the status data set and the preset equipment linkage rules; the combination module is used to combine the operation monitoring data set and the equipment linkage relationship to generate a linkage control instruction, and control the linkage operation of each equipment in the building according to the linkage control instruction.

[0020] In a third aspect, the present application provides an electronic device that adopts the following technical solution: it includes a processor, a memory, a user interface, and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes a computer program such as any one of the above-mentioned building data processing methods.

[0021] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution: storing a computer program that can be loaded by a processor and execute any of the above-mentioned building data processing methods.

[0022] In summary, the present application includes at least one of the following beneficial technical effects: 1. Realize real-time monitoring and precise control of equipment operation; 2. It realizes the coding transformation and effective integration of multi-source data inside the building, which is conducive to the correlation analysis between heterogeneous data, provides a data foundation for data-based building intelligence, and improves the level of intelligent monitoring, operation and management of buildings. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a flowchart of a building data processing method provided by an embodiment of the present application; Figure 2 It is a structural schematic diagram of a building data processing device provided in an embodiment of the present application; Figure 3 It is a structural schematic diagram of an electronic device provided in an embodiment of the present application.

[0024] Description of reference numerals: 1000, electronic device; 1001, processor; 1002, communication bus; 1003, user interface; 1004, network interface; 1005, memory. DETAILED DESCRIPTION

[0025] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.

[0026] In the description of the embodiments of the present application, words such as "illustrative", "for example" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "illustrative", "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "illustrative", "for example" or "for example" is intended to present related concepts in a concrete way.

[0027] Figure 1 It is a flow chart of a method for processing building data provided by an embodiment of the present application. It should be understood that although Figure 1 The steps in the flowchart are shown in sequence as indicated by the arrows, but the steps are not necessarily executed in the order indicated by the arrows; unless otherwise specified in this document, there is no strict order restriction for the execution of the steps, and the steps may be executed in other orders; and Figure 1 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.

[0028] The present application discloses a method for processing building data. Figure 1 As shown, the method includes S101-S105.

[0029] S101, obtaining physical structure data of the building, status data of equipment in the building, and operation monitoring data of the building.

[0030] In one example, in order to realize the intelligent management of building equipment, it is necessary to obtain multi-source heterogeneous data of the building as support. The three types of data in this step are: Building physical structure data: including equipment information, component information, and connection relationship between equipment. The data is obtained to restore the physical structure of the building and equipment to generate a three-dimensional model of the building, which is the basis for the subsequent realization of equipment linkage control.

[0031] Equipment status data: includes real-time or historical operating parameters of the equipment, such as temperature, pressure, speed, etc. This data is obtained to monitor the operating status of the equipment, determine whether it is abnormal, and serve as one of the inputs for generating linkage control instructions.

[0032] Building operation monitoring data: including equipment performance indicator data, such as energy consumption, output, quality, etc. This data is obtained to evaluate the economic efficiency of equipment and systems and as a reference for adjusting linkage plans.

[0033] The specific methods of obtaining the above three types of building data can be obtained through database query, sensor collection, manual entry, etc. The combination of these three types of data can fully reflect the static physical structure, dynamic operation status and economic efficiency of buildings and equipment, and provide the required multi-dimensional heterogeneous data support for the subsequent establishment of a digital twin system and the realization of intelligent linkage operation and maintenance of equipment.

[0034] S102, classify the physical structure data, status data and operation monitoring data according to a preset asset coding system, and obtain a physical structure data set, a status data set and an operation monitoring data set in sequence.

[0035] In one example, after acquiring multi-source heterogeneous building data, the data needs to be standardized in order to subsequently establish a digital twin system. The purpose of this step is to classify and encode different types of data according to a unified asset coding system to obtain a standardized structured data set to achieve effective data management.

[0036] The specific implementation method is: first, it is necessary to preset an asset coding system, which can adopt a hierarchical tree structure and perform coding design according to the levels of buildings, systems, subsystems, equipment, components, etc. According to the coding system, the equipment information, component information and their connection relationships in the physical structure data are encoded, such as the category, number, system affiliation, etc. of the coded equipment, to obtain the encoded physical structure data set. Similarly, according to the same coding system, the equipment operating parameters in the status data are encoded to obtain the encoded status data set. Finally, the equipment performance indicators in the operation monitoring data are encoded to obtain the encoded operation monitoring data set. By encoding and classifying heterogeneous data, the association between data elements can be established, which is conducive to the subsequent establishment of a digital twin system. The data set after coding and classification is clearly structured, which is also conducive to data management and subsequent computer processing.

[0037] Based on the above embodiment, as an optional implementation mode, in S102, the physical structure data includes equipment information, component information and connection relationships between equipment, the status data includes equipment operation parameters, and the operation monitoring data includes equipment performance indicators. The physical structure data, status data and operation monitoring data are classified according to a preset asset coding system, and the physical structure data set, status data set and operation monitoring data set are obtained in sequence, which specifically include: According to the preset asset coding system, the equipment information, component information and the connection relationship between the equipment are encoded to obtain the encoded physical structure data set; according to the preset asset coding system, the operating parameters of the equipment are encoded to obtain the encoded status data set; according to the preset asset coding system, the performance indicators of the equipment are encoded to obtain the encoded operation monitoring data set.

[0038] In one example, after acquiring multi-source heterogeneous building data, a unified asset coding system needs to be established to achieve standardized management of the data. The purpose of this step is to improve the efficiency of data processing by systematically coding the three types of data and establishing associations between data elements.

[0039] The specific implementation method is to first preset a unified system for asset coding, which can adopt a hierarchical tree structure, decompose from the building system level to the equipment components step by step, and form a code. Then, according to the coding system, standardize the equipment information, component information and its connection relationship in the physical structure data. At the same time, use the same coding system to encode the equipment operation parameters in the status data, and encode the equipment performance indicators in the operation monitoring data. In this way, different types of data are associated with the asset system after coding, and the corresponding relationship between different data sets can be found through coding.

[0040] After coding and classification, heterogeneous data are unified into a standard coding system, which greatly improves the efficiency of data processing and management. The coded data is also more structured, which is conducive to computer automated analysis. This step provides standardized structured data support for the subsequent establishment of a digital twin system.

[0041] S103, pre-process the physical structure data set, status data set and operation monitoring data set and store them in the data center, extract the three-dimensional model data in the physical structure data set through the data center, and build a three-dimensional model of the building based on the three-dimensional model data.

[0042] In one example, the purpose of building a three-dimensional model is to provide three-dimensional spatial information support for subsequent equipment linkage control. The specific implementation steps are: first, the physical structure data set, status data set, and operation monitoring data set after coding and classification are stored in the data middle platform, and the data middle platform provides a unified data service interface. Then, through the service interface of the data middle platform, the geometric information data such as equipment information, component information, and its connection relationship that constitute the three-dimensional model are extracted from the stored physical structure data set.

[0043] Next, 3D modeling software is used to generate the preliminary outline of the 3D digital model of the building and equipment based on the extracted geometric information data. Finally, the design attribute data in the physical structure data set is imported into the 3D model to enrich the non-geometric information of the model, such as material, performance parameters, etc., and finally generate a 3D digital twin model of the building and equipment.

[0044] By constructing a three-dimensional model, the business characteristics and spatial information of buildings and equipment can be intuitively reflected, which is conducive to the subsequent marking and quality inspection of equipment linkage relationships on the model, and provides a three-dimensional digital platform for the linkage operation and maintenance of intelligent equipment.

[0045] Based on the above embodiment, as an optional implementation, in S103, the three-dimensional model data in the physical structure data set is extracted through the data center, and the three-dimensional model of the building is constructed according to the three-dimensional model data, including: The physical structure data set is formatted and a target data set that meets the requirements of the building information model format is generated; geometric information data consisting of equipment information, component information, and connection relationships between equipment, as well as design attribute data of equipment and components are extracted from the target data set; the geometric information data is converted into three-dimensional model data, and a preliminary three-dimensional model of the building is generated based on the three-dimensional model data; the design attribute data is imported into the preliminary three-dimensional model to generate a three-dimensional model of the building.

[0046] In one example, the purpose of this step is to convert the encoded physical structure data set into a three-dimensional digital model of the building. The reason for the need for three-dimensional digitization is that compared with two-dimensional drawings, three-dimensional models can more intuitively and accurately reflect the spatial information and business relationships of buildings and equipment, and provide simulated space support for subsequent equipment digital twins and linkage control.

[0047] The specific implementation process is as follows: First, the CAD drawings or BIM models in the encoded physical structure data set are converted to conform to the required format of the Building Information Model (BIM) to generate the target data set. BIM is a digital representation of data containing the physical and functional characteristics of a building.

[0048] Then, geometric information such as equipment, components and their connection relationships, as well as some design attributes of equipment and components, such as material parameters, are extracted from the target data set. Geometric information is the basis of modeling, and attribute information enriches the model content.

[0049] Next, the geometric information is input into the 3D modeling software to convert and generate the preliminary mesh outline of the 3D digital model of the building and equipment. Finally, the extracted design attribute information is mapped to the 3D model to complete the attribute binding and obtain the 3D digital model of the building and equipment containing semantic information.

[0050] S104: marking the device linkage relationship in the three-dimensional model according to the state data set and the preset device linkage rule.

[0051] In one example, after obtaining the three-dimensional digital model of the building, the equipment linkage relationship is directly marked on the three-dimensional model according to the equipment status data and the preset linkage rules, and the equipment linkage topological network is constructed. The specific implementation method is that the real-time status data of each device needs to be collected first, such as the wind speed of the fan, the collected temperature of the temperature sensor, etc. Then, the equipment is preliminarily paired according to the preset linkage rules, such as air-conditioning units and corresponding thermostats. Then, the real-time status data of the equipment is analyzed again, the pairing scheme of the equipment is optimized and adjusted, and the best equipment linkage combination under the current state is determined. Finally, the finalized equipment linkage relationship is marked with lines on the three-dimensional model, and all linkage devices and linkage lines constitute the topological network of equipment linkage and are stored in the data center. The above process intuitively completes the extraction and annotation of the equipment linkage relationship on the three-dimensional model, providing visual modeling support for the subsequent linkage control strategy formulation.

[0052] Based on the above embodiment, as an optional implementation, in S104, according to the state data set and the preset device linkage rule, the device linkage relationship is marked in the three-dimensional model, including: Analyze the status data set to obtain the operating parameters of each device; predetermine the first device pair with a linkage relationship according to the device linkage rules; adjust the first device pair according to the operating parameters of each device to obtain the second device pair; mark the second device pair in the three-dimensional model, connect the second device pair through lines to obtain the device linkage topology network, and store the device linkage topology network in the data center.

[0053] In an example, the purpose of this step is to visually mark the linkage relationship between devices on the three-dimensional digital model and construct a topological network for device linkage to provide support for the subsequent formulation of linkage control strategies.

[0054] First, the encoded state data set needs to be parsed to extract the real-time operating parameters of each device, such as temperature, pressure, energy consumption, etc. Then, according to the preset device linkage rules, the device combination that may have a linkage relationship can be preliminarily determined, which is called the first device pair, such as the fan and air conditioning unit determined according to the system topology relationship.

[0055] Next, according to the real-time operating parameters of each device, the combination relationship of the device pairs can be optimized and adjusted to form a second device pair, that is, the device combination that is most likely to have a linkage relationship in the current state, such as the air conditioning unit A1 and the corresponding temperature sensor B2.

[0056] Finally, on the 3D digital model, the relationship between the second device pairs is marked with line segments. All device pairs and connections constitute the topological network of device linkage and are stored in the data center for backup. In this way, not only is the extraction of device linkage relationships intuitively completed on the 3D model, but it also provides visual support for the subsequent formulation of linkage control strategies.

[0057] S105, combining the operation monitoring data set and the equipment linkage relationship, generating a linkage control instruction, and controlling the linkage operation of each equipment in the building according to the linkage control instruction.

[0058] In one example, the goal of this step is to achieve intelligent closed-loop linkage control of building equipment. Based on the determination of the equipment linkage topology, it is necessary to monitor the equipment operation data in real time and generate linkage control instructions to achieve optimized collaborative operation and maintenance of building equipment.

[0059] Specifically, it is first necessary to collect the real-time status monitoring data of each device and compare it with the historical data to determine whether it is abnormal. Then, combined with the pre-established device linkage topology, search for the linkage device corresponding to the abnormal device. Next, based on the linkage relationship between the devices, determine the control strategy of the abnormal device and form a linkage control instruction to improve the abnormality. Finally, send the linkage control instruction to the process control system of the corresponding building equipment to achieve coordinated linkage and optimized control of the building equipment. The entire process realizes closed-loop monitoring and control of the equipment operation status, can flexibly respond to equipment abnormalities and achieve mutual coordination between equipment to ensure safe, reliable, economical and efficient, and high-performance operation and maintenance of the building system.

[0060] Based on the above embodiment, as an optional implementation, in S105, combining the operation monitoring data set and the equipment linkage relationship, generating a linkage control instruction, and controlling the linkage operation of each equipment in the building according to the linkage control instruction, including: Obtain the historical operating parameters of each device, and determine the normal operating range of each device based on the historical operating parameters; determine the real-time operating status parameters of each device based on the operation monitoring data set; determine whether the real-time operating status parameters of each device are in the corresponding normal operating range; when the real-time status parameters of the target device are not in the corresponding normal operating range, query the linkage relationship of the target device, and generate the linkage control instruction of the target device according to the linkage relationship of the target device; control the linkage operation of the target device and the linkage device of the target device according to the linkage control instruction.

[0061] In an example, the purpose of this step is to achieve real-time monitoring of the equipment operating status based on the determination of the equipment linkage relationship, and when an abnormality occurs, the corresponding linkage control instructions can be automatically generated and executed to achieve autonomous collaborative operation and maintenance of the equipment.

[0062] Specifically, it is necessary to first collect the historical operation data of each device, analyze and determine the state parameter range of the device under normal operating conditions, that is, the normal operating range. Then, obtain the current operation monitoring data set in real time and extract the real-time operation parameters of each device. Then determine whether the real-time state parameters are in the normal range. Once it is found that the parameters of the target device are abnormal, that is, they are beyond the normal range, then query and find other devices that have a linkage relationship with the target device based on the pre-built device linkage topology relationship. Generate linkage control instructions for the target device according to the linkage relationship, for example, by adjusting the status of the related linkage device to correct the abnormality of the target device. Finally, issue linkage control instructions to enable the target device and its linkage devices to operate in coordination to correct the abnormality and realize automatic and autonomous control of the equipment.

[0063] In this way, the real-time status of the equipment can be monitored in a closed loop, and equipment linkage can be automatically triggered when an abnormality occurs, without the need for human intervention, thereby achieving intelligent autonomous control and optimized operation of the equipment.

[0064] Assume that in a HVAC system of an intelligent building, the monitoring system of the data center detects that the inlet air temperature sensor of the main air conditioning unit A is abnormal and the collected temperature is high. According to the pre-established equipment linkage topology, the main air conditioning unit A corresponds to 4 fresh air units in the system. In order to improve the abnormal condition of the main air conditioning unit A, the intelligent control system first analyzes the historical operation data of the air conditioning unit A to determine the normal threshold range of the inlet air temperature. Then, combined with the real-time monitoring data of the 4 fresh air units, it is determined that the supply air temperature of the fresh air fan C is too high and the air volume needs to be reduced to reduce the supply air temperature. Therefore, the linkage control instruction of the fresh air fan C is generated and sent to the field controller of the fresh air fan C to reduce the frequency of the fresh air fan C until the inlet air temperature of the air conditioning unit A drops to the normal range. In this way, through real-time monitoring and analysis of the equipment operation status and formulation of closed-loop control instructions, the intelligent coordinated control of the fresh air unit and the main air conditioning unit is realized to solve the abnormal condition of the air conditioning system.

[0065] After controlling the linkage operation of each device in the building according to the linkage control instructions, it also includes: collecting the target status data and target performance indicators of each device after the linkage operation; judging whether the status and performance of each device after the linkage operation are normal according to the target status data and target performance indicators; when the status and / or performance of any device after the linkage operation are abnormal, regenerating the linkage control instructions of the device.

[0066] In one example, after the equipment is intelligently linked and controlled, in order to achieve closed-loop control and optimization of the entire process, the effect of the linked control needs to be tested.

[0067] Specifically, it is necessary to first collect the target state data of the equipment after executing the linkage control instructions, such as temperature, pressure, etc.; at the same time, it is also necessary to collect the data of operational performance, such as energy consumption, output and other target performance indicators. Then, compare the detected data with the standard state range and performance indicators to determine whether the actual state and performance of the equipment have reached the normal level. If it is found that the state or performance of any device is still abnormal, it means that the previous linkage control has not been fully effective. It is necessary to re-analyze the linkage relationship of the device, regenerate the linkage control instructions of the device, and realize the re-control of the device until the state and performance indicators of the device enter the normal range.

[0068] Through closed-loop detection and continuous optimization and adjustment of the linkage control effect, dynamic monitoring and intelligent control of the linkage operation of equipment can be achieved to ensure that the equipment is always in a normal and efficient operating state.

[0069] The method also includes: acquiring energy consumption data of each device; determining the economic efficiency of each device according to the energy consumption data of each device; when the economic efficiency of an abnormal device is lower than a threshold, regenerating linkage control instructions for the abnormal device and adjusting the operating parameters of the abnormal device.

[0070] In one example, in the process of linkage control of intelligent building equipment, in addition to ensuring the normal status of the equipment, economic benefits also need to be considered. The specific implementation is as follows: First, the energy consumption data of each device during the linkage operation is collected in real time, such as electricity consumption, water resource consumption, etc. Then, the current economic efficiency of each device is calculated and determined, such as the energy consumption per unit of output product. Next, the economic efficiency of each device is compared with the standard threshold to determine whether the efficiency is abnormal, that is, lower than the threshold. For equipment with abnormal efficiency, it is necessary to re-analyze its role in the linkage system, regenerate the linkage control instructions of the equipment, and adjust its operating parameters, such as lowering the power of the equipment, reducing its energy consumption, and improving economic efficiency.

[0071] In this way, by continuously monitoring the economic efficiency of the equipment linkage operation process and re-optimizing inefficient equipment, we can not only ensure the normal status of the equipment, but also achieve the optimization of energy utilization, and achieve the goal of economical and efficient equipment collaborative operation and maintenance.

[0072] Based on the above method, the present application also discloses a building data processing device, such as Figure 2 As shown, Figure 2 It is a structural schematic diagram of a building data processing device provided in an embodiment of the present application.

[0073] A building data processing device comprises: an acquisition module, a classification module, a processing module, a marking module and a combining module; wherein the acquisition module is used to acquire the physical structure data of the building, the status data of the equipment in the building and the operation monitoring data of the building; the classification module is used to classify the physical structure data, the status data and the operation monitoring data according to a preset asset coding system, and obtain the physical structure data set, the status data set and the operation monitoring data set in turn; the processing module is used to store the physical structure data set, the status data set and the operation monitoring data set in a data middle platform after pre-processing, extract the three-dimensional model data in the physical structure data set through the data middle platform, and construct a three-dimensional model of the building according to the three-dimensional model data; the marking module is used to mark the equipment linkage relationship in the three-dimensional model according to the status data set and the preset equipment linkage rules; the combining module is used to combine the operation monitoring data set and the equipment linkage relationship to generate a linkage control instruction, and control the linkage operation of each equipment in the building according to the linkage control instruction.

[0074] In one example, the classification module is also used to encode equipment information, component information and connection relationships between equipment according to a preset asset coding system to obtain an encoded physical structure data set; encode the operating parameters of the equipment according to the preset asset coding system to obtain an encoded status data set; encode the performance indicators of the equipment according to the preset asset coding system to obtain an encoded operation monitoring data set.

[0075] In one example, the processing module is also used to convert the format of the physical structure data set to generate a target data set that meets the requirements of the building information model format; extract geometric information data consisting of equipment information, component information and connection relationships between equipment, as well as design attribute data of equipment and components from the target data set; convert the geometric information data into three-dimensional model data, and generate a preliminary three-dimensional model of the building based on the three-dimensional model data; import the design attribute data into the preliminary three-dimensional model to generate a three-dimensional model of the building.

[0076] In one example, the annotation module is also used to parse the status data set to obtain the operating parameters of each device; according to the device linkage rules, a first device pair with a linkage relationship is pre-determined; according to the operating parameters of each device, the first device pair is adjusted to obtain a second device pair; the second device pair is annotated in the three-dimensional model, and the second device pair is connected through lines to obtain a device linkage topology network, and the device linkage topology network is stored in the data middle platform.

[0077] In one example, the combination module is also used to obtain the historical operating parameters of each device, determine the normal operating range of each device based on the historical operating parameters; determine the real-time operating status parameters of each device based on the operation monitoring data set; judge whether the real-time operating status parameters of each device are in the corresponding normal operating range; when the real-time status parameters of the target device are not in the corresponding normal operating range, query the linkage relationship of the target device, and generate a linkage control instruction for the target device based on the linkage relationship of the target device; control the linkage operation of the target device and the linkage device of the target device according to the linkage control instruction.

[0078] In one example, the above-mentioned device is also used to collect the target status data and target performance indicators of each device after the linked operation; based on the target status data and target performance indicators, determine whether the status and performance of each device after the linked operation are normal; when the status and / or performance of any device after the linked operation are abnormal, regenerate the linked control instructions of the device.

[0079] In one example, the above-mentioned device is also used to obtain energy consumption data of each device; determine the economic efficiency of each device based on the energy consumption data of each device; when the economic efficiency of an abnormal device is lower than a threshold, regenerate the linkage control instructions of the abnormal device and adjust the operating parameters of the abnormal device.

[0080] It should be noted that: when the device provided in the above embodiment realizes its function, only the division of the above functional modules is used as an example. In actual application, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0081] See also Figure 3 , is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. Figure 3 As shown, the electronic device 1000 may include: at least one processor 1001 , at least one network interface 1004 , a user interface 1003 , a memory 1005 , and at least one communication bus 1002 .

[0082] The communication bus 1002 is used to realize the connection and communication between these components.

[0083] The user interface 1003 may include a display screen (Display) and a camera (Camera). Optionally, the user interface 1003 may also include a standard wired interface and a wireless interface.

[0084] The network interface 1004 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).

[0085] Among them, the processor 1001 may include one or more processing cores. The processor 1001 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 1005, and calling data stored in the memory 1005. Optionally, the processor 1001 can be implemented in at least one hardware form of digital signal processing (Digital, Signal, Processing, DSP), field programmable gate array (Field-Programmable, Gate, Array, FPGA), and programmable logic array (Programmable, Logic, Array, PLA). The processor 1001 can integrate one or a combination of a central processing unit (Central, Processing, Unit, CPU), an image processor (Graphics, Processing, Unit, GPU), and a modem. Among them, the CPU mainly processes the operating system, user interface, and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; and the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 1001, but may be implemented separately through a chip.

[0086] Among them, the memory 1005 may include a random access memory (Random, Access, Memory, RAM) and may also include a read-only memory (Read-Only, Memory). Optionally, the memory 1005 includes a non-transitory, computer-readable, storage, medium. The memory 1005 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 1005 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 1005 may optionally be at least one storage device located away from the aforementioned processor 1001. As Figure 3 As shown, the memory 1005 as a computer storage medium may include an operating system, a network communication module, a user interface module and an application program of a building data processing method.

[0087] exist Figure 3 In the electronic device 1000 shown, the user interface 1003 is mainly used to provide an input interface for the user and obtain data input by the user; and the processor 1001 can be used to call an application program storing a building data processing method in the memory 1005. When executed by one or more processors, the electronic device executes one or more methods described in the above embodiments.

[0088] An electronic device readable storage medium stores instructions, which, when executed by one or more processors, enable the electronic device to execute one or more of the methods described in the above embodiments.

[0089] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the order of the actions described, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.

[0090] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0091] In the several embodiments provided in the present application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of the units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0092] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0093] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0094] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.

[0095] The above is only an exemplary embodiment of the present disclosure, and the scope of the present disclosure cannot be limited thereto. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the specification and practicing the disclosure here, those skilled in the art will easily think of other embodiments of the present disclosure. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field not recorded in the present disclosure. The description and examples are only regarded as exemplary, and the scope and spirit of the present disclosure are defined by the claims.

Claims

1. A method for processing building data, characterized in that: The method comprises: Acquiring physical structure data of a building, status data of equipment in the building, and operation monitoring data of the building; Classifying the physical structure data, the status data and the operation monitoring data according to a preset asset coding system, and obtaining a physical structure data set, a status data set and an operation monitoring data set in sequence; Preprocessing the physical structure data set, the state data set and the operation monitoring data set and storing them in a data center, extracting the three-dimensional model data in the physical structure data set through the data center, and constructing a three-dimensional model of the building according to the three-dimensional model data; According to the state data set and the preset device linkage rule, marking the device linkage relationship in the three-dimensional model; In combination with the operation monitoring data set and the equipment linkage relationship, a linkage control instruction is generated, and the linkage operation of each equipment in the building is controlled according to the linkage control instruction.

2. The building data processing method according to claim 1, characterized in that: The physical structure data includes equipment information, component information and connection relationships between equipment, the status data includes equipment operation parameters, and the operation monitoring data includes equipment performance indicators. The physical structure data, the status data and the operation monitoring data are classified according to a preset asset coding system to obtain a physical structure data set, a status data set and an operation monitoring data set in sequence, including: According to a preset asset coding system, the device information, the component information and the connection relationship between the devices are encoded to obtain an encoded physical structure data set; According to the preset asset coding system, the operating parameters of the equipment are encoded to obtain an encoded status data set; According to the preset asset coding system, the performance indicators of the equipment are encoded to obtain an encoded operation monitoring data set.

3. The building data processing method according to claim 1, characterized in that: The extracting the three-dimensional model data in the physical structure data set through the data center, and constructing the three-dimensional model of the building according to the three-dimensional model data, includes: Converting the physical structure data set into a format to generate a target data set that meets the requirements of the building information model format; Extracting device information, component information, geometric information data consisting of connection relationships between devices, and design attribute data of devices and components from the target data set; Converting the geometric information data into three-dimensional model data, and generating a preliminary three-dimensional model of the building according to the three-dimensional model data; The design attribute data is imported into the preliminary three-dimensional model to generate a three-dimensional model of the building.

4. The building data processing method according to claim 1, characterized in that: The marking of the device linkage relationship in the three-dimensional model according to the state data set and the preset device linkage rule includes: Parsing the status data set to obtain operating parameters of each device; According to the device linkage rule, predetermine a first device pair having a linkage relationship; According to the operating parameters of each device, the first device pair is adjusted to obtain a second device pair; The second device pair is marked in the three-dimensional model, and the second device pair is connected by lines to obtain a device linkage topology network, and the device linkage topology network is stored in the data middle platform.

5. The building data processing method according to claim 1, characterized in that: The step of combining the operation monitoring data set and the equipment linkage relationship to generate a linkage control instruction, and controlling the linkage operation of each equipment in the building according to the linkage control instruction includes: Obtaining historical operating parameters of each device, and determining a normal operating range of each device based on the historical operating parameters; Determine the real-time operating status parameters of each device according to the operation monitoring data set; Determine whether the real-time operating status parameters of each device are within the corresponding normal operating range; When the real-time status parameter of a target device is not within the corresponding normal operating range, querying the linkage relationship of the target device, and generating a linkage control instruction for the target device according to the linkage relationship of the target device; The target device and the linkage device of the target device are controlled to operate in linkage according to the linkage control instruction.

6. The building data processing method according to claim 1, characterized in that: After controlling the linkage operation of each device in the building according to the linkage control instruction, the method further includes: Collect target status data and target performance indicators of each device after linkage operation; According to the target status data and the target performance index, judging whether the status and performance of each device after the linkage operation are normal; When the status and / or performance of any device after linkage operation is abnormal, the linkage control instruction of the device is regenerated.

7. The building data processing method according to claim 1, characterized in that: The method further comprises: Obtain energy consumption data of each device; Determine the economic efficiency of the operation of each of the equipment according to the energy consumption data of each of the equipment; When the economic efficiency of an abnormal device is lower than a threshold, a linkage control instruction of the abnormal device is regenerated and an operating parameter of the abnormal device is adjusted.

8. A building data processing device, characterized in that: The device comprises: an acquisition module, a classification module, a processing module, a labeling module and a combination module; wherein, The acquisition module is used to acquire physical structure data of the building, status data of equipment in the building, and operation monitoring data of the building; The classification module is used to classify the physical structure data, the status data and the operation monitoring data according to a preset asset coding system to obtain a physical structure data set, a status data set and an operation monitoring data set in sequence; The processing module is used to store the physical structure data set, the state data set and the operation monitoring data set in a data center after pre-processing, extract the three-dimensional model data in the physical structure data set through the data center, and construct the three-dimensional model of the building according to the three-dimensional model data; The marking module is used to mark the device linkage relationship in the three-dimensional model according to the state data set and the preset device linkage rule; The combining module is used to combine the operation monitoring data set and the equipment linkage relationship to generate a linkage control instruction, and control the linkage operation of each equipment in the building according to the linkage control instruction.

9. An electronic device, characterized in that: It includes a processor, a memory user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the method as described in any one of claims 1-7.

10. A computer-readable storage medium, characterized in that: A computer program is stored which can be loaded by a processor and execute the method according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Internet-of-things-based building operation equipment state monitoring and visual analysis system

    CN108268595A

  • Construction operation and maintenance management system and management method thereof

    CN109460834A

  • Building equipment operation early warning and linkage control device and method

    CN112180795A

  • Building data processing method and device

    CN113516331A

  • Data processing method and device based on intelligent building system

    CN114125005A